Staff and Commissioner Feedback_FountainHills_Strategic_Plan_2027-2032_Confidential_DRAFT

Town of Fountain Hills — Strategic Planning Advisory Commission (2026-11-18)

View PDF Meeting page

Extracted text (via pymupdf_layout) 41066 characters
Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
TOWN OF FOUNTAIN
HILLS
Arizona
Strategic Plan
2027 – 2032
SP1: Infrastructure
SP2: Finances
SP3: Economic Development
SP4: Quality of Life & Safety
SP5: Land Use & Development
This is a Draft that is made
available to the Strategic Planning
Advisory Commissioners and
Town Manager & Staff for review,
comments, suggested edits. It is a
work product and has not been
voted on or approved by the SPAC
or Town Council.
Town of Fountain Hills • Confidential - DRAFT Page 1

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP1 | INFRASTRUCTURE
Fountain Hills’ infrastructure — roads, water, stormwater, parks facilities, and public buildings —
represents the Town’s most significant long-term capital obligation. SP1 is organized around
fivethree Signature Strategies. Commented [HM1]: Assess all Town
buildings and their major systems and score
Facility Condition (a standard score
★ Signature Strategy 1: Street Network Stewardship comparing repair needs to replacement
value) for each building. Marc B
Intent: Preserve and improve the condition of Fountain Hills’ street network through a data-
driven, adequately funded, and consistently reported pavement management program.
SUPPORTING TASKS:
1.1.1 UpdateEstablish the pavement condition baseline.
Complete periodic updates to the a Town-wide condition assessment of all streets and publish an
overall Pavement Condition Index (PCI) condition rating by street classification (arterial,
collector, local and alleysneighborhood), maintained in the Town’s GIS-based asset management
system (SS 1.5).
1.1.2 Adopt condition targets and priority criteria.
Set Council-approved target condition ratings and the criteria used to rank projects, such as
condition, traffic volume, safety, drainage, utility coordination and cost-effectiveness.
1.1.3 Develop a rolling multi-year paving and reconstruction schedule.
Sequence preservation, resurfacing, and full reconstruction projects over a five-year window,
updated annually and aligned with the Capital Improvement Plan.
1.1.4 Establish a sustainable funding approach for street maintenance.
Identify the annual funding level needed to meet condition targets, and coordinate with SP2
Finances on dedicated revenue sources, reserves, and grant opportunities.
1.1.5 Enhance public communication on street projects.
Provide residents with a clear, accessible view of the paving schedule, project status, and
construction impacts.
Town of Fountain Hills • Confidential - DRAFT Page 2

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
1.1.6 Report on street network performance.
Include condition ratings, miles treated, and funding invested in the yearly Council progress
reports and the annual community summary and reassess targets as part of the formal plan
review at the end of Year 5. Commented [GU2]: The SP1 introduction
mentions public buildings, but no strategy
1.1.7 Integrate pedestrian and ADA improvements into street projects. covers them. Marc B.
Upgrade curb ramps within project limits to current ADA standards as part of all mill and Commented [DJ3]: Added to reflect the
overlay and reconstruction projects, as required by federal accessibility requirements. Close federal ADA requirement that curb ramps
adjacent sidewalk gaps where feasible, consistent with the Active Transportation Plan and SS within project limits be upgraded to current
4.3. standards when streets are milled and
overlaid or reconstructed. Pairing this with
sidewalk gap closures where feasible
advances the Active Transportation Plan
priorities under SS 4.3.
Town of Fountain Hills • Confidential - DRAFT Page 3

