Application Packet

City of El Mirage — Regular Meeting (2021-02-18)

View PDF Item 4 Meeting page

Extracted text (via pymupdf) 49386 characters
Zoning Application Submittal 
 
for 
 
The Legacy at Pueblo El Mirage RV Resort 
 
 
 
To allow for the development of a 29-lot single-family residential 
development on approximately 4.85 acres located at the vicinity of the 
southwest corner of 17th Avenue and Park Place in City of El Mirage, 
Arizona 
 
APN: 
501-86-408A & 501-86-441A & 501-86-474A & 501-86-503A & 501-86-553 
 
 
 
 
 
Submittal date: 
April 24, 2020 
 
VICINITY MAP 
N 
n.t.s.

Zoning Application Narrative for a proposed 31-lot SFR Development 
The Legacy at Pueblo El Mirage RV Resort 
Page 2 of 3 
 
 
 
Introduction & Purpose of Request: 
 
This application seeks an approval for developing a 29 Single Family Residential 
development known as The Legacy at Pueblo El Mirage RV Resort on approximately 
4.85 acres located at the vicinity of the southwest corner of 17th Avenue and Park Place 
in the City of El Mirage, Maricopa County, Arizona.  
 
The APNs are: 
501-86-408A & 501-86-441A & 501-86-474A & 501-86-503A & 501-86-553 
 
This site known as The Legacy, within the Master Planned Community of Pueblo El 
Mirage RV Resort, has been recorded Previously under Book 275, Page 45, of 
Maricopa County Recorder Office, Maricopa County, Arizona. It is the intention of this 
application to alter the layout of The Legacy development boundary from its original 
layout configuration to better attain a certain desired lotting yield, but well within the 
maximum allowable yield of 1,553 lots throughout the entire community. 
 
Doing so will require a replat of portions of APN 501-86-408A & 501-86-441A & 501-86-
474A & 501 86-503A & 501-86-553. 
 
This proposed project further proposes to modify the existing improvements including 
paving, grading, water, and sewer systems to accommodate the proposed 
development’s needs. 
 
 
Included with this zoning application narrative report submittal are: 
 
1. The zoning application 
 
2. The proposed 29 lots final plat named as The Legacy 
 
3. Development drainage report outlining the proposed stormwater management 
and all floodplain relate data 
 
4. Development sewer design “basis of design” report outlining the proposed 
wastewater management system 
 
5. Development water distribution system “basis of design” report outlining the 
proposed water distribution system 
 
6. Processing Fee

Zoning Application Narrative for a proposed 31-lot SFR Development 
The Legacy at Pueblo El Mirage RV Resort 
Page 3 of 3 
 
 
 
 
Site Information: 
 
APN:  
501-86-408A & 501-86-441A & 501-86-474A & 501 86-503A & 501-86-
553 
Site Size: 
4.85 acres 
Location: 
Vicinity of the southwest corner of 17th Avenue and Park Place, in the City 
of El Mirage, Arizona 
 
 
 
Applicant: 
 
SKG Enterprises, Inc. 
ATTN: 
Shakir Gushgari, PE 
9260 E. Raintree Drive, Suite 140 
Scottsdale, AZ  85260 
 
Phone: 
480-998-5600 
Fax: 
480-998-5603 
Email: 
shakirg@skgaz.com

4022 East Greenway Road Ste. 11 #208  Phoenix, Arizona 85032
Phone  602.574.6171      Phone  208.558.0143
Extreme Land Surveying, Inc.
HORIZ:
VERT:
SCALE:
DATE:
CKD:
DSN:
of
E-mail  m3kjennings@gmail.com
JOB#
SHEET
NOTES
”
NOTICE OF MILITARY OVER FLIGHTS
FLOOD ZONE
DEVELOPER
OWNER
CIVIL ENGINEER
LAND SURVEYOR
BASIS OF BEARING
BENCHMARK
AREA TABLE
PERTINENT DOCUMENTS
FINAL PLAT
"THE LEGACY"
FINAL PLAT
"THE LEGACY"
PLAT CERTIFICATION
DEDICATION
ACKNOWLEDGEMENT
APPROVAL OF CITY ENGINEER
APPROVAL BY CITY COUNCIL
CERTIFICATE OF COMPLIANCE
 LEGAL DESCRIPTION
”

4022 East Greenway Road Ste. 11 #208  Phoenix, Arizona 85032
Phone  602.574.6171      Phone  208.558.0143
Extreme Land Surveying, Inc.
HORIZ:
VERT:
SCALE:
DATE:
CKD:
DSN:
of
E-mail  m3kjennings@gmail.com
JOB#
SHEET
FINAL PLAT
"THE LEGACY"
FINAL PLAT
"THE LEGACY"
NOT TO SCALE

Prepared by: 
 
SKG Enterprises, Inc. 
9260 East Raintree Drive, Suite 140 
Scottsdale, Arizona 85260 
Phone (480) 998-5600 
Fax (480) 998-5603 
 
 
MAY 2020 
 
PUEBLO EL MIRAGE: THE LEGACY 
DRAINAGE REPORT ADDENDUM 
 
 
 
Prepared for: 
Pueblo El Mirage RV Resort 
8350 E. Raintree Drive, Suite 220 
Scottsdale, AZ  85260 
(480) 425-8696 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
SKG Project # 127-9

The Legacy 
Drainage Report & Addendum 
 
 
 
 
i
TABLE OF CONTENTS 
EXPLANATION OF THE LEGACY ADDENDUM ................................................................ 1 
INTRODUCTION......................................................................................................................... 2 
FLOOD INSURANCE RATE MAP ........................................................................................... 6 
OFFSITE DRAINAGE ................................................................................................................. 6 
ONSITE DRAINAGE ................................................................................................................... 6 
 
 
 
EXHIBITS 
 
Exhibit 1 
General Vicinity Map 
 
Exhibit 2 
“The Legacy” Vicinity Map 
Exhibit 3 
“The Legacy” Close Up Map 
 
 
APPENDICIES 
 
 
Appendix A 
FEMA FIRMette 
Appendix B 
Drainage Exhibit

The Legacy 
Drainage Report & Addendum 
 
 
 
 
1
EXPLANATION OF THE LEGACY ADDENDUM 
The proposed “Legacy” residential community within the master planned community of 
Pueblo El Mirage RV Resort consists of 29 lots (141,218 square feet) and 40,736 square feet of 
roadway (including 4” roll curbs). The purpose of this drainage report addendum is to determine 
the change in stormwater capacity due to the proposed development, delineate the management 
of stormwater flow within the proposed development, determine the hydraulic capacity of the 
proposed onsite retention basin and adjacent wash the onsite stormwater will discharge to, and 
determine the hydraulic capacity of the proposed roadway within “The Legacy” development 
and its ability to convey the hydraulic stormwater load. 
 
