LOTTO WOOD WELL
Attachment “B”
JOB ORDER AGREEMENT
THIS AGREEMENT is niade and entered into this / a day of MAGEH, 202gby and between
i _., (hereinafter referred to as “Contractor”) and the City of El Mirage, Arizona, a municipal
corporation, (hereinafter referred to as “City”").
Whereas, City issued Request for Proposal (hereinafter "RFQ) No. PWI9 - JOCO2 seeking proposals from
contractors to provide Job Order Contracting for water and wastewater projects on property owned and/or controlled by City;
and,
Whereas, Contractor submitted a response to City RFQ No. PWI9 - JOCO2 offering to provide Joh Order
Contracting for water and wastewater projects from identified property owned and/or controlled by City (hereinafter
“Proposal”); and,
Whereas, Contractor was awarded a Contract to provide services in conformance with the requirements of RFQ No.
PWI9 - $0C02.
NOW, THEREFORE, Contractor and City hereby agsee as follows:
1,
6.
Contractor agrees, at its own cost and expense, to do all the work and furnish all the equipment, personnel and materials
necessary to provide, in a good and substantial manner and to the satisfaction of the City, the following work, Job Order
Contracting for water and wastewater projects, in accordance with the City of El Mirage RFQ No. PWI9 - JOCO2 and
Contractor’s contract in response to RFQ No. PWI9 - JOCO2, which are hereby specially referred to and by such
reference miade a part hereof in their cntirely. RFQ No. PW19 - JOCO2 shall consist of the fullowing documents, which
are incorporated herein by this reference: Notice of Request for Qualifications; Instructions and Proposal Conditions;
Scope of Work and Project Specifications; Cieneral Terms and Conditions; Proposal; Appendices; and Exhibits.
. City agrees to pay Contractor, and Contractor agrees to accept, as full compensation for furnishing all equipment,
personnel and materials and for doing all the work contemplated and embraced in this Agreement, the amounts sct forth
in Contractor's contract in response to RFQ No. PWES - JOCO2.
. The Cily hereby promises and agrees with the Contractor to retain, and does hereby retain, Contractor to provide the
equipment, and personnel and materials and to do the work according to the terms and conditions herein contained and
referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the
conditions as provided; and the said parties for themselves, their heirs, executors, administrators, successors and assigns,
do hereby agree to the full performance of the covenants herein contained.
It is further expressly agreed by and between the puartics that should there be ay conflict between the terms of this
Agreement, RFQ No. PW19 - JOCO2 or the Proposal, then this Agreement and the provisions terms of RFQ No, PW19 -
JOCO2 shall control and nothing herein shal! be considered as an acceptance of the terms of the said Proposal conflicting
herewith or RFQ No. PW19 - JOCO2, unless expressly so stated herein.
. Time is of the essence to the ternis of this contract.
FEDERAL AND STATE EMPLOYMENT IMMIGRATION LAWS. To the extent applicable under A.R.S. § 41-4401,
Contrastor warrants its and its subcontractors compliance with all fedural immigration laws and regulations that relate to
their compliance with the E-verity requirements under A.R.S. § 23-214(A). Contractor's or its subcontractors’ breach of
the above-mentioned warranty shall be deemed a material breach of the Agreement and may result in the termination of
the Agreement by the City of El Mirage. The City of El Mirage retains the legal right to randomly inspect the papers and
records of Contractor and its subcontractors to ensure that the Contractor and its subcontractors are complying with the
above-mentioned warranty.
The Contractor warrants to keep the papers and records open for random inspection during normal business hours by the
City of Bl Mirage. The Contractor shall cooperate with the City of El Mirage’s random inspections including granting the
City entry rights to Contractor's property to perform the random inspections and waiving its right to keep such papers and
records confidential. The failure of Contractor to comply with this warranty regarding the keeping of papers and records
and cooperating with the City's random inspections shall constitute a material breach of the Agreement and the City shail
have the right to immediately terminate the Agreement.