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Irrigation Strategies
Intent: Maintain and modernize the irrigation systems that sustain Town parks, medians, and
landscaped areas, and maximize the responsible use of reclaimed water to reduce potable
water demand and long-term costs. Commented [KS4]: All Parks have the
same controllers on a central controller to
allow for easy adjustments to be made from
anywhere. The ROW controllers, I believe
SUPPORTING TASKS: are all battery operated controllers making
them tough to update to a centralized
1.2.1 Develop a replacement and modernization schedule. controller.
Prioritize aging or inefficient irrigation components for repair or replacement and align the
schedule with the Capital Improvement Plan and the Town’s asset management program (SS
1.5)approach.
1.2.2 Evaluate opportunities to expand reclaimed water use.
Assess which Town-maintained sites could be converted to or better served by reclaimed water,
including required infrastructure, costs, and regulatory considerations. Commented [KS5]: This is really up to the
Sanitary District to provide water to more
1.2.3 Establish a sustainable funding approach for irrigation renewal. locations and it seems like a nearly fiscally
Identify annual funding needs for irrigation maintenance and replacement. impossible goal adding for any further
locations other than the locations we have.
1.2.4 Report on irrigation and water use performance. Commented [KS6]: This is already part of
Include system condition, water use, and reclaimed water share in the yearly Council progress our maintenance budget.
reports and the annual community summary. Commented [KS7]: Not sure this is needed.
We report to Arizona Department of Water
Resources for all our reclaimed water usage.
What would the point of this be? Usage
varries yearly based on irrigation leaks,
climate and rainfall events.
Town of Fountain Hills • Confidential - DRAFT Page 4

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 3: Multiuse Public/Private Partnerships (P3)
Intent: Leverage private-sector, nonprofit, and regional partners to deliver and sustain multiuse
infrastructure and facilities that serve several community purposes, while protecting the Town’s
financial interests and public benefit. Commented [GU8]: Do we want to include
this strategy? Is this a policy or operational
decision? AJ
SUPPORTING TASKS:
Commented [KS9]: This is very difficult to
1.3.1 Adopt a Town P3 policy and evaluation framework. have a general policy for as each request
Establish Council-approved guidelines defining when a partnership is appropriate, the criteria can be completely different. Two examples
used to evaluate proposals, and the roles of Council, staff, and advisory bodies. are our partnerships with Sonoran
conservancy and their partnership to all
1.3.2 Identify and prioritize candidate partnership projects. things trails and supporting the town through
Review Town infrastructure and facility needs to identify projects where a partnership could add volunteering and helping save the town
capacity, reduce cost, or expand community benefit. money while greatly enhancing the hiking
experience for all who use the trails and with
1.3.3 Coordinate funding structures. the Elks running the concession stand and
Evaluate how partnerships can be paired with grants, reserves, and other funding sources, and using the funding to support the town's youth.
I would recommend keeping this an
assess the long-term financial impact of each proposed partnership on the Town.
operational decision.
1.3.4 Report on partnership performance.
Include active partnerships, public benefits delivered, and financial results in the yearly Council
progress reports and the annual community summary.
Town of Fountain Hills • Confidential - DRAFT Page 5

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
Commented [DJ10]: New Signature
★ Signature Strategy 4: Drainage & Stormwater Management Strategy added. The SP1 introduction lists
stormwater as a core infrastructure
Intent: Reduce flood risk to residents, property, and roadways by building the drainage obligation, but the draft had no drainage
improvements identified in the Area Drainage Master Study/Plan, maintaining the Town’s strategy. The Town is already coordinating
washes and dams, and meeting stormwater regulatory requirements. with the Flood Control District of Maricopa
County on the Area Drainage Master
Supporting Tasks: Study/Plan update. This strategy commits the
Town to prioritizing the study’s recommended
1.4.1 Continue coordination with the Flood Control District of Maricopa County to projects in the CIP, pursuing District cost-
complete the Area Drainage Master Study/Plan update. share funding, maintaining washes and
Continue the Town’s partnership with the District through completion of the Fountain Hills dams, and continuing MS4 compliance. It
ADMS/ADMP, share staff and community knowledge of known drainage problem areas, and also gives SS 4.2 (wash fuel management)
present the final study and recommended projects to Council. and SS 5.1/5.2 (wash protection) a drainage
counterpart to coordinate with.
1.4.2 Prioritize recommended drainage improvement projects.
Rank the projects identified in the ADMS/ADMP using criteria such as flood risk to structures
and roadways, public safety, cost-effectiveness, and opportunities to coordinate with street,
sidewalk, and park projects. Add the priority projects to the Capital Improvement Plan.
1.4.3 Pursue cost-share and outside funding for drainage projects.
Seek District cost-share partnerships and other grant programs for priority projects, coordinating
with SP2 (SS 2.2, Alternate Funding Support).
1.4.4 Maintain washes, dams, and drainage infrastructure.
Set a recurring inspection and maintenance schedule for Town washes, dams, culverts, and
storm drains, tracked through the asset management system under SS 1.5. Coordinate it with
the wash corridor fuel management program under SS 4.2 so that flood capacity and fire safety
are handled together.
1.4.5 Sustain stormwater regulatory compliance and public education.
Keep up MS4 permit compliance, the Stormwater Management Program, and public outreach
on stormwater quality and drainage responsibilities.
1.4.6 Report on drainage program performance.
Include study progress, projects designed and built, funding leveraged, and maintenance
completed in the yearly Council progress reports and the annual community summary.
Town of Fountain Hills • Confidential - DRAFT Page 6