The total area of the lots impacted by the proposed development totals 181,954 S.F. (4.18 
Ac.) and constitutes a total 24.77 CFS 100-year event and a 15.52 CFS 10-year event to the 
hydraulic requirements, split the proposed “onsite basin 1” and the existing wash located directly 
adjacent to the southwestern boundary of the proposed development: 
 =  ∗ ∗ 
 
Where: 
		,	 = 
 ℎ
 () 
		 = 7.5  ℎ

 (100 −"
 #$) 
	 = 4.7  ℎ

 (10 −"
 #$) 
 = 4.18 . ('$ 
 () 
*,  ) 
,+,-. = 0.79 (0ℎ$1 23()) ())$) 
,+45 = 0.50 (0ℎ$1 23()) ())$) 
 
		6+,-. = 77.5  ℎ

8(4.18 
. )(0.79) = 9:. ;; <=> (?@@ −AB CDCEF) 
	6+,-. = 74.7  ℎ

8(4.18 
. )(0.79) = ?G. G9 <=> (?@ −AB CDCEF) 
 
		6+45 = 77.5  ℎ

8(4.18 
. )(0.50) = ?G. HI <=> (?@@ −AB CDCEF) 
	6+45 = 74.7  ℎ

8(4.18 
. )(0.50) = J. I9 <=> (?@ −AB CDCEF) 
 
As it can be seen, the proposed developments constitute an increase of 9.09 CFS and 5.70 CFS 
for the 100-yr and 10-yr events, respectively, compared to their current conditions. No other 
deviations have been made from the original approved master drainage report aside from the 
grading revisions and related onsite stormwater flow calculations.

The Legacy 
Drainage Report & Addendum 
 
 
 
 
2
 
INTRODUCTION 
 
This report is prepared in partial fulfilment of the improvement plans’ submittal requirement 
for the proposed subdivision development of “The Legacy”, within the existing master planned 
community of Pueblo El Mirage RV Resort in El Mirage, Arizona. The proposed development to 
the master planned community consists of 29 lots to the south of the intersection of W. 17th Avenue 
and N. Park Place. This proposed subdivision development legally falls within a portion of the 
northwest quarter of Section 24, Township 3 North, Range 1 West, of the Gila and Salt River base 
and meridian, Maricopa County, Arizona, as recorded in Book 775 of Maps, Page 43 of Maricopa 
County Records. 
 
The purpose of this report is to present the proposed design and drainage concepts of the 
proposed addition of “The Legacy” development within the existing master planned community. 
Approximately 1310 linear feet of additional roadway is proposed in “The Legacy” development, 
and subsequent sections will show that the proposed roadway system’s hydraulic capacity is 
sufficient to handle the hydraulic capacity requirements of the proposed development. Lots 5-18 will 
drain under towards the back of the lots and directly into “Lower El Mirage Wash” or the adjacent 
existing waterway. Lots 1-4, Lots 19-29, and the proposed roadway will all drain to along the 
proposed roadway and within the hydraulic capacity of the road to the southwestern portion of the 
proposed development, ultimately discharging at two points into the “Lower El Mirage Wash”, as 
the site does under current undisturbed conditions. The following pages present the general and close 
up location exhibits for “The Legacy” proposed development.

The Legacy 
Drainage Report & Addendum 
 
 
 
 
3
 
 
 
 
 
 
Exhibit 1 
 
 
 
 
 
(General Vicinity Map)

The Legacy 
Drainage Report & Addendum 
 
 
 
 
4
 
 
 
 
 
 
Exhibit 2 
“The Legacy” Vicinity Map 
Red outline delineates “The Legacy” development area.

The Legacy 
Drainage Report & Addendum 
 
 
 
 
5
 
 
 
 
 
 
 
 
 
 
Exhibit 3 
“The Fairways II” Close-Up Map 
Red line delineates location of 29 proposed lots within “The Fairways II”.

The Legacy 
Drainage Report & Addendum 
 
 
 
 
6
FLOOD INSURANCE RATE MAP 
 
The Legacy development segment is located within Zone X as shown on FEMA Flood Insurance 
Rate Map (FIRM) per Flood Insurance Rate Map (FIRM) number 040131C1680 L dated October 
16, 2013, and updated on February 27, 2015 (See Appendix A: FEMA FIRMette).  Zone X is 
defined as “Areas of 500-year flood; areas of 100-year flood with average depths of less than 1 
foot of with drainage areas less than 1 square mile; and areas protected by levees from 100-year 
flood”.  
It should be noted that a flood-hazard designated flood “AE” zone (Lower El Mirage Wash) is 
located to the southwest of “The Legacy” proposed lots 10 to 18 (see Appendix A). 
 
 
OFFSITE DRAINAGE 
 
The portion of land being developed is bounded fully by “S. Park Place” and existing lotting to the 
northwest, an existing golf course to the northeastern and southeastern boundaries of the proposed 
development, and by “Lower El Mirage Wash” and the subsequent “Creekside” development area 
to the southwestern portion of the development boundary. All offsite flows in this area have been 
addressed under the previous master drainage report, and the proposed grading design does not 
deviate from the original design – only the “weighted runoff coefficient” for the proposed 
development area has change, slightly increasing the stormwater flow that the system will experience 
(calculations shown in subsequent sections).  
 
ONSITE DRAINAGE 
 
The proposed lots within “The Legacy” development are designed to drain one of two ways: (1) 
front-drainage towards the proposed roadway, to be carried within the hydraulic capacity of the 
roadway and ultimately discharged into “Lower El Mirage Wash” at two discharge points, or (2) 
back-drainage towards existing waterways which can handle the additional hydraulic load without 
modification. Of the proposed lots, lots 5-19 have been designed under the back-draining concept, 
while the remainder of the lots are designed under the front-draining concept (see Appendix B: 
Drainage Exhibit). The rational equation was used to determine the increase in onsite stormwater 
volume due to the proposed development of “The Legacy” community, as shown below:

The Legacy 
Drainage Report & Addendum 
 
 
 
 
7
𝑄= 𝐶𝑊∗𝑖∗𝐴 
Rainfall intensity values were obtained from Figure 9-4 of the Maricopa County Hydrology 
Manual for both the 100-year and the 10-year stormwater events. Time of concentration values 
(Tc) were obtained using Kirpich’s formula, as follows: 
𝑇𝑐= 0.0078 (𝐿0.77
𝑆0.385
⁄
) 
Where: 
𝑇𝑐= 𝑇𝑖𝑚𝑒 𝑜𝑓 𝐶𝑜𝑛𝑐𝑒𝑛𝑡𝑟𝑎𝑡𝑖𝑜𝑛 (𝑚𝑖𝑛) 
𝐿= 𝑇𝑟𝑎𝑣𝑒𝑙 𝐿𝑒𝑛𝑔𝑡ℎ (𝑓𝑡) = 565 𝑓𝑡 
𝑆= 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑆𝑙𝑜𝑝𝑒 (𝑓𝑡
𝑓𝑡
⁄
) = 0.0055 
Through Kirpich’s formula, a value of 7.61 minutes for the time of concentration was calculated, 
and a conservative value of 7 minutes was then used in figure 9.4 of the Maricopa County 
Hydrology manual, resulting in intensity values for the 100-year and 10-year stormwater events 
of 7.5 in/hr and 4.7 in/hr, respectively. Of the 29 proposed lots, 15 of them (70,171 SF) are front-
draining lots contributing to the street hydraulic capacity. The following calculations take into 
account the 16 front-draining lots (70,171 SF) and 40,736 square feet of roadway (including 4” 
roll curbs).  
Pre-Development Conditions: 
 
