APS LEVEL 2 ELECTRIC VEHICLE CHARGING PILOT 
 AGREEMENT #171539 
 
This Electric Vehicle Charging Station Pilot Agreement (“Agreement”) between Arizona Public 
Service Company (“APS”) and City of El Mirage - Library (“Customer”), is effective as of October 
21, 2021 (the “Effective Date”).   
 
Customer’s Charging Stations will be located at: 13513 N. El Mirage Road, El Mirage AZ 85335 
 
Background 
 
APS is conducting an Electric Vehicle Charging Pilot Program (the “Program”), whereby APS is 
installing Level 2 charging stations at certain APS Customer’s location.  The Program is being 
conducted in order for APS to assess electric vehicle (“EV”) consumer purchasing, EV driver 
charging behavior, and other relevant information regarding the use of EV charging stations.  APS 
has selected Customer to participate in the Program.   
 
Customer acknowledges that APS cannot fully determine Customer’s eligibility in the Program 
until after execution of this Agreement and that Customer eligibility will be determined by APS, in 
its sole discretion. 
 
APS and Customer Agree as follows: 
 
1. Definitions: 
 
a. Charging Station: A UL/ETL certified electrical device that provides power to an EV 
using a standard J1772 Plug connector and cable.  The Charging Station will be a Level 
2 type, capable of providing up to 7kW of power to an EV.  The Charging Stations will 
be either pedestal mounted, with two chargers on each pedestal, or wall mounted.  Each 
Customer will receive a maximum of 4 plugs. 
 
b. Charging Station Area: the area where the Charging Stations are installed and used, 
and where designated parking spots for EV charging are located.   
 
c. Environmental Contamination: any and all actual or threatened releases, discharges, 
spills, or the presence of Hazardous Substances within the Property.   
 
d. Environmental Laws: all applicable federal, state, local, or municipal law, statute, code, 
regulation, or policy (including without limitation common law) governing the use, 
storage, treatment, or disposal of Hazardous Substances or otherwise relating to the 
protection, conservation, or preservation of the natural environment or natural resources, 
including ambient air, wildlife or plant species, surface water or groundwater resources, 
or soil and other subsurface strata.     
 
e. Hazardous Substances: any liquid, solid, or gaseous substance or material (including 
petroleum and petroleum products) that is designated, classified, or regulated as, either, a

2 
 
solid or hazardous waste, a hazardous substance or material, a contaminant, or a 
pollutant under any Environmental Law, or which becomes so designated, classified, or 
regulated 
 
f. Infrastructure: the electrical equipment required to provide power to the Charging 
Station.  The equipment may include a transformer, underground conduits, cables, 
meters, disconnects (on/off switches), concrete pads, and signage. 
 
g. Property: the entirety of the property owned or leased by Customer that is included in 
the address listed at the top of the agreement. 
 
h. Site: any part of the Property subject to the Utility Easement with the exception of the 
meter pedestal, Charger and cable between the two described in Section 3(b).  
 
2. General Terms  
 
a. Except as set forth in subsection (d) below, APS will, at no cost to Customer, design, 
construct, and install all necessary Infrastructure and Charging Stations at the Site. 
 
b. APS will own, operate, and maintain the Infrastructure and Charging Stations.  APS’s 
routine maintenance of the Charging Stations will be limited to semi-annual inspections 
of the Charging Stations, testing, and firmware upgrades.   Customer’s inspection 
obligations are set forth in Section 5. 
 
c. If, for any reason, Customer’s existing electrical infrastructure cannot accommodate 
installation of the Infrastructure or Charging Stations, or there are other technical or Site 
related issues of any kind that, in APS’s sole discretion, prevent APS from installing the 
Infrastructure or Charging Stations, APS may terminate this Agreement upon written 
notice to Customer.  Termination of this Agreement will be effective as of Customer’s 
receipt of APS’s notice of termination. 
  
d. Based on estimates to install the Infrastructure and Charging Stations, both are being 
provided at no charge to Customer.  In the event that, as a result of an unusual design or 
technical issue associated with the Site, APS or its subcontractor is required to bill the 
Customer for any additional costs, APS will notify Customer in writing if additional 
charges are required to the Customer (the “Customer Cost Allocation”).  Customer will 
have 30 days following receipt of APS’s written notice of a Customer Cost Allocation to 
notify APS in writing if Customer will pay the Customer Cost Allocation or terminate 
this Agreement. The signatory on behalf of the Customer must have proper authority to 
authorize the customer cost allocation on behalf of their company.  Customer’s notice 
that it is electing to terminate this Agreement will serve as Customer’s termination of 
this Agreement. 
 
e. Customer will work with APS and its contractors to schedule and allow for the following 
activities: site inspection to verify eligibility, necessary permitting and inspections, 
installation, and all other reasonably necessary activities.  Customer will also provide

