Staff Report

Town of Fountain Hills — Town Council (2026-11-17)

View PDF Meeting page

Extracted text (via pymupdf_layout) 4096 characters
ITEM 9.j.
TOWN OF FOUNTAIN HILLS
STAFF REPORT
Meeting Date: 11/17/2026
Meeting Type: Town Council Regular Meeting
Submitting Department: Public Works
Prepared by: Justin Weldy, Public Works Director
Staff Contact Information: Phone: 480-816-5133
Email: jweldy@fountainhillsaz.gov
Request to Town Council Regular Meeting (Agenda Language)
CONSIDERATION AND POSSIBLE ACTION: Relating to the Second Amendment to the
Active Transportation Plan.
Staff Summary (background)
The Mayor and Town Council adopted the Active Transportation Plan (ATP) on June 15, 2021.
The ATP is a comprehensive guide outlining the vision for active transportation in the Town of
Fountain Hills and serves as a roadmap for achieving that vision. It envisions a complete, safe,
and comfortable network of trails, sidewalks, and bikeways that serves all residents. Active
transportation includes walking (including the use of a wheelchair or other assistive device),
bicycling (including e-bikes, tricycles, and adaptive bicycles), and hiking.
On May 21, 2024, the Town Council approved the First Amendment to the ATP. That
amendment updated the short-range sidewalk infill plan to include priority areas identified by the
Mayor, Town Council, and citizens, focused on the Downtown area and a small section in the
southeast part of Town.
Since adoption of the ATP, the Town has made the following improvements:
Improvement (June 15, 2021 to present) Quantity
New sidewalk 14,699 linear feet (approx. 2.8 miles)
New bike lanes 14.5 miles
New marked crosswalks 13
With the exception of one segment on Shea Boulevard of just under one mile, all new bike lanes
were completed without road widening. They were incorporated as part of the Town’s pavement
management program using improved pavement markings, allowing the bicycle network to grow
at the time streets were resurfaced.
To keep the ATP a useful tool for budgeting and applying for grants, the Plan requires periodic
updates that reflect the changing needs of the community. The Second Amendment for
consideration tonight focuses on closing remaining gaps in the following locations:
Corridor Limits Purpose
Saguaro Boulevard Shea Boulevard north to Close remaining gaps on Saguaro
Kiwanis Drive Boulevard (identified as a Priority 1b
need in the 2021 ATP)
Ivory Drive and Short section connecting to El Tie the newly constructed mixed-use
Glenbrook Boulevard Pueblo Boulevard development into El Pueblo Boulevard
Fountain Hills Connector to the grade school Provide a connected route to the grade
Boulevard school

Fountain Hills Boulevard Segundo to Crystalridge Provide connector to Churches
The Second Amendment focuses on a five-year horizon beginning with the next budget year,
Fiscal Year 2027-28, through Fiscal Year 2031-32. Specific project sequencing and costs will be
brought forward through the annual budget and Capital Improvement Program process, and
improvements will be coordinated with the pavement management program and grant
opportunities where practical.
The ATP seeks to achieve the following goals:
• Achieve a connected, safe, accessible, and comfortable network for pedestrians,
bicyclists, and trail users.
• Improve roadway safety for people walking, biking, and hiking.
• Fill key gaps in Fountain Hills walking and bicycling networks.
Related Ordinance, Policy or Guiding Principle
• 2020 Fountain Hills General Plan
• 2021 Fountain Hills Active Transportation Plan
• First Amendment to the Active Transportation Plan (May 21, 2024)
• 2022 Fountain Hills Strategic Plan
Risk Analysis
Not approving the Amendment will have a negative impact on grant opportunities and delay
Capital Improvement Projects.
Recommendation(s) by Board(s) or Commission(s)
N/A
Staff Recommendation(s)
Staff recommends approval of the Second Amendment to the Active Transportation Plan
Suggested Motion
MOVE TO APPROVE the Second Amendment to the Active Transportation Plan.
FISCAL IMPACT
Fiscal Impact: N/A
Budget Reference: FY28 and Future Years
Funding Source: Capital Projects and possible grant funds
ATTACHMENTS
1. SIDEWALK PLAN - ATP AMEND II - PROPOSED SW