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
Commented [DJ11]: New Signature
★ Signature Strategy 5: Asset Management & GIS Strategy added. Several tasks in the draft
(1.2.1, 4.1.2, 2.3.3) refer to an asset
Intent: Establish a Town-wide asset management program, built on GIS, that inventories public management approach that isn’t defined
infrastructure, tracks condition and maintenance history, and guides cost-effective repair and anywhere. This strategy sets up a GIS-based
replacement decisions across all asset types. inventory and maintenance tracking program.
It starts with pavement condition, street
Supporting Tasks: signage, striping, and traffic signals and adds
other asset classes over time. It ties
1.5.1 Develop a GIS-based inventory of Town infrastructure assets. condition data to the CIP, the Facilities
Map and record the location, attributes, age, and condition of Town infrastructure. At a Reserve Study, and multi-year budgeting,
minimum, this includes pavement condition, street signage, pavement striping and markings, and supports public-facing maps of projects
and traffic signals. Add other asset classes as determined by the Town, such as sidewalks and and paving schedules.
curb ramps, streetlights, storm drains and culverts, washes and dams, irrigation systems, parks
amenities, and public buildings. Build the inventory in phases, starting with the highest-value
and highest-risk assets.
1.5.2 Implement an asset management and work order system.
Select and deploy a computerized maintenance management system (CMMS) that works with
the Town’s GIS. Use it to schedule preventive maintenance, track work orders, record labor and
material costs, and keep a maintenance history for each asset.
1.5.3 Establish condition assessment and lifecycle standards.
Adopt consistent condition rating methods, inspection frequencies, and expected service lives
for each asset class. Use them to forecast repair and replacement needs and to support risk-
based project prioritization.
1.5.4 Integrate asset data into capital and budget planning.
Use asset condition and lifecycle forecasts to inform the Capital Improvement Plan, the
Facilities Reserve Study (2.3.3), and multi-year budget planning (SS 2.3).
1.5.5 Expand public access to infrastructure information.
Publish selected GIS layers and project information through the Town’s website or an online
map viewer, such as the paving schedule, capital projects, and drainage improvements. This
supports the communication goals in 1.1.5.
1.5.6 Report on asset management performance.
Include inventory completion, overall asset condition, preventive versus reactive maintenance
ratios, and work orders completed in the yearly Council progress reports and the annual
community summary.
Town of Fountain Hills • Confidential - DRAFT Page 7

