April 8, 2026 
SU250009 
Page 1 of 4 
 
 
 
 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
Board Hearing Date: 
April 8, 2026 
 
Case #/Title:   
 
 
Z250024 – HEGIC South 
 
Supervisorial District: 
5 
 
Applicant/Owner:  
Keith Nichter, Kimley-Horn / CV Harquahala LLC     
 
Request: 
Amendment to the IND-2 IUPD zoning district (modification of 
conditions of Z2023131) 
 
Site Location: 
Generally located south of Lower Buckeye Road and Harquahala 
Valley Road. 
 
Site Size: 
690 acres 
 
County Island Status: 
N/A 
Additional 
Comments: 
 
 
• 
The applicant is requesting to amend the IND-2 IUPD zoning for the Harquahala Energy 
Generation & Industrial Campus (HEGIC South). This will allow for several additional industrial 
uses on a 690 acre portion of four parcels of the overall 9,048 acre Harquahala Sun III-IV site. The 
subject site is designated as a ‘Utilities’ land use per Maricopa County’s Vision 2030 
Comprehensive Plan ( CPA2021010). There is not a precise plan of development at this time, but 
will be submitted for administrative approval prior to construction permitting. 
 
• 
Water/sewer is currently via well and septic. Staff has included a condition that IND-2 entitled 
uses are limited to those that can be accommodated via onsite wastewater and water until sewer 
and water system connections are available to the site. The site is already zoned industrial which 
is consistent with area land use and development patterns. 
 
• 
The nearest major roads to the site are Baseline Rd. and Harquahala Valley Rd. Site access is 
undetermined until a formal Plan of Development is established. The site is located within an 
established industrial area served by streets designed for future industrial traffic. 
 
• 
The Maricopa County Vision 2030 Comprehensive Plan designated the site as Rural Development 
Area. Per the pending but not yet adopted Maricopa County Framework 2040 Comprehensive 
Plan, the site is within a Rural Service Area. The subject use remains appropriate due to its 
proximity to electrical transmission infrastructure, the APS Delaney Substation, and the existing 
Harquahala Power Plant located a few miles to the south. The surrounding area consists of 
approximately 30,000 acres of approved utility and industrial uses, including multiple solar

April 8, 2026 
SU250009 
Page 2 of 4 
projects, battery energy storage facilities, and the Harquahala Power Plant, making HEGIC South 
a natural continuation of the established industrial character of the Harquahala Valley. 
•
There are not any outstanding concerns from reviewing agencies.
•
The applicant complied with the public participation requirements according to MCZO Section
304, including notification of property owners within 300’ of the subject site and posting. Staff
has not received any public comment.
Commission  
Recommendation: 
On 3/5/26, the Commission voted 6-0 (motion by Vice Chair 
Hernandez D5, seconded by Commissioner Rochwalik D3) to 
adopt a motion recommending the Board of Supervisors 
approve Z250024 subject to conditions ‘a’ – ‘i’: 
a.
Development shall be in substantial conformance with the zoning exhibit entitled
“Harquahala Energy Generation and Industrial Campus South” consisting of 1 full-size sheet,
dated July 2, 2025 except as modified by the following conditions. Staff may determine
slight refinements to remain in substantial conformance with the approved site plan. Minor
and major amendments to the site plan will be determined in accordance with Chapter 3 of
the Maricopa County Zoning Ordinance.
b.
Development of the site shall be in substantial conformance with the narrative report
entitled “HARQUAHALA ENERGY GENERATION & INDUSTRIAL CAMPUS (HEGIC) SOUTH”,
consisting of 11 pages, dated December 11, 2025 except as modified by the following
conditions.
c.
The following Planning Engineering conditions shall apply:
1.
Engineering review of planning and/or zoning cases is for conceptual design only. All
development and engineering design shall be in conformance with Section 1205 of
the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain
Regulations for Maricopa County; MCDOT Roadway Design Manual; and current
engineering policies, standards and best practices at the time of application for
construction.
2.
Based on the conceptual design nature of the information submitted, changes to the
site layout may be necessitated by the final engineering design of the site’s drainage
infrastructure.
3.
Maricopa County does not supply water, fire or sewer services. It is the
applicant/owner’s responsibility to coordinate and secure water, fire and sewer
services for this site.
4.
Sealed final Grading and Drainage (Site Infrastructure) Plans and Sealed Final
drainage report must be submitted with the application for Building Permits.
d.
The following IND-2 IUPD Zoning District standards shall apply:
1.
Maximum Electric Transmission Line Height – 199’
2.
Maximum Building Height - 90' (Not including gas generating facility stack height up
to 199’)

April 8, 2026 
SU250009 
Page 3 of 4 
3. Maximum Lot Coverage - 60%, solar panel arrays are not calculated as lot coverage. 
4. Article 902.91 – All uses except for parking, loading, unloading, storage, electric 
generation, electric storage and electric transmission infrastructure shall be 
conducted within a completely enclosed building. 
5. Site Enclosure and Screening – At a minimum, chain-link fencing and gates shall be 
allowed on the perimeter of the project. One (1) foot of barbed wire strands will be 
incorporated atop 6-foot fencing for additional  security. Up to 12' aluminum anti-climb 
fencing allowed.  
6. Permitted uses – Solar electric generating facility and Battery Energy Storage System 
(BESS) – including ancillary offices and ancillary uses only, Gas generating facility and 
ancillary uses including accessory electrical substation, other power equipment, and 
distribution facilities. Water storage and treatment. All Uses Permitted in the IND-2 
Zoning District where wastewater can be accommodated via onsite septic and water 
systems until such time that sewer and/or water service is available to the site. 
 
e. 
Noncompliance with any Maricopa County regulation shall be grounds for initiating a 
revocation of this zone change as set forth in the Maricopa County Zoning Ordinance.  
 
f. 
The IUP overlay is applied to restrict the use of the site. Until such time as the site is served 
by sewer, uses on the site shall only be those acceptable to the Maricopa County 
Environmental Services Department (MCESD) that can be accommodated by septic 
systems. A public water system and public sewer system shall be required prior to 
establishment of any non-residential use that requires potable water. 
 
g. 
Administrative approval of a Plan of Development will be required prior to approval and 
issuance of construction permits to develop and establish use of the site. Prior to issuance 
of a building permit, written confirmation will be required from the emergency fire protection 
jurisdiction having authority that the facility has been designed in accordance with their 
regulations and requirements, and that emergency fire protection service will be provided 
to the facility. Prior to issuance of the certificate of occupancy, local fire protection 
jurisdiction review and approval will be required. 
 
h. 
The property owner/s and their successors waive claim for diminution in value if the County 
takes action to rescind approval due to noncompliance with conditions.  
 
i. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
may be considered for reversion to the zoning that existed on the date of application in 
accordance with Maricopa County Zoning Ordinance requirements.  It is, therefore, 
stipulated and agreed that reversion of the zoning due to the failure to comply with any 
conditions does not reduce any rights that existed on the date of application to use, divide, 
sell or possess the property and that there would be no diminution in value of the property 
from the value it held on the date of application due to such reversion of the zoning.  This 
zone change enhances the value of the property above its value as of the date the zone 
change is granted, and reverting to the prior zoning results in the same value of the property 
as if the zone change had never been granted.  
 
