QUOTATION
Qty
Unit
Description
Unit Price
Amount
26.00 HOURS
MOB TO SITE WITH PUMP RIG, CRANE TRUCK, SERVICE TRUCK, AND
325.00
8,450.00
3 MAN CREW.  PULL PUMP FROM 740', MOB BACK TO SHOP.
1.00 EACH
GOULDS 12 CMC, 10 STAGE BOWL ASSEMBLY DESIGNED FOR
28,567.95
28,567.95
980GPM @710' TDH
17.00 EACH
2 1/2" X  1 11/16" X 20' PEERLESS INNER COLUMN
1,109.30
18,858.10
1.00 EACH
2 1/2" X  1 11/16" X 10' PEERLESS INNER COLUMN
668.60
668.60
1.00 LS
CHEMICALS AS RECOMMENDED BY THE LAB TESTING
82,056.85
82,056.85
10.00 HOURS
INSTALLING CHEMCALS IN WELL WITH SURGE BLACK. CHEMICALS
325.00
3,250.00
INCLUDE:  950 GALLONS OF NW120 PHOSPERIC ACID, 270 GALLONS
OF NW 310 BIODISPERSANT, 112.5LBS OF NW 420 C
20.00 HOURS
SWABBING OF CHEMICALS IN WELL
325.00
6,500.00
40.00 HOURS
34 HOURS BRUSHING, 6 HOURS BAILING FROM 370' TO 980'
325.00
13,000.00
1.00 LS
AIRLIFTING CHEMICALS.  INCLUDES RENTAL COMPRESSOR, 1000' OF
36,600.00
36,600.00
AIRLIFTING TOOLS INSTALLED, RENTAL BAKER TANK TO PUMP INTO.
30 HOURS OF AIRLIFTING.
1.00 EACH
LAKOS 1,000GPM SAND SEPARATOR, OPTIONAL $13,220.00
30.00 HOURS
HAUL NEW INNERCOLUMN TO SITE, STAB INTO COLUMN PIPE, LOAD
325.00
9,750.00
AND HAUL OFF OLD INNER COLUMN, INSTALL WELL TO 740', INSTALL
AND WIRE UP MOTOR, CHECK ROTATION, SET LATERAL, STARTUP
AND TEST.
1.00 FS
FUEL SURCHARGE
1,228.50
1,228.50
Quote Number: ELM500-091525MM
Quote Date:
Sep 15, 2025
Sales Rep
Quoted To:
City of El Mirage
10355 N 121st Ave
El Mirage, AZ  85335
Good Thru
10/15/25
Customer ID
Payment Terms
Page:
ELM500
Net Due
MM
1
TOTAL
Empire Pump Corporation
Voice:
Fax:
602-254-6154
602-254-2261
Cottonwood Well
complete rehab
SITE INFORMATION
CONTACT INFO
2849 S 49th Ave
Phoenix, AZ  85043
AZ ROC #'s 216197, 216198 / NV ROC# 81523
208,930.00
Authorized Signature
Printed Name and Title
Date
Acceptance of all outlined pricing, terms and conditions:
Purchase Order #
13,220.00
Add sand separator option
Add 10% contingency
22,215
___________________________________
TOTAL
$244,365