DESIGN & DEVELOPMENT
STANDARDS MANUAL
Adopted by City Council:
December 2, 2025
NEW IN THE 2026 EDITION
The City of El Mirage Development Services, Public Works and Fire Departments collaborated to review and
provide comments/updates to the 2025 version of the Design & Development Standards Manual (DDSM) in an
attempt to provide more consistent and comprehensive guidelines for its citizens as well as designers and contractors
working within the City. The revisions made in this Manual are summarized below. Minor revisions such as spelling,
formatting, etc. are not included in the summary.
Revised Standards (these sections have been highlighted in the Manual)
Chapter 1(B-1)
Chapter 1(B-2)(A)
Chapter 1(B-2)(G)(3)
Chapter 1(B-2)(I)(3 & 5)
Chapter 1(I-2)(B)
Chapter 1(I-2)(G)
Chapter 1(J-1)
Chapter 1(J-13)
Chapter 1(K)(B)(5)
Chapter 1(K)(G)(13)
Chapter 1(L-1)(C)
Chapter 1(N)(7i, 7k & 7l)
Chapter 3-1(E)
Chapter 3-4(C)(2a)
Chapter 5 Header
Chapter 5-2(G)(2a, 2b & 3b)
Chapter 5-2(I)(2h)
Chapter 6 Header
Chapter 7-3(3e, 3u & 3v)
Chapter 8
Revised Details (these details have been highlighted in the Manual)
EM-100
EM-101-1
EM-101-3
EM-101-5
EM-101-8
EM-101-10
EM-101-11
EM-101-12
EM-111-1
EM-132-1 & 2
EM-133
EM-157
EM-158
EM-170
EM-259
EM-402-2
New Details (these appendices have been highlighted in the Manual)
EM-115
EM-145
EM-172-1 to 8
EM-173
EM-239
EM-253-1 & 2
EM-265
EM-365
Revised Appendices (these appendices have been highlighted in the Manual)
C. SWPPP Guidance Document
D. Design of Striping and Signing Plans
F. Street Classification Map
J. Traffic Impact Study Criteria
Q. Water & Wastewater System Design Criteria
New Appendices (these appendices have been highlighted in the Manual)
H. Street Light Standards
CITY OF EL MIRAGE
DESIGN & DEVELOPMENT STANDARDS MANUAL (DDSM)
TABLE OF CONTENTS
Chapter 1 .................................................................................................................................... 4
Section A – Introduction, Purpose and Authorization, General Information and Definitions
Section B – Design and Submittal Standards for Preliminary and Final Plats
Section C – General Design Principles and Development Standards
Section D – Blank
Section E – Street and Utility Improvement Requirements
Section F – Phasing Plans
Section G – Administrative Changes to a Recorded Plat
Section H – Blank
Section I – Development Design Principles and Standards
Section J – General Improvement Policies
Section K – Improvement Plan Preparation
Section L – Management of Construction in Rights-of-Way
Section M – Insurance Requirements
Section N – Final Letter of Acceptance for Construction Projects
Chapter 2 – Not Used
Chapter 3 – Street Design and Construction ............................................................... …...…. 60
Chapter 4 – Storm Drainage Facilities – Design and Construction ......................................... 87
Chapter 5 – Water Infrastructure Design and Construction ................................................... 116
Chapter 6 – Wastewater Infrastructure Design and Construction .......................................... 132
Chapter 7 – Plan Submittal Requirements ............................................................................. 149
Chapter 8 – Design Standard Acknowledgements ................................................................. 155
APPENDICESX
A. City Notes and Details ..................................................................................................... 156
B. Approval Block & As-Built Certification
C. SWPPP Guidance Document
D. Guidance for Design of Striping & Signage Plans
E. Auxiliary Lane Criteria
F. Street Classification Map
G. Speed Limit Map
H. Street Light Standards
I.
Street lLight Master Plan
J. Traffic Impact Study Criteria
K. Traffic Signal Master Plan
L. Traffic Signal Qualified Products List
M. Irrigation Standards and Specifications
N. Material Testing Guidelines
O. Scheduled Water Shutdown Procedures
P. Water & Sewer Service Area Map
Q. Water & Wastewater System Design Criteria
R. Request for Design Exception
All developments shall be designed and constructed according to the standards mentioned above
unless specific variances are approved by the City. Any deviation from the provisions presented in
this document must be approved by the City.
A-3
GENERAL INFORMATION AND DEFINITIONS
A. Subdivision Approval Process
The process that the City of El Mirage uses to approve a subdivision is as follows:
1. Pre-application Conference. Prior to the submission of a preliminary plat, the subdivider
shall contact the Planning DirectorDevelopment Services Department and any other
administrative personnel or private agencies to determine procedures and requirements
for filing the sketch plat and preliminary and final plats. Availability of public water and
sewer or requirements when public systems are not readily available. Zoning
requirements on the property. Requirements of the duly adopted General Plan for major
and minor streets, land use, drainage, schools, parks, and other public open space. The
location and extent of any floodplains.
As a part of this contact, the subdivider may discuss with the Development Services
Department Planning Director, his or her tentative proposals for the development of the
property. The subdivider shall submit, and the Development Services Department
Planning Director shall review and comment on, a sketch plat prior to the preparation of
a preliminary plat. The Development Services Department Planning Director shall make
the review and make its comments known to the subdivider within five days from the
date of the review. The sketch plat shall contain or show two-foot contours and shall
address the requirements of division.
The purpose of this pre-application procedure is to determine any problems with the
proposed development before expenses are incurred in the preparation of a preliminary
plat. No official action is required other than to offer appropriate comments on the
proposal and indicating suitability for proceeding through the platting process.
2. Preliminary Plat Application. A Preliminary Plat Application shall be submitted to the
Development Services Department Planning Director or designee. The preliminary plat
shall consist of a drawing or drawings and supporting material and information a
prescribed by these regulations. The preliminary plat drawing shall be prepared at a
scale of one-inch equals 100 feet or larger for subdivisions where the majority of the lots
are less than five acres in size. The scale may be reduced to one-inch equals 200 feet for
subdivisions in which the minimum lot size is five acres or more. The face of the
drawing shall contain information as stated in Zoning Code §155.031 (A). The
preliminary plat shall include all information as requested in Chapter 1, Section B-1 of
this Manual.
3. Preliminary Plat Approval. The preliminary plat shall be approved by the Development
Services Department El Mirage Planning Commission once the El Mirage Technical
Advisory Committee (TAC) comments and redlines have been satisfied. The preliminary
plat shall be effective for one year from the date of approval. The subdivider may apply
in writing for, and the Development Services Department Planning and Zoning
Commission may allow for, up to a six-month extension.
4. Final Plat Application. The applicant/subdivider shall submit a Final Plat Application
together with the requirements in §155.032Chapter 1, Section B-2 of this Manual. Upon
submittal of all required supporting materials, the Development Services Department
Planning Director shall review them for completeness to determine whether a complete
final plat submittal has been made and shall refer the material to appropriate agencies for
review and comment. Upon being notified of the comments and any necessary approvals
of reviewing agencies, the Development Services Department Planning Director shall
forward the final plat, comments and approvals of reviewing agencies and pertinent
supporting materials to the Council. Incomplete final plats, or final plats for which
necessary approvals have not been secured, shall not be forwarded to Council for action.
5. Final Plat Approval. Following receipt of the final plat, the recommendation from the
Development Services Department Planning Director and Chairperson of the Planning
and Zoning Commission that the final plat complies with the preliminary plat, and
required supporting materials, the Development Services DepartmentCity Council shall
either approve the final plat or disapprove the final plat and notify the subdivider of the
conditions to be met to gain approval. If disapproved final plat is modified and
resubmitted to the Development Services Department City Council at a later date for
their consideration, the Development Services Department Council may require the
concurrent submittal of an updated ownership and encumbrance report or title opinion.
6. Plat Recording. The City Clerk shall record the Final Plat after Development Services
Department City Council approval and gathering of signatures. Preliminary Plats and
phasing plans are reviewed by the TAC Committee and approved by the Development
Services Department Planning Commission for the City. Final Plats are approved by the
Development Services Department City Council as a consent item on the Council
Agenda. The Engineering Division approves all street designs and engineering drawings
associated with right-of-way and drainage improvements proposed for construction in
the development. The Zoning Administrator reviews, approves and inspects the
landscaping in the City’s ROW and common shared areas.
B. Use of Professional Surveyors and Engineers
Drawings and maps required for the pre-application conference and Preliminary Plat
submittals need not be prepared by registered land surveyor or engineering professionals. A
licensed Land Surveyor registered in the State of Arizona shall prepare the Final Plat Map.
All other drawings, engineering drawings and final maps submitted for approval shall be
prepared by a licensed Professional Engineer registered in the State of Arizona.
C. Request for Design Exception
Technical provisions of this Design & Development Standards Manual may be waived or
modified through a Request for Design Exception. A copy of the request document, which
is located in the Appendix R of this Manual, shall be filled out and submitted to the
Engineering Division. There is no guarantee that the request will be approved.
D. Phasing Plans
Preparation of phasing plans shall be required when phasing of lot sales or public
improvements is proposed. The TAC Committee may approve preliminary and final phasing
plans. Phasing plans shall be considered when performance bonds or other final assurances
are accepted for proposed improvements.
E. Certificate of Correction or Change
Administrative changes to a plat may be approved through a Certificate of Correction or
Change. An application for a Certificate of Correction or Change may be considered and
approved by the City Engineer. Changes that can be approved administratively must be
minor and not substantive. Substantive changes shall be approved by re-platting.
F. Definitions
All words in the Design & Development Standards Manual shall be first defined as provided
herein and, if not defined herein, shall be defined as in the El Mirage Zoning Ordinance or
according to the customary dictionary definition. Words used in the present tense include the
future tense; words used in singular include plural, and words used in plural include the
singular; the word “shall” is always mandatory; the word “person” includes a firm,
association, organization, partnership, trust, corporation, company, and/or an individual.
1. Approved Lending Institution. Any person or company currently approved by the
Federal Housing Administration to act as a mortgagee, qualified to transact business
in the State of Arizona and having a business office within the Phoenix metropolitan
area and any other lending institution approved by City of El Mirage.
2. Area of Special Flood Hazard. Land within a flood plain, which is subject to
inundation by the base flood.
3. Base Flood. The flood having a one-percent chance of being equaled or exceeded in
any given year i.e., the 100-year flood.
4. Block. A piece or parcel of land or group of lots entirely surrounded by public streets,
cemeteries, streams, railroads, or parks or boundary lines of the municipality, or
combination thereof.
5. Building. Any structure having a roof and used or built for the shelter or enclosure of
persons, animals, chattel or property of any kind, including, but not limited to, tents,
awnings, carports, ramadas, mobile homes or vehicles situated on private property
and used for purposes of a building.
(a) Principal building means a building, or where the context so indicates, a group
of buildings, within which is conducted the principal use of the lot on which
the building is situated.
19.
Development. Utilization of land. Development shall include any man-made
changes to improve or alter real estate, including but not limited to establishment of
uses, buildings or other structures, mining, dredging, filling, grading, paving, or
excavations.
20.
Easement. A right granted to a governmental body, public, or persons over
privately-owned land for specific uses and purposes as so designated.
21.
Easement, Drainage. An area designated and used for conveyance, retention or
detention of runoff in which nothing can be placed, which will impede, divert or
cause runoff to have an adverse effect on adjoining property.
22.
Easement, Public Utility. An easement for the installation of facilities underground
or overhead, furnished for the use of the public; including electricity, gas,
communication, water, storm drainage, sewage, sidewalks, landscaping, traffic
signals, street lights, flood control, etc. Owned and operated by any person, firm,
corporation, municipal department, board duly authorized by State or municipal
regulations. Utility or utilities as used herein may also refer to such persons, firms,
corporations, departments, or boards.
23.
Easement, Non-Vehicular Access. An easement prohibiting vehicular access from a
street, or between inappropriate uses.
24.
Engineering Division. May also be referred to as the Community Developmentthe
Development Services Department or any other reference that has been used to
represent the Engineering Division in past, present or future publications.
25.
Engineering Plans. Plans, profiles, cross-sections, and other required details for the
construction of improvements, prepared by a professional engineering registered in
the State of Arizona in accordance with the approved preliminary plat and/or site
plan and in compliance with standards of design and construction approved by the
Council.
26.
Exception. Any parcel of land which is within or adjacent to the boundaries of the
subdivision, which is not owned by the subdivider and not part of the platted area.
27.
Fill. The deposit of soil, rock or other materials placed by mankind.
28.
Final Approval. Conditional approval of the final plat by the Council as evidenced
by certification on the plat by the City Engineer, Mayor, and City Clerk of the City
of El Mirage, constitutes authorization to record a plat.
29.
Finish Grade. The final grade or elevation of the ground surface after grading is
completed.
30.
First Flush. The City of El Mirage defines first flush as 1” of rainfall.
31.
Floodplain. The 100-year flood base flood elevation established by the Federal
Emergency Management Agency (FEMA) or other City floodplain management
approved area adjoining the channel of a water course, or areas where drainage is
or may be restricted by natural or man-made structures which may have been or
may be covered partially or wholly by floodwater from a base flood. See
Floodplain Management Ordinance Chapter 153, El Mirage City Code.
32.
General Plan. A General Plan or comprehensive plan, or parts thereof, provides
guidance for the future development goals, growth and improvement; it provides
policies statements to achieve those goals of the City of El Mirage. It provides long
range plans for zoning districts and the general location and coordination of streets
and highways, schools and recreation areas, public building sites, specific
neighborhood elements; and other physical development, which shall have been
duly adopted by the City Council pursuant to ARS Section 9-461.
33.
Grading. Any excavating or filling or combination thereof, including (A) the
conditions resulting from any excavation or fill, (B) any alteration of the natural
drainage pattern or (C) the removal or rearrangement of surface soil.
34.
Irrigation Facilities. Includes canals, laterals, ditches, conduits, gates, pumps and
allied equipment necessary for the supply, delivery, and drainage of irrigation
water and the construction, operation, and maintenance of such.
35.
Legal Access. Access provided to real property connecting the property to the
public street system. Access may include a public or private street or access
easement as approved by the City Engineer.
36.
Lot. A piece, plot, tract, or parcel of land separated from other pieces, plots, tracts
or parcels by description, as in a subdivision or on a record survey map, or by
metes and bounds, for purposes of sale, lease, or separate use and abutting or
having legal access to a public street.
a. Corner lot. A lot abutting on two or more intersecting streets where the interior
angle of intersection does not exceed one hundred thirty-five degrees. A corner
lot shall be considered to be in that block in which the lot fronts.
b.
Interior lot. A lot having but only one side abutting on a street.
c. Key lot. An interior lot, one side of which abuts the rear lot (line) of a corner
lot, or is separated there from, by an alley.
d. Panhandled Lot. A lot which does not directly abut a public or private street
except through a driveway “handle” that connects the lot and the street.
e. Through Lot (Double Frontage Lot). A lot abutting on two more or less parallel
streets.
37. Lot Width. The distance between side lot lines measured at the minimum front
setback line on a parallel line to the street or street chord for a lot abutting on the
outside of a street curve, or the distance measured between lot lines measured at the
rear of the dwelling for lots abutting the inside of a street curve. Lot width is
measured 30-feet behind the minimum front setback line for lots with no buildings.
38. Map of Dedication. Form of plat that dedicates right-of-way, and/or easements.
39. Master Plan. A plan for the development of a larger or complicated land area, the
platting of which is expected in progressive stages, not necessarily by a single owner
or developer. A Master Plan may be designed by the subdivider or by the Planning
Division. It shall be subject to Department approval and may be in the form of a
Specific Area Plan or Planned Community District in accordance with State Law and
City Ordinances.
40. Minor Land Division. The division of one parcel of land, into three or less parcels.
41. Natural Terrain. The existing grade of the land at the time of application submittal
unless the original grade has been altered by other than natural events and
engineering proof of the original grade such as original topographic maps or aerial
photos with topography shown and certified as to date by a recognized competent
official or other evidence of similar validity is submitted.
42. Pedestrian Way. A public walk dedicated entirely through a block from street to
street and/or providing access to a school, park, recreation area, or shopping center.
43. Plat. A map, chart, survey, plan, or replat certified by a licensed, registered land
surveyor containing a description of the subdivided land with ties to permanent
monuments.
a. Preliminary Plat. The preliminary drawing or drawings, described in this
chapter, indicating the proposed manner of layout of the subdivision.
b. Final Plat. The map or plan or a record of a subdivision and any accompanying
material, as described in these regulations.
c. Recorded Plat. A final plat bearing all of the certificates of approval required in
applicable City of El Mirage Codes and Ordinances and duly recorded in the
Maricopa County Recorder's office.
d. Amended Plat. A final plat that changes a portion of a previously recorded plat.
44. Preliminary Plat Approval. Approved by the the Development Services Department
El Mirage Planning Commission once the El Mirage Technical Advisory Committee
(TAC) comments and redlines have been satisfied. The preliminary plat shall be
effective for one year from the date of approval. The subdivider may apply in writing
for, and the Development Services Department Planning and Zoning Commission
may for cause shown, grant up to a six-month extension.
45. Private Access Way. Any private street or private way of access to one or more lots,
which is owned and maintained by an individual or group of individuals and has been
improved in accordance with City standards for private access ways and plans
approved by the Engineering Division. A private access way is intended to apply
where its use is logically consistent with a desire for neighborhood identification and
control of access, and where special design concepts may be involved, such as within
planned area developments and mobile home developments.
46. Public Improvement Standards. A set of regulations (City of El Mirage Design &
Development Standards Manual) setting forth the details, specifications, and
instructions to be followed in the planning, design and construction of certain public
improvements in the City of El Mirage.
47. Request for Design Exception. A request submitted by the owner or developer for an
exception from specified development standards.
48. Slope. The vertical rise in feet measured over a horizontal distance of 100-feet,
expressed as a percentage, measured generally at right angles to contour lines but
which shall not extend across significant changes in grade. A portion of the 100-foot
line shall extend across property lines, if necessary, to obtain the 100-foot
measurement at a property line so long as not more than 50-feet shall so extend.
49. Street. Any thoroughfare, avenue, boulevard, road, lane, parkway, place, viaduct,
easement for access, or other way that is an existing state, county, or municipal
roadway; or a street or way shown in a plat heretofore approved pursuant to law or
approved by official action; or a street or way in a plat duly filed and recorded in the
County Recorder's office. A street includes the land between the right-of-way lines
whether improved or unimproved and may comprise pavement, shoulders, curbs,
gutters, sidewalks, parking areas, landscaping, and above and below ground utilities.
a. Arterial Street. A general term including freeways, expressways, and major or
minor arterial streets; and interstate, state, or county highways having regional
continuity. These streets are designed to carry large amounts of traffic across or
through the city and designated as such by the General Plan.
b. Collector Street. A public thoroughfare that provides for traffic movement within
neighborhoods and between major streets and local streets with direct access to
abutting property.
c. Local Street. A public thoroughfare that provides direct access to residential,
commercial, industrial, or other abutting land. It provides for local traffic
movements and connects to collector and/or major streets.
d. Marginal Access Street, or Frontage Road or Service Street. A minor street
parallel and adjacent to an arterial route, which provides access to abutting
property and intercepts local streets and controls, access to an arterial route.
SECTION B
DESIGN AND SUBMITTAL STANDARDS
FOR PRELIMINARY AND FINAL PLATS
Section B contains standards for design and submittal of required documents and maps associated with
the Preliminary Plat, Minor Land Division application and Final Plat applications.
B–1
INFORMATION REQUIRED FOR PRELIMINARY PLAT SUBMITTAL
A.
Review Submittal Requirements
Preliminary Plat submittals shall be made to the Development Services Department Planning and
Zoning Division using the City’s ELM Online Permit Portal. Preliminary Plats shall be in
conformance with the Chapter 155: Subdivision, §155.031 PRELIMINARY PLAT;
REQUIREMENTS AND REVIEW.
B.
Preliminary Plat Format
1. The Preliminary Plat shall be submitted as a PDF to the City’s ELM Online Permit
Portal.
2. The Preliminary Plat shall be drawn to an accurate scale having not more than 100-feet
to an inch for a subdivision where the majority of the lots are less than five acres in size.
The scale may be reduced to 200-feet to an inch when the minimum lot size is five acres
or more.
3. The Preliminary Plat shall be prepared and sealed by a professional engineer registered
to practice in the State of Arizona.
C.
Identification Data Required
Basic identification data shall be provided regarding the development including:
1. The name of the subdivision. The name shall not duplicate or too closely resemble the
name of any subdivisions previously filed in the city.
2. Date of preparation, scale and north arrow. The top of each sheet shall represent north
wherever possible.
3. A vicinity map drawn at a scale of 1,000 feet to an inch or 2,000 feet to an inch, showing
the location of the proposed subdivision in the city and its relationship to surrounding
development.
4. The names, addresses, and phone numbers of the developer or subdivider, and the
individual or firm responsible for the preparation of the preliminary plat.
D.
Survey Data Required
Basic survey data shall be provided regarding the development including:
1. A legal description of the subdivision boundary.
2. The boundary lines of the subdivision in a heavy, solid line and referenced to section or
quarter section lines.
3. A description of all monuments, both found and set, which mark the boundary of the
subdivision, and a description of all control monuments used in the survey.
4. Existing contours at a maximum interval of one foot unless waived by the Development
Services Department .
5. General location and extend of any significant natural features such as streams or
drainage ways.
6. Floodplains as delineated on maps available from the Maricopa County Flood Control
District Office.
7. Location, dimensions and names of existing roads, streets, alleys, railroad rights of way
and structures within 200 feet immediately adjacent to the property showing how they
relate to the proposed subdivision layout.
8. Location, size and grades of existing sanitary and storm sewers and location and size of
water mains, gas lines, pipelines or other underground utilities or installations within the
proposed subdivision and within 200 feet immediately adjacent thereto.
9. Location and dimensions of all easements of record.
E.
Design Data Required
Basic design data shall be provided regarding the development including:
1. Existing zoning and land use of the proposed subdivision and immediately adjacent areas.
2. Location and widths of proposed streets, alleys, pedestrian ways and easements, with
proposed names for streets.
3. Layouts, numbers and approximate dimensions of proposed lots and blocks.
4. Location of proposed fire hydrants, light standards, stop signs, traffic signals and gang
mailboxes.
5. Location, dimension and size in acres of all sites proposed to be used for commercial or
industrial areas, acreage of open space, amount of land in rights of way and other
descriptive material useful in reviewing the proposed subdivision.
6. Certificate of approval of the Development Services Director as follows:
Data on this plat has been reviewed and approved this ________________day of
___________, 20_______, by the Development Services Director of El Mirage, Arizona.
F.
Supporting Material
The following information and material shall be a part of any Preliminary Plat submittal and shall
accompany the Preliminary Plat drawing.
1. Payment of the total amount of the preliminary plat fee.
2. A statement explaining the proposed design and function of the water, sewage, paving,
sidewalk, stormwater collection and retention systems, including preliminary drainage
calculations and storm drainage systems, their compatibility with existing systems and
the timing and/or phasing of installation. Approximate size and location of the above may
be required on the plat, as determined by the City Engineer.
3. A statement describing the development maintenance responsibility for any private
streets, ways or open spaces.
4. The recommendations of a qualified professional engineer regarding soil suitability,
erosion control, sedimentation and flooding problems.
5. A description of the phasing and scheduling of the phasing for the development, if the
final plat is to be submitted in separate phases.
6. A petition of annexation to the city and if the area to be subdivided is contiguous to, and
outside, either by itself or as a part of a larger tract, the boundaries of the city.
7. An application for appropriate zoning for the subdivided area if the area is to be annexed
or if the existing zoning district does not allow the type of use proposed.
8. The names and addresses or all owners of subdivided lots and unplatted land contiguous
to or within 200 feet of the boundary of the proposed subdivision.
9. Letters of certification and/or signed copies of the proposed preliminary plat from
appropriate agencies and utility companies approving the proposed preliminary plat and
confirming availability of services.
B–2
INFORMATION REQUIRED FOR MINOR LAND DIVISION SUBMITTAL
The Minor Land Division map approval process generally is an administrative process with map
approval granted by the City staff. The review/approval process is generally intended to ensure
that the proposed division or future division of land will result in lots which meet the minimum
area and width requirements of the Zoning Code and produce a legally recognized land division
into less than four parcels. A land division into four or more parcels and/or where right of way
needs to be dedicated to or abandoned from the City requires the preparation of a Final Plat per
B-3 of this Section.
A. Review Submittal Requirements
The Minor Land Division shall be prepared and certified as to its accuracy by a land surveyor
registered to perform the work in the State of Arizona. Minor Land Division submittals shall be
made using the City’s ELM Online Permit Portal.
B. Minor Land Division Format
1. The Minor Land Division shall be clearly and legibility drawn in black, waterproof ink upon
mylar of a minimum of 0.003 inch in thickness. The original mylar and all required
supporting material shall be submitted to the Development Services Department.
2. The sheet size of all Minor Land Divisions shall be 24 inches high by 36 inches wide.
Information should be so positioned that a one and one half inch margin is on the left hand
side and a one half inch margin is shown on the remaining sides. The Minor Land Division
shall be drawn to an accurate scale having not more than 100-feet to an inch.
3. Each sheet shall be numbered and the total number of sheets comprising the plat shall be
stated on each sheet (i.e., Sheet 2 of 4). The relationship of one sheet to the other shall be
shown by key maps or match lines.
4. The map shall be prepared and sealed by a land surveyor registered to practice in the State of
Arizona.
5. All necessary easements (public water, public sewer etc.) shall be dedicated on a Minor
Land Division. Deviations from this policy are required in writing from the Engineering
Division.
6. The submitted Minor Land Division shall contain an Acknowledgment Statement with a
signature block for all owners of any and all equitable or legal interest in the land or
whatever nature.
C. Identification Data Required
Basic identification data shall be provided regarding the development and land surveyor.
1. The name of the map shall be centered at the top of each sheet as “Minor Land Division
for _____________”.
2. The Minor Land Division shall contain a title block that includes the name and location
of the development and its legal description by number of section, township, range,
county and state, on each sheet.
3. The title block shall also contain the name, address and registration number of seal of the
registered land surveyor preparing the plat.
4. The map shall contain a scale, north arrow, and date of plat preparation on each sheet.
5. Vicinity Map.
D. Survey Data Required
Data from a survey of the area to be divided shall be required as part of the Minor Land
Division submittal.
1. Boundaries of the tract to be divided shall be fully balanced and closed, showing all
bearings and distances, determined by an accurate survey in the field. All dimensions
shall be expressed in feet and decimals of feet. Boundary lines shall be shown in a heavy
solid line on each sheet.
2. A metes and bounds legal description of all lots within he map area based on an accurate
traverse, giving bearing and linear dimensions that result in a maximum allowable error
of closure of one part in 10,000.
3. The location and description of the point of beginning and its proper reference to the
monumented boundary survey.
4. Location and description of cardinal points to which all dimensions, angles, bearings, and
similar data on the map shall be referenced; each of two corners of the development
traverse shall be tied by bearing and distance to two separate section corners or quarter-
section corners.
5. The location and description of all monuments, found or set.
6. Location of any physical encroachments upon the boundaries of the tract shall be
identified.
E. Descriptive Data Required
Data depicting physical attributes and parcel dimensions of land being divided shall be part
of the Minor Land Division submittal.
1. All drainage ways shall be shown on the map. If a property lies within a 100-year
floodplain, the following statement shall appear on the face of the Minor Land Division:
“THIS LAND DIVISION IS (OR THE FOLLOWING LOTS ARE) LOCATED IN THE
ONE HUNDRED-YEAR FLOODPLAIN AS DEFINED BY THE UNITED STATES
FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA).”
2. All unobstructed view easements and sight distance triangles shall be shown at all
intersections on all Minor Land Divisions.
3. All minimum building setbacks shall be shown.
4. The location and dimensions of all residential lots shall be shown on the map. Proposed
subdivisions for single family dwellings shall provide a table identifying the lot area in
square feet for each lot.
5. All residential lots shall be individually numbered by consecutive numbers throughout
the map.