 
Presented by: 
 
Joel Landis, Planner 
Reviewed by: 
 
Darren Gérard, AICP, Planning Manager

April 8, 2026 
SU250009 
Page 4 of 4 
Attachment: 
 
3/5/26 P&Z Packet (22 pages) 
 
 
3/5/26 P&Z Handout Memo (2 pages)  
 
 
Note: 
3/5/26 Draft P&Z Minutes are not available as of the writing of this report, but can be provided 
upon request later, or accessed via Agenda Center, when available.

Z250024 
Page 1 of 8 
 
 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
Case: 
Z250024 – HEGIC South 
 
 
 
 
 
Hearing Date: 
March 5, 2026 
 
Supervisor District: 
5 
 
 
 
  
 
Applicant: 
Keith Nichter, Kimley-Horn  
 
Owner: 
CV Harquahala LLC  
   
Request: 
Amendment to the IND-2 IUPD zoning district (modification of conditions 
of Z2023131) 
 
  
 
Site Location: 
Generally located south of Lower Buckeye Road and Harquahala Valley 
Road. 
 
  
Site Size: 
690 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plan: 
Maricopa County Vision 2030 Comprehensive Plan – Utilities 
 
Municipal Plan: 
N/A 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z250024 
Page 2 of 8 
Project Summary: 
 
1. 
The applicant, Keith Nichter, is requesting to amend the IND-2 IUPD zoning for the Harquahala 
Energy Generation & Industrial Campus (HEGIC South). This will allow for a data center use on a 
690 acre portion of four parcels of the overall 9,048 acre Harquahala Sun III-IV site. The subject 
site is designated as a ‘Utilities’ land use per Maricopa County’s Vision 2030 Comprehensive Plan 
( CPA2021010). There is not a precise plan of development at this time, but will be  submitted for 
administrative approval prior to construction permitting.  
 
2. 
The proposed amendment would expand allowed uses to include gas generating facilities and 
ancillary uses including accessory electrical substation, other power equipment, distribution 
facilities, water storage and treatment, and all uses permitted in the IND-2 zoning district (where 
wastewater disposal can be accommodated via on-lot septic systems). To accommodate these 
additional uses, the applicant requests an increase in maximum height from 60’ to 90’, not 
including gas generating facility stack height up to 199’. Maximum electrical transmission line 
height would increase from 150’ to 199’. Site enclosure standards would be modified to allow up 
to 12’ aluminum anti-climb fencing in addition to the currently permitted chain-link fencing with 
barbed wire. The amendment also clarifies that all uses except parking, loading, unloading, 
storage, electric generation, electric storage, and electric transmission infrastructure must be 
conducted within completely enclosed buildings. All other development standards including 
setbacks, lot coverage, landscaping, parking, and paving requirements remain unchanged from 
the original approval. 
 
3. 
The following table indicates the differences between the approved and proposed zoning with 
changes highlighted in bold. 
 
REGULATION 
EXISTING ZONING REGULATIONS 
(IND-2 IUPD) 
PROPOSED ZONING REGULATIONS 
(IND-2 IUPD) 
MAX. HEIGHT 
60’* 
90' (NOT INCLUDING GAS GENERATING 
FACILITY STACK HEIGHT UP  
TO 199’) 
MIN. FRONT YARD 
10’ 
10’ 
MIN. SIDE YARD 
10’ 
10’ 
MIN. REAR YARD 
10’ 
10’ 
MIN. STREET SIDE YARD 
10’ 
10’ 
LANDSCAPING 
NO LANDSCAPE STRIP REQUIRED 
NO LANDSCAPE STRIP REQUIRED 
MIN. LOT AREA 
6,000 SQ. FT. 
6,000 SQ. FT. 
MIN. LOT WIDTH 
60’ 
60’ 
MAX. LOT COVERAGE 
60% 
60%, SOLAR PANEL ARRAYS ARE NOT 
CALCULATED AS LOT  
COVERAGE. 
PARKING SPACES 
REQUIRED 
NONE REQUIRED WITH A MARICOPA 
COUNTY AIR QUALITY CONTROL 
APPROVED DUST CONTROL PLAN 
NONE REQUIRED WITH A MARICOPA 
COUNTY AIR QUALITY CONTROL 
APPROVED DUST CONTROL PLAN 
LOADING & UNLOADING 
SPACES 
NONE REQUIRED 
NONE REQUIRED 
SIGHT VISIBILITY 
TRIANGLES 
NO SVT’S AT PROJECT SITE 
ENTRY/EXIT POINTS, SECTION LINE, 
AND MIDSECTION LINE 
INTERSECTING ALIGNMENTS. 
NO SVT’S AT PROJECT SITE ENTRY/EXIT 
POINTS, SECTION LINE, AND MIDSECTION 
LINE INTERSECTING ALIGNMENTS. 
SCREENING 
CHAIN-LINK FENCING AND GATES 
SHALL BE ALLOWED ON THE 
PERIMETER OF THE PROJECT. ONE 
AT A MINIMUM, CHAIN-LINK FENCING 
AND GATES SHALL BE ALLOWED

Z250024 
Page 3 of 8 
(1) FOOT OF BARBED WIRE STRANDS 
WILL BE INCORPORATED ATOP 6-
FOOT FENCING FOR ADDITIONAL 
SECURITY AND ALLOW BARBED WIRE 
FENCING MATERIALS UNDER 8’ IN 
HEIGHT, EXCEPT IF NEXT TO 
EXISTING RESIDENCES. 
ON THE PERIMETER OF THE PROJECT. 
ONE (1) FOOT OF BARBED WIRE  
STRANDS WILL BE INCORPORATED ATOP 
6-FOOT FENCING FOR ADDITIONAL  
SECURITY. UP TO 12' ALUMINUM ANTI-
CLIMB FENCING ALLOWED. 
ARTICLE 902.9.1 
A WAIVER FROM ARTICLE 902.9  
AS APPLIED TO SOLAR ARRAYS;  
THEY WILL NOT BE LOCATED INSIDE  
ENCLOSED BUILDINGS. 
ALL USES EXCEPT FOR PARKING, 
LOADING, UNLOADING, STORAGE, 
ELECTRIC GENERATION, ELECTRIC 
STORAGE AND ELECTRIC 
TRANSMISSION INFRASTRUCTURE 
SHALL BE 
CONDUCTED WITHIN A COMPLETELY 
ENCLOSED BUILDING. 
MAX. ELECTRIC 
TRANSMISSION LINE 
HEIGHT 
150’ 
199’ 
BARBED WIRE FENCING 
BARBED WIRE ATTACHED TO 
FENCING UNDER 8’ WILL BE ALLOWED 
WITHIN THE PROPERTY LINE 
BOUNDARIES 
BARBED WIRE ATTACHED TO FENCING 
UNDER 8’ WILL BE ALLOWED WITHIN THE 
PROPERTY LINE BOUNDARIES 
LIGHT POLE HEIGHT 
30’ MAXIMUM FROM GRADE 
30’ MAXIMUM FROM GRADE 
ALLOWED USES 
 