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP2 | FINANCES
Sustain the Town’s long-term financial health by planning ahead, diversifying revenue, funding
capital needs responsibly, and keeping residents informed about how public dollars are used.
SP2 is organized around three Signature Strategies.
Commented [GU12]: Is AI a top priority for
★ Signature Strategy 1: A.I. Integration FH and Finance? AJ
Commented [PS13R12]: I do think AI is
becoming the forefront of what we do to be more
Intent: Use artificial intelligence responsibly to improve the Town’s financial analysis, operationally efficient and transparent.
forecasting, and operational efficiency, while protecting data security, public trust, and human
Commented [PS15R14]: Yes, the Town
oversight of financial decisions.
Council already approved a Town policy in 2024.
If this is kept, I would recommend modifying to
Approving operational procedures to better
SUPPORTING TASKS:
leverage AI/SI usage to improve operational
2.1.1 Adopt a Town policyEstablish departmental procedures for responsible AI use. efficiencies and accuracies.
Establish departmental procedures that comply with Council-approved guidelines policy
covering acceptable uses, human review of AI outputs, data privacy and security, public records This may be difficult to track unless we specify
requirements, and accountability for decisions informed by AI. that the measurement is each individual Town
process modified to use AI/SI. For example, we
have recently been using Claude to strengthen
2.1.2 Identify and prioritize AI applications for financial operations. our internal business license databases rather
Evaluate opportunities such as budget and revenue forecasting, expenditure analysis, than relying on the business license software
procurement and payment processing, and anomaly detection, and rank them by benefit, cost, reporting. However, this seems to be covered in
and risk, and implement those that bring benefits outweighing the costs. the subsequent supporting tasks, so we could
probably just remove 2.1.1 instead.
2.1.3 Pilot selected tools and evaluate results. Commented [GU14]: The Town already has
an AI policy. AJ
Test prioritized applications on a limited basis, measure time saved, accuracy, and cost, and
decide whether to expand, modify, or discontinue each tool. Commented [PS16]: I’m not quite clear on the
benefit of ranking the AI applications, rather than
implementing them as-needed to improve
2.1.4 Report on AI integration performance. operations. We could probably report on the
Include active applications, measured benefits, and any issues in the yearly Council progress operational efficiencies and improvements, but
reports and the annual community summary. the measurements would likely be broader,
especially if it has to do with confidential taxpayer
information.
Commented [PS17]: I just think it will be
difficult to measure benefits but I think it is
achievable and worthwhile. Does this intend for
Finance to report our AI progress to Council
annually or the Town as a whole? Also, is the
annual community summary specific to AI/SI and
Finance or could it be Town-wide and included in
our annual report?
Commented [PS18]: Just as a follow-up,
consider better clarifying what you expect from a
yearly Council progress report (eg, Finance or
multiple departments) and what you mean by an
annual community summary.
Town of Fountain Hills • Confidential - DRAFT Page 8

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Alternate Funding Support
Intent: Reduce reliance on local taxpayers and general revenues by pursuing grants,
partnerships, sponsorships, and other outside funding to advance Strategic Plan priorities.
SUPPORTING TASKS:
2.2.1 Set a baseline and target for outside funding.
Establish the share of the Town’s capital and program funding currently supported by outside
sources and adopt a target for increasing that share over the life of this plan. Commented [PS19]: I just don’t know on this
one. It is very difficult for Finance to target outside
funding, because it is really other departments
and the Council’s decision. If the Council wants
to pursue alternate funding through a bond, they
will consider it and may ask the voters to
authorize it, but that really is their decision. Other
departments can raise fees or identify grant
opportunities but there are many considerations
that go into that process. The Council considers
a new development impact fee schedule every 5
2.2.2 Establish a coordinated approach to identifying and pursuing outside funding. years and just approved a new fee schedule in
Assign responsibility within the Town Staff for tracking federal, state, regional, and private 2026.
funding opportunities.
I would say that we really would not be able to set
a target for outside funding, and this would not be
2.2.3 Develop and launch a sponsorship and partnership funding program.
achievable.
Adopt policies governing sponsorships, donations, and naming opportunities, including standards
Commented [PS20R19]: Otherwise, if we
for acceptance and public benefit and post on Town’s website.
keep this, we probably will apply some arbitrary
number such as 10% or 20% of the CIP plan will
2.2.4 Report on alternate funding performance. be funded by other funding sources than the
Include applications submitted, funds awarded, dollars leveraged, and progress toward the Capital Projects Fund.
outside funding target in the yearly Council progress reports and the annual community Commented [PS21]: This is possible, and one
summary. of the areas we could probably improve upon.
Commented [PS22]: We do have some
sponsorship policies but I believe they are quite
outdated. For example, Community Services has
identified a few of these opportunities recently
such as receiving $105,000 towards the
construction of a bike park at Desert Vista Park.
Commented [PS23]: Still not entirely clear
what we mean by yearly Council progress reports
and annual community summary, which maybe
could be clarified. We have tried to meet other SP
tasks by including additional information in our
annual budget book, so we could try that
approach or work some of this information into
our Council budget meetings.
Town of Fountain Hills • Confidential - DRAFT Page 9

