Woodruff Construction Quote
Extracted text (via pymupdf)
8695 characters
www.eziqc.com Summary Of Costs Statewide General Contracting JOC Demo of Parcel Number 501-26-082 JOC Project Name: 22-CityofElMirage-0001.00 JOC Project Number: Amount of Proposal: $48,973.79 Purchase Order Amount to Contractor Woodruff Construction Contractor: Contractor: Woodruff Construction 8/13/2021 Price Proposal Summary - CSI Job Order Contract www.eziqc.com Statewide JOC Contract Demo of Parcel Number 501-26-082 Job Order Title: Job Order Number: Contract Number: Date: ADSPO17-174299-ez 22-CityofElMirage-0001.00 August 13, 2021 We propose to furnish the following material, labor & equipment necessary to complete the following: Base Bid: Demolish the (3) existing buildings on the parcel and remove all concrete down to the dirt. Work to include the following: General Requirements: Supervision, Project Management, and General Liability Insurance, Permits, Daily and Final Clean-up. Demolition: Demo and haul off of all debris from the demolition of (3) existing building structures on the property. Remove all debris from the site. Remove all concrete foundations including footings(backfill). Remove the site concrete and the existing block wall in the front of the house. All required permits. Bid Clarifications: 1) Per jobsite walk, owner is to disconnect existing electrical (pull any meters to buildings), disconnect existing gas lines and meters(disconnect at the service point to the house), and all water lines and meters. 2) Work to be completed during normal business hours. Exclusions: Special inspections, no payment and performance bonds, builders risk, anything not listed above. Detailed Scope: Proposal Name: Proposal Value: Proposal created by Contractor: Demo of Parcel Number 501-26-082 Woodruff Construction $48,973.79 01 - General Requirements: $6,174.43 02 - Site Work: $42,799.36 $48,973.79 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona . The Percent of NPP on this Proposal: 0.00% 1 Page 1 of 1 8/13/2021 Price Proposal Summary - CSI Price Proposal Detail - CSI Job Order Contract August 13, 2021 22-CityofElMirage-0001.00 ADSPO17-174299-ez Date: Job Order Title: Job Order Number: Contract Number: Demo of Parcel Number 501-26-082 1.0626-Option 4 - Non-State ezIQC Reimbursable Fee, 1.2040-Option 4 - Non-State - Owner Funded - Normal Working Hours Adjustment Factor(s) Used: Proposal created by Contractor: Proposal Value: Proposal Name: Demo of Parcel Number 501-26-082 Woodruff Construction $48,973.79 CSI Number Line Total Description UOM Mod. Rec# 01 - General Requirements 01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal. 1 $1,115.73 EA Installation = x x $1,115.73 Factor Unit Price Quantity Total 1.0626 $1.00 1,050.00 User Note: Demo permit - $350 per structure (3) structures 01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal. 2 $595.06 EA Installation = x x $595.06 Factor Unit Price Quantity Total 1.0626 $1.00 560.00 User Note: Dust Permit 01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal. 3 $637.56 EA Installation = x x $637.56 Factor Unit Price Quantity Total 1.0626 $1.00 600.00 User Note: NESHAP Permit 2.00 Page 1 of 3 8/13/2021 Price Proposal Detail - CSI Demo of Parcel Number 501-26-082 22-CityofElMirage-0001.00 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 01 - General Requirements 01 22 16 00 0004 TaxesThe Contractor shall pay all sales, consumer, use and other similar taxes required by Law for which an exemption does not exist. If the Contractor is required to pay sales tax on non-exempt material, equipment, services or other items purchased in connection with a Purchase Order, the Member will reimburse the Contractor for such tax, without mark-up, provided the Contractor submits the appropriate documentation therefore. The base cost of the Taxes is $1.00. The quantity used will adjust the base cost to the actual Taxes (e.g. quantity of 125 = $125.00 Taxes). If there are multiple Taxes, each one shall be listed separately with a comment in the "note" block to identify the Taxes. 4 $1,719.10 EA Installation = x x $1,719.10 Factor Unit Price Quantity Total 1.0626 $1.00 1,617.82 User Note: Taxes on Material and Equipment = $1,617.82 01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial warehouse forklifts, sweepers, scissor platform lifts, telescoping and articulating boom man lifts with up to 40' boom lengths, etc. 5 $161.99 EA Installation = x x $161.99 Factor Unit Price Quantity Total 1.2040 $134.54 1.00 User Note: Delivery and Pick-up of equipment (Backhoe) 01 74 19 00 0032 Traditional Building Construction Materials Landfill Dump Fee 6 $1,392.79 CY Installation = x x $1,392.79 Factor Unit Price Quantity Total 1.2040 $9.64 120.00 User Note: 12 cubic yards x 10 loads = 120 cy 01 74 19 00 0038 Hauling On Paved Roads, First 15 Miles 7 $552.20 CYM Installation = x x $552.20 Factor Unit Price Quantity Total 1.2040 $0.49 936.00 User Note: CY of debris x 7.8 miles Subtotal for 01 - General Requirements: $6,174.43 02 - Site Work 02 41 16 13 0018 By Machine, Wood Frame Construction Building Demolition 8 $18,741.46 CCF Installation = x x $18,741.46 Factor Unit Price Quantity Total 1.2040 $18.10 860.00 User Note: 8,600 sf of building demo = 860 ccf. of demolition 02 41 16 13 0018 For >500 To 1,000, Add 9 Mod $3,748.29 CCF Installation = x x $3,748.29 Factor Unit Price Quantity Total 1.2040 $3.62 860.00 02 41 16 13 0018 For Volume Of Area Within 15' To An Adjacent Building, Add 10 Mod $3,090.79 CCF Installation = x x $3,090.79 Factor Unit Price Quantity Total 1.2040 $5.97 430.00 02 41 16 13 0024 Reinforced Concrete Foundation Demolition 11 $28,675.02 CF Installation = x x $28,675.02 Factor Unit Price Quantity Total 1.2040 $8.31 2,866.00 User Note: 8600 sf of foundation demolition @ 4" depth= 2,866cf Page 2 of 3 8/13/2021 Price Proposal Detail - CSI Demo of Parcel Number 501-26-082 22-CityofElMirage-0001.00 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 02 - Site Work 02 41 16 13 0024 For >2025, Deduct 12 Mod -$11,456.20 CF Installation = x x $-11,456.20 Factor Unit Price Quantity Total 1.2040 $-3.32 2,866.00 Subtotal for 02 - Site Work: $42,799.36 $48,973.79 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona The Percent of NPP on this Proposal: 0.00% Page 3 of 3 8/13/2021 Price Proposal Detail - CSI