𝑄100 = (7.5 𝑖𝑛ℎ𝑟
⁄
)(2.55 𝑎𝑐. )(0.50) = 𝟗. 𝟓𝟔 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
𝑄10 = (4.7 𝑖𝑛ℎ𝑟
⁄
)(2.55 𝑎𝑐. )(0.50) = 𝟓. 𝟗𝟗 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
 
Post-Development Conditions: 
 
𝑄100 = (7.5 𝑖𝑛ℎ𝑟
⁄
)(2.55 𝑎𝑐. )(0.79) = 𝟏𝟓. 𝟏𝟏 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
𝑄10 = (4.7 𝑖𝑛ℎ𝑟
⁄
)(2.55 𝑎𝑐. )(0.79) = 𝟗. 𝟒𝟕 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
 
Post- and Pre-Development Difference: 
∆𝑄100 = 15.11 𝐶𝐹𝑆−9.56 𝐶𝐹𝑆= 𝟓. 𝟓𝟓 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
∆𝑄10 = 9.47 𝐶𝐹𝑆−5.99 𝐶𝐹𝑆= 𝟑. 𝟒𝟖 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕)

The Legacy 
Drainage Report & Addendum 
 
 
 
 
8
Therefore, the proposed developments for the roadway and the front-draining lots will contribute 
a maximum of 5.55 CFS addition of stormwater flow to the stormwater system ultimately 
discharging to the “Lower El Mirage Wash” system, as it currently does under current conditions. 
 
Proposed lots 5 to 18 will also follow the current drainage pattern by following the back-drainage 
concept and ultimately discharging to the existing wash/waterways that they do under current 
undisturbed conditions. The same rainfall intensity values used to calculate stormwater discharge 
from the previous calculations were also used for calculations of back-draining lots 5-18 (71,047 
SF). As the undeveloped area currently drains onsite stormwater under the same conditions, the 
increase to the “Lower El Mirage Wash” and subsequent basins is minimal, as calculated below 
using the rational method formula for the peak discharge: 
𝑄= 𝑖∗𝐴∗𝐶𝑊 
Pre-Development Conditions: 
 
𝑄100 = (7.5 𝑖𝑛ℎ𝑟
⁄
)(1.63 𝑎𝑐. )(0.50) = 𝟔. 𝟏𝟏 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
𝑄10 = (4.7 𝑖𝑛ℎ𝑟
⁄
)(1.63 𝑎𝑐. )(0.50) = 𝟑. 𝟖𝟑 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
 
Pre-Development Conditions: 
 
𝑄100 = (7.5 𝑖𝑛ℎ𝑟
⁄
)(1.63 𝑎𝑐. )(0.79) = 𝟗. 𝟔𝟔 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
𝑄10 = (4.7 𝑖𝑛ℎ𝑟
⁄
)(1.63 𝑎𝑐. )(0.79) = 𝟔. 𝟎𝟓 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
 
Post- and Pre-Development Difference: 
∆𝑄100 = 9.66 𝐶𝐹𝑆−6.11 𝐶𝐹𝑆= 𝟑. 𝟓𝟓 𝑪𝑭𝑺 (𝟏𝟎𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
∆𝑄10 = 6.05 𝐶𝐹𝑆−3.83 𝐶𝐹𝑆= 𝟐. 𝟐𝟐 𝑪𝑭𝑺 (𝟏𝟎−𝒚𝒓 𝒆𝒗𝒆𝒏𝒕) 
 
Therefore, the proposed developments for the back-draining lots will contribute a maximum of 
3.55 CFS addition of stormwater flow to the stormwater system ultimately discharging to the 
“Lower El Mirage Wash” system, as it currently does under current conditions.

APPENDIX A 
FEMA FIRMette

National Flood Hazard Layer FIRMette
0
500
1,000
1,500
2,000
250
Feet
Ü
112°19'28.96"W 
33°35'27.27"N 
112°18'51.51"W 
33°34'57.30"N 
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile  Zone X
Future Conditions 1% Annual
Chance Flood Hazard Zone X
Area with Reduced Flood Risk due to
Levee. See Notes. Zone X
Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard
Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5
Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of 
digital flood maps if it is not void as described below. 
The basemap shown complies with FEMA's basemap 
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 4/22/2020 at 12:30:25 PM  and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes. 
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
1:6,000
B
20.2
The pin displayed on the map is an approximate 
point selected by the user and does not represent 
an authoritative property location.

APPENDIX B 
Drainage Exhibit

WASTEWATER (SEWER) COLLECTION SYSTEM 
BASIS OF DESIGN REPORT 
For 
The Legacy 
Pueblo El Mirage RV Resort 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Prepared By: 
SKG Enterprises, Inc. 
9260 E. Raintree Drive 
 
Suite 140 
 
Scottsdale, Arizona 85260 
 
April 2020

TABLE OF CONTENTS 
 
 
 
1.0 
INTRODUCTION .......................................................................................................................................... 1 
2.0 
PROPOSED WASTEWATER COLLECTION SYSTEM  ........................................................................ 2 
3.0 
ESTIMATED PEAK DISCHARGE ............................................................................................................. 2 
4.0 
CONCLUSIONS ............................................................................................................................................. 3 
 
 
EXHIBITS 
 
EXHIBIT 
 
 
 
 
 
DESCRIPTION 
 
1 
Parcel Location Map 
 
2 
Hydraulic Calculation 
  
3 
The Legacy Sewer Design Layout 
 
 
APPENDIX  
 
 
 
 
DESCRIPTION 
 
     A  
 
 
 
 
 
COEM Collection System Design Criteria

Pueblo El Mirage RV Resort - Sewer BOD Report 
 
 
The Legacy 
 
1 
 
 
 
1.0 
INTRODUCTION 
This wastewater (sewer) basis of design (BOD) report is generated in order to analyze the 
proposed sanitary sewer system described herein. The purpose of this proposed sanitary 
sewer system is to provide wastewater services to the 29 lots within the property known 
as “The Legacy” within the master planned community of Pueblo El Mirage RV Resort 
as recorded in Book 275, Page 45, of Maricopa County Recorder Office, Maricopa 
County, Arizona. This “Legacy” project is approximately 4.85-acre in size and falls 
within the City of El Mirage Quarter Section map number 20-02. A parcel location map 
is given in “Exhibit 1” below. 
 
