AMENDMENT NO. 1 
PROFESSIONAL SERVICES CONTRACT 
This AMENDMENT No. 1 to the bo ARCH L.L.C.. PROFESSIO AL ERY LCES CO TRACT 
r ·contract .. ) executed on October 6. 2020. is hereby made and entered into this I st day of December. 
2020 by and between the CITY OF EL MIRAGE, ARJZONA, an Arizona municipal corporation 
('•City'") and bo ARCH L.L.C.. an Arizona corporation ("'Consultant""). collectively (""the 
Parties··) .. 
RECITALS 
WHEREAS. the City and the Consultant entered into a Professiona l Services Contract to 
provide design services and construction documents for the library remodel/relocation project. 
executed on October 6. 2020: and. 
WHEREAS, the City has requested the Consultant to prepare a scope of work for 
supplemental services and compensation for those additional supplemental services as set forth in 
"Exhibit A": and. 
WHEREAS. the City has reviewed and agreed to amend the original Contract as stated. 
CONTRACT AMENDMENT 
NOW, THEREFORE. in consideration of the mutual promises and obligations set forth 
herein. the parties. hereby agree to amend the Contract as fo llows: 
I. The Consultant shall provide additional supplemental services. as described in the 
attached scope of services set forth in Exhibit "A". 
2. The Contract shall be amended to include compensation for these additional services in 
an amount not to exceed $30.6 10.00 and for a total Contract amount of $196.840.00. 
3. Except as specifically modified above. all of the remaining terms and conditions of said 
Contract shall remain and continue in fu ll force and effect. 
[Signature page follows! 
Page I of2

IN WITNESS WHEREOF. the parties have executed this Contract Amendment as of the 
date first above written. 
CITY: 
City of El Mirage 
ATTEST: 
Sharon A,;tes 
City Clerk 
Page 2 of2 
CO SULTA T: 
bo ARCH L.L.C. 
By:_ D_av_id_A_._B_o_sa_k_S_r_. _____ _ 
Print Name 
Signature 
Its: 
bo ARCH L. L. C. 
----- - -------

Exhibit 'A'

James A. Lane PE, SE, LEED AP 
Structural Engineer 
6757 W Cocopah Street 
Goodyear. AZ 85338 
1ameslane1@cox.net 
www.jameslanepe.com 
602-321-1945 
November 9, 2020 
Mr. David Bosak Sr. AIA, LEED AP 
Director of Program/ Construction Management / Principal Architect 
Bo Arch 
20118 North 67th Avenue 
Suite 300 #610 
Glendale, Arizona 85308 
Dav1dSr@boArch.us 
(602) 909-0901 
David: 
RE: Structural Engineering Services Fee Proposal 
Proposal for Structural Engineering Services for (1) existing approximately 5000-sf single story fire station building being 
converted into a public library for the City of El Mirage. The building is located at 13513 N El Mirage Road, El Mirage, 
Arizona. 
Scope to include a new addition to the existing building of approximately 1140-sf. Addition to be east of the existing fire 
truck bay and may or may nor be connected to existing building. Exterior concrete masonry walls and wood roof trusses 
are the proposed structural systems this proposal is being based upon. 
Proposal includes the following services: 
Structural Engineering 
1. Gravity and lateral analysis to include foundations, vertical walls, horizontal floors, sloping roofs, columns, beams, 
lintels/ headers, shear walls, diaphragms, and other elements shown on architectural documents for structural 
integrity of building. 
2. The existing building elements will be based on the construction documents received/ provided by the City of El 
Mirage. 
3. Analysis based on dead load, live load, seismic load, wind load, and soil load. 
4. Generate structural general notes/ specifications, structural construction details. size and material schedules. 
5. Review all structural documents performed under my direct supervision, seal and sign. 
6. Wood truss calculations if required to be by others/ manufacturer of trusses (seal/signature by truss engineer). 
7. Per study recommendations, investigate existing wood roof trusses currently supporting clay tile roof covering. 
Construction documents show asphalt shingle roof covering. Ensure current/proposed conditions for roof trusses 
are acceptable for current code loading requirements. 
8. Services will be performed as reflected in feasibility study dated March 4, 2020. 
CAD Generated Construction Documents (performed by Gove Design & Technical Services) 
9. To include structural general notes. typical construction details, size and material schedules, foundation, floor and 
roof framing plans, plus project specific construction details. 
Other 
10. Drawing exchanges performed electronically {pdf or dwg format). 
11. Reasonable construction related questions for project during construction. 
12. Review and incorporate the recommendations of the Geotechnical Report (if available) for the project. 
13. Respond to any corrections or clarifications requested by the permit department having jurisdiction during the 
Building Permit review process. 
14. Contract construction document administration services (RFl's, consultation, changes to documents) to be 
performed at an hourly rate. 
15. Special Structural Inspections if required by authorities having jurisdiction can be provided at an hourly rate.

