FY 2026-27 CDBG Application Roadway Project Layout
Extracted text (via pymupdf)
781 characters
City of El Mirage Fall 2025 – CDBG Grant Proposal ADA, Stormwater, and Roadway Improvements - Original Town Site ADA ramp upgrades (includes curb, gutter, and re-grade). 6 locations. Stormwater improvements – includes curb, gutter, re-grade, and scupper. Mill and overlay roadway surface – includes 2” mill and overlay, recompact and repair of subgrade. *Total budgetary estimate for all pavement work - $550,000 City of El Mirage Fall 2025 – CDBG Grant Proposal ADA, Stormwater, and Roadway Improvements - Original Town Site Figure 1 – Roadway deterioration due to improper stormwater retention. Figure 2 – ADA compliant ramp required when roadway surface is re-graded. Figure 3 – Pavement surface at end of life cycle that requires a mill and overlay treatment.