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 3: Budget Planning Strategies
Intent: Build a budget process that is structurally balanced, looks beyond a single year, and
directs resources to Strategic Plan priorities, so the Town can sustain services and fund long-
term needs.
SUPPORTING TASKS:
2.3.1 Integrate capital and operating budget planning.
Evaluate the ongoing operating and maintenance costs of each capital project before it is
approved and build those costs into multi-year budget planning. Commented [PS24]: This is something we
kind of do through the Budget Book and ever-
2.3.2 Create a dedicated funding plan for a small number of priority asset maintenance and changing Capital Improvement Plan process, but
it is probably a good requirement to ensure we
replacement (AMR) and special area plans (SAPs). Priority AMRs and SAPs are identified by
always do this. For example, Sierra Madre park
the council but could include the Streets fund, lake liner, downtown plan & Saguaro/Shea has over $200,000 of estimated annual operating
intersection plan. costs, so we were careful to make sure we
reported those amounts, but we don’t always
2.3.3 Update the Current Facilities Reserve Study to Identify lifecycle replacement and make this clear.
repair facilities and infrastructure. Commented [PS25R24]: However, for most
projects we complete, these operating and
maintenance costs are pretty minor (other than
larger park projects). Maybe we could adjust this
to also require staff to publish a 5-year funding
outlook for the Capital Improvement Plan. I have
just started doing this, but we could strengthen
the approach by comparing to 5-year revenue
projections to better evaluate future funding
needs.
Commented [PS26]: We’ve internally started
drafting policies and considering this approach, so
this could work out well.
Town of Fountain Hills • Confidential - DRAFT Page 10

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP3 | ECONOMIC DEVELOPMENT
SP3 pursues economic vitality through four Signature Strategies.
★ Signature Strategy 1: Downtown Planning
Intent: Establish a clear, community-supported vision for Downtown Fountain Hills and guide
public and private investment to make it a vibrant, walkable center for business, culture, and
community life.
SUPPORTING TASKS:
3.1.1 Continue to implement the current Economic Development Strategy. Commented [GU27]: Economic
Prioritize implementation of the current plan while engaging residents, property owners, and Development or Downtown Plan? Please
businesses to update and adopt a renewed plan over the next five years. clarify because 2 different documents. AJ
3.1.2 Implement the Downtown streetscape capital improvements project.
Advance the streetscape program through design, funding, and phased construction, coordinating
with street, utility, and park projects to limit disruption to businesses.
3.1.3 Report on Downtown performance.
Include progress on the Economic Development Strategy and streetscape improvements, private Commented [GU28]: Economic
investment, and business activity in the yearly Council progress reports and the annual Development or Downtown Plan? Please
community summary. clarify, because 2 different documents. AJ
Commented [GU29]: Is there an annual
community summary requirement or is this
new? AJ
Town of Fountain Hills • Confidential - DRAFT Page 11

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Outdoor Activities & Tourism Destination
Development, Outdoor Recreation & Dark Skies
Intent: Build on Fountain Hills’ desert setting, trails, parks, and signature attractions to grow
outdoor recreation and tourism, bringing visitor spending to local businesses while protecting
the natural character residents value. Position Fountain Hills as a distinctive destination for
outdoor recreation, dark-sky experiences, and overnight visitation. Commented [KS30]: let's make this
recreation in general and include the
Community Center attracting grand ballroom
SUPPORTING TASKS: events like the dance summit who rent the
entire building and increase spending
3.2.1 Develop and launch a Fountain Hills Tourism & Outdoor Recreation Strategy with a throughout town, from hotels to restaurants.
unified destination brand. Inventory the Town’s trails, parks, open spaces, and signature
attractions, identify the visitor markets that best fit the community, and adopt priorities for
promoting them.
3.2.2 Expand and connect trail and outdoor recreation opportunities.
Identify and pursue improvements that link trailheads, parks, and downtown, with attention to
access, signage, and visitor facilities.
3.2.3 Launch a coordinated destination marketing program with a unified destination
brand. Promote Fountain Hills as an outdoor and visitor destination through a shared brand that
identifies the Town as a dark-sky destination by leveraging the International Dark Sky Discovery
Center and the Town’s commitment to dark-sky preservation as a distinct tourism asset.
• Establish Fountain Hills as a dark-sky destination by leveraging the International
Dark Sky Discovery Center and the community's commitment to dark-sky
preservation as distinctive tourism assets.
• Expand overnight visitation and tourism-related economic activity by attracting new
lodging and resort development.
• Use visitor and tourism data to identify and target high-potential domestic and
international markets.
Town of Fountain Hills • Confidential - DRAFT Page 12