6. The location of all adjoining subdivisions and/or parcels with parcel number and the date,
book, and page number of recordation noted, or if unrecorded, so marked and noted on
the map.
7. All 65, 70, 75, 80 and 85 LDN noise level contours generated by activities from Luke Air
Force Base.
8. The names of all streets.
9. A notation of the total acreage of the land to be divided, the total number of lots and the
acreage of the individual lots.
10. A notarized certificate by all parties having any titled interest in or lien upon the land,
consenting to the recording of the plat and dedicating public ways, grounds and
easements. Dedication shall include a written description by section, township and range
of the tract. If the plat contains private streets, public utilities shall be reserved the right to
install and maintain utilities in the street right of way.
11. A Certification Statement with a signature block for the registered land surveyor,
registered under the laws of Arizona, stating that the map is true, accurate and complete
and that the described monuments have been found or set as described.
F. Signature Block
A signature block for the signatures of the City Engineer shall be included as follows:
CERTIFICATE OF APPROVAL OF THE CITY ENGINEER
Data on this Minor Land Division has been reviewed and approved this
________________day of ___________, 20_______, by the City Engineer of El Mirage,
Arizona.
G. Legibility
Any seal, detail, note or other item required for inclusion on the Minor Land Division shall be
clearly legible. Failure to provide legible details on a final plat shall be considered an
incomplete submittal.
H.
Supporting Material
The following information and material shall be a part of any Minor Land Division submittal and
shall accompany the map.
1. Payment of the total amount of the Minor Land Division fee.
2. Evidence of location of access to the parcel from an existing public street system
3. Minor Land Division located within a private water franchise area shall provide evidence
that the pretty has a Certificate of Assured Water Supply.
4. The application shall contain such other information as determine to be appropriate and
necessary to understand and evaluate the proposed Minor Land Division.
5. A Drainage Report prepared by a registered Civil Engineer may be required if City staff
see a potential issue with flooding.
6. Other requirements may be requested by the City on a case-by-case basis.
B–32 INFORMATION REQUIRED FOR FINAL PLAT SUBMITTAL
A.
A.
Review Submittal Requirements
After approval of the Preliminary Plat, if required, a Final Plat and supporting material may be
prepared and submitted to the Development Services Department. The Final Plat shall be
prepared and certified as to its accuracy by a land surveyor register to perform the work in the
State of Arizona. Final Plat submittals shall be made to the Planning and Zoning Division using
the City’s ELM Online Permit Portal. Final Plats shall be in conformance with this Section and
City Code Chapter 155: Subdivision, §155.032 FINAL PLAT; REQUIREMENTS AND
REVIEW.
A. Recording Requirements
The developer shall make all required corrections to the Final Plat/Map of Dedication (MOD),
prior to submitting for Council action. The submittal shall include:
1. Submit CD of PDF images of the signed Final Plat.
2. One check payable to the City of El Mirage:
A.
The check will include courier fees and recording fees.
3. All type and signatures must be in black ink. No ball point pens.
4. All stamps/seals must be clearly legible and not smeared. If the stamps/seals are smeared
or illegible, the Final Plat/MOD will be returned to the engineer/developer for correction.
5. Electronic file of the approved version of the Final Plat.
1.
The Final Assurance and Agreement to Install for construction of the infrastructure
improvements off-site and on-site, including but not limited to water, sewer, street lights, grading and drainage,
paving, curb, gutter, sidewalk, drainage features, and signing and striping, must be posted with the City in
accordance with the City of El Mirage Subdivision Ordinance, prior to recordation of the Final Plat.
B.I. Final Plat Format
1. The recorded plat shall be submitted on CD of PDF images of signed Final Plat.The final
plat shall be clearly and legibility drawn in black, waterproof ink upon mylar of a minimum
of 0.003 inch in thickness. The original mylar and all required supporting material shall be
submitted to the Development Services Department.
2. The sheet size of all final plats shall be 24 inches high by 36 inches wide. Information on the
plat should be so positioned that a one and one half inch margin is on the left hand side and a
one half inch margin is shown on the remaining sides. The plat shall be drawn to an accurate
scale having not more than 100-feet to an inch or not more than 200-feet to an inch for
subdivisions in which the minimum lot size is five acres or more.
2.3. Each sheet of the final plat shall be numbered and the total number of sheets comprising the
plat shall be stated on each sheet (i.e., Sheet 2 of 4). The relationship of one sheet to the
other shall be shown by key maps or match lines.
3.
4. The plat shall be prepared and sealed by a land surveyor registered to practice in the State of
Arizona.
5. All necessary rights-of-way and easements (public water, public sewer etc.) shall be
dedicated on a Final Plat or MOD. Deviations from this policy are required in writing
from the Engineering Division.
6. Required affidavits, certificates and acknowledgements shall be legibly printed on the
plat.
7. The submitted final plat shall contained the notarized signature of the owner or owners of
any and all equitable or legal interest in the land or whatever nature.
5.8. Staged Approval - Final platting may be accomplished in stages. When this is done, each
sheet of the final plat shall contain a vicinity map showing the location of the portion
being submitted in relationship to the total area of the project. All final plats so submitted
shall be of the same scale, shall have identical titles, legends and any other information,
and shall have match lines so that mosaics of the entire subdivision can be developed.
Each stage of the subdivision shall be nearly self-sustaining and complete as possible and
shall by itself, or in conjunction with the previous stages, meet the design standards set
forth in these regulations so that if development of the entire subdivision is interrupted or
discontinued after one or more stages is completed, a viable development will result.
C.J. Identification Data Required
Basic identification data shall be provided regarding the development and land surveyor.
1. The name of the subdivision or project, centered at the top of each sheet.
1.2. The Final Plat shall contain a title block that includes the name and location of the
development and its legal description by number of section, township, range, and county
and state, entered under the name of the project on each sheet.
2.3. The title block shall also contain the name, address and registration number of seal of the
registered land surveyor preparing the plat.
3.4. The plat map shall contain a scale, north arrow, and date of plat preparation on each sheet.
D.K. Survey Data Required
Data from a survey of the area to be subdivided shall be required as part of the Final Plat
submittal.
1. Boundaries of the tract to be subdivided shall be fully balanced and closed, showing all
bearings and distances, determined by an accurate survey in the field. All dimensions
shall be expressed in feet and decimals of feet. Boundary lines shall be shown in a heavy
solid line on each sheet.
2. Any excepted parcels within the plat boundaries shall be located showing all bearings and
distances, determined by an accurate survey in the field. All dimensions shall be
expressed in feet and decimals of feet.
3. Legal description of the subdivision boundary based on an accurate traverse, giving
bearing and linear dimensions that result in a maximum allowable error of closure of one
part in 10,000.
2.4. The location and description of the point of beginning and its proper reference to the
monumented boundary survey.
5. Location and description of cardinal points to which all dimensions, angles, bearings, and
similar data on the plat shall be referenced; each of two corners of the development
traverse shall be tied by bearing and distance to two separate section corners or quarter-
section corners.
3.6. The location and description of all monuments found or set.
4.7. All existing adjacent plats shall be referenced to the location of monument corners.
5.8. Location of all physical encroachments upon the boundaries of the tract shall be
identified.
6.9. A sealed copy of a computer printout or all material involved in a hand calculated
boundary traverse survey of the tract shall be included with the plat submittal.
7.10.
A copy of a current title report (dated within 30 days of the submittal).
8.11.
Copy of a current ALTA Survey (dated within six months of the submittal).
E.L. Descriptive Data Required
Data depicting physical attributes and parcel dimensions of land being subdivided shall be
part of the Final Plat submittal.
1. The name, right-of-way lines, courses, length, width of all public streets, alleys,
crosswalks and utility easements radii, points of tangency, and central angles of all
curvilinear streets and alleys, radii of all rounded street line intersections shall be
included on the map.
2. All drainage ways shall be shown on the plat. The right-of-way of all major drainage
ways, flood plains, floodways, probable maximum flood boundaries, etc., as approved by
the City of El Mirage Engineering Division, shall be shown as dedicated. Dedication of
drainage way rights of way or easements may be required when it is deemed by the city
to be in the best interest of the city. If a property lies within a 100-year floodplain, the
following statement shall appear on the face of the final plat and all contracts and
agreements relating to the project: “THIS SUBDIVISION IS (OR THE FOLLOWING
LOTS ARE) LOCATED IN THE ONE HUNDRED-YEAR FLOODPLAIN AS
DEFINED BY THE UNITED STATES FEDERAL EMERGENCY MANAGEMENT
AGENCY (FEMA).”
3. All unobstructed view easements and sight distance triangles shall be shown at all
intersections on all Final Plats.
3.4. All minimum building setbacks shall be shown.
4.5. The location and dimensions of all residential lots shall be shown on the map. Proposed
subdivisions for single family dwellings shall provide a table identifying the lot area in
square feet for each lot.
5.6. All residential lots shall be individually numbered by consecutive numbers throughout
the plat. "Exceptions," "tracts," “common areas,” and "private parks" shall be so
designated, lettered, or named and clearly dimensioned.
6.7. The location, dimensions, bearings, radii, arcs, and central angles of all sites to be
dedicated to the public shall be shown on the map with the use clearly indicated.
8. The location of all adjoining subdivisions and/or parcels with parcel number and the date,
book, and page number of recordation noted, or if unrecorded, so marked and noted on
the map.
9. All 65, 70, 75, 80 and 85 LDN noise level contours generated by activities from Luke Air
Force Base.
10. The names of all streets.
11. All dimensions shown on irregularly shaped lots, with lot area calculations.
12. A notation of the total acreage of the subdivision and the total number of lots.
13. Any proposed private deed restrictions to be imposed upon the plat or any part or parts
thereof pertaining to the intended use of the land shall be typewritten and attached to the
plat.
14. A notarized certificate by all parties having any titled interest in or lien upon the land,
consenting to the recording of the plat and dedicating public ways, grounds and
easements. Dedication shall include a written description by section, township and range
of the tract. If the plat contains private streets, public utilities shall be reserved the right to
install and maintain utilities in the street right of way.
15. In cases involving vacation of public or private streets or public ways, easements or
grounds, a notarized certificate of all parties having any titled interest in, or lien upon, the
land or other pertinent interest, consenting to the vacation shall be provided.
7.16.
A notarized certificate of a registered land surveyor, registered under the laws of
Arizona, stating that the plat is true, accurate and complete and that the described
monuments have been found or set as described.
8. Any proposed private deed restrictions to be imposed upon the plat or any part or parts
thereof pertaining to the intended use of the land shall be typewritten and attached to the
plat and to each copy submitted.
F.M. Dedication and Acknowledgment
1. A statement of dedication of all streets, alleys, drainage ways, pedestrian ways, and other
tracts and/or easements for public use by the person holding title of record, by persons
holding title as venders under land contract and by spouses of said parties shall be
required as part of the Final Plat submittal. Mortgaged land to be dedicated shall require
the signature of the mortgagee. Dedication shall include a verbal legal description
including the section, township, and range in which the tract is located.
2. Private streets contained in the plat shall have the right reserved to public utilities to
install and maintain facilities within the street boundaries. Private streets shall be
dedicated as tracts.
12. No structure of any kind shall be constructed, or any vegetation be planted, nor be
allowed to grow within the drainage easement or tract, which would impede the flow
of water over, under, or through the easement or tract.
13. An association, including all property owners in the development, will be formed and
have the responsibility of maintaining all common areas noted as “Tracts” or easements,
including landscaped areas and drainage facilities, in accordance with the approved plans.
14. All landscaping and irrigation installed as part of this project, including within the City’s
right of way, shall be maintained by the property owner unless otherwise noted.
15. Maximum building envelope on each lot is
.
J.C
Signature Block
A signature block for the signatures of the City Engineer and, Mayor, and
OwnerDevelopment Services Director. shall be included as follows:.
CERTIFICATE OF APPROVAL OF THE CITY ENGINEER
Data on this plat has been reviewed and approved this ________________day of
___________, 20_______, by the City Engineer of El Mirage, Arizona.
CERTIFICATE OF APPROVAL OF THE DEVELOPMENT SERVICES DIRECTOR (if
the project has an approved preliminary plat)
This plat is in full compliance with the original preliminary plat as approved by the City of
El Mirage on the ____________day of _____________, 20_____. The final plat has been
reviewed and approved this ________________day of ___________, 20_______, by the
Development Services Director of El Mirage, Arizona.
or
CERTIFICATE OF APPROVAL OF THE DEVELOPMENT SERVICES DIRECTOR (if
the project did not require a preliminary plat)
Data on this plat has been reviewed and approved this ________________day of
___________, 20_______, by the Development Services Director of El Mirage, Arizona.
K.D Legibility
Any seal, detail, note or other item required for inclusion on the final plat shall be clearly
legible. Failure to provide legible details on a final plat shall be considered an incomplete
submittal.
L.
Supporting Material
The following information and material shall be a part of any final plat submittal and shall
accompany the final plat drawing.
7. Payment of the total amount of the final plat fee.
8. Construction plans per Chapter 1, Section K of the DDSM.
9. Drainage Report per Chapter 4 of the DDSM.
10. Soils Report. A soils report for the site in question and pertinent off-site areas shall be
prepared by a register engineer. The report shall indicate the type and location of soils,
using the unified soil classification system, shall contain drill logs and swell
consolidation curves, and shall contain a discussion of any present or potential hazards,
associated with soils on the site along measures which could be taken to mitigate hazards.
In additional, the soils report shall contain recommendations on subsurface area drains
and peripheral drains, foundation design, pavement thickness, utility trench design,
erosion control and surface drainage.
11. Deeds. When required by the city, a warranty deed or other acceptable instrument
conveying to the city or other appropriate or other appropriate agency any public lands
other than streets, alleys, or easements shown on the final plat and title insurance, if
required by the city on the subject parcel, shall be presented to the city upon approval of
the final plat. The method of assurance will be approved by the City Attorney.
12. A contractor’s performance bond or other financial guarantee acceptable to the city to
guarantee the complete and timely development of any facilities or improvements which
are the subdivider’s responsibility shall be submitted as described in City Code Section §
155.080.
13. Letters of utility approval. Letters of certification and/or signed copies of the proposed
final plat from appropriate agencies and utility companies approving the final plat.
14. Covenants, conditions and restrictions. Any covenants, conditions, restrictions (CCRs)
for the subdivision shall be submitted for review to assure that the CCRs do not conflict
with any city regulations.
I.
Street Design for Developments Located Adjacent to Impediments
Where a development abuts or contains the right-of-way of a railroad, a limited access
highway, an irrigation canal or other physical impediment, or abuts a commercial or
industrial land use, the TAC Committee may recommend location of a street approximately
parallel to and on each side of such right-of-way at a distance suitable for appropriate use of
the intervening land. Such distance shall be determined with due regard for approach grades,
drainage, bridges, or future grade separations.
J. Street Design in Relation to Topography
Streets shall be so arranged in relation to existing topography as to produce desirable lots of
maximum utility, streets of reasonable gradient and facilitation of efficient drainage patterns.
K. Alleys
Alleys may be included but shall not be required in residential, commercial, or industrial
developments, except that alleys shall be required in all developments where:
1. The development abuts an existing, partially dedicated alley(s).
2. Extension of an alley(s) from an adjoining development is required to complete the
established circulation pattern.
L. Streets Connecting Adjoining Neighborhoods
Local streets shall be extended to provide access between adjoining neighborhoods at
appropriate intervals. Half streets at development boundaries shall be discouraged except
where necessary for continuation of existing patterns. Platted half-streets abutting the tract to
be subdivided and furnishing the sole access to residential lots shall be platted within the
tract.
C-4
LOT PLANNING AND DESIGN
A. Lot and Block Arrangement and Dimensions
1. Lot width, depth, area, and building setbacks shall comply with the minimum
requirements of the El Mirage Zoning Ordinance and shall be appropriate for the location
and character of the proposed development, and for the type and extent of street and
utility improvements being installed.
2. Where lots are more than double the minimum required area for the zoning district, the
City may require that the lots be arranged so as to allow further subdivision and the
opening of future streets where they would be necessary to serve the potential lots, all in
compliance with the El Mirage Zoning Ordinance.
1.3. Dimensions of corner lots shall be large enough to allow for erection of buildings,
observing the minimum setbacks from both streets. Depth and width of properties
reserved or laid out for business, commercial, or industrial purposes shall be adequate to
provide for the off-street parking and loading facilities required for the type of use and
development contemplated, as established in the El Mirage Zoning Ordinance.
4. Maximum length of blocks, measured along the centerline of the street, and between
intersecting street centerlines shall be 1,000-feet or 15 times the minimum lot width
required in the Zoning District. Cul-de-sacs shall not exceed 600-feet in length.
2.5. The lot arrangement shall be such that there will be no foreseeable difficulties, for
reasons of topography or other conditions, in securing building permits to build on all lots
in compliance with the El Mirage Zoning Ordinance or in providing driveway access to
buildings on the lots from an approved street.
B. Relationship of Lots to Streets
1. Side lot lines shall be substantially at right angles or radial to street lines.
2. Every lot shall abut upon a public street or private street or access way designed and
appropriate for providing vehicular access.
3. Lot lines for private streets constructed to less than City street standards shall be extended
to the center of the street. Net lot area, for conformance with the minimum required lot
area for the zoning district, shall not include the street easement or tract area.
4. Double frontage and reversed frontage lots shall be avoided except where necessary to
provide separation of residential development from traffic arterials, to overcome specific
disadvantages of topography and orientation or Single-family residential lots extending
through the block and having frontage on two parallel streets shall not be permitted
except where the second street is designated as a collector or arterial street. The rear lot
line of through lots shall be buffered as determined by the Development Services
Department.
4.5. Lots shall not, in general, derive access exclusively from an arterial street. Where
driveway access from an arterial street may be necessary for several adjoining lots, the
City may require that the lots be served by a combined access drive in order to limit
possible traffic hazards on the street. Where possible, driveways should be designed and
arranged so as to avoid requiring vehicles to back into traffic on arterial streets.
C. Utility Easement Planning
1. Where alleys are provided, four-foot aerial overhead easements on each side of alley shall
be provided by dedication.
2. Guy and anchor easements shall be one-foot wide on each side of a lot line and
approximately 35-feet in length measured from the rear lot line.
SECTION G
ADMINISTRATIVE CHANGES TO A RECORDED PLAT
Minor changes may be accomplished without re-recording the plat through the Certificate of Correction
administrative process. Allowable changes under this process are engineering errors and name changes,
typographical errors, misspellings, etc. Administration changes to the recorded plat must be reviewed by
the Development Services DepartmentPlanning Director, prior to recording.
A. Engineering Error Classification
1. If, after the approval and recording of a final plat, errors are found in the language or
numbers on the recorded plat, the developer shall file a properly signed, corrected, or
revised original Mylar with the Development Services DepartmentPlanning Director.
The plat shall be noted “Corrected Plat” under the name of the development. Notations
shall be made on the face of the plat listing all corrections made and the book and page
numbers where the original plat was recorded. The Development Services Department
director shall review the plat for corrections, secure the signatures of the proper public
officials on the corrected plat, and present approve the plat to the Development
Services Department City Council for the reaffirmation of their approval and submit
the plat to the County Clerk for recording. The recording of the corrected plat shall
void the incorrect original plat, and the County Clerk shall note “Void” across the face
of the incorrect plat.
B. Procedure
1. If, after the approval and recording of the final plat, a subdivider wishes to modify the
location of lot lines on part or all of the recorded plat, and if there is no change in the
location or size of dedicated streets or other dedicated public land, the subdivider shall
submit a new final plat drawing with the lotting arrangement revised. The
Development Services DepartmentPlanning Director shall determine which of the
required supporting materials shall be resubmitted with the revised final plat. The plat
shall be marked the “Resubdivision of ” under the name of the
development and shall be processed as a final plat.
2. If, after the approval and recording of a final plat, a subdivider wishes to change the
street or public land location, size, or arrangement of a part or all of the platted area,
the resulting subdivision shall be treated as a new submittal with both a preliminary
plat and a final plat required. The subdivision shall be identified as the “Resubdivision
of ”. Any action of the Development Services Department City
Council approving the resubdivision shall contain clear reference to the vacation of
public lands as appropriate.
3. The Development Services Department Planning Director shall review and approve the
application as appropriate. The subdivider shall have the Certificate recorded in the
Office of the Maricopa County Recorder with copies of the recorded Certificate
B. Plan Review
Once the plans and necessary reports for a development have been prepared, they shall be
submitted to the City of El Mirage Engineering Division via the City’s ELM Online Permit
Portal. The Engineering Division will distribute the plans to the appropriate City departments
for review and comment. These comments will be compiled, consolidated, and returned to the
applicant. All such comments shall be incorporated into the plans and reports by the applicant
prior to resubmittal.
C. Right-of-Way/Easements
When required, the acquisition and dedication of new rights-of-way and/or easements shall be
coordinated with the Engineering Division. Deeds and other necessary documents for the
dedications of rights-of-way, easements and/or parcels shall be prepared by the developer and
submitted to the Engineering Division for review and approval.
The property owner is responsible for the dedication of adjacent full streets of rights-of-way
and shall provide the adjacent full street improvements including, but not limited to: paving,
curb,
gutter,
sidewalk,
landscaping,
irrigation,
street
lighting,
signage,
signal
installation/relocation, drainage infrastructure, interconnect conduit and pavement striping.
Half street dedication and improvements will be allowed on a case by case basis.
D. Street Lights
Streetlights are required on all streets within or adjacent to any proposed development.
Streetlights are also required at each intersection and commercial/industrial driveway. Street
light layout plans for these facilities must be included in the overall submittal, in accordance
with the City Code Sections 154.106(A) and 155.052(A)(8),City’s Street Light Standards
located in Appendix H of this manual, the IES RP8 model, the Arizona Public Service
Company (APS) Standards and Approved Manufacturers for Street Lights. The developer is
required to hire a professional electrical engineer to prepare the street light layout plans.
Photometrics must be included with the plans for any proposed lighting along a public street
or whenever adjacent to a residential use. The plans will be reviewed by the City and once
approved; the applicant shall forward copies to APS. APS owns and maintains all street lights
within the City.
E. Striping and Signage
Each developer is required to install striping and signage on all streets. Striping and signage
plans must be included in the overall submittal package.
F. Construction
Construction/Improvement Permits are required for all improvements in accordance with City
of El Mirage ordinances whether or not they are referenced or stated in this manual. Any
contractor found working on a project without an official set of approved plans or a valid
benchmark or permanent above-grade feature using GPS, using potholing traditional
survey coordinates, or measuring the distance to permanent landmarks.
p. Once the underground utility is located, the pothole should be managed in the same
manner as any other open excavation: place barricades, traffic plates, or other
measures until backfill and restoration is carried out.
q. Backfilling shall be ½ sack ABC slurry.
r.
The contractor shall reinstate the pavement core within 24 hours of cutting the
pavement. Holes left open longer than 24 hours after cutting shall be covered with an
approved steel road plate.
s. The pavement surface shall be restored to its original condition by setting the
reinstated pavement core flush with and in its original orientation.
t.
Bonding agent shall be used for pavement core reinstatement. Excess bonding
material shall be removed from the restored pavement surface. A "patched"
appearance shall be avoided in surface restoration wherever possible.
J-16 TRAFFIC CONTROL PLAN POLICY
The purpose of the TCP is to proactively plan for, coordinate, and minimize the impacts of
encroachment and construction in the right-of-way to the traveling public. A TCP shall be submitted
by the permittee prior to (with permittee plans) or submitted with the permit application for allany
proposed work within or on arterial or collector City right of waystreets.
The TCP will be reviewed and approved by the Engineering Division prior to commencement of
construction. The plan shall indicate the construction duration and schedule and the hours of
operation for the project. The plan shall show the proposed work location area in detail and
describe the traffic routing, traffic control devices, signage and construction traffic routing
proposed. Additional information and stipulations may be required by the City of El Mirage
Engineering Division on a case by case basis. This requirement is in addition to the submission of
a TCP prior to the start of construction.
a. A TCP along with the City’s Traffic Control Plan Submittal Form shall be submitted to the
City of El Mirage Engineering Division shall be submitted with the Temporary Traffic
Control permit application through the ELM Online permit portal a minimum of 48- hours
(two working days) prior to any proposed partial or complete street or alley closure. TCP
submittal
forms
and
traffic
control
plans
shall
be
submitted
via email at
Engineering@elmirageaz.gov. The Engineering Division will review all TCPs prior to TCP
approval and commencement of work by the permittee. Work shall not commence on the
portion of the project requiring street barricading until approval has been obtained in writing
from the Engineering Division.
b. All signs, barricades and other necessary traffic control devices shall be placed in accordance
with the latest versions of the City of Phoenix Traffic Barricade Manual and Manual on
Uniform Traffic Control Devices.
c. Design and implementation of the TCP shall be performed by a well-trained and
knowledgeable individual assigned the responsibility for traffic control devices at work sites.
This individual must be ATSSA (American Traffic Safety Services Association) certified.
d. The TCP shall include the identification and location of all barricades and signs, the hours of
J-18 CONSTRUCTION HOURS POLICY
The construction work hours are as follows:
A
Construction Type
May 1 - October 15
October 16 - April 30
All Construction Work -
Monday through Friday*
5:00 a.m. to 7:00 p.m.
7:00 a.m. to 7:00 p.m.
All Construction Work -
Saturday*
6:00 a.m. to 7:00 p.m.
7:00 a.m. to 7:00 p.m.
All Construction Work -
Sunday*
8:00 a.m. to 7:00 p.m.
8:00 a.m. to 7:00 p.m.
*Concrete work may begin 1 hour prior to start times above.
Approval from the Engineering Division is required to in order work on Friday, Saturday, Sunday
and outside the hours noted above.
J-19
USE OF OFF-DUTY OFFICER POLICY
The permittee shall provide a uniformed off-duty officer to assist with traffic control when the
construction zone extends within 300’ of a signalized intersection or whenever traffic in any one
direction is restricted. An off-duty officer may be required at other times if construction
conditions dictate or by direction of the City Engineer or their designee.
J-20 CONSTRUCTION SIGN POLICY
The permittee shall post information signs on construction vehicles and at the work site
identifying the name of the utility authorizing the work. The purpose of the sign is to identify the
permittee authorizing the work and the contractor performing the work. The sign information
shall include a phone number where a person can call and receive information about the job and
leave a message. The permittee must respond to all phone messages within 24-hours. In addition,
all permittees must return regular traffic control signs back to their original place and replace any
signs damaged during construction. General signage requirements are listed below. Specific
project signs may be required on a case by case basis.
A. Arterial Streets
1. Projects on arterial streets, as identified by the City of El Mirage Street Classification
Map, that are either; a) greater than one mile in length or b) have a construction
timeframe of 30 calendar days or longer, must utilize the following signage:
a. Variable Message Board (VMB) or Portable Arrow Panel type signs at each end of
the project that indicate the following:
(1) Location of construction, including cross street names.
Construction Type
May 1 – September 30
October 1 – April 30
All Construction Work – Monday through
Saturday
6:00 a.m. to 7:00 p.m.
7:00 a.m. to 7:00 p.m.
All Construction Work - Sundays
8:00 a.m. to 7:00 p.m.
8:00 a.m. to 7:00 p.m.
4. Key Map. A key map showing the project’s location within a section and a graphic sheet
index.
5. Names and Addresses. Place the names, addresses and telephone numbers of both the
owners of the development and the engineering, architectural, or survey firm, which
prepared the improvements plans.
6. Approval Blocks. The block for the City approval signatures shall be placed on the lower
right side of the sheet. Since re-approvals of the plans may be needed, space shall be
provided adjacent to the approval signature block for a re-approval signature block. The
re-approval block shall not be placed on the sheet until a re- approval is needed.
7. The Professional’s Seal. The Civil Engineer’s, Landscape Architect’s or Land Surveyor’s
seal shall be stamped in the lower right portion of the sheet. Plans for improvements to
water and wastewater systems and for paving and grading and drainage shall have a
registered civil engineer’s seal; plans for landscaping in the public right-of-way shall
have a landscape architect’s seal; and plans depicting land measurements, identifying
boundaries, etc., shall have a land surveyor’s seal. The engineer, architect or surveyor
shall place his/her signature on the stamped seal.
