PO 25190 Expenditure Summary
Extracted text (via pymupdf)
2302 characters
Purchase Order 25190 Total $165,450.65 Paid invoice 21096-1 ($17,308.70) Invoice 21096-2 ($160,315.85) Amount requested to complete project ($12,173.90) CIP 62065 Water Production Facility Rehabilitation Program Alto Well Site 2025 - Summary INVOICE Job site: Voice: 602-254-6154 Fax: 602-254-2261 Invoice #: 21096-2 Invoice Date: Jun 16, 2025 Page: Bill To: City of El Mirage 10355 N 121st Ave El Mirage, AZ 85335 Alto Well submersible option with rehab Customer ID Customer PO Payment Terms Ship Date Sales Rep ID ELM500 Net Due 1 MM Qty Unit Description Unit Price Amount 16.00 HOURS MOB TO SITE WITH PUMP RIG, CRANE TRUCK, SERVICE TRUCK AND 3 310.00 4,960.00 MAN CREW. PULL PUMP FROM 500', TAKE DISCHARGE HEAD, MOTOR AND PUMP BOWL TO SHOP FOR INSPECTION. DEMOB TO SHOP. 6.50 HOURS BAIL WELL BEFORE SWABBING AFTER WELL JETTING 310.00 2,015.00 60.00 HOURS SWABBING, THEN BAILING 310.00 18,600.00 1.00 LS WELL JETTING FROM 500' TO 840' 17,308.70 17,308.70 1.00 EACH THREE WELL PATCHES INSTALLED 28,323.20 28,323.20 20.00 HOURS LOAD MATERIALS, HAUL TO SITE, STAGE FOR INSTALLATION OF 310.00 6,200.00 PUMP TO 480'. INSTALL MOTOR, WIRE UP, CHECK FOR ROTATION, SET LATERAL, STARTUP AND TEST 25.00 EACH 8" X 20' T & C TAPER COLUMN PIPE 893.60 22,340.00 1.00 EACH HITACHI 150HP 460V, 3600RPM, 3P SUBMERSIBLE MOTOR 28,625.40 28,625.40 1.00 EACH GABRIEL HW9AHC 3 STAGE SUBMERSIBLE BOWL ASSEMBLY 8,330.15 8,330.15 DESINED FOR 1,000GPM @ 460' TDH 520.00 FT SUBMERSIBLE PUMP CABLE 57.55 29,926.00 1.00 EACH SPLICE KIT, INSTALLED 454.40 454.40 1.00 LS BANDING AND BUCKLES 800.00 800.00 500.00 FT 1 1/4" SCHEDULE 40 SOUNDING TUBE, INSTALLED WITH TWO CAPS 1.75 876.00 1.00 EACH 8" FABRICATED SUBMERSIBLE DISCHARGE HEAD 2,500.00 2,500.00 1.00 LS ELECTRICIAN TO CHANGE THE SETTINGS IN THE CUSTOMERS 250HP 500.00 500.00 SOFT STARTER 2.00 EACH 8" FLOMATIC CHECK VALVES 2,415.75 4,831.50 1.00 FS FUEL SURCHARGE 1,034.20 1,034.20 *************************************************************************** 1.00 EACH LESS PAYMENT FOR INVOICE 21096-1 (WELL JETTING) 17,308.70 -17,308.70 160,315.85 160,315.85 Payment/Credit Applied Total Invoice Amount TOTAL Check/Credit Memo No: 6/16/25 Due Date Empire Pump Corporation 2849 S 49th Ave Phoenix, AZ 85043 25190 Quote Number AZ ROC #'s 216197, 216198 / NV ROC# 81523