City of El Mirage

10355 N. 121st Avenue,
El Mirage, AZ 85335
Attn: Mr. Scott Ketchmark

Re: Blower Replacement and Blower Building Upgrades — JOC Package
Garney GMP Proposal

Dear Mr. Ford

Garney Companies, Inc. has prepared the below revised proposal as requested per the Job Order. A summary of
this work is as follows:

1. Install two (2) each new hybrid rotary screw blowers’ model D98S 100HP with VFD’s. Removal of the
existing 2 blowers (Garney will remove the existing blowers carefully, knowing the owner’s intent is to
salvage the existing equipment). reconfiguring existing 12’ carbon steel air piping, demo existing and
install conduits and power for new blowers back to MCC, and install control wire back to PLC. Two (2) VFD
to ship loose to be install on rack, Start up support for blowers.

a. Blower manufacture will be onsite for all startup services

Garney has assumed the existing air piping is in suitable working conditions

Garney has assumed keeping one blower offline during construction

Garney has excluded all permits except for dust control and SWPPP as required.

Garney assumed all existing shelving and misc. equipment that is stored in blower area will be

removed by the City prior to start of all work.

2. Building upgrades include the following: painting interior room including, epoxy coat floor, and repair
celling insulation.

a. Interior painting includes all walls. Excludes all pipe and conduit on walls.
b. Removal of existing insulation and Paper and install new R19 Fiberglass insulation and new scrim
paper.

poa2o7

3. Notice to proceed will be negotiate with the City of City of El Mirage
4. Specifically excluded from the proposal are: ADOT, SRP and Building Permits (Garney will pull permits if
needed, payment will be pulled from Contingencies Allowance if needed), Engineering, Remediation of
contamination, and hazardous material handling or disposal, and supply of Engineer’s Trailer/Equipment,
Surveyor.
Garney Companies, Inc. has developed a GMP proposal to include labor, material, equipment and supervision to
complete the above work for the lump Sum $513,551.86. Any deviations from the above will require a revised

quotation.

In order to secure the material prices offered and meet the schedule, this proposal is valid for acceptance until
August 27", 2021. Thank you for your cooperation.

Sincerely,
Stephen Hagy
Project Manager

Attachment: GMP Proposal

Page 1 of 4

Gaarne

Be
ADVANCING WATER EL TRAGE
Contractor Name — Garney Construction
Contract Type: Water Wastewater JOC - PW19-JOCO City Projecti#:
Job Order#: Contractor's Job #:
City Project Manage |Adam Ford Prepared by:
Fee Type: JOC Fee Type:
Location: 10355 N. 121 Ave. El Mirage, AZ 85335 Location:
Job Title: WAS Pipe Repair and SBR Supports Job Title:
Description of work to be performed: See Attached
[ SECTION 1: LABOR (Includes Burden) |
Labor Cost Position
Position Unit Quantity Each Total
PROJECT ENGINEER Hours 40) $ 58.28 $ 2,331.20
SUPERINTENDENT Hours 40} $ 83.25 3 3,330.00
FOREMAN ASSISTANT SUPERINTENDENT Hours 120) $ 58.28 $ 6,993.60
LABORER: PIPELAYER Hours 200 $ 49.45 $ 9,890.58
LABORER: COMMON Hours 10} $ 38.12 $ 381.19
Total Labor Cost $ 22,926.57
Equipment Cost Item
Item Unit Quantity Each Total
TRUCK: ON-HIGHWAY LIGHT DUTY 4X2 GAS Hours 160} $ 12.89 $ 2,062.40
Misc. Rental Equipment Hours 1 $ 3,500.00 $ 3,500.00
Total Equipment Cost $ 5,562.40
| SECTION 3: MATERIALS |
Material Item
Item Unit Quantity Each Total
Misc. Piping Materials Ls Z| S 18,552.03 $ 18,552.03
Aerzen Delta Hybrid Blower Package Each 2 $ 138,850.00 $ 277,700.00
Misc. Equipment Setting materials Ls 1 5 1,500.00 $ 1,500.00
Total Equipment Cost $ 297,752.03
| Section 4: Subcontractors and Consultants |
Company Description of Work to be Preform (supporting quote & info attached) Total
Install/Repair Pipe Insulation 12" Carbon Steel Pipe. $ 6,000.00
Fire Protection to Disconect System and Reinstall System $ 6,569.87
Carbon Steel Pipe welding $ 2,500.00
Alliance Service and Control Specialists Electrical and Control Work $ 33,900.00
Interior wall and Floor Coating $ 11,531.00
INC and Control Systems Programing $ 12,310.00
Building Insulation $ 19,747.00
I Total Subcontractor Cost $ 92,557.87
OVERHEAD: (2 to be taken from JOC Pricing Matrix Form

