Extracted text (via pymupdf)
1114 characters
6WUDWHJLF3ULRULWLHV CITY OF EL MIRAGE CAPITAL PROJECT 352-(&7-867,),&$7,21 PROJECT DESCRIPTION 6XEPLWWHG'HSDUWPHQW %XGJHWHG'HSDUWPHQW 'LYLVLRQ 352-(&729(59,(: 1R &,35(48(67 PROJECT ,0$*(6 <HV Project No. $FFRXQW1R 3URMHFW$PRXQW 6WDUW'DWH *UDQW)XQGLQJ 5HODWHG3URMHFWV 3URMHFW6WDWXV Well Site Security Improvement Public Works Water N/A 62076 $ 175,000 Security improvements needed at the Thompson Ranch and Rockwood well sites. The project consists of constructing 1.100 linear feet of concrete (CMU) 8" x 8" x 16" block fence 8' high with sliding steel grates, man doors, and security equipment. The existing chain link fencing is in poor condition and does not provide adequate security to the site. The new block fencing will e consistent with other City well sites and provide enhanced security, noise reduction, privacy and visual appeal. FY19/20 - Thompson Ranch well site. FY20/21 - Rockwood well site. Carryforward FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 $0 $0 $0 $0 53-Water Fees $125,000 $125,000 $125,000 $0 $0 $0 $0 $125,000 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 $0 $0