March 14, 2025 
 
 
 
Ms. Crystal Dyches, Manager 
City of El Mirage 
10000 North El Mirage Road 
El Mirage, Arizona 85335 
 
Dear Ms. Dyches: 
 
On March 7, 2025, the Maricopa Association of Governments (MAG) received notification 
from the Arizona Department of Transportation (ADOT) that the agreement for the 
transposition of federal Congestion Mitigation and Air Quality Improvement (CMAQ) 
funds for MAG Highway User Revenue Funds has been completed for the Prioritized List 
of Proposed PM-10 Certified Street Sweepers for FY 2025. On December 4, 2024, the MAG 
Regional Council approved the Prioritized List of Proposed PM-10 Certified Street 
Sweepers for FY 2025 CMAQ Funding. One PM-10 certified street sweeper project 
requested by the City of El Mirage has been approved for FY 2025 funding for an amount 
not to exceed $341,973 (see Attachment One). The City of El Mirage may proceed with 
the purchase of the proposed street sweeper project for FY 2025. In the project 
application, the City of El Mirage agreed to provide a 5.7 percent cash match. We are 
requesting that the FY 2025 street sweeper be purchased and the reimbursement 
request be sent to MAG by March 14, 2026. 
 
For the FY 2025 street sweepers, MAG member agencies may procure their own street 
sweepers. Reimbursement requests are to be sent to MAG. After MAG reviews the 
reimbursement request, MAG will send the reimbursement documentation to ADOT and 
then ADOT will issue the reimbursement check to the member agencies. Additional details 
are provided below. 
 
1. 
Eligibility - Eligible street sweepers are defined as those which have been certified 
by the South Coast Air Quality Management District (SCAQMD) as meeting the 
SCAQMD Rule 1186 certification standards. The most recent list of Certified Street 
Sweepers Under SCAQMD Rule 1186 is dated July 10, 2024 (see Attachment Two). 
It is important to note that not all sweepers on the list are eligible for funding. At 
this time, the MAG street sweeper program will continue to fund only 
conventionally fueled vehicles to reduce PM-10.

Ms. Crystal Dyches, Manager 
March 14, 2025 
Page 2 
 
It is assumed that, at a minimum, the grant funded street sweepers will be used in 
accordance with the lane miles and sweeping cycle submitted with the project 
applications. 
 
2. 
Procurement – MAG member agencies may procure their own PM-10 certified 
street sweepers. The procurement of the street sweepers must conform to 
applicable state and local procurement regulations for the purchase of the certified 
street sweeper. In March 2025, ADOT completed the transposition of federal CMAQ 
funds for MAG Highway User Revenue Funds for the Prioritized List of Proposed 
PM-10 Certified Street Sweepers for FY 2025. 
 
3. 
Annual Inventory - According to ADOT policy, MAG is responsible for conducting 
and submitting an annual inventory of the certified street sweepers owned by the 
jurisdictions to ADOT by October 31. For the annual inventory, MAG will contact 
the jurisdictions to obtain information on each street sweeper. 
 
4. 
Reimbursement - MAG is requesting that the street sweeper be purchased and the 
reimbursement request be sent to MAG by March 14, 2026. Since ADOT 
determined that there are no street sweeper manufacturers that can meet FHWA’s 
Buy America requirements, the federal CMAQ funds have been transposed to 
Highway User Revenue Funds for reimbursement to the member agencies. 
Additional costs for equipment beyond the specifications necessary for compliance 
with Rule 1186-certification are not eligible for reimbursement. Examples of 
additional street sweeper equipment not eligible for reimbursement are provided 
in Attachment Three. 
 
Within 30 days after payment for the street sweeper, submit a copy of the vendor 
invoice along with all back-up documentation to the attention of Dean Giles at 
MAG. MAG will review the reimbursement request, ADOT Payment Report Form, 
and send the invoice documentation to ADOT and ADOT will reimburse the City of 
El Mirage for an amount not to exceed $341,973 for the FY 2025 sweeper. 
 
Documentation that includes a description of the street sweeper, the vehicle 
identification number, name of title holder, the cost of the vehicle (copy of invoice 
with detailed cost information on optional equipment, bill of sale, etc.), and the 
location where the sweeper is kept when it is not in use, should be provided. Also, 
please provide the name of the contact person for the sweeper and telephone 
number.

Ms. Crystal Dyches, Manager 
March 14, 2025 
Page 3 
 
5. 
Disposition – The ADOT Federal Property Management Standards (see 
Attachment Four) requires that each jurisdiction obtain ADOT approval prior 
to disposal of a grant funded street sweeper. Each jurisdiction is to request 
disposal of a street sweeper in writing to MAG. MAG will send the request to ADOT, 
and MAG will in turn forward the ADOT response back to the jurisdiction. 
 
For disposal of an older grant funded street sweeper through any means, the 
federal awarding agency is entitled to a share of the proceeds. According to the 
ADOT Federal Property Management Standards for disposition through a trade-in 
or sale, an amount of the proceeds entitled to the federal awarding agency will be 
calculated and applied toward the cost of the new street sweeper and an amount 
based on the percentage of the jurisdiction’s participation in the original sweeper 
may be used to offset the amount of local cash match required. 
 
On December 4, 2024, the MAG Regional Council approved the prioritized list of proposed 
PM-10 certified street sweeper projects for FY 2025 CMAQ funding. Also, on 
January 22, 2025, the MAG Regional Council approved the FY 2025 Closeout 
Programming that includes an additional $2,355,757 in FY 2025 CMAQ funding for street 
sweepers on the prioritized list. 
 