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 3: Shea BoulevardRoad Corridor
Intent: Position the Shea BoulevardRoad corridor as a thriving commercial gateway by guiding
reinvestment, improving access and appearance, and supporting the businesses that serve
residents and visitors.
SUPPORTING TASKS:
3.3.1 Develop a Beeline/Saguaro/Fountain Hills Blvd/Shea BlvdRoad corridor economic
development plan. Assess current land uses, vacancies, traffic patterns, and market conditions
along the corridor, engage property owners and businesses, and adopt priorities for the
corridor’s future role and investment. Coordinate with SP5 Land Use & Development.
3.3.2 Enhance corridor appearance and identity.
Develop and implement design standards and improvements, such as landscaping, signage, trails,
and access/gateway features, that give the corridor a consistent, attractive character consistent
with the Town’s desert setting.
3.3.3 Report on Shea BlvdRoad corridor performance.
Include progress on the corridor plan, improvements completed, and business activity in the
yearly Council progress reports and the annual community summary.
Town of Fountain Hills • Confidential - DRAFT Page 13

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 4: Diversification in Business Recruitment
Intent: Broaden the Town’s economic base by attracting and retaining a wider range of
businesses and employers, reducing dependence on a few sectors and strengthening the local
economy’s resilience.
SUPPORTING TASKS:
• Develop targeted business recruitment strategies focused on industries and
business types that complement Fountain Hills' existing economy and community
character.
• Identify and pursue businesses that diversify the Town's employment and revenue
base, including opportunities in emerging, knowledge-based, tourism-related, and
service sectors.
• Leverage regional, state, and private-sector partnerships to expand business
recruitment opportunities.
• Use market intelligence, demographic trends, consumer data, and competitive
analysis to identify and prioritize recruitment targets.
3.4.1 Complete a Target Business & Industries Analysis.
Analyze the Town’s current business mix, workforce, and market position, and identify the
industries and business types that fit Fountain Hills’ size, setting, and community goals, such as
professional services, health and wellness, remote and small-office employers, and specialty
retail and dining, then assign priorities and targets based of this analysis.
3.4.2 Develop and launch a Business Retention & Expansion Program. Commented [GU31]: BRE has already
Create a business recruitment prospect list and a coordinated approach to attract target businesses been launched. Eliminate redunancy. AJ
and support existing ones, including a point of contact within the Town, regular outreach to local
employers, and a process for addressing barriers to opening or expanding.
3.4.3 Achieve a net gain of new businesses across the identified target sectors.
Over the 5-year span of this plan track new business expansions, private investment, jobs and
sale tax generating activity with a goal of achieving a net gain in each targeted sector.
Town of Fountain Hills • Confidential - DRAFT Page 14

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP4 | QUALITY OF LIFE & SAFETY
SP4 is built around three Signature Strategies that invest in parks, fire safety, trails, and
connectivity.
★ Signature Strategy 1: Park Development
Intent: Provide a well-maintained, accessible, and varied park system that meets the recreation
needs of residents of all ages and abilities and enhances community character and health.
SUPPORTING TASKS:
4.1.1 Update the parks and recreation master plan.
Assess current park conditions, usage, and community needs through resident input, identify
service gaps, and adopt priorities for improvements and new facilities over the life of the plan. Commented [KS32]: The strategic plan will
be updated in 2027 and the Master Plan in
4.1.2 Renew and upgrade existing parks and amenities. 2031
Establish a schedule for replacing aging playgrounds, ramadas, courts, restrooms, lighting, and Commented [KS33]: This was done in 2021
other amenities. Track their condition and maintenance through the Town’s asset management and good for 10-15 years. It will be redone at
program (SS 1.5), and align the schedule with the Capital Improvement Plan and the asset that time. We also have a strategic plan that
funding approach under SP2. is updated every 5-7 years. Ours was last
updated
4.1.3 Improve accessibility and connections to parks. Commented [DJ34]: Added a reference to
Ensure parks meet accessibility standards and continue progress in linking thenm by safe the new SS 1.5 (Asset Management & GIS)
pedestrian and trail routes to neighborhoods and downtown. so park amenities are inventoried and their
condition tracked in the same Town-wide
asset management system as other
infrastructure. This also fills in the “asset
management approach” referenced in 1.2.1,
which wasn’t defined anywhere in the draft.
Town of Fountain Hills • Confidential - DRAFT Page 15

