080321 Gen Tech Proposal

City of El Mirage — Regular Meeting (2021-08-17)

View PDF Item 10 Meeting page

Extracted text (via ocr_local) 17760 characters
WRF Generator Repair Estimated Costs
Gen-tech (per ADPS contract CTRO50957)

Item Cost
Parts S 28,952.57
Temporary Generator S 10,593.00
Total S 39,545.57

Proposal
Proposal Date Proposal Number
5/10/2021 Service Request - 1472679
(Pending)
Gen-Fech f Coord LE
wwiv.gentechusa.comt 800-625-8324 Customer Number
7901 N 70th Ave toon
Glendale, AZ 85303
p. 1(800)625-8324
SOLD TO: SHIP TO:
City of El Mirage Office
10000 N El Mirage 10355 N 121ST AVE
El Mirage, AZ 85335 EL Mirage, AZ 85335
Contact:
Marc Johnson
AZ Glendale
PO Number Order Date Salesperson Proposal Number
1114/2021 CARA TAGGART Service Request - 1472679
{Pending)
Terms
Net 30
Description Quantity — Unit Price Subtotal Tax Total
SHOP SUPPLIES 1.00 $500.00 $500.00 $46.00 $546.00
(1000kW Kohler 1000ROZD4 Office - 698229)
15W-40 OIL BULK 75,00 $13.40 $1,005.00 $92.46 $1,097.46
(1000kW Kohler 1000ROZD4 Office - 698229)
HOSE - SILICONE 3/4IN 8.00 $4.75 $38.00 $3.50 $41.50
(1000kW Kohler 1000ROZD4 Office - 698229)
CONSTANT TORQUE CLAMP 4.00 $6.95 $27.80 $2.56 $30.36
9/16" LINES SS
5/8"- 1-1/4"
(1000kW Kohler 1000ROZD4 Office - 698229)
55 GAL CLEAR DRUM 1.00 $40.70 $40.70 $3.74 $44.44
(1000kW Kohler 1000ROZD4 Office - 698229)
HOSE, 3/4"3 PLY SILICONE 6.00 $12.08 $72.48 $6.67 $79.15
(14000kW Kohler 1000ROZD4 Office - 698229)
FILTER, OIL 3.00 $56.15 $168.45 $15.50 $183.95
(1000kW Kohler 1000ROZD4 Office - 698229)
T-BOLT CLAMP W/ CHANNEL 1.00 $8.90 $8.90 $0.82 $9.72
(1000kW Kohler 1000ROZD4 Office - 698229)
Gasket 1.00 $1,089.60 $1,089.60 $100.24 = $1,189.84
(1000kW Kohler 1000ROZD4 Office - 698229)
Sealing ring 1.00 $108.30 $108.30 $9.96 $118.26
(1000kW Kohler 1000ROZD4 Office - 698229)
Gasket 1.00 $8.92 $8.92 $0.82 $9.74
(1000kW Kohler 1000ROZD4 Office - 698229)
Sealing ring 4.00 $78.12 $312.48 $28.75 $341.23
(1000kW Kohler 1000ROZD4 Office - 698229)
Sealing ring 1.00 $72.46 $72.16 $6.64 $78.80
({4000kKW Kohler 1000ROZD4 Office - 698229)
Gasket 4.00 $24.22 $24.22 $2.23 $26.45
(1000kW Kohler 1000ROZD4 Office - 698229)
Sealing ring 2.00 $95.88 $191.76 $17.64 $209.40
{1000kW Kohier 1000ROZD4 Office - 698229)
Sealing ring 5.00 $79.30 $396.50 $36.48 $432.98
(1000kW Kohier 1000ROZD4 Office - 698229)
Gasket 6.00 $26.12 $156.72 $14.42 $171.14