8. As-Built Drawings of Completed Work in the Right-of-Way. As-built drawings indicating
any changes to the approved plans of the constructed or revised facilities permitted in the
right-of-way or on-site shall be provided to the City of El Mirage Engineering Division
within 30 days of completion of the project and shall be maintained by the permittee in
accordance with State Statutes. The preferred format for the as-builts is digital format in
both PDF and AutoCAD formats.
9. “As-Built” Drawing Certification. When the construction of improvements that will
become the City’s property has been completed, the City requires the developer to
provide a set of drawings that accurately reflect the nature, locations and dimensions of
those improvements. The civil engineer who makes the measurements to verify or correct
the information shown on the plans must provide an “as-built” drawing certification
statement on the plans. The certification statement (unsigned) shall be placed on the
cover sheet prior to the time the plans are submitted for approval. The certification
statement shall be placed on the lower half of the cover sheet near the approval block.
This certification is located in the Appendix B of this Manual.
10. Information on the Right Edge of the Sheet. Along the right edge of the cover sheet,
provide the following information:
•
The title of the plan
•
The engineer’s, architect’s, or surveyor’s name, fax and telephone number for
contact by the City staff
This information along the right edge of the cover sheet will expedite handling by the City
staff since plans won’t have to be unrolled to find this information.
11. Other Information on the Cover Sheet. Some information, in addition to that described
above, such as the names of the utility system owners, plan sheet index, or Maricopa
County Environmental Services Department approvals may also be placed on the cover
sheet. However, the construction notes (or general notes) and construction detail
H. General Notes
Certain City notes are required with each set of improvement plans while others are required
depending upon the kind of improvements depicted on the plans. The required notes are
briefly described in the following subparagraphs and all of the notes are presented in the
Appendix A.
1. General Information and General Notes. These two set of notes shall be placed on every
set of plans, which involves construction of any kind.
2. Grading and Drainage Notes. This set of notes applies to all grading work.
3. Landscape and Irrigation Notes. This set of notes applies to all landscaping and
irrigation work in the rights-of-way.
4. Paving Notes. This set of notes applies to paving work in the rights-of-way.
5. Sewer Notes. This set of notes applies to all work on the City’s wastewater system.
6. Water Notes. This set of notes applies to all work on the City’s water system.
7. Signing and Striping Notes. This set of notes applies to striping and signage work in the
public street.
8. SWPPP Notes. This set of notes shall be used on all SWPPP Plans.
9. Traffic Signal Notes. This set of notes applies to all work on the City’s traffic signal
system.
10. Dry Utility Notes. This set of notes applies to dry utility work in the rights-of-way.
I.
Plan Revisions
If an approved set of plans must be revised, the following items must be provided:
•
Cover letter addressing the revised items and reasons for revisions.
•
Re-approval signature line added to the original cover sheet.
•
Engineer’s seal for the revisions added to the original cover sheet.
•
All changes on the plan set must have clouds and deltas to indicate revisions.
After the revised plan set has been approved, and re-signed by the City Engineer or their
designee, a new permit must be pulled for the revised plans, and additional permit sets
must be provided to the Engineering Division.
J. Approved Plans
Approved plans shall be used as the permit set. Any changes to the plans that occur after the
signed plans shall be submitted for review and approval prior to permitting.
above/below ground improvements but do not include any pavement cutting.
Permit fees and other construction costs are collected upon issuance of each individual
permit in accordance with the El Mirage City Code except as superseded by a franchise
or license agreement. On joint trench projects, the surcharge fee will be apportioned to
the participating agencies.
4. Grading At Owner’s Risk Permit. The Engineering Division will issue a “Grading at
Owner’s Risk” permit which is effective for 60 calendar days provided that the
developer/owner/contractor agree to complete the items listed below. No other permits
such a water, sewer, concrete, dry utilities or paving will be issued until such time as all
civil construction drawings are approved by the Engineering Division, the Grading and
Drainage Permit is obtained, all fees identified by the plan approval letter have been paid
to the City, all documents have been executed by the developer and accepted by the City,
the City of El Mirage Sales Tax license is obtained and proof of insurance is submitted to
the City.
If the above items are not completed within 60 calendar days, the “Grading at Owner’s
Risk” permit will be withdrawn and the contractor will be required to return the property
to its original condition.
ITEMS REQUIRED TO OBTAIN A “GRADING AT OWNER’S RISK” PERMIT
(a) The “Grading at Owner's Risk” Aapplication shall be completed by the applicant.
The application shall contain the following information:
(1) Identify and describe work to be covered by the permit.
(2) Indicate intended use for which the site is being prepared.
(3) Permit application is to be signed shall be submitted by the authorizing agent.
(b) City must complete first review of Grading and Drainage plans for the proposed
development and find that the plans are substantially acceptable.
(c) City must approve the SWPPP for the proposed development.
(d) Developer must provide to the Engineering Division two copies upload a copy of the
red lined Grading and Drainage Plans and approved SWPPP. The red lined plans will
alert the Engineering Inspector that the project has not been approved, but has been
reviewed at least one time and also make them aware of the possible changes.
(e) Contractor shall provide to the Engineering Division upload a copy of the Dust
Control Permit per Maricopa County Rule 310.
(f) Developer/Engineer/Contractor must provide to the Engineering Division copies
upload a copy of the cut/fill quantities.
(g) Contractor shall obtain a “Grading at Owner’s Risk” permit at a cost of 100% of the
actual grading and drainage permit cost up front, which has a one time “life” of 60
calendar days. This fee will not be charged again for the final construction permit.
(h) A haul route permit must be obtained if 500-cubic yards of material or more will be
brought onto or exported from the site.
SECTION N
FINAL LETTER OF ACCEPTANCE FOR CONSTRUCTION PROJECTS
The Final Letter of Acceptance (FLOA) will be granted when the entire project is completed. To obtain the
FLOA, the following items must be approved:
1. All work shown on the approved plans completed and installed.
2. AC or Concrete Mix design approval.
3. Compaction reports approved.
4. All concrete work (sidewalk, curb, gutter, apron, or valley gutter) is accepted, or if cracked,
replaced if it is a hazard (tripping, etc.) shall be replaced. All existing perimeter/adjacent
concrete damaged during construction shall also be replaced.
5. Brass Caps for Horizontal Control and Bench Marks for Vertical Control (new and
existing) installed and survey roles establishing the x, y, and z data approved. All new or
re-set monumentation that is not associated with a plat or MOD that has an RLS
responsible for checking the brass caps accuracy in relation to two separate section,
quarter section, or other acceptable cadastral ties must be checked for accuracy by an
RLS, submitted to the City for review then upon City acceptance the RLS shall record
said replacement or set.
6. All materials testing results, Bac-T test results for waterlines, and video tapes for sewer
lines. Additional test results, certifications, registrations and reports as required in the
Chapter 7-3 of the DDSM.
7. “As-built” drawings, certified by a registered land surveyor or professional civil engineer
registered in the State of Arizona, with original approval block signature intact, for:
(a) Grading and Drainage including certificates of pad elevations or finished floor
elevations, drywell rim elevations, retention/detention basin elevations and volume(s)
and flood zone determinations.
(b) Sanitary sewer system, including dimension between manholes, actual location of
services and length of services installed, rim and flowline elevations and type of pipe,
etc. Must have Approval of Construction (AOC) in hand prior to acceptance.
(c) Water system, including valve locations, depth of water line, type of pipe, actual
location of services, actual location of vertical alignment(s), dimension to hydrant
locations, dimensions to tees and crosses. Must have AOC in hand prior to
acceptance.
(d) Paving, curb, gutter and sidewalk, including locations and widths of driveways,
elevations, streetlight locations. Tops of curbs are to have a stamped S at sewer tap
crossings per MAG Standard Detail 440-4.
(e) Storm Drain, including type of pipe, dimension of pipe to monument line, location of
catch basins, inlets and NPDES markers, manhole rim and flowline elevations,
dimensions to vertical or horizontal realignments.
(f) Bank stabilization, if any included in as-builts.
(g) Traffic signal/striping and signage.
(h) Flood irrigation (public and private).
(i)
8. Copies of drywell drilling logs and EPA ADEQ certification/registration.
(j)
9. Copies of drywell percolation tests.
(k)
10. Approval of Construction (AOC) from the Maricopa County
Environmental Services Department (MCESD).
(l)
11. Notice of Termination (NOT) from ADEQ, if applicable.
(m)
12. Provide CAD drawings, compatible with City software of the water,
sewer, storm drain system base maps with as-built locations of the mains.
8.
13. All fees must be paid.
The FLOA will constitute the beginning of the one-year warranty.
G. Street and Lot Layout and Easement Planning
Streets, lots, tracts and easements planning and layout shall be in accordance with the
Subdivision Regulations, Zoning Stipulations and Approved Site Plan.
H. Pavement Transitions
When development causes the widening of a portion of the pavement of an existing road,
pavement transitions are required at each end of the widened portion. Design of the various
features of the transition between pavements of different widths should be consistent with the
design standards of the superior facility. The transitions should be made on a tangent section
whenever possible. Locations with horizontal and vertical sight distance restrictions should
be avoided. Whenever feasible, the entire transition should be visible to the driver of a
vehicle approaching the narrower section. Intersections at grade within the transition area
should be avoided. Refer to City Detail 111-1 for transition equations.
3-2
GENERAL TECHNICAL INFORMATION
A. Retaining Walls, and Structural Clearances
1. Retaining Walls
a. Types and Uses. Recommended types of retaining walls include reinforced concrete and
structural masonry. Heavy timber construction is not encouraged, except when
approved by the City Engineer. Retaining walls shall include integral attachments for
handrails and weep holes for drainage, where applicable.
b. Aesthetic Considerations. In general, the materials and design of retaining walls shall
match or blend with the adjacent natural features, landscaping, and/or buildings. The
surface of the retaining wall should have low light reflectance. Suggested surface
treatments include exposed aggregate, stucco or mortar wash, and native stone, or other
surfaces as approved by the Community Development Services Department.
The height of retaining walls shall not exceed 6-feet except when approved by the City
Engineer. If approved to retain above 6-feet, terracing is encouraged and the length of the
alignment of the retaining walls should be foreshortened by vertical grooves, periodic
offsets, and height changes, or other configurations as approved by the Community
Development Services Department.
c. Retaining Walls may be constructed per a structural engineered design.
d. Submittal requirements for structural engineered designs are as follows:
•
A separate application and submittal shall be made to the Building Safety
Division for approval.
•
Plans must be signed and sealed by an AZ registered engineer. Plans shall be
submitted with the grading and drainage plans.
•
Provide wall elevations and cross-sections including the structural details, ground
slope, method of drainage, and need for safety railing
•
Specifications for the construction materials and backfill material and
compaction requirements.
•
Two copies of the sSigned and sealed design calculations. Calculations
shall address the effect of any surcharges on the wall and shall use the
minimum factor of safety of 1.5 for both sliding and overturning.
•
One copy of the Geotechnical Report used for soil pressure or excessive slopes.
2. Safety Railings
Safety railings are required on or adjacent to vertical faces such as retaining walls, culvert
headwalls, bridge wing-walls, etc. where the vertical drop is 30-inches or more. In areas of
pedestrian activity, a safety railing may be required where the vertical drop is 12-inches or
more. The safety railing shall be constructed per MAG Standard Detail 145. Railings that
will be maintained by the City shall be non-galvanized and painted “Black Bean
(SW6006)”.
3. Structural Clearances
a. Horizontal Clearance
(1) A fixed object other than street lights, signal poles and utility poles will not be
allowed within 10-feet of the traveled way unless approved by the City Engineer and
a safety barrier is provided. A lesser clearance may only be allowed when other
controls make the desired clearance unreasonable and appropriate traffic barriers are
installed. In no case shall a fixed object be allowed within 2-feet of a traveled way.
(2) The horizontal clearance to bridge piers, abutments, and retaining walls on all streets
shall not be less than 10-feet from the edge of the traveled way.
b. Vertical Clearance
The minimum vertical clearance shall be 16.5-feet over the entire width of the traveled
way of an arterial street or major collector street. On other streets, the minimum shall be
14.5- feet. Exceptions must be submitted to the City Engineer for review and approval.
B. Side Slopes
1. Side Slope Standards. Side slopes should be designed for functional effectiveness, ease of
maintenance, and pleasing appearance. For areas greater than 10- feet back of curb, slopes of
4:1 or flatter shall be provided. Steeper slopes may be approved in areas more than 30-feet
back of curb when soils are not highly susceptible to erosion, or when a cut is not more than 4-
feet. Consult the AASHTO publication, Roadside Design Guide for further details.
2. Slope Rounding. The top of all cut slopes shall be rounded where the material is other than
solid rock. A layer of earth overlaying a rock cut also shall be rounded. The top and bottoms of
all fill slopes for, or adjacent to a traveled way, sidewalk, or bicycle path shall also be rounded.
C. Driveway Spacing and Location
1. Driveway Spacing. Driveway Spacing and Location shall be in accordance with City Detail
EM-259.
2. Commercial Driveways. For commercial driveways that potentially could be signalized,
the minimum throat length shall be 150 feet. The throat length shall be clear of parking
and intersecting drive aisles. Planned commercial sites that consist of two or more parcels
shall have internal connectivity that is clear of obstacles to minimize the impact to the
adjacent public streets. Exceptions must be submitted to the City Engineer with an
accompanied traffic study for review and approval.
D. Sidewalk and Pedestrian Areas
1. General. Placement of sidewalks and pedestrian ways shall promote and enhance
pedestrian safety and the visual quality of the roadway by creating a boulevard landscaped
area between the street, fence, wall, railing and the detached sidewalk. Sidewalks and
pedestrian ways shall be constructed to a width, line and grade in accordance with ADA
requirements and as approved by the City. Construction shall conform to the MAG Standard
Detail 230.
2. Sidewalks. Sidewalks are required along both sides of the pavement section on all public
streets. Sidewalks shall be a minimum of eight-feet in width and detached from the back of
curb on all arterial streets. Sidewalks shall be six-feet in width and detached on all collector
streets. Sidewalks shall be five-feet in width on all local streets. Sidewalks abutting any
public or private elementary school, high school, or park shall be a minimum of 10-feet in
width. Sidewalks shall be included within the dedicated non-pavement right-of-way of all
streets.
3. Pedestrian Ways. Pedestrian ways shall be constructed to connect sidewalks with public and
private facilities not located in the public street right-of-way. Public pedestrian ways shall
be within a tract or easement for such purposes. The minimum width shall be 5-feet or a
width consistent with adjacent trails, and may be used for additional purposes as approved by
the City. If additional uses are approved, the minimum required width may be increased
depending specific use.
E. Curb Returns and Ramps
All urban street intersections and designated mid-block crossings shall be constructed with
concrete vertical curb and curb ramps. Directional ramps shall be constructed to accommodate
every marked or unmarked crossing at each intersection including t-intersections. When a new
street segment is constructed intersecting an existing street, all marked or unmarked crossings
shall be accommodated with curb ramps conforming to current ADA standards. One or more
intersection crossings and the associated ramps may be deleted at the discretion of the
Engineering Division.
Ramps shall be constructed using an appropriate detail from the MAG Standard Details or
other details approved by the Engineering Division. Truncated domes are required at all ramps
crossing public or private streets, as well as busy commercial driveways. Truncated domes
shall be specified as StrongGo TekWay domes, terracotta in color, or equal meeting current
ADA standards approved by the Engineering Division.
The radius to face of curb for the return shall be:
Street
Classification
Major
Arterial
Minor
Arterial
Collector
Local
Parkway
35’
35’
35’
N/A
Major Arterial
35'
35'
30'
20'
Minor Arterial
35'
35'
30'
20'
Collector
30'
30'
30'
20'
Local
20'
20'
20'
20'
F. Valley Gutter
Concrete valley gutters per MAG Standard Detail 240, shall be constructed at all intersections
where the drainage pattern requires them. Concrete for valley gutters shall comply with MAG
Standard Specification 725 for Class ‘A’ concrete. Valley gutters are not allowed to cross
major arterial and minor arterial streets. Valley gutters are not allowed where storm drain
facilities are existing. Valley gutters crossing collector or local street intersections with major
arterial or minor arterial streets shall be six-feet wide, minimum. Valley gutters not at
intersections shall be six-feet wide, minimum. Asphalt valley gutters are not allowed on
public streets.
G. Designated Tracts
Vertical curbs shall be constructed along the street frontage of all designated tracts.
H. Street Drainage Facilities
Street drainage facilities shall be in accordance with Section 4-2.
I. Street Lighting
Street Lighting shall be in accordance requirements noted in Chapter 1, Section I-2(D) of this
Manual and the Street Light Standards located in the Appendix. If an existing street light is in
conflict due to development, it is not allowed to be relocated. A new LED street light is required
per pole and foundation requirements.
their networks, the providers may underground existing facilities that are currently on existing
poles.
2. Installation of new facilities or major enhancements to existing facilities shall be installed
underground unless it can be demonstrated that the public’s general health, safety and welfare
are affected by the underground installation. The fact that an underground installation is more
costly than an overhead installation shall not, in and of itself, constitute a health or safety
issue.
3. All above ground appurtenances that are required to provide services shall be designated and
installed with attention to minimizing the number of appurtenances, joint location,
combined use with existing boxes, and shared facilities where ever possible. All locations
will meet industry standards for sight distance locations, all industry safety requirements
and the aesthetic requirements of the City. A permit shall be issued for the installation or
conversion of any overhead to underground facilities. The issuance of a permit in violation
of any requirements will not void the permitee’s responsibility unless the standard
installation is clearly noticed and approved separately from normal permit requirements.
M. Survey Monuments
All developments shall provide survey monuments at section corners, street centerline
intersections, street centerline alignment changes (P.C.'s, P.T.’s, or P.I. if it is within street
pavement), and development corners.
All section corners, 1/4 corners, and center of section shall be a brass cap in a hand hole per
MAG Standard Detail 120-1-A. All other required survey monuments shall be a brass cap on the
surface per MAG Standard Detail 120-1-B. All existing monumentation shall be preserved
both horizontally and vertically.
Any survey monuments disturbed by construction must be reset and certified at the contractor's
or Developer’s expense. Any disturbed monument shall be reset and a new vertical datum
established and certified. At least two other monuments shall be referenced as a check. The
survey notes showing these reference monuments and the elevation certification will be
required before any project will be accepted as complete.
N. Street Names
Wherever a plan indicates a public or private street, the street name shall be shown. Street
names shall be consistent with the natural alignment and extension of existing streets and the
"MAG Address and Street Assignment Policy". New street names shall not duplicate in whole
or in part, or be confusing with existing street names. be sufficiently different in sound and
spelling from other street names in the city so as not to cause confusion. The City reserves the
right to modify street names to conform to City standards at the technical review stage. Aisles
or drives shall not be named or numbered. The site shall receive a single address based on the
public street on which it fronts. Lots, homes, units and spaces, within the project will be
assigned sub-addresses by the City staff for mail or delivery, emergency or other service needs.
O. Street Name Signs
Street name signs shall be located at all street intersections within or abutting a project, the type
and location of which are to be approved by the City Engineer. The developer shall be
responsible for submitting the necessary plans to the Engineering Division for review and
approval. The contractor shall ensure the landscape area behind the curb/sidewalk is level and
prepared prior to installation of the sign posts. The developer shall be responsible for the
fabrication and installation of all signs, in accordance with the City standards. All street signs
shall be installed for the project before the issuance of certificates of occupancy for any
residence.
For public streets, street name signs shall be white on green. All street name signs shall be
retro-reflective. Private street name signs are considered non-standard and shall be
maintained by the Homeowner’s Association. Refer to City Detail EM-131.
P. Mailbox Standards
Mailbox facilities shall be in accordance with the U.S. Postal Service standards and requirements
and the location must be approved by the City. Mailboxes shall not be located within any
easements or within 6-feet of any fire hydrant or other aboveground utility structure or
facility. A streetlight shall be located such that the clustered mailbox locations are illuminated
in the same manner as the street.
Q. Traffic Control Devices
Traffic control, sign, barricades and pavement markings shall be in accordance with the Federal
Manual on Uniform Traffic Control Devices (MUTCD) as revised. Street and lane closure shall
be in accordance with the Phoenix Traffic Barricade Manual and the MUTCD as revised. When
any existing traffic control signs, barricades, guardrails, traffic signal facilities and equipment is
called to be removed or replaced care shall be taken to salvage such facilities and equipment
and deliver to the City Public Works Office at 10355 N. 121st Avenue.
1. Traffic Signs and Pavement Markings – All new developments and roadway projects shall
provide the required traffic control signs, street name signs, sign posts and pavement
markings on all streets and intersections. The Developer is responsible to furnish and install
the signs, posts and markings. Final Certificate of Completion and Construction bonds
will not be released and streets will not be opened to the public until all signs and markings
have been installed.
2. Signing and Striping Plan – shall be submitted to the Engineering Division and
approved through the plan review process. All new and existing signs shall be shown on the
plans. It is the Design Engineers’ responsibility to design the Signing and Striping Plan to
meet standards as described by the latest adopted version of the MUTCD. The signing and
striping Plan shall include striping with Raised Pavement Markers (RPM) on arterial streets
with no adjacent street lighting and at other locations deemed necessary by the
Engineering Division through engineering judgment.
3. Signs and Sign Posts – shall conform to the latest adopted version of the MUTCD and City
of El Mirage Standards and be installed per city of City Detail EM-132.
4. Striping Installation – shall conform to the latest adopted version of the MUTCD,
other responsible agency.
2. Street Classification Map. Whenever the development embraces any part of a street
designed in the adopted Streets Classification Map, such street shall be platted in conformity
therewith.
3. Continuation. The arrangement of streets shall provide for the continuation of principal
streets between adjacent properties when the continuation is necessary for convenient
movement of traffic, effective fire protection, for efficient provision of utilities, and
where the condition is in accordance with the General Plan. If the adjacent property is
undeveloped and the street must be a dead-end street temporarily, the right-of-way shall
be extended to the property line and there shall be a notation on the subdivision plat that
land outside the normal street right-of-way shall revert to abuttors whenever the street is
continued. The city may limit the length of temporary dead-end streets in accordance
with the design standards of these regulations.Street layouts shall provide for the
continuation of existing collector streets in adjacent areas, and such other streets as the
City Engineer may designate.
3.4. Frontage on Improved Streets. No subdivision shall be approved unless the area to be
subdivided shall have frontage on, and access from, an existing street and unless the street is:
A street shown upon a plat approved by the City and recorded in the County Recorder’s
office. The street or highway must be suitably improved as required by Maricopa Association
on Governments (MAG) Specifications, or be secured by a performance bond required under
the City’s Subdivision Regulations, with the width and right-of-way required by these
regulations or the General Plan. Wherever the area to be subdivided is to utilize existing road
frontage, the road shall be suitably improved as required by these regulations and as outlined
in this manual.
4.5. Future Street Extensions. Proposed streets shall be extended to the boundary lines of the
tract to be subdivided, unless prevented by topography or other physical conditions, or
unless in the opinion of the City, the extension is not necessary or desirable for the
coordination of the layout of the subdivision with the existing layout or the most
advantageous future development of adjacent tracts.Certain proposed streets, as
designated by the City Engineer, shall be extended to the development boundary to
provide future connection with adjoining unplatted lands. In general, these extensions
should not be farther apart than the maximum permitted length of a block, as specified
herein.
5. Local Street Arrangement. Local streets shall be so arranged as to discourage their use by
traffic originating outside the immediate neighborhood. Local streets shall be discontinuous
and generally should be interrupted with jogs and offsets. Four-way intersections of local
streets should be avoided. Local roads shall be curved wherever possible to avoid
conformity of lot appearance.
6. Marginal Access and Reverse Frontage Streets. Lots intended for single-family residential
use shall not front or have access from arterial streets. When a proposed development
abuts or contains an existing or proposed arterial street, the arrangement of interior streets
and lots shall prohibit marginal access streets and minimize reverse frontage streets, and
shall provide non-access easements along the arterial street, or such other treatment as may
be justified for protection of properties from the nuisance and hazard of high volume
traffic and for preservation of the traffic function of the arterial street.
7. Access Provisions for Development Boundary Constraint. When a residential subdivision
abuts the right-of-way of a railroad or limited access highway or abuts a commercial or
industrial land use, the City Engineer may require location of a street approximately
parallel to such right-of-way or use at a distance suitable for appropriate use of intervening
land, such distance being determined with due regard for approach grades, drainage,
embankments, bridges, and future grade separations.
8. Dead End Streets. Dead End Streets shall be prohibited except in locations approved by the
City Engineer for future street connection to adjacent unplatted lands.
a.
Where a street does not extend to the boundary of a subdivision and its continuation
is not required by the city for access to adjoining property, its terminus shall normally not
be nearer to the boundary than 50 feet. However, the city may require the reservation of
an appropriate easement to accommodate drainage facilities, pedestrian traffic, or utilities.
A cul-de-sac shall be provided at the end of a permanent dead-end street in accordance
with city construction standards and specifications.
8.b. For greater convenience to traffic and more effective police and fire protection,
permanent dead-end streets shall, in general, be limited in length in accordance with the
design standards of these regulations.
9. Maximum Lengths for Blocks and Cul-de-sacs.
a. Maximum length of blocks in residential areas, measured along the centerline of the
street, and between intersecting street center lines, shall not exceed 1000-feet or 15
times the minimum lot width required in the zoning district. Blocks shall be as long
as reasonably possible under the circumstances within the above maximums in order
to achieve depth and possible street economy and to reduce the expense and safety
hazard arising from excessive street intersections.
b. The maximum length of cul-de-sac streets shall not exceed 600-feet, measured from the
intersection of right-of-way lines to the extreme depth of the turning circle along the
cul-de-sac street center line, unless specifically approved by the Engineering
Division. An exception may be made where topography constrains the number of
adjacent lots served and shall not be made merely because the tract has restrictive
boundary dimensions. In such cases, provision should be made for extension of the
street pattern to the adjoining unplatted parcel and a temporary turnaround installed,
or to alter the street pattern to eliminate the constraint. Cul-de-sac streets shall
terminate in a circular right-of-way 60-foot in radius with an improved unobstructed
traffic turning circle of at least 48 feet in radius. Refer to City Detail EM-114.
c. Blocks shall have sufficient width to provide for two tiers of lots or appropriate depths.
Exceptions to this prescribed block width shall be permitted in blocks adjacent to major
streets, railroads, waterways, or parks.
b.d. In long blocks the City Council may require the reservation of an easement through the
block to accommodate utilities, drainage facilities, emergency access, or pedestrian
traffic.
10. Railroads and limited access highways. Railroad rights-of-ways and limited access
highways where so located as to affect the subdivision of adjoining lands shall be treated
as follows:
a.
In residential districts a buffer strip at least 25 feet in depth in addition to
the normal depth of the lot required in the district shall be provided adjacent to the
railroad right-of-way or limited access highway. This strip shall be part of the platted
lots and shall be designated on the plat: “This strip is reserved for screening. The
placement of structures, except for street signs and lighting is prohibited.”
b. In districts zoned for business, commercial, or industrial uses, the nearest street
extending parallel or approximately parallel to the railroad shall, wherever
practicable, be at a sufficient distance therefrom to ensure suitable depth for
commercial or industrial sites.
c. Streets parallel to the railroad when intersecting a street which crosses the railroad at
grade shall, to the extent practicable, be a distance of at least 150 feet from the
railroad right-of-way. The distance shall be determined with due consideration of the
minimum distance required for future separation of grades by means of appropriate
approach gradients. This distance shall be reviewed as part of a Traffic Impact Study
and increased as necessary based on the volume, configuration, etc. as determined by
the Traffic Engineer.
11. Widening and realignment of existing streets. Where a subdivision borders an existing
narrow street or when the General Plan or Zoning Ordinance indicates plans for
realignment or widening of a street that would require the use of some of the land in the
subdivision, the applicant shall be required to improve and dedicate at his or her expense
the areas for widening or realignment of the streets. The streets shall be improved and
dedicated by the applicant at his or her own expense to the full width as required by these
subdivision regulations. Land reserved for any road purposes may be counted in satisfying
yard requirements of the Zoning Ordinance, whether the land is to be dedicated to the
municipality in fee simple or as an easement for future expansion or as a private street.