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Fire Safety
Intent: Reduce the risk of wildfire and structure fire in Fountain Hills, with particular emphasis
on wash corridors where vegetation, terrain, and adjacent homes combine to create elevated
risk, while protecting residents, property, and the community’s desert character.
SUPPORTING TASKS:
4.2.1 Assess wildfire risk across the community, with a focus on wash corridors.
Map vegetation, fuel loads, access, and adjacent development along the wash system, and rank
corridor segments by risk to guide where mitigation work is done first.
4.2.2 Implement a wash corridor fuel management and maintenance program.
Establish a recurring schedule for clearing and thinning vegetation in Town-managed washes,
coordinated with drainage maintenance and SS1.4 so that fire safety and flood capacity are
addressed together.
4.2.3 Engage property owners and neighborhoods on defensible space. Commented [HM35]: Commissioner Bonnett:
Provide outreach, guidance, and incentives for homeowners and associations adjacent to washes The notes I have from our meeting with Town
and open space and clarify responsibilities for private and shared parcels. Staff include a 'flood, rain, fire risk' dashboard as
part of the "Fire Safety" supporting tasks. This
could fall under the 4.2.3. action item, however it
may not have been included due to this task
being focused on fire safety only.
Town of Fountain Hills • Confidential - DRAFT Page 16

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 3: Connecting Public Areas
Intent: Link parks, trails, Downtown, schools, and neighborhoods through a safe, accessible
network for walking, biking, and other non-motorized travel, improving mobility, health, and
community connection.
SUPPORTING TASKS:
4.3.1 Update Active Transportation Plan and add a connectivity section for public areas.
Map existing sidewalks, trails, bike routes, and crossings, identify gaps and barriers between
major destinations, and adopt priorities for closing them. Coordinate with the parks master plan
under SS 4.1.
4.3.2 Close priority sidewalk and pathway gaps.
Program and build sidewalk, pathway, and ramp improvements that connect neighborhoods to
parks, schools, Downtown, and other public destinations, in coordination with street projects
under SS 1.1.
4.3.3 Create trail connections, where allowable, along washes and open space.
Develop and link multi-use trails where allowable, along appropriate wash corridors and open Commented [KS36]: This is not allowed per
space areas. town resident approved vote as discussed in
earlier rendition of plan
Town of Fountain Hills • Confidential - DRAFT Page 17

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
SP5 | LAND USE & DEVELOPMENT
SP5 shapes the long-term physical and fiscal character of Fountain Hills through three
Signature Strategies.
Commented [JW37]: This Strategy seems
★ Signature Strategy 1: State Trust Land unnecessary. We already have a
Intent: Proactively engage with the Arizona State Land Department and the community so that relationship with the staff at State Trust.
State Trust Land in and around Fountain Hills is planned, preserved, or developed in ways that Their processes are very specific. All of
reflect community values and protect the Town’s character, open space, and infrastructure. these issues will be addressed if and when
the Trust authorizes a developer to work
through an entitlement process. If anything,
there could be a note somewhere for the next
SUPPORTING TASKS: General Plan update to put in some goals
and policies for the use and development of
5.1.1 Inventory and monitor State Trust Land in and adjacent to the Town. this land.
Map all trust parcels, record current zoning and General Plan designations, access, utilities, and
environmental features, and track any planned sales, auctions, leases, or applications.
5.1.2 Establish a standing coordination process with the State Land Department.
Set up regular communication so the Town is notified early of proposed actions, can comment on
plans, and can bring community priorities to the Department before decisions are made.
5.1.3 Align zoning and development standards for trust land parcels.
Ensure zoning, design standards, and infrastructure requirements for trust land parcels protect
washes, hillsides, connectivity, views, and address fire safety in line with SS 4.2 and drainage
requirements in line with SS 1.4..
Town of Fountain Hills • Confidential - DRAFT Page 18