SOLAR ELECTRIC GENERATING FACILITY 
AND BATTERY ENERGY STORAGE  
SYSTEM (BESS) – INCLUDING ANCILLARY 
OFFICES AND ANCILLARY USES  
ONLY, GAS GENERATING FACILITY AND 
ANCILLARY USES INCLUDING  
ACCESSORY ELECTRICAL SUBSTATION, 
OTHER POWER EQUIPMENT,  
AND DISTRIBUTION FACILITIES. WATER 
STORAGE AND TREATMENT.  
ALL USES PERMITTED IN THE IND-2 
ZONING DISTRICT. 
*Maximum building height in Industrial zoning districts increased from 40’ to 60’ with MCZO update 
effective 1/9/26

Z250024 
Page 4 of 8 
Aerial photo of subject site 
 
 
 
 
Zoning Exhibit

Z250024 
Page 5 of 8 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
4. 
On-site: 
IND-2 / Vacant & Agriculture 
North: 
Rural-43 / Vacant & Agriculture 
South: 
IND-2 / Vacant & Agriculture 
East: 
IND-2 / Vacant & Agriculture 
West: 
IND-2 / Vacant & Agriculture 
 
 
Utilities and Services: 
 
5. 
Water: 
 
Hauled Water/Well 
Wastewater: 
Onsite Septic System  
Electric: 
APS 
Fire: 
Harquahala Valley Fire District 
Police:  
Maricopa County Sheriff’s Office 
Solid Waste:                 Republic Services 
 
Right-of-Way: 
 
6. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) Major 
Streets and Routes Plan. 
 
Street Name 
Existing R/W 
Proposed R/W* 
Future Classification 
Baseline Road 
65’ 
130’ 
Minor Arterial 
Harquahala Valley Road 
55’ 
130’ 
Minor Arterial 
Elliot Road 
Varies 
130’ 
Minor Arterial 
539tj Avenue 
40’ 
130’ 
Minor Arterial 
 
 
Adopted Plan: 
 
7. 
Maricopa County Vision 2030 Comprehensive Plan (adopted 2013): The site is designated as 
Utilities. The Utilities designation is for electric generating plants, water, and wastewater 
treatment facilities, associated offices, and accessory equipment. The subject site is designated 
as a ‘Utilities’ land use per Maricopa County’s Vision 2030 Comprehensive Plan following a Major 
Comprehensive Plan Amendment approved by the Board of Supervisors on December 8, 2021 per 
case CPA2021010. Under a Utilities designation, the appropriate zoning district is IND-2. 
 
Public Participation Summary: 
 
8. 
The applicant complied with the Maricopa County Citizen Review Process with the required 
posting of the site and notification by first class mail to adjacent property owners within 300’ of 
the subject parcel and interested parties. The applicant submitted a Public Participation Results 
Report. To date, no opposition has been received. 
 
Outstanding Concerns from Reviewing Agencies: 
 
9. 
N/A

Z250024 
Page 6 of 8 
Staff Analysis: 
 
10. 
Maricopa County recognizes the need for diverse energy generation resources to support grid 
reliability and renewable energy integration. The proposed amendment to allow gas generating 
facilities and other industrial uses at HEGIC South would complement the existing solar and 
battery energy storage approvals by providing quick-starting, fast-ramping power generation 
capacity. The gas generating facilities would support the integration of renewable solar energy in 
the Harquahala Valley area while providing reliable backup generation during periods of peak 
demand or limited solar availability. The proposed facilities would comply with all local, state, and 
federal air quality regulations, with emissions monitored and reported pursuant to air permit 
requirements. 
 
11. 
Staff believes the proposed industrial uses are well suited to this remote area, which is already 
characterized by utility and industrial development. The subject site remains appropriate due to 
its proximity to electrical transmission infrastructure, the APS Delaney Substation, and the 
existing Harquahala Power Plant located a few miles to the south. The surrounding area consists 
of approximately 30,000 acres of approved utility and industrial uses, including multiple solar 
projects, battery energy storage facilities, and the Harquahala Power Plant, making HEGIC South 
a natural continuation of the established industrial character of the Harquahala Valley. The 
proposed gas generating facilities and associated infrastructure would not detrimentally affect 
the area given the remote location and existing industrial context. 
 
12. 
The expansion of allowed uses at HEGIC South reinforces Maricopa County's role as a leader in 
energy infrastructure development. The proposed amendment would promote economic diversity 
and employment opportunities by providing permanent campus employment as well as hundreds 
of construction jobs during development. Once operational, the site will contribute to the local 
economy through real and property taxes, helping to fund public services and infrastructure within 
Maricopa County. The amendment supports the comprehensive plan by recognizing the need to 
redesignate land uses in response to changing market conditions and increasing demands for 
energy generation capacity. As such, staff recommends approval of this zone change major 
amendment with conditions of approval that ensure the site remains appropriate for the area. 
 
13. 
Staff notes that the proposed amendment requests "all uses permitted in the IND-2 zoning 
district" as allowed uses. This can be problematic as most general industrial uses will require 
public water and wastewater.  However this site and surrounding area is an industrial area 
characterized by power generation, storage and distribution uses for which wastewater can be 
accommodated via septic systems. One of the proposed new uses are data centers. These can 
be appropriate when located remove from residential neighborhoods. It is appropriate to locate 
them in conjunction with power generation and storage due to their high power demand.  Staff 
recommends approval of the amended IND-2 IUPD zoning but with condition that IND-2 entitled 
uses are limited to those that can be accommodated via onsite wastewater and water until sewer 
and water system connections are available to the site.  The site is already zoned industrial which 
is consistent with area land use and development patterns. 
 