10.12.
Non-Vehicular Access. Access to the parkway, arterial and major collector streets
shall be restricted by use of a one-foot, Vehicular Non-Access Easement (VNAE) at
locations other than street intersections and legitimate driveways.
11.13.
Topography: Streets shall be arranged in relation to topography as to produce desirable
lots of maximum utility and streets of reasonable gradient, safe ingress-egress and to
facilitate adequate surface drainage.
C. Design Standards
material, such as Portland cement concrete, concrete pavers, or other materials approved
by the Engineering Division. The surface should be crowned and have the same cross-
slope as the street pavement.
c. Unpaved and Landscaped Medians. These medians are greater than five-feet in width
and are unpaved. Features present in the median, i.e., landscaping, or other types of median
features shall not restrict sight distances per the City Details EM-158 and EM-159.
Mature vegetation size and maintenance should be considered when designing
landscaping in median areas. At no time should landscaping impede on sight distance
triangles.
4. Curbs. All curbs except for mountable curbs shall conform to the appropriate MAG Standard
Detail and MAG Standard Specifications, except that concrete for curbs shall be Class
‘A’ concrete, per MAG Standard Specification 725. For mountable curbs refer to MAG
Standard Detail 220-2, Type E.
a. Vertical Curbs. Vertical curbs are required for all streets. Vertical curbs with gutter are
to be constructed in accordance with MAG Standard Detail 220-1, Type ‘A’. Vertical
curb and gutter shall match the adjacent pavement slope to the gutter cross section
direction. The curb height shown on the Standard Detail is six-inches, but where fire
lane or public maintenance vehicle access to abutting property must be provided, the
curb must be flush with the adjacent grade. must be provided over the curb, use
mountable curb, per MAG Standard Detail 220-2, Type E.
b. Roll Curb, Ribbon Curb, Maricopa Edge. Roll curb is not allowed along local residential
streets unless approved by the City Engineer. If allowed, roll curb shall be constructed
in accordance with MAG Standard Detail 220-1, Type ‘C’. Ribbon curb may be used
for rural local roads or low volume industrial roads when approved by the City
Engineer. If allowed, ribbon curb shall be constructed in accordance with MAG
Standard Detail 220-1, Type ‘B’. When ribbon curb is used, drainage runoff from the
road shall not drain with the road but shall be directed to roadside ditches. See Chapter 4
for additional details. For rural local roads, a Type ‘A’ Maricopa Edge per MAG
Standard Detail 201 may be used when approved by the City Engineer. When a
Maricopa edge is used, drainage runoff from the road shall not drain with the road but
shall be directed to roadside ditches.
c. Cut-Off Walls. In locations where dip sections are permitted to allow drainage flows to
cross roadways, cut-off walls conforming to MAG Standard Detail 552 shall be
installed. Cut-off walls shall be at least three-feet deep and have a top that is flush
with the pavement surface. The exposed portion of the cut-off wall shall have the
appearance of ribbon curb, with the same width as the street’s regular curb and gutter.
The cut-off walls shall extend across the flow path in the dip section to protect the
pavement structure during runoff flows from a 100-year storm event. Transitions will
be needed between the regular curbs and the cut-off walls at each end of the dip
section.
degrees with approval of the City Engineer) on parkways, expressways, arterial streets and
major collector streets; and by a maximum of 4 degrees (15 degrees with special approval of
the City Engineer) on minor and local collector streets and local streets. An oblique street
should be curved approaching an intersection and should be approximately at right angles
at least 100 feet therefrom. Not more than two streets shall intersect at any one point
unless specifically approved by the City Engineer.
2. Alignment and Profile. Intersections occurring on horizontal or crest vertical curves are
undesirable. When there is latitude in the selection of intersection locations, vertical or
horizontal curvature should be avoided. A line or grade change is frequently warranted when
major intersections are involved. If a curve is unavoidable, it should be as flat as site
conditions permit. Where the grade of the through roadway is steep, flattening through the
intersection is desirable as a safety measure.
3. Intersection Sight Distance. In order to provide the opportunity for vehicles at an
intersection to safely cross or make left or right turns onto a through street, adequate sight
distance must be provided. Sight lines are to be drawn on roadway and landscaping plans to
represent the areas that must be free of all objects and topography in excess of 30-inch above
the roadway surface. City Detail EM-158 depicts the technique used to determine driver’s
eye locations; a line is then drawn to connect these two points. Continuous unobstructed
line of sight must be provided along this line and throughout the approach to the intersection,
providing an unobstructed sight triangle to the side street driver. Vegetation placed within
the sight triangle shall be of a low variety that remains below 30-inch when mature. Trees
can be considered within the triangle as long as the canopy is above 7-feet and if it is a single
trunk variety.
a. Right Angle Intersection. If the street intersection legs meet at an angle of 88 to 90
degrees, the sight distances shown in City Detail EM-158 are to be used to calculate the
sight triangle. If high volumes of truck traffic are anticipated on other than local
Industrial Street, the procedures in the AASHTO publication, A Policy on Geometric
Design of Highway and Streets should be consulted to determine the necessary sight
distances.
b. Skewed Intersections. For skewed intersections where the intersection angles are less
than 88 degrees, sight distances must be calculated in accordance with the procedures
described in Chapter 9 of the AASHTO publication A Policy on Geometric Design of
Highways and Streets.
c. Intersections within or near a curve. Distances ‘A’ and ‘B’ shown in City Detail EM-158
shall follow the street alignment when the intersection is within or near a horizontal
curve.
d. Unobstructed View Easements. Unobstructed view easements should be used as a
means to limit the height of structures, vegetation, and other improvements on corner
properties immediately adjacent to intersections. Unobstructed view easements are not to
be used as a substitute for intersection sight distance. Unobstructed view easements
provide additional visibility around corners for all intersection approaches and should be
applied to the design of perimeter walls and landscape features. Items within the
unobstructed view easements shall be no higher than 30-inch measured from the roadway
CHAPTER 4
STORM DRAINAGE FACILITIES - DESIGN AND CONSTRUCTION
4-1
GENERAL INFORMATION
A. Intent
The guidelines contained in this section are intended to expand upon and supplement
information contained in legally adopted Chapters of the El Mirage City Code. The City will
not recommend for approval any plat which does not make adequate provision for storm or
flood water run-off channels or basins.
B. Requirement for Storm Drainage
All developments within the City shall provide such storm drainage facilities as are necessary
to ensure that all improvements, structures and properties, both within the subject
development and those located upstream and downstream of the development, shall be
protected from the adverse impact of storm water due to the proposed development.
Owners, developers, engineers, and/or contractors are required to prepare a Storm Water
Pollution Prevention Plan (SWPPP) for developments within the City of El Mirage with a
disturbed area of one acre or greater, or are part of a common plan of development or sale
that will ultimately disturb one or more acres. The City website contains a SWPPP Guidance
Document to aid in the preparation of a SWPPP. Each development shall comply, as a
minimum, with NPDES notification to the EPA and implementation of SWPPP control
measures, as defined and required by the “Best Management Practices” of the Drainage
Design Manual for Maricopa County.
C. System Classification
1. The "Minor System" (10-year) shall consist of those collection and/or storm water storage
facilities necessary to collect, convey, retain and/or detain storm water runoff from the
more frequent rainfalls. The "Minor System" shall be designed to accommodate storms
up to and including a "10-year storm" and shall be used only when specifically approved
by the City Engineer.
2. The "Major System" (100-year storm of duration as defined by the Drainage Design
Manual for Maricopa County) shall consist of those facilities necessary to convey storm
water runoff from storms up to and including a "100-year storm." It consists primarily of
the planning and/or analysis of the overall drainage system to insure: that there is always
positive drainage from all areas, that the "100-year" flows can safely pass through the
project, and that all structures are above the 100-year water elevation in areas where
temporary and/or long duration ponding may occur as well as those areas lying within the
FEMA floodplain.
D. Drainage Facilities Components
1. Collection System. This portion of the system is intended to collect and convey runoff to
storm water storage, trunk line storm drain facilities and/or outfall into natural and man-
made drainage channel facilities. The storm water drainage system shall be separate and
independent of any sanitary sewer system.
2. Storm Water Storage Facilities. Storm water storage facilities are defined as any
apparatus, device, manmade construction or method for temporarily storing, suspending
storm water runoff and releases by means of basins, channels, swales, wetlands, ponds,
lakes, vaults, cisterns, or any other means approved by the City Engineer. This portion
of the system is intended to retain, detain, store or suspend sufficient volumes of runoff to
minimize the adverse impact of new developments upon downstream areas. All
developments must provide storm water storage facilities, which consist of one or both of
the following as provided below:
a. "On-Site" facilities, for private property to be maintained by the property owner or
owner’s association are required for any or all of the following types of
developments.
(1) Apartment complexes
(2) Town homes, Condos, Patio Homes and/or locations where a Homeowners
Association will maintain the common area and drainage facilities.
(3) Large lot Single Family parcels, where the lot is at least one-half acre or larger.
(Note: this is an option in lieu of "off-site or public facilities").
(4) Industrial Developments including Subdivisions (Note: this is an option in lieu of
"off-site or public facilities").
(5) Commercial Developments including Commercial Subdivisions.
(6) Any lot being developed, permanently or temporarily, for any purpose, including
materials or commodity storage, parking, open space, structures of any kind or
temporary use consistent with the Zoning Code.
b. "Off-Site" facilities, for projects in a separate tract dedicated, as “Public Drainage
Easements”, to the City and to be maintained by an association of owners, are
required of the following types of development:
(1) Single-Family lots (regardless of acreage) that are part of a subdivision.
(2) Planned Area Developments (PAD) or other large master planned developments.
c. Storm water storage facilities shall be protected from further development by a
recorded drainage easement and must be fully improved with landscaping, irrigation
systems, lighting and such other aesthetic improvements as may be required by the
City. Any basin, which is accepted by the City for maintenance, shall be deemed
public property and shall be dedicated to the City in fee simple title. If the City does
not accept a basin for maintenance, the developer shall be responsible for establishing
some satisfactory means to maintain the area.
3. Open Channels. Channels consist of facilities that collect, store, suspend, convey and
discharge accumulated runoff by means respectively described as follows:
a. Natural Channels: Are described as Rivers, washes, arroyos, lakes, wetlands, or other
“volume provided”.
b. All storm water storage facilities are required to provide sufficient volume to retain
100 percent of the 100 year, 1-hour storm (must use 2.4 inches) for the sub-basin that
it serves. The routing of storm drainage for the development shall be through the
storm water storage facilities.
Detention style storm water storage facilities shall be designed for the volumes and
discharge rates as defined by the Flood Control District of Maricopa County for
purposes other than a storm water storage retention function. Design of the facilities
shall meet the criteria of the appropriate recommended procedure level defined by the
ADWR “State Standard for Stormwater Detention/Retention”, SSA8-99 (or current
version).
c. A drainage easement shall be recorded over the tract or parcel containing each storm
water storage facility within the project for both "public" and "private" facilities. The
drainage easement shall include a 20-foot access easement from a paved surface. For
publicly maintained basins, channels and other drainage facilities, the 20-foot access
easement shall connect to a public street.
d. For the complete half right-of-way area of adjacent streets and parkways, a storm
water storage facility located outside of the right-of-way, is required to provide the
equivalent calculated volume required to retain one hundred percent of the 100-year,
1-hour storm (2.4 inches) for that area. The basin is not required to intercept that
right-of-way flow unless required by the City.
e. Storm Water Storage facilities shall not be located within public rights-of-way, water,
sewer or utility easements.
f.
Two or more developers may join together to provide a common retention facility. A
letter of agreement signed by all developers participating in the common retention
area must be presented to the City Engineer, and the recorded plat shall indicate that
the retention area is a joint facility. The joint retention area must meet all criteria as a
single area.
e.g. No 100-year flow line shall encroach upon the minimum building setback line.
4-2
TECHNICAL DESIGN REQUIREMENTS - STORM DRAINS
A.
Drainage
1. Street Drainage.
a. The basis of design for local streets shall be designed to carry the 10-year storm
being contained within the pavement section with a maximum depth of 6-inches.
b. Streets shall be designed to carry the following minimum flows:
(1) Major and minor arterial streets to carry a ten-year flow between the curbs and
maintain a 12-foot dry lane in each direction; and carry the 100-year flow within
the right-of-way with a maximum depth of 6-inches over the crown of the street,
for emergency vehicles and evacuation purposes.
c. Spacing - The maximum spacing for manholes, catch basins or junction structures
along a storm drain main line shall be:
(1) 400-feet on lines 18-inch to 36-inch diameter
(2) 550-feet on lines over 36-inch in diameter
3. Catch Basin, Scuppers, Spillways, Inlets and Outlets.
a. Catch basins are to be curb opening inlets. Curb opening catch basins shall be
constructed per City of Phoenix Detail P-1569MAG Detail 542.
b. Drywells, area drains and non-curbed catch basins with grates, within vehicular
traffic areas, shall provide a heavy-duty H-20 bicycle safe grate.
c. In addition, construction of all catch basins, scuppers, spillways, inlets and outlets
shall include installation of inlet markers per City Detail EM-559.
d. Catch basins located within commercial or industrial developments that handle, store,
dispense, sell, recycle, or dispose of motor vehicle fuels or lubricants shall be
designed to include storm drain inlet protection best management practice devices as
identified in the FCDMC Drainage Design Manual.
e. Catch basins and drywells can be used as junction structures providedprovided, they
meet and achieve the hydraulic requirements of Section 4-2.A.6, and that the pipe
sizes do not exceed the recommendations of the inlet or catch basin standards.
Connections to drywells must also meet environmental requirements conforming to
the NPDES.
4. Tracer Wire.
Tracer Wire shall be installed per MAG Specification 616.4.1. Material shall be per City
Detail EM-101-12. Installation shall be per City Detail EM-162.
4-3
TECHNICAL DESIGN REQUIREMENTS - STORM WATER STORAGE FACILITIES
A. Sizing
1. Basis of Design.
a. All storm water storage facilities shall be sized to retain 100% of the 100-year, 1-
hour storm (must use 2.4 inches) falling over the entire project site including the total
adjacent half right(s)-of-way. For the purpose of determining the volume required the
project shall be considered to extend to the centerline of all existing and future streets
on the exterior boundaries and to include all interior streets and other rights-of-way
within the project.
b. Freeboard. There shall be a 1-foot (12-inch) freeboard from the basin overflow water
surface elevation to the lowest adjacent building elevation and/or equal to the gutter
of the upstream streets. The freeboard for all project building floor elevations shall be
a minimum of fourteen inches (14-inch) above the project outfall water surface
elevation. The project site outfall elevations must be considered to be lower than an
individual on-site basin overflow elevation or the effective depth of the basin is
measured to the outfall elevation.
c. Run-off Factors. The following run-off factors shall be used when determining the
runoff coefficient. Any materials not shown below can be taken from the "Drainage
Design Manual for Maricopa County, Arizona, Volume II Hydraulics" published and
sponsored by the Flood Control District of Maricopa County.
Material
Coefficient
Concrete Pavement (concrete, brick, etc.)
0.95
Roof/Asphalt
0.85
Grass
0.15
Desert Lawn/Gravel
0.70
b.
2. Volume. The following data shall be provided for each storm water storage facility:
a. Volume Required. The volume required in cubic feet shall be computed using the
methods of the "Drainage Design Manual for Maricopa County, Arizona, Volume II
Hydraulics" published and sponsored by the Flood Control District of Maricopa
County. With few exceptions, the City’s developments should be considered urban
with respect to percentage of impervious cover.by:
a.
Volume Required = (2.4 in/12) x (Drainage Area) x (Average Runoff Coefficient)
3. Volume Provided. The volume provided shall be submitted in a table noting the stage-
capacity relationships. Storm Water Storage Facilities shall be located such that they can
intercept the flows from the entire site. If the basin is located other than at the lowest
point of the project, the Design Engineer shall denote on the master drainage map the
actual or effective drainage area. If portions of the project cannot drain to the primary
basin, additional basins shall be added to retain/detain runoff from these areas. The City
Engineer may make exceptions on a case by case basis.
4. The sub-drainage areas for each basin shall be denoted on the plans and the calculations
for each sub-basin storm water storage required shall be provided. Overflow from any
sub-basin may be safely routed to another sub-basin, to ultimately be contained in the
compilation of storm water storage provided. The storm water storage provided shall
contain 100% of the 100-year, 1-hour storm event, as actually routed through the
development. Over sizing (having a capacity greater than the possible capture volume) of
intermediate basins will not be considered for the provision of storm water storage
required beyond the volume of the contributing area.
5. Underground or concealed storm water storage facilities may be considered on a case by
case basis. Installation of approved underground facilities shall conform to Section 4-
2.A.8 and City Detail EM-406.
6. The High Water Level (HWL) shall be denoted on the plans for each basin or ponding area.
The basin depth (overall average depth) shall be measured from the lowest point to the
elevation of the basin overflow. This is not to be considered the water surface elevation of
the basin’s storm water storage depth (HWL) for the period storm event. The HWL elevation
shall be designed to prevent damage of public improvements and minimize damage of site
improvements, such as paving, structures, utilities, walls, landscape, signs and light
standards.
7. No 100-year flowline shall encroach upon any minimum setback line.
8. The Outfall elevation and each basin Overflow elevation shall be shown on the plans.
9. Storm Water Storage facilities located within a drainage way, channel way or floodway are
prohibited.
a.
The High-Water Level (HWL) shall be denoted on the plans for each basin or ponding
area. The basin depth (overall average depth) shall be measured from the lowest point to
the elevation of the basin overflow. This is not to be considered the water surface
elevation of the basin’s storm water storage depth (HWL) for the period storm event. The
HWL elevation shall be designed to prevent damage of public improvements and
minimize damage of site improvements, such as paving, structures, utilities, walls,
landscape, signs and light standards.
b.
The Outfall elevation and each basin Overflow elevation shall be shown on the plans.
c. Storm Water Storage facilities located within a drainage way, channel way, or floodway
are prohibited.
B. Grading
1. Depths.
a. The overall average depth shall not exceed 3-feet without authorization of the
City. If granted, the side slopes shall be flattened (See 4-3.B.2.(a)(3)). At the
City's option, the basin may be fenced to allow steeper side slopes or greater
depths.
b. In no case shall the water storage depth exceed 1.0 foot without a positive means
(not relying on evaporation) of disposing of accumulated runoff. Soils
Investigation Reports and testing in accordance with Section 4-3.B.8.b.(3) must
demonstrate that the facility is able to drain the first 1.0 foot of storage in
accordance with the City’s requirements, otherwise a positive means of disposing
accumulated runoff in accordance with these provisions, will be required.
2. Slopes, Side and Bottom.
a. The bottom of all basins shall be sloped towards the discharge points. The
minimum bottom slope shall be 0.1%.
(1) Side Slopes. Side slopes adjacent to public rights-of-way, within a Public Utility
Easement or when there is pedestrian type access to that portion of the basin, shall
have a side slope of 6:1 or flatter. There shall be at least 2-feet of level ground
between the back of the sidewalk and the beginning of the side slope grading.
(2) When a basin is adjacent to walls, fences, and hedges, etc. (i.e., no or limited
pedestrian type access in that area) the side slopes may have slopes up to 4:1 if
adjacent to public right-of-way or easement and 3:1 if adjacent to private
property. There shall be at least two feet of level ground adjacent from any wall or
vertical obstruction to the top of the side slope grading.
(3) Greater water depths will require flatter side slopes and approval of the City. The
following depth/side slope criteria shall be used:
Depth (feet)
Side Slope
< 34
4:1
34-6
6:1
6-9
10:1
> 9
14:1
(4) Retaining walls (i.e., vertical slopes) may be used in areas adjacent to permanent
walls, fences, etc., with specific written request to the City Engineer and written
acknowledgment by the City. The horizontal separation of a retaining wall from a
building, wall or fence shall be at least equal to the height of the retaining wall but
in no case less than 4-feet. There shall be at least 2-feet of level ground adjacent to
any building, wall, fence or vertical obstruction to the top of the side slope grading
between the retaining wall and such building, wall, fence or vertical obstruction. The
grade of the balance of the slope between such retaining wall and a building, wall,
fence or vertical obstruction shall not exceed 4:1.
(5) Concrete or grouted rip rap slope erosion protection and splash pad, a minimum of
9- inches in thickness, shall be provided when street runoff is collected and
conveyed to the basin(s) via a storm drain, scupper, weir or spillway. The width of
the slope protection shall be at least the width of the scupper or weir, but have a
minimum width of 10-feet. The slope protection shall be channelized to contain the
calculated flows and shall terminate at a level concrete splash pad or grouted rip rap
within the basin, a minimum of 10-feet beyond the termination of the spillway and
5- feet beyond each side of the spillway. The City may reduce these criteria when
flow quantities and velocities may warrant.
(6) Side slopes adjacent to public right-of-way or easement where pedestrian access is
permitted via sidewalks, trails or paths shall not exceed 6:1.
(7) Refer to Chapter 3, Section 3-2 A.2. for required Safety Railings.
3. Basin Access. The following access provisions shall apply to water storage basin and
drainage channel construction. Access shall be provided for each storm water storage
facilities to be maintained by the City. Provide a driveway entrance, 10-feet of level
ground, and a 10:1 ramp, 10-feet (min.) in width. The basin access shall be a minimum of
2-inches compacted decomposed granite over 6-inches of compacted ABC. The ramp
shall be concrete, 9-inch in thickness with a surface that provides appropriate traction.
4. Grading and Landscaping. Storm water storage facilities shall be landscaped in
accordance with the El Mirage Zoning Ordinance. Basins maintained by the City shall
incorporate the use of drought tolerant plant material with the ground surfaces being
covered with decomposed granite, river rock or other type of decorative rock. Basins may
incorporate the use of other planting including turf. Turf areas shall be kept to a minimum
and will be reviewed with respect to promote water conservation. The maximum side
slope for turf areas shall be 6:1. The use of turf shall be in compliance with the percent of
site area criteria for allowable turf area.
The perimeter of basins and channels shall incorporate a means of preventing erosion
caused by uncontrolled drainage reaching and damaging side slopes. To prevent rills,
head-cutting and other adverse erosion a berm, swale or combination of these features
shall be incorporated to guide accumulated side flows safely into the basin or channel
method, subject to the following:
(a) Bleed-off meeting conditions described in 4-3.B.8.b.1 cannot be met.
(b) Drywells shall penetrate a minimum or 10-feet into permeable soil, defined
as mostly cobbles and gravel with no material passing a no. 40 sieve.
(c) The minimum number of drywells per storm water storage facility shall be
computed and noted in the drainage report. During design, it is recommended to
use an estimated percolation rate of 0.1 cfs per drywell.
(c)(d)
During construction, Aan actual well percolation test(s) shall be
performed, and the resultant design disposal rate shall not exceed 50% of the
rate determined by the test, in order to compensate for deterioration of
percolation rates over time. Only one test will be required if all dDrywells in
the area have similar soil boring logs otherwise one test per basin shall be
performed. If multiple test are performed, the lowest percolation rate shall be
used. Copies of any percolation tests must be submitted to the City. If the
actual test results allow for a reduction in the amount of drywells to be
installed, the Developer may submit a formal request to the City.
(d)(e)
Percolation tests shall conform to ASTM D3385-94 or D5093-90.
(e) The minimum number of wells per storm water storage facility shall be
computed and noted in the drainage report.
(f) Drywell drilling log(s) and a copy of the completed Arizona Department of
Environmental Quality Drywell registration(s) will be required before project
can be accepted.
(g) All dDrywells are to be equipped with a secured grate to prevent
unauthorized removal.
(h) Drywell rims shall be set a minimum of 0.3 feet above finished grade of the
basin bottom.
(h) Infiltration into a drywell cannot be considered to reduce the size of the
retention area. The property owner of record shall be responsible for the
design, performance, operation, or maintenance of dry wells used with on-
site retention.
(4) Runoff generated from washing vehicles and equipment shall conform to
“Arizona Department of Environmental Quality – NOI supplement for Type 3.03
General Aquifer Protection Permit for Vehicles and Equipment Washes” (A.A.C
R18-9-D303).
(5) Drywells that drain areas at motor fuel dispensing facilities where motor fuels are
stored or loaded, shall conform to “Arizona Department of Environmental
Quality – NOI supplement for type 2.04 General Permit. Protection Permit for
Vehicles and Equipment Washes” (A.A.C R18-9-D303) and Arizona
Administrative Code R18-9-C301. In addition, the design of the system shall be
fully automated (human intervention not required) and shall not depend on a
power source.
(6) Drywells that drain areas where hazardous substances are used, stored, loaded or
treated, shall conform to “Arizona Department of Environmental Quality – NOI
supplement for Type 2.01 General Permit and Arizona Administrative Code R18-
9-C301. In addition, the design of the system shall be fully automated (human
intervention not required) and shall not depend on a power source.
9. Nuisance Water. Each basin, particularly those used as a park or play area, shall be
graded such that there are one or more "sump" areas wherein runoff from the more
"frequent" storms and nuisance runoff may be retained/detained without flooding the
CHAPTER 5
WATER INFRASTRUCTURE DESIGN AND CONSTRUCTION
The standards set forth in Chapter 5 are for improvements within the City of El Mirage Water Service
Area. Any improvements proposed within the EPCOR Water Service Area shall adhere to the standards of
EPCOR. The Water & Sewer Service Area Map in the Appendix P show the boundaries of the Service
Areas. Most improvement plans for projects within the EPCOR Water Service Area will still need to be
reviewed by the City. Applicants can contact the El Mirage Engineering Division at 623-972-8116 to
verify.
5-1
GENERAL INFORMATION
A. System Design Criteria
The criteria for development of water infrastructure in the City of El Mirage shall
be in conformance with:
1. The most current edition of the El Mirage Water and Wastewater Master Plan. All new
construction shall comply with the Master Plan.
2. The Arizona Department of Environmental Quality (ADEQ) Engineering Bulletin 10.
3. International Fire Code, approved edition.
3.4. The Water System Design Criteria provided in Appendix Q of this Manual.
4.5. The design engineer is responsible for evaluating site specific design conditions.
5.6. All other applicable City, State, County and Federal Codes and Guidelines.
B. Requirement to Connect
All developments, including single-family residences, are required to connect to the City’s
water system. The connection to the City’s water system and the extension of the waterline
per City requirements are a condition of issuance of a building permit.
Waivers to this requirement may be granted by the Utilities Director if the connection is
determined not to be feasible. A connection may be considered “not feasible” according to
the following:
1. Single lot developments if such development is on a major arterial road.
2. The extension of the waterline is greater than 1320-feet from the City water system.
3. The applicant demonstrates the inability to obtain necessary easements upon reasonable
pursuit.
C. Water System Facilities
Water System Facilities include the: wells, recovery wells, booster stations, inline boosters,
pressure reducing valves, lift stations, reservoirs, treatment facilities, and all other
appurtenances required for proper treatment, conveyance, and service of water within the
system.
It is the responsibility of the design engineer to review the most current edition of the Water
and Wastewater Master Plan and determine what additional water infrastructure is necessary
to serve the proposed development. The Public Works Department will utilize the most
b. All waterlines 12-inch and larger must be shown in plan and profile.
c. To increase clarity, profiles of 8-inch waterlines may be required at the request of the
plan reviewer.
3. Encasement or Casing
Extra protection per MAG 610.5.5, MAG Standard Detail 404 and City Detail EM-402 is
required:
a. Where cover is less than 4-feet due to topography or potential conflicts with facilities
such as canals, washes, or rivers.
b. Where the bottom of pipe of the water line is between one to two feet above the top
of pipe of any irrigation, storm drain, sanitary sewer, force main or other gray water
pipe.
c. Where the top of pipe of the water line is greater than 2-feet below any irrigation
pipe, storm drain, sanitary sewer, force main or other gray water pipe. No water lines
are allowed to be located less than 2-feet below the bottom of the irrigation, storm
drain, sanitary sewer, force main or other gray water pipe.
d. Where waterlines pass under a significant structure greater than 10-feet wide such as
box culverts, railroads, highways, canals, etc. The waterline(s) shall be installed
inside a pipe casing as approved by the Engineering Division.
e. As deemed necessary by the plan reviewer.