3 
 
APS with;  existing as built one-line electrical drawings identifying connections for 
electrical power;  existing electrical load designs and layouts of actual connected loads, 
and any other documents reasonably requested by APS. 
 
f. Customer will permit APS to post signage on or near the Charging Stations identifying 
that the Charging Stations are being provided by APS and otherwise providing pertinent 
information about the Charging Stations, APS, or the Program.      
 
g. In the event of an emergency or other situation where APS must gain immediate access 
to the Site, APS must be able to access the Charging Stations and Infrastructure without 
delay (i.e., access to the Charging Stations or Infrastructure cannot be locked or gated 
unless immediately accessible by a customer representative who is on duty 24 hours a 
day).  In all other situations, Customer will provide APS access to the Charging Stations 
upon 24 hours verbal notice.   
 
h. Customer will keep trees, bushes, and hedges trimmed so that the Charging Stations 
remain unobstructed, as required when initially installed. 
 
i. Customer will not modify the Site in any way that may impact the operation or use of the 
Charging Stations without the prior written approval of APS. 
 
j. In APS’s discretion, APS may replace the Charging Stations with new Charging 
Stations.  If Customer paid for any infrastructure or fees for networking the Charging 
Stations, APS will ensure Customer has comparable functionality.   
 
k. The APS Charging Stations must remain isolated electrically and separately metered 
from all other electrical equipment, unless agreed to otherwise by APS in writing. 
 
l. APS, in collaboration with Customer, will take any action which, in their reasonable 
judgment, is necessary to ensure the Charging Stations and Infrastructure are being 
properly maintained and operated, and to ensure the Charging Stations are meeting the 
objectives of the Program.  
 
 
3. Certain Other Terms of Service 
 
a. Customer’s monthly APS electric bill for the Charging Stations will include the energy 
used by the Charging Stations.  For the dedicated Charging Stations meter, Customer 
must enroll in APS’s E-32XS Demand Service Plan.  APS may, in its sole discretion 
revise the list of eligible Service Plans at any time.  If during the term of this Agreement 
an EV Service Plan becomes available, APS may require Customer to enroll in that 
Service Plan. Customers may choose the service plan that works best for them. 
b. Customer must execute an easement to APS in the form and substance of the standard 
Utility Easement.  Among other things, the Utility Easement Agreement will provide 
APS with the right to leave the infrastructure in place if the Charging Stations are 
removed.  Notwithstanding the foregoing, after the term of this Agreement as set forth in

4 
 
Sections 7 or any earlier termination provided for in this Agreement, if Customer 
requests APS to modify or abandon the Utility Easement, APS shall reasonably agree to 
such requests.  All such costs associated with any modification or abandonment of the 
Utility Easement, including the removal of any equipment (meter, chargers and 
services), conduit, or otherwise, shall be borne solely by APS.  Notwithstanding the 
foregoing, in no event shall APS be required to modify or abandon any new 
transformers, and associated infrastructure to install those new transformers as part of 
this pilot program. 
 
c. An officer of Customer must sign the Utility Easement and this Agreement. 
 
d. If customer is a lessee of the Property, an officer or Mayor of the owner of the Property 
must sign the Utility Easement Agreement and an officer or Mayor of both the Customer 
and the owner of the Property must sign this Agreement.   
 
 
4. Consent to Share Information.   
 
a. As part of the Program, APS will collect and use the following information from the 
dedicated meter installed at the Site: total energy usage of the Charging Stations and 
information regarding performance of the Charging Stations (uptime, maintenance, 
utilization, and the like).   
 
b. Customer agrees that APS may use the information described in subsection (a) for any 
reason, so long the information does not identify the Customer.   
 
5. Additional Customer Obligations.   
 
a. Customer must perform weekly safety inspections (snow, debris, clear and safe access) 
of the Charging Station Area and immediately notify APS at the APS phone number 
listed on APS provided signage, if it observes any of the conditions listed on the APS 
Charging Station Inspection Checklist, which is attached here as Appendix A.   
 
b. Customer must advise employees and any other third persons using the Charging 
Stations, if the Charging Stations are not available between 3pm and 8pm daily. 
 
c. Customer is responsible for all typical parking related matters, including, but not limited 
to arrangement and painting of parking/painted lines, and the like with the exception that 
APS will mark the parking spots with “Reserved Electric Vehicle Parking”.  
d. Customer agrees to encourage employees to participate in APS provided surveys 
regarding the Charging Stations and provide APS with related information regarding 
charging usage and the like, as reasonably requested by APS.     
 
e. Customer agrees that APS may use the information described in subsection (d) for any 
reason, so long the information does not identify the Customer.

5 
 
6. Term.  The Program is intended to be in effect for five years following installation of the 
Charging Stations.  APS, however, reserves the right to terminate this Agreement at any time, 
without liability to Customer.  Unless terminated earlier as set forth in this Agreement, this 
Agreement will terminate on the fifth anniversary of the In-Service Date.  
 
