Extracted text (via pymupdf)
13407 characters
Flashing Yellow Arrow Improvements Project NO. EM21-TS01 Various Locations City Of El Mirage Submitted to: City of El Mirage Project: Bid Number: 21104 Bid Date: 2/18/2021 El Mirage, AZ 12145 N. W. Grand Ave El Mirage, AZ 85335 USA Tessa Wessel Phone Number: 6239338318 Cell Number: 623-876-2971 Email: twessel@elmirageaz.gov Attention: Total Price Unit Price Unit Item Description Item # Estimated Quantity ****************************************************************************************************** $869.61 $869.61 1.00 EACH 1. INSTALL TRAFFIC SIGNAL HEAD, TYPE F $21,759.15 $1,036.15 21.00 EACH 2. INSTALL TRAFFIC SIGNAL HEAD, TYPE G $11,397.65 $1,036.15 11.00 EACH 3. INSTALL TRAFFIC SIGNAL HEAD, TYPE G, HORIZONTAL $5,314.38 $885.73 6.00 EACH 4. INSTALL TRAFFIC SIGNAL HEAD, TYPE R $1,771.46 $885.73 2.00 LS 5. INSTALL TRAFFIC SIGNAL HEAD, TYPE R, HORIZONTAL $451.59 $451.59 1.00 EACH 6. TRAFFIC SIGNAL MOUNTING ASSEMBLY, PELCO (ASTRO- BRAC) $1,105.26 $552.63 2.00 EACH 7. TRAFFIC SIGNAL MOUNTING ASSEMBLY, TYPE XI $2,321.49 $773.83 3.00 EACH 8. INSTALLATION OF ELECTRICAL CONDUCTORS $11,316.69 $538.89 21.00 EACH 9. INSTALL TRAFFIC SIGN TO EXISTING SIGNAL MAST ARM R10-101 Sign $755.44 $755.44 1.00 EACH 10. INSTALL TRAFFIC SIGN TO EXISTING SIGN POST R10-16 Sign $3,340.00 $3,340.00 1.00 EACH 11. REPLACE EXISTING SMART MONITOR WITH MMU2- 16LEip $8,228.90 $216.55 38.00 EACH 12. REMOVE AND SALVAGE EXISTING SIGNAL HEADS $2,600.00 $2,600.00 1.00 LS 13. FORCE ACCOUNT - NEW CONDUCTOR INSTALLATION AND SPLICE $15,000.00 $15,000.00 1.00 LS 14. FORCE ACCOUNT - PULL BOX AND CONDUIT RECONDITIONING $13,500.00 $13,500.00 1.00 LS 15. FORCE ACCOUNT - SIGNAL HEAD MOUNTING ASSEMBLY RECONDITIONING $8,000.00 $8,000.00 1.00 LS 16. FORCE ACCOUNT - RELOCATION OF PREEMPTION DETECTORS $8,500.00 $85.00 100.00 HR 17. OFF - DUTY OFFICERS $12,025.88 $12,025.88 1.00 LS 18. TRAFFIC CONTROL $1,250.00 $1,250.00 1.00 TRIP 19. MOBILIZATION $129,507.50 Base Bid Price Subtotal: $6,773.24 65% Of 8.1% = 5.23%: $136,280.74 Total Bid Price: • Terms: Net 30 Days ****************************************************************************************************** Page 1 of 2 2/18/2021 11:03:10 AM B&F Contracting Inc. bfcontracting.com • This proposal is based on the following information: Plans: City of El Mirage Flashing Yellow Arrow Improvements Plans used were: TS01-TS10 Prepared by: City of El Mirage Engineering Addenda Received: 0 ****************************************************************************************************** • Excludes: Const. Survey/Staking, Compaction Testing & Inspection Fees. Engineering, Locate, Hard