FountainHills_Strategic_Plan_2027-2032_Confidential_DRAFT_29OCT26

Town of Fountain Hills — Strategic Planning Advisory Commission (2026-11-18)

View PDF Meeting page

Extracted text (via pymupdf_layout) 21651 characters
Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
TOWN OF FOUNTAIN
HILLS
Arizona
Strategic Plan
2027 – 2032
SP1: Infrastructure
SP2: Finances
SP3: Economic Development
SP4: Quality of Life & Safety
SP5: Land Use & Development
This is a Draft that is made
available to the Strategic Planning
Advisory Commissioners and
Town Manager & Staff for review,
comments, suggested edits. It is a
work product and has not been
voted on or approved by the SPAC
or Town Council.
Town of Fountain Hills • Confidential - DRAFT Page 1

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP1 | INFRASTRUCTURE
Fountain Hills’ infrastructure — roads, water, stormwater, parks facilities, and public buildings —
represents the Town’s most significant long-term capital obligation. SP1 is organized around
three Signature Strategies.
★ Signature Strategy 1: Street Network Stewardship
Intent: Preserve and improve the condition of Fountain Hills’ street network through a data-
driven, adequately funded, and consistently reported pavement management program.
SUPPORTING TASKS:
1.1.1 Establish the pavement condition baseline.
Complete a Town-wide condition assessment of all streets and publish an overall condition
rating by street classification (arterial, collector, neighborhood).
1.1.2 Adopt condition targets and priority criteria.
Set Council-approved target condition ratings and the criteria used to rank projects, such as
condition, traffic volume, safety, drainage, and cost-effectiveness.
1.1.3 Develop a rolling multi-year paving and reconstruction schedule.
Sequence preservation, resurfacing, and full reconstruction projects over a five-year window,
updated annually and aligned with the Capital Improvement Plan.
1.1.4 Establish a sustainable funding approach for street maintenance.
Identify the annual funding level needed to meet condition targets, and coordinate with SP2
Finances on dedicated revenue sources, reserves, and grant opportunities.
1.1.5 Enhance public communication on street projects.
Provide residents with a clear, accessible view of the paving schedule, project status, and
construction impacts.
1.1.6 Report on street network performance.
Include condition ratings, miles treated, and funding invested in the yearly Council progress
reports and the annual community summary and reassess targets as part of the formal plan
review at the end of Year 5.
★ Signature Strategy 2: Irrigation Strategies
Intent: Maintain and modernize the irrigation systems that sustain Town parks, medians, and
landscaped areas, and maximize the responsible use of reclaimed water to reduce potable
water demand and long-term costs.
Town of Fountain Hills • Confidential - DRAFT Page 2

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SUPPORTING TASKS:
1.2.1 Develop a replacement and modernization schedule.
Prioritize aging or inefficient irrigation components for repair or replacement and align the
schedule with the Capital Improvement Plan and the asset management approach.
1.2.2 Evaluate opportunities to expand reclaimed water use.
Assess which Town-maintained sites could be converted to or better served by reclaimed water,
including required infrastructure, costs, and regulatory considerations.
1.2.3 Establish a sustainable funding approach for irrigation renewal.
Identify annual funding needs for irrigation maintenance and replacement.
1.2.4 Report on irrigation and water use performance.
Include system condition, water use, and reclaimed water share in the yearly Council progress
reports and the annual community summary.
★ Signature Strategy 3: Multiuse Public/Private Partnerships (P3)
Intent: Leverage private-sector, nonprofit, and regional partners to deliver and sustain multiuse
infrastructure and facilities that serve several community purposes, while protecting the Town’s
financial interests and public benefit.
SUPPORTING TASKS:
1.3.1 Adopt a Town P3 policy and evaluation framework.
Establish Council-approved guidelines defining when a partnership is appropriate, the criteria
used to evaluate proposals, and the roles of Council, staff, and advisory bodies.
1.3.2 Identify and prioritize candidate partnership projects.
Review Town infrastructure and facility needs to identify projects where a partnership could add
capacity, reduce cost, or expand community benefit.
1.3.3 Coordinate funding structures.
Evaluate how partnerships can be paired with grants, reserves, and other funding sources, and
assess the long-term financial impact of each proposed partnership on the Town.
1.3.4 Report on partnership performance.
Include active partnerships, public benefits delivered, and financial results in the yearly Council
progress reports and the annual community summary.
SP2 | FINANCES
Sustain the Town’s long-term financial health by planning ahead, diversifying revenue, funding
capital needs responsibly, and keeping residents informed about how public dollars are used.
SP2 is organized around three Signature Strategies.
Town of Fountain Hills • Confidential - DRAFT Page 3