Recommendation: 
 
14. 
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors 
approve Z250024 subject to the following conditions ‘a’ – ‘j’: 
 
a. 
Development shall be in substantial conformance with the zoning exhibit entitled 
“Harquahala Energy Generation and Industrial Campus South” consisting of 1 full-size sheet,

Z250024 
Page 7 of 8 
dated July 2, 2025 except as modified by the following conditions. Staff may determine 
slight refinements to remain in substantial conformance with the approved site plan. Minor 
and major amendments to the site plan will be determined in accordance with Chapter 3 of 
the Maricopa County Zoning Ordinance. 
 
b. 
Development of the site shall be in substantial conformance with the narrative report 
entitled “HARQUAHALA ENERGY GENERATION & INDUSTRIAL CAMPUS (HEGIC) SOUTH”, 
consisting of 11 pages, dated December 11, 2025 except as modified by the following 
conditions. 
 
c. 
The following Planning Engineering conditions shall apply: 
  
1. Engineering review of planning and/or zoning cases is for conceptual design only. All 
development and engineering design shall be in conformance with Section 1205 of 
the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain 
Regulations for Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of application for 
construction. 
 
2. Based on the conceptual design nature of the information submitted, changes to the 
site layout may be necessitated by the final engineering design of the site’s drainage 
infrastructure. 
 
3. Maricopa County does not supply water, fire or sewer services. It is the 
applicant/owner’s responsibility to coordinate and secure water, fire and sewer 
services for this site. 
 
4. Sealed final Grading and Drainage (Site Infrastructure) Plans and Sealed Final 
drainage report must be submitted with the application for Building Permits. 
 
d. 
The following IND-2 IUPD Zoning District standards shall apply: 
 
1. Maximum Electric Transmission Line Height – 199’ 
2. Maximum Building Height - 90' (Not including gas generating facility stack height up 
to 199’) 
3. Maximum Lot Coverage - 60%, solar panel arrays are not calculated as lot coverage. 
4. Article 902.91 – All uses except for parking, loading, unloading, storage, electric 
generation, electric storage and electric transmission infrastructure shall be 
conducted within a completely enclosed building. 
5. Site Enclosure and Screening – At a minimum, chain-link fencing and gates shall be 
allowed on the perimeter of the project. One (1) foot of barbed wire strands will be 
incorporated atop 6-foot fencing for additional  security. Up to 12' aluminum anti-climb 
fencing allowed.  
6. Permitted uses – Solar electric generating facility and Battery Energy Storage System 
(BESS) – including ancillary offices and ancillary uses only, Gas generating facility and 
ancillary uses including accessory electrical substation, other power equipment, and 
distribution facilities. Water storage and treatment. All Uses Permitted in the IND-2 
Zoning District where wastewater can be accommodated via onsite septic and water 
systems until such time that sewer and/or water service is available to the site.

Z250024 
Page 8 of 8 
e. 
Noncompliance with any Maricopa County regulation shall be grounds for initiating a 
revocation of this zone change as set forth in the Maricopa County Zoning Ordinance.  
 
f. 
The IUP overlay is applied to restrict the use of the site. Until such time as the site is served 
by sewer, uses on the site shall only be those acceptable to the Maricopa County 
Environmental Services Department (MCESD) that can be accommodated by septic 
systems. A public water system and public sewer system shall be required prior to 
establishment of any non-residential use that requires potable water. 
 
g. 
Administrative approval of a Plan of Development will be required prior to approval and 
issuance of construction permits to develop and establish use of the site. Prior to issuance 
of a building permit, written confirmation will be required from the emergency fire protection 
jurisdiction having authority that the facility has been designed in accordance with their 
regulations and requirements, and that emergency fire protection service will be provided 
to the facility. Prior to issuance of the certificate of occupancy, local fire protection 
jurisdiction review and approval will be required. 
 
h. 
The property owner/s and their successors waive claim for diminution in value if the County 
takes action to rescind approval due to noncompliance with conditions.  
 
i. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
may be considered for reversion to the zoning that existed on the date of application in 
accordance with Maricopa County Zoning Ordinance requirements.  It is, therefore, 
stipulated and agreed that reversion of the zoning due to the failure to comply with any 
conditions does not reduce any rights that existed on the date of application to use, divide, 
sell or possess the property and that there would be no diminution in value of the property 
from the value it held on the date of application due to such reversion of the zoning.  This 
zone change enhances the value of the property above its value as of the date the zone 
change is granted, and reverting to the prior zoning results in the same value of the property 
as if the zone change had never been granted.  
 
 
Presented by: 
Joel Landis, Planner 
Reviewed by: 
Rachel Applegate, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Zoning Exhibit (1 page) 
 
Narrative Report (11 pages) 
 
MC Engineering Comments (1 pages)

/
Maricopa County Planning & Development - Phoenix, AZ
5
Gross Acres: 689 approx.
Generated February 4, 2026 10:24 AM
Z250024
Application Name:
Legal Description
Harquahala Energy Generation & Industrial Campus (HEGIC) South
Applicant
Case Address
1N 9W 21, 1N 9W 22
Keith Nichter
3604 S 515TH AVE
Applicant Phone/Email
Parcel Primary:506-28-004
(602) 313-7206
TONOPAH, AZ 85354
Map scale 1:25,880
Supervisor District No.
Zone Change Major Amendment to update a portion of the existing IND-2 IUPD zoning (Z2023131) to
amend the conditions, IUPD zoning & the approved POD to allow for other industrial uses on four parcels

W BROADWAY RD
W BROADWAY RD
W SOUTHERN AVE
W SOUTHERN AVE
W LOWER BUCKEYE RD
S 539TH AVE
W LOWER BUCKEYE RD
S 539TH AVE
S 507TH AVE
S 507TH AVE
S HARQUAHALA VALLEY RD
S HARQUAHALA VALLEY RD
S 531ST AVE
S 531ST AVE
30
28
27
26
25
19
20
23
18
17
16
15
14
13
24
29
21
22
N
0'
HARQUAHALA ENERGY GENERATION & INDUSTRIAL CAMPUS SOUTH
MARICOPA COUNTY, AZ
DRAWN BY: JK
SCALE: APPROX.
800'
1,600'
HARQUAHALA SUN III-V
SOLAR/BESS SITE
(CPA2022010/Z2023131)
HARQUAHALA SUN III-V
SOLAR/BESS SITE
(CPA2022010/Z2023131)
RU-43
LEGEND
EXISTING IND-2 IUPD
(LIGHT INDUSTRIAL) ZONING
FOR SOLAR & BESS USE
ARIZONA STATE LAND
DEPARTMENT (ASLD)
HARQUAHALA SUN III-V SITE
EXISTING UTILITIES AREA
(+/-9,047.58 AC.)
HARQUAHALA SUN II
SOLAR/BESS SITE
(CPA2022015/Z2022214)
HARQUAHALA SUN II
SOLAR/BESS SITE
(CPA2022015/Z2022214)
 07/02/2025
PROPOSED ZONING EXHIBIT
HARQUAHALA ENERGY
GENERATION AND INDUSTRIAL
CAMPUS (HEGIC) SOUTH
PROPOSED ZONING - IND-2 IUPD FOR OTHER INDUSTRIAL USES
PROPOSED ZONE CHANGE
MAJOR AMENDMENT TO AMEND
CONDITIONS, IUPD ZONING &
APPROVED POD FOR OTHER
INDUSTRIAL USES
HARQUAHALA ENERGY
GENERATION & INDUSTRIAL
CAMPUS (HEGIC) SOUTH
HARQUAHALA ENERGY
GENERATION & INDUSTRIAL
CAMPUS (HEGIC) SOUTH

kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
General Location: The proposed Project is located in an unincorporated portion of western Maricopa County. 
The site, currently vacant, is located 11 miles south-west of Tonopah, south of I-10, north of Broadway Road, 
between S Harquahala Valley Rd Avenue and S 531st Avenue in Township 1 North, Range 9 West, Sections 
21,22. 
 