Probable Manpower Loading Schedule 
bo 
Architectural Services 
Prepared 11/9/20 
Library Project 
A R C H. 
I. bo ARCH Summary 
Principal 
Project 
Cast 
Job 
Interior 
in Charge 
Architect 
Estimator 
Captain 
Designer 
Total 
boArch 
$165.00 
$150.00 
$135.CIO 
$115.00 $115.00 
Hours 
Labor cost 
Task 1.0 - PROGRESS MEETINGS 
1.1 
Design Meetings with City Staff (5) 
0 
$0.00 
1.2 
Not used 
$0.00 
1.3 
Not Used 
$0.00 
1.4 
Not used 
$0.00 
Subtotal - Programming 
0 
0 
0 
0 
0 
0 
$0.00 
Task 2.0 - Programming/Conceptual Design 
2.1 
Generate base drawings 
0 
$0.00 
2.2 
Finalize Code Study 
0 
$0.00 
2.3 
Programming/ Analysis 
0 
$0.00 
2.4 
Preliminary Floor Plan 
0 
$0.00 
Subtotal - Programming 
0 
0 
0 
0 
0 
0 
$0.00 
Task 3.0 -Schematic Design 
3.1 
Schematic Design 
4 
40 
44 
$5,200.00 
3.2 
QC and VE 
0 
$0.00 
3.3 
Order of Magnitude Cost 
4 
4 
$540.00 
Subtotal - Programming 
0 
4 
4 
40 
0 
48 
$5,740.00 
Task 4.0 - Design Development 
4.1 
Final Code Study 
2 
2 
$300.00 
4.2 
60% DD Plans 
4 
60 
4 
68 
$7,960.00 
4.3 
QC and VE 
0 
$0.00 
4.3 
Review of 60% CMAR GMP 
2 
2 
$270.00 
Subtotal - Design Development 
0 
6 
2 
60 
4 
72 
$8,530.00 
Task 5.0 - Contract Document Preparation 
5.1 
95% Construction Documents 
4 
60 
4 
68 
$7,960.00 
5.2 
Specifications 
0 
$0.00 
5.3 
Constructability Review 
3 
3 
$450.00 
5.4 
Review of CMARs 95% GMP 
0 
$0.00 
5.5 
Plan Review Submittal/100% CDs 
2 
2 
$230.00 
Subtotal - Contract Documents 
0 
7 
0 
62 
4 
73 
$8,640.00 
Subtotal Hours - bo Arch Labor Summary 
Hrs 
17 Hrs 
6 Hrs 
162 Hrs 
8 Hrs 
193 Hrs 
Subtotal Fees - bo Arch Labor Summary 
$0 
$2,SS0 
$810 
$18,630 
$920 
$22,910 
II. Consultant Labor Summary 
1 
Rick Enginering - Civil Engineering 
$ 
2 
James Lane - Structural Engineering 
s 
6,000.00 
3 
AZPL - Mechanical/Plumbing/Electrical Engineering 
s 
1,700.00 
4 
Open 
$ 
Subtotal - Consultant Labor Summary 
$ 
7,700.00 
Ill. Other Direct/Indirect Costs 
Item No. Expense Description 
Unit 
Cost/Unit 
Total 
1 
Indirect - Reproduction 
LS 
$ 
2 
Indirect - Mileage 
LS 
$ 
Subtotal - Direct/Indirect Costs 
$ 
TotalFee 
$ 30,610.00 
Fee Proposal 1 of 1