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 1: A.I. Integration
Intent: Use artificial intelligence responsibly to improve the Town’s financial analysis,
forecasting, and operational efficiency, while protecting data security, public trust, and human
oversight of financial decisions.
SUPPORTING TASKS:
2.1.1 Adopt a Town policy for responsible AI use.
Establish Council-approved guidelines covering acceptable uses, human review of AI outputs,
data privacy and security, public records requirements, and accountability for decisions
informed by AI.
2.1.2 Identify and prioritize AI applications for financial operations.
Evaluate opportunities such as budget and revenue forecasting, expenditure analysis,
procurement and payment processing, and anomaly detection, and rank them by benefit, cost,
and risk.
2.1.3 Pilot selected tools and evaluate results.
Test prioritized applications on a limited basis, measure time saved, accuracy, and cost, and
decide whether to expand, modify, or discontinue each tool.
2.1.4 Report on AI integration performance.
Include active applications, measured benefits, and any issues in the yearly Council progress
reports and the annual community summary.
★ Signature Strategy 2: Alternate Funding Support
Intent: Reduce reliance on local taxpayers and general revenues by pursuing grants,
partnerships, sponsorships, and other outside funding to advance Strategic Plan priorities.
SUPPORTING TASKS:
2.2.1 Set a baseline and target for outside funding.
Establish the share of the Town’s capital and program funding currently supported by outside
sources and adopt a target for increasing that share over the life of this plan.
2.2.2 Establish a coordinated approach to identifying and pursuing outside funding.
Assign responsibility within the Town Staff for tracking federal, state, regional, and private
funding opportunities.
2.2.3 Develop and launch a sponsorship and partnership funding program.
Adopt policies governing sponsorships, donations, and naming opportunities, including standards
for acceptance and public benefit and post on Towns website.
2.2.4 Report on alternate funding performance.
Include applications submitted, funds awarded, dollars leveraged, and progress toward the
Town of Fountain Hills • Confidential - DRAFT Page 4

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
outside funding target in the yearly Council progress reports and the annual community
summary.
★ Signature Strategy 3: Budget Planning Strategies
Intent: Build a budget process that is structurally balanced, looks beyond a single year, and
directs resources to Strategic Plan priorities, so the Town can sustain services and fund long-
term needs.
SUPPORTING TASKS:
2.3.1 Integrate capital and operating budget planning.
Evaluate the ongoing operating and maintenance costs of each capital project before it is
approved and build those costs into multi-year budget planning.
2.3.2 Create a dedicated funding plan for a small number of priority asset maintenance and
replacement (AMR) and special area plans (SAPs). Priority AMRs and SAPs are identified by
the council but could include the Streets fund, lake liner, downtown plan & Saguaro/Shea
intersection plan.
2.3.3 Update the Current Facilities Reserve Study to Identify lifecycle replacement and
repair facilities and infrastructure.
SP3 | ECONOMIC DEVELOPMENT
SP3 pursues economic vitality through four Signature Strategies.
★ Signature Strategy 1: Downtown Planning
Intent: Establish a clear, community-supported vision for Downtown Fountain Hills and guide
public and private investment to make it a vibrant, walkable center for business, culture, and
community life.
SUPPORTING TASKS:
3.1.1 Continue to implement the current Economic Development Strategy.
Prioritize implementation of the current plan while engaging residents, property owners, and
businesses to update and adopt a renewed plan over the next five years.
3.1.2 Implement the Downtown streetscape capital improvements project.
Advance the streetscape program through design, funding, and phased construction, coordinating
with street, utility, and park projects to limit disruption to businesses.
3.1.3 Report on Downtown performance.
Include progress on the Economic Development Strategy and streetscape improvements, private
investment, and business activity in the yearly Council progress reports and the annual
community summary.
Town of Fountain Hills • Confidential - DRAFT Page 5

