Fire Apparatus (Fire Suppression Vehicle} Replacement Program

Project Number: 62201 Department: Fire
Total Capital Cost: $2,248,000.00 Type: Capital Equipment
Request Groups: CIP

Request description:

Purchase of a 2 (two ) new apparatus’ (Engine) as replacements for a currently in-service 2010 Ferrara reserve apparatus {Engine} that has exhausted its standard usable life,
and a 2017 Pierce apparatus (Engine) that due to continued significant maintenance, repair costs, and increased out of service time. This request includes costs related to
design, construction, equipment, computers, communications systems, and installation of locally appropriated items necessary to place apparatus in service. Currently, the
delivery time for a spec built apparatus currently in process from contract, production time, and delivery is between 14-16 months.The apparatus’ will consist of a crew
cab/compartment, a minimum of a 380 hp diesel engine, a minimum 500-gallon water tank, foam system, minimum 1250 gallons per minute pump, automatic transmission,
4 cross lay hose bays, and a complete complement of ground ladders. This fire apparatus will be a spec-built apparatus that meets the needs and specifications of the City of
El Mirage and its fire suppression requirements. The currently in-service 2010 Ferrara apparatus is beyond its service life, resulting in an increasing number of costly non-
warrantied repairs and increased out-of-service time. This unit has served 10 years in front line service and reserve unit status for the last S years. The new apparatus would
be placed in service as the front line engine with an expected life of 10 years, with an additional 5 years as a reserve unit. The purchase and replacement of this apparatus
will ensure and enhance the ability of the El Mirage Fire Department to continue providing this high level of service. The currently in-service 2017 Pierce apparatus continues
to experience significant maintenance, repair costs, and increased out of service time. With the current out of service time, this unit places extreme burden on the
department to maintain sufficient in-service apparatus to serve the community. With the past service history of this unit, the maintenance, repair costs and out of service
time is projected to increase significantly over the next several years. Based on the current trend, this unit will not be serviceable to its scheduled end of service time.
Modified: Request to move replacement of fire apparatus #1008, currently on the 5-year city CIP schedule for FY 26/27 ro Fy25/26, and replacement of fire apparatus
#1013, on schedule for FY 30/31 replacement, to FY27/28 to accommodate delivery time for a spec built apparatus currently in process from contract, production time, and
delivery is between 14-16 months.

Capital Costs F¥Y2026 FY2028 Total

Vehicle Cost $1,091,000.00 $1,157,000.00 $2,248,000.00
Other $0.00
Total $1,091,000.00 $1,157,000.00 $2,248,000.00
Funding Source FY2026 FY2028 Total

111 - General $1,091,000.00 $1,157,000.00 $2,248,000.00
114 - Court $0.00
121 - Court Enhance $0.00
128 - Towing $0.00
131 - HURF $0.00
141 - LTAF $0.00
148 - CDBG $0.00
149 - Special Projects $0.00
156 - Capital Streets $0.00
511 - Water $0.00
516 - Ranchettes $0.00
541 - Sewer $0.00
591 - Sanitation $0.00
Total $1,091,000.00 $1,157,000.00 $2,248,000,00

Account Codes (Capital Costs):
111-5-2511-650 $2,248,000.00
$2,248,000.00

Additional Information

New Purchase or Replacement
Useful Life

Strategic Priority

Division

Grant Funding

Bond Eligible

Project Status

Replacement

10 or more years
Safe Community
Operations

No

No.

Modified

59