ITEM 9.k.
TOWN OF FOUNTAIN HILLS
STAFF REPORT
Meeting Date: 11/17/2026
Meeting Type: Town Council Regular Meeting
Submitting Department: Public Works
Prepared by: Justin Weldy, Public Works Director
Staff Contact Information: Phone: 480-816-5133
Email: jweldy@fountainhillsaz.gov
Request to Town Council Regular Meeting (Agenda Language)
CONSIDERATION AND POSSIBLE ACTION: Relating to staff applying for a Safe
Streets and Roads for All (SS4A) Planning Grant.
Staff Summary (background)
Background
In April 2024, the Town applied to the FY 2024 SS4A Grant Program to develop a
Comprehensive Street Safety Action Plan. The Federal Highway Administration (FHWA)
awarded the Town $240,000. With the required $60,000 local match, the project budget was
$300,000. Staff brought the grant agreement to Council on January 21, 2025 (Resolution
2025-01). Council did not approve the agreement, and the Town did not accept the funds.
Under the original schedule, the plan would have started in January 2025 and been finished in
June 2027.
Why is staff bringing this back?
The Town does not have a transportation master plan or a safety action plan. That gap is now
the main barrier to winning outside transportation funding. Most federal and regional
transportation grants are scored on whether a project comes from an adopted, data-based plan
that was developed with public input. For SS4A Implementation Grants (the grants that pay
for construction), an adopted Action Plan is a requirement, not just a scoring factor. Without
one, the Town cannot compete for SS4A construction funding at all. It is also at a
disadvantage for other programs that fund roads, intersections, sidewalks, and safety
improvements. In practice, the Town pays for these needs almost entirely with local funds.
Program status.
The SS4A program now has broad support in Congress and from the current federal
administration:
• The FY 2026 round closed on May 26, 2026. On October 30, 2026, U.S.
Transportation Secretary announced $1.013 billion in awards to 297 communities.
That included 197 Planning and Demonstration Grants totaling about $329 million
(USDOT). Fifty-two percent of FY 2026 awards will benefit rural communities.
• The FY 2026 round was the last one funded under the Infrastructure Investment and
Jobs Act (IIJA). Congress has extended surface transportation programs through
December 11, 2026. That extension did not include new FY 2027 SS4A funding, so

the next round depends on Congress passing a reauthorization bill.
• The House reauthorization bill is the BUILD America 250 Act (H.R. 8870). The
Transportation and Infrastructure Committee approved it 62–2 on May 22, 2026.
The bill would continue SS4A at $500 million in FY 2027, rising to $1 billion by
FY 2031 (CSAC, Reports on the bill also say it would cut the local match for SS4A
projects from 20% to 10%.
What staff is requesting.
1. Authorize staff to prepare and submit an SS4A Planning Grant application in the
next open funding round.
2. Confirm Council's intent that, if the Town is selected, staff will proceed with the
project. Staff would return to Council with the grant agreement and budget for
formal acceptance.
With Council's support up front, staff can prepare the application now and submit it as soon
as the funding notice is released. Past funding rounds have allowed about 60 days to apply.
Plan scope. The Comprehensive Transportation Safety Action Plan will:
• Review crash history and roadway conditions across Town to identify high-risk
locations and corridors.
• Recommend a prioritized list of infrastructure improvements that improve safety
for drivers, pedestrians, cyclists, and other road users.
• Develop speed management strategies for high-risk areas.
• Address pedestrian accessibility, school routes, and emergency response routes.
• Engage residents, businesses, schools, and regional partners, including the Fort
McDowell Yavapai Nation, Maricopa County, and the Maricopa Association of
Governments.
• Produce a list of projects ready for grant applications, which the Town can use to
pursue construction funding.
• Serve as the safety element and starting point for a broader Town Transportation
Master Plan.
Note: This is a planning project. No construction or ground disturbance will occur.
Estimated schedule (pending a federal funding round):
• Application submitted: within the next SS4A funding window (expected in 2027,
depending on reauthorization)
• Award notification: typically 6–9 months after the funding notice is released
• Grant agreement to Council: after award
• Plan development: about 18–24 months after the grant agreement is signed
Estimated cost and funding (assuming a project the same size as the 2024 award):
Item Amount

Federal grant (80%) $240,000
Local match (20%) $60,000
Total project budget $300,000
The final request amount will be set when the funding notice is released. If Congress lowers
the match requirement, the Town's share would go down.
Related Ordinance, Policy or Guiding Principle
This project supports the Town Strategic Plan priority of "improving the public health, well-
being, and safety of our town." It also supports the Public Works Department's mission to
provide safe, well-maintained, and accessible infrastructure. An adopted plan lets the Town
prioritize capital spending based on data and helps it bring in outside funding instead of
relying only on local revenue.
Risk Analysis
If Council does not authorize the application:The Town will stay without a transportation
master plan or safety action plan. As a result:
• The Town will remain ineligible for SS4A Implementation (construction) Grants.
• The Town will be less competitive for other federal, state, and regional
transportation funding.
• Safety and roadway improvements will continue to depend almost entirely on the
Town's own funds.
• To develop a plan, the Town would have to pay the full cost locally (estimated at
$300,000 or more) or keep delaying it.
Not having a plan also leaves the Town without a documented, community-supported basis
for prioritizing roadway safety investments.
Recommendation(s) by Board(s) or Commission(s)
N/A
Staff Recommendation(s)
Staff recommends approval to proceed.
Suggested Motion
MOVE TO authorize staff to apply for a Planning Grant.
FISCAL IMPACT
Fiscal Impact: N/A
Budget Reference: N/A
Funding Source: N/A
ATTACHMENTS
None