MOU re Bartlett Dam Modification Feasibility Study

City of El Mirage — Regular Meeting (2021-08-17)

View PDF Item 11 Meeting page

Extracted text (via pymupdf) 24049 characters
1 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
MEMORANDUM OF UNDERSTANDING 
TO SUPPORT THE BARTLETT DAM MODIFICATION FEASIBILITY STUDY 
AMONG VARIOUS PARTICIPATING ENTITIES, 
SALT RIVER VALLEY WATER USERS' ASSOCIATION, 
AND 
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT 
 
August__, 2021 
 
 
1. 
PARTIES: 
 
This nonbinding memorandum of understanding (“MOU”) to support the Bartlett Dam 
Modification Feasibility Study is entered into by those entities listed in the Contact List of 
Exhibit A (“Participating Entities”), the Salt River Valley Water Users' Association 
(“Association”), and the Salt River Project Agricultural Improvement and Power District 
(“District”). The Association and District are referred to collectively as “SRP.”  SRP and the 
Participating Entities are referred to collectively as “Parties.” 
 
2. 
BACKGROUND AND PURPOSE: 
 
a. 
The United States Department of the Interior’s Bureau of Reclamation 
(“Reclamation”), in partnership with SRP, conducted an appraisal level 
investigation called the Verde Reservoirs Sediment Mitigation Study to evaluate 
options to restore capacity lost in SRP’s Verde River reservoirs due to sediment 
accumulation, which impacts critical water supplies for central Arizona.  
 
b. 
Reclamation issued a draft report entitled “Verde Reservoirs Sediment Mitigation 
Study Appraisal Report” in May 2021 (“Draft Appraisal Report”) recommending 
that Reclamation:  
 
i. 
Seek/confirm authority to initiate a feasibility study to determine the 
technical, environmental, 
economic, 
and 
financial feasibility of 
implementing one of two Bartlett Dam modification alternatives to enable 
central Arizona to adapt water management to changing climate 
conditions (“Bartlett Dam Modification Feasibility Study”);

2 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
ii. 
Address topics identified in the Verde Reservoirs Sediment Mitigation 
Study during the feasibility study process; and  
 
iii. 
Develop cost-share agreements necessary to support the successful 
completion of the Bartlett Dam Modification Feasibility Study.  
 
c. 
Reclamation is expected to release a final appraisal report by the end of calendar 
year 2021. The Parties support Reclamation’s recommendations as identified in 
Subparagraph 2(b) and the initiation of the Bartlett Dam Modification Feasibility 
Study to further evaluate alternatives for modification of Bartlett Dam to improve 
management of water supplies of the Verde River, reduce the reliance on 
groundwater, and help position central Arizona to manage extended droughts and 
shortages created by climate change impacts on the Colorado, Salt, and Verde 
River watersheds.  
 
d. 
The purpose of this MOU is to describe the cooperative efforts and roles and 
responsibilities of the Parties related to supporting Reclamation in completing the 
Bartlett Dam Modification Feasibility Study as recommended in the Draft 
Appraisal Report.  As described below, included in those cooperative efforts is the 
formation and participation in a steering committee as described in Paragraph 
5(d) (“Steering Committee”), and development of the following agreements:  (1) 
a cost-share agreement among the Participating Entities and SRP as described in 
Paragraph 5(a) (“Nonfederal Participating Entities Cost-Share Agreement”), and 
(2) the development of a cost-share agreement among SRP and Reclamation as 
described in Paragraph 4(b)(i) (“SRP-Reclamation Cost-Share Agreement”). 
 
3. 
TERM AND TERMINATION: 
 
a. 
This MOU will become effective upon execution by the Parties and, unless 
terminated under Subparagraph 3(b), will remain in effect until Reclamation 
issues a final report for the Bartlett Dam Modification Feasibility Study.   
 
b. 
This MOU will terminate in the event that Reclamation issues a final Verde 
Reservoirs Sediment Mitigation Study Appraisal Report that does not include a 
recommendation to study the feasibility of Bartlett Dam modification alternatives.  
 
c. 
This MOU and the provisions of this MOU may only be modified upon mutual 
written consent of the Parties.