16
The Contractor further agrees to include the following language in all subcontracts entered into by Contractor with any
person or cntity to pertorm work on the Agreement and to terminate the agreement with any subcontractor who violates
any of the warranties set forth in said language below.
To the extent applicable under A.R.S. § 41-4401, Subcontractor warrants to Contractor and the City of E)
Mirage Subcontractor’s compliance with all federal immigration taws and regulations that relate to ils
compliance with the E-verify requirements under A.R.S. § 23-214(A). Subcontractor’s breach of the above-
mentioned warranty shall be deemed a material breach of the Agtecment and niay result in the termination of the
subcontract by Contractor at the direction of the City of El Mirage. Subcontractor further acknowledges the City
of El Mirage’s right to randomly inspect the papers and records af Subcontractor to ensure that Subcontractor is
complying with the above-mentioned warranty.
Subcontractor warrants to keep the papers and records open for random inspection during normal business hours
by City of El Mirage. Subcontractor shall cooperate with City of El Mirage’s random inspections including
granting the City entry rights to Subcontractor’s property to perform the random imspections and waiving their
respective rights to keep such papers and records confidential. The failure of Subcontractor to comply with this
warranty regarding the keeping of papers and records and failure to cooperate with the City’s random
inspections shall constitute a material breach of the Agreement and the City shall have the right (0 i mmediately
require Contractor (o terminate the Agreement with Subcontractor.
Executed and entered into on the date first written above.
CITY: CONTRACTOR:
Public Works Department Director (Contractor Representative)
Job Order Cost Proposal
{4
FISH
GRAND HERITAGE, BRIGHT FUTURE!
CONTRACTOR NAME: The Fishel Company
Contract Type: Water Wastewater JOC - PW19-JOC02 City Project No.: Cottonwood Well Chem. Treatment
Job Order No.: 3 Contractors Job No.: 2020-0971
City Project Mgr.: -Scott Ketchmark Prepared By: Kris Lyon
Fee Type: GMP Date: 3.4.2020
Location: 16401 N. Nash Rd, Surprise AZ 85373 Revision: Revo
Job Title: Cottonwood Well Chemical Treatment
Description of Work to be See attached Cost Estimate for Empire Pump to Chemincaly Treat the Existing Well located at the Cottonwood
Performed (supporting Well Site. Two Treatments and Removal/Disposal of Chemicals. Chemicals tobe discharged to existing Waste
information attached): Systems (Chemicals do not require Neutralization or Special Handling).
SECTION 1: LABOR (inclusive of burden) - . Labor Cost
Position Unit Quantity ‘ . Total
Estimator Hours - $ 75.00 | $ :
Project Manager Hours 4.00 $ 80.00 | $ 320.00
Project Engineer Hours - $ 55.00 | $ :
Admin Hours 6.00 $ 35.00 | $ 210.00
Project Superintendent Hours 12.00 $ 75.00 | $ 900.00