(1000kW Kohler 10UUROZu4 Office - 0¥8229)

fy yar
Al ae eo HN Proposal
ELA Proposal Date Proposal Number
5/10/2021 Service Request - 1472679
(Pending)
Customer Number
10011
7901 N 70th Ave
Glendate, AZ 85303
p. 1(800)625-8324
Description Quantity Unit Price Subtotal Tax Total
Sealing ring 12.00 $14.52 $174.24 $16.03 3190.27
(1000kW Kohler 1000ROZD4 Office - 698229)
Gasket 2.00 $5.92 $11.84 $1.09 $12.93
(1000kW Kohler 1000ROZD4 Office - 698229)
Gasket 1.00 $7.68 $7.68 $0.71 $8.39
(14000kW Kohler 1000ROZD4 Office - 698229)
Gasket 1.00 $218.62 $218.62 $20.11 $238.73
(1000kW Kohler 1000ROZD4 Office - 698229)
GASKET 1.00 $46.70 $46.70 $4.30 $51.00
(1000kW Kohler 1000ROZD4 Office - 698229)
GASKET 1.00 $9.62 $9.62 $0.89 $10.51
(1000kW Kohler 1000ROZD4 Office - 698229)
O/CLR GASKET 1.00 $7.82 $7.82 $0.72 $8.54
(1000kW Kohler 1000ROZD4 Office - 698229)
SEAL RING 1.00 $24.84 $24.84 $2.29 $27.13
(1000kW Kohler 1000ROZD4 Office - 698229)
4.00 $250.00 $1,000.00 $92.00 $1,092.00
({000kW Kohler 1000ROZD4 Office - 698229)
LIFTING EYES
HAZARDOUS WASTE/DISPOSAL FEE - 3% OF OIL AND 1.00 $30.15 $30.15 $0.00 $30.15
(1000kW Kohler 1000ROZD4 Office - 698229)
LABOR 80.00 $112.00 $8,960.00 $0.00 $8,960.00
(1000kW Kohler 1000ROZD4 Office - 698229)
LABOR 40.00 $150.00 $6,000.00 $0.00 $6,000.00
(1000kW Kohler 1000ROZD4 Office - 698229)
1.00 $6,900.00 $6,900.00 $0.00 $6,900.00
{1000kW Kohler 1000ROZD4 Office - 698229)
RIGGING SERVICES
MILEAGE 250.00 $2.25 $562.50 $0.00 $562.50
(1000kW Kohler 1000ROZD4 Office - 698229)
1.00 $250.00 $250.00 $0.00 $250.00
(1000kW Kohler 1000ROZD4 Office - 698229)
FREIGHT
Total $28,426.00 $526.57 $28,952.57

DRAIN OIL AND COOLANT, AND REMOVE ALL CONDUIT ETC SO ENCLOSURE CAN BE REMOVED. WELD ON
LIFTING EYES. REMOVE HOSES AND UNBOLT FAN HUB AND MOVE BATTERIES OUT OF ENCLOSURE AREA.
CRANE ONSITE TO REMOVE ENCLOSURE WITH EXHAUST ATTACHED. LOOSEN GENERATOR VIBRATION
ISOLATORS AND LIFT ENGINE. BEGINE REMOVING OIL PAN ETC.
FINISH REPAIR AND RESET ENGINE, REPLACE ASSOCIATED PARTS HAVE CRANE RESET ENCLOSURE.