Dig or Rock Excavation. Hard Dig Defined As Any Material A 416 Cannot Dig Effectively At A Production Rate OF 30 LF Per Hour At An Average Depth of 5ft. Sawcut Remove/ Replace of Asphalt/Landscape/Concrete/Hardscape. Century Link TMB/TTC- Provided By Others. Existing Utilities. Dust Control Permit, SWPP by Others. Prices are good for 30 days. Quantities are approximate and final payment is to be based on actual field measurement. ****************************************************************************************************** • Inclusions:Pricing is based on the approved plans and technical specs. Bond Costs @ 1.5% Insurance Costs @ 1% ****************************************************************************************************** • We propose to furnish labor, equipment, and materials - complete in accordance with the plans and specifications supplied to us for the above mentioned project. All material is guaranteed to be as specified. All work will be completed in a workmanlike manner according to the standard practices. Any alternations or deviations from the above specifications involving extra costs, will be executed only upon written orders and will become an extra charge over the above proposed estimate. ****************************************************************************************************** ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: B&F Contracting, Inc. (Proposal) Authorized Signature: Estimator: Angel Flores 623-377-5573 angelf@bfcontracting.com Page 2 of 2 2/18/2021 11:03:10 AM B&F Contracting Inc. bfcontracting.com Cost Detail With Man Hours Project Name: Flashing Yellow Arrow Improvements Project NO. EM21-TS01 Customer: City of El Mirage Job Number: 2000 Bid Number: 21104 Billing Address: 12145 N. W. Grand Ave Bid As: Prime Contractor El Mirage, AZ 85335 USA Estimator: Phone: 6239338318 Angel Flores Project Address: Various Locations City Of El Mirage, El Mirage, AZ Contact: Tessa Wessel Completion Date: 4/16/2021 Pay Items Description Quantity UM Hours Man per Unit Man Hours Direct Cost Direct Cost Unit Total 1.00 EACH 6.00 6.00 $647.46 $647.46 1. INSTALL TRAFFIC SIGNAL HEAD, TYPE F TS-ADOT Modifications Large 1.00 EACH 6.00 6.00 $647.46 $647.46 TS-ADOT Modifications Large Crew (4.00 LS/DY, 0.25 DY) 1.00 LS 6.00 6.00 $322.46 $322.46 Truck - Crew 2.00 HR $28.95 $57.90 Aerial Truck - 35ft 2.00 HR $39.45 $78.90 Foreman 2.00 HR $43.75 $87.50 Tech I 2.00 HR $21.76 $43.52 Operator: Small Equipment 2.00 HR $27.32 $54.64 Head - ADOT Type F 1.00 EACH $325.00 $325.00 21.00 EACH 126.00 6.00 $771.46 $16,200.66 2. INSTALL TRAFFIC SIGNAL HEAD, TYPE G TS-ADOT Modifications