Foreman Hours : $ 65.00 | $ :
Craftsman Hours - $ 45.00 | $ :
Apprentice / Laborer Hours - $ 28.50 | $ -
Elect Professional Engineer Hours - $ 85.00 | $ -
Elect Project Manager Hours - $ 80.00 | $ :
Elect Technician - Lead Hours : $ 55.00 | $ :
Elect Technician - Journeyman Hours : $ 45.00 | $ :
Elect Technician - Apprentice Hours - $ 36.00 | $ :
Elect General Laborer Hours - $ 28.50 | $ -
Elect Admin Hours : $ 35.00 | $ :
*Any emergency or T&M work that requires overtime will be billed at 1.5 times the listed Unit Prices. $ 1,430.00
SECTION 2: EQUIPMENT (supporting information attached) Equipment Cost
Item Unit Quantity Unit Price Total
Backhoe Hours : $ - 4$ :
Excavator Hours : $ : $ :
Loader Hours - $ : $ :
Boom Truck Hours - $ : $ :
Water Truck Hours - $ - $ :
Water Wagon Hours - $ : $ -
Air Compressor Hours, - $ -_ |$ :
Compactor - Hand Hours - $ - $ =
Dump Truck Hours - $ - $ -
Roller Hours : $ : $ :
ext, Reach Forklift Hours : $ : $ :
Crane Hours : $ : $ :
Pickup Truck - Light Duty Hours - $ - $ -
Pickup Truck - 1 Ton Hours - $ -_ |$ 7
Small Tools & Supplies (Consumables) Hours - $ : $ -
Manlift Hours - $ - {$ -
Portable Welder Hours : $ -_ [$s :
Other Equipment Hours - $ : $ :
Subtotal Equipment Cost (B)] $ -
Page 1 of 2 rev 4/9/2018 LH
SECTION 3: MATERIALS
Material Cost
Item Unit Quantity Unit Price Total
Material - 01 : $ -_ I$ :
Material - 02 - $ : $ -
Material - 03 - $ -_|$ :
Material - 04 - $ -_ I$ :
Material - 05 - $ -_ I$ =
- $ - |$ -
Subtotal Material Cost (C)| $ -
SECTION 4: SUBS & CONSULTANTS Description of Work to be Performed Total Cost
Company (Supporting quote & information attached)
Empire Pump Corporation Chemical Treatment of Existing Well $ 42,591.50
TBD $ =
TBD $ :
TBD $ =
TBD $ :
Subtotal Subcontractors & Consultants (D)| $ 42,591.50
SECTION 5: RENTAL EQUIPMENT Description of Rental Equipment Total Cost
Company (Supporting quote & information attached)
TBD $ -
TBD $ :
TBD $ -
| Subtotal Rental Equipment (E)| $ :
SECTION 6: GENERAL CONDITIONS OF THE WORK General Conditions Cost
Item Unit Quantity Unit Price Total
Mobilization / Demobilization Ls 1.00 $ -_ I$ -
Permits & Environmental Controls Ls 1.00 $ -_|$ :
Temporary Facilities & Controls LS 1.00 $ - $ -
Engineering / Testing Ls 1.00 $ : $ :
Site Support Ls 1.00 $ : $ :
Miscellaneous / Other Ls 1.00 $ -_|$ z
Subtotal General Conditions (F)| $ :
OVERHEAD: 12.00% (% to be taken from matrix)
PROFIT: 10.00% (% to be taken from matrix)
Subtotal General Contractor Costs (1+2+3+5+6): $ 1,430.00
O&P (20% of 1+2+3+5+6): $ 314.60
Total General Contractor Costs including O&P: $ 1,744.60
Subtotal Subcontractor Costs (4) $ 42,591.50
Subcontractor Profit (5% of 4) $ 2,129.58
Total Subcontractor Costs including Profit: $ 44,721.08
TOTAL GC Cost (Including O&P) and Subcontractor: $ 44,336.10
Costs (including Subcontractor Profit): $ 46,465.68
Insurance Costs @ 1.0% $ 443.36
Bond Costs @ .7% $ 310.35