 
 
Second Submittal: 11/07/2025, Revised 12/11/2025 
HARQUAHALA ENERGY GENERATION & 
INDUSTRIAL CAMPUS (HEGIC) SOUTH 
CASE #: Z250024                                                                                          
REQUEST: Proposed Zone Change Major Amendment to Amend Conditions, IUPD 
Zoning & Approved POD for Other Industrial Uses on Approximately +/- 697.77 Acres 
NARRATIVE REPORT

Page 2 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
 
 
 
 
 
 
 
TABLE OF CONTENTS 
1. PURPOSE OF REQUEST ......................................................................................................... 3 
2. DESCRIPTION OF PROPOSAL ............................................................................................... 4 
3. RELATIONSHIP TO SURROUNDING PROPERTIES ............................................................... 5 
4. LOCATION AND ACCESSIBILITY ........................................................................................... 8 
Location: .................................................................................................................................... 8 
Access: ...................................................................................................................................... 8 
5. CIRCULATION SYSTEM .......................................................................................................... 8 
Off-site Circulation (Access) ...................................................................................................... 8 
On-site Circulation ..................................................................................................................... 8 
Parking and Loading .................................................................................................................. 8 
6. DEVELOPMENT SCHEDULE ................................................................................................... 9 
7. COMMUNITY FACILITIES AND SERVICES ............................................................................. 9 
8. PUBLIC UTILITIES AND SERVICES ........................................................................................ 9 
TABLE 1: INDUSTRIAL UNIT PLAN OF DEVELOPMENT ............................................................. 9 
 
 
 
 
 
 
 
PROJECT TEAM
 
DEVELOPER  
 
         PLANNING/ENTITLEMENTS         ENGINEERING 
 
Harquahala Campus LLC              Kimley-Horn 
 
                  Kimley-Horn 
 
Contact: Dallas Pugh        
         Contact: Keith Nichter                    Contact: Brett Stroup  
619.208.0853  
 
         602.313.7206 
 
                  480.561.1438 
Dallas.Pugh@Copiapower.com            Keith.Nichter@Kimley-Horn.com          Brett.Stroup@Kimley-Horn.com 
TABLES AND EXHIBITS
 
Table A – Parcel/Ownership Data 
                             
Table B – Surrounding Adjacent General Land Descriptions  
Table C – Surrounding Adjacent Parcel Descriptions (Zoning and Land Use) 
Table D – Existing Surrounding Solar (Utility) Land Use Approvals 
Table E – Public Utilities and Services 
  
Exhibit 1 – Site Context Map – Existing Zoning  
Exhibit 2 – Surrounding Utilities/Industrial Land Uses

Page 3 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
1. PURPOSE OF REQUEST 
Kimley-Horn, on behalf of Harquahala Campus LLC (the “Applicant”) with permission of CV Harquahala LLC 
(the “property owner”) is proposing a Zone Change Major Amendment to update a portion of the existing IND-
2 IUPD zoning (Z2023131) to amend the conditions, IUPD zoning & the approved POD to allow for other 
industrial uses on four parcels, of the larger Harquahala Sun III-IV project, to allow for the development of the 
±697.77-acre Harquahala Energy Generation & Industrial Campus (HEGIC) South (the “Project”).  
Harquahala Sun III-V is an approved ±9,047.58-acre Photovoltaic Solar Energy Generation and Storage project 
that received unanimous Board of Supervisors approval for a Major CPA, from Rural Development Area to 
Utilities, on December 7, 2022 with a subsequent Zone Change with Overlay, from RU-43 and RU-190 to the 
IND-2 IUPD with a Plan of Development (POD), approval on July 24, 2024. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Major CPA Approval – 12/07/2022                                     Zone Change with Overlay Approval – 07/24/2024 
In addition to the utility-scale solar energy generation and battery energy storage system (BESS) uses currently 
allowed, this proposal will look to make a significant investment within Maricopa County by providing residents 
with additional crucial energy generation uses such as gas generating facilities and other ancillary uses, as 
shown in Table 1: Industrial Unit Plan of Development. 
 
Together, these facilities will maximize renewable energy available on the grid, providing substantial resources 
for local electric providers servicing the growing Arizona population centers, contributing to grid resilience and 
reliability. HEGIC South will also be a key contributor to numerous sustainability goals including reduced water 
consumption in electricity generation and decarbonization of the grid by providing essential resource adequacy 
capacity and reliability.

Page 4 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
Exhibit 1 – Site Context Map – Proposed Amendment Area  
2. DESCRIPTION OF PROPOSAL 
The Harquahala Energy Generation & Industrial Campus South is approximately 11 miles south-west of 
Tonopah within the Harquahala Valley area and is located, north of the W Broadway Road, between S 
Harquahala Valley Rd and 531st Avenue, as shown in Exhibit 1 – Site Context Map – Existing Zoning. The 
Project is made up of the following four (4) parcels:   
Table A – Parcel/Ownership Data: 
 
APN 
Owner Name 
Acreage 
T/R 
SEC 
Existing Zoning 
Existing Land 
Use Designation 
1 
506-27-014 
CV Harquahala LLC 
320.19
T01N R09W 
21 
IND-2 IUPD 
Utilities 
2 
506-28-001 
CV Harquahala LLC 
160.09
T01N R09W 
22 
IND-2 IUPD 
Utilities 
3 
506-28-002 
(Portion Of)
CV Harquahala LLC 
60.64
T01N R09W 
22 
IND-2 IUPD 
Utilities 
4 
506-28-004 
CV Harquahala LLC 
156.85
T01N R09W 
22 
IND-2 IUPD 
Utilities 
Total Site Ac (4 Parcels)
697.77 
AC
  
  
  
  
HEGIC South represents a cost-effective, reliable electric capacity and storage resource that will meet near-
term and long-term electric supply requirements, while first embracing available, low-carbon renewable energy. 
The Project includes quick-starting and fast-ramping power generation and storage capacity-based resources 
for reliable energy and critical integration of thousands of megawatts of renewable solar in the area.