LOADBANK UNIT FOR 4 HOURS
ig alay's

Sal -#

BPN GOASbO
Lonvact Fe ~CTROSOIST

afi froar

Arizona Generator Technology, Inc. ere

tsa GEN-TECH ;
7901 N. 70th Avenue, Glendale, AZ 85303 ue
(W) 623-937-1719 (F) 623-937-0408 = Th...
Committed to Providing Excellence te
J Q NUMBER: 07202t-1737-MEG
o [Job Site Contact: Mare DATE/TIME: 7-20-21 @ 7:37 PM
b  |Job Site Phone #: 623-518-0381
Job Site Address: DATE OUT: TBD
Ss 10355 N 12st Ave EST. RETURN: TBD
i EI! Mirage, AZ 85335
t ORDERED BY: Marc Johnson 623-518-0381
e
PREPARED BY: Matt Grudowski 602-757-4824
c City of El Mirage
: SALES REP: MEG
‘ SHIFT TYPE: Standby - Weekly Estimate
m Day Week 4 Weeks
e Single Shift Hours: 0-10 0-50 9-200
r P.O. . : : Double Shift Hours: 11-16 51-80 201-320
Permits and Drawings Excluded at this Price Triple Shift Hours: 17-24 81-168 321-672
QTY DESCRIPTION DAY WEEK 4 WEEKS TOTAL AMOUNT
1 1000kW @ 480/277v / 60hz / 3B $1,775.00 $5,325.00 $15,975.00 $5,325.00
34 50' 4/0 Cable $11.00 $33.00 $99.00 $1,122.00
17 4/0 Male Tails $4.00 $12.00 $36.00 $204.00
7 4/0 Female Tails $0.00 $0.00 $0.00 $0.00
8 4 Hole Insulated Lug $5.00 $15.00 $45.00 $120.00
2 100’ Battery Charger & Block Heater Cord $0.00 $0.00 $0.00 $0.00
1 100' Auto Start Wire $0.00 $0.00 $0.00 $0.00
Fuel
Fuel Drop $75 Mon-Fri $125 Sat, Sun, Nights
Price Per Gallon: $4.45
Price will vary with the market
Delivery: $300.00
On-Site Labor: $1,250.00
Gen-Tech will deliver, lay out cable, and make Pick-up: $300.00
terminations. Once rental is complete, Environmental Fee: $63.90
Gen-Tech will remove all equipment from the site. *15% Damage Waiver: $1,015.65
Sub-total: $9,700.55
Tax: $892.45
Fuel is not included in this estimate [__ESTIMATED Cost: $10,593.00 |

ALL FUEL INVOICES ARE NET 10 DAYS
*A Damage Waiver will be charged at 15% of rental rate, if no Certificate of Insurance is provided within 20 days of delivery, or the end of the rental whichever comes first.
24 hour fuel service is available, please call 623-937-1719 for current fuel prices. If you do not choose Gen-Tech to be your fuel provider, there will be a fuel service
charge of $6.50 per gallon if the equipment is not returned full of the proper fuel. A clean-up fee of $75 per hour will be charged for equipment needing excessive cleaning.
Our equipment requires maintenance every 250 hours and is the responsibility of the customer, unless otherwise scheduled with GEN-TECH .
Prices contained in this estimate are not valid after 30 days of estimate date. There will be an additional 3% convenience fee added if paid by credit card.
This proposal constitutes an estimation of rates only and is subject to change and/or availability of goods.
Thank you for giving us the opportunity to earn your business. We look forward to providing you the best quality service possible.

Customer Printed Name Customer Signature Date

Committed To Providing Excellence
ADDITIONAL TERMS AND CONDITIONS

1 AUTHORITY TO SIGN: Itis hereby agreed that any individual signing this contract as deemed reasonable wear and treatment: (a) damage resulting from lack of lubrication or maintenance of

ARIZONA DEPARTMENT OF PUBLIC SAFETY

2102 WEST ENCANTO BLVD. P.O. BOX 6638 PHOENIX, ARIZONA 85005-6638 (602) 223-2000

"Courteous Vigilance,,

DOUGLAS A, DUCEY Heston Silbert
Governor Director

July 30th, 2020

bevraets@gentechus.com

Mr. Lanny Slater
Mr. Brandon Evaets

AZ Generator Technology
7901 N. 70" Ave
Glendale, Az 85303

Re: Award of Contract No. CTR- Generators, Accessories, Maintenance and Repair Services

Dear Mr. Slater, and Mr. Evaets:

Thank you for submitting a response to Invitation for Bid No. BPM002560. | am pleased to inform
you that your company's offer has been selected for award. The initial contract term of one year
shall begin on August 1st, 2020 and terminate on August 1st, 2021. Four (4) additional terms are
available for renewal.

The procurement file for this solicitation, including evaluation documents and resultant contract,
will be available shortly via the State's e-Procurement system, Arizona Procurement Portal
(APP).

In order to complete the contract award process and in accordance with the Special Terms and
Conditions, your company is required to submit a Certificate of Insurance. The certificate of
insurance (COI) shall indicate that your company is in compliance with insurance requirements
contained in the contract. Please submit your certificate of insurance to me as soon as possible.
Once the COI has been received, the Offer and Acceptance form will be signed by the State
completing the contract process.