F. Design Requirements
1. Fire hydrant runs in excess of 100-feet in length require 8-inch diameter waterlines and
additional valves.
2. Fire hydrants shall be installed on all dead-end lines as close to the end as possible.
3. The maximum length for a dead-end waterline is 400 feet unless approved in writing by
the Engineering Division.
4. Combination Air/Vacuum release valves shall be installed at high points in the waterline
and where the waterline changes slope or as required by the Engineering Division. The
valves shall be installed per City Detail EM-395.
5. The City of El Mirage water testing standards require at least 1 water sampling station per
developed square mile. New residential developments are required to construct the water
quality sampling stations. Sampling station frequency and location will be coordinated by
the Public Works Department during plan review.
6. Water systems shall be designed for the ultimate tributary area. The unit design flows,
peaking factors and other system standards are provided in the Water System Design Criteria
located in the Appendix Q of this Manual.
5.
6.7. Existing Waterlines to be Removed or Abandoned. Water pipes shall be removed or
abandoned according to City policy as outlined in Chapter 1.
a. Removal of asbestos cement pipe (ACP) shall be in accordance with EPA National
Emission Standard for Hazardous Pollutants (NESHAP), ADEQ and MCESD
requirements.
b. If abandonment is allowed submit abandonment plans to include filling procedure for
filling the abandoned pipe and the proposed slurry mixture to be used. All abandoned
pipes must be shown on the as-built drawings and marked appropriately.
7.8. Tapping Sleeves
a. Tapping sleeves are not allowed on deficient pipe sections. Replace the pipe section
with ductile iron pipe and fittings as needed.
b. Tapping sleeves are allowed to be installed on ductile iron waterlines 12-inch and
less in diameter in good condition. Tapping sleeves are not allowed to be installed on
waterlines 16-inch or larger. Any exceptions must be approved in writing by the
Engineering Division.
c. Size on size taps are not allowed. Any exceptions must be approved in writing by the
Engineering Division.
8.9. Thrust Restraint
a. Mechanical Thrust Restraint may be provided with U.S. Pipe TR FLEX, Griffin,
SNAP-LOK RJ pipe or American Ductile Iron Flex-Ring Joint Pipe. Joint restraint
may be provided with Meg-a-Lug or equivalent, as approved by the Engineering
Division.
b. Thrust Blocks will be concrete only per City Detail EM-301 and MAG Standard
Details 340, 380 and Class “B” concrete per MAG Specification 725.
c. Both mechanical restraint and thrust blocks are required.
9.10.
Pipe Bedding Requirements
Refer to City Detail EM-406. Bedding compaction densities shall be per MAG
Specification Table 601-2. Specially designed and alternate bedding may be approved on
a case by case basis by the Engineering Division.
10.11.
Trench Backfill Requirements
Refer to City Detail EM-406 minimum trench backfill requirements shall be Type I per
MAG Specification 601.4.3, with compaction densities per MAG Specification Table
601-2. Backfill requirements provided by the design engineer shall apply when such
be done by contractor including chlorination and testing requirements that apply to this
type of work. Contractor shall not operate valves. Representatives of the Public Works
Department are the only personnel authorized to operate water valves on the City’s
existing water system.
3. Switch-overs and Abandonments. Work will be done by contractor after written
authorization by the Public Works Department.
4. Asbestos – Cement Pipe (ACP). All work on asbestos-cement pipe shall be in accordance
with AWWA 20406 Work Practices for Asbestos Cement Pipe and OSHA’s Asbestos
Standard for construction, 1926.1101. Methods that intentionally cause ACP to shatter,
crumble, be pulverized or release asbestos fibers are prohibited including sanding,
sawing, grinding, chipping and the use of power tools.
5-4
FINAL DOCUMENT SUBMITTALS
A. Plan Approvals
1. Plans shall be prepared per Chapter 1 of the DDSM.
2. Utility Reports – Utilize the Water System Design Criteria provided in Appendix Q of
this Manual.
Preliminary Water and Sewer Analysis Report This is used to determine the potential
impact that the development would have to the existing water and sewer infrastructure.
This report will also be used to verify that the proposed density and water use of the
proposed development is consistent with the City’s general plan and the City’s water
allocation for the proposed parcel.
Final Water Network Analysis- Required for all sites in which water main is extended/
looped in order to service the proposed development, in areas identified as having
problematic or low pressures, or for buildings that have an unusually high-water demand.
The modeling in this report will be used to verify that adequate service and fire flows can
be obtained with the proposed waterline construction.
Master Water and Master Sewer Reports- When required this report should show the
infrastructure required for the utilities in the development to function per City of El
Mirage standards. Individual Final Water and Final Sewer Reports will be required for
each parcel at the time of submittal. Individual phased reports should be consistent with
the data, calculations, and assumptions shown in the Master Reports. Refer to Chapter 6
for additional information regarding Sewer Reports.
3. The completed Approval to Construct (ATC) application with signatures should be
submitted during plan review. Sign-off from the “public water supply provider” on page
2 of 3 the Approval to Construct (ATC) will be issued by the Engineering Division after
the ATC application has been submitted and will not be provided until the utility plans
are substantially approved.
4. A copy of the Approval to Construct (ATC) issued by Maricopa County Environmental
Services Department (MCESD) and the cover sheet signed by MCESD must be submitted to
Engineering prior to receiving final plan approval from the City.
CHAPTER 6
WASTEWATER INFRASTRUCTURE DESIGN AND CONSTRUCTION
The standards set forth in Chapter 6 are for improvements within the City of El Mirage Sewer Service
Area. Any improvements proposed within the EPCOR Sewer Service Area shall adhere to the standards of
EPCOR. The Water & Sewer Service Area Map in the Appendix P show the boundaries of the Service
Areas. Most improvement plans for projects within the EPCOR Sewer Service Area will still need to be
reviewed by the City. Applicants can contact the El Mirage Engineering Division at 623-972-8116 to
verify.
6-1
GENERAL INFORMATION
A. System Design Criteria
The criteria for development of wastewater infrastructure in the City of El Mirage shall be in
conformance with:
1. The most current edition of the El Mirage Water and Wastewater Master Plan. All new
construction shall comply with the Master Plan.
2. The Arizona Department of Environmental Quality (ADEQ) Aquifer Protection Permit
and Arizona Pollution Discharge Elimination System regulations.
2.3. The Wastewater System Design Criteria provided in the Appendix Q of this Manual.
3.4. The design engineer is responsible for evaluating site specific design conditions.
4.5. All other applicable City, State, County and Federal Codes and Guidelines.
B. Requirement to Connect
All developments, including single-family residences, are required to connect to the City’s
wastewater system. The connection to the City’s wastewater system and the extension of the
public sanitary sewer are required for all new construction or for modifications to existing
disposal systems.
Waivers to this requirement may be granted if the public sewer is determined to not be
available to the subject property. A public sanitary sewer can be considered “not available”
according to the following:
1. The extension of the sanitary sewer is greater than 1320-feet from the City wastewater
system for a multi-family, commercial or industrial site or within 300-feet and directly
adjacent to a single-family residential lot (see City Code Section 51.049).
2. The applicant demonstrates the inability to obtain necessary easements upon reasonable
pursuit.
3. There is not adequate capacity or depth in the existing public sanitary sewer.
C. Wastewater System Facilities
Water System Facilities include the: lift stations, force mains, chlorine flushers, odor control
sites, and all other appurtenances required for proper treatment, conveyance, and disposal of
wastewater within the system.
It is the responsibility of the design engineer to review the most current edition of the Water
and Wastewater Master Plan and determine what additional wastewater infrastructure is
necessary to serve the proposed development. The Public Works Department will utilize the
most current edition of the Water and Wastewater Master Plan and operational knowledge of
the system to determine which facilities or upgrades are the requirements of the new
development.
D. Exceptions to the Design Guidelines
Any exceptions to Chapter 6 of the Design Guidelines must be approved in writing by the
Public Works Department or their designees.
6-2
DESIGN STANDARDS
A. General
1. Materials. Refer to City Detail EM-101-12 for allowable materials. The design engineer
must specify the exact pipe material in the construction drawings that are in accordance
with the City approved pipe materials. Modifications to the pipe material will require a
formal plan revision and must be approved by the design engineer and the City of El
Mirage.
2. Conveyance. Rights-of-way and easements shall be dedicated prior to any construction or
with the Final Plat of the development.
3. Pavement Replacement. Pavement replacement type and compaction type shall be
indicated per MAG Standard Details and Specifications on each sheet or as modified in
the City of El Mirage General Notes.
B. Classification of Sewer Lines
The City's sewer system includes four classifications of wastewater lines, which are
determined by use or location within the system, identified below: Wastewater lines shall be
sized to accommodate their ultimate service area. Larger mains may be required dependent
upon the maximum flows anticipated with full development of the ultimate service area, with
additional consideration given to land use. The minimum size line for any public main is 8-
inch diameter. Non standardNonstandard sizes will not be allowed unless approved by the
Public Works Department.
1. Service Line. The public sewer pipe that extends and connects the customer’s private
building sewer to the lateral sewer.
2. Lateral Sewer. A sewer pipe that collects flow from one or more services and discharges
to another lateral sewer or a trunk sewer.
3. Trunk Sewer. A sewer pipe that receives flow from lateral sewers and connects to an
interceptor sewer. Trunk sewers are generally 15” in diameter and larger. Trunk sewers
may have some limited connections to services.
4. Interceptor Sewer. A large sewer pipe that receives flows from a number of trunk sewers,
and lateral sewers, and conveys such wastewater to a point for treatment or disposal. No
service connections are allowed into interceptor sewers.
4.5. Cleanouts and lampholes will not be permitted.
C. Location of Sewer Lines
1. Limited Access Parkway - sewer main alignment shall be reviewed individually.
2. Arterial streets - sewer mains shall be offset from the street centerline 13-feet south or
west.
3. Collector streets - sewer mains shall be offset from the street centerline 6-feet south or
west.
4. Local streets - sewer mains shall be offset from the street centerline 6-feet. For
curvilinear streets the offset from the street centerline can range from 6 to 9-feet south or
west.
5. Generally, the intent is to avoid locating the manhole covers so that wheel line of normal
traffic does not track over the casting. The location for the covers and lids should not be
closer than 6-feet from the street drainage flow line or gutter line.
6. All sewers shall be parallel to the centerlines or as close to parallel as possible.
7. In cases where public sewers are authorized outside of public rights-of-way, all such
sewers shall be centered and parallel to the property lines or as close to parallel as
possible.
8. Vertical and horizontal separation from water lines shall be in accordance with MAG
Section 610.5, MAG Standard Detail 404-1 and City Detail EM-402.
9. No part of any manhole shall be located any closer horizontally than the depth of cover or
6-feet, whichever is greater, from any wall, fence or structure, etc.
10. Public sewer lines will not be permitted within the limits of retention/detention basins.
11. Sewer service lines shall not be located under driveways or under concrete aprons
adjacent to driveways.
12. Private sewer lines are not recommended to be placed beneath retention/detention basins.
D. Easements
1. Sewer easements are to be dedicated for the specific use, maintenance and repair of the
sewer line, and any associated appurtenances. Sewer easements are to be dedicated as
part of a Final Plat or by separate instrument with written approval from the Engineering
Division.
2. Sewer lines shall be located within public rights-of-way or centered within a 20-foot wide
easement dedicated for sewer line, or within a 30-foot wide easement (minimum width)
dedicated for both water and sewer lines. Larger easement widths with a minimum clear
width equal to twice the depth of cover will be required for deeper installations as
determined by the Public Works Department or Engineering Division.
3. No other parallel utilities shall be located within the public water or sewer easement.
4. Underground retention and above ground retention basins are not permitted to cross or be
within designated public water or public sewer easements.
5. Trees and substantial plantings are not permitted within designated public water or public
sewer easements where the easement provides primary access to the utilities. Plantings
must typically be at least 5’ from the centerline of the pipeline.
E. Cover and Depth
1. Maximum depth for sewer lines and manholes shall be 12-feet unless detailed loading
calculations and materials selection is approved with the written request by the
Developer’s Design Engineer to the Engineering Division and with written approval by
the Public Works Department. The proposed design shall be submitted to the Engineering
Division for review.
2. When connecting to an existing manhole, verify that there is an existing base and channel
to accommodate the new sewer connection. If necessary, construct a new manhole base
with channel in the existing manhole.
3. All lateral sewer mains s shall have a minimum of 35-feet of cover measured from
finished grade to the invert top of the mainlateral. During construction the depth of cover
may be less than 35-feet, such as during preparation of street sub-grade, installation of
foundations, culverts or utilities.
4. All trunk sewers and interceptors shall have a sufficient depth to serve the ultimate
service area with a minimum cover of 6-feet.
5. Encasement or Casing
Extra protection per MAG 610.5.5 and Standard Detail 404 is required:
a. Where cover is less than 4-feet (due to topography or potential conflicts with
facilities such as canals, washes, or rivers).
b. Where the bottom of any irrigation, storm drain, sanitary sewer, force main or other
gray water pipe is less than 2-feet over the top of the sanitary sewer.
c. Where a sanitary sewer crosses less than 2-feet above any water line, force main or
pressure main.
d. Where wastewater lines pass under a significant structure greater than 10-feet wide
such as box culverts, railroads, highways, canals, etc. The sewer line(s) shall be
installed inside a pipe casing as approved by the Engineering Division.
e. As deemed necessary by the plan reviewer.
F. Slopes and Design Flows
1. Pipe slopes are to maintain a minimum mean flow velocity for pipes flowing full of 2.0
feet per second for all diameters. The maximum mean flow velocity for pipes flowing full
is 8 feet per second.
The minimum slope for an 8-inch sewer line is 0.33% (0.0033 feet per foot). Minimum
slopes for larger diameter sewer lines shall follow Table 3 of City Code Section 155.056(D).
2. The minimum slope per sewer size is as follows:
Sewer Size (Inches)
Minimum Slope (%)
8
0.34
10
0.25
12
0.20
15
0.15
18
0.12
21
0.10
24
0.08
2.
3. At “end of the line” sewers (the portions of sewer lines between the last two manholes),
theThe slope of sewers serving less than 30 households (or the equivalent of 30
households) shall be 0.76%. The, and “end of the line” sewers (the portions of sewer
lines between the last two manholes), that of sewers serving less than 10 households (or
the equivalent of 10 households) shall be 1.00%.
4. The “n” value of the pipe shall be 0.013 for all new construction.
5. Sanitary sewer systems should be designed for the ultimate tributary area. Sewer capacities
should be adequate to handle the anticipated maximum hourly quantity of sewage and
industrial waste together with an adequate allowance for infiltration and other extraneous
flow. The unit design flows, peaking factors and other system standards are provided in the
Wastewater System Design Criteria located in the Appenidx of this Manual.
4.
G. Design Requirements
1. Tie-ins to Existing System. Construction plans shall call for the contractor to tie-in new
requirements and if approved by the Engineering Division. Construction of drop
manholes shall comply with City Detail EM-426.
2. Spacing & Locations
a. Manholes are required at all changes in grade and alignment.
b. Maximum manhole spacing shall be:
400-feet for less than 18-inch sewers
500-feet for 18-inch or larger
c. A manhole shall be placed on the upstream end of all sewer lines. If sewer system is
to be phased, a stub shall be provided. The stub shall be capped and plugged.
d. Manholes are required at the following locations:
•
All changes in grade or slope.
•
All changes in pipe size.
•
All changes in alignment.
•
All pipe intersections other than service connections less than eight
inches in diameter.
•
All service connections eight inches in diameter and larger.
•
At the end of each sewer line.
e. Manholes shall not be located in washes or retention/detention basins
f.
Clean-outs are prohibited. Existing clean-outs shall be removed and replaced by
Developer with a manhole per these guidelines.
I.
Sewer Taps
1. Materials and Details
a. New sewer taps and sewer service piping shall be per City Detail EM-440. See the
Materials List, City Detail EM-101-12, for allowable materials. Tap location shall be
supplemented by a curb stamp per MAG Standard Detail 440-4 (stamped S on top of
the curb).
b. Taps are not allowed into manholes unless approved by the Engineering Division.
c. A 3-foot minimum separation between service taps is required. A 5-foot minimum
separation between a service tap and the outside diameter of a manhole is required.
d. All taps shall be stationed using the closest downstream manhole as station 0+00.
e. All taps shall be perpendicular to the lateral.
2. Closed Circuit TV (CCTV) Inspection. Perform CCTV inspections in accordance with
NASSCO’s Pipeline Assessment Certification Program. CCTV inspections shall be
provided in digital (DVD) format utilizing a measuring device ahead of the camera to
identify deflections in the line. Measuring device shall be able to measure water depth
from 0-2 inches in ¼ inch increments.
3. Epoxy Coating Systems. Perform inspections and testing according to City specifications.
Administer adhesion testing for the underlayment and the finished coating system.
Perform spark testing for all surfaces of the complete installation in accordance with
ASTM D-4787.
D. Protection of Monuments
The Developer is responsible for protecting and restoring if damaged, construction survey
stakes and property corner monuments used by the City to locate the service lines.
E. Existing Wastewater System Requirements
1. Sewer Service Installations. Requirements for lowering, extending and relocating sewer
service lines are as follows:
a. A construction permit is required for any work on the City system regardless of the
location of the facility. Construction permits can be obtained through the
Engineering Division.
b. The Contractor’s representative shall be responsible for customer notification.
2. All building sewers and service line installations shall be completed by a qualified
licensed contractor and comply with current City of El Mirage Standard Details and the
latest edition of the International Plumbing Code Chapter 10.
3. Switch-overs and Abandonments. Work will be done by contractor after written
authorization by the Public Works Department.
6-5
FINAL DOCUMENT SUBMITTALS
A. Plan Approvals
1. Plans shall be prepared per Chapter 1 of the DDSM.
2. Utility Reports – Utilize the Wastewater System Design Criteria provided in Appendix Q of
this Manual.
Preliminary Water and Sewer Analysis Report - This is used to determine the potential
impact that the development would have to the existing water and sewer infrastructure.
This report will also be used to verify that the proposed density and water use of the
proposed development is consistent with the City’s general plan and the City’s water
allocation for the proposed parcel.
CHAPTER 8
DESIGN STANDARDS ACKNOWLEDGEMENTS
1.
City of Peoria. City of Peoria Engineering Standards Manual. Retrieved from
https://www.peoriaaz.gov/home/showdocument?id=1916
2.
City of Peoria. City of Peoria Supplement to Maricopa Association of Governments Uniform
Standard Details. Retrieved from https://www.peoriaaz.gov/home/showdocument?id=1928
2.3.
City of Peoria. Site Development – Minor Land Divisi0n Process Guide. Retrieved from
https://www.peoriaaz.gov/home/showpublisheddocument/1918/63892686975813
0000
3.4.
City of Prescott.. City of Prescott General Engineering Standards. Retrieved from
https://www.codepublishing.com/AZ/Prescott/#!/PrescottPGES/PrescottPGES01.html
4.5.
Town of Gilbert.. Town of Gilbert Supplement to Maricopa Association of Governments Uniform
Standard Details for Public Works Construction. Retrieved from
https://www.gilbertaz.gov/home/showdocument?id=33275
5.6.
City of Surprise. Engineering Development Standards & Details. Retrieved from
https://surpriseaz.gov/682/Engineering-Development-Standards
6.7.
Maricopa County Department of Transportation. MCDOT Roadway Design Manual. Retrieved
from https://www.maricopa.gov/DocumentCenter/View/51399/Roadway-Design-Manual-
2024
8.
City of Phoenix Water Services Department. Design Standards Manual for Water and
Wastewater Systems. Retrieved from
https://www.phoenix.gov/waterservicessite/Documents/2021_DSM-Final_101421.pdf
9.
City of Scottsdale. City of Scottsdale Supplement to MAG Uniform Standard Details for Public
Works Construction. Retrieved from https://www.scottsdaleaz.gov/docs/default-
source/scottsdaleaz/design/mag-supplements/2020/2020-details-
combined.pdf?sfvrsn=f5fae0b3_1
10.
Maricopa Association of Governments. Uniform Standard Details for Public Works
Construction. Retrieved from https://azmag.gov/Portals/0/Documents/MagContent/2025-
MAG-Details-for-Public-Works
Construction.pdf?ver=G58vbv8HtawfLOomCMOwbw%3d%3d
7.
CITY OF EL MIRAGE
SUPPLEMENT TO MAG UNIFORM STANDARD DETAILS
FOR PUBLIC WORKS CONSTRUCTION
JANUARY 2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
INDEX
EM-100
100 SERIES: GENERAL
EM-100
INDEX
EM-101-1
GENERAL INFORMATION
EM-101-2
GENERAL NOTES
EM-101-3
GRADING AND DRAINAGE NOTES
EM-101-4
LANDSCAPE AND IRRIGATION NOTES
EM-101-5
PAVING NOTES
EM-101-6
SANITARY SEWER NOTES
EM-101-7
WATER NOTES
EM-101-8
SIGNING AND STRIPING NOTES
EM-101-9
STORM WATER POLLUTION PREVENTION (SWPPP) NOTES
EM-101-10
TRAFFIC SIGNAL NOTES
EM-101-11
DRY UTILITY NOTES
EM-101-12
ALLOWABLE MATERIALS LIST
EM-111-1
TECHNICAL DESIGN REQUIREMENTS BY STREET CLASSIFICATION
EM-111-2
TECHNICAL DESIGN REQUIREMENTS NOTES
EM-113-1
TRASH ENCLOSURE
EM-113-2
TRASH ENCLOSURE SCREEN WALL, SAFETY POST & NOTES
EM-114
FIRE TRUCK TURNAROUND OPTIONS
EM-115
FIRE DEPARTMENT ACCESS BARRIER
EM-116
BIKE LANE DETAIL
EM-131-1
POST MOUNTED STREET SIGNS (40 MPH OR LESS)
EM-131-2
POST MOUNTED STREET SIGNS (OVER 40 MPH & ARTERIAL
STREETS)
EM-132-1
SIGN POST INSTALLATION
EM-132-2
SIGN POST SPECIFICATIONS
EM-133
TYPICAL MEDIAN NOSE MARKINGS
EM-145
SAFETY RAIL
EM-157
PARKING LOT DIMENSIONS
EM-158
SIGHT DISTANCE REQUIREMENTS FOR ARTERIAL AND COLLECTOR
STREETS
EM-159
UNOBSTRUCTED VIEW EASEMENT REQUIREMENTS FOR LOCAL
STREETS
EM-161
CORNER RADII DEDICATIONS
EM-162-1
TRACER WIRE
EM-162-2
TRACER WIRE STATION
EM-168-1
INTERCONNECT PRECAST COMMUNICATION PULL BOX
EM-168-2
INTERCONNECT PRECAST COMMUNICATION PULL BOX NOTES
EM-169
INTERCONNECT COMMUNICATION VAULT
EM-170
INTERCONNECT TRENCH DETAIL
EM-171-1
TRAFFIC SIGNAL WIRING DETAIL
EM-171-2
TRAFFIC SIGNAL WIRING NOTES
EM-172-1
TYPICAL MICRO-TRENCHING DETAILS
EM-172-2
MICRO-TRENCHING SECOND TRENCH LOCATION
EM-172-3
MICRO-TRENCHING GENERAL NOTES
EM-172-4
MICRO-TRENCHING GENERAL NOTES
REVISION DATE: 01/2026
100 SERIES: GENERAL (CONTINUED)
EM-172-5
MICRO-TRENCHING GENERAL NOTES
EM-172-6
MICRO-TRENCHING SURFACE RESTORATION NOTES
EM-172-7
MICRO-TRENCHING SURFACE RESTORATION NOTES
EM-172-8
MICRO-TRENCHING SURFACE RESTORATION NOTES
EM-173
FIBER-OPTIC CURB MARKER
200 SERIES: STREET
EM-239
BICYCLE EXIT/ENTRANCE RAMP
EM-251-1
RETURN TYPE DRIVEWAYS WITH ATTACHED SIDEWALK
EM-251-2
RETURN TYPE DRIVEWAYS WITH DETACHED SIDEWALK
EM-253-1
TURN DIVERTERS - RIGHT TURN LANE
EM-253-2
TURN DIVERTERS - NO RIGHT TURN LANE
EM-259
DRIVEWAY CRITERIA
EM-265
TRAFFIC SIGNAL POLE ACCESS PAD
300 SERIES: WATER
EM-301
BLOCKING FOR GATE AND BUTTERFLY VALVE
EM-303-3
REVERSE THRUST BLOCK (ACP)
EM-303-4
REVERSE THRUST BLOCK (PVC AND DIP)
EM-325
WATER SERVICE CONNECTION (2" AND SMALLER)
EM-326
1" AND 2" WATER SERVICE ABANDONMENT
EM-345
LARGE METER VAULT (3" OR LARGER)
EM-351
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION
ASSEMBLIES (3" AND SMALLER)
EM-352-1
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION
ASSEMBLIES (4" OR LARGER)
EM-352-2
BACKFLOW PREVENTION ASSEMBLIES PROTECTION
EM-353
CROSS CONNECTION CONTROL 3" AND LARGER LEAD FREE
DOUBLE CHECK VALVE ASSEMBLY
EM-360
FIRE HYDRANT INSTALLATION
EM-361
FIRE HYDRANT / FDC CLEARANCE
EM-362
LOCATIONS FOR NEW FIRE HYDRANTS
EM-363
FIRE HYDRANT VERTICAL DEFLECTION
EM-364
FIRE HYDRANT PROTECTION POLE
EM-365
TEMPORARY WATER SUPPLY HYDRANT METER ASSEMBLY
EM-370
VERTICAL REALIGNMENT OF WATER MAINS
EM-390
BLOW OFF
EM-395
1" AIR RELEASE VALVE
SHEET 1 OF 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
INDEX
EM-100
REVISION DATE: 01/2026
400 SERIES: SEWER
EM-402-1
WATER / SEWER HORIZONTAL SEPARATION
EM-402-2
WATER / SEWER VERTICAL SEPARATION
EM-406
BEDDING AND BACKFILL FOR ALL PIPELINES
EM-414
UTILITY MAIN EXPOSURE FOR NEW SERVICE CONNECTION
EM-420
PRECAST CONCRETE SEWER MANHOLE
EM-423
MANHOLE COVER WITH CITY LOGO
EM-426
INSIDE DROP MANHOLE
EM-440-1
SEWER SERVICE LATERAL (GREATER THAN 2' DEEP)
EM-440-2
SEWER SERVICE LATERAL (LESS THAN 2' DEEP)
EM-442
BACKWATER VALVE
500 SERIES: STORM DRAIN
EM-559-1
STORM DRAIN INLET MARKER
EM-559-2
STORM DRAIN INLET MARKER ON CATCH BASIN / SCUPPER
EM-559-3
STORM DRAIN INLET MARKER ON HEADWALL
SHEET 2 OF 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
GENERAL INFORMATION
EM-101-1
REVISION DATE: 01/2026
GENERAL INFORMATION
1.
NO PERSON, CORPORATION, CONTRACTOR, OR UTILITY SHALL WORK WITHIN THE RIGHT-OF-WAY, ROAD, STREET, OR EASEMENTS GRANTED FOR PUBLIC USE OR ALLEYS
WITHOUT SECURING AN ENGINEERING CONSTRUCTION PERMIT FROM THE ENGINEERING DIVISION.
2.