Page 5 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
The amendment would further promote economic diversity and employment opportunities in the area by 
providing quality jobs. In addition to permanent campus employment, the Project will generate substantial 
economic activity during its development, including utility and support service jobs including hundreds of 
construction jobs. Once operational, the site will contribute significantly to the local economy through both real 
and property taxes, helping to fund public services and infrastructure within Maricopa County.   
3. RELATIONSHIP TO SURROUNDING PROPERTIES 
  
As seen in Table B – Surrounding Adjacent General Land Descriptions and Table C – Surrounding Adjacent 
Parcel Descriptions (Zoning and Land Use), the Project is agricultural or vacant property surrounded by other 
vacant and agricultural lands. HEGIC South would look to complement the other land uses in the greater 
Harquahala Valley area which include a host of existing and planned renewable energy production centers, 
battery energy storage facilities and industrial uses. These uses take advantage of the areas remoteness and 
existing infrastructure, anchored by the nearby Harquahala Power Plant located a few miles to the south. 
HEGIC South will comply with all local, State, and federal air quality regulations which are protective of human 
health and the environment. The emissions from Project will be under federal thresholds and will be closely 
monitored and reported pursuant to the requirements of the Project’s air permit. Total emissions will be more 
than offset through the integration services provided for renewable energy in the area. 
Table B – Surrounding Adjacent General Land Descriptions 
Direction
Zoning 
Land Use Designation 
Current Use  
Site 
IND-2 IUPD 
Utilities 
Agricultural/Vacant 
North 
RU-43 
Rural Development Areas 
Vacant 
East 
IND-2 IUPD/RU-43 
Utilities/Rural Development Areas 
Vacant 
South 
IND-2 IUPD 
Utilities 
Agricultural 
West 
IND-2 IUPD/RU-43 
Utilities/Rural Development Areas 
Agricultural/Vacant 
 
With this proper planning and strategic site selection, HEGIC South addresses the primary concern associated 
with the increasing regional demand for energy generation: the risk of developments encroaching upon 
residential and commercial areas, thereby disrupting neighboring communities. In response, Harquahala 
Campus LLC is committed to developing a master-planned campus that offers a cohesive framework for future 
energy generation—strategically located to minimize community impact and maximize access to critical 
infrastructure. 
HEGIC South looks to expand upon the ongoing improvements being constructed as a part of the approved 
Harquahala III-V (Z2023131) project. In addition, many of the nearby parcels have been subject to previous 
entitlements and approvals, by the Board of Supervisors, including the Applicants Harquahala Sun projects. 
Overall, there are roughly 30,000 acres of Utility/Industrial approvals within the immediate Harquahala Valley 
area, making HEGIC South a natural fit for this location. In addition to improving reliability, co-locating energy 
manufacturing with adjacent solar and BESS infrastructure supports long-term cost savings and sustainability 
goals. Additionally, offering more energy generation options provides significant operational, environmental, 
and economic advantages. This strategic pairing demonstrates a commitment to responsible development.

Page 6 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Ultimately, this synergy promotes faster project deployment, energy independence, and sensitivity to the 
surrounding community. 
 
Table C – Surrounding Adjacent Parcel Descriptions (Zoning and Land Use) 
Direction 
APN's 
Owner 
Zoning 
Current Use 
North 
506-27-009A 
Courthouse Ag Holdings LLC 
RU-43 
Agriculture 
West 
506-27-011A 
WF Investment LLC 
IND-2 IUPD 
Agriculture 
North 
506-27-012 
Courthouse Ag Holdings LLC 
RU-43 
Agriculture 
North 
506-27-013 
Courthouse Ag Holdings LLC 
RU-43 
Agriculture 
South 
506-27-015 
CV Harquahala LLC 
IND-2 IUPD 
Agriculture 
South 
506-27-019 
CV Harquahala LLC 
IND-2 IUPD 
Agriculture 
South 
506-27-035B 
Vallee Katherine M TR 
RU-43 
Vacant 
North 
506-28-003 
CV Harquahala LLC 
RU-43 
Agriculture 
North 
506-28-005A 
CV Harquahala II LLC 
IND-2 IUPD 
Vacant 
East 
506-28-006E 
Gyp Harquahala Holdings LLC 
RU-43 
Vacant 
East 
506-28-006F 
Gyp Harquahala Holdings LLC 
RU-43 
Vacant 
South 
506-28-014 
CV Harquahala LLC 
IND-2 IUPD 
Agriculture 
South 
506-28-015 
CV Harquahala LLC 
IND-2 IUPD 
Agriculture 
East 
506-28-025A 
CV Harquahala II LLC 
IND-2 IUPD 
Vacant 
East 
506-28-039 
El Paso Natural Gas Co. 
RU-43 
Utility 
East 
506-28-040 
El Paso Natural Gas Co. 
RU-43 
Utility 
 
Table D – Existing Surrounding Solar (Utility) Land Use Approvals 
Project 
Location (Township/Range) 
Maricopa Solar and Storage Project 
T1N R8W; T1N R9W; T2N R8W; T2N R9W 
Harquahala Sun 
T1N R9W 
Harquahala Sun II and III 
T1N R9W 
Saddle Mountain Solar I and II 
T1N R9W 
Eagletail Solar Farm 
T1S R9W 
Areva Solar AZ II 
T2N R7W 
Almeria Solar 
T2N R8W 
Sun Valley North 
T2N R8W 
Sun Valley South 
T2N R8W 
Maricopa Energy Center 
T2N R8W; T2N R9W 
Papago Solar 
T2N R8W 
Tonopah Photovoltaic 
T2N R8W

Page 7 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Exhibit 2 – Surrounding Utilities/Industrial Land Uses 
In addition to these planned utility and industrial 
developments, as shown in Exhibit 2 – Surrounding 
Utilities/Industrial Land Uses and Table D – Existing 
Surrounding Solar (Utility) Land Use Approvals, the 
surrounding area is mainly characterized by active 
and passive agricultural land uses, Bureau of Land 
Management 
(BLM) 
and 
Arizona 
State 
Land 
Department (ASLD) owned and managed lands, 
native desert lands along with a few sparsely 
distributed residential land uses.  
The proposed Zone Change Major Amendment 
request is consistent with the approved and/or 
implemented mixture of solar projects, BESS, a 
hydrogen facility, utility corridors, transmission lines, 
substations, a gas generation power plant and 
industrial uses all within an approximately 5-mile 
radius of the Project site.  
Approval of the Project strengthens the overall energy 
production output within Maricopa County. The 
increased local production overtime will create energy 
surplus within the market resulting in a reduction of 
cost and consumption by additional sectors of the 
local and regional economy. Project approval 
facilitates a larger regional share of renewable energy 
generation activities within the national production mix 
thereby promoting energy independence throughout 
related national industries and markets. 
 