Large 21.00 EACH 126.00 6.00 $771.46 $16,200.66 TS-ADOT Modifications Large Crew (4.00 LS/DY, 5.25 DY) 21.00 LS 126.00 6.00 $322.46 $6,771.66 Truck - Crew 42.00 HR $28.95 $1,215.90 Aerial Truck - 35ft 42.00 HR $39.45 $1,656.90 Foreman 42.00 HR $43.75 $1,837.50 Tech I 42.00 HR $21.76 $913.92 Operator: Small Equipment 42.00 HR $27.32 $1,147.44 Head - ADOT Type G 21.00 EACH $449.00 $9,429.00 11.00 EACH 66.00 6.00 $771.46 $8,486.06 3. INSTALL TRAFFIC SIGNAL HEAD, TYPE G, HORIZONTAL TS-ADOT Modifications Large 11.00 EACH 66.00 6.00 $771.46 $8,486.06 TS-ADOT Modifications Large Crew (4.00 EACH/DY, 2.75 DY) 11.00 EACH 66.00 6.00 $322.46 $3,547.06 Truck - Crew 22.00 HR $28.95 $636.90 Aerial Truck - 35ft 22.00 HR $39.45 $867.90 Foreman 22.00 HR $43.75 $962.50 Tech I 22.00 HR $21.76 $478.72 2/18/2021 11:05:31 AM Page 1 Description Quantity UM Hours Man per Unit Man Hours Direct Cost Direct Cost Unit Total (Item 3. INSTALL TRAFFIC SIGNAL HEAD, TYPE G, HORIZONTAL continued) Operator: Small Equipment 22.00 HR $27.32 $601.04 Head - ADOT Type G 11.00 EACH $449.00 $4,939.00 6.00 EACH 36.00 6.00 $659.46 $3,956.76 4. INSTALL TRAFFIC SIGNAL HEAD, TYPE R TS-ADOT Modifications Large 6.00 LS 36.00 6.00 $659.46 $3,956.76 TS-ADOT Modifications Large Crew (4.00 EACH/DY, 1.50 DY) 6.00 EACH 36.00 6.00 $322.46 $1,934.76 Truck - Crew 12.00 HR $28.95 $347.40 Aerial Truck - 35ft 12.00 HR $39.45 $473.40 Foreman 12.00 HR $43.75 $525.00 Tech I 12.00 HR $21.76 $261.12 Operator: Small Equipment 12.00 HR $27.32 $327.84 Head - ADOT Type R 6.00 EACH $337.00 $2,022.00 2.00 LS 12.00 6.00 $659.46 $1,318.92 5. INSTALL TRAFFIC SIGNAL HEAD, TYPE R, HORIZONTAL TS-ADOT Modifications Large 2.00 LS 12.00 6.00 $659.46 $1,318.92 TS-ADOT Modifications Large Crew (4.00 EACH/DY, 0.50 DY) 2.00 EACH 12.00 6.00 $322.46 $644.92 Truck - Crew 4.00 HR $28.95 $115.80 Aerial Truck - 35ft 4.00 HR $39.45 $157.80 Foreman 4.00 HR $43.75 $175.00 Tech I 4.00 HR $21.76 $87.04 Operator: Small Equipment 4.00 HR $27.32 $109.28 Head - ADOT Type R 2.00 EACH $337.00 $674.00 1.00 EACH 3.00 3.00 $336.23 $336.23 6. TRAFFIC SIGNAL MOUNTING ASSEMBLY, PELCO (ASTRO-BRAC) TS-ADOT Modifications Large 1.00 EACH 3.00 3.00 $336.23 $336.23 TS-ADOT Modifications Large Crew (8.00 LS/DY, 0.13 DY) 1.00 LS 3.00 3.00 $161.23 $161.23 Truck - Crew 1.00 HR $28.95 $28.95 Aerial Truck - 35ft 1.00 HR $39.45 $39.45 Foreman 1.00 HR $43.75 $43.75 Tech I 1.00 HR $21.76 $21.76 Operator: Small Equipment 1.00 HR $27.32 $27.32 Mount - Pelco Bracket Pole 1.00 EACH $175.00 $175.00 2.00 EACH 12.00 6.00 $411.46 $822.92 7. TRAFFIC SIGNAL MOUNTING ASSEMBLY, TYPE XI TS-ADOT Modifications Large 2.00 EACH 12.00 6.00 $411.46 $822.92 TS-ADOT