PROFIT: Lv to be taken from JOC Pricing Matrix Form

Subtotal General Contractor Costs (1+2+3):
O&P
Total General Contractor Costs including O&P:

Subtotal Subcontractor Costs (4):
Subcontractor Profits (5% of 4):

Total Subcontractors Costs including Profit:

TOTAL GC Cost and Subcontractor: With O&P

Insurance Costs @ 1.00% 1%
Bond Costs @ 1.50% to 1.00 1.36%
Sales Tax (_% of _%): 6.05%

Tax Exemption Credit:

Subtotal Job Cost:

Contingencies Allowance

TOTAL JOB COST:

Submitted by:

$ 326,241.00
$ 45,673.74
$ 371,914.74

$ 92,557.87
$ 4,627.89
$ 97,185.76

$ 4,691.01
$ 6,379.77
$ 28,380.58

$ 508,551.86
$ 5,000.00

=m
fev ll

4 FERGUSON

WATERWORKS

PHOENIX, AZ 85004-2725

Phone: 602-495-8420
Fax: 602-262-4276

FERGUSON WATERWORKS (3083)
111 EAST BUCKEYE ROAD SUITE 5

Deliver To: EXP 2020 EM TAX EM
From: Allyson Baptista

(Comments:

09:58:07 JUL 08 2021

FERGUSON WATERWORKS #3083
Price Quotation
Phone: 602-495-8420
Fax: 602-262-4276

Page 1 of 2

Bid No: B355692 Cust Phone: 602-470-0001
Bid Date: 07/07/21 Terms: 2% 10TH NET 25TH
Quoted By: ADB
Customer: GARNEY COMPANIES INC Ship To: GARNEY COMPANIES INC
ATTN ACCOUNTING MELIA PENC. ATTN ACCOUNTING MELIA PENC
1333 NW VIVION ROAD 1333 NW VIVION ROAD
KANSAS CITY, MO 64118 KANSAS CITY, MO 64118
Cust PO#: Job Name: EL MIRAGE BLOWERS
Item Description Quantity Net Price UM Total
SP-FFCSPCE12G6 12X1'6 FLGXFLG PC EPOXY CS SPL 2 4125.000 EA 8250.00
VC120341PSO 12 FLG ADPT 341 W/S GSKT 137-77 341 2 577.505 EA 1155.01
FNWNBSS6112 12 316 SS 150# FLG NUT/BLT SET 2 135.022 EA 270.04
ATSGA12 12 FF 1/8 TORUSEAL NSF61 FLG GSKT 2 21.370 EA 42.74
SP-FFCSPCE126 12X0'6 FLGXFLG PC EPOXY CS SPL 2 1875.000 EA 3750.00
TOTAL 13467.79

ADDED BFV W/GASKETS

12" FLG 150B Cl BFV G SERIES W/HDWL

SP-BAW12NBRN150B 2 2229.335 EA 4458.67
LEAD TIME TBD AT TIME OF ORDER

ATSGA12 12 FF 1/8 TORUSEAL NSF61 FLG GSKT 4 21.370 EA 85.48

FNWNBSS6112 12 316 SS 150# FLG NUT/BLT SET 4 135.022 EA 540.09

Net Total: $18552.03

Tax: $0.00

Freight: $0.00

Total: $18552.03

HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=3083&0n=1867

#6 FERGUSON’ Page 20f2

FERGUSON WATERWORKS #3083
WATERWORKS Price Quotation

Fax: 602-262-4276

09:58:07 JUL 08 2021
Reference No: B355692

Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE

AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE
ARE NOT FIRM UNLESS NOTED OTHERWISE.

CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBE/WBE/SMALL BUSINESS REQUIREMENTS.

Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon

Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or

on the web at https://www.ferguson.com/content/website-info/terms-of-sale

Govt Buyers: All items are open market unless noted otherwise.