3 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
4. 
RESPONSIBILITIES: 
 
a. 
Mutual Responsibilities: 
 
i. 
The Parties will work cooperatively to develop the Nonfederal Participating 
Entities Cost-Share Agreement.  
 
ii. 
The Parties will work cooperatively to form and participate in the Steering 
Committee that is identified in Subparagraph 5(d) and will be further 
described by the Nonfederal Participating Entities Cost-Share Agreement. 
 
 
 
iii. 
The Parties will support and assist Reclamation to conduct the Bartlett 
Dam Modification Feasibility Study in the event that Reclamation 
has/obtains authority to conduct this study as identified in the 
recommendations noted in Subparagraph 2(b). This support and 
assistance is expected to include funding of the Bartlett Dam Modification 
Feasibility Study by some or all of the Participating Entities, as will be 
specified by the Nonfederal Participating Entities Cost-Share Agreement. 
The Parties will provide data and information relevant to analyses that may 
include but are not limited to assessments of hydrology and climate 
change, demand for use of water supplies, environmental and cultural 
resources, economics, engineering, dam safety and flood control, and 
recreation. 
 
b. 
SRP Responsibilities:  
 
i. 
SRP will work with Reclamation to develop the SRP-Reclamation Cost-
Share Agreement as a mechanism for SRP to pay the nonfederal cost-share 
required for completing the Bartlett Dam Modification Feasibility Study in 
the event that Reclamation has/obtains authority to conduct this study, 
including the funds collected under the Nonfederal Participating Entities 
Cost-Share Agreement, for completing the Bartlett Dam Modification 
Feasibility Study. 
 
ii. 
SRP will consult with the Participating Entities on substantive decisions 
related to Reclamation developing a plan of study for the Bartlett Dam 
Modification Feasibility Study while it finalizes the Draft Appraisal Report.

4 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
SRP will be the single point of contact with Reclamation on behalf of the 
Parties and will lead communications with Reclamation related to the 
Bartlett Dam Modification Feasibility Study until the Nonfederal 
Participating Entities Cost-Share Agreement is executed. 
 
iii. 
SRP will serve as chair of the Steering Committee.  
  
c. 
Participating Entities Responsibilities: 
 
i. 
Participating Entities will provide relevant data, information, opinions, and 
analyses related to the Bartlett Dam Modification Feasibility Study as 
reasonably requested by SRP or Reclamation in the event that Reclamation 
has/obtains authority to conduct the Bartlett Dam Modification Feasibility 
Study.   
 
ii. 
Participating Entities will serve on the Steering Committee as appropriate 
to engage in collaboration and coordination with SRP to support 
Reclamation’s completion of the Bartlett Dam Modification Feasibility 
Study as will be further defined in the Nonfederal Participating Entities 
Cost-Share Agreement. 
 
iii. 
Participating Entities will coordinate and collaborate with SRP in efforts to 
communicate information related to the Bartlett Dam Modification 
Feasibility Study with elected officials and other relevant stakeholders on 
the project.  
 
5.  
DEVELOPMENT OF THE NONFEDERAL PARTICIPATING ENTITIES COST-SHARE 
AGREEMENT: 
 
a. 
The Parties will collaborate to develop the Nonfederal Participating Entities Cost-
Share Agreement with a goal of execution in Fall 2021.  The Nonfederal 
Participating Entities Cost-Share Agreement will describe how nonfederal costs 
will be allocated among SRP and any Participating Entities agreeing to share those 
costs to provide nonfederal funding to Reclamation and any appropriate 
contractors to conduct the Bartlett Dam Modification Feasibility Study in the event 
that Reclamation has/obtains authority to conduct this study.