Currently there is no wastewater generated from the above described parcel. The 
proposed sewer system involves the addition of 1,358’ of 8” (PVC-SDR-35) of sewer line 
material to ultimately tie-in to an existing manhole located adjacent to the northwest 
corner of the project parcel. As such, this wastewater (sewer) BOD report is generated in 
support of the proposed development of the Legacy project as shown in Exhibit 3 of this 
report, labeled, “The Legacy Sewer Design Layout”. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 1 – Parcel Location Map

Pueblo El Mirage RV Resort - Sewer BOD Report 
 
 
The Legacy 
 
2 
 
 
 
 
 
2.0 
PROPOSED WASTEWATER COLLECTION SYSTEM 
The existing sewer manhole to tie into is located within the adjacent roadway (Park 
Place) just northwest of the parcel. This existing manhole ties into an 8” PVC sewer line 
with the following existing data: 
 
Existing Manhole (Southeastern section within APN 501-86-408A) 
1. Existing manhole Rim Elevation 
 
1106.23 
2. Existing manhole Flow Line Elevation (E) 1097.08 
3. Existing Manhole depth 
 
 
9.15 feet 
4. Existing Sewer Line Size 
 
 
8-inch in diameter 
(NOTE: the above existing data is based on site topographic data provided by Extreme Land Surveying, LLC on 
April 2020) 
 
The proposed sewer line consists of (1) 1,358’ of 8-inch diameter PVC-SDR-35 material 
sloping at a minimum of 0.33%, (2) 7-each of 4” sewer cleanouts, (3) 29-each of 4” 
sewer tab services and (4) 5-each of 4’ diameter manholes. The line will be designed to 
attain a minimum scouring velocity of 2.0 feet-per-second (fps) when flowing full (d/D = 
0.65) at a minimum slope rate of 0.33%. Once the proposed Sewer plans are city 
approved, it is the intent that construction activity will commence shortly thereafter. 
 
 
3.0 
ESTIMATED PEAK DISCHARGE  
 
The estimated wastewater generation from the subject development (29 residential lots) is 
estimated based on the parameters shown in the table below. 
 
Land use 
Person/ 
House 
Hold 
Average 
Daily 
Flow/ 
House 
Hold 
Total 
Average 
Daily Flow 
Peak 
Factor 
Peak 
Flow/ 
House 
Hold 
Total 
Peak 
Flow 
(dry) 
Wet 
Weather 
Factor 
Total 
Peak 
Flow 
(wet) 
Residential 
3.4 
210 gpd 
6,090 gpd 
4.0 
840 
gpd 
24,360 
gpd 
1.17 
28,501 
gpd 
gpd: gallons per day

Pueblo El Mirage RV Resort - Sewer BOD Report 
 
 
The Legacy 
 
3 
 
 
 
 
It should be noted that the proposed 8” line capacity exceeds both the estimated total 
average daily flow and the estimated total peak flow generated from the contributing 29 
lots into this sewer system. Exhibit 2 presents hydraulic calculation of the proposed 8” 
sewer line with the estimated total average daily flow of 6,090 gpd (or 0.01 CFS), the 
estimated total peak flow (dry) of 24,360 gpd (or 0.04 CFS), the estimated total peak flow 
(wet) of 28,501 gpd (or 0.04 CFS, used 0.05 CFS to be conservative), and the flow at 
maximum volume (d/D=0.65). 
 
City of El Mirage requirements state dry weather peak flow must not exceed a d/D of 
0.50 and wet weather peak flow must not exceed a d/D of 0.90. Under the proposed 
design, dry weather peak flow d/D = 0.16, and wet weather peak flow d/D = 0.19, both of 
which are well within the maximum limits set forth by the City of El Mirage. 
 
The proposed Sewer Design Layout concept for The Legacy is shown in Exhibit 3 of this 
report. 
 
 
 
4.0 
CONCLUSIONS 
 
 The project is located in City of El Mirage corporate limit. 
 The proposed sewer system is designed in accordance with the City of El Mirage and 
Policies and designed to be composed of 8-inch diameter pipe of a PVC, SDR-35 
material with a minimum slope rate of 0.33%.

Exhibit 2 
Hydraulic Calculations

Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
Tuesday, Apr 21 2020
<Name>
Circular
Diameter (ft)
=  0.67
Invert Elev (ft)
=  1000.00
Slope (%)
=  0.33
N-Value
=  0.013
Calculations
Compute by:
Known Q
Known Q (cfs)
=  0.01
Highlighted
Depth (ft)
=  0.06
Q (cfs)
=  0.010
Area (sqft)
=  0.02
Velocity (ft/s)
=  0.63
Wetted Perim (ft)
=  0.41
Crit Depth, Yc (ft)
=  0.05
Top Width (ft)
=  0.38
EGL (ft)
=  0.07
0
1
Elev (ft)
Section
999.75
1000.00
1000.25
1000.50
1000.75
1001.00
Reach (ft)
Average Daily Flow
8", 6,510 GPD

Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
Tuesday, Apr 21 2020
<Name>
Circular
Diameter (ft)
=  0.67
Invert Elev (ft)
=  1000.00
Slope (%)
=  0.33
N-Value
=  0.013
Calculations
Compute by:
Known Q
Known Q (cfs)
=  0.04
Highlighted
Depth (ft)
=  0.11
Q (cfs)
=  0.040
Area (sqft)
=  0.04
Velocity (ft/s)
=  1.06
Wetted Perim (ft)
=  0.56
Crit Depth, Yc (ft)
=  0.09
Top Width (ft)
=  0.50
EGL (ft)
=  0.13
0
1
Elev (ft)
Section
999.75
1000.00
1000.25
1000.50
1000.75
1001.00
Reach (ft)
Total Peak (Dry)
8", 26,040 GPD

Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
Tuesday, Apr 21 2020
<Name>
Circular
Diameter (ft)
=  0.67
Invert Elev (ft)
=  1000.00
Slope (%)
=  0.33
N-Value
=  0.013
Calculations
Compute by:
Known Q
Known Q (cfs)
=  0.05
Highlighted
Depth (ft)
=  0.13
Q (cfs)
=  0.050
Area (sqft)
=  0.05
Velocity (ft/s)
=  1.03
Wetted Perim (ft)
=  0.61
Crit Depth, Yc (ft)
=  0.11
Top Width (ft)
=  0.53
EGL (ft)
=  0.15
0
1
Elev (ft)
Section
999.75
1000.00
1000.25
1000.50
1000.75
1001.00
Reach (ft)
Total Peak (Wet)
8", 30,467 GPD

Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
Tuesday, Apr 21 2020
<Name>
Circular
Diameter (ft)
=  0.67
Invert Elev (ft)
=  1000.00
Slope (%)
=  0.33
N-Value
=  0.013
Calculations
Compute by:
Known Depth
Known Depth (ft)
=  0.44
Highlighted
Depth (ft)
=  0.44
Q (cfs)
=  0.540
Area (sqft)
=  0.25
Velocity (ft/s)
=  2.20
Wetted Perim (ft)
=  1.27
Crit Depth, Yc (ft)
=  0.35
Top Width (ft)
=  0.64
EGL (ft)
=  0.52
0
1
Elev (ft)
Section
999.75
1000.00
1000.25
1000.50
1000.75
1001.00
Reach (ft)
Max Volume
8", d/D=0.65

Exhibit 3 
Legacy Sewer Design Layout

design
job no.
revisions
date
approved
sheet
127-9
SKG
SKG
SKG ENTERPRISES, INC.
9260 E. RAINTREE DRIVE
SUITE 140
SCOTTSDALE, AZ. 85260
PH) 480-998-5600
FAX) 480-998-5603
WWW.SKGAZ.COM
PROJECT NO. 
04/2020
CITY OF EL MIRAGE, MARICOPA COUNTY, ARIZONA
THE LEGACY
EXHIBIT 3
PUEBLO EL MIRAGE R.V. RESORT - THE LEGACY
SEWER LAYOUT