Moreover, the Project aligns with the County’s 2030 Vision by recognizing the need to redesignate land uses 
in response to changing market conditions and to address the increasing demands of growth to the public 
infrastructure needs, specifically energy generation and consumption demands within the local economy. 
 
HEGIC South will support the county and greater region within the state by providing additional renewable 
energy resources for local energy reliability and resiliency. The location and surrounding utility land uses 
minimize impacts to neighbors and lessen the impact to the environment based on proximity to the APS Delaney 
Substation by minimizing very long electrical interconnects. The electricity generated through these facilities 
would be distributed to the regional electrical grid, supplying the county and state while directly benefitting 
Arizona corporations seeking competitively priced renewable energy and looking to add new clean energy 
resources to power the record number of people and companies moving to the state. Specifically, consistent 
with their 2020 Clean Energy Commitment, Arizona Public Service Co. (APS) is looking to add additional clean 
energy resources to its diverse power supply and has issued a request for proposals (RFP) to supply renewable 
energy, which the Project will respond to.

Page 8 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
4. LOCATION AND ACCESSIBILITY 
Location: 
The proposed Project is located in an unincorporated portion of western Maricopa County. The site, currently 
vacant, is located 11 miles south-west of Tonopah, south of I-10, north of Broadway Road, between S 
Harquahala Valley Rd Avenue and S 531st Avenue in Township 1 North, Range 9 West, Sections 21,22. 
Access: 
 
The Project is located south of Interstate 10 (I-10), approximately 30 miles west of the State Route 85 
(SR 85) connection to I-10.  
 
Regional access to the site will be from I-10 to Harquahala Valley Road southward past W Lower 
Buckeye Rd to the site.  
 
Access to the site will be established by a variety of full-access driveways determined during the 
subsequent Plan of Development.  
 
Maricopa County Department of Transportation (MCDOT) requires that driveways be spaced a 
minimum of 250 feet from adjacent intersections on major collector roadways.  
5. CIRCULATION SYSTEM 
Off-site Circulation (Access) 
The roadway network serving the proposed Project from the I-10 corridor includes the I-10/Salome Highway 
interchange that connects Salome Hwy to Harquahala Valley Rd. The site can be accessed from the I-10/ 
Salome Highway interchange. Salome Highway provides connections to Harquahala Valley Road which 
extends south past W. Lower Buckeye Road to the Project. Primary access to the Project is via Harquahala 
Valley Road on the east side of the site. There are a few smaller, existing roads, both named and unnamed, 
that traverse the Project site, which are anticipated to be used and improved for construction and ongoing 
operations of the Project. Site access will be identified with the zone change major amendment and plan of 
development applications. Final access locations will be determined in accordance with access management 
policies and permitting requirements of Maricopa County. 
 
Harquahala Energy Generation & Industrial Campus South will work with MCDOT to coordinate the 
preservation and/or dedication of necessary right-of-way, including the 65’ half street right-of-way for 
Harquahala Valley Road and a minimum of 55’ half street(s) right-of-way dedication for W Broadway Rd. Per 
Maricopa County Zoning Ordinance Section 1105, HEGIC South will provide the necessary setbacks starting 
from the future half street rights-of-way of 65’ and 55’ respectively. Offsite improvements and any additional 
right-of-way needed will be determined by MCDOT Traffic Design and MCDOT Permits based on the submittal 
of a TIA/TIS. Final dedication, preservation, alignments, terminations, and vacations of unneeded ROW will be 
determined in negotiation with MCDOT. 
On-site Circulation  
Internal circulation is planned via a network of private driveways and maintenance and service drive aisles to 
provide vehicular access to the proposed facilities. For all solar, BESS and energy generation uses, driveway 
aprons (as specified by MCDOT), shall be paved with a minimum asphalt millings bound with a liquid binding 
emulsifier, or comparable, with the remainder of the typical 20’ internal drives being compacted decomposed 
granite (DG), or similar road base material to minimize imperviousness and stormwater runoff, as proposed

Page 9 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
with an approved dust control permit from Maricopa County Air Quality Control. Construction and maintenance 
of the drives will conform to applicable requirements of the Maricopa County Air Quality Control Department.  
Parking and Loading 
HEGIC South’s proposed parking requirements, as a part of this IUPD, are because the operational model of 
the proposed uses differ significantly from traditional industrial facilities since the proposed uses require little 
on-site staff. During operations or maintenance parking, loading, and temporary maintenance staging will occur 
within designated area within the substation(s)/yard(s) areas. Loading during maintenance activities in the solar 
field will occur on private 20-foot (typical) all weather surfaced roads among the solar arrays and BESS Yard 
as coordinated on the future Plan of Development. 
6. DEVELOPMENT SCHEDULE 
Following approval of the Zone Change Major Amendment application, the Applicant would submit a separate 
Plan of Development (POD) application for administrative review. Pending POD approval and subsequent 
permit approvals, the Applicant would move forward with an initial phase of the development with the size and 
scope subject to market conditions at the time of approvals. 
7. COMMUNITY FACILITIES AND SERVICES 
The Project is not anticipated to generate any adverse impacts to the listed school districts. The Project is 
located within the following district boundaries: 
 
Western Maricopa Education Center (MEC) Technical School District (District Ward No. 2) 
 
Buckeye Union High School District No. 1 
 
Arlington School District No. 47 
8. PUBLIC UTILITIES AND SERVICES 
Unless otherwise coordinated with County staff during the subsequent POD, given the limited employees on-
site, the proposed energy generation uses are planned to operate without public water/sewer sources. 
Service(s) to the Project site will be provided by the following providers. Water for construction purposes will be 
transported to the site. 
Table E – Public Utilities and Services 
UTILITY/SERVICE 
AGENCY/PROVIDER 
Water 
Hauled / Well 
Sewer 
Septic / Accessible portable restroom facilities, for solar, BESS and 
energy generation, as needed for maintenance activities. In the event that 
a future O&M building is built and/or permanent employees are present 
on the site wastewater will be treated by septic. 
Electric Service  
Arizona Public Service 
Fire Protection (including EMS 
and Ambulatory Services) 
Harquahala Valley Fire District 
Police Protection 
Maricopa County Sheriff Office 
Refuse (Waste Management) 
Republic Services 
Telephone 
American Telephone and Telegraph (AT&T) Co 
Irrigation 
Harquahala Valley Irrigation District

Page 10 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
TABLE 1: INDUSTRIAL UNIT PLAN OF DEVELOPMENT 
 