5 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
b. 
As part of the process to develop the Nonfederal Participating Entities Cost-Share 
Agreement, SRP and any Participating Entities agreeing to share the nonfederal 
costs will collaborate to determine the relative shares of the non-federal cost 
contribution in support of the Bartlett Dam Modification Feasibility Study in the 
event that Reclamation has/obtains authority to conduct this study as 
recommended in the Draft Appraisal Report.  The Parties understand that any 
cost-share contribution under the Nonfederal Participating Entities Cost-Share 
Agreement does not guarantee capacity in a future Modified Bartlett Dam in the 
event such a facility is constructed. 
 
c. 
The Nonfederal Participating Entities Cost-Share Agreement will be among SRP 
and any Participating Entities agreeing to share the nonfederal costs and will 
require those Participating Entities to submit funds to SRP for SRP to remit such 
funds to any necessary contractors or to Reclamation through the separate 
Reclamation-SRP Cost-Share Agreement. 
 
d. 
As part of the Nonfederal Participating Entities Cost-Share Agreement, the Parties 
will establish the Steering Committee chaired by SRP to provide timely and 
effective feedback and guidance to support Reclamation and any necessary 
contractors in achieving the milestones necessary to complete the Bartlett Dam 
Modification Feasibility Study in the event that Reclamation has/obtains authority 
to conduct this study and to facilitate coordination in communications with 
elected officials and other relevant stakeholders.  
 
6. 
AUTHORIZED REPRESENTATIVES  
 
Within thirty (30) days after execution of this MOU, SRP and each Participating Entity shall 
designate in writing to the other Parties an Authorized Representative and an Alternate 
to administer this MOU on behalf of the designating party. Written notice of a change of 
an Authorized Representative or Alternate shall be provided within thirty (30) days of 
such change. The Alternate shall act only in the absence of the Authorized Representative.  
Neither the Authorized Representatives nor the Alternates shall have authority to amend, 
modify, or supplement this MOU.  Agreements of the Authorized Representatives 
pursuant to this MOU shall be in writing and signed by them.

6 
Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
7. 
ADDITION AND WITHDRAWAL OF PARTICIPATING ENTITIES: 
 
a. 
Any Participating Entity may voluntarily withdraw from this MOU by providing 
thirty (30) days written notice to the other Parties as provided in Paragraph 8.   
 
b. 
Additional Participating Entities may be added to this MOU by the Steering 
Committee.  Such additional Participating Entities may or may not (1) be parties 
to the Nonfederal Participating Entities Cost-Share Agreement, or (2) participate 
in the Steering Committee. 
 
8. 
ADDRESSES FOR COMMUNICATIONS: 
 
a. 
All notices and communications under this MOU shall be addressed to the 
contacts set forth in Exhibit A.  In the event Participating Entities are added to this 
MOU by the Steering Committee as described in Subparagraph 7(b), the 
Authorized Representatives shall update Exhibit A accordingly and distribute the 
updated Exhibit A to all of the Parties.  
 
b. 
The Parties may change the addressee or address to which communications or 
copies are to be sent by giving notice of such change of addressee. 
 
 
[signatures on the following pages]

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
9. 
SIGNATURES: 
 
IN WITNESS WHEREOF, this MOU was executed by the Parties on the date first 
hereinabove written. 
 
SALT RIVER VALLEY WATER USERS' 
ASSOCIATION 
 
By:  
 
 
 
 
 
 
Name:  David C. Roberts 
Title:     Associate General Manager  
 Water Resources 
 
APPROVED AS TO FORM 
 
By:  
 
Name: Patrick B. Sigl 
Title:    Supervising Attorney, Environment, Land 
& Water Rights 
 
SALT RIVER PROJECT AGRICULTURAL 
IMPROVEMENT AND POWER DISTRICT 
 
By:  
 
Name:  David C. Roberts 
Title:     Associate General Manager  
  Water Resources 
 
APPROVED AS TO FORM 
 
By:  
 
Name: Patrick B. Sigl 
Title:    Supervising Attorney, Environment, Land 
& Water Rights

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
 
ARIZONA WATER COMPANY 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
BUCKEYE WATER CONSERVATION AND 
DRAINAGE DISTRICT  
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CENTRAL ARIZONA GROUNDWATER 
REPLENISHMENT DISTRICT  
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF APACHE JUNCTION 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF AVONDALE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF BUCKEYE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF CHANDLER 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
TOWN OF GILBERT 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF EL MIRAGE  
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF GLENDALE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF GOODYEAR 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF MESA 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF PEORIA 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF PHOENIX 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF SCOTTSDALE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
CITY OF SURPRISE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
 