7. Shut Off and Termination for Cause.   
 
a. If, in APS’s reasonable opinion, a safety condition related to the Infrastructure or 
Charging Stations exists, APS may immediately shut off the Charging Stations and any 
impacted Infrastructure.   
 
b. If:  (i) a safety conditions exists that is not being caused by APS or (ii) Customer is 
otherwise in default of this Agreement (each of  (i) or (ii) being a “Default”), then 
Customer will have 30 days following receipt of APS’s written notice identifying the 
Default to remedy the same.  If Customer has not remedied the Default within the 30 day 
cure period, APS may terminate this Agreement immediately, upon Customer’s receipt 
of APS’s notice of termination.   
 
8. Termination.  Upon termination of this Agreement for any reason, APS will notify Customer in 
writing of termination of this Agreement and Customer will notify APS within 30 days of 
receipt of APS’s written notice whether it intends to take ownership of the Charging Stations or 
require that APS remove the Charging Stations.   
 
a. If Customer notifies APS that it is electing to have APS remove the Charging Stations, 
APS will remove the Charging Stations within 60 days after receipt of Customer’s 
written notice and APS will disconnect and abandon the infrastructure in place or 
remove it as it deems fit (pursuant to the Utility Easement). 
 
b. If Customer notifies APS that it is electing to take ownership of the Charging Stations 
after five years, APS will transfer title to Customer.  Upon transfer of title of the 
Charging Stations, Customer will assume sole and full responsibility for the operation 
and maintenance of the Infrastructure and Charging Stations.  Prior to the transfer of title 
to Customer, APS will perform a fair market value analysis of the Charging Stations and 
provide the information to Customer in writing.   
 
9. Tax Implications.  If Customer elects to take ownership of the Charging Stations and the 
Charging Stations have a fair market value, Customer may incur a tax burden as a result of 
taking possession of the Charging Stations.  APS advises that Customer should consult a tax 
advisor regarding possible tax liability resulting from the transfer of ownership (please note: 
current U.S. tax code requires APS to generate a Form 1099 if the System value is $600 or 
more). APS will still maintain ownership of the infrastructure and easement of the 
infrastructure. 
 
10. Exclusion of Damages. Neither party will be liable to the other party for any indirect, 
consequential, special, or punitive damages for any actions resulting from or arising out of this

6 
 
agreement, whether based on contract, tort (including negligence), strict liability, contribution, 
or otherwise. 
 
11. American Disabilities Act.  Customer agrees to defend, indemnify, and hold harmless APS and 
its subcontractors against any claims by Customer or any third parties arising out of or related to 
violation of the Americans with Disabilities Act Amendments Act (ADAAA) with respect to 
parking accommodations. 
 
12.   Environmental Liability.    
 
a. APS shall retain all liability arising from and responsibility to address, and the Customer 
shall not any assume such liability or responsibility for, Environmental Contamination 
caused by APS’s installation, operation, and maintenance of the Infrastructure or 
Charging Stations, including any and all losses, costs, damages, or obligations (including 
without limitation any environmental remediation or corrective action obligations).   
 
b. Customer shall retain all liability arising from and responsibility to address, and APS 
shall not any assume such liability or responsibility for, pre-existing Environmental 
Contamination within the Site prior to the Effective Date or any Environmental 
Contamination caused by Customer after the Effective Date, including any and all 
losses, costs, damages, or obligations (including without limitation any environmental 
remediation or corrective action obligations).   
 
The indemnification obligations in this paragraph will survive any expiration or termination of 
this Agreement. 
 
COMPANY 
 
ARIZONA PUBLIC SERVICE COMPANY 
By:____________________________ 
By:__Dawn Tompkins_____ __________ 
Title: __________________________ 
Title: __Manager, APS C2GS__________ 
Signature: ______________________ 
Signature: _Dawn Tompkins____________ 
 
 
PROPERTY OWNER  
(If different from company) 
By:______________________________ 
Title: ____________________________ 
Signature: ________________________

7

8 
 
Appendix A 
 
APS Take Charge AZ – Customer Charger Inspection 
To be Performed Weekly 
Date: ____________ 
Time: ____________ 
Name of Inspector: ___________________________________________________________ 
Location of Chargers: __________________________________________________________ 
 
ENSURE A SAFE WORK AREA PRIOR TO INSPECTION. 
If there are critical safety concerns with your chargers, please contact APS immediately! 
Walk down all charging stations, inspect for the following: 
 
i. Any signs of damage or physical contact with vehicle 
ii. Note damage or issues in comment box 
Detail 
Good 
Bad 
Comment 
Charger Body 
 
 
 
Charger Cord 
 
 
 
Connector/Plug 
 
 
 
Any Exposed Wiring 
 
 
 
Meter 
 
 
 
Meter Pedestal