bo 
A R C H1; 
ARCHITEC T URE 
INT E R IORS 
M A N A G E M E N T 
ESTIMATING 
ANA
LY SIS 
November 10, 2020 
Jorge Gast elum, P.E. 
Community Development Director/City Engineer 
City of El Mirage 
10000 N. El Mirage 
El Mirage, AZ 85335 
RE: 
Supplemental Services Request No. 01 
Addition of Programing Space 
Mr. Gastelum: 
As discussed on November 2, 2020, here within is our supplemental services request for changes 
made at the request of the City of El Mirage, that are beyond our original scope, as outlined in our 
agreement dated November 9, 2020 
Supplemental Services: 
Addition to Building to accommodate 1140SF of Programming space, inclusive of casework for sink 
and adjacent refrigerator and table storage. 
Per t he City's direction, bo ARCH and our consultants will provide modifications during the 
Schematic Development Phase to reflect changes as noted above. 
We are requesting 
supplemental services in the amount of $30,610.00 (Thirty Thousand Six-Hundred Ten dollars), 
billed at our standard hourly rates. 
Authorization and Acknowledgement: 
If the services and fee described are acceptable, please sign and return a copy as an amendment 
to our original contract. Dated October 6, 2020. 
Sincerely, 
bo ARCH L. L. C. 
~A - ~
~-
oavid A Bosak Sr., AIA, LEED AP 
Managing Partner 
Director of Program/Construction Management I Principal Architect 
Authorization and Acknowledgement: 
If the services and fee described are acceptable, please sign and return a copy. 
Acceptance:~ A, ~ 
~------
November 10, 2020 
David Bosak, Managing Partner, bo ARCH LLC. 
Acceptance: _____________ ____ _ 
Jorge Gastelum, P.E. City of El Mirage 
Attachments: 
Manpower loading schedule 
Consultant quotes 
Dated 
Dated

November 9, 2020 
Page 2 
16. Anticipated scope items appear to include, modification at roof eave, larger opening at entrance, additional 
windows, new concrete floor a truck bays, review of existing wood trusses, new 1140-sf addition, exterior patio slab 
on grade with perimeter fence/ emu column elements and monument sign. 
Fee for above services $9,000 (original fee w/ o proposed new addition) Structural Engineering and Structural 
Construction Documents. 
Additional Fee for above services to include in scope the proposed new building addition $6,000 additional fee. 
It is the intention that work begins upon a notice to proceed and acceptance of proposal. Anticipated time to 
perform/ complete after receiving direction to proceed is to be determined. 
In efforts to be paperless, all invoices emailed. Questions or issues of clarification may be directed to James Lane. 
In the event collections are required additional charges for time/ legaljetc. will be charged. 
Sincerely yours, 
James A. Lane PE, SE, LEED AP 
Structural Engineer 
James Lane, PE 
c=US, cn=James Lane, PE, 
email=jameslanel @cox.net 
2020.11.09 13:23:24 -07'00' 
Proposal accepted by __________________ Date ____ _____ _

ARIZONA 
•••• 
PINNACLE ENGINEERING 
November 05. 2020 
Bo Arch 
ARIZONA PINNACLE ENGINEERING, LLC 
Mechanical and Electrical Consulting Engineers 
Rodney L Hillis, P.E. • 
Raymond B Lanford, P.E. • 
Eudjen Savu, P.E. • 
Scott E Woods, P.E. 
3253 1 N. Scottsdale Rd. Ste. I 05 #282 
Scottsdale. AZ 85266 
Attn: Mr. David Bosak Sr. 
Re: 
City of El Mirage Fire Station to Library Design 
Proposal for Mechanical and Electrical Engineering Services P20200.1 
Sub: 
Addendum No. I to Mechanical and Electrical Engineering Services Agreement 
Dear Mr. Bosak: 
We are pleased to submit Addendum No. I to the Mechanical and Electrical Engineering 
Services Agreement for the City of El Mirage Fire Station to Library Design 
in El Mirage, Arizona. 
l. 
This Addendum includes the following additions to our scope of work: 
a. 
Provide Mechanical and Electrical Engineering Design for the new I. L-1-0 S.F. 
Programming Room. 
b. 
Revise the electrical connection from a single 7.5-ton packaged rooftop air 
conditioning unit to an indoor fan coil unit and an outdoor condensing unit. 
2. 
All other items in our Proposal for Mechanical and Electrical Engineering Services dated 
September 22. 2020. shall remain unchanged as a result of this Addendum. 
Our proposed basic fee for this Addendum is $ 1,700.00. 
If this Addendum meets with your approval. please sign in the space provided and return one 
copy to us for our files. 
2222 West Pinnacle Peak Road. Suite 290 ~ Phoenix, AZ 85027 _ Phone: (623) 594-9049 _ Fax: (623) 594-9072

Bo Arch 
Re: Addendum No. l to Mechanical and Electrical Engineering Services Agreement P'.W:W0. I 
November 5. 2020 
Page 2 
We continue to appreciate the opportunity of working with you on this project and know it will 
be mutually beneficial. 
Sincerely. 
ARIZONA PINNACLE ENGINEERING. LLC 
~
dcP-
Rodney L. Hillis. P.E. 
Managing Member 
ACCEPTED AND APPROVED THIS ____ DAY OF ______ . 20_ 
BY: ____________ _ 
FOR: -------------
TITLE: __________________________ _