August 26, 2021
Jorge Gastelum, P.E.
Community Development Director/City Engineer
City of El Mirage
10000 N. El Mirage
El Mirage, AZ 85335
RE:
Supplemental Services Request No. 03
Programming Room Expansion
Mr. Gastelum:
As discussed on August 23, 2021, here within is our supplemental services request for changes
made at the request of the City of El Mirage, that are beyond our original scope.
Scope/Deliverables:
Construction documents for fast-track revision in order to stay ahead of construction sequencing
so as not to incur delays or additional demo costs, consisting of modified At-Risk grading and
drainage plan, foundation package, structural frame package, and interior build out. Project
consists of 1140 SF Programming room expansion, inclusive of restroom, separate entry with
flexibility to adjoin existing programming room and outdoor patio. Project will entail modification
to the existing programing space construction documents in order to accommodate expansion.
Order of Magnitude Cost to be included.
Proposed Fee:
We are requesting supplemental services on an Hourly Not-To-Exceed sum fee in the amount of
$56,000.00 (Fifty-Six Thousand dollars), billed at our standard hourly rates.
Authorization and Acknowledgement:
If the services and fee described are acceptable, please sign and return a copy as an amendment
to our original contract. Dated October 6, 2020.
Sincerely,
bo ARCH L. L. C.
David A Bosak Sr., AIA, LEED AP
Managing Partner
Director of Program/Construction Management | Principal Architect
Authorization and Acknowledgement:
If the services and fee described are acceptable, please sign and return a copy.
Acceptance:_______ ________ ______________ ____________
August 26, 2021
David Bosak, Managing Partner, bo ARCH LLC.
Dated
Acceptance: ______________________________________
_______________
Jorge Gastelum, P.E. City of El Mirage Dated