You are cautioned not to begin any services under the contract until the Procurement Officer
assigned to your contract has issued a purchase order against the contract through APP.

If you have any questions regarding your company's contract, please contact me
mguyette@azdps.gov 602-223-2262. Thank you for your response and for your continued interest
in doing business with the State of Arizona.

Linde? CONG:
V Fey

Executive Summary. Evaluation Report and THE nie il OF
Award Recommendation 2102 W. ENCANTO BLVD.
P O BOX 6638 MAIL DROP 1330
PHOENIX ARIZONA 85005
Solicitation Type: Request for Proposal (‘RFP") Solicitation Number: BPM002560 _|
Solicitation Title: Generators,Accessories, Specification Type: Performance/Standards
Maintenance & Repair Service
Date Posted May 9", 2020 Due Date June 8%, 2020

Material and/or Service Requirement: Generators, Accessories, Maintenance & Repair Service

Standards: The above entitled Request for Proposal (“RFP”) was formally announced, advertised and evaluated in
accordance with A.R.S. §41-2534 Competitive Sealed Proposals et. seq. and A.A.C. R2-7-C316(B) Evaluation of Offers.

Evaluation Criteria: RFP section 6, Special Instructions to Offerors.
1. Offeror's Experience and Capacity

2, Offeror’s cost proposal

3, Offeror’s Proposed Method of Approach

Evaluation of Offers: Offers received from Arizona Generator, Bud Giffin, Cummins and WW Williams were evaluated in
accordance with the evaluation criteria specified in Section 6, Special Instructions to Offerors.

Negotiations/Clarifications: Negotiations/Clarifications were conducted with all offers received with clarifications to their
original offers.

Award Recommendation: In order to meet the requirements of the WSB unit and facilities, recommendation is made to
award contract to both Arizona Generator and Cummins.

e Both scored “Meets” for the Methodology requirements

e Arizona Generator had a slightly higher score than Cummins on the Experience and Capacity requirements.
Primarily due to their previous experience working with WSB. Cummins scored high on the pricing for hourly labor
rates and for the maintenance of the existing generators for facilities.

Additional negotiations are not recommended as the above offeror's proposals, as submitted, represent the best value for
the State.

Koad Authorized:

LC Award Not Authorized:

«

N
ate: fad fo ABQRO

Chief Pro¢éurement Officer

Request for Proposals Arizona Department of

Solicitation No. Public Safety
- BPM002560 _ ; 2102 W. Encanto Bivd,,
Description: Generators, Accessories, Maintenance
and Repair Services Phoenix, Arizona 85009

Attachment 1
Offer and Acceptance Form

SUBMISSION OF OFFER: Undersigned hereby offers and agrees to provide Generators, Accessories, Maintenance and Repair Services in
compliance with the Solicitation indicated above and our Offer indicated by the lates! dated version below:

intat 1. | x 06/08/2020
Offer: tate

i
|

| initial

raligl lite ass Inital date #6 initial

ahah

Petied oid an,

SECTION 1-C: . '

Contract Amendment Arizona Department of Public
Safety

. 2102 W. Encanto Blvd.,
Contract No.: CTRO50957 Phoenix, Arizona 85009

Amendment No: 03

Generators, Accessories, Maintenance and Repair Services

1. In accordance with Special Terms and Conditions Section 6.0, Contract Extensions, this Contract is
extended for the contract period August 1st, 2021 through August tst, 2022.

2. In accordance with the Uniform Terms and Conditions, Section 5.1 Amendments, this contract is
amended to modify the following items:

. . Current
Prices effective &-1-24 Contract Price New Contract Price
Industrial Outdoor Diesel Generator Set Rated for 30kw:
Standby Rated, 120/240V Single Phase, 60hz: $19625 $17859
Fuel Tank: 24 hr run time for 30kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents
$2465 $1972
Fuel Tank: 48 hr run time for 30kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents $2652 $2513
industrial Outdoor Diesel Generator Set Rated for 40kw:
Standby Rated, 120/240V Single Phase, 60hz: $22874 $19028
Fuel Tank: 24 hr run time for 40kw diese! generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents
$3024 $2319
Fuel Tank: 48 hr run time for 40kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, venis
Le $3707 $3404

ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED:

This change order shall be fully executed upon the approval electronically in Arizona Procurement Portal by an
authorized representative of the Contractor and applied to the contract In APP by the Procurement Officer or delegate.