ENGINEERING CONSTRUCTION PERMITS ARE REQUIRED FOR GRADING, DRAINAGE, EROSION CONTROL, FLOOD CONTROL STRUCTURES, HAULING MATERIAL IN EXCESS OF
500 CUBIC YARDS, OILING, GRAVELING OR ANY SURFACING OF ANY STREET OR ALLEY, WATER SYSTEM, SANITARY SEWER SYSTEM, STORM DRAIN SYSTEM, TRENCHING, GAS
OR ANY OTHER TYPES OF PIPE LINES, DRYWELLS, PAVING, CURB, GUTTER, SIDEWALKS, DRIVEWAYS, FLOOD IRRIGATION, LANDSCAPE/IRRIGATION, TRAFFIC SIGNALS,
STRIPING AND SIGNAGE, BANK STABILIZATION AND CHANNELIZATION, STREET LIGHTS, WELL ABANDONMENT, UTILITY LINES SUCH AS ELECTRIC, TELEPHONES, TELEVISION,
COMMUNICATIONS AND OTHER SIMILAR FACILITIES.
3.
CONSTRUCTION WORK HOURS WITHIN THE CITY OF EL MIRAGE SHALL COMPLY WITH THE FOLLOWING:
NIGHTTIME AND WEEKEND WORK REQUIRES PERMISSION IN WRITING FROM THE CITY ENGINEER OR THEIR DESIGNEE.
4.
NO INTERFERENCE WITH TRAFFIC FLOW ON PUBLIC STREETS OR ALLEYS SHALL BE PERMITTED DURING THE HOURS OF 5:00 A.M. TO 8:30 A.M. OR FROM 4:00 P.M. TO 7:00 P.M.
UNLESS PRIOR AUTHORIZATION IS OBTAINED IN WRITING BY THE CITY OF EL MIRAGE CITY ENGINEER OR THEIR DESIGNEE.
5.
PRIOR TO ISSUANCE OF ENGINEERING CONSTRUCTION PERMITS, THE CONTRACTOR/DEVELOPER MUST PROVIDE THE CITY OF EL MIRAGE WITH THE SPECIFIC INFORMATION
NOTED IN SECTION L OF THE CITY'S DESIGN & DEVELOPMENT STANDARDS MANUAL (DDSM) AND PAYMENT OF FEES PER THE CITY'S LATEST FEE SCHEDULE. ANY PERSON,
CORPORATION, CONTRACTOR, OR UTILITY COMPANY WORKING IN THE RIGHT-OF-WAY, ROAD, STREET, OR EASEMENTS GRANTED FOR PUBLIC USE OR ALLEYS WITHOUT
SECURING A PERMIT IS SUBJECT TO A FINE IN ACCORDANCE WITH THE CITY CODE.
6.
TRAFFIC CONTROL SHALL CONFORM TO THE LATEST EDITIONS OF THE CITY OF PHOENIX TRAFFIC BARRICADE MANUAL, MUTCD, AND THE CITY OF EL MIRAGE DESIGN AND
DEVELOPMENT STANDARDS MANUAL (DDSM). BARRICADES MUST BE CONTINUALLY MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. IF ANY PART OF THE
TRAFFIC CONTROL PLAN FALLS WITHIN 300' OF A SIGNALIZED INTERSECTION, AN OFF-DUTY OFFICER WILL BE REQUIRED FOR TRAFFIC CONTROL. A TRAFFIC CONTROL PLAN
(TCP) SHALL BE SUBMITTED TO THE ENGINEERING DIVISION A MINIMUM OF TWO WORKING DAYS (48-HOURS) PRIOR TO CONSTRUCTION UNLESS A FULL CLOSURE IS
REQUESTED IN WHICH 2 WEEKS NOTICE IS REQUIRED. AN ACCEPTED TCP WILL BE STAMPED AND A COPY RETURNED TO THE CONTRACTOR AND/OR TRAFFIC CONTROL
COMPANY. A COPY OF THE ACCEPTED PLAN MUST REMAIN ON THE JOB SITE AT ALL TIMES.
7.
THE PLANS SHALL COMPLY WITH THE AMERICANS WITH DISABILITY ACT'S ACCESSIBILITY GUIDELINES, AS PUBLISHED IN THE FEDERAL REGISTER ON SEPTEMBER 15, 2010.
8.
REFER TO SECTION N AND CHAPTERS 7-3 AND 7-4 OF THE DDSM FOR A LIST OF THE REQUIRED CLOSE OUT ITEMS. ANY QUESTIONS SHOULD BE DIRECTED TO THE
ENGINEERING INSPECTOR.
CONSTRUCTION TYPE
MAY 1 - OCTOBER 15
OCTOBER 16 - APRIL 30
A
ALL CONSTRUCTION
WORK - MONDAY
THROUGH FRIDAY*
5:00 A.M. TO 7:00 P.M.
7:00 A.M. TO 7:00 P.M.
B
ALL CONSTRUCTION
WORK - SATURDAY*
6:00 A.M. TO 7:00 P.M.
7:00 A.M. TO 7:00 P.M.
C
ALL CONSTRUCTION
WORK - SUNDAY*
8:00 A.M. TO 7:00 P.M.
8:00 A.M. TO 7:00 P.M.
*CONCRETE WORK MAY BEGIN 1 HOUR PRIOR TO START TIMES ABOVE
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
GRADING AND DRAINAGE NOTES
REVISION DATE: 01/2026
GRADING AND DRAINAGE NOTES:
1.
THE GRADING AND DRAINAGE PLANS MUST BE APPROVED BY THE CITY ENGINEER OR HIS/HER DESIGNEE. THE ENGINEERING INSPECTOR SHALL BE NOTIFIED AT (623)
876-2975, 48 HOURS BEFORE ANY ON-SITE CONSTRUCTION BEGINS. AN APPROVED GRADING AND DRAINAGE PLAN MUST BE ON THE JOB SITE AT ALL TIMES. DEVIATIONS
FROM THE PLANS MUST BE PRECEDED BY AN APPROVED PLAN REVISION.
2.
AN ENGINEERING CONSTRUCTION PERMIT IS REQUIRED PRIOR TO ANY ON-SITE GRADING, INCLUDING CUSTOM HOMES. PRIOR TO THE RELEASE OF THE PERMIT, THE
CONTRACTOR MUST OBTAIN A DUST CONTROL PERMIT FROM THE MARICOPA COUNTY AIR QUALITY DIVISION AND PROVIDE A COPY TO THE CITY.
3.
GRADING AND DRAINAGE PLAN APPROVAL INCLUDES:
A.
CONSTRUCTION OF ALL SURFACE IMPROVEMENTS SHOWN ON THE APPROVED GRADING AND DRAINAGE PLAN, INCLUDING BUT NOT LIMITED TO, RETENTION AREAS
AND/OR OTHER DRAINAGE FACILITIES, DRAINAGE PATTERNS, CHANNELS, WALLS, CURBING, ASPHALT PAVEMENT, BANK PROTECTION AND CHANNELIZATION, AND
BUILDING FLOOR ELEVATIONS.
B.
CONTRACTOR SHALL PROVIDE MINIMUM SLOPE TO THE BOTTOM IN ALL RETENTION BASINS AT ELEVATIONS AS SHOWN ON THE PLANS. RETENTION BASIN SIDE SLOPES
SHALL NOT EXCEED 3:1 ON PRIVATE PROPERTY AND 6:1 ADJACENT TO PUBLIC RIGHT-OF-WAY UNLESS NOTED OTHERWISE ON PLANS.
4.
ALL DRAINAGE PROTECTIVE DEVICES SUCH AS SWALES, INTERCEPTOR DITCHES, PIPES, PROTECTIVE BERMS, CONCRETE CHANNELS OR OTHER MEASURES DESIGNED TO
PROTECT HOMES OR OTHER IMPROVEMENTS WHETHER EXISTING OR PROPOSED, FROM RUNOFF OR DAMAGE FROM STORM WATER, MUST BE CONSTRUCTED PRIOR TO THE
CONSTRUCTION OF ANY IMPROVEMENTS.
5.
ACCESS BARRIERS/TRASH RACKS ARE REQUIRED ON THE EXPOSED ENDS OF ALL STORM DRAINS EIGHTEEN (18) INCHES IN DIAMETER OR GREATER.
6.
DRYWELLS MUST BE DRILLED A MINIMUM OF TEN (10) FEET INTO PERMEABLE POROUS STRATA AND PERCOLATION TESTS WILL BE REQUIRED. THE CITY ENGINEERING
INSPECTOR MUST BE PRESENT BEFORE BACKFILL OR WALL PIPES ARE PLACED WITHIN ANY DRYWELL. PERCOLATION TESTS MUST BE CONDUCTED BY AN INDEPENDENT
LABORATORY AND RESULTS PROVIDED TO THE ENGINEERING DIVISION. ALL DRYWELLS MUST BE REGISTERED WITH ADEQ. COPIES OF DRILLING LOGS AND ADEQ
REGISTRATION INFORMATION MUST BE PROVIDED TO THE CITY.
7.
ALL FINISH FLOOR ELEVATIONS SHOWN ARE A MINIMUM OF 14-INCHES ABOVE THE POINT OF OUTFALL AND ONE (1) FOOT ABOVE THE 100-YEAR BASE FLOOD ELEVATION AS
SHOWN ON THE APPROVED PLAN.
8.
A FEMA ELEVATION CERTIFICATE FOR ALL NEW AND SUBSTANTIALLY IMPROVED CONSTRUCTION IN THE FLOODPLAIN SHALL BE SUBMITTED TO THE ENGINEERING DIVISION
PRIOR TO FINAL ACCEPTANCE OF THE PROJECT.
9.
SOILS COMPACTION TEST RESULTS MUST BE SUBMITTED TO THE ENGINEERING DIVISION FOR ALL BUILDING PADS THAT HAVE ONE (1) FOOT OR MORE OF FILL MATERIAL
INDICATED.
10.
STAKING PAD AND/OR FINISH FLOOR ELEVATIONS IS THE RESPONSIBILITY OF THE DEVELOPER AND HIS ENGINEER. NO MINIMUM FINISH FLOOR ELEVATION WILL BE RAISED
OR LOWERED WITHOUT APPROVAL OF THE CITY ENGINEER. IN NON-CRITICAL AREAS, THE DEVELOPER'S ENGINEER SHALL SUBMIT CERTIFICATION OF CONSTRUCTED
BUILDING PAD ELEVATIONS PRIOR TO REQUEST FOR FINAL INSPECTION. IN CRITICAL DRAINAGE AREAS, OR IN THE 100-YEAR FLOODPLAIN, SUBSTITUTE BUILDING FLOOR
ELEVATION IN ABOVE NOTE, OR FEMA ELEVATION CERTIFICATE.
11.
THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND CONFIRMING DEPTH OF ALL EXISTING UTILITY LINES WITHIN PROPOSED RETENTION AND DRAINAGE FACILITY
AREAS. IF THE DRAINAGE FACILITIES CANNOT BE CONSTRUCTED PER PLAN AS A RESULT OF CONFLICT WITH UNDERGROUND UTILITIES, THE CONTRACTOR SHOULD
CONTACT THE ENGINEERING DIVISION AND THE DESIGN ENGINEER AND REQUEST MODIFICATION OF THE DRAINAGE FACILITY DESIGN.
12.
ALL BANK PROTECTION AND CHANNELIZATION MUST BE COMPLETED PRIOR TO FINAL ACCEPTANCE OF THE PROJECT.
13.
A SEPARATE HAUL PERMIT SHALL BE REQUIRED WHENEVER HAULING IN EXCESS OF 500 CUBIC YARDS OF MATERIAL IN OR OUT OF A SITE. A HAUL ROUTE MUST BE
SUBMITTED AND APPROVED BY THE ENGINEERING DIVISION. ADDITIONAL REQUIREMENTS AS SET FORTH BY THE ENGINEERING DIVISION SHALL BE MET.
14.
ALL CONTRACTORS/DEVELOPERS ARE RESPONSIBLE TO OBTAIN A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL
AND STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION (NOT), AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP). A COPY OF
THE NOI AND SWPPP SHALL BE AVAILABLE ON THE JOB SITE AT ALL TIMES.
15.
ONCE AN EXISTING SHOULDER IS DISTURBED BY THE GRADING OPERATION OR ANY OTHER PHASE OF CONSTRUCTION, THE SHOULDER SHALL BE BARRICADED. SUCH
BARRICADING SHALL REMAIN IN PLACE UNTIL FINAL ACCEPTANCE OF THE PROJECT.
EM-101-3
SHEET 1 OF 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
PAVING NOTES
EM-101-5
REVISION DATE: 01/2026
PAVING NOTES:
1.
EXACT POINT OF PAVEMENT MATCHING, TERMINATION AND/OR OVERLAY, IF NECESSARY, SHALL BE DETERMINED IN THE FIELD BY THE ENGINEERING INSPECTOR. CRACK
SEAL IS REQUIRED BETWEEN OLD AND NEW ASPHALTIC CONCRETE AND BETWEEN ASPHALT AND CONCRETE (I.E. ALONG CURB, VALLEY GUTTER, ETC.).
2.
ALL FRAMES, COVERS, VALVE BOXES AND MANHOLES SHALL BE ADJUSTED TO FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED CONSTRUCTION. THE
CONCRETE COLLAR SHALL BE ADJUSTED LEVEL WITH EXISTING BITUMINOUS PAVEMENT. THE EDGE OF THE CONCRETE COLLAR SHALL BE CRACK SEALED.
3.
ALL CONTRACTORS/DEVELOPERS SHALL COMPLY WITH MAG STANDARD DETAIL 211 FOR TRENCH PLATING.
4.
PAVING SHALL NOT START UNTIL ALL APPROPRIATE TESTING HAS BEEN COMPLETED AND ACCEPTED (PRESSURE TESTING OF UTILITIES, DENSITY TESTING, VIDEO OF
SANITARY SEWER LINE, ETC.). SERVICE STUBS TO ALL PLATTED LOTS SHALL BE EXTENDED, AND ALL CONFLICTING UTILITY CONSTRUCTION COMPLETED PRIOR TO START OF
PAVING.
5.
TREES AND SHRUBBERY IN THE RIGHT-OF-WAY, WHICH CONFLICT WITH THE IMPROVEMENTS PROPOSED HEREIN, ARE NOT TO BE REMOVED OR RELOCATED WITHOUT PRIOR
APPROVAL OF THE CITY OF EL MIRAGE. THE PERMITTEE SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY AUTHORIZATION TO REMOVE AND/OR RELOCATE SAID
TREES OR SHRUBBERY.
6.
IN ALL AREAS WHERE NEW CONSTRUCTION OF CURB, GUTTER, SIDEWALKS, AND DRIVEWAYS IS REQUIRED, AND THE ENGINEER DETERMINES THE EXISTING GRADE TO
CONSIST OF SOILS WITH SWELLING CHARACTERISTICS, THE MOISTURE CONTENT SHALL BE BROUGHT AS CLOSE AS POSSIBLE TO OPTIMUM REQUIRED FOR COMPACTION BY
THE ADDITION OF WATER, BLENDING OF DRY SUITABLE MATERIAL OR BY DRYING OF EXISTING MATERIAL. THE MATERIAL SHALL THEN BE COMPACTED TO A RELATIVE
DENSITY OF 75 PERCENT MINIMUM TO 85 PERCENT MAXIMUM WITH 80 PERCENT AS IDEAL.
7.
CONSTRUCTION LOADS: DURING CONSTRUCTION OPERATIONS, HEAVY EQUIPMENT MAY CROSS EXISTING OR PROPOSED PIPE. IN THIS CASE, AN EARTH FILL SHOULD BE
CONSTRUCTED TO AT LEAST THREE (3) FEET ABOVE PIPE. THE FILL MUST BE SUFFICIENT TO PREVENT THE LATERAL DISPLACEMENT OF THE PIPE.
8.
UNLESS OTHERWISE SPECIFIED, THE CITY OF EL MIRAGE REQUIRES THAT ALL ASPHALTIC CONCRETE MIX DESIGNS (C-3/4” HIGH VOLUME), CONCRETE MIX DESIGNS,
AGGREGATE BASE COURSE SUPPLIERS, SLURRY SEAL AND MICRO-SURFACING SUPPLIERS MEET THE CURRENT CITY OF PHOENIX APPROVED MIX DESIGNS AND SUPPLIERS
LIST. SUBMITTALS SHALL BE PROVIDED TO THE CITY FOR EACH OF THESE ITEMS PRIOR TO CONSTRUCTION.
9.
ALL STREET IMPROVEMENTS FOR CUSTOM HOMES MUST BE COMPLETED IN ACCORDANCE WITH THE CITY OF EL MIRAGE POLICY ON UNPAVED STREETS PROVIDED IN
SECTION J OF THE CITY'S DESIGN & DEVELOPMENT STANDARDS MANUAL (DDSM). ALL PRIVATE ACCESS MUST BE CONSTRUCTED WITH AN ACCEPTABLE DUST PALLIATIVE.
10. ALL CONTRACTORS/DEVELOPERS ARE RESPONSIBLE TO CONSTRUCT STABILIZED CONSTRUCTION ENTRANCES IN ORDER TO REDUCE OR ELIMINATE THE TRACKING OF
SEDIMENT ONTO PUBLIC RIGHTS-OF-WAYS OR STREETS. GRAVEL TRACK-OUT PADS SHALL MEET CURRENT MARICOPA COUNTY STANDARDS. THE CONTRACTOR/DEVELOPER
SHALL IMMEDIATELY REMOVE ANY SEDIMENT TRACKED ONTO PUBLIC RIGHTS-OF-WAYS OR STREETS.
11. IF ANY EXISTING BARRICADES, TRAFFIC SIGNS OR STREET NAME SIGNS NEED TO BE REMOVED DURING CONSTRUCTION, NOTIFY THE CITY OF EL MIRAGE OPERATIONS
SUPERINTENDENT AT (480) 372-1131. A MINIMUM OF 48-HOURS NOTICE IS NEEDED FOR REMOVALS. IF SIGNS AND BARRICADES BELONG TO ANOTHER AGENCY, IT IS THE
RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER TO NOTIFY THEM.
12. NO WATER SUPPLY HOSE OR RAMPS SHALL BE PLACED ACROSS OR IN THE ARTERIAL OR COLLECTOR STREETS. APPROVAL IN WRITING FROM THE CITY ENGINEER OR HIS
DESIGNEE IS REQUIRED FOR PLACEMENT OF THE SUPPLY HOSE OR RAMPS IN LOCAL STREETS. APPLICATIONS SHALL INCLUDE SUBMITTALS OF THE MANUFACTURER'S
SPECIFICATIONS, MATERIALS USED, DIMENSIONS OF THE RAMP, PROPOSED LOCATION, PROPOSED BARRICADING AND SIGNAGE.
13. ALL FIRE HYDRANTS SHALL HAVE A TWO-WAY BLUE REFLECTOR INSTALLED PER MAG STANDARD DETAIL 122.
14. ASPHALT COMPACTION WITHIN THE CITY'S RIGHT-OF-WAY AND FOR ALL PUBLIC ROADS SHALL ADHERE TO THE REQUIREMENTS IN THE LATEST EL MIRAGE MATERIAL
TESTING GUIDELINES.
15. ALL NEW CURB SHALL BE IMPRINTED WITH THE WORDS "PRIVATE STREET - NO CITY MAINTENANCE" IN 2-INCH HIGH LETTERS AT EVERY CURB RETURN AND AT EVERY
ENTRANCE INTO A NEW PRIVATE PROPERTY SUBDIVISION OR AS DIRECTED BY THE CITY.
16. IF THE CITY ALLOWS A NEW COLLECTOR OR ARTERIAL ROADWAY TO BE CUT WITHIN A YEAR OF CONSTRUCTION, RECONSTRUCTION OR RENOVATION, THE
CONTRACTOR/DEVELOPER MUST RESTORE THE PAVEMENT FOR THE FULL WIDTH OF ALL LANES DIRECTLY IMPACTED BY THE CUT VIA SLURRY SEAL, MICRO SEAL OR OTHER
APPROVED METHOD. FOR PAVEMENT CUTS GREATER THAN 300 FEET IN LENGTH, SEE NOTE 17.
17. FOR TRENCH CUTS, PAVEMENT WIDENING, OR OTHER PARTIAL PAVEMENT INSTALLATIONS GREATER THAN 300 FEET IN LENGTH FOR ANY ROADWAY CLASSIFICATION, THE
ENTIRE AREA SHALL BE SLURRY SEAL COATED IN ACCORDANCE WITH MAG SECTION 332 OR AS OTHERWISE SPECIFIED. THE SEAL COAT SHALL EXTEND FROM THE EDGE OF
PAVEMENT OR LIP OF GUTTER TO THE STREET CENTERLINE EXCEPT THAT ON LOCAL STREETS LESS THAN 36 FEET FROM FACE TO FACE OF CURB AND WHERE THE
PAVEMENT PATCH STRADDLES THE CENTERLINE, THE ENTIRE WIDTH OF STREET SHALL BE SEAL COATED.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
SIGNING AND STRIPING NOTES
EM-101-8
SIGNING AND STRIPING NOTES:
1.
SIGNING AND STRIPING INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
ADOPTED BY THE ARIZONA DEPARTMENT OF TRANSPORTATION (ADOT) AND THE CITY OF EL MIRAGE DESIGN & DEVELOPMENT STANDARDS MANUAL.
2.
THE SIGNING AND STRIPING LAYOUT SHALL BE APPROVED BY THE ENGINEERING INSPECTOR PRIOR TO ANY INSTALLATION. THE CONTRACTOR SHALL NOTIFY THE CITY OF EL
MIRAGE ENGINEERING INSPECTOR AT LEAST 48 HOURS IN ADVANCE OF ANY SIGNING OR STRIPING INSTALLATION AT (623) 876-2975. SIGNING AND STRIPING INSTALLATIONS
COMPLETED PRIOR TO THE CITY'S INSPECTION SHALL BE REMOVED AND/OR MODIFIED IF IT IS DEEMED INADEQUATE BY THE ENGINEERING INSPECTOR.
3.
THE OBLITERATION OF PRIOR OR CONFLICTING THERMOPLASTIC STRIPING SHALL BE ACCOMPLISHED BY WATER BLASTING WITH VACUUM RECOVERY OR OTHER METHODS
APPROVED BY THE ENGINEERING INSPECTOR. A TYPE II MICRO SEAL TREATMENT, PER A CITY OF PHOENIX APPROVED SUPPLIER, SHALL BE APPLIED IN A MINIMUM 3-FOOT
WIDE, CONTINUOUS APPLICATION TO THE PORTIONS OF THE AFFECTED ASPHALT FOLLOWING OBLITERATION. THE TYPE II MICRO SEAL TREATMENT CAN BE APPLIED
DIRECTLY OVER WATER-BASED PAINT WITHOUT PAINT OBLITERATION PRIOR TO PLACEMENT.
4.
ANY DAMAGE TO THE PAVEMENT CAUSED BY THE PAVEMENT MARKING REMOVAL SHALL BE REPAIRED BY METHODS ACCEPTABLE TO THE CITY ENGINEERING INSPECTOR.
5.
ALL ROAD SURFACES SHALL BE PREPARED PER MANUFACTURER'S INSTRUCTIONS OR TO THE SATISFACTION OF THE ENGINEERING INSPECTOR PRIOR TO APPLICATION OF
PAVEMENT MARKINGS. AT A MINIMUM, SURFACES SHALL HAVE DEBRIS REMOVED, CLEANED AND DRIED PRIOR TO APPLICATION.
6.
SHORT LINE STRIPING SUCH AS CROSSWALKS, STOP BARS, CHEVRONS, AND CROSSHATCH MARKINGS SHALL BE INSTALLED USING ALKYD THERMOPLASTIC MATERIAL
APPLIED AT 90 MIL THICKNESS. LONGITUDINAL STRIPING SHALL BE INSTALLED USING ALKYD THERMOPLASTIC MATERIAL APPLIED AT 60 MIL THICKNESS. WORDS, SYMBOLS
AND OTHER LEGEND MARKINGS SHALL BE INSTALLED USING ALKYD THERMOPLASTIC MATERIAL APPLIED AT 90 MIL THICKNESS.
7.
ALL STRIPING ON NEW ASPHALT SHALL BE INSTALLED USING A WATER BASED PAINT APPLIED AT A MINIMUM OF 15 MIL THICKNESS. THE FINAL THERMOPLASTIC STRIPING
SHALL THEN BE APPLIED A MINIMUM OF 30 CALENDAR DAYS LATER.
8.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE FINAL SURFACE COURSE IS PLACED SO THAT THE STRIPING IS OFFSET ONE (1) FOOT CLEAR OF THE
CONSTRUCTION JOINT, UNLESS OTHERWISE DIRECTED BY THE ENGINEERING DIVISION.
9.
RAISED PAVEMENT MARKERS (RPMs) SHALL BE INSTALLED PER ADOT STANDARD DETAIL M-19 WITH BITUMINOUS ADHESIVE WHICH IS ON THE ADOT APPROVED PRODUCTS
LIST.
10.
ALL SIGNS SHALL BE PROVIDED AND INSTALLED BY THE DEVELOPER PER THE APPROVED PERMITTED PLANS.
11.
ALL SIGNS SHALL BE INSTALLED PER CITY DETAIL EM-132-1 & 2. THE CONTRACTOR SHALL CONTACT BLUE STAKE PRIOR TO DIGGING. CARE SHALL BE TAKEN TO ENSURE
UNOBSTRUCTED VIEWS FOR ALL SIGNS INSTALLED. NO SIGN SHALL BE PLACED CLOSER THAN 100' TO ANOTHER SIGN.
12.
ALL SIGN BLANKS SHALL BE 0.080 GAUGE ALUMINUM, UNLESS OTHERWISE NOTED AND ALL SIGNS SHALL BE ASTM TYPE IV HIGH INTENSITY SHEETING, UNLESS OTHERWISE
NOTED.
13.
THE CONTRACTOR SHALL RETURN ALL REMOVED TRAFFIC SIGNAL EQUIPMENT/SIGNS TO THE CITY OF EL MIRAGE. CONTACT THE ENGINEERING INSPECTOR AT (623)
876-2975.
14. PARKING RESTRICTION SIGNS SHALL BE SET AT AN ANGLE OF NOT LESS THAN 30 DEGREES OR MORE THAN 45 DEGREES WITH THE LINE OF TRAFFIC FLOW IN ORDER TO BE
VISIBLE TO APPROACHING TRAFFIC, PER GUIDANCE IN SECTION 2B OF THE MUTCD.
15.
SIGNING AND STRIPING SHALL BE INSTALLED SIMULTANEOUSLY. STRIPING SHALL NOT BE PLACED IF ASSOCIATED SIGNAGE CANNOT BE INSTALLED.
16.
THE ENGINEERING INSPECTOR MAY REQUIRE THE CONTRACTOR TO MAKE ANY ADJUSTMENTS DEEMED NECESSARY TO ADDRESS CONDITIONS NOT INCLUDED IN THE
APPROVED PERMITTED PLANS.
17.
THE CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS FOR TRAFFIC CONTROL, BARRICADING, SIGNING AND STRIPING AS PER THE CURRENT EDITION OF THE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) ADOPTED BY THE ARIZONA DEPARTMENT OF TRANSPORTATION (ADOT), THE CITY OF PHOENIX TRAFFIC BARRICADE MANUAL
AND CITY OF EL MIRAGE SUPPLEMENTS.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TRAFFIC SIGNAL NOTES
EM-101-10
SHEET 3 OF 3
TRAFFIC SIGNAL NOTES (CONTINUED):
7.
THE CONTRACTOR SHALL CONTACT ARIZONA PUBLIC SERVICE (APS) FOR THE ELECTRICAL SERVICE. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL ELECTRICAL
SERVICE CONDUCTORS, UNLESS OTHERWISE DIRECTED BY APS.
8.
VIDEO CABLE TO RUN CONTINUOUS FROM CABINET TO RESPECTIVE CAMERA WITHOUT SPLICES. THE CONTRACTOR SHALL CONTACT THE CITY OF EL MIRAGE ENGINEERING
DIVISION AT 623-876-2977 TO COORDINATE THE MOUNTING AND INSTALLATION OF THE VIDEO DETECTION DEVICES.
9.
THE CONTRACTOR SHALL HAVE AN AUTHORIZED REPRESENTATIVE PRESENT FROM THE TRAFFIC SIGNAL CONTROLLER AND VIDEO DETECTION SYSTEM MANUFACTURER
AT THE TIME THE TRAFFIC SIGNAL IS ACTIVATED FOR SET UP AND CONFIGURATION OF THE CABINET\CONTROLLER AND VIDEO DETECTION.