LEAD LAW WARNING: Itis illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water
systems anticipated for human consumption. Products with *NP in the description are NOT lead free and can only be installed in non-potable
applications. Buyer is solely responsible for product selection.

HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=3083&0n=1 867

AERZEN USA CORPORATION

108 Independence Way

Coatesville, PA 19320 AE RZ FE N

Tel. (610) 380-0244 Fax. (610) 380-0278

Confidential & Proprietary - this document shall not be distributed to anyone other than the intended recipients.

AERZEN Reference Number: E16-176531 16-Jun-21
Re: El Mirage, AZ K-Turbo Replacement Part 2

Page 1 of 2
To: Stephen Hagy AERZEN Proposal Prepared By:
Firm - Garney Construction Name - Tom McCurdy
email - tom.mccurdy@aerzen.com
phone - 303-482-7437 phone - (610) 656-1683
AERZEN Representative Info: AERZEN Regional Manager:
Name - Lisa Snyders, PE of Coombs-Hopkins Name - Tom McCurdy
e-mail - lisa@chcwater.com e-mail - tom.mccurdy@aerzen.com
phone - (602) 275-4303 phone - (610) 656-1683

Thank you for the opportunity to bid this project for (2) Hybrid Rotary Screw Blower Packages.

This scope of supply does NOT include the following items: External Controls, Isolation Valves, Anchor Bolts
and Installation Hardware. VFD is included, factory mounted.

Instrumentation as shown below, is part of this scope of supply.

Replacement Blower - Hybrid Model: D98S

Performance Data: Design Min
Intake volume, handled at intake condition icfm 2,294 903
Volume handled at normal condition scfm 2,000 787
Relative humidity co) 50% 50%
Intake pressure (abs.) psia 14.12 14.12
Discharge pressure psig 8.50 8.50
Intake temperature °F 104 104
Discharge temperature a 214 228
Main rotor speed rpm 4,614 2,200
% of maximum % 69% 33%
Motor Speed rpm 3,545 1,690
Power consumption at coupling bHp 90.7 40.6
Motor Rating HP 100

Blower max rotor speed rpm 6,660

Tolerance on flow & power +5%

Sound pressure level w/ enclosure dB(A) 73

*Measured in free field at 3ft. distance from the outline of the unit
*does not include system piping noise (tol. + 2 dB(A)).

Weights & Dimensions:

Discharge connection EPDM ANSI 10"
Blower pkg weight Ibs. 5,958
Envelope dim.* LxWxHin. 87x 75 x 93
460 VAC Cooling Fan kw 0.38
AERtronic kW 0.2

* non binding dimensions includes, inlet filter silencer, relief valve, check valve, and flex connector

AERZEN USA CORPORATION

108 Independence Way

Coatesville, PA 19320

Tel. (610) 380-0244 ¢@ Fax. (610) 380-0278

AERZEN

Confidential & Proprietary - this document shall not be distributed to anyone other than the intended recipients.

AERZEN Reference Number: E16-176531 16-Jun-21
Re: El Mirage, AZ K-Turbo Replacement Part 2

Page 2 of 2
Replacement Blower - Hybrid D98S

Aerzen Delta Hybrid Blower Package consists of the following components, assembled in our factory.
+ Aerzen Rotary Lobe Compressor D Series
* base frame with integrated reactive type, discharge silencer
* hinged motor support as automatic belt tensioning device
+ set of vibration isolating mounts
+ intake filter-silencer
* narrow V-belt drive with guard
+ spring loaded pressure relief valve
+ discharge manifold with externally accessible integrated check valve
* flexible connector with clamps for schedule 40 pipe, discharge
+ Integral forced lubrication system, with integral oil pump and oil filter

Scope of Supply
2 compact blower package as listed above
2 motor 100 HP, 2-pole, NEMA, TEFC, 460 V / 60 Hz, prm-eff, 405TS, T-Stat, AEGIS ring
2 sound enclosure with integral 460 V cooling fan and factory supplied fan motor starter
2 set of sensors (P1, P2, T2 & Oil Temp) w/AERtronic Control (460 VAC, 5 Amp), E-Stop , UL508A
2 100 HP Allen Bradley Powerflex 753 VFD Panel, NEMA 12 enclosure, UL 508A labeling
VFD shipped loose, to be installed by contractor