Appendix A 
COEM Collection System 
Design Criteria

WATER DISTRIBUTION SYSTEM 
BASIS OF DESIGN REPORT 
FOR 
THE LEGACY 
      
 
 
 
    Prepared For: 
 
     Pueblo El Mirage RV Resort 
     8350 E. Raintree Drive, Suite 220 
     Scottsdale, AZ  85260 
      
 
      
  
 
Prepared By: 
 
 
 
 
SKG ENTERPRISES, INC. 
9260 E. Raintree Drive 
Suite 140 
Scottsdale, AZ  85260  
 
 
Ph:   (480) 998-5600 
 
 
 
 
Fax: (480) 998-5603 
www.skgaz.com  
 
 
 
SKG Job No. 127-9 
April 2020 
 
COEM#: E xx-xxxx

TABLE OF CONTENTS 
 
 
 
1.0 
INTRODUCTION .......................................................................................................................................... 3 
2.0 
EXISTING WATER DISTRIBUTION SYSTEM ....................................................................................... 4 
3.0 
WATER DEMAND ........................................................................................................................................ 4 
4.0 
PROPOSED ONSITE WATER DISTRIBUTION SYSTEM ..................................................................... 5 
5.0 
CONCLUSIONS ............................................................................................................................................. 6 
 
 
 
EXHIBITS 
 
Exhibit 1 - Site Location Map  
Exhibit 2 - Proposed Onsite Water System Schematic 
Exhibit 3 – Water Layout 
 
 
APPENDICIES 
 
 
Appendix A -  Fire Hydrant Flow Test Results 
Appendix B - International Fire Code 2018, Section B105, Table B105.1(1) 
Appendix C – Hydraulic Modeling Results 
Appendix D – City of El Mirage Water System Sizing Criteria 
Appendix E – Arizona Administrative Code, Title 18, Chapter 9

3  
 
 
 
1.0 
INTRODUCTION 
 
 
This report is prepared in partial fulfillment of the improvement plans submittal 
requirement for the development of 29 lots denoted “The Legacy”. It lies within the 
master planned community “Pueblo El Mirage RV Resort” in El Mirage, Arizona as 
recorded in Book 275, Page 45, of Maricopa County Recorder Office, Maricopa County, 
Arizona. The proposed “Legacy” development is located within the vicinity of the 
intersection of 17th Avenue and Park Place and consisting of 4.85 acres in size. It also lies 
within the City of El Mirage Quarter Section number 20-02, see Vicinity Map (Exhibit 1) 
below for the site’s general location. 
 
The proposed Legacy development consists of 29-residntial units of 58’ wide by 80’ deep 
in dimension. The general terrain of the subject parcel slopes from northeast to southwest 
at a relatively flat slope rate. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Exhibit 1 – Site Location Map 
 
The purpose of this report is to describe the water distribution system proposed for this 
project including water demand and connection to the existing water distribution system.

4  
 
 
 
2.0 
EXISTING WATER DISTRIBUTION SYSTEM 
 
According to as-built topographic data provided by Extreme Land Surveying, LLC in 
April 202, the existing water system which the proposed “Legacy” would connect to is 
located along the south side of Park Place and consists of an existing 8” polyvinyl 
chloride (PVC) pipe. The existing water system is located directly north of The Legacy 
Development 3’ south of the Park Place Roadway’s Prism. Therefore, the proposed 
development of The Legacy will connect to this existing 8” PVC for its water needs as 
depicted in Exhibits 2 and 3 located at the end of this report. 
 
3.0 
WATER DEMAND 
 
As previously noted, The Legacy development is a single family residential development, 
comprising of 29 lots. The average day and peak day demand for these lots were 
calculated based on the City of El Mirage Water and Wastewater Master Plan dated 
December 2014 and fire flow demand were adopted as per Appendix B, Section B105, 
Table B105.1(1) of the 2018 International fire code and are summarized in table below. 
 
Average day demand (gallon/day/unit) 
250 
Maximum Day Demand 
1.7 x average day demand 
Peak Hour Demand 
1.7 x max day demand 
Fire flow (gallons per minute) 
1,500 
              
 
While Table B105.1(1) of the International fire code dictates a fire flow of 1,000 GPM, 
for conservative purposes a fire flow value of 1,500 GPM was used for fire flow 
modeling and analysis purposes. Copy of the fire code is presented in Appendix B  of this 
report and detailed demand computation for each junction is summarized in Appendix C 
of this report.

5  
 
 
 
4.0 
PROPOSED ONSITE WATER DISTRIBUTION SYSTEM 
 
The proposed onsite water distribution system will consist of installing an 8” PVC-
AWWA-C900 (PVC) pressure class 200 waterline within The Legacy interior roadway 
prism, and installation of 1” “Type K” copper water service from the individual lots to 
the aforementioned proposed 8” PVC waterline. The water line is proposed to be located 
within the interior roadway prism 6’ off the road’s centerline. The proposed onsite water 
distribution system is shown on Exhibits 2 and 3 located at the end of this report. 
 
A fire hydrant tests were conducted by Hydra Contracting on February 19, 2019.  
According to Hydra Contracting test results, the tested two fire hydrants (#1 & #1162) 
recorded a static pressure of 70-psi each and a residual pressure of 55 and 35-psi, 
respectively, with a test flow of 1185 and 918-gpm, respectively (see Appendix A). 
These fire hydrant test results were used in modeling the onsite water distribution system 
using WaterCAD software.  Four scenarios were modeled: 
 
 
1. Average day 
2. Maximum (peak) day 
3. Maximum (peak) day + Fire Flow (1,500 gpm) 
4. Peak hour 
 
 
 
The proposed onsite water distribution defining junction nodes and water line segments’ 
locations is presented on Exhibit 2 while all four modeled hydraulic scenarios’ results are 
shown in Appendix D, at the end of this report. Based on these modeling results, the 
proposed onsite water system meets minimum and maximum pressure requirement of 40 
pounds per square inch (psi) and 100 psi, respectively, for all scenarios. 
 
Automated fire flow analysis was also performed using WaterCAD software by assigning 
demand of 1500 gpm for each node. Maximum velocity is found to be 9.58 fps in pipe   
P-9 when a demand of 1500 gpm is applied at junction J-9. Fire flow results are included 
in Appendix C of this report.

6  
 
 
Note: A more recent fire hydrant flow test has been requested and is currently in process 
of being done. Should the new fire hydrant flow test results show both flow and pressure 
values being similar or better than the currently used values in the hydraulic analyses, no 
further action would be necessary and the current analyses would stand. On the other 
hand, should the fire hydrant flow test values on either flow or pressure were found to be 
of lesser values than what has been used, an update models will then be provided. 
 
 
5.0 
CONCLUSIONS 
 
 The project is located in City of El Mirage corporate limit.  
 The proposed onsite water system is in general conformance with the 
requirements outlined in the City of El Mirage Development. 
 Standards and Summary of results are tabulated below. 
 