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Outdoor Activities & Tourism
Intent: Build on Fountain Hills’ desert setting, trails, parks, and signature attractions to grow
outdoor recreation and tourism, bringing visitor spending to local businesses while protecting
the natural character residents value.
SUPPORTING TASKS:
3.2.1 Develop and launch a Fountain Hills Tourism & Outdoor Recreation Strategy with a
unified destination brand. Inventory the Town’s trails, parks, open spaces, and signature
attractions, identify the visitor markets that best fit the community, and adopt priorities for
promoting them.
3.2.2 Expand and connect trail and outdoor recreation opportunities.
Identify and pursue improvements that link trailheads, parks, and downtown, with attention to
access, signage, and visitor facilities.
3.2.3 Launch a coordinated destination marketing program with a unified destination
brand. Promote Fountain Hills as an outdoor and visitor destination through a shared brand that
identifies the Town as a dark-sky destination by leveraging the International Dark Sky Discovery
Center and the Town’s commitment to dark-sky preservation as a distinct tourism asset.
★ Signature Strategy 3: Shea Road Corridor
Intent: Position the Shea Road corridor as a thriving commercial gateway by guiding
reinvestment, improving access and appearance, and supporting the businesses that serve
residents and visitors.
SUPPORTING TASKS:
3.3.1 Develop a Beeline/Saguaro/Fountain Hills Blvd/Shea Road corridor economic
development plan. Assess current land uses, vacancies, traffic patterns, and market conditions
along the corridor, engage property owners and businesses, and adopt priorities for the
corridor’s future role and investment. Coordinate with SP5 Land Use & Development.
3.3.2 Enhance corridor appearance and identity.
Develop and implement design standards and improvements, such as landscaping, signage, trails,
and access/gateway features, that give the corridor a consistent, attractive character consistent
with the Town’s desert setting.
3.3.3 Report on Shea Road corridor performance.
Include progress on the corridor plan, improvements completed, and business activity in the
yearly Council progress reports and the annual community summary.
★ Signature Strategy 4: Diversification in Business Recruitment
Intent: Broaden the Town’s economic base by attracting and retaining a wider range of
businesses and employers, reducing dependence on a few sectors and strengthening the local
economy’s resilience.
Town of Fountain Hills • Confidential - DRAFT Page 6

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SUPPORTING TASKS:
3.4.1 Complete a Target Business & Industries Analysis.
Analyze the Town’s current business mix, workforce, and market position, and identify the
industries and business types that fit Fountain Hills’ size, setting, and community goals, such as
professional services, health and wellness, remote and small-office employers, and specialty
retail and dining, then assign priorities and targets based of this analysis.
3.4.2 Develop and launch a Business Retention & Expansion Program.
Create a business recruitment prospect list and a coordinated approach to attract target businesses
and support existing ones, including a point of contact within the Town, regular outreach to local
employers, and a process for addressing barriers to opening or expanding.
3.4.3 Achieve a net gain of new businesses across the identified target sectors.
Over the 5-year span of this plan track new business expansions, private investment, jobs and
sale tax generating activity with a goal of achieving a net gain in each targeted sector.
SP4 | QUALITY OF LIFE & SAFETY
SP4 is built around three Signature Strategies that invest in parks, fire safety, trails, and
connectivity.
★ Signature Strategy 1: Park Development
Intent: Provide a well-maintained, accessible, and varied park system that meets the recreation
needs of residents of all ages and abilities and enhances community character and health.
SUPPORTING TASKS:
4.1.1 Update the parks and recreation master plan.
Assess current park conditions, usage, and community needs through resident input, identify
service gaps, and adopt priorities for improvements and new facilities over the life of the plan.
4.1.2 Renew and upgrade existing parks and amenities.
Establish a schedule for replacing aging playgrounds, ramadas, courts, restrooms, lighting, and
other amenities, and align the schedule with the Capital Improvement Plan and the asset funding
approach under SP2.
4.1.3 Improve accessibility and connections to parks.
Ensure parks meet accessibility standards and continue progress in linking then by safe
pedestrian and trail routes to neighborhoods and downtown.
★ Signature Strategy 2: Fire Safety
Intent: Reduce the risk of wildfire and structure fire in Fountain Hills, with particular emphasis
on wash corridors where vegetation, terrain, and adjacent homes combine to create elevated
risk, while protecting residents, property, and the community’s desert character.
Town of Fountain Hills • Confidential - DRAFT Page 7

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SUPPORTING TASKS:
4.2.1 Assess wildfire risk across the community, with a focus on wash corridors.
Map vegetation, fuel loads, access, and adjacent development along the wash system, and rank
corridor segments by risk to guide where mitigation work is done first.
4.2.2 Implement a wash corridor fuel management and maintenance program.
Establish a recurring schedule for clearing and thinning vegetation in Town-managed washes,
coordinated with drainage maintenance so that fire safety and flood capacity are addressed
together.
4.2.3 Engage property owners and neighborhoods on defensible space.
Provide outreach, guidance, and incentives for homeowners and associations adjacent to washes
and open space and clarify responsibilities for private and shared parcels.
★ Signature Strategy 3: Connecting Public Areas
Intent: Link parks, trails, Downtown, schools, and neighborhoods through a safe, accessible
network for walking, biking, and other non-motorized travel, improving mobility, health, and
community connection.
SUPPORTING TASKS:
4.3.1 Update Active Transportation Plan and add a connectivity section for public areas.
Map existing sidewalks, trails, bike routes, and crossings, identify gaps and barriers between
major destinations, and adopt priorities for closing them. Coordinate with the parks master plan
under SS 4.1.
4.3.2 Close priority sidewalk and pathway gaps.
Program and build sidewalk, pathway, and ramp improvements that connect neighborhoods to
parks, schools, Downtown, and other public destinations, in coordination with street projects
under SS 1.1.
4.3.3 Create trail connections, where allowable, along washes and open space.
Develop and link multi-use trails where allowable, along appropriate wash corridors and open
space areas.
SP5 | LAND USE & DEVELOPMENT
SP5 shapes the long-term physical and fiscal character of Fountain Hills through three
Signature Strategies.
★ Signature Strategy 1: State Trust Land
Intent: Proactively engage with the Arizona State Land Department and the community so that
State Trust Land in and around Fountain Hills is planned, preserved, or developed in ways that
reflect community values and protect the Town’s character, open space, and infrastructure.
Town of Fountain Hills • Confidential - DRAFT Page 8