10.
THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF EL MIRAGE'S ENGINEERING DIVISION AT 623-980-9987; THREE WORKING DAYS PRIOR TO SIGNAL ACTIVATION FOR
PRE-TURN ON INSPECTION. INSTALLATION OF ALL EQUIPMENT WIRING AND ALIGNMENT OF HEADS SHALL BE DONE PRIOR TO PRE-TURN ON INSPECTION. IT IS THE CITY OF
EL MIRAGE'S POLICY THAT NEW SIGNAL ACTIVATION SHALL NOT OCCUR ON A FRIDAY OR THE DAY BEFORE A HOLIDAY.
11.
THE CONTRACTOR SHALL PROVIDE AND INSTALL “TRAFFIC CONTROL CHANGE” SIGNS WITH FLAGS 500 FEET PRIOR TO THE INTERSECTION FOR ALL AFFECTED
APPROACHES FOR 30-DAYS. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND SALVAGING OF THE SIGNS TO THE CITY OF EL MIRAGE PUBLIC WORKS DEPARTMENT
AT 10355 N. 121ST AVENUE.
12.
ALL SIGNING AND STRIPING THAT PERTAINS TO THE OPERATION OF THE TRAFFIC SIGNAL SHALL BE INSTALLED IMMEDIATELY PRIOR TO THE ACTIVATION OF THE SIGNAL.
THE CONTRACTOR SHALL CONTACT THE CITY OF EL MIRAGE ENGINEERING INSPECTOR AT 623-876-2975, THREE WORKING DAYS PRIOR TO INSTALLATION FOR APPROVAL
OF LAYOUT AND SIGN LOCATIONS.
13.
ALL ADA FACILITIES SHALL BE IN PLACE PRIOR TO THE ACTIVATION OF THE TRAFFIC SIGNAL.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
DRY UTILITY NOTES:
15.
ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY SHALL BE REPORTED TO THE CITY OF EL MIRAGE AND THE PROPERTY OWNER. REPAIR AND/OR REPLACEMENT, IN KIND,
SHALL BE COORDINATED WITH THE PROPERTY OWNER AND/OR THE CITY.
16.
ALL WORK THAT LIES WITHIN A SPECIAL FLOOD HAZARD AREA (SFHA) WILL REQUIRE A FLOODPLAIN REVIEW BY THE FLOODPLAIN ADMINISTRATOR OR THEIR DESIGNEE AND
ADDITIONAL STIPULATIONS MAY BE REQUIRED.
17.
THE JOBSITE SHALL BE CLEANED OF ANY DEBRIS OR SPOILS RESULTING FROM THIS PROJECT AT THE COMPLETION OF THE PROJECT.
18.
THE UTILITY PROVIDER IS RESPONSIBLE FOR OBTAINING A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL AND
STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION (NOT), AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS NECESSARY.
19.
THE UTILITY PROVIDER IS RESPONSIBLE FOR OBTAINING A DUST CONTROL PERMIT IN ACCORDANCE WITH MARICOPA COUNTY RULE 310.
20.
DIRECT BURIAL CABLE IS NOT ALLOWED WITHIN THE CITY RIGHT OF WAY.
21.
THE USE OF MICRO-TRENCHING MUST BE PRE-APPROVED BY THE CITY. MICRO-TRENCHING WILL ONLY BE ALLOWED WITH UTILITY PROVIDERS THAT HAVE AN EXISTING
AGREEMENT IN PLACE WITH THE CITY.
DRY UTILITY NOTES
REVISION DATE: 01/2026
EM-101-11
SHEET 2 OF 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
ALLOWABLE MATERIALS LIST
ALLOWABLE MATERIALS LIST: *
MATERIALS ALLOWED FOR CONSTRUCTION IN EL MIRAGE SHALL BE PER THE LATEST EDITIONS OF THE MARICOPA ASSOCIATION OF GOVERNMENTS UNIFORM STANDARD
SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS CONSTRUCTION EXCEPT AS PROVIDED BELOW.
WATER LINE MATERIALS:
A.
WATERLINE AND PLUMBING MATERIALS SHALL COMPLY WITH NSF 61 LATEST EDITION AND BE LEAD FREE. NO EXCEPTIONS FOR NON-POTABLE SYSTEMS.
B.
DUCTILE IRON PIPE, MORTAR-LINED, PRESSURE CLASS 350, IS ACCEPTABLE FOR WATERLINE SIZES 6" THROUGH 12" IN DIAMETER.
C.
DUCTILE IRON PIPE, MORTAR-LINED, PRESSURE CLASS 250 MINIMUM, IS ACCEPTABLE FOR WATERLINES 16" IN DIAMETER AND LARGER.
D.
PVC PIPE, AWWA C-900 PRESSURE CLASS 200, IS ACCEPTABLE FOR WATERLINES SIZES 6" AND 8" IN DIAMETER. (PRIVATE ONLY)
E.
POLYWRAP FOR DUCTILE IRON PIPE SHALL BE IN CONFORMANCE WITH SECTION 610.6 OF THE MAG STANDARD SPECIFICATIONS.
DISTRIBUTION FITTING:
PUSH-ON OR MECHANICAL JOINT IN ACCORDANCE WITH AWWA C111 AND MAG SECTION 750.2. JOINT RESTRAINTS, WHERE REQUIRED, SHALL BE MECHANICAL RESTRAINED
JOINT WITH PRODUCT APPROVED BY CITY OR FLANGED JOINT FOR LENGTHS IN ACCORDANCE WITH MAG DETAIL 303-2. FIELD LOCK GASKETS ARE NOT ALLOWED.
WATER LINE VALVE:
MUELLER, CLOW, KENNEDY, AMERICAN FLOW CONTROL, OR M&H RESILIENT WEDGE SEATED GATE VALVE IN ACCORDANCE WITH MAG SECTION 630.3 WITH VALVE BOX AND
COVER IN ACCORDANCE WITH MAG DETAIL 391-1 TYPE "A". ALL VALVES SHALL INCLUDE A DEBRIS CAP INSTALLED PER MAG DETAIL 392 TYPE "A". VALVES SHALL OPEN BY
TURNING COUNTER CLOCKWISE.
TAPPING SLEEVE & VALVE:
STAINLESS STEEL - APPROVED MANUFACTURERS ARE CASCADE, JCM, AND SMITH-BLAIR.
WATER SERVICE:
A.
WATER SERVICE PIPING SHALL BE TYPE "K" COPPER. MINIMUM WATER SERVICE LINE SIZE DIAMETER SHALL BE 1-INCH.
B.
APPROVED SADDLES, ALL IRON PIPE THREAD TAP AND BRONZE STRAP; FOR PVC, JONES J-995, JONES J-996, MUELLER H-13000 SERIES, MCDONALD 3806, MCDONALD
3846; FOR DUCTILE IRON PIPE, FORD 202B, JONES J-979, MUELLER BR2B SERIES, MUELLER BR2S SERIES, MCDONALD 3826.
C.
ALL BRASS FITTINGS MUST BE MANUFACTURED BY FORD, MUELLER, JAMES JONES, OR MCDONALD. ALL ANGLE METER STOPS MUST INCLUDE LOCKING WINGS.
D.
ALL CORP STOPS AND ANGLE VALVES MUST BE BALL STYLE. ALL FITTINGS MUST BE "PAC-JOINT" TYPE. ALL BRASS MUST BE LEAD FREE.
FIRE HYDRANTS (DRY BARREL):
A.
HYDRANTS SHALL BE MANUFACTURED BY CLOW, KENNEDY, MUELLER CENTURION, OR WATEROUS PACER.
B.
ALL HYDRANTS SHALL BE EQUIPPED WITH NATIONAL STANDARD HOSE THREADS.
DIP SECTIONS:
ALL DIP SECTIONS SHALL BE CONSTRUCTED OF RESTRAINED DUCTILE IRON PIPE (DIP) PER CITY DETAIL EM-370. ALL DIP SECTIONS SHALL BE JOINT RESTRAINED DIP WITH
POLYETHYLENE WRAP FOR THE ENTIRE LENGTH PER MAG SECTION 610.6. JOINT RESTRAINED LENGTHS WILL FOLLOW MAG DETAIL 303-1 AND 303-2. ANCHOR BLOCKS / THRUST
BLOCKS MUST BE INSTALLED FOR VERTICAL BENDS PER MAG DETAIL 381.
SEWER LINE MATERIALS:
A.
PVC SDR 35 (FOR PIPE DEPTHS UNDER 10 FEET) AND PVC SDR 26 (FOR PIPE DEPTHS 10 FEET AND OVER) SEWER PIPE, WHICH CONFORMS WITH SECTION 745 OF THE MAG
STANDARD SPECIFICATIONS IS ACCEPTABLE FOR SEWER LINE SIZES 8" THROUGH 15" IN DIAMETER.
B.
SEWER SERVICE PIPING SHALL BE SCH-40 PVC.
SEWER FORCE MAIN MATERIALS:
A.
PVC AWWA C-900, DR14 OR DR18 FOR 12" DIAMETER AND LESS.
B.
DUCTILE IRON PIPE (WITH APPROVED LINING) FOR GREATER THAN 12" DIAMETER OR GREATER THAN 10' DEEP.
REVISION DATE: 01/2026
EM-101-12
SHEET 1 OF 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TECHNICAL DESIGN REQUIREMENTS
BY STREET CLASSIFICATION
EM-111-1
ITEM
SUB ITEM
CLASSIFICATION
MAJOR ARTERIAL
MINOR ARTERIAL
COLLECTOR (8)
LOCAL &
PRIVATE
RESIDENTIAL
CUL-DE-SAC (3)
EXISTING ALLEY (5)
EMERGENCY
ACCESS*
MINIMUM RIGHT-OF-WAY
(PUBLIC / PRIVATE)
130' - 150'
(4)
110'
(4)
60' TO 80'
50'
60' RADIUS
VARIES
20'
MINIMUM STREET WIDTH
(FC TO FC)
92' - 102'
(8)
68'
(8)
44' - 64'
(8)
32'
48' RADIUS TO FACE OF CURB
PAVEMENT FULL
WIDTH OF ALLEY
UP TO 24'
20'
CURBING
(MAG STD. DET. 220)
VERTICAL CURB & GUTTER
N/A
N/A
SIDEWALK
(MAG STD. DET. 230)
8' WIDE (DETACH) (9)
6' WIDE (9)
5' WIDE
MINIMUM PAVEMENT
STRUCTURE (1)
ASPHALTIC CONCRETE
(MAG SPEC. 710)
5"
4"
3" MINIMUM
3" MINIMUM
(12)
BASE DEPTH
12"
8"
6" MINIMUM
6" MINIMUM
LONGITUDINAL SLOPE
0.4% MINIMUM
6% MAXIMUM
600' MAXIMUM LENGTH
0.4% MINIMUM
9% MAXIMUM
600' MAXIMUM LENGTH
0.4% MINIMUM
9% MAXIMUM
0.4%
10%
CROSS SLOPE
(STRAIGHT CROWN)
1% MINIMUM TO 3% MAXIMUM (2% PREFERRED)
5%
VERTICAL CURVE (6)
REQUIRED WHEN:
GRADE CHANGE EXCEEDS 1.5%
GRADE CHANGE EXCEEDS 1.5%
N/A
CREST CURVE (2)
(11)
(11)
(11)
(11)
10%
SAG CURVE (2)
(11)
(11)
(11)
(11)
10%
HORIZONTAL CURVE
REQUIRED WHEN:
TANGENT CENTERLINES DEFLECT
MORE THAN 5 DEGREES
TANGENT CENTERLINES DEFLECT
MORE THAN 5 DEGREES
TANGENT CENTERLINES DEFLECT
MORE THAN 5 DEGREES
N/A
WB-50
(INSIDE 19.5')
(OUTSIDE 45')
MINIMUM
RADIUS
NO SUPERELEVATION
(10)
(10)
300'
2% SUPERELEVATION
(10)
(10)
N/A
MINIMUM TANGENT
CENTERLINE BETWEEN
REVERSE CURVES
280'
270'
150' (MINOR)
200' (MAJOR)
150'
TAPERS
LENGTH
SPEED LIMIT x WIDTH (7)
(SPEED LIMIT) (WIDTH)
60
N/A
N/A
PAVEMENT STRUCTURE
MATCH MINIMUM PAVEMENT STRUCTURE ABOVE
TECHNICAL DESIGN REQUIREMENTS BY STREET CLASSIFICATION
2
REVISION DATE: 01/2026
*ADDITIONAL LENGTH MAY BE REQUIRED BY THE FIRE DEPARTMENT
N/A
N/A
N/A
N/A
N/A
N/A
MINIMUM RADIUS
OF CURB
MINIMUM LENGTH OF
TANGENT BETWEEN
REVERSE CURVES
750'
575'
450'
300'
280'
270'
200'
150'
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
FIRE DEPARTMENT ACCESS
BARRIER
EM-115
REVISION DATE: 01/2026
FIRE DEPARTMENT ACCESS
FIRE DEPARTMENT ACCESS
2"
NOTES:
1.
ALTERNATIVE FIRE DEPARTMENT
ACCESS BARRIERS WILL NEED TO BE
APPROVED BY THE FIRE MARSHALL.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
SIGN POST INSTALLATION
EM-132-1
SEE DETAIL 'A'
FOR MOUNTING
DETAIL 'A'
SIGN MOUNTING
1-11/32" x 31/32" THRD x 5/16"
CORNER BOLT WITH 5/16"
SELF LOCKING NUT
POST
SIGN
SIGN HEIGHT PER MUTCD
UNLESS OTHERWISE
DIRECTED
SEE
DETAIL 'B'
POST
ANCHOR
CONCRETE BASE
OFFSET PER
MUTCD UNLESS
OTHERWISE
DIRECTED
DETAIL 'B'
ANCHOR ASSEMBLY
POST
ANCHOR
1-11/32" x 31/32" THRD
EACH END x 5/16" DIA.
CORNER BOLT WITH
5/16" SELF LOCKING
NUTS
LEGEND:
·
POST: 1-3/4" x 1-3/4" SQUARE PERFORATED 0.105"
(12 GAUGE) GALVANIZED STEEL TUBING
(GALVANIZED FINISH)
·
ANCHOR: 2" x 2" x 30" SQUARE PERFORATED 0.105"
(12 GAUGE) GALVANIZED STEEL TUBING
(GALVANIZED FINISH)
NOTES:
1.
SIGN POST AND ANCHOR SPECIFICATIONS PER COEM
STD. DET. EM-132-2.
2.
CONCRETE FOR ANCHOR SHALL BE 8-INCHES IN DIA. BY
24-INCHES IN DEPTH AND CLASS "C" CONCRETE.
3.
TOP OF ANCHOR SHALL BE 6-INCHES MAXIMUM ABOVE
GROUND SURFACE.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
SIGN POST SPECIFICATIONS
EM-132-2
SPECIFICATIONS:
1.
THE CITY OF EL MIRAGE REQUIRES SQUARE TUBING FOR POST MOUNTED SIGN INSTALLATIONS.
2.
TUBING SHALL HAVE A GALVANIZED FINISH AND BE ROLL FORMED FROM TWELVE (12) GAUGE (.105 USS GAUGE) COLD ROLLED
STEEL, BE PERFORATED, AND HAVE A HOLE SIZE OF 7/16" IN DIAMETER AND 1" ON CENTER ON ALL SIDES.
3.
ALL POSTS REQUIRE A 2" x 2" x 30" ANCHOR AT A DEPTH OF 24" IN THE GROUND.
4.
FOR SINGULAR SIGNS A 1-3/4" x 1-3/4" x 10' POST IS REQUIRED. FOR MULTIPLE SIGNS A 1-3/4" x 1-3/4" x VARIED LENGTH POST IS
REQUIRED PER MUTCD HEIGHT REQUIREMENTS.
5.
FOR SIGNS THAT EXCEED 42" IN WIDTH, DUAL POSTS AND ANCHORS ARE REQUIRED.
6.
ATTACHMENT OF THE POST TO THE ANCHOR REQUIRES A 1-11/32" x 31/32" x 5/16" CORNER BOLT (THREADED AT EACH END) WITH
5/16" SELF LOCKING NUTS.
7.
ATTACHMENT OF THE SIGN TO THE POST REQUIRES A 1-11/32" x 31/32" x 5/16" CORNER BOLT WITH SELF LOCKING NUTS.
8.
THE ANCHOR SHALL BE PROTECTED (TAPED) PRIOR TO THE CONCRETE PLACEMENT. THE CONCRETE BASE SHALL BE 8" IN
DIAMETER x 24" IN DEPTH, WITH 4" MINIMUM TO 6" MAXIMUM ABOVE FINISH GROUND LEVEL.
9.
ALL STOP SIGN POSTS MUST BE EQUIPPED WITH A RED VIS-Z-SHIELD OR APPROVED EQUAL.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TYPICAL MEDIAN NOSE MARKINGS
EM-133
2' MAXIMUM SPACING
R4-7 (24"x30")
OM-3L (12"x36")
7'
4'
END OF RADIUS
R4-7 & OM-3L
PAVEMENT MARKERS
NOTES:
1.
THE USE OF R4-7 SIGNS SHOULD BE MINIMIZED BY LIMITING INSTALLATION
TO THE BEGINNING OF A SERIES OF MEDIANS AND AT MEDIAN BREAKS AT
ARTERIAL AND COLLECTOR STREETS.
2.
RAISED PAVEMENT MARKERS SHALL BE USED TO PROVIDE ADDITIONAL
VISIBILITY TO MEDIAN NOSES. THE RAISED PAVEMENT MARKERS SHALL
BE INSTALLED ON THE TOP OF THE CURB, USING EITHER TYPE 'D' OR 'G',
DEPENDING ON APPLICATION WITH A MINIMUM QUANTITY OF FOUR.
3.
MEDIAN NOSE STRIPING PER MCDOT PAVEMENT MARKING MANUAL,
DETAILS 5-54 AND 5-55.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
SAFETY RAIL
EM-145
REVISION DATE: 01/2026
NOTES:
1.
POSTS AND RAILS SHALL BE 1.90 INCH OUTSIDE
DIAMETER, HIGH STRENGTH HEAVY INDUSTRIAL
STEEL PIPE CONFORMING TO ASTM F1043
MATERIAL GROUP IA-2 (2.72 LB/FT, MINIMUM
YIELD STRENGTH=50 KSI) OR MATERIAL GROUP
IC GALVANIZED AFTER FORMING (2.28 LB/FT,
MINIMUM YIELD STRENGTH=50 KSI). PUBLIC
SAFETY RAIL SHALL BE A NON-GALVANIZED
EQUIVALENT.
2.
PAINT RAIL PER MAG SPECIFICATIONS SECTION
530 WHEN REQUIRED BY PLANS, SHOP PRIME
WITH RUST INHIBITING PRIMER (FIELD REPAIR
PRIMER AS NEEDED). COLOR FOR PUBLIC
SAFETY RAIL SHALL BE BLACK BEAN (SW6006).
3.
VERTICAL POSTS TO BE EVENLY SPACED.
4.
REMOVE ALL SHARP EDGES.
5.
INSTALL SAFETY RAIL AS REQUIRED BY PLANS
OR SPECIFICATIONS.
6.
THE EMBEDMENT FOR ANCHOR TYPES 1, 2, AND
3 SHALL BE LOCATED INSIDE THE WALL
REINFORCEMENT CAGE.
7.
SAFETY RAIL IS NOT TO BE USED AS A
PEDESTRIAN BRIDGE RAIL.
8.
FOR SAFETY RAIL ON 8" BLOCK (CMU) WALLS,
THE TOP COURSE SHALL BE A BOND BEAM
WITH 2-#4 LONGITUDINAL REBAR AND GROUT.
A
B
C
C'
E1**
E2**
PARKING
ANGLE
STALL
WIDTH
STALL
DEPTH
DRIVE AISLE WIDTH
ONE-WAY
TWO-WAY
30
45
90
9'
9'
17'
13'
9' *
19'
18' *
16'
18' *
16'
16'
25'
25'
25'
25'
*
UP TO 30% OF NON-ADA PARKING SPACES MAY BE COMPACT WITH AN 8'
WIDTH AND 16' DEPTH. THESE SPACES MUST BE MARKED AS "COMPACT".
**
ADDITIONAL WIDTH MAY BE REQUIRED BY THE FIRE DEPARTMENT.
ANGLE PARKING
PARALLEL PARKING
90° PARKING
10'
22' MIN
25'
16'*
TWO-WAY
ONE-WAY
E1
C
B
NOTE 1
PROPERTY
LINE
C'
C'
E2
C
C'
A
C'
C
E2
C
A
NOTE 2
WALL, FENCE
OR BUILDING
8'
5'
8'
25'
SINGLE A.D.A.
PARKING SPACES
18'
18'
25'
18'
9'
9'
8'
5'
2 OR MORE A.D.A.
PARKING SPACES
NOTE 1
WALL, FENCE, OR BUILDING
A
18'
75
9'
20'
19'
22'
25'
60
9'
20'
18'
16'
25'
NOTE 2
ATTACHED
SIDEWALK
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
PARKING LOT DIMENSIONS
EM-157
NOTES:
1.
A SIX (6) INCH HIGH MAG TYPE CURB IS REQUIRED AROUND ALL PARKING LOTS
AND DRIVEWAYS. THE CURB SHALL BE NO CLOSER THAN 3-FEET TO ANY
PROPERTY LINE.
2.
PARKING SPACES ADJACENT TO A SIDEWALK REQUIRE PARKING BLOCKS OR THE
SIDEWALK SHALL BE A MINIMUM OF 6-FEET WIDE.
3.
A.D.A. PARKING SPACES FOR VAN ACCESS TO BE A MINIMUM OF EIGHT (8) FEET
WIDE WITH AN EIGHT (8) FOOT WIDE AISLE. VAN ACCESS AT LEAST ELEVEN (11)
FEET WIDE MAY UTILIZE A MINIMUM OF FIVE (5) FEET OF AISLE. SEE A.D.A.
GUIDELINE 502.2.
4.
ALL ACCESSIBLE PARKING FACILITIES SHALL COMPLY WITH A.D.A. REQUIREMENTS.
5.
ALL STANDARD PARKING SPACES SHALL BE PAINTED WITH A MINIMUM OF 4" OF
WHITE PAINT. ANY ALTERNATIVE STRIPING MUST BE APPROVED BY THE CITY.
6.
OVERHANG CANNOT COUNT TOWARDS THE LENGTH OF THE PARKING SPACE.
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
SIGHT DISTANCE REQUIREMENTS
ARTERIAL AND COLLECTOR STREETS
EM-158
NOTES:
1.
THE SHADED AREAS (SIGHT VISIBILITY
TRIANGLES) SHALL BE KEPT CLEAR OF
VEGETATION THAT AT MATURITY WILL
HAVE HEIGHTS GREATER THAN 30” AND
TREES THAT HAVE BRANCHES LOWER
THAN 84”; AS MEASURED FROM
PAVEMENT SURFACE.
2.
ABOVE GROUND UTILITY FACILITIES
AND APPURTENANCES ABOVE 30” IN
HEIGHT SHALL NOT BE LOCATED
WITHIN THE SIGHT VISIBILITY
TRIANGLES.
3.
THE DRAWING DEPICTS A TYPICAL
PASSENGER VEHICLE WITH GRADES OF
3% OR LESS, ADJUSTMENTS FOR
GRADES GREATER THAN 3% SHALL BE
MADE PER AASHTO.
4.
DESIGN VEHICLE SHALL BE
DETERMINED BY THE CITY ENGINEER.
REFER TO AASHTO FOR SIGHT
DISTANCE REQUIREMENTS FOR A
SINGLE UNIT TRUCK AND COMBINATION
TRUCK.
5.
MEDIANS LESS THAN 4’ IN WIDTH WILL
EITHER BE STAMPED CONCRETE,
EXPOSED CONCRETE OR PAVERS; NO
PLANT MATERIAL WILL BE ALLOWED.
6.
MOUNDS USED WITHIN SIGHT
DISTANCE TRIANGLES, ROW, AND VIEW
EASEMENTS ARE NOT PERMITTED.
CARE SHOULD BE TAKEN WHEN
DESIGNING LANDSCAPING WITHIN
SIGHT DISTANCE TRIANGLES AND VIEW
EASEMENTS.
REVISION DATE: 01/2026
RESTRICTED AREA FOR VEGETATION
AND OTHER SIGHT OBSTRUCTIONS.
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
RIGHT-OF-WAY
MAJOR STREET
MAJOR STREET
MINOR STREET
OR DRIVEWAY
EDGE OF PAVEMENT / CURB LINE
EDGE OF PAVEMENT / CURB LINE
EDGE OF PAVEMENT / CURB LINE
SIGHT LINE
SIGHT LINE
MEASURE TO CENTER
OF THROUGH LANE
(TYP.)
STOP SIGN
DISTANCE B
DISTANCE A
DISTANCE C
12'
3'
10'
SIGHT LINE
3'
*
DESIGN SPEEDS SHALL BE 10 MPH OVER THE POSTED SPEED LIMIT.
** BIKE LANES DO NOT COUNT AS LANES.
DESIGN SPEED
(85TH PERCENTILE)
OF MAJOR STREET*
DISTANCE A
DISTANCE C
DIST. B
NUMBER OF MAJOR STREET LANES
TO CROSS FOR LEFT TURN FROM
MINOR STREET OR DRIVEWAY
(INCLUDING MEDIAN) **
NUMBER OF OPPOSING LANES
TO CROSS FOR LEFT TURN
FROM MAJOR STREET **
RIGHT
TURN
FROM
MINOR
STREET
25 MPH
30 MPH
35 MPH
40 MPH
45 MPH
50 MPH
55 MPH
280'
340'
390'
450'
500'
560'
610'
300'
360'
420'
480'
530'
590'
650'
320'
380'
440'
500'
570'
630'
690'
340'
400'
470'
530'
600'
670'
730'
240'
290'
340'
390'
430'
480'
530'
210'
250'
290'
330'
370'
410'
450'
230'
270'
310'
360'
400'
450'
490'
240'
290'
340'
390'
430'
480'
530'
260'
310'
370'
420'
470'
520'
570'
1
2
3
4
1
2
3
4
PASSENGER VEHICLE INTERSECTION SIGHT DISTANCE
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
INTERCONNECT TRENCH DETAIL
EM-170
CITY OF EL MIRAGE FIBER OPTIC CABLE
CITY OF EL MIRAGE
COPPER LOCATOR WIRE (#12 AWG) AND DETECTABLE
MULE TAPE (INSIDE CONDUIT) - (SEE NOTE 8 & 9)
COPPER LOCATOR WIRE (#12 AWG) AND DETECTABLE
MULE TAPE (INSIDE CONDUIT) - (SEE NOTE 8 & 9)
REVISION DATE: 01/2026
NOTES:
1.
TRENCH SHALL BE A MINIMUM DEPTH OF42-INCHES AND
SHALL HAVE A MINUMUM COVER OF 36-INCHES OVER
PVC CONDUITS.
2.
REFER TO CITY DRY UTILITY NOTE 11 FOR PAVEMENT
REPLACEMENT.
3.
BORING IS PREFERRED. OPEN TRENCHING SHALL BE
PERMITTED WITH PRIOR APPROVAL FROM THE CITY.
4.
IF THE CONDUIT ROUTING CROSSES AN EXISTING
PORTLAND CEMENT CONCRETE DRIVEWAY, THE
CONDUITS SHALL BE PLACED BY BORING. ALL
ASPHALTIC CONCRETE (AC) DRIVEWAYS MAY BE
TRENCHED.
5.
ALL CONDUIT BENDS SHALL BE CONCRETE ENCASED
FOR A MINIMUM OF TWO (2) FEET BEYOND EACH END OF
THE BEND.
6. A 1/2 SACK OF CEMENT SLURRY BACKFILL SHALL BE
USED THROUGH THE PIPE ZONE WHEN BACKFILLING
CONDUITS INSTALLED IN A TRENCH IN PAVEMENT.
CONDUITS SHALL BE SUPPORTED AND ANCHORED IN
THE TRENCH PRIOR TO BACKFILLING WITH THE CEMENT
SLURRY.