If you have any questions or require additional information, please contact Dean Giles at 
602-452-5013 or dgiles@azmag.gov. 
 
Sincerely, 
 
 
 
Ed Zuercher 
Executive Director 
 
cc: 
Cason Chambers, Operations Superintendent, El Mirage 
 
Nick Russo, Public Works Director, El Mirage 
 
Amber Wakeman, Intergovernmental Affairs Director, El Mirage

1 
Prioritized List of Proposed PM-10 Certified Street Sweeper Projects for FY 2025 CMAQ Funding 
Approved by the MAG Regional Council on December 4, 2024 
$1,380,000 in CMAQ Funding is Available for Sweeper Projects +++ 
Supplemental Information 
Agency 
Federal 
Cost 
Local 
Cost 
Total 
Cost * 
Daily 
Emission 
Reduction 
(Kilograms
/day) 
Cost-
Effectiveness 
(CMAQ dollar 
cost per 
annual metric 
ton reduced) 
The requested certified street sweeper will: 
Have local 
resources been 
committed 
such as staff or 
equipment to 
support the 
operation of 
the sweeper? 
Please indicate in 
what geographical 
area(s) the requested 
certified street 
sweeper will operate 
Number 
of 
certified 
street 
sweepers 
owned 
and 
operated 
by your 
agency. ** 
Replace 
non- 
certified 
sweeper 
Expand 
Area 
Swept 
Increase 
Sweeping 
Frequency 
Replace 
older 
certified 
sweeper 
Yes 
No 
Peoria 
$363,644 
$21,981 
$385,625 
287 
$494 


Northern Ave. to 
SR 74; 67th Ave. to 
138th Ave. 
7 
Phoenix #2 
$390,624 
$23,611 
$414,235 
245 
$621 


Camelback Rd. to 
Pinnacle Peak Rd.; 51st 
Ave. to 16th St. 
35 
Phoenix #1 
$390,624 
$23,611 
$414,235 
214 
$713 


Estrella Dr. to 
Camelback Rd.; 107th 
Ave. to Central Ave. 
35 
El Mirage 
$341,973 
$20,671 
$362,644 
143 
$934 


Northern Ave. to 
Thompson Ranch Rd.; 
Dysart Rd. to the Agua 
Fria riverbed 
2 
Subtotal 
$1,486,865 
Amount 
Available 
$1,380,000 
Balance
($106,865)
Attachment One

2 
Supplemental Information 
Agency 
Federal 
Cost 
Local 
Cost 
Total 
Cost * 
Daily 
Emission 
Reduction 
(Kilograms
/day) 
Cost-
Effectiveness 
(CMAQ dollar 
cost per 
annual metric 
ton reduced) 
The requested certified street sweeper will: 
Have local 
resources been 
committed 
such as staff or 
equipment to 
support the 
operation of 
the sweeper? 
Please indicate in 
what geographical 
area(s) the requested 
certified street 
sweeper will operate 
Number 
of 
certified 
street 
sweepers 
owned 
and 
operated 
by your 
agency. ** 
Replace 
non- 
certified 
sweeper 
Expand 
Area 
Swept 
Increase 
Sweeping 
Frequency 
Replace 
older 
certified 
sweeper 
Yes 
No 
Surprise 
$392,143 
$23,703 
$415,846 
93 
$1,641 


Jomax Rd. to Peoria 
Ave.; 163rd Ave. to 
Dysart Rd. 
8 
Buckeye #1 
$349,488 
$21,125 
$370,613 
59 
$2,301 



Citywide in the PM-10 
nonattainment area 
8 
Chandler 
$369,677 
$22,345 
$392,022 
53 
$2,723 


Elliot Rd. to Germann 
Rd.; Alma School Rd. 
to Gilbert Rd. 
10 
Mesa 
$416,464 
$25,173 
$441,637 
57 
$2,868 


Price Rd. to Gilbert Rd.; 
Brown Rd. to Elliot Rd. 
7 
Tempe 
$377,358 
$22,810 
$400,168 
50 
$2,950 


48th St. to Evergreen 
Rd.; Continental Dr. to 
Warner Rd. 
6 
Paradise 
Valley 
$371,632 
$22,463 
$394,095 
35 
$4,088 


Townwide 
2 
Buckeye #2 
$349,488 
$21,125 
$370,613 
9.3 
$14,606 


Citywide in the PM-10 
nonattainment area 
8 
Pinal 
County #2 
$359,549 
$21,733 
$381,282 
2.7 
$52,344 


Unincorporated area 
within the PM-10 
nonattainment area 
near Apache Junction 
9

3 
Supplemental Information 
Agency 
Federal 
Cost 
Local 
Cost 
Total 
Cost * 
Daily 
Emission 
Reduction 
(Kilograms
/day) 
Cost-
Effectiveness 
(CMAQ dollar 
cost per 
annual metric 
ton reduced) 
The requested certified street sweeper will: 
Have local 
resources been 
committed 
such as staff or 
equipment to 
support the 
operation of 
the sweeper? 
Please indicate in 
what geographical 
area(s) the requested 
certified street 
sweeper will operate 
Number 
of 
certified 
street 
sweepers 
owned 
and 
operated 
by your 
agency. ** 
Replace 
non- 
certified 
sweeper 
Expand 
Area 
Swept 
Increase 
Sweeping 
Frequency 
Replace 
older 
certified 
sweeper 
Yes 
No 
Pinal 
County #3 
$359,549 
$21,733 
$381,282 
2.6 
$54,724 


Unincorporated area 
within the PM-10 
nonattainment area 
near Apache Junction 
9 
Pinal 
County #1 
$359,549 
$21,733 
$381,282 
1.4 
$97,981 

East Germann Rd. to 
Bella Vista Rd.; Central 
Arizona Canal to South 
Meridian Rd. 
9 
Total 
$5,191,762 
Applications for all agencies indicate sweeping within four miles of a PM-10 monitor. 
Application for Phoenix #1 indicates sweeping in Salt River Area. 
* Total cost for the CMAQ eligible portion of the project; excludes ineligible equipment.
** The total number of certified street sweepers owned and operated by the agency, regardless of funding source.
++ For El Mirage sweeper project, initial funding of $235,108 is available in FY 2025 CMAQ. The remaining $106,865 of the $341,973 requested for the project may become available due to 
year-end closeout including any additional funding received by the region. 
+++ On January 22, 2025, the MAG Regional Council approved the FY 2025 Closeout Programming that includes an additional $2,355,757 in FY 2025 CMAQ funding for the remaining balance 
for the El MIrage sweeper project ($106,865), and the Surprise, Buckeye #1, Chandler, Mesa, Paradise Valley, and Buckeye #2 projects.

South Coast 
Air Quality Management District 
21865 Copley Drive, Diamond Bar, CA 91765-4182 
(909) 396-2000 www.aqmd.gov
CERTIFIED STREET SWEEPERS UNDER 
South Coast AQMD RULE 1186 
(AS OF JULY 10, 2024) 
South Coast AQMD Rule 1186 requires local governments within the South Coast Air 
Quality Management District (see Figure below) to procure certified street sweepers for 
new equipment purchases or new street sweeping contracts made after January 1, 2000 
(there are no retrofit requirements under Rule 1186). 
Various South Coast AQMD regulations also require procurement of certified street 
sweepers to implement specific rule requirements. This list of equipment is updated 
periodically based on certifications test results and in response to new information. 
The South Coast AQMD Governing Board adopted Rule 1186 street sweeper testing 
and certification procedures in September of 1999. Enclosed is a list of equipment that 
has met the Rule 1186 certification standards. (The equipment may either be new or 
upgraded to meet certification specifications). Questions on equipment capabilities and 
options should be directed to your local distributor and/or the manufacturer. Questions 
regarding the Rule requirements can be directed to Area Sources, at (909) 396-2390, or 
areasources@aqmd.gov. 
* Additional sweepers may be certified based on future tests. You can call 1 (800) CUT-SMOG or visit
www.aqmd.gov for the most recent list of Rule 1186 certified equipment.
Attachment Two

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
2 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
CHALLENGER 
MANUFACTURING 
CHALLENGER 
•
THREE (3) 0.03 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
FOUR (4) 0.03 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND THE
CONVEYOR
•
WATER PUMP TO PROVIDE 25 POUNDS PER SQUARE INCH WATER PRESSURE DURING OPERATION; MAXIMUM
OF 45 POUNDS PER SQUARE INCH
CURBTENDER* 
(*formerly Wayne 
Sweepers) 
CENTURION 
•
SEVEN (7) 0.0925 INCH DIAMETER ORIFICE NOZZLES ON SPRAY BAR UNDERNEATH THE CAB
•
TWO (2) 0.0925 INCH DIAMETER ORIFICE NOZZLES PER GUTTER BROOM
(GUTTER BROOMS CAN BE OPERATED WITHOUT WATER SPRAYS IF FULLY ENCLOSED SHROUD SYSTEM IS
UTILIZED AND MAINTAINED PER THE MANUFACTURERS SPECIFICATIONS)
•
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES ON SPRAY BAR ABOVE CONVEYOR
•
300 GALLON WATER TANK
•
WATER PUMP TO PROVIDE MINIMUM OF SEVEN GALLONS PER MINUTE
•
SINGLE FAN VACUUM SYSTEM
•
GLAZED, POLYESTER FILTER SYSTEM (MAINTAINED TO ENSURE PROPER INTEGRITY)

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
3 
MAKE* 
MODEL*
DUST CONTROL SYSTEM* 
CURBTENDER* 
(*formerly Wayne 
Sweepers) 
GLADIATOR 
•
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
SIX (6) 0.0925 INCH DIAMETER ORIFICE NOZZLES ACROSS FRONT BUMPER
•
FOUR (4) 0.0925 INCH DIAMETER ORIFICE NOZZLES AT THE REAR BROOM
•
WATER PUMP TO PROVIDE 60 POUNDS PER SQUARE INCH WATER PRESSURE
CURBTENDER* 
(*formerly Wayne 
Sweepers) 
WARRIOR 
•
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
SIX (6) 0.0925 INCH DIAMETER ORIFICE NOZZLES ACROSS FRONT BUMPER
•
WATER PUMP TO PROVIDE 60 POUNDS PER SQUARE INCH WATER PRESSURE
ELGIN 
AIR CUB (LX/DX) 
CROSSWIND FURY 
•
DIAMOND GRID DUST SEPARATION SCREEN
•
LOUVERED CENTRIFUGAL DUST SEPARATOR
•
ONE (1) 0.06 INCH DIAMETER ORIFICE NOZZLE CENTRALLY LOCATED ABOVE FAN INLET IN THE HOPPER
•
TWO (2) 0.047 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE THE SUCTION TUBE
•
FOUR (4) 0.051 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
PUMP TO PROVIDE 40 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
4 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
ELGIN 
CROSSWIND J 
• 
DIAMOND GRID DUST SEPARATION SCREEN 
• 
S-TRAP CENTRIFUGAL SEPARATOR 
• 
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE HOPPER 
• 
THREE (3) 0.059 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE SUCTION TUBE 
• 
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM 
• 
WATER PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE 
 ELGIN 
REGENX RM 
• 
DIAMOND GRID DUST SEPARATION SCREEN 
• 
S-TRAP CENTRIFUGAL SEPARATOR 
• 
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE HOPPER 
• 
THREE (3) 0.059 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE SUCTION TUBE 
• 
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM 
• 
WATER PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
5 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
ELGIN 
PELICAN P & S PELICAN 
S E  (WET 
SUPPRESSION) 
• 
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND 
THE CONVEYOR 
• 
TWO (2) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH GUTTER BROOM 
• 
WATER PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE 
ELGIN 
PELICAN P 
(WATERLESS 
SUPPRESSION) 
• 
GUTTER/MAIN BROOM FULLY ENCLOSED SHROUD SYSTEM 
• 
ONE OR TWO CENTRIFUGAL DUST EVACUATION FAN(S) TO PROVIDE SUBSTANTIALLY SIMILAR AIRFLOW 
WITHIN A NORMAL OPERATING RANGE 
• 
SYNTHETIC MULTI-POCKET FILTER WITH HYDRAULIC SHAKER FOR DUST REMOVAL 
ELGIN 
PELICAN P 
(COMBINATION) 
• 
ALL OF THE FEATURES OF THE WET AND WATERLESS SUPPRESSION PELICAN P STREET SWEEPER WITH THE 
EQUIPMENT OPERATED IN EITHER THE WET OR WATERLESS MODE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
6 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
ELGIN 
EAGLE E 
EAGLE F 
EAGLE (CNG) 
BROOM BEAR ROAD 
WIZARD 
•
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND
THE CONVEYOR
•
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH GUTTER BROOM
•
WATER PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE
ELGIN 
EAGLE F 
(WATERLESS) 
•
GUTTER/MAIN BROOM FULLY ENCLOSED SHROUD SYSTEM
•
CENTRIFUGAL DUST EVACUATION FAN
•
SYNTHETIC MULTI-POCKET FILTER WITH HYDRAULIC SHAKER FOR
DUST CONTROL
ELGIN 
EAGLE F 
(COMBINATION) 
•
ALL OF THE FEATURES OF THE WET AND WATERLESS EAGLE F STREET SWEEPER WITH THE EQUIPMENT
OPERATED IN EITHER THE WET OR WATERLESS MODE
ELGIN 
BROOM BEAR PLUG-IN 
HYBRID ELECTRIC 
•
FOUR (4) 0.060 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND
THE CONVEYOR
•
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH GUTTER BROOM
•
ELECTIC DRIVEN WATER PUMP TO PROVIDE MINIMUM 80 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
7 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
ELGIN 
GEOVAC 
•
DIAMOND GRID DUST SEPARATION SCREEN
•
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED IN THE HOPPER
•
TWO (2) 0.059 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE THE SUCTION TUBE
•
TWO (2) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES LOCATED AT THE EXTENSION BROOM
•
WATER PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE
ELGIN 
WHIRLWIND MV 
•
DIAMOND GRID DUST SEPARATION SCREEN
•
FOUR (4) 0.06 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED IN THE HOPPER
•
TWO (2) 0.059 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE THE SUCTION TUBE
•
TWO (2) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM
•
FOUR (4) 0.60 INCH DIAMETER ORIFICE NOZZLES LOCATED AT THE EXTENSION BROOM
•
PUMP TO PROVIDE 80 POUNDS PER SQUARE INCH WATER PRESSURE
ELGIN 
BROOM BADGER 
•
MAIN BROOM 58 INCH WIDE AND 35 INCH DIAMETER
•
FOUR (4) 0.060 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND
THE CONVEYOR
•
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH GUTTER BROOM
•
ELECTRIC WATER PUMP SYSTEM TO PROVIDE MINIMUM 80 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
8 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
GLOBAL 
ENVIRONMENTAL 
PRODUCTS 
M3 
R3  
R4 
M4 
M4 HSD 
M4E Zero Emissions 
•
ENCLOSED ELEVATOR SYSTEM
•
STEEL OR MIXED POLYESTER MAIN PICK UP BROOM
•
ONE (1) 0.072 INCH DIAMETER ORIFICE NOZZLE PER EACH GUTTER BROOM
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES PER EACH SIDE OF THE MAIN PICK UP BROOM
•
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES IN SPRAY BAR LOCATED BEHIND THE MAIN PICK UP
BROOM
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN SPRAY BAR LOCATED UNDERNEATH THE CAB
•
WATER PUMP TO PROVIDE 40 POUNDS PER SQUARE INCH WATER PRESSURE
JOHNSTON 
310 
•
FOUR (4) 0.072 INCH DIAMETER ORIFICE NOZZLES LOCATED IN FRONT SPRAY BAR
•
TWO (2) 0.072 INCH DIAMETER ORIFICE NOZZLES PER EACH GUTTER BROOM
•
ONE (1) 0.026 INCH DIAMETER ORIFICE NOZZLE LOCATED IN THE FAN SUCTION HOOD
•
WATER PUMP TO PROVIDE 50 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
9 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
JOHNSTON 
3000 
MX450 
4000 
4000 SDS 
MST 350 
•
ENCLOSED ELEVATOR SYSTEM
•
STEEL OR MIXED POLYESTER MAIN PICK UP BROOM
•
ONE (1) 0.072 INCH DIAMETER ORIFICE NOZZLE PER EACH GUTTER BROOM
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES PER EACH SIDE OF THE MAIN PICK UP BROOM
•
THREE (3) 0.057 INCH DIAMETER ORIFICE NOZZLES IN SPRAY BAR LOCATED BEHIND THE MAIN PICK UP
BROOM
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN SPRAY BAR LOCATED UNDERNEATH THE CAB
•
WATER PUMP TO PROVIDE 40 POUNDS PER SQUARE INCH WATER PRESSURE
JOHNSTON 
VT605 
VT610 
VT650 
V501 
V651 
V801 
•
TWO (2) 0.039 INCH DIAMETER ORIFICE NOZZLES PER GUTTER BROOM
•
THREE (3) 0.042 INCH DIAMETER ORIFICE NOZZLES PER SUCTION  BROOM
•
THREE (3) 0.039 INCH DIAMETER ORIFICE NOZZLES PER SUCTION NOZZLE
•
MULTI-POSITION SUCTION NOZZLE TWO ARM FACILITY
•
ONE (1) 0.042 INCH DIAMETER ORIFICE NOZZLE FOR THE IMPELLER FAN
•
WATER PUMP TO PROVIDE 50 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
10 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
JOHNSTON 
770 CYCLONE/ 
RT655 
• 
THREE (3) 0.067 INCH DIAMETER ORIFICE NOZZLES FOR GUTTER BROOMS 
• 
TWO (2) 0.07 INCH DIAMETER ORIFICE NOZZLES FOR CENTER CURTAIN 
• 
FOUR (4) 0.055 INCH DIAMETER ORIFICE NOZZLES FOR FRONT BUMPER 
• 
TWO (2) 0.067 INCH DIAMETER ORIFICE NOZZLES FOR FRONT CURB SPRAY 
• 
TWO (2) 0.07 INCH DIAMETER ORIFICE NOZZLES ON LEFT AND RIGHT SIDE OF PICK 
UP HEAD  
• 
THREE (3) 0.082 INCH DIAMETER ORIFICE NOZZLES FOR PICK UP HEAD FRONT SIDE 
• 
SEVEN (7) 0.079 INCH DIAMETER ORIFICE NOZZLES FOR PICK UP HEAD REAR SIDE 
• 
THREE (3) 0.079 INCH DIAMETER ORIFICE NOZZLES FOR WINDROW PATH 
• 
TWO (2) 0.045 INCH DIAMETER ORIFICE NOZZLES FOR PICK UP HEAD SUCTION  
• 
ONE (1) 0.079 INCH DIAMETER ORIFICE NOZZLE FOR BLOWER FAN OUTLET 
• 
PUMP TO PROVIDE 50 POUNDS PER SQUARE INCH WATER PRESSURE 
NESCON 
X-BROOM 
• 
THREE (3) 0.079 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE  BROOM 
• 
FIVE (5) 0.079 INCH DIAMETER ORIFICE NOZZLES ACROSS FRONT BUMPER 
• 
FIVE (5) 0.050 INCH DIAMETER ORIFICE NOZZLES IN MAIN BROOM  HOUSING 
• 
WATER PUMP TO PROVIDE 50 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
11 
MAKE* 
MODEL*
DUST CONTROL SYSTEM* 
 NITEHAWK 
RAPTOR II 
REGENERATIVE AIR 
SWEEPER ** 
** EQUIPPED WITH 
PM-10 OPTION 
PACKAGE  
•
FOUR (4) 0.036 INCH DIAMETER ORIFICE NOZZLES ON SPRAY BAR
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN HOPPER
•
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES ON GUTTER BROOMS
•
WATER PUMP TO PROVIDE 70 PSI WATER PRESSURE
PLEASE NOTE THAT THE PM-10 OPTION PACKAGE DUST CONTROL SYSTEM IS DIFFERENT THAN THE 
STANDARD MODEL 
SCHWARZE 
EV-1 
•
TWELVE (12) POLYESTER DRY FILTER CARTRIDGES (MAINTAINED TO ENSURE PROPER INTEGRITY)
•
FILTRATION CLEANED THREE TIMES PER-MINUTE
•
FILTRATION SYSTEM ACTIVE AT ALL TIMES

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
12 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
SCHWARZE 
EV-2 
• 
EIGHT (8) POLYESTER DRY FILTER CARTRIDGES (MAINTAINED TO ENSURE PROPER INTEGRITY) 
• 
FILTRATION SYSTEM OPERATED AT ALL TIMES 
• 
EACH FILTER CLEANED THREE TIMES PER MINUTE 
SCHWARZE 
DXR 
• 
POLYESTER DRY FILTER CARTRIDGES (MAINTAINED TO ENSURE PROPER INTEGRITY)  
• 
FILTRATION SYSTEM ACTIVE AT ALL TIMES 
• 
FILTRATION CLEANED FOUR TIMES PER MINUTE AND A HALF 
SCHWARZE 
A4000/ 
A4STORM 
• 
FOUR (4) 0.036 INCH DIAMETER ORIFICE NOZZLES LOCATED ON THE SWEEPING HEAD 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES INSIDE HOPPER 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM 
• 
FOUR (4) 0.036 INCH DIAMETER ORIFICE NOZZLES INSIDE HOPPER ON SPRAY BAR 
• 
WATER PUMP TO PROVIDE 70 POUNDS PER SQUARE INCH WATER PRESSURE 
SCHWARZE 
M5000/M6000/ 
M6 AVALANCHE 
• 
FIVE (5) 0.036 INCH DIAMETER ORIFICE NOZZLES ON MAIN BROOM 
• 
THREE (3) 0.036 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM 
• 
WATER PUMP TO PROVIDE 70 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
13 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
SCHWARZE 
A 7000/ 
A7 TORNADO 
A7 ZEPHYR 
A 8000/ 
A8 TWISTER 
A 9000/ 
A9 MONSOON 
• 
SAWTOOTH DUST SEPARATION SCREEN, SELF DUMPING DUST SEPARATOR, FAN CENTRIFUGE 
• 
FIVE (5) 0.036 INCH DIAMETER ORIFICE NOZZLES LOCATED ON THE SWEEPING HEAD 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES LOCATED ON HEAD INTAKE TUBE 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN RIGHT HAND GUTTER BROOM 
• 
FOUR (4) 0.036 INCH DIAMETER ORIFICE NOZZLES LOCATED ON HOPPER SPRAY BAR 
• 
WATER PUMP TO PROVIDE 70 POUNDS PER SQUARE INCH WATER PRESSURE 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN LEFT HAND GUTTER BROOM (REQUIRED IF BOTH 
GUTTER BROOMS ARE USED) 
SCHWARZE 
S348-I/ 
SUPERVAC 
VORTEX 
S348-LE/ 
SUPERVAC GALE 
FORCE 
 SUPERVAC SUPER 
 UPDRAFT 
 
• 
FOUR (4) 0.036 INCH DIAMETER ORIFICE NOZZLES ON HOPPER SPRAY BAR 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES IN HOPPER 
• 
TWO (2) 0.036 INCH DIAMETER ORIFICE NOZZLES ON RIGHT HAND GUTTER BROOM  
• 
WATER PUMP TO PROVIDE 70 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
15 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
STEWART-AMOS 
STARFIRE S-4, S-5, 
AND S-6 
•
FOUR (4) 0.05 INCH DIAMETER ORIFICE NOZZLES CENTRALLY LOCATED BETWEEN THE MAIN BROOM AND
THE ELEVATOR
•
FOUR (4) 0.05 INCH DIAMETER ORIFICE NOZZLES LOCATED BENEATH THE FRONT BUMPER OF THE CHASSIS
•
TWO (2) 0.05 INCH DIAMETER ORIFICE NOZZLES LOCATED IN FRONT OF EACH GUTTER BROOM
•
WATER PUMP TO PROVIDE 40 POUNDS PER SQUARE INCH WATER PRESSURE
PYTHON 
S2000 
•
FOUR (4) 0.008 INCH DIAMETER ORIFICE NOZZLES MOUNTED ABOVE AND AHEAD OF A 36 INCH FILL
DIAMETER REAR BROOM
•
WATER LINE WITH 0.02 INCH DIAMETER ORIFICE AND THREE (3) 0.06 DIAMETER OUTLETS ABOVE
EACH 42 INCH DIAMETER GUTTER BROOM
•
PUMP TO PROVIDE 24 POUNDS PER SQUARE INCH WATER PRESSURE DURING OPERATION
PLEASE NOTE THAT THE GUTTER AND REAR BROOM SIZES ARE DIFFERENT THAN THE STANDARD MODEL 
PYTHON 
S3000 
•
FOUR (4) 0.008 INCH DIAMETER ORIFICE NOZZLES MOUNTED ABOVE AND AHEAD OF REAR BROOM
•
WATER LINE WITH 0.02 INCH DIAMETER ORIFICE AND THREE (3) 0.06 DIAMETER OUTLETS ABOVE EACH
GUTTER BROOM
•
PUMP TO PROVIDE 24 POUNDS PER SQUARE INCH WATER PRESSURE DURING OPERATION

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
15 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM*
TENNANT 
SENTINEL 
•
GUTTER/MAIN BROOM FULLY ENCLOSED SHROUD SYSTEM
•
DUAL FAN VACUUM SYSTEM (OPERATED AT ALL TIMES)
•
SYNTHETIC-SINGED POLYESTER FILTER (MAINTAINED TO ENSURE PROPER INTEGRITY)
 TENNANT 
830 / 831 II 
•
GUTTER/MAIN BROOM FULLY ENCLOSED SHROUD SYSTEM
•
DUAL FAN VACUUM SYSTEM (OPERATED AT ALL TIMES)
•
SYNTHETIC-SINGED POLYESTER FILTER (MAINTAINED TO ENSURE PROPER INTEGRITY)
 TYMCO 
210 
300 
350 
 435 
•
CYCLONIC, MULTIPASS, CENTRIFUGAL SEPARATION
•
CENTER DEBRIS DEFLECTOR ASSEMBLY PERPENDICULAR TO THE PICK UP HEAD
•
TWO (2) 0.043 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM
•
ONE (1) 0.063 INCH DIAMETER ORIFICE NOZZLE FOR EACH GUTTER BROOM
•
ONE (1) 0.063 INCH DIAMETER ORIFICE NOZZLE LOCATED IN THE HOPPER
•
ONE (1) 0.063 INCH DIAMETER ORIFICE NOZZLE LOCATED IN BLOWER HOUSING
•
WATER PUMP WITH A MINIMUM SYSTEM RELIEF VALVE SET AT 25 POUNDS PER SQUARE INCH

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
15 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
TYMCO 
600 
600 BAH 
FHD 
500X 
• 
CYCLONIC, MULTIPASS, CENTRIFUGAL SEPARATION 
• 
CENTER DEBRIS DEFLECTOR ASSEMBLY PERPENDICULAR TO THE PICK UP HEAD 
• 
FRONT DEBRIS DEFLECTOR CURTAIN ASSEMBLY PARALLEL TO THE PICK UP HEAD 
• 
LOW EMISSION DUST GUARDS (ONLY APPLICABLE TO CABOVER TRUCKS) 
• 
THREE (3) 0.063 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM 
• 
TWO (2) 0.043 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM 
• 
ONE (1) 0.093 INCH DIAMETER ORIFICE NOZZLE LOCATED IN THE HOPPER 
• 
ONE (1) 0.093 INCH DIAMETER ORIFICE NOZZLE LOCATED IN BLOWER HOUSING 
• 
TWO (2) [MINIMUM] HOPPER BAFFLE CURTAINS 
• 
WATER PUMP WITH A MINIMUM SYSTEM RELIEF VALVE SET AT 25 POUNDS PER SQUARE INCH 
TYMCO 
 DST - 4 
• 
CYCLONIC, MULTIPASS, CENTRIFUGAL SEPARATION 
• 
SELF CONTAINED MULTIPLE FILTRATION SYSTEM UTILIZING PTFE MEMBRANE FILTERS 
• 
TWO (2) 0.043 INCH DIAMETER ORIFICE NOZZLES FOR EACH 32 INCH DIAMETER GUTTER BROOM 
• 
ONE (1) 0.063 INCH DIAMETER ORIFICE NOZZLES FOR EACH 32 INCH DIAMETER GUTTER BROOM 
• 
ONE (1) 0.063 INCH DIAMETER ORIFICE NOZZLE LOCATED IN THE HOPPER 
• 
WATER PUMP WITH A MINIMUM SYSTEM RELIEF VALVE SET AT 25 POUNDS PER SQUARE INCH

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
15 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
TYMCO 
DST - 6 
•
CYCLONIC, MULTIPASS, CENTRIFUGAL SEPARATION
•
SELF CONTAINED MULTIPLE FILTRATION SYSTEM UTILIZING PTFE MEMBRANE FILTERS
•
THREE (3) 0.063 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM
•
TWO (2) 0.043 INCH DIAMETER ORIFICE NOZZLES FOR EACH GUTTER BROOM
•
ONE (1) 0.094 INCH DIAMETER ORIFICE NOZZLE LOCATED IN THE HOPPER
•
TWO (2) [MINIMUM] HOPPER BAFFLE CURTAINS
•
WATER PUMP WITH A MINIMUM SYSTEM RELIEF VALVE SET AT 25 POUNDS PER SQUARE INCH
 VACALL 
VS10/10D, VF10 
VS13/13D, VF13 
VS14/14D, VF14 
VS16/16D, VF16 
 VS20/20D, VF20 
•
FOUR (4) 0.062 INCH DIAMETER ORIFICE NOZZLES LOCATED IN FRONT OF EACH 36 INCH GUTTER BROOM
•
FOUR (4) 0.062 INCH DIAMETER ORIFICE NOZZLES LOCATED IN FRONT OF THE TRANSFER BROOM
•
TEN (10) 0.125 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE THE PICK UP HEAD
•
SIX (6) 0.181 INCH DIAMETER ORIFICE NOZZLES LOCATED INSIDE THE SCRUBBER COLLAR OF THE PICK UP
HEAD
•
48 INCH POWER VACUUM NOZZLE
•
MINIMUM 300 GALLON GRAVITY FEED WATER SUPPLY SYSTEM WITH WATER CONTINUOUSLY SUPPLIED TO
ALL NOZZLES
•
LOW VELOCITY DUST COLLECTION AIR CHAMBER
•
MINIMUM OF SIX (6) EXPANDED METAL SCREENS

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE 
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S 
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST 
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the 
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper. 
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have 
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant. 
15 
 
 
 
MAKE* 
MODEL* 
DUST CONTROL SYSTEM* 
WAYNE SWEEPERS* 
(*acquired by 
Curbtender) 
CENTURION 
• 
SEVEN (7) 0.0925 INCH DIAMETER ORIFICE NOZZLES ON SPRAY BAR UNDERNEATH THE CAB 
• 
TWO (2) 0.0925 INCH DIAMETER ORIFICE NOZZLES PER GUTTER BROOM 
• 
(GUTTER BROOMS CAN BE OPERATED WITHOUT WATER SPRAYS IF FULLY ENCLOSED SHROUD SYSTEM IS 
UTILIZED AND MAINTAINED PER THE MANUFACTURERS SPECIFICATIONS) 
• 
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES ON SPRAY BAR ABOVE CONVEYOR 
• 
300 GALLON WATER TANK 
• 
WATER PUMP TO PROVIDE MINIMUM OF SEVEN GALLONS PER MINUTE 
• 
SINGLE FAN VACUUM SYSTEM 
WAYNE SWEEPERS 
(*acquired by Curbtender) 
  GLADIATOR 
• 
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM 
• 
SIX (6) 0.0925 INCH DIAMETER ORIFICE NOZZLES ACROSS FRONT BUMPER 
• 
FOUR (4) 0.0925 INCH DIAMETER ORIFICE NOZZLES AT THE REAR BROOM 
• 
WATER PUMP TO PROVIDE 60 POUNDS PER SQUARE INCH WATER PRESSURE 
WAYNE SWEEPERS 
(*acquired by Curbtender)   WARRIOR 
• 
THREE (3) 0.0925 INCH DIAMETER ORIFICE NOZZLES LOCATED AT EACH SIDE BROOM 
• 
SIX (6) 0.0925 INCH DIAMETER ORIFICE NOZZLES ACROSS FRONT BUMPER 
• 
WATER PUMP TO PROVIDE 60 POUNDS PER SQUARE INCH WATER PRESSURE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (South Coast AQMD) 
RULE 1186 CERTIFIED* STREET SWEEPERS AS OF JULY 10, 2024 
THE FOLLOWING IS A LIST OF STREET SWEEPING EQUIPMENT THAT HAS CURRENTLY BEEN CERTIFIED FOR South Coast AQMD RULE
1186. ALL CERTIFIED EQUIPMENT MUST BE OPERATED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. FUTURE TESTING MAY QUALIFY ADDITIONAL EQUIPMENT. CALL 1 (800) CUT-SMOG FOR THE CURRENT LIST
* In order to ensure compliance with Rule 1186 requirements, all certified equipment must be operated and maintained in accordance with the
manufacturer's specifications.  End users are responsible for ensuring that the dust control systems are in place for each certified sweeper.
Note: The make and model of the sweeper must have the dust control system(s) specified above to be in compliance.  (Standard or older models may not have
all the systems).  Please contact the manufacturer if you would like to ensure that your sweeper(s) are Rule 1186 compliant.
15 
ADDITIONAL NOTES: 
** For any entity wishing to operate a NiteHawk Raptor II compliant with Rule 1186, the sweeper must be ordered with PM-10 Option Package, which includes 
the following: 
-
Front Spray bar configured with Four (4) 0.036-inch Orifice Spray Nozzles
-
Two (2) Sweeper Head Spray Nozzles Removed from the Dust Suppression System
-
24” Whisper Wheel Fan Turbine Installed in place of Standard Hi Flow Fan Turbine
-
Low Profile Brooms installed (applicable to driver side and passenger side brooms)
o
60 holes, 17 bristles. Bristle Dimension: 20” Length, 0.034” Thick, 0.011” Width
-
Blower Vacuum System
o
System will be tuned to an airflow rating of 6,178 CFM
o
System will be tuned to deliver 27 HP at fan

May 19, 2017 
EXAMPLES OF ADDITIONAL STREET SWEEPER EQUIPMENT 
NOT ELIGIBLE FOR REIMBURSEMENT 
1. Automatic lubrication system
(Autolube, grease jockey system)
2. Hopper access step
3. Hydrant hopper wash down system
4. Conveyer flush kit with hydrant
5. 1000 pounds per square inch (PSI) wand
6. Dual HiBack air-suspended seats
7. Hand hose
8. Hopper sound suppression
9. Right hand steer chassis upcharge
10. Air 
horn 
(reimbursable 
when
conventional 
electric 
horn 
is 
not
included)
11. AM/FM radio; CD
12. Training
13. Magnet bar
14. Stainless steel hopper
15. Sweeper, truck and wheel yellow paint
16. Additional roof-mounted air
conditioner
17. Holder rear mount for five-gallon pail
18. Cigarette lighter with 12v
19. Foam filled tire
20. Window tinting
21. Move exhaust port to left side of vehicle
22. John Deere auxiliary engine - Tier iT4
Attachment Three

ARIZONA DEPARTMENT OF TRANSPORTATION 
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov 
Infrastructure Delivery and Operations 
MEMORANDUM 
TO:  PM 10 Street Sweepers Program Awardees 
FROM: Lisa Pounds, Local Public Agency Manager 
CC: Patrick Stone, Federal Aid Administrator 
DATE: Tuesday June 11, 2019 
RE: Interim Process for Disposition of Street Sweepers acquired with federal funds under FIN-
11.08 Federal Property Management Standards Policy 
This memorandum serves as notice to recipients and subrecipients of federal funds through a 
pass-through entity that acquire, in whole or in part, with federal funds or whose costs are 
charged to a project supported by a federal grant, of a change in procedure for the disposition 
of street sweepers owned by subrecipients.  Due to administrative changes in the PM 10 Street 
Sweeper Program, ADOT Policy FIN-11.08 Federal Property Management Standards (attached) 
is in the process of being updated.   In the interim, ADOT is requesting that subrecipients no 
longer forward funds resulting from the trade-in or sale without replacement of sweepers to 
the entity from which it received funds for the original purchase.   Instead, the funds will need 
to be forwarded to ADOT.  ADOT’s Financial Management Services division will make 
adjustments to the current or future year distribution from the federal awarding agency.  
Should you have any questions regarding this change in procedure, you may contact me at 
LPounds@azdot.gov or 602-712-8088. 
Sincerely, 
Lisa Pounds 
Local Public Agency Manager 
Attachment Four