Factory Services
2 Simplified ISO-1217, Annex B test report(s)
1 submittal data, hard copy
1 O&M manual, hard copy
2 factory set PRV to 10.9 psig

Onsite Manufacturer Services
2 trip(s), 4 day(s) total installation inspection, startup, & training
additional mfg services beyond what is listed herein and/or resulting from delays will be invoiced separately

Spare Parts
2 air filter, 2 belt set, 2 oil filter -Hybrid,

Freight & Packaging
2 freight to jobsite
2 domestic packaging

TOTAL for 2 unit(s) c/o: Lisa Snyders, PE of Coombs-Hopkins

Confidential & Proprietary - this document shall not be distributed to anyone other than the intended recipients.
Pricing: DAP Jobsite
Terms: This offer is subject to Aerzen Standard Terms and Conditions (A2-001-USA January 2009)
Submittals: 4 weeks after receipt of Purchase Order
Delivery: presently approx. 4 months upon technical release by customer
Payment: 20% upon receipt of approved submittal, 75% upon shipment Net 30 and 5% retention not to exceed 180 days from shipment.
Warranty: 24 months after start up or 30 months after delivery, which ever comes first on Aerzen package*
*Maintenance must be performed per the Instruction Manual using Aerzen spare parts.
*Equipment not manufactured by Aerzen will carry the manufacturer's standard warranty.

Stephen Hagy

From: Lisa Snyders <lisa@chcwater.com>

Sent: Wednesday, June 16, 2021 6:55 PM

To: Stephen Hagy

Subject: RE: [EXTERNAL] RE: Blower Pricing Seconded Phase
Attachments: E16-176531 El Mirage AZ D98S Hybrid Scope 06-16-2021.pdf
Follow Up Flag: Follow up

Flag Status: Flagged

Stephen,

Updated scope is attached which shows contractor installation of the VFDs. The 2021 price is $277,700.
Let me know if you need anything else.

Lisa Snyders, P.E. | Coombs-Hopkins Company
8950 S. 52"4 Street, Suite 103 | Tempe, AZ 85284
lisa@chcwater.com | Cell: 602.339.8070

COOMBS
HOPKINS

COMPANY

This electronic message is intended only for the use of the individual or entity to which it is addressed. It may contain information that is privileged, confidential, and exempt from disclosure under
applicable laws. If the reader of this message is not the intended recipient, employee, or agent responsible for delivering this transmittal to the intended recipient, you are hereby notified that any
disclosure, dissemination, distribution, or copying of this electronic document of the taking of any action in reliance of this information, is strictly prohibited. If you have received this communication in error,
please notify us immediately by telephone or by replying to the above email address. Thank you.

From: Stephen Hagy <shagy@garney.com>

Sent: Tuesday, June 15, 2021 8:12 AM

To: Lisa Snyders <lisa@chcwater.com>

Subject: RE: [EXTERNAL] RE: Blower Pricing Seconded Phase

Thanks, the only change would be the VFD ship loose and installed by others

Stephen Hagy
Employee-Owner Since 2008

GARNEY CONSTRUCTION Advancing Water

PH: 602-470-0001 Cell: 303.482.7437 FAX: 303.791.1801
ADDRESS: 4435 E Holmes Ave, Suite 102, Mesa, AZ 85206 GARNEY.COM

From: Lisa Snyders <lisa@chcwater.com>

Sent: Friday, June 11, 2021 9:56 AM

To: Stephen Hagy <sha, arney.com>

Subject: [EXTERNAL] RE: Blower Pricing Seconded Phase

External Message - Please be cautious when opening links or attachments in email

Stephen,

Scope is attached for your review. This includes mounted VFDs for both machines and 2 trips of 2 days each for startup
of each individual Hybrid. Let me know if this is adequate or if anything needs to be updated.
If all is good, I’ll get the pricing updated.

Thanks,

Lisa Snyders, P.E. | Coombs-Hopkins Company
8950 S. 52"4 Street, Suite 103 | Tempe, AZ 85284
lisa@chcwater.com | Cell: 602.339.8070

COOMBS
HOPKINS

COMPANY ——
This electronic message is intended only for the use of the individual or entity to which it is addressed. It may contain information that is privileged, confidential, and exempt from disclosure under
applicable laws. If the reader of this message is not the intended recipient, employee, or agent responsible for delivering this transmittal to the intended recipient, you are hereby notified that any

disclosure, dissemination, distribution, or copying of this electronic document of the taking of any action in reliance of this information, is strictly prohibited. If you have received this communication in error,
please notify us immediately by telephone or by replying to the above email address. Thank you.