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 2: Flexible Zoning Commented [JW38]: I am already doing
some of this in my effort to re-structure the
Intent: Modernize the Town’s zoning framework so it can adapt to changing economic, housing, zoning ordinance. Having an approved
and community needs, while protecting neighborhood character, the desert setting, and public strategy in the Strategic Plan would reinforce
safety. the work already being done. As mentioned
SUPPORTING TASKS: in our meeting with them, after this work is
done an update to the Subdivision Ordinance
5.2.1 Adopt flexible zoning tools that fit Fountain Hills. would be my next priority. Most of the items
Evaluate and adopt tools such as mixed-use, floating, artesian, overlay districts, and expanded mentioned in the supporting tasks are either
permitted uses in commercial areas, adaptive reuse of vacant buildings, and performance- in place or would be considered as part of
based standards, consistent with state law and the General Plan. future projects.
Commented [JW39]: We already have
5.2.2 Tailor flexibility to priority areas. some flexibility tools in our zoning ordinance.
Apply the new tools first to areas identified in other strategies, including Downtown (SS 3.1) and It is challenging to create tools in a vacuum.
the Beeline/Saguaro/Shea BlvdRoad corridor (SS 3.3), so zoning supports the planned vision for The first step should be the planning work
each area. discussed in our meeting to review areas
such as Shea and Saguaro or the
5.2.3 Protect neighborhoods and natural features through clear standards. commercial area east of Saguaro from
Establish design, buffering, and density standards that safeguard existing neighborhoods, Desert Vista to Colony and see what the
hillsides, washes, and views, and incorporate fire safety requirements in line with SS 4.2 and needs are then develop any tools necessary
drainage requirements in line with SS 1.4. to implement the plan.
Commented [JW40]: Our ordinances
5.2.4 Streamline the development review process. already provide significant protection for
Include and/or augment AI-powered development permit review assistant that automatically natural features.
screens incoming applications for completeness, cross-checks against applicable zoning
standards, and generates preliminary compliance summaries. Coordinate with SS 3.4.
Town of Fountain Hills • Confidential - DRAFT Page 19

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
★ Signature Strategy 3: Underutilized Parcels Commented [JW41]: Strategically, a more
important task is to get our paper files
Intent: Return vacant, underused, and aging properties to productive use in ways that scanned and all existing entitlements clearly
strengthen the economy, expand housing and community options, and fit the character of identified and understood, and published
surrounding neighborhoods. online so staff and developers can easily find
SUPPORTING TASKS: and understand the requirements for any
given parcel in Town. That will then set the
5.3.1 Inventory, classify, and publish an underutilized parcel list. stage to be able to work on marketing vacant
Using the Town’s GIS platform (SS 1.5), layer mapping, identify vacant, underused, and and underutilized parcels.
obsolete properties across the Town, public and private, and record their size, zoning,
ownership, access, utilities, and constraints such as washes, slopes, and fire risk. Commented [DJ42]: Revised to use the
Town’s GIS platform under the new SS 1.5
(Asset Management & GIS) rather than a
5.3.2 Match parcels with appropriate uses and zoning.
separate GIS layer, so parcel data, utilities,
Work with owners and the community to identify suitable uses, such as housing, commercial, washes, and other constraints come from
mixed-use, parks, or open space, and apply the zoning tools under SS 5.2 where changes align one consistent source.
with his plan and benefit the community.
5.3.3 Engage property owners and prospective developers.
Share parcel information, meet with owners, and connect them with potential partners and Town
resources to encourage redevelopment that meets community goals.
Town of Fountain Hills • Confidential - DRAFT Page 20

Staff and Commissioner Feedback Document - Town of Fountain Hills, Arizona | Strategic Plan 2027–2032
I M P L E M E N T A T I O N & A C C O U N T A B I L I T Y
Implementation Roadmap
The plan unfolds across two phases, to deliver sustained, measurable progress toward Fountain
Hills’ 5-year vision.
Phase 1: Foundation (Years 1–2)
Phase 2: Growth (Years 3–5)
Performance & Accountability
Progress is tracked and reported to Town Council annually. The plan is formally reviewed and
renewed at the end of Year 5.
SP1 – Infrastructure
SP2 – Finances
SP3 – Economic
Development
SP4 – Quality of Life
SP5 – Land Use
A Commitment to Fountain Hills
Fountain Hills is a community of extraordinary assets — a spectacular natural setting, an iconic
landmark, dedicated residents, and a legacy of thoughtful planning. This Strategic Plan provides
the framework to carry those assets forward into a future defined by fiscal strength, vibrant
commerce, excellent services, and enduring community character.
Town of Fountain Hills, Arizona
16705 E. Avenue of the Fountains • Fountain Hills, AZ 85268
- Strategic Plan 2027–2032 • Learn more at www.fountainhillsaz.gov
Town of Fountain Hills • Confidential - DRAFT Page 21