Extracted text (via pymupdf_layout)
6969 characters
ITEM 9.d. TOWN OF FOUNTAIN HILLS STAFF REPORT Meeting Date: 11/17/2026 Meeting Type: Town Council Regular Meeting Submitting Department: Community Services Prepared by: Kevin Snipes, Community Services Director Staff Contact Information: Phone: 480-816-5178 Email: ksnipes@fountainhillsaz.gov Request to Town Council Regular Meeting (Agenda Language) CONSIDERATION AND POSSIBLE ACTION: Relating to the Veteran's Memorial Shade Project and potential funding options. Staff Summary (background) Background A community donor group has approached the Town with a proposal to install a shade structure at the Veterans Memorial located within Fountain Park. The proposed improvement is intended to provide additional shade and enhance the comfort and usability of the memorial for veterans, visitors, and community members attending ceremonies and other commemorative activities. The Veterans Memorial serves as an important gathering place for the community, particularly during events recognizing military service and honoring veterans. Given the Town's climate and the memorial's exposure to direct sunlight, the addition of shade could improve the experience for visitors and participants during these activities and for all who attend throughout the year. The donor group has been working with Town staff to evaluate the feasibility of the proposed improvement and develop a design that complements the existing memorial. The proposed design, which will be presented separately to Council, has an estimated project cost of $250,000. The group has initiated community fundraising efforts and has raised approximately $60,000 toward the project. While the group intends to continue seeking private contributions, it has also expressed interest in potential financial support from the Town to assist with project implementation. Because the memorial is located on Town property, Council consideration is appropriate before the project proceeds. Project Overview The proposed project would install a permanent shade structure within the Veterans Memorial area at Fountain Park. The intent is to complement the existing memorial while improving visitor comfort and accommodating commemorative events and gatherings. The proposed design will be presented to Council through a separate visual presentation illustrating the structure's appearance, placement, and relationship to the existing memorial. The project is currently estimated at $250,000, subject to final design, engineering, permitting, and construction costs. Any approved improvements would need to comply with applicable Town standards and requirements. Project Considerations Town staff has worked with representatives of the donor group to evaluate preliminary project considerations, including: • Location and design: Proposed placement, dimensions, materials, structural design, and overall appearance of the shade structure. • Compatibility: Integration with the Veterans Memorial, existing improvements, landscaping, and surrounding Fountain Park amenities. • Access and usability: Potential impacts on pedestrian circulation, accessibility, sight lines, ceremonies, and the ongoing use of the memorial. • Engineering and construction: Applicable structural engineering, permitting, construction standards, and coordination with existing park infrastructure. • Funding: Preliminary project costs, private fundraising efforts, potential financial participation by the Town, and any remaining funding needs. • Long-term responsibilities: Project delivery, ownership, warranties, maintenance, and future replacement considerations. These considerations are intended to ensure that the project is appropriate for the memorial setting, meets Town standards for public improvements, and provides long-term value to the community. Project Funding The estimated cost of the proposed shade structure is $250,000. To date, the community donor group has raised approximately $60,000 through private fundraising efforts, leaving an estimated funding gap of $190,000. The group intends to continue fundraising and pursuing additional private contributions. However, it has also requested that the Town consider providing financial support toward the project. The extent of any potential Town participation has not been established and would be subject to Council direction, available resources, and consideration of the Town's other capital and operational priorities. Council Considerations Staff is seeking Council consideration and possible action on two components of the proposed project. 1. Project Concept and Design Council is asked to consider whether it supports the proposed shade structure at the Veterans Memorial, including the design and location presented by the donor group. Approval of the project concept would allow the project to advance, subject to final engineering, permitting, and other applicable Town requirements. 2. Potential Town Financial Participation Council is also asked to consider whether it wishes to provide financial support toward the project. The donor group has raised approximately $60,000 toward the estimated $250,000 project and intends to continue fundraising. While the current unfunded balance is approximately $190,000, this amount is not being presented as a requested or recommended Town contribution. Council may consider whether a Town contribution is appropriate and, if so, establish an amount or other parameters for financial participation. Any Town assistance would supplement private fundraising efforts and would be subject to available funding and applicable budget requirements Related Ordinance, Policy or Guiding Principle N/A Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) NA Staff Recommendation(s) Staff recommends approval of this project Suggested Motion MOVE TO APPROVE funding for the Veterans Shade Project FISCAL IMPACT Fiscal Impact: The financial impact to the Town has not yet been established. Although the donor group initiated the proposal and so far have $60,000 to donate to the project, the extent of its financial commitment and any requested Town contribution needs to be confirmed for this project to move forward tonight. Budget Reference: N/A Funding Source: Because the project is supported by restricted private donations, it will be administered in a manner similar to a grant-funded project. As such, expenditures will be managed through the Town's Special Revenue Fund, which is used for funds restricted to specific purposes. Sufficient funds are available within the Capital Projects Fund to accommodate the Town's matching portion up to $190,000. Upon receipt of the donation, staff will transfer the Town's matching contribution from the Capital Projects Fund into the Special Revenue Fund. Both the donated funds and the Town's matching funds will then be expended directly from the Special Revenue Fund to complete the project. ATTACHMENTS 1. Veterans Memorial Shade Structure – Council Presentation