Sales Tax (65% of 9.3%) $ 2,725.68
Tax Exemption Credit: $ :
Subtotal Job Cost: $ 49,945.07
Project Contingencies $ -
Project Allowances $ :
Owner must provide prior approval (in writing) before the use of any Allowance or Contingency Funds
TOTAL JOB COST: $ 49,945.07
Submitted by:
Auctaphir We. Lyon 3.4.2020
Project Mandger 0 Date
Page 2 of 2 rev 4/0/2018 LH
Oz0z/0t/S TOWSL = 9TMd ees {3 30 AID SQuevayweyy jEusis Iyjesy S8A 00°L82’E0T l00'282‘E0t | 00'z8z'E0t | OZZ- OOv-TZ 40H >MEHPOY)
6107/0E/6 @pt-7t0z # ehayaNg 30 AD Sunund iq Aupn weworsn> SOA (00°00S'S@ oo'oos’sz | oo'00s’se | ete-or-es | somsas sewoysna ‘Duy “09 Bunuid puepuers|
Oz0z/tT/Z PE-LTdsd # BIePUAID 30 AAD S@2"URS JED paroUy SULIg BpInosg SOA 00°00S'Z oo'oos’Z | Oo°00s’2 | sEt-pOr-Es | somses saUIOISND Seomuas pes 2uny SyuLg|
OOTTEEET OOTTEEet | ELE-TzS-OT Sed
(00°000ST oorosr’et_ | Eté-Eor-es SHRM
> aseuy jo As ‘Saamuas 23: di "$697 Duy ‘adedsau
6LO¢/TE/ZT GOINT - Std 282s [3 30 AID Was sdueuaUIeW adeaspue] SBA anvzos |°' S96 corres | etezzSOr sopapes yl eD|
OO‘OTT eer OO'OTT’6st | ETE-0Or-Tz #0H
020¢/t/t TOWD-LIMd a8enW 13 30 AD saouuas Sues Surpjing 2K (00°00028 ‘00°000'28 | oo000'8 | Ete-z7s-0T Samper SQUEUSIUIEWN [eIPAISND g UeId|
W9948303 9807-60 # IVDH SJBUJEIUOD YSEIL SOA 00°000°Z7 00°000'Zr | o0'000'Zy | €zz-0Or-zs uonewues Swiarsis [eqUaWIUOIUAZ OLLO}
‘Suyduies ssueyduios Arowejnsou (00°000°Sz oo'000'se_[ E€€-000-6S FSIEMaISEM,
: adwe. K jenjuyse1 puede”
6102/ST/6 vO-ETT-STGNM# 130 Ar Buyjduses soueyjduios Aroweynday S8A 00°000°SE 00°000’09 oo000%se | ese-cores TEM ‘SDIAIRS JeUYIAL PI 1)
T20z/0E/9 898E-S88-BUM # JojpueYD JO AID quaUReaA JaIeMarseM JO} [eDWayD S84 (00°000°SE oo'oo0'’se | o0'000’se | zzz-00r-1s Javemarsem DU] S4APAIOd INS|
JOIEM JUANIYe JO UONIJUISIG 00"000‘s8 00°000'S8 | Z2Z-00b-S JaJemayseMm
uel "000"
Tz0z/0E/9 898E-S88-BVM # JBIpUeYD 40 AID TaieM siqeiod jo wORSaIUIIG sa, on 000%z 07 O00'ETT | cowrae | zercOpes TEM S484i09 IIH]
0z0z/0E/9 TOGHS-LTMdi S82 13 30 AD esodsip SapnIs x O0'00s"voT_{00'00S"r0t | O0'o0S"vot | veE-OOH-rs JRENSISEM Suos pue 5922,
UR—IBI9AZ SBCA 13 30 AD SeoyAlas sulp/da. pue yse.y fenuapisey * 00°000'SZ6 }00°000°S26 | 00°000°S26 | 9EE-00F-@S Sd1IAJas JWOISN s Pue Sed
0z02/6T/E DIOSHT# PeIUOD Bfepuony Jo AyD BuRooysaiqnon pue siyedas wayshs VGWIS S2A 00°000°ST 00°000'st | _00°000'ST TLE-O0b-1S JaIEMAISEM {pave
Juawanosduyj UOReS J83S00g -dID 00°000'0T 00°000‘0T €29-800-ES JEM
O20Z/6T/9 | ZZOdUST# Je.QUOD aePs}I0s 30 AND Sayedas {e013333;9 SRODUE|BISIW, 52, (00°000'Sz. o'000'sz |_o0'000'se | EtE-0Or-rS aezemaysem S@LNSNpUl [eD1N29}3 J3I12y|
Suredas Jeo1339/9 sROaUeT|eIsI 00°000'07 00°000'0r | ELE-E0r-eS J3IeM
0202/22/6 POTIPT # PERUOD x1UBOYY 40 AUD Su JIVEM, SOA 00°000‘09 00°000'09 | o0'00009 | Oz2-E0r-ES JeIeM Aiddns 3 adig seis urequnoW
Sugooysaiqnoy pue siedes waysks VOWS 00°000‘St 00°000'ST TTE-E0r-ES JEM
oft PeEQUOD UOsINy Jo sa, "000" sayisnpuy 2jdd!
