Summary Sheet- WSS ISSUE REVIEW SUMMARY
Extracted text (via pymupdf)
3456 characters
MEMORANDUM – ISSUE REVIEW SESSION TO: Mayor and Council THROUGH: Keith Burke, Deputy City Manager, (480) 350-5819 Shelly Seyler, Interim Engineering and Transportation Director, (480) 350-8854 Isaac Chavira, Interim Deputy Engineering and Transportation Director, (480) 350- 8349 FROM: Catherine Hollow, Principal Civil Engineer, (480) 350-8445 Ellie Volosin, Senior Civil Engineer, (480) 350-8629 DATE: 1/11/2024 SUBJECT: All-Pedestrian Phase at Mill Avenue and 5th Street AGENDA ITEM: 3A PURPOSE: To provide the Council with an overview of the current operations of the pilot all-pedestrian phase currently operating at the intersection of Mill Avenue and 5th Street. RECOMMENDATION OR GUIDANCE REQUESTED: Staff is seeking Council feedback on the permanent configuration moving forward: Make the all- pedestrian phase permanent or revert to the standard phasing. CITY COUNCIL STRATEGIC PRIORITY AND RELATED PERFORMANCE MEASURE: 3.26 – 20 Minute City BACKGROUND INFORMATION: In February 2023, City of Tempe staff were asked to implement an all-pedestrian phase signal timing at the intersection of Mill Avenue and 5th Street, with the purpose of creating a unique pedestrian experience for those visiting the downtown area. While a standard phasing scheme allows pedestrians to cross at the same time as the green light for through traffic parallel to the desired pedestrian movement, the all-pedestrian phase scheme does not allow any pedestrian movement during vehicle green phases and allows all pedestrian movements (including diagonal movements) during a separate additional phase in the cycle. City staff collected some pre-launch data at that time, and then launched the all-pedestrian phase timing on March 8, 2023. Literature review of the research surrounding this phasing scheme provided some guidance, recommendations, cautions, and strategies for the most successful type of implementation. City staff provided Council with an overview of the operations at this intersection in June 2023. That presentation provided a summary of data collected from various sources during the pilot test, including observed queue lengths, corridor travel times, observations of user compliance, stakeholder feedback, and the summarized results of the public survey conducted during the month of March 2023. At the conclusion of the June 2023 presentation, Council elected to extend the pilot test period for an additional 6 months. The attached presentation provides a summary of current operations at the intersection of Mill Avenue and 5th Street. Data summaries include observations of travel time, user compliance, observations from Tempe PD, and feedback from Mill Avenue businesses. 2 FISCAL IMPACT or IMPACT TO CURRENT RESOURCES: If the City decides to revert the signal timing scheme at this location back to the standard phasing, there is not associated cost aside from staff hours. If the City decides to make the all-pedestrian phase permanent, structural changes to the intersection would be needed in order to ensure safe permanent operations. These changes include temporary paint and striping for the crosswalk updates, audible pedestrian push buttons on all corners, and larger permanent signage. The total cost of these changes is estimated to be $30,000. Permanent changes to the intersection pavement will be incorporated in the Mill Avenue Refresh project. ATTACHMENTS: 1. ALL-PEDESTRIAN PHASE FOLLOW-UP POWERPOINT