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SUPPORTING TASKS:
5.1.1 Inventory and monitor State Trust Land in and adjacent to the Town.
Map all trust parcels, record current zoning and General Plan designations, access, utilities, and
environmental features, and track any planned sales, auctions, leases, or applications.
5.1.2 Establish a standing coordination process with the State Land Department.
Set up regular communication so the Town is notified early of proposed actions, can comment on
plans, and can bring community priorities to the Department before decisions are made.
5.1.3 Align zoning and development standards for trust land parcels.
Ensure zoning, design standards, and infrastructure requirements for trust land parcels protect
washes, hillsides, connectivity, views, and address fire safety in line with SS 4.2.
★ Signature Strategy 2: Flexible Zoning
Intent: Modernize the Town’s zoning framework so it can adapt to changing economic, housing,
and community needs, while protecting neighborhood character, the desert setting, and public
safety.
SUPPORTING TASKS:
5.2.1 Adopt flexible zoning tools that fit Fountain Hills.
Evaluate and adopt tools such as mixed-use, floating, artesian, overlay districts, and expanded
permitted uses in commercial areas, adaptive reuse of vacant buildings, and performance-
based standards, consistent with state law and the General Plan.
5.2.2 Tailor flexibility to priority areas.
Apply the new tools first to areas identified in other strategies, including Downtown (SS 3.1) and
the Beeline/Saguaro/Shea Road corridor (SS 3.3), so zoning supports the planned vision for each
area.
5.2.3 Protect neighborhoods and natural features through clear standards.
Establish design, buffering, and density standards that safeguard existing neighborhoods,
hillsides, washes, and views, and incorporate fire safety requirements in line with SS 4.2.
5.2.4 Streamline the development review process.
Include and/or augment AI-powered development permit review assistant that automatically
screens incoming applications for completeness, cross-checks against applicable zoning
standards, and generates preliminary compliance summaries. Coordinate with SS 3.4.
★ Signature Strategy 3: Underutilized Parcels
Intent: Return vacant, underused, and aging properties to productive use in ways that
strengthen the economy, expand housing and community options, and fit the character of
surrounding neighborhoods.
SUPPORTING TASKS:
5.3.1 Inventory, classify, and publish an underutilized parcel list.
Using GIS layer mapping, identify vacant, underused, and obsolete properties across the Town,
Town of Fountain Hills • Confidential - DRAFT Page 9

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
public and private, and record their size, zoning, ownership, access, utilities, and constraints
such as washes, slopes, and fire risk.
5.3.2 Match parcels with appropriate uses and zoning.
Work with owners and the community to identify suitable uses, such as housing, commercial,
mixed-use, parks, or open space, and apply the zoning tools under SS 5.2 where changes align
with his plan and benefit the community.
5.3.3 Engage property owners and prospective developers.
Share parcel information, meet with owners, and connect them with potential partners and Town
resources to encourage redevelopment that meets community goals.
Town of Fountain Hills • Confidential - DRAFT Page 10

Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
I M P L E M E N T A T I O N & A C C O U N T A B I L I T Y
Implementation Roadmap
The plan unfolds across two phases, to deliver sustained, measurable progress toward Fountain
Hills’ 5-year vision.
Phase 1: Foundation (Years 1–2)
Phase 2: Growth (Years 3–5)
Performance & Accountability
Progress is tracked and reported to Town Council annually. The plan is formally reviewed and
renewed at the end of Year 5.
SP1 – Infrastructure
SP2 – Finances
SP3 – Economic
Development
SP4 – Quality of Life
SP5 – Land Use
A Commitment to Fountain Hills
Fountain Hills is a community of extraordinary assets — a spectacular natural setting, an iconic
landmark, dedicated residents, and a legacy of thoughtful planning. This Strategic Plan provides
the framework to carry those assets forward into a future defined by fiscal strength, vibrant
commerce, excellent services, and enduring community character.
Town of Fountain Hills, Arizona
16705 E. Avenue of the Fountains • Fountain Hills, AZ 85268
- Strategic Plan 2027–2032 • Learn more at www.fountainhillsaz.gov
Town of Fountain Hills • Confidential - DRAFT Page 11