0202/v/1 ZO-LLLOET # DEM 1 30 ARID (raseya) sean 1g 51S FM JD A D0'000°STE 00 O00'0ET Fo ccoere Tt Eze gores EM wasnpU; addry
0202/s/e ZOD0f-6TMd # OF BBE 1330 AND PURQeY BUN SYM -diD SOA 00°000’sz 00°000'sz | 00°000'st | 029-80%-bS JaIEMaISeM uonngsuoD Aauiep
Juausere|das JMO] YM - dID 00°000'S67 00°000°S6Z | _LT9-80b-S Ja VeMIISEM
agen "000"
_ eeor/s/e 7OD0f-6TMd # D0 HW. 13 30 AD SOUEUSIUIEW ued aBeIONS JAIEM = dD S20 007000009 100°000'S68 00°000°ZZS | €29-B00-5 TEM vonpnasuo) x19]
+ p__vOOOf-6TMd # DOF e824 1330 AID | Seonies s1edes Wassis Jezem snosue||oIsIN 00°000‘0S oo'000'oy | €té-cor-es soem 7 : = =|
< jo |_S0001-6T Md # JOFABEH 1230 AD. -Seoyues pue Seda, O25 [AM 2 £ 00°000'SZT /00'000‘0St|-SSz-E0t-eS JEM 7
—— — —— =100'000‘ Auedwio. jaysty at
oc/sle | ooretma #DOrSsenI BIO AD JuswaAoiduiy Andes aus [Mad 5A oro |°0'0'S2E Foc coors | eza-sores Tae | Faust SUL
ZODOf-6TMd # OL aBesW 13 30 AID quawace|day We! JOMaS - JID ‘00°000°0S o0'000%0s | 029-80b-rS JajemarseM
SUOJSUSIXS 392AU0D jJ2 7B [!uNOD Aq panaidde AjsnojAaid
Ot0e¢/TE/E ZZT99T-Odsav Andy Aempiy, UteiSo1d JusUIDIE|day SPIYDA - did 00°00S'92 00°00S'92_|{ 0S9-29S-0T Agayes Surpying
~ k BJOsAayD Aempit
Oz0z/TE/E ZZT99T-Odsdv AnayD Aempin Wesso1g JUaWAIE|day BPIUEA - dD WN 0000897 00°000'€S Foy oosor 0S9-2vS-0T Supssuguy djosnayD Aempiny
0202/TE/E LTT99T-OdSGv Psod e10ag Wweiso1d JUaWa2e|dey SPIUEA - did 00°000°Z7 gs9zv'ov | 0s9-Tzs-0T ed
O202/TE/E LTT99T-OdSGV Psos BOed Wesd0lg JuaWare|day aPIYeA - dID vN 00°000°L¢ yEOST'97T | _ET'L88'cy | OS9-OOH-TZ 3UNH Paoy eoag
Oz0¢/TE/E LTT99T-OdSAV Pso3 BL0ag wess01g JUaUEDe|dey SPIGA - did 00°000'Z GU'Les'ty | OS9-E0r-ES JEM
waedssen3 9807-60# IVDH SPIYeA Surueaf) Jamas voReWIqWOD -diID vN coooo’oor —_—[o0'o00'ese | ez‘ese’zee | 219-80r-bS semas “Uy “U0-e/\
WN 3240s 310S sayedau duind ajqissauiqns snoaueliaosi vN oo'ooo’ozt —_[oo'o00‘ozt | oo'oo0’oet | 95¢-00r-1S aajemaysem Hof]
aqeg ‘dg 1eaoaddy poeoxg
CF no! no»: uoIstAL sopua,
pesuoD (ennessdooa) # envoy asodang aeak-ninw | 0} 30U jUnNOWY TOL Od | unowy $ | qunorVv 15 a BUSA
Sulsajqj [9UNOD GTOT ‘ST aung - sjeaoiddy 39e4}U09 paysanbay Jo 3st]