From: Stephen Hagy <sha, arney.com>
Sent: Thursday, June 10, 2021 12:30 PM
To: Lisa Snyders <lisa@chcwater.com>
Subject: Blower Pricing Seconded Phase

Lisa
Can you make sure | have the updated cost by next week Wednesday please?

Stephen Hagy
Employee-Owner Since 2008

GARNEY CONSTRUCTION Advancing Water

PH: 602-470-0001 Cell: 303.482.7437 FAX: 303.791.1801
ADDRESS: 4435 E Holmes Ave, Suite 102, Mesa, AZ 85206 GARNEY.COM

This e-mail message is intended only for named recipients. It contains information that may be confidential, privileged,
or otherwise exempt from disclosure under applicable law. If you have received this message in error, are not a named
recipient, or are not the employee or agent responsible for delivering this message to a named recipient, be advised that
any review, disclosure, use, dissemination, distribution, or reproduction of this message or its contents is strictly
prohibited. Please notify us immediately that you have received this message in error, and delete the message. Thank
you. Visit us on the web at http://www.Garney.com

This e-mail message is intended only for named recipients. It contains information that may be confidential, privileged,
or otherwise exempt from disclosure under applicable law. If you have received this message in error, are not a named
recipient, or are not the employee or agent responsible for delivering this message to a named recipient, be advised that
any review, disclosure, use, dissemination, distribution, or reproduction of this message or its contents is strictly
prohibited. Please notify us immediately that you have received this message in error, and delete the message. Thank

you. Visit us on the web at http://www.Garney.com

6

INSULATION CONTRACTOR

July 8, 2021

Garney Construction

Attn: Stephen Hagy

Job: Aerzen Blower Insulation

We propose to repair and replace insulation on 12” blower piping with 2” thick
fiberglass 850 rated pipe insulation with a PVC jacket cover in two areas.

Bid: $6,000.00

Thank you
Sincerely,

Ralph Davis
M&M Contractors, LLC

542 E. University Dr. e Mesa, Arizona 85203 e (480) 962-7757 Fax (480) 962-0079

FIRE PROTECTION | TEST & INSPECTION | MAINTENANCE | MONITORING

Ere pated By, Garney Contruction - City of El Mirage - Dry System

Copperstate Fire Protection Repairs
neta Pe 10355 N 121st Ave El Mirage, AZ, 85335
Service Estimator
8415 W Sherman ST
Tolleson, AZ, 85353
+8516

Jschilling@copperstatefire.com.

ROC270148
ROC279104
ROC280452

NOTIFIER’
by Honeywell

Submitted: 7/12/2021

Garney Construction
Stephen Hagy
602-470-0001
shagy@garney.com

855.936.4081 © COPPERSTATEFIRE.COM

SUPERIOR SOLUTIONS SINCE 1952

SCOPE OF WORK

CopperState Fire Protection to provide Labor and Materials to install new Detection and Piping
for City of El Mirage - Aerzen Designed Blowers for Waste Water Treatment Plant. Technician to
work with Garney Construction and Blower Engineers to determine access point for new detection
and Supply Line Piping into unit. Technician to install new 3/4" Schedule 40 Piping and 1/2"
Conduit starting from existing Detection and Supply Lines on two new Blowers. Run both lines in
Hazard areas of Blowers per design requirements. Run new Detection Line Wire, Bracketing Kit,
and Scissor Bracketing for Series Fusible Links. Install new PyroChem Nozzles with proper port
configuration with included Caps for Protection. Once Installed verify actuation of Detection Line
and Alarm Signals going to FACP. Work does not include any Design, Permitting, or Fire Marshal
Acceptance Testing. Penetration points of Detection and Supply Piping to be approved by Aerzen
Design Engineers. Once all work has been completed, provided detailed report of repairs.

Re-enable system, and put back online

Location : Qty 2 Blower Systems - 2nd Phase of new Turbine Blowers - Blower Room 2.

INVESTMENT

New

QTY Part #
QsA9
PC435547
435546
PC435545
G360ML
QSA11

NOAONDAN

Chargeable Items:

QTY Description

Conduit and Fittings
3/4" Piping Schedule 40
Nozzles

Unions 3/4"

Cable - 1/16" - 250ft.