7. TRENCH WIDTH MAY NOMINALLY VARY FROM 6" TO 8"
BUT SHALL NOT EXCEED 12" IN WIDTH.
8. A SINGLE CONTINUOUS INSULATED COPPER LOCATOR
WIRE (#12 AWG) PER CITY DETAIL EM-101-12 SHALL BE
INSTALLED INSIDE ONE OF THE CONDUITS ALONG THE
ENTIRE LENGTH OF THE CONDUIT RUN. WIRE SHALL
HAVE A 5' SERVICE LOOP IN EACH PULL BOX. CRIMP A
PIGTAIL TO LID. A CRIMPED SPLICE IS REQUIRED IN ALL
THE PULL BOXES AND NOT IN THE CONDUIT RUN.
9. FLAT WOVEN POLYESTER MULE TAPE WITH 2500 POUND
TENSILE STRENGTH SHALL BE INSTALLED ALONG THE
ENTIRE LENGTH OF THE CONDUIT RUN FOR ALL
CONDUITS THAT DO NOT HAVE A LOCATOR WIRE.
10. CONTRACTOR SHALL MAINTAIN A 10:1 VARIANCE OF THE
CONDUIT ALIGNMENT DURING INSTALLATION.
11. CONDUIT SPACERS AT 3 PER 20', AND 2' FROM ANY
DIRECTION CHANGE OR JOINT.
12. ITS CONDUITS TO BE LOCATED WITHIN THE ROW.
PREFERRED LOCATION IS BACK OF SIDEWALK IF
RIGHT-OF-WAY PERMITS.
13. AC MIX AND SOURCE OF MATERIALS SHALL BE
APPROVED BY THE CITY PRIOR TO INSTALL.
PAVEMENT REPLACEMENT (SEE NOTE 2)
1/2 SACK CEMENT SLURRY PER MAG SECTION 604 & 728
1/2 SACK CEMENT SLURRY BACKFILL
TRENCH WIDTH, SEE NOTE 7
NATIVE BACKFILL PER MAG SECTION 601
ASPHALTIC
SEALER SEE
EM-172-6,
NOTE (II)
M
SIDEWALK (TYP)
RIGHT OF WAY (TYP)
FACE OF CURB (TYP)
EDGE OF PAVEMENT (TYP)
LIP OF GUTTER (TYP)
VALLEY
GUTTER
PREFERRED PATHWAY IF
GREATER THAN 4'
HORIZONTAL CLEARANCE
FROM EXISTING MANHOLES
ALTERNATE PATHWAY IF
PREFERRED IS LESS THAN
4' HORIZONTAL CLEARANCE
FROM EXISTING MANHOLES
ROADWAY WITH VALLEY GUTTER & APRON @ CURB RETURN
NOTE: REFER TO MICRO-TRENCHING GENERAL NOTES ON EM-172-3 TO EM-172-5 AND MICRO-TRENCHING SURFACE RESTORATION NOTES ON EM-172-6 TO EM-172-8
4" MIN.
FROM OUTSIDE
EDGE OF THE
MANHOLE BARREL
A
A
C
C
SIDEWALK (TYP)
RIGHT OF WAY (TYP)
FACE OF CURB (TYP)
EDGE OF PAVEMENT (TYP)
PREFERRED PATHWAY
MAINTAIN 2' HORIZONTAL
CLEARANCE FROM
EXISTING VALVES
ROADWAY WITH CURB AND GUTTER @ CURB RETURN
2' MIN.
FROM OUTSIDE
EDGE OF VALVE
COVER EXTENSION
D
D
E
E
V
BIKE LANE
STRIPE
MICRO-TRENCH
PATHWAY (TYP)
MICRO-TRENCH
PATHWAY (TYP)
LEGEND
ASPHALT
CONCRETE
SUBGRADE
CEMENTIOUS BACKFILL,
EM-172-5, NOTE 6
CONDUIT
SIDEWALK
ASPHALTIC
SEALER SEE
EM-172-6 NOTE (II)
CURB &
GUTTER
SEE EM-172-3,
NOTE 2 (II)
SECTION A-A
SEE EM-172-3,
NOTE 2 (IV)
ROADWAY
MIN COVER
SEE EM-172-3,
NOTE 2 (I)
SEE EM-172-3,
NOTE 2 (IV, V, VI)
MIN COVER
SEE EM-172-3,
NOTE 2 (I)
SECTION B-B
EM-172-3, NOTE 1
EM-172-5, NOTE 5
CURB
GUTTER
SEE EM-172-3,
NOTE 2 (IV)
SECTION C-C
SEE
EM-172-3,
NOTE 2 (II)
MIN COVER
SEE EM-172-3,
NOTE 2 (I)
CONTRACTOR SHALL NOT CUT
EXISTING REINFORCEMENT OR
DOWELING IN VALLEY GUTTER
APRON
SEE EM-172-3,
NOTE 2 (IV)
ROADWAY
MIN COVER
SEE EM-172-3,
NOTE 2 (I)
SECTION E-E
ROADWAY
NTS
NTS
SECTION D-D
NTS
NTS
NTS
NTS
ASPHALTIC
SEALER SEE
EM-172-6,
NOTE (II)
ROADWAY
SEE EM-172-3,
NOTE 2 (II)
3' MIN
MIN COVER
SEE EM-172-3,
NOTE 2 (I)
GUTTER
MICRO-CONDUIT
JUNCTION
LOCATION (TYP)
MICRO-CONDUIT
JUNCTION
MICRO-CONDUIT
JUNCTION
B
B
MICRO-CONDUIT
TERMINATION
LOCATION (TYP)
EM-172-3, NOTE 1
EM-172-5, NOTE 5
NTS
VALLEY
GUTTER
ASPHALTIC
SEALER SEE
EM-172-6,
NOTE (II)
SEE EM-172-3,
NOTE 2 (II)
SEE EM-172-3,
NOTE 2 (II)
SEE EM-172-3,
NOTE 2 (IV, V, VI)
ALTERNATE SECOND TRENCH
PATHWAY IF JOINT TRENCH
NOT POSSIBLE. SAWCUT TO A
STRAIGHT/CLEAN EDGE (MAY
EXCEED MICRO-TRENCH
LIMITS IF NECESSARY). SEE
EM-172-2 FOR DETAIL.
JOINT MICRO-TRENCH
WHEN SECOND TRENCH
PRESENT (PREFERRED))
BIKE
LANE
STRIPE
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TYPICAL MICRO-TRENCHING
DETAILS
EM-172-1
INSTALL CURB MARKER WHERE
LATERAL SERVICE CROSSES
BENEATH CURB (TYP)
REVISION DATE: 01/2026
1'-6"
MIN
CONDUITS
ZONE
6'-0" MIN
2.5"
MAX WIDTH
EXISTING CURB
AND GUTTER
LIP OF GUTTER
NEW ASPHALT
CONCRETE
PAVEMENT
GRIND AND CAP
4" DEEP
TACK
COAT
EXIST.
ASPHALT
CONCRETE
PAVEMENT
THICKNESS
VARIES
SEE NOTE 1
SEE NOTE 3
BOTTOM
OF TRENCH
FIRST
INSTALLED
CONDUIT
SEE NOTE 4
SEE NOTE 2
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING SECOND
TRENCH LOCATION
EM-172-2
NOTES:
1.
LOCAL STREETS - 3" AC ON 6" ABC*
COLLECTOR STREETS - 4" AC ON 8" ABC*
ARTERIAL STREETS - 5" AC ON 12" ABC*
*UNLESS OTHERWISE NOTED
2.
6" DEPTH ON LOCAL STREETS
10" DEPTH ON COLLECTOR STREETS
10" DEPTH FOR ARTERIAL CROSSINGS
3.
BACKFILL PER DETAIL EM-172-3 TO EM-172-5 REQUIREMENTS.
4.
PER DETAIL EM-172-3 TO EM-172-5 REQUIREMENTS FOR THIRD
MICRO-TRENCHES, APPLY MICRO-SEAL OR SLURRY SEAL PER CITY
STANDARDS FROM LIP OF GUTTER TO 50' BEYOND THE PAVEMENT CUT.
ALL STRIPING SHALL BE REPLACED PER CITY STANDARDS.
REVISION DATE: 01/2026
THE FOLLOWING STANDARDS APPLY TO MICRO-TRENCHING:
1. MICRO-TRENCHING IS NOT PERMITTED IN THE FOLLOWING AREAS:
I)
CONCRETE STREETS, DRIVEWAYS, SIDEWALKS, CURB AND GUTTER, APRONS, BOX CULVERTS, BRIDGES, OR OTHER CONCRETE STRUCTURES.
II)
SPECIAL PAVEMENTS SUCH AS, DECORATIVE PAVING, BRICKS, CONCRETE PAVERS, EXPOSED AGGREGATE CONCRETE, STAMPED ASPHALT, OR OTHER
UNIQUE NON-CONCRETE OR NON-ASPHALT MATERIALS.
III)
AREAS RESTRICTED PER EL MIRAGE CITY CODE AND THE PAVEMENT CUT POLICY.
IV)
CROWN OF THE STREET.
V)
THE APPLICANT MUST COORDINATE ATTACHMENTS TO ANY BOX CULVERT OR BRIDGE WITH THE ENGINEERING DIVISION.
2. MICRO-TRENCHING MUST:
I)
ONLY BE ALLOWED FOR PERPENDICULAR CROSSINGS ON ARTERIAL STREETS AND HAVE SUFFICIENT DEPTH FOR
THE CONDUITS TO BE INSTALLED WITH A MINIMUM COVER OF 10" IN AN ARTERIAL OR COLLECTOR STREET AND 6" IN LOCAL STREETS;
II)
HAVE MAXIMUM 2.5" WIDE TRENCH:
III)
BE RESTORED WITH PRE-APPROVED CEMENTITIOUS BACKFILL. SEE EM-172-5, NOTE 6 FOR ADDITIONAL INFORMATION;
IV)
CONDUITS MUST BE TRACEABLE WITH TRACER WIRE PER THE CITY'S APPROVED MATERIAL LIST AND MUST MEET ASTM B1010 REQUIREMENTS;
V)
CONFORM TO SEPARATION REQUIREMENTS (HORIZONTAL AND VERTICAL) FROM EXISTING UTILITIES AS SHOWN ON CITY DETAIL EM-402.
VI)
BE INSTALLED WITHOUT CUTTING EXISTING CONCRETE IMPROVEMENTS. MICRO-TRENCH SHALL BE INSTALLED BENEATH CONCRETE WHERE
REQUIRED.
3. LOCATION OF TRENCHES:
I)
MICRO-TRENCHING IS APPROVED FOR PERPENDICULAR CROSSINGS ON ARTERIAL STREETS AND FOR USE ON COLLECTOR AND LOCAL STREET
CLASSIFICATIONS.
II)
MICRO-TRENCHING ON PRIVATE STREETS SHALL BE APPROVED AND PERMITTED BY THE HOMEOWNERS ASSOCIATION OR EQUIVALENT GOVERNING
BODY.
III)
THE UTILITY/CONTRACTOR IS RESPONSIBLE TO VERIFY CITY HAS A UTILITY EASEMENT OVER THE PRIVATE STREET. THE UTILITY/CONTRACTOR SHALL
OBTAIN A PERMIT FROM THE CITY TO WORK WITHIN THE UTILITY EASEMENT.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING GENERAL NOTES
EM-172-3
NOTES:
REVISION DATE: 01/2026
3. LOCATION OF TRENCHES (CONT.):
IV)
MICRO-TRENCHING MUST BE LOCATED AT THE LIP OF GUTTER ON EITHER SIDE OF A STREET UNLESS SPECIFIED OTHERWISE WITHIN THE
CITY STANDARD DETAILS.
V)
A SECOND MICRO-TRENCH MAY BE PLACED 6 FEET AWAY FROM THE FIRST MICRO-TRENCH. IF A BIKE LANE EXISTS, MICRO-TRENCH SHALL
BE COMPLETELY OUTSIDE OF THE BIKE LANE AND BE ADJACENT TO THE BIKE LANE STRIPE. CONTRACTOR SHALL APPLY A SURFACE
TREATMENT, I.E. MICRO-SEAL, SLURRY SEAL OR OTHER SEALANT MATERIAL APPROVED BY THE CITY ENGINEER FROM 1' BEYOND THE
SECOND TRENCH AND THE LIP OF GUTTER AND RESTRIPE THE BIKE LANE LINES AND SYMBOLS;
VI)
WHERE ANGULAR CROSSING OR ANY LENGTH-WISE CUTS OF A BIKE LANE OCCUR BY MICRO-TRENCHING, THE CAPPING LIMITS SHALL
EXTEND THE FULL WIDTH OF THE BIKE LANE. PERPENDICULAR CROSSINGS MAY RECEIVE A CAPPING WIDTH A DISTANCE OF 50' FROM EDGE
OF PAVEMENT CUT. PAVEMENT MARKINGS SHALL BE RESTORED IN KIND. WHERE NO BIKE LANE MARKINGS EXIST, CONTRACTOR SHALL
CONSULT WITH CITY TO DETERMINE LOCATION OF ANY PLANNED BIKE LANES SO THAT IMPACT OF PAVEMENT SURFACE MAY BE AVOIDED.
VII)
MICRO-TRENCHING SHALL BE CONSTRUCTED AND PHASED TO MINIMIZE INTERFERENCE WITH VEHICULAR TRAFFIC.
VIII) MICRO-TRENCHING MAY EXTEND THROUGH AN INTERSECTION AND CONTINUE ADJACENT TO THE CURB ON THE OTHER SIDE OF THE
INTERSECTION.
IX)
PRIOR TO MICRO-TRENCHING OPERATION, THE CITY INSPECTOR AND CONTRACTOR SHALL "WALK" THE MICRO-TRENCH PATH AFTER AZ811
LOCATE MARKERS HAVE BEEN COMPLETED. THE PURPOSE OF THE "WALK" IS TO IDENTIFY ANY AREAS OF POTENTIAL CONFLICT AND/OR
INTERFERENCE AND RECORD THE RESULTS OF THE "WALK". ADDITIONALLY, THE CONTRACTOR SHOULD VERIFY THAT ALL UTILITIES HAVE
BEEN LOCATED. THE CONTRACTOR SHALL CROSS CHECK THE RECORD DRAWINGS AND PLANS WITH FIELD LOCATE MARKS TO DETERMINE
DISCREPANCIES.
X)
THE CITY REQUIRES EACH LICENSEE TO REFER TO THE ARIZONA UTILITY COORDINATING COMMITTEE (AUCC) - PUBLIC IMPROVEMENT
PROJECT GUIDE (PIPG) JOINT USE TRENCH MODEL. EACH LICENSEE INTENDING TO INSTALL CONDUIT USING THE MICRO-TRENCH METHOD
SHALL NOTIFY OTHER LICENSEES AND OFFER JOINT TRENCH USE TO POTENTIAL PARTICIPANTS.
4. VAULTS AND SERVICE CONNECTIONS
I)
CONNECTION TO SERVICE LATERALS, JUNCTION BOXES, ETC., SHALL BE DONE SUCH THAT CURB AND GUTTER IS NOT DISTURBED, SETTLED OR DAMAGED.
REMOVAL LIMITS OF SIDEWALK SHALL FOLLOW APPLICABLE STANDARDS AND REQUIREMENTS AS APPROVED BY THE ENGINEERING DIVISION.
II)
THE USE OF HYDRO-JETTING IS NOT PERMITTED. TRENCHLESS METHODS SHALL NOT CREATE A VOID TWO TIMES GREATER THAN CONDUIT. VOID SHALL
BE COMPACTED AND BACKFILLED.
III)
VAULTS, JUCTION BOXES, HANDHOLES, ETC. THAT ARE INSTALLED WITHIN PAVEMENT OR VEHICULAR PATHWAYS MUST MEET TRAFFIC RATING CRITERIA
DESCRIBED WITHIN AASHTO M306. PRODUCT DATA, DETAILS, AND/OR SPECIFICATIONS SHOWING THAT PRODUCT(S) MEET TRAFFIC RATING
REQUIREMENTS SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING GENERAL NOTES
EM-172-4
REVISION DATE: 01/2026
6. BACKFILL PROCEDURES
THE BACKFILL MATERIAL MUST BE 1200 - 2000 PSI CONTROLLED LOW STRENGTH MATERIAL (CLSM) WITH SAND OR AN EQUIVALENT FLOWABLE TYPE BACKFILL AS
SPECIFIED IN MAG SPECIFICATION 604, 701.3, AND 728. MICRO-TRENCHING AND CORES SHALL BE BACKFILLED BY THE END OF THE DAY FOLLOWING THE
INSTALLATION OF THE NEW FACILITY. THIS BACKFILL PROCESS MUST ADHERE TO THE FOLLOWING:
I)
TRENCH BACKFILL SHALL BE PLACED IN A TRENCH THAT IS FREE OF STANDING WATER.
II)
BEFORE PLACING ANY BACKFILL, REMOVE ALL LOOSE CONCRETE OR ROCKS, ROOTS, TRASH, AND OTHER DEBRIS FROM THE EXCAVATION.
III)
SAND BEDDING IS NOT ALLOWED.
IV)
THE BACKFILL MUST BE PLACED USING AN ON-BOARD VIBRATOR THAT MATCHES THE MICRO-TRENCH WIDTH.
V)
THE BACKFILL MATERIAL MUST ADHERE TO MAG SPECIFICATION 604.1 MODIFIED TO REPLACE COURSE AGGREGATE WITH FINE AGGREGATE (SAND), AS
SPECIFIED IN MAG SPECIFICATION 701.3.
THE MATERIAL MUST ALSO:
1)
FLOW FREELY TO THE MICRO-TRENCH BOTTOM.
2)
REMAIN STABLE UNDER TRAFFIC LOADS.
3)
BE SUITABLE FOR THE ROAD ENVIRONMENT.
4)
MEET PERFORMANCE TESTING PER MAG SPECIFICATION 604.4.
5)
MEET ACCEPTANCE PER MAG SPECIFICATION 604.5.
VI)
THE BACKFILL MATERIAL MUST BE 100% CURED BEFORE APPLYING THE ASPHALTIC SEALANT.
VII)
IF TESTS OR INSPECTONS REVEALS THAT THE BACKFILL FAILS TO MEET THE REQUIREMENTS MENTIONED ABOVE, THE BACKFILL WILL BE CONSIDERED
UNACCEPTABLE AND MUST BE REMOVED AND REPLACED. ALL COSTS RELATED TO CORRECTIONS AND SUBSEQUENT TESTING WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR IF THE BACKFILL IS DEEMED UNACCEPTABLE AND/OR IF THE TRENCH IS BACKFILLED WITHOUT BEING INSPECTED
BY THE CITY INSPECTOR.
VIII) THE ASPHALTIC SEALANT SHALL BE COMPLETED IN NO MORE THAN 7 CALENDAR DAYS AFTER PLACEMENT OF THE CLSM.
5. PAVEMENT CUTS
I)
SAWCUTS SHALL BE STRAIGHT AND CLEAN.
II)
THE VERTICAL FACES OF THE TRENCH MUST BE CLEAN, OIL FREE, WITH NO LOOSE MATERIAL.
III)
CONTRACTOR SHALL JACK OR PUSH CONDUITS DIRECTLY UNDER THE CURB AND GUTTER, SIDEWALK AND/OR VALLEY GUTTER.
IV)
COMPLY WITH THE CITY OF EL MIRAGE PAVEMENT CUT POLICY.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING GENERAL NOTES
EM-172-5
REVISION DATE: 01/2026
I)
THE SEALANT SHALL OVERLAY THE GROOVE LEAVING A MAXIMUM OVERBAND APPEARANCE OF 3-INCH WIDE (6-INCH WIDTH TOTAL) ON EACH SIDE OF T
EXCAVATION CENTERLINE.
II)
WHERE THE TRENCH IS ADJACENT TO CURB AND GUTTER OR OTHER CONCRETE SURFACE, THE SEALANT SHALL OVERLAY THE GROOVE LEAVING A
MAXIMUM 3-INCH WIDE OVERBAND ON THE ASPHALT SURFACE.
III)
THE HEIGHT OF THE SEALANT ABOVE THE PAVEMENT SURFACE SHALL NOT EXCEED 1/8-INCH.
IV)
PAVEMENT PATCHES SHALL BE "SQUARED UP" AND NOT IRREGULAR IN SHAPE.
V)
THE UTILITY POTHOLE-KEYHOLE METHOD, ALSO KNOWN AS CORE RESTORATION, SHALL CONFORM TO MAG DETAIL 212, TYPE B PAVEMENT REPAIR
MODIFIED FOR A MAXIMUM DIAMETER CORE OF 10-INCHES.
(A)
IF THE PAVEMENT CORE IS FOUND FRACTURED OR DEFECTIVE UPON REMOVAL, OR IF IT BECOMES DAMAGED AFTER REMOVAL AND BEFORE
REINSTATEMENT, THE DEFECTIVE OR DAMAGED CORE SHALL NOT BE USED TO RESTORE PAVEMENT.
(B)
CLSM SHALL CONFORM TO MAG SPECIFICATIONS SECTION 355.3.1 AND SECTION 728, AND BE PLACED TO TOP OF TRENCH, ALLOWING SPACE FOR
ASPHALT SEALER.
(C)
CONVENTIONAL POTHOLE RESTORATION SHALL CONFORM TO MAG DETAIL 212, TYPE A OR B PAVEMENT REPAIR, MODIFIED TO INCLUDE CRACK SE
VI)
THE RESTORED SURFACE SHALL BE THOROUGHLY COMPACTED, SMOOTH AND TRUE TO GRADE AND CROSS-SECTION, AND FREE FROM RUTS, HUMPS,
DEPRESSIONS, OR IRREGULARITIES PER MAG 336.2.4.1.
VII) RESTORATION OF ANY DAMAGED TRAFFIC CONTROL DEVICES MUST BE COMPLETED, INCLUDING BUT NOT LIMITED TO, EMBEDDED LOOP DETECTORS A
PAVEMENT MARKINGS.
THE ASPHALTIC SEALING MATERIAL, ALSO KNOWN AS AN OVERBAND, PLACED OVER THE TOP OF A MICRO-TRENCH SHALL CONFORM TO MAG
STANDARD 337 AND BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS OR THE REQUIREMENTS OF THIS STANDARD
WHICHEVER IS MORE STRINGENT.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING SURFACE
RESTORATION NOTES
EM-172-6
ASPHALTIC SEALER/OVERBAND
REVISION DATE: 01/2026
I)
A CONTRACTOR PERFORMING CONSTRUCTION IN PUBLIC RIGHT-OF-WAY (ROW) MUST RESTORE THE ROW TO A CONDITION EQUAL TO OR BETTER THAN
THAT SPECIFIED IN THIS DETAIL OR OTHER APPLICABLE CITY DESIGN AND CONSTRUCTION STANDARDS.
II)
CONCRETE DAMAGE, POTHOLE EXCAVATIONS OR OTHER DAMAGE IN CONCRETE FACILITIES, SHALL BE SAW CUT AND REMOVED TO THE NEAREST JOINT.
IF SIDEWALK PANELS ARE DAMAGED OR POTHOLED THEY MUST BE ENTIRELY REPLACED.
III)
TURF REPLACEMENT AND SOD MATCHING EXISTING TURF SHOULD BE USED AND CONFORM TO MAG STANDARD SPECIFICATION 430. RUTS SHOULD BE
ELIMINATED, AND TOPSOIL MUST BE PREPARED TO CREATE A SMOOTH SURFACE DEVOID OF ROCKS AND GRAVEL.
IV)
ANY IRRIGATION SYSTEMS SHALL BE RESTORED PER MAG SPECIFICATION SECTION 440. ALL IRRIGATION SYSTEMS (I.E., SPRINKLER HEADS, BUBBLERS,
EMITTERS, CONTROLS, ETC.) SERVING AN AREA AFFECTED BY THIS PROJECT SHALL BE RESTORED AS REQUIRED TO FACILITATE THE CONTINUED
OPERATION FOR THEIR INTENDED USE. NEW SPRINKLER HEADS SHALL HAVE THE SAME PRECIPITATION OUTPUT AS THE EXISTING LAWN HEADS. ALL
PIPING, PIPE FITTINGS, COUPLINGS, SPRINKLERS, EMITTERS, CONDUIT, SLEEVING, LOW VOLTAGE CONDUCTORS, SERVICE LINE CONDUCTORS, DRIP LINE,
FIXTURES, ETC. USED IN THE REPAIR AND RESTORATION OF EXISTING SPRINKLER AND EMITTER SYSTEMS SHALL BE NEW, IN PERFECT CONDITION, AND
SHALL COMPLY WITH MAG SPECIFICATION SECTION 757.
V)
FOR SYNTHETIC TURF, FOLLOW THE MANUFACTURER'S RECOMMENDATIONS FOR RESTORATION, ADHERING TO THESE ABBREVIATED STEPS:
(A)
CLEAN THE SURFACE: BEGIN BY THOROUGHLY CLEANING THE SYNTHETIC TURF SURFACE. REMOVE DEBRIS, LEAVES, DIRT, AND DUST USING A LEAF
BLOWER, BROOM, OR A GENTLE SPRAY OF WATER.
(B)
APPLY INFILL: IF YOUR SYNTHETIC TURF HAS INFILL MATERIAL (LIKE SAND), CHECK IF IT NEEDS REPLENISHING. ADD THE APPROPRIATE AMOUNT OF
INFILL TO MAINTAIN WEIGHT AND SUPPORT FOR THE TURF.
(C)
REPAIR DAMAGES: INSPECT FOR DAMAGE SUCH AS TEARS, RIPS, OR LOOSE SEAMS. REPAIR DAMAGED AREAS AS PER THE MANUFACTURER'S
GUIDELINES. SECURE SEAMS PROPERLY.
(D)
DIRECTION OF GAUGES OR TUFTED FIBER: DETERMINE THE DIRECTION OF THE GAUGES OR TUFTED FIBER IN THE LAWN. ADD NEW SECTIONS IN THE
CORRECT DIRECTION FOR A SEAMLESS APPEARANCE. ENSURE THAT BLADES AND STITCH PATTERNS FACE THE SAME DIRECTION.
(E)
REMOVE STAINS: USE A MILD DETERGENT MIXED WITH WATER TO GENTLY SCRUB STAINED AREAS. RINSE THOROUGHLY WITH WATER TO REMOVE
SOAP RESIDUE.
(F)
RINSE AND DRAIN: RINSE THE ENTIRE TURF WITH WATER TO REMOVE CLEANING AGENTS OR DIRT. ENSURE PROPER DRAINAGE FROM THE
SURFACE.
(G)
GROOM THE TURF: USE THE BRUSH OR POWER BROOM TO GROOM THE TURF IN THE NATURAL DIRECTION OF THE BLADES. THIS HELPS FIBERS
STAND UPRIGHT AND GIVES A REALISTIC APPEARANCE.
SITE RESTORATION
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING SURFACE
RESTORATION NOTES
EM-172-7
REVISION DATE: 01/2026
(A)
GEOTEXTILE OR WEED BARRIER FABRIC, IS A SPECIALIZED MATERIAL DESIGNED FOR WEED CONTROL, EROSION PREVENTION, AND ENHANCED
LANDSCAPING STABILITY. ENSURE THAT THE NEW GEOTEXTILE FABRIC MATCHES OR EXCEEDS THE QUALITY OF THE EXISTING FABRIC BEING REPLACED.
THE WEIGHT PER SQUARE YARD SHOULD EXCEED THAT OF THE EXISTING GEOTEXTILE FABRIC.
(B)
BACKFILL AND COMPACT TRENCHES TO A MINIMUM OF 90% OF MAXIMUM DENSITY.
(C)
MAINTAIN A 6 TO 12-INCH OVERLAP BETWEEN EACH PIECE OF GEOTEXTILE FABRIC. FAILING TO OVERLAP THE MATERIAL COULD ALLOW WEEDS TO GROW
BETWEEN THE GAPS.
(D)
SECURE THE LANDSCAPE FABRIC IN PLACE.
(E)
REMