Extracted text (via pymupdf)
2406 characters
City of El Mirage City Council Meeting City Chambers 10000 N. El Mirage Road El Mirage, Arizona 85335 July 1, 2025 Action Item: Pulido Project Fourplex Conditional Use Permit / Site Plan Site Location Pulido Project Fourplex 13225 N Main St El Mirage, AZ 85335 Lot Size: 0.73 Acres (31,799 sf.) 2020 General Plan: Neighborhood Planning Area Zoning: Mixed-Urban (MU) Overlays: None Land Use: Vacant ARS 28-8481: N/A Flood Zone: N/A Proposed Use: Dwelling, Multi-Family Table of Land Use: Conditional Use Permit / Site Plan Site Plan Elevations Elevations Landscaping Conditional Use Permit CONDITIONAL USE PERMIT The Planning Commission and City Council shall, in addition to any other conditions, impose the following general conditions upon every conditional use permit granted. 1. The right to a use and occupancy permit is contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure. 2. All of the special conditions shall constitute restrictions running with the land and shall be binding upon the owner of the land, his or her successors, or assigns. 3. All conditions specifically stated under any conditional use listed in this chapter shall apply and be adhered to by the owner of the land, his or her successors, or assigns. 4. All of the special conditions shall be consented to in writing by the applicant. 5. The proposed multi-family use for the four-plex residential building shall not create noise, vibrations, parking, or odor that may become a nuisance to the public. 6. If the conditional use permit is granted, the permit shall be issued upon the signature of the Senior Planner / Zoning Administrator, and any conditions, automatic termination date, or period of review shall be stated on the permit. Zoning Review Staff Review: The staff of the Technical Advisory Committee (TAC) has conducted a thorough review of the application and has determined that it is appropriate to proceed with the public hearings. Stipulation(s): Consent and address the stipulations in the May 20, 2025, Memorandum. Public Comment: One (1) Call, General Information, One (1) In-Person, Hour Construction & School route. Planning & Zoning Commission: June 10, 2025: Recommended approval 4-0 unanimous vote. City Council: July 1, 2025: Final Action Questions Applicant: ProCa Design LLC/Jose Mendez Pulido