RPNOuUR

Description

EMT/ Conduit Adapter 1/2
PyroChem Series Detector Detector
PyroChem Terminal Detector
PyroChem Scissor Linkage

fusible Links - 360 Deg.

3/4 Compression Adapters

Unit Price
$39.70
$64.10
$76.24
$30.14

$8.12
$66.00

$2,889.87

Ext.Price

$79.40
$256.40
$152.48
$180.84

$48.72
$132.00

Monitoring Services $3,680.00

Labor:
QTY Description
32 Labor

Ext.Price
$3,680.00

System Investment

Total Proposal Amount

$6,569.87

~

-

~~

>
pe

OF PROPOSAL

SYSTEM $6,569.87

Acceptance of proposal - The above prices, specifications, and conditions are satisfactory and are hereby
accepted (subject to credit approval.) You are authorized to do the work as specified.

Progress Billing will be applied to this proposal.

Garney Construction Copperstate Fire Protection

Company Date Company Date
Authorized Signature Authorized Signature

Stephen Hagy Jonathan Schilling

Printed Name Title Printed Name Title
602-470-0001 (623) 936-4081-8516 (623) 936-4136
Phone Fax Phone Fax
shagy@garney.com jschilling@copperstatefire.com

Email Email

TERMS AND CONDITIONS

1. The information given is warranted to be true and given for the purpose of obtaining credit. The applicant consents to the
opening of an account. | / We authorize Fire Protection Service Corporation to review the company credit history and/or
personal information as may be required in connection with the credit line hereby applied for or any renewal or extension
thereof and to the disclosure of any trade information concerning the undersigned to any credit reporting agency or to
any person with whom the undersigned has or proposes to have financial relations.

2. In the event credit privileges are extended, | / We agree that Fire Protection Service Corporation may, in its discretion,
increase the credit limit from time to time on this account without notice. | / We agree and understand that | / We are
liable for the full amount of all invoices, regardless of whether they exceed the credit limits on this account.

3. In the event credit privileges are extended |/We hereby give authorization to Fire Protection Service Corporation and its
subsidiaries to obtain my (our) Credit Report Information/Duns & Bradstreet (credit report) through a credit reporting
company chosen by Fire Protection Service Corporation. Credit report information will be retained on file at Fire
Protection Service Corporation and that information will not be disclosed to anyone without my prior written consent.

4. In the event credit privileges are extended, | / We agree to pay Fire Protection Service Corporation within seven days of
My / Our receipt of payment from the owner, general contractor, sub-contractor, or other party from whom payment is
received. This payment term suspends My / Our duty to pay for a reasonable period of time to allow Me / Us to receive
payment. This payment term does not create a condition precedent to payment and does not shift the risk of non-
payment to Fire Protection Service Corporation.

5. Allinvoices are due and payable at 8415 W Sherman ST Tolleson, AZ 85353.

| / We agree to pay interest charges on overdue accounts at the rate of 1.5% per month.

7. Merchandise will not be accepted for return unless authorized by Fire Protection Service Corporation by
obtaining an “RMA” number from the branch.

8. PROOF OF PURCHASE IS REQUIRED FOR ALL RETURNS

2

ACC

EPTANCE OF PROPOSAL

10.

id.
12.

a3.

Purchaser agrees to pay all costs of collection including state approved fees for all unpaid checks, substitute
image documents, and/or credit or debit card transactions that are returned unpaid.

Should these terms not be honored on demand, and the matter placed in the hands of an attorney or
collection agency, the undersigned shall pay all costs of collection, including reasonable attorney fees.
Pricing is valid for 60 days from the date listed in the signature block.

Failure to comply with these Terms and Conditions may result in cancellation of credit privileges without
notice.

| / WE AGREE THIS ACCOUNT WILL BE LITIGATED IN WEBER COUNTY, UTAH IF NEEDED.

ALLIANCE SERVICE & CONTROL SPECIALISTS, INC « 4846 South 40th Street Phoenix, Arizona 85040
Office: 602.431.8434 Fax: 602.431.8482 © License # 128471

7/9/2021

GARNEY CONSTRUCTION
4435 E Holmes Ave, Suite 102,
Mesa, AZ 85206

Attn: Mr. Stephen Hagey
Re: El Mirage Blower Upgrade
Alliance Service and Control Specialists is quoting the following work:

1.) Demo existing conduits at Blower | & 3 for existing blowers demo and to

accommodate new blowers.