Summary of Water System Analysis Results 
Scenarios 
Total 
Demand 
gpm 
           Velocity (ft/s) 
Pressure (psi) 
Head loss  
(ft/1000 ft) 
 
Maximum 
Max. 
Permissible 
Minimum 
Min. 
Permissible 
Maximum 
Max. 
Permissible 
Average Day 
5.03 
2.15 
5 
69 
40 
0.32 
10 
Maximum Day 
8.56 
2.17 
5 
69 
40 
0.32 
10 
Maximum Day 
+ Fire Flow 
1508.56 
9.58 
10 
67 
20 
0.32 
10 
Peak Hour 
14.55 
2.19 
7 
69 
40 
0.32 
10

EXHIBIT 2 
Proposed Onsite Water  
System Schematic

Exhibit 2 - Proposed Onsite Water System Schematic
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
8" EX. WAT
P-16
P-15
P-13
P-7
P-8
P-5
P-4
P-3
P-1
P-6
P-9
P-10
P-11
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

EXHIBIT 3 
Water Layout

design
job no.
revisions
date
approved
sheet
127-9
SKG
SKG
SKG ENTERPRISES, INC.
9260 E. RAINTREE DRIVE
SUITE 140
SCOTTSDALE, AZ. 85260
PH) 480-998-5600
FAX) 480-998-5603
WWW.SKGAZ.COM
PROJECT NO. 
04/2020
CITY OF EL MIRAGE, MARICOPA COUNTY, ARIZONA
THE LEGACY
EXHIBIT 3
PUEBLO EL MIRAGE R.V. RESORT - THE LEGACY
WATER LAYOUT

APPENDIX A 
Fire Hydrant Flow Test  
Results

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
91468FE4-AF12-4A7B-A34C-A5C61A5D76C2
Location
Client
Pueblo El Mirage
Hydrant #
1
Address
11201 N El Mirage
City
 
State
AZ
Zip Code
 
Hydrant Assessment
Type of Hydrant
Mueller
Summary of Hydrant disfunction
 
Assessment Photo
Trouble Codes
Trouble Codes
HT = hard turning stem
Repair

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
91468FE4-AF12-4A7B-A34C-A5C61A5D76C2
Upper Barrel
Lower Barrel
Hydrant Greased
Hydrant Flushed
Hydrant Painted
Repair summary
 
After Service
GPS Location
Summary

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
91468FE4-AF12-4A7B-A34C-A5C61A5D76C2
Notes & Comments
STATIC-70 
RESIDUAL-55 
PITOT-50
GPM 1185
NEEDS UPPER BARREL REPAIR
FAILED
Hydrant Technician
David Munoz
Project Manager
David Munoz ROC #283661, UFM4 #CSA21277 
exp 6/20
Date
02/19/2019

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
D1B73267-0938-4ADA-81EA-B4252E532110
Location
Client
Pueblo El Mirage
Hydrant #
1162
Address
11201 N El Mirage
City
EL MIRAGE
State
AZ
Zip Code
 
Hydrant Assessment
Type of Hydrant
Mueller
Summary of Hydrant disfunction
 
Assessment Photo
Trouble Codes
Trouble Codes
ND = no deficiencies
Repair

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
D1B73267-0938-4ADA-81EA-B4252E532110
Upper Barrel
Lower Barrel
Hydrant Greased
Hydrant Flushed
Hydrant Painted
Repair summary
 
After Service
GPS Location
Summary

Fire Hydrant Service Report
PO Box 979
 Tempe, Arizona 85280
480-242-8402
www.gocanvas.com
D1B73267-0938-4ADA-81EA-B4252E532110
Notes & Comments
STATIC-70 
RESIDUAL-35 
PITOT-30
GPM 918
Hydrant Technician
David Munoz
Project Manager
David Munoz ROC #283661, UFM4 #CSA21277 
exp 6/20
Date
02/19/2019

APPENDIX B 
International Fire Code 2018, 
Section B105, Table B105.1(1)

APPENDIX C 
Hydraulic Modeling Results

Junction #
Number of Units
Average Day 
Demand (gpd)
Average Day Flow 
(gpm)
Maximum Day 
Demand (gpm)
Peak Hour 
Flow (gpm)
A
B
C=B X 250
D=C/1440
E=D*1.7
F=E*1.7
1
0
0
0.00
0.00
0.00
2
1
250
0.17
0.30
0.50
3
1
250
0.17
0.30
0.50
4
2
500
0.35
0.59
1.00
5
2
500
0.35
0.59
1.00
6
4
1000
0.69
1.18
2.01
7
4
1000
0.69
1.18
2.01
8
1
250
0.17
0.30
0.50
9
1
250
0.17
0.30
0.50
10
5
1250
0.87
1.48
2.51
11
5
1250
0.87
1.48
2.51
12
3
750
0.52
0.89
1.51
13
0
0
0.00
0.00
0.00
14
0
0
0.00
0.00
0.00
Design Criteria:
1. Average Daily Consumption = 250 gpd
2. Average total daily consumption = No. of Units X 250 gpd
4. Maximum Day Flow Rate = 1.7 X Avg Day Flow
5. Peak Hour Flow Rate = 1.7 X Peak Day Flow
5. Fire Flow = 1500 gpm for Single family residential
6. Hazen-Williams Co-efficient for PVC, C=150
Water Demand Computation - THE LEGACY
APPENDIX C