Regulation 
Zoning District Regulations 
(IND-2 IUPD) 
HEGIC SOUTH IND-2 IUPD Zoning District Regulations  
Max. Height 
40' 
90' (Not including gas generating facility stack height up 
to 199’) 
Min. Front 
Yard Setback
10'-25'; 0' for solar panels; 
100’ for BESS containers 
10'-25'; 0' for solar panels; 100’ for BESS containers 
Min. Side Yard 
Setback 
3'-10'; 0' for solar panels; 
100’ for BESS containers 
3'-10'; 0' for solar panels; 100’ for BESS containers 
Min. Rear 
Yard Setback
0'-25'; 0' for solar panels; 
100’ for BESS containers 
0'-25'; 0' for solar panels; 100’ for BESS containers 
Min. Lot Area
6,000 sq. ft. 
6,000 sq. ft. 
Min. Lot Width
60’ 
60’ 
Max. Lot 
Coverage 
60% Maximum  
60%, solar panel arrays are not calculated as lot 
coverage. 
Landscaping
No landscaping required 
No landscaping required. 
Parking 
Regulations 
None required 
None required.  
Paving 
Regulations 
 
Parking/paving material 
allowed to be stabilized 
decomposed granite with an 
approved dust control plan by 
Maricopa County Air Quality 
Control. 
 
 
Parking/paving material allowed to be stabilized decomposed 
granite with an approved dust control plan by Maricopa 
County Air Quality Control.

Page 11 
kimley-horn.com
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
Loading & 
Unloading 
None required 
None required 
 
Site Visibility 
Triangles 
(SVT’s) 
No SVT’s at project site 
entry/exit points, section line 
and midsection line 
intersecting alignments. 
No SVT’s at project site entry/exit points, section line and 
midsection line intersecting alignments.  
Uses/Building 
Enclosures 
A waiver from Article 902.9 
as applied to solar arrays; 
they will not be located inside 
enclosed buildings. 
All uses except for parking, loading, unloading, storage, 
electric generation, electric storage and electric 
transmission infrastructure shall be 
conducted within a completely enclosed building. 
Site 
Enclosure and 
Screening 
Chain-link fencing and gates 
shall be allowed on the 
perimeter of the project. One 
(1) foot of barbed wire 
strands will be incorporated 
atop 6-foot fencing for 
additional security. 
At a minimum, chain-link fencing and gates shall be allowed 
on the perimeter of the project. One (1) foot of barbed wire 
strands will be incorporated atop 6-foot fencing for additional 
security. Up to 12' aluminum anti-climb fencing allowed. 
Allowed Uses
Solar electric generating 
facility and Battery Energy 
Storage System (BESS) – 
including ancillary offices and 
ancillary uses only. 
Solar electric generating facility and Battery Energy Storage 
System (BESS) – including ancillary offices and ancillary uses 
only, Gas generating facility and ancillary uses including 
accessory electrical substation, other power equipment, 
and distribution facilities. Water storage and treatment. 
All Uses Permitted in the IND-2 Zoning District. 
Maximum 
Electrical 
Transmission 
Line 
Height 
150’ 
199’

Anh Harambasic, PE 
Planning & Development 
301 W. Jefferson St., Suite 170 
Phoenix, Arizona 85003 
Phone: (602) 506-3611 
www.maricopa.gov/planning 
email address: 
Anh.Harambasic@maricopa.gov 
  
Planning & Development 
 
Engineering Plan Review 
 
 
Date:    
October 13, 2025 
 
Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development 
 
Attn: 
Joel Landis Planner, Planning & Development Services 
 
via: 
Doug Jones P.E., Engineering Supervisor, Planning and Development 
 
From: 
Anh Harambasic P.E., Plans Examiner Engineer, Planning & 
Development 
 
Subject:   
Z250024 Harquahala zone change from Z2023131 
APN(s): 
506-28-004,506-27-014, 506-28-001 
Description-Application for a plan of development to establish a site for electric battery 
storage facility.       
Engineering Review has reviewed the first site plan and narrative routed for review for 
on 8.29.2025 for the request for a Zone change with major amendment to update a 
portion of the existing IND-2 IUPD Zoning from Z2023131 to allow for the conditions 
IUPD zoning and the approved POD to allow for other industrial uses on the four 
parcels for the development of Harquahala Energy generation.  Engineering has no 
objections to the zone change except any approvals are subject to the following 
conditions:    
 
GENERAL DRAINAGE REVIEW/INFORMATION 
1. Engineering review of planning and/or zoning cases is for conceptual design only. 
All development and engineering design shall be in conformance with Section 
1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; 
Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; 
and current engineering policies, standards and best practices at the time of 
application for construction. 
 
2. Based on the conceptual design nature of the information submitted, changes to 
the site layout may be necessitated by the final engineering design of the site’s 
drainage infrastructure. 
 
3. Maricopa County does not supply water, fire or sewer services.  It is the 
applicant/owner’s responsibility to coordinate and secure water, fire and sewer 
services for this site. 
 
4. Sealed final Grading and Drainage (Site Infrastructure) Plans and Sealed Final 
drainage report must be submitted with the application for Building Permits. 
 
 
 
Please contact me with any questions.

DATE:  
3/3/26 
 
TO: 
 Planning & Zoning Commission   
 
From: 
 Joel Landis, Planner  
 
SUBJECT: 
 Z250024 – HEGIC South   
 
 Agenda Item: 3 
 
 
 
Staff has received feedback from the applicant regarding certain aspects of the staff 
report. The changes regard ensuring that the requested use is for a gas generating 
facility rather than a data center. Staff agrees with these requested changes. The 
changes are to paragraphs one and thirteen and are as follows: 
 
1. 
The applicant, Keith Nichter, is requesting to amend the IND-2 IUPD zoning for 
the Harquahala Energy Generation & Industrial Campus (HEGIC South). This 
will allow for a data center use gas generating facilities on a 690 697.77-acre 
portion of four parcels of the overall 9,048 acre Harquahala Sun III-IV site. The 
subject site is designated as a ‘Utilities’ land use per Maricopa County’s Vision 
2030 Comprehensive Plan ( CPA2021010). There is not a precise plan of 
development at this time, but will be  submitted for administrative approval 
prior to construction permitting. 
 
13. Staff notes that the proposed amendment requests "all uses permitted in 
the IND-2 zoning district" as allowed uses. This can be problematic as most 
general industrial uses will require public water and wastewater.  However this 
site and surrounding area is an industrial area characterized by power 
generation, storage and distribution uses for which wastewater can be 
accommodated via septic systems. One of the proposed new uses are data 
centers gas generating facilities. These can be appropriate when located 
remove from residential neighborhoods. It is appropriate to locate them in 
conjunction with power generation and storage due to their high power 
demand.  Staff recommends approval of the amended IND 2 IUPD zoning but 
with condition that IND-2 entitled uses are limited to those that can be 
accommodated via onsite wastewater and water until sewer and water

system connections are available to the site.  The site is already zoned 
industrial which is consistent with area land use and development patterns.