CITY OF TEMPE 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
                                                                                      EPCOR USA, INC. 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
FORT MCDOWELL YAVAPAI NATION  
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
ROOSEVELT WATER CONSERVATION DISTRICT 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
TOWN OF QUEEN CREEK 
 
By:  
 
 
 
 
 
 
Name:   
Title:      
 
APPROVED AS TO FORM 
 
By:  
 
Name: 
Title:

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
 
MEMORANDUM OF UNDERSTANDING 
TO SUPPORT THE BARTLETT DAM MODIFICATION FEASIBILITY STUDY 
AMONG VARIOUS PARTICIPATING ENTITIES, 
SALT RIVER VALLEY WATER USERS' ASSOCIATION, 
AND 
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT 
 
 
Exhibit A 
 
Contact List 
 
Arizona Water Company 
Buckeye Water Conservation and Drainage District
Central Arizona Groundwater Replenishment 
District 
City of Apache Junction 
City of Avondale 
Town of Gilbert 
City of Buckeye 
City of Chandler 
City of El Mirage 
City of Glendale 
City of Goodyear 
City of Mesa 
City of Peoria 
City of Phoenix 
City of Scottsdale 
City of Surprise 
City of Tempe 
EPCOR USA, Inc. 
Fort McDowell Yavapai Nation 
Roosevelt Water Conservation District 
Town of Queen Creek

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
MEMORANDUM OF UNDERSTANDING 
TO SUPPORT THE BARTLETT DAM MODIFICATION FEASIBILITY STUDY 
AMONG VARIOUS PARTICIPATING ENTITIES, 
SALT RIVER VALLEY WATER USERS' ASSOCIATION, 
AND 
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT 
 
 
 
Mailing Addresses 
 
If to SRP: 
 
Salt River Project  
c/o Corporate Secretary 
P.O. Box 52025 
Phoenix, AZ 85072-2205 
 
with a copy to: 
 
Ronald J. Klawitter 
Water System Projects Principal 
Salt River Project  
P.O. Box 52025 
Phoenix, AZ 85072-2205

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to Arizona Water Company: 
 
Arizona Water Company  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to Buckeye Water Conservation and Drainage District: 
 
Buckeye Water Conservation and Drainage District  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to Central Arizona Groundwater Replenishment District: 
 
Central Arizona Groundwater Replenishment District  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Apache Junction: 
 
City of Apache Junction 
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Avondale: 
 
City of Avondale  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Buckeye: 
 
City of Buckeye  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
_ 
If to City of Chandler: 
 
City of Chandler  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to Town of Gilbert: 
 
Town of Gilbert  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of El Mirage: 
 
City of El Mirage  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Glendale: 
 
City of Glendale  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Goodyear: 
 
City of Goodyear  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Mesa: 
 
City of Mesa  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Peoria: 
 
City of Peoria  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Phoenix: 
 
City of Phoenix  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Scottsdale: 
 
City of Scottsdale  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Surprise: 
 
City of Surprise  
c/o _____________ 
_________________ 
_________________ 
 
 
 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to City of Tempe: 
 
City of Tempe  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to EPCOR USA, Inc.: 
 
EPCOR USA, Inc  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to FORT MCDOWELL YAVAPAI NATION: 
 
FORT MCDOWELL YAVAPAI NATION  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to ROOSEVELT WATER CONSERVATION DISTRICT: 
 
ROOSEVELT WATER CONSERVATION DISTRICT  
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________

Memorandum of Understanding for Bartlett Dam Modification Feasibility Study 
 
If to TOWN OF QUEEN CREEK: 
 
TOWN OF QUEEN CREEK 
c/o _____________ 
_________________ 
_________________ 
 
with a copy to: 
 
 ________________ 
_________________ 
_________________ 
_________________