Average Day      
Scenario  
Flow Results

Active Scenario:  Average Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
8" EX. WAT
P-16
P-15
P-13
P-7
P-8
P-5
P-4
P-3
P-1
P-6
P-9
P-10
P-11
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Average Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Headloss
(ft)
Headloss 
Gradient
(ft/ft)
Hydraulic 
Grade 
(Stop)
(ft)
Hydraulic 
Grade 
(Start)
(ft)
Velocity
(ft/s)
Flow
(gpm)
Length (User 
Defined)
(ft)
Stop 
Node
Start 
Node
Status 
(Initial)
ID
Diameter
(in)
Label
0.2067
0.0019
1,264.49
1,264.70
2.159
338.20
109.81
J-1
R-1
Open
38
8.0
P-1
0.0688
0.0019
1,264.42
1,264.49
2.159
338.20
36.58
J-2
J-1
Open
39
8.0
P-2
0.0756
0.0019
1,264.35
1,264.42
2.158
338.03
40.23
J-3
J-2
Open
40
8.0
P-3
0.0396
0.0019
1,264.31
1,264.35
2.156
337.86
21.02
J-4
J-3
Open
41
8.0
P-4
0.0621
0.0003
1,264.25
1,264.31
0.846
132.57
187.18
J-5
J-4
Open
42
8.0
P-5
0.0033
0.0003
1,264.24
1,264.25
0.844
132.22
9.94
J-6
J-5
Open
43
8.0
P-6
0.0000
0.0000
1,264.18
1,264.18
0.002
0.34
86.84
J-8
J-7
Open
66
8.0
P-8
0.0656
0.0003
1,264.18
1,264.24
0.840
131.53
200.41
J-7
J-6
Open
67
8.0
P-7
0.0000
0.0000
1,264.18
1,264.18
0.001
0.17
39.61
J-9
J-8
Open
70
8.0
P-9
0.0607
0.0003
1,264.12
1,264.18
0.833
130.50
188.00
J-10
J-7
Open
72
8.0
P-10
0.1860
0.0007
1,264.12
1,264.30
1.303
204.07
251.95
J-10
J-11
Open
74
8.0
P-11
0.0056
0.0007
1,264.30
1,264.31
1.308
204.94
7.63
J-11
J-4
Open
76
8.0
P-12
0.3265
0.0018
1,263.79
1,264.12
2.130
333.70
177.85
J-12
J-10
Open
78
8.0
P-13
0.0483
0.0018
1,263.74
1,263.79
2.127
333.18
26.46
J-13
J-12
Open
80
8.0
P-14
0.1606
0.0018
1,263.58
1,263.74
2.127
333.18
87.77
J-14
J-13
Open
82
8.0
P-15
0.2721
0.0018
1,263.31
1,263.58
2.127
333.18
148.62
R-2
J-14
Open
84
8.0
P-16
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  
+1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Average Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Demand
(gpm)
Pressure Head
(ft)
Pressure
(psi)
Hydraulic Grade
(ft)
Elevation
(ft)
Label
0.00
162.82
70
1,264.49
1,101.67
J-1
0.17
163.42
71
1,264.42
1,101.00
J-2
0.17
160.49
69
1,264.35
1,103.86
J-3
0.35
159.46
69
1,264.31
1,104.85
J-4
0.35
163.66
71
1,264.25
1,100.59
J-5
0.69
163.56
71
1,264.24
1,100.68
J-6
0.69
163.18
71
1,264.18
1,101.00
J-7
0.17
163.63
71
1,264.18
1,100.55
J-8
0.17
163.66
71
1,264.18
1,100.52
J-9
0.87
162.94
70
1,264.12
1,101.18
J-10
0.87
159.39
69
1,264.30
1,104.91
J-11
0.52
160.79
70
1,263.79
1,103.00
J-12
0.00
160.79
70
1,263.74
1,102.95
J-13
0.00
162.46
70
1,263.58
1,101.12
J-14
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

Active Scenario:  Average Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Hydraulic Grade
(ft)
Flow (Out net)
(gpm)
Elevation
(ft)
Label
1,264.70
338.20
1,264.70
R-1
1,263.31
-333.18
1,263.31
R-2
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

Maximum Day      
Scenario  
Flow Results

Active Scenario:  Maximum Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
8" EX. WAT
P-16
P-15
P-13
P-7
P-8
P-5
P-4
P-3
P-1
P-6
P-9
P-10
P-11
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Maximum Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Headloss
(ft)
Headloss 
Gradient
(ft/ft)
Hydraulic 
Grade 
(Stop)
(ft)
Hydraulic 
Grade 
(Start)
(ft)
Velocity
(ft/s)
Flow
(gpm)
Length (User 
Defined)
(ft)
Stop 
Node
Start 
Node
Status 
(Initial)
ID
Diameter
(in)
Label
0.2092
0.0019
1,264.49
1,264.70
2.173
340.46
109.81
J-1
R-1
Open
38
8.0
P-1
0.0697
0.0019
1,264.42
1,264.49
2.173
340.46
36.58
J-2
J-1
Open
39
8.0
P-2
0.0765
0.0019
1,264.34
1,264.42
2.171
340.16
40.23
J-3
J-2
Open
40
8.0
P-3
0.0399
0.0019
1,264.30
1,264.34
2.169
339.86
21.02
J-4
J-3
Open
41
8.0
P-4
0.0629
0.0003
1,264.24
1,264.30
0.852
133.47
187.18
J-5
J-4
Open
42
8.0
P-5
0.0033
0.0003
1,264.24
1,264.24
0.848
132.88
9.94
J-6
J-5
Open
43
8.0
P-6
0.0000
0.0000
1,264.17
1,264.17
0.004
0.60
86.84
J-8
J-7
Open
66
8.0
P-8
0.0658
0.0003
1,264.17
1,264.24
0.841
131.70
200.41
J-7
J-6
Open
67
8.0
P-7
0.0000
0.0000
1,264.17
1,264.17
0.002
0.30
39.61
J-9
J-8
Open
70
8.0
P-9
0.0602
0.0003
1,264.11
1,264.17
0.829
129.92
188.00
J-10
J-7
Open
72
8.0
P-10
0.1865
0.0007
1,264.11
1,264.30
1.304
204.32
251.95
J-10
J-11
Open
74
8.0
P-11
0.0056
0.0007
1,264.30
1,264.30
1.314
205.80
7.63
J-11
J-4
Open
76
8.0
P-12
0.3247
0.0018
1,263.79
1,264.11
2.124
332.76
177.85
J-12
J-10
Open
78
8.0
P-13
0.0481
0.0018
1,263.74
1,263.79
2.118
331.87
26.46
J-13
J-12
Open
80
8.0
P-14
0.1595
0.0018
1,263.58
1,263.74
2.118
331.87
87.77
J-14
J-13
Open
82
8.0
P-15
0.2700
0.0018
1,263.31
1,263.58
2.118
331.87
148.62
R-2
J-14
Open
84
8.0
P-16
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  
+1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Maximum Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Demand
(gpm)
Pressure Head
(ft)
Pressure
(psi)
Hydraulic Grade
(ft)
Elevation
(ft)
Label
0.00
162.82
70
1,264.49
1,101.67
J-1
0.30
163.42
71
1,264.42
1,101.00
J-2
0.30
160.48
69
1,264.34
1,103.86
J-3
0.59
159.45
69
1,264.30
1,104.85
J-4
0.59
163.65
71
1,264.24
1,100.59
J-5
1.18
163.56
71
1,264.24
1,100.68
J-6
1.18
163.17
71
1,264.17
1,101.00
J-7
0.30
163.62
71
1,264.17
1,100.55
J-8
0.30
163.65
71
1,264.17
1,100.52
J-9
1.48
162.93
70
1,264.11
1,101.18
J-10
1.48
159.39
69
1,264.30
1,104.91
J-11
0.89
160.79
70
1,263.79
1,103.00
J-12
0.00
160.79
70
1,263.74
1,102.95
J-13
0.00
162.46
70
1,263.58
1,101.12
J-14
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

Active Scenario:  Maximum Day
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Hydraulic Grade
(ft)
Flow (Out net)
(gpm)
Elevation
(ft)
Label
1,264.70
340.46
1,264.70
R-1
1,263.31
-331.87
1,263.31
R-2
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

Maximum Day + 
FIRE  Flow   
Scenario  
Flow Results.