2.) Supply and install conduit, conduit fittings, j-boxes as needed between existing
conduit and new blowers.

3.) Supply, install and terminate power wire back to existing MCC buckets as needed.

4.) Supply, install and terminate control wire back to existing PLC if needed. Existing
control seems to be over Ethernet.

5.) Blower | & 3 VFDs shipped loose. VFDs and new 100A non-fused disconnects will
be mounted on new strut racks next to each blower. VFDs will be wire back to control
panel.

6.) Startup support for Blowers | & 3.

TOTAL: $33,900.00
Exclusions:
1. All Taxes and Bonds
2. All Fees and Permits
3. Programming

This quote is good for 30 days

If you have any questions, please call me at (602) 431-8434 ext. 106, Mobile: (602)-920-
7079.

Thank you for your consideration.

Sincerely,

Teng, Feachir
Tonyischer PE,

Protect Manager

REVOLUTION

5858 W. Riggs Rd. * Chandler, AZ 85226
INDUSTRIAL COATINGS P.O, Box 51420 * Phoenix, AZ 85076
www. revolutionindustrial.com P: (480) 993-6699 + F: (480) 718-7656
Proposal #20380.1 7/13/21

Revolution Industrial is pleased to present our proposal for:

Client: Garney

Project: City of El Mirage Blower Building #2 Floor and Wall Coating
This scope of work includes:

e  Alllabor, material, and equipment to prep and coat the floor and walls on site.

Our price for this scope of work is as follows:

1. Floor Price of - $ 6,418.00
2. Wall Price of - $ 5,113.00
3. Taxes Excluded (Taxes to be included if tax exemption not provided)

Clarifications:

e All work to be performed according to OSHA/MSHA and site-specific safety regulations.
e Quote valid for 30 days from date on proposal.

Exclusions:

e Any other item not specifically listed above

e Bonds and Permits

e Third Party Testing and Inspection

e Professional Engineering services and/or stamps
e —Electrical/ Utilities

e Blue stake/utility locating

e Delays in work caused by other trades

e — Liquidated damage clauses

e Prevailing Wages

Sincerely,
Tyrel Brunson — Project Manager

C: 928.812.2610
tyrel@revolutionindustrial.com

This proposal is the sole property of Revolution Industrial. The contents herein are strictly confidential and are supplied on
the understanding that they will be held confidentially and not disclosed to third parties without the prior written consent of
Revolution Industrial. (© 2015)

Vertech © Blower Upgrade Phase 2

Garney Construction

July 16%, 2021

Stephen Hagy

Garney Construction

4435 E Holmes Ave, Ste 102
Mesa, AZ 85206

Quote #: Q210383

Thank you for the opportunity to quote the Blower Upgrade Phase 2 for the City of El Mirage. Vertech will
supply PLC and SCADA programming and startup assistance for this project. Two blowers are being replaced.
With this, there will be two separate startups.

Services supplied by Vertech:
e PLC programming
o Modify existing PLC code to remove the old blowers and add the new blowers to the system
e SCADA programming
o. Vertech will modify the existing SCADA screens to remove the old blowers and add the new blowers

e Startup Assistance

© Vertech will participate in two separate startups. One 8-hour day is included for each blower startup

Blower Upgrade Phase 2
Garney Construction

PLC and SCADA Programming $ 9,120.00

1 Startup Assistance $ 3,190.00
Subtotal $12,310.00
Labor Only $ 0.00

Total $12,310.00

Date: July 16, 2021 www.vertech.com Page 1 of 7
CONFIDENTIAL INFORMATION

Ver tech © Blower Upgrade Phase 2

Garney Construction

The following is NOT provided:

e Hardware of any type

e Installation

e Any permits or other governmental fees required for physical installation of any equipment
e Sales, use or TPT tax as may be required by law

e Additional hardware required to accommodate any changes requisitions during the designing or building
the system

e Any services or hardware not specified by this proposal document

e Startup includes two 8-hour days. If additional time is required, it will be billed at Vertech’s Standard
Rates.

e Terms of payment: Net-30 days. FOB Origin

e Pricing is good for 60 days from date of this proposal
e Estimated Lead Time: 4 - 8 Weeks. Please reconfirm lead time at time of order.

