ITEM 9.d.
TOWN OF FOUNTAIN HILLS
STAFF REPORT
Meeting Date: 11/17/2026
Meeting Type: Town Council Regular Meeting
Submitting Department: Community Services
Prepared by: Kevin Snipes, Community Services Director
Staff Contact Information: Phone: 480-816-5178
Email: ksnipes@fountainhillsaz.gov
Request to Town Council Regular Meeting (Agenda Language)
CONSIDERATION AND POSSIBLE ACTION: Relating to the Veteran's Memorial Shade
Project and potential funding options.
Staff Summary (background)
Background
A community donor group has approached the Town with a proposal to install a shade
structure at the Veterans Memorial located within Fountain Park. The proposed improvement
is intended to provide additional shade and enhance the comfort and usability of the memorial
for veterans, visitors, and community members attending ceremonies and other
commemorative activities.
The Veterans Memorial serves as an important gathering place for the community,
particularly during events recognizing military service and honoring veterans. Given the
Town's climate and the memorial's exposure to direct sunlight, the addition of shade could
improve the experience for visitors and participants during these activities and for all who
attend throughout the year.
The donor group has been working with Town staff to evaluate the feasibility of the proposed
improvement and develop a design that complements the existing memorial. The proposed
design, which will be presented separately to Council, has an estimated project cost of
$250,000.
The group has initiated community fundraising efforts and has raised approximately $60,000
toward the project. While the group intends to continue seeking private contributions, it has
also expressed interest in potential financial support from the Town to assist with project
implementation.
Because the memorial is located on Town property, Council consideration is appropriate
before the project proceeds.
Project Overview
The proposed project would install a permanent shade structure within the Veterans Memorial
area at Fountain Park. The intent is to complement the existing memorial while improving
visitor comfort and accommodating commemorative events and gatherings.

The proposed design will be presented to Council through a separate visual presentation
illustrating the structure's appearance, placement, and relationship to the existing memorial.
The project is currently estimated at $250,000, subject to final design, engineering,
permitting, and construction costs. Any approved improvements would need to comply with
applicable Town standards and requirements.
Project Considerations
Town staff has worked with representatives of the donor group to evaluate preliminary project
considerations, including:
• Location and design: Proposed placement, dimensions, materials, structural design,
and overall appearance of the shade structure.
• Compatibility: Integration with the Veterans Memorial, existing improvements,
landscaping, and surrounding Fountain Park amenities.
• Access and usability: Potential impacts on pedestrian circulation, accessibility, sight
lines, ceremonies, and the ongoing use of the memorial.
• Engineering and construction: Applicable structural engineering, permitting,
construction standards, and coordination with existing park infrastructure.
• Funding: Preliminary project costs, private fundraising efforts, potential financial
participation by the Town, and any remaining funding needs.
• Long-term responsibilities: Project delivery, ownership, warranties, maintenance,
and future replacement considerations.
These considerations are intended to ensure that the project is appropriate for the memorial
setting, meets Town standards for public improvements, and provides long-term value to the
community.
Project Funding
The estimated cost of the proposed shade structure is $250,000. To date, the community
donor group has raised approximately $60,000 through private fundraising efforts, leaving an
estimated funding gap of $190,000.
The group intends to continue fundraising and pursuing additional private contributions.
However, it has also requested that the Town consider providing financial support toward the
project. The extent of any potential Town participation has not been established and would be
subject to Council direction, available resources, and consideration of the Town's other capital
and operational priorities.
Council Considerations
Staff is seeking Council consideration and possible action on two components of the proposed
project.
1. Project Concept and Design
Council is asked to consider whether it supports the proposed shade structure at the Veterans
Memorial, including the design and location presented by the donor group.
Approval of the project concept would allow the project to advance, subject to final

engineering, permitting, and other applicable Town requirements.
2. Potential Town Financial Participation
Council is also asked to consider whether it wishes to provide financial support toward the
project.
The donor group has raised approximately $60,000 toward the estimated $250,000 project
and intends to continue fundraising. While the current unfunded balance is approximately
$190,000, this amount is not being presented as a requested or recommended Town
contribution.
Council may consider whether a Town contribution is appropriate and, if so, establish an
amount or other parameters for financial participation. Any Town assistance would
supplement private fundraising efforts and would be subject to available funding and
applicable budget requirements
Related Ordinance, Policy or Guiding Principle
N/A
Risk Analysis
N/A
Recommendation(s) by Board(s) or Commission(s)
NA
Staff Recommendation(s)
Staff recommends approval of this project
Suggested Motion
MOVE TO APPROVE funding for the Veterans Shade Project
FISCAL IMPACT
Fiscal Impact: The financial impact to the Town has not yet been established. Although the
donor group initiated the proposal and so far have $60,000 to donate to the project, the extent of
its financial commitment and any requested Town contribution needs to be confirmed for this
project to move forward tonight.
Budget Reference: N/A
Funding Source: Because the project is supported by restricted private donations, it will be
administered in a manner similar to a grant-funded project. As such, expenditures will be
managed through the Town's Special Revenue Fund, which is used for funds restricted to
specific purposes.
Sufficient funds are available within the Capital Projects Fund to accommodate the Town's
matching portion up to $190,000. Upon receipt of the donation, staff will transfer the Town's
matching contribution from the Capital Projects Fund into the Special Revenue Fund. Both the
donated funds and the Town's matching funds will then be expended directly from the Special
Revenue Fund to complete the project.
ATTACHMENTS
1. Veterans Memorial Shade Structure – Council Presentation