Modifications Large Crew (4.00 EACH/DY, 0.50 DY) 2.00 EACH 12.00 6.00 $322.46 $644.92 Truck - Crew 4.00 HR $28.95 $115.80 Aerial Truck - 35ft 4.00 HR $39.45 $157.80 Foreman 4.00 HR $43.75 $175.00 Tech I 4.00 HR $21.76 $87.04 Operator: Small Equipment 4.00 HR $27.32 $109.28 Mount - ADOT Type XI 2.00 EACH $89.00 $178.00 3.00 EACH 32.00 10.67 $576.15 $1,728.44 8. INSTALLATION OF ELECTRICAL CONDUCTORS TS-Full Wiring 3.00 LS 32.00 10.67 $576.15 $1,728.44 Flashing Yellow Arrow Improvements Project NO. EM21-TS01 2/18/2021 11:05:31 AM Page 2 Description Quantity UM Hours Man per Unit Man Hours Direct Cost Direct Cost Unit Total (Item 8. INSTALLATION OF ELECTRICAL CONDUCTORS continued) TS-Full Wiring Crew (3.00 EACH/DY, 1.00 DY) 3.00 EACH 32.00 10.67 $473.15 $1,419.44 Truck - Crew 8.00 HR $28.95 $231.60 Aerial Truck - 35ft 8.00 HR $39.45 $315.60 Foreman 8.00 HR $43.75 $350.00 Tech II 8.00 HR $21.76 $174.08 Tech I [2] 8.00 HR $21.76 $348.16 Wire - 16 IMSA 19-1 7-Conductor Stranded High Temp 300.00 LF $1.03 $309.00 21.00 EACH 63.00 3.00 $401.23 $8,425.83 9. INSTALL TRAFFIC SIGN TO EXISTING SIGNAL MAST ARM R10-101 Sign TS-Illuminated Street Name Signs 21.00 EACH 63.00 3.00 $401.23 $8,425.83 TS-Illuminated Street Name Signs Crew (8.00 EACH/DY, 2.63 DY) 21.00 EACH 63.00 3.00 $161.23 $3,385.83 Truck - Crew 21.00 HR $28.95 $607.95 Aerial Truck - 35ft 21.00 HR $39.45 $828.45 Foreman 21.00 HR $43.75 $918.75 Tech I 21.00 HR $21.76 $456.96 Operator: Small Equipment 21.00 HR $27.32 $573.72 R10-101 Sign 21.00 EACH $240.00 $5,040.00 1.00 EACH 6.00 6.00 $562.46 $562.46 10. INSTALL TRAFFIC SIGN TO EXISTING SIGN POST R10-16 Sign TS-Illuminated Street Name Signs 1.00 EACH 6.00 6.00 $562.46 $562.46 TS-Illuminated Street Name Signs Crew (4.00 EACH/DY, 0.25 DY) 1.00 EACH 6.00 6.00 $322.46 $322.46 Truck - Crew 2.00 HR $28.95 $57.90 Aerial Truck - 35ft 2.00 HR $39.45 $78.90 Foreman 2.00 HR $43.75 $87.50 Tech I 2.00 HR $21.76 $43.52 Operator: Small Equipment 2.00 HR $27.32 $54.64 R10-16 Sign 1.00 EACH $240.00 $240.00 1.00 EACH 24.00 24.00 $2,486.76 $2,486.76 11. REPLACE EXISTING SMART MONITOR WITH MMU2-16LEip TS-Control Cabinet - Cobalt 1.00 EACH 24.00 24.00 $929.76 $929.76 TS-Control Cabinet Crew (1.00 EACH/DY, 1.00 DY) 1.00 EACH 24.00 24.00 $929.76 $929.76 Truck - Crew 8.00 HR $28.95 $231.60 Foreman 8.00 HR $43.75 $350.00 Tech II 8.00 HR $21.76 $174.08 Tech I 8.00 HR $21.76 $174.08 MMU2-16EIP Controller 1.00 EACH $1,557.00 $1,557.00 38.00 EACH 114.00 3.00 $161.23 $6,126.74 12. REMOVE AND SALVAGE EXISTING SIGNAL HEADS TS-ADOT Modifications Large 38.00 EACH 114.00 3.00 $161.23 $6,126.74 TS-ADOT Modifications Large Crew (8.00 EACH/DY, 4.75 DY) 38.00 EACH 