Available online at |

Appstate.az.gov Page | 1

Contract Amendment Arizona Department of Public
Safety

. 2102 W. Encanto Bivd.,
Contract No.: CTRO50957 Phoenix, Arizona 85008

Amendment No: 03

Industrial Outdoor Diesel Generator Set Rated for 45-50kw:
Standby Rated, 120/240V Single Phase, 60hz: $21696 $19323

Fuel Tank: 24 hr run time for 45-50kw diesel generator, sub-
base double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $3024 $2319

Fuel Tank: 48 hr run time for 45-50w diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents

$3707 $3403

Industrial Outdoor Diesel Generator Set Rated for 100kw:
Standby Rated, 120/240V Single or Three Phase based on
requirements, 60hz: $27027 $26171

Fuel Tank: 24 hr run time for 100kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $3263 $2231

Fuel Tank: 48 hr run time for 100kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $4830 $3408

{ndustrial Outdoor Diesel Generator Set Rated for 200kw:
Standby Rated, 120/240V Single or Three Phase based on
requirements, 60hz: $41000 $34575

Fuel Tank: 24 hr run time for 200kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents

$3792 $3122

Fuel Tank: 48 hr run time for 200kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $5984 $4742

Industrial Outdoor Diesel Generator Set Rated for 300kw:
Standby Rated, 120/240V Single or Three Phase based on

requirements, 60hz: $50386 $55685

Fuel Tank: 24 hr run time for 300kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $4744 $4647

ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED

This change order shall be fully executed upon the approval electronically in Arizona Procurement Portal by an
authorized representative of the Contractor and applied to the contract In APP by the Procurement Officer or delegate.

Avai'eble online at
Appstate.az.gov Page |2

Contract Amendment Arizona Department of Public
Safety

. 2102 W. Encanto Bivd.,
Contract No.: CTRO50957 Phoenix, Arizona 85009

Amendment No: 03

Fuel Tank: 48 hr run time for 300kw diesel generator, sub-base |
double wall UL Listed fuel tank with ail necessary sensors,
gauges, vents $8278 $6806
Industrial Outdoor Dieset Generator Set Rated for 400kw:
Standby Rated, 120/240V Single or Three Phase based on
requirements, 60hz: $66936 $68867
Fuel Tank: 24 hr run time for 400kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,
gauges, vents $5175 $4376
Fuel Tank: 48 hr run time for 400kw diesel generator, sub-base
double wall UL Listed fuel tank with all necessary sensors,

gauges, vents $9550 $7302

Industrial Outdoor LP Vapor Generator Set Rated for 30kw:

Standby Rated, 120/240V Single Phase, 60hz: $19351

Industrial Outdoor LP Vapor Generator Set Rated for 40-45kw:

Standby Rated, 120/240V Single Phase, 60hz: $20858 $20299

Industrial Outdoor LP Vapor Generator Set Rated for 50kw:

Standby Rated, 120/240V Single Phase, 60hz: $22508 $21620

Industrial Outdoor LP Vapor Generator Set Rated for 55-60kw:

Standby Rated, 120/240V Single Phase, 60hz: $22838 $22318

Industrial Outdoor LP Vapor Generator Set Rated for 65-70kw: $27750

Standby Rated, 120/240V Single Phase, 60hz:

$29271 _

Automatic Transfer Switch: To be configured/built/manufactured

in USA/delivered as specified below: 200A ATS: 2 pole, solid $2460

neutral, 120/240V single p $2197

Automatic Transfer Switch: To be configured/built’manufactured

in USA/delivered as specified below: 400A ATS: 2 pole, solid §3248
neutral, 120/240V single o 2 $3067 |

ALL OTHER REQUIREM

MAIN UNCHANGED

This change order shall be fully executed upon the approval electronicaily in Arizona Procurement Portal by an
authorized representative of the Contractor and applied to the contract in APP by the Procurement Officer or delegate.

~Aveilzble online = |

Appstate.az.gov Page {3