Exhibit 2 - Proposed Onsite Water System Schematic
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
8" EX. WAT
P-16
P-15
P-13
P-7
P-8
P-5
P-4
P-3
P-1
P-6
P-9
P-10
P-11
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Maximum Day+Fire Flow
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Velocity of 
Maximum 
Pipe
(ft/s)
Is Fire Flow 
Run 
Balanced?
Pipe w/ 
Maximum 
Velocity
Junction w/ 
Minimum 
Pressure 
(Zone)
Pressure 
(Calculated 
Residual)
(psi)
Pressure 
(Residual 
Lower 
Limit)
(psi)
Flow (Total 
Available)
(gpm)
Flow (Total 
Needed)
(gpm)
Fire Flow 
(Available)
(gpm)
Fire Flow 
(Needed)
(gpm)
Satisfies Fire 
Flow 
Constraints?
Label
7.83
True
P-1
J-11
70
20
1,501.00
1,500.00
1,501.00
1,500.00
True
J-1
7.34
True
P-2
J-11
70
20
1,501.30
1,500.30
1,501.00
1,500.00
True
J-2
6.90
True
P-2
J-11
68
20
1,501.30
1,500.30
1,501.00
1,500.00
True
J-3
6.70
True
P-2
J-11
68
20
1,501.59
1,500.59
1,501.00
1,500.00
True
J-4
6.49
True
P-2
J-11
69
20
1,501.59
1,500.59
1,501.00
1,500.00
True
J-5
6.48
True
P-2
J-11
69
20
1,502.18
1,501.18
1,501.00
1,500.00
True
J-6
6.26
True
P-2
J-11
69
20
1,502.18
1,501.18
1,501.00
1,500.00
True
J-7
9.58
True
P-8
J-9
68
20
1,501.30
1,500.30
1,501.00
1,500.00
True
J-8
9.58
True
P-8
J-8
67
20
1,501.30
1,500.30
1,501.00
1,500.00
True
J-9
5.87
True
P-2
J-11
69
20
1,502.48
1,501.48
1,501.00
1,500.00
True
J-10
7.62
True
P-12
J-4
68
20
1,502.48
1,501.48
1,501.00
1,500.00
True
J-11
5.01
True
P-14
J-11
68
20
1,501.89
1,500.89
1,501.00
1,500.00
True
J-12
5.19
True
P-15
J-12
68
20
1,501.00
1,500.00
1,501.00
1,500.00
True
J-13
5.85
True
P-16
J-11
69
20
1,501.00
1,500.00
1,501.00
1,500.00
True
J-14
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  
+1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Peak Hour   
Scenario  
Flow Results

Active Scenario:  Peak Hour
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
8" EX. WAT
P-16
P-15
P-13
P-7
P-8
P-5
P-4
P-3
P-1
P-6
P-9
P-10
P-11
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Peak Hour
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Headloss
(ft)
Headloss 
Gradient
(ft/ft)
Hydraulic 
Grade 
(Stop)
(ft)
Hydraulic 
Grade 
(Start)
(ft)
Velocity
(ft/s)
Flow
(gpm)
Length (User 
Defined)
(ft)
Stop 
Node
Start 
Node
Status 
(Initial)
ID
Diameter
(in)
Label
0.2135
0.0019
1,264.49
1,264.70
2.197
344.21
109.81
J-1
R-1
Open
38
8.0
P-1
0.0712
0.0019
1,264.42
1,264.49
2.197
344.21
36.58
J-2
J-1
Open
39
8.0
P-2
0.0780
0.0019
1,264.34
1,264.42
2.194
343.71
40.23
J-3
J-2
Open
40
8.0
P-3
0.0406
0.0019
1,264.30
1,264.34
2.191
343.21
21.02
J-4
J-3
Open
41
8.0
P-4
0.0642
0.0003
1,264.23
1,264.30
0.861
134.97
187.18
J-5
J-4
Open
42
8.0
P-5
0.0034
0.0003
1,264.23
1,264.23
0.855
133.97
9.94
J-6
J-5
Open
43
8.0
P-6
0.0000
0.0000
1,264.16
1,264.16
0.006
1.00
86.84
J-8
J-7
Open
66
8.0
P-8
0.0659
0.0003
1,264.16
1,264.23
0.842
131.96
200.41
J-7
J-6
Open
67
8.0
P-7
0.0000
0.0000
1,264.16
1,264.16
0.003
0.50
39.61
J-9
J-8
Open
70
8.0
P-9
0.0593
0.0003
1,264.10
1,264.16
0.823
128.95
188.00
J-10
J-7
Open
72
8.0
P-10
0.1871
0.0007
1,264.10
1,264.29
1.307
204.73
251.95
J-10
J-11
Open
74
8.0
P-11
0.0057
0.0008
1,264.29
1,264.30
1.323
207.24
7.63
J-11
J-4
Open
76
8.0
P-12
0.3219
0.0018
1,263.78
1,264.10
2.114
331.17
177.85
J-12
J-10
Open
78
8.0
P-13
0.0475
0.0018
1,263.73
1,263.78
2.104
329.66
26.46
J-13
J-12
Open
80
8.0
P-14
0.1576
0.0018
1,263.58
1,263.73
2.104
329.66
87.77
J-14
J-13
Open
82
8.0
P-15
0.2667
0.0018
1,263.31
1,263.58
2.104
329.66
148.62
R-2
J-14
Open
84
8.0
P-16
Page 1 of 1
27 Siemon Company Drive Suite 200 W  Watertown, CT 06795 USA  
+1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution Center
The Legacy.wtg

Active Scenario:  Peak Hour
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Demand
(gpm)
Pressure Head
(ft)
Pressure
(psi)
Hydraulic Grade
(ft)
Elevation
(ft)
Label
0.00
162.82
70
1,264.49
1,101.67
J-1
0.50
163.42
71
1,264.42
1,101.00
J-2
0.50
160.48
69
1,264.34
1,103.86
J-3
1.00
159.45
69
1,264.30
1,104.85
J-4
1.00
163.64
71
1,264.23
1,100.59
J-5
2.01
163.55
71
1,264.23
1,100.68
J-6
2.01
163.16
71
1,264.16
1,101.00
J-7
0.50
163.61
71
1,264.16
1,100.55
J-8
0.50
163.64
71
1,264.16
1,100.52
J-9
2.51
162.92
70
1,264.10
1,101.18
J-10
2.51
159.38
69
1,264.29
1,104.91
J-11
1.51
160.78
70
1,263.78
1,103.00
J-12
0.00
160.78
70
1,263.73
1,102.95
J-13
0.00
162.46
70
1,263.58
1,101.12
J-14
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

Active Scenario:  Peak Hour
THE LEGACY
PUEBLO EL MIRAGE R.V. RESORT
Current Time:  0.000 hours
Hydraulic Grade
(ft)
Flow (Out net)
(gpm)
Elevation
(ft)
Label
1,264.70
344.21
1,264.70
R-1
1,263.31
-329.66
1,263.31
R-2
Page 1 of 1
27 Siemon Company Drive Suite 200 W  
Watertown, CT 06795 USA  +1-203-755-1666
4/27/2020
Bentley WaterCAD V8i (SELECTseries 4)
[08.11.04.50]
Bentley Systems, Inc.  Haestad Methods Solution 
Center
The Legacy.wtg

APPENDIX D 
City of El Mirage Water System 
Sizing Criteria

APPENDIX E 
Arizona Administrative Code, 
Title 18, Chapter 9