114.00 3.00 $161.23 $6,126.74 Truck - Crew 38.00 HR $28.95 $1,100.10 Aerial Truck - 35ft 38.00 HR $39.45 $1,499.10 Foreman 38.00 HR $43.75 $1,662.50 Flashing Yellow Arrow Improvements Project NO. EM21-TS01 2/18/2021 11:05:31 AM Page 3 Description Quantity UM Hours Man per Unit Man Hours Direct Cost Direct Cost Unit Total (Item 12. REMOVE AND SALVAGE EXISTING SIGNAL HEADS continued) Tech I 38.00 HR $21.76 $826.88 Operator: Small Equipment 38.00 HR $27.32 $1,038.16 1.00 LS 0.00 0.00 $2,600.00 $2,600.00 13. FORCE ACCOUNT - NEW CONDUCTOR INSTALLATION AND SPLICE Allowance - Work Extra 1.00 AL $2,600.00 $2,600.00 1.00 LS 0.00 0.00 $15,000.00 $15,000.00 14. FORCE ACCOUNT - PULL BOX AND CONDUIT RECONDITIONING Allowance - Work Extra 1.00 AL $15,000.00 $15,000.00 1.00 LS 0.00 0.00 $13,500.00 $13,500.00 15. FORCE ACCOUNT - SIGNAL HEAD MOUNTING ASSEMBLY RECONDITIONING Allowance - Work Extra 1.00 AL $13,500.00 $13,500.00 1.00 LS 0.00 0.00 $8,000.00 $8,000.00 16. FORCE ACCOUNT - RELOCATION OF PREEMPTION DETECTORS Allowance - Work Extra 1.00 AL $8,000.00 $8,000.00 100.00 HR 0.00 0.00 $85.00 $8,500.00 17. OFF - DUTY OFFICERS Subcontracted-Police Officers 100.00 HR $85.00 $8,500.00 1.00 LS 104.00 104.00 $8,953.76 $8,953.76 18. TRAFFIC CONTROL GC-Traffic Control 1.00 LS 104.00 104.00 $8,953.76 $8,953.76 GC-Traffic Control Support Crew (0.08 LS/DY, 13.00 DY) 1.00 LS 104.00 104.00 $6,233.76 $6,233.76 Truck - Crew 104.00 HR $28.95 $3,010.80 Laborer 104.00 HR $21.76 $2,263.04 Arrowboard Trailer 104.00 HR $9.23 $959.92 Signage - Traffic Control Change Ahead Sign 32.00 EACH $85.00 $2,720.00 1.00 TRIP 0.00 0.00 $1,250.00 $1,250.00 19. MOBILIZATION Mobilization Allowance 1.00 LS $1,250.00 $1,250.00 Indirect Items Description Quantity UM Hours Man per Unit Man Hours Indirect Cost Indirect Cost Unit Total 1.00 LS $200.00 $200.00 JI-Permits/Fees 1.00 DY 8.00 8.00 $658.40 $658.40 3.1 - JI-Project Manager JI-Project Manager 8.00 HR 8.00 1.00 $82.30 $658.40 JI-Project Manager Crew (8.00 HR/DY, 1.00 DY) 8.00 HR 8.00 1.00 $82.30 $658.40 Project Manager 8.00 HR $82.30 $658.40 2.00 DY 16.00 8.00 $658.40 $1,316.80 3.2 - JI-Project Superintendent JI-Project Superintendent 16.00 HR 16.00 1.00 $82.30 $1,316.80 JI-Project Superintendent Crew (8.00 HR/DY, 2.00 DY) 16.00 HR 16.00 1.00 $82.30 $1,316.80 Project Superintendent 16.00 HR $82.30 $1,316.80 1.00 DY 8.00 8.00 $658.40 $658.40 3.3 - JI-Project Engineer JI-Project Engineer 8.00 HR 8.00 1.00 $82.30 $658.40 JI-Project Engineer Crew (8.00 HR/DY, 1.00 DY) 8.00 HR 8.00 1.00 $82.30 $658.40 Project Engineer 8.00 HR $82.30 $658.40 Flashing Yellow Arrow Improvements Project NO. EM21-TS01 2/18/2021 11:05:31 AM Page 4