© Lead time subject to change based on Vertech’s resource availability at time of order.
e — Sales tax will be included at the time of billing if applicable

e This proposal is subject to the terms and conditions detailed on the following pages

Contact Robert Simpson with any questions regarding this proposal or to place an order.

Robert Simpson

Business Development Manager
Vertech

Office: 480.756.2300

Mobile: 480.231.9062
bsimpson@vertech.com

Date: July 16, 2021 www.vertech.com Page 2 of 7
CONFIDENTIAL INFORMATION

Blower Upgrade Phase 2

Garney Construction

1. Definition of Terms: “Vertech” shall be Vertech
Industrial Systems, LLC. “Customer” shall be the legal
entity issuing the contract or purchase order to
Vertech authorizing the Work and taking possession of
all tangible goods produced as a result of executing
the Work. The “Work” shall be the entirety of the
goods and services defined in the attached Proposal.
The “Work Product” shall be the software deliverable
provided by Vertech as a part of the Work. The
“Proposal” includes this document in its entirety.

2. The entire agreement between Vertech and
Customer consists of: (a) these Terms and Conditions,
(b) the Proposal, (c) the written requirements of
Customer (if any) that are attached as Exhibit B and,
(d) if applicable, Customer’s later purchase orders to
the extent consistent with the foregoing documents
(collectively the "Contract"). To the extent any later
purchase order includes terms that additional,
different or inconsistent with these Terms and
Conditions or the Proposal, such additional, different
or inconsistent terms are expressly rejected by
Vertech unless agreed to by both Customer and
Vertech in writing. The Contract may only be modified
by a written Change Order, executed by both
Customer and Vertech.

3. Payment must be made according to the terms
defined in this Proposal or otherwise agreed to in
writing. Failure to make payment as agreed will result
in the assessment of finance charges of 1.5% per
month or the highest amount allowable by law,
whichever is smaller. Additionally, lack of payment
shall be just cause to withhold shipment of any
tangible goods or the release of any Work Product,
design documents or software. Prior to the release of
any deliverable to Customer, Customer’s payment
account for the affected project shall be current.

4. If, after seven (7) days’ notice by Vertech, Customer
does not make payment for the Work in conformity
with this Contract (or, with or without such notice if
Customer has repeatedly failed to make payment in
conformity with this Contract), Vertech may suspend
the Work until it receives all payments then due, and
the Contract Sum shall be increased by the Vertech’s
reasonable demobilization and remobilization costs.

In the event collection of any amounts due to Vertech
is referred to an attorney, Customer shall bear all costs
of collection, including, but not limited to, Vertech’s
reasonable attorney fees. Vertech may require
prepayment of any or all amounts due if the financial
condition of Customer reasonably justifies it.

5. The Schedule for completing the Work shall be
modified from time to time to reflect changes in scope
or specifications or to permit revisions, particularly
with respect to the software development portion of
the Work. The Schedule also shall be extended in the
event of delays caused by the Customer or anything
else not caused by Vertech’s acts or omissions and
that are beyond Vertech’s reasonable control.

6. To complete Vertech’s portion of the Project,
Vertech will require Customer to provide sufficient
technical assistance to ensure that the specifications
for the Work and the requirements of Customer are
communicated to Vertech in a timely and cohesive
manner consistent with the agreed scope of the Work.
Customer will take all steps necessary to secure the
availability of such technical personnel at appropriate
times to coordinate and communicate with Vertech.
Vertech will not be liable for any failure to perform the
Work to the extent that the failure is caused by
Customer’s lack of cooperation. Vertech is entitled to
rely on the accuracy and completeness of any data,
material, or other information furnished by Customer,
without independent investigation or verification.

7. Vertech’s process for performing the software
development portion of the Work requires Customer's
participation in the following stages of the project:

a. Functional Specifications. Vertech will
prepare definitions, general drawings,
specifications, etc. that specifically and
completely describe the functional and
visual requirements of the custom Work
Product (the "Functional Specifications").
The Functional Specifications shall be
considered a part of the Proposal.
Customer must give its approval to the
Functional Specifications prior to Vertech
proceeding further with the Work. Any
modifications to the Functional

Date: July 16, 2021

www.vertech.com

Page 3 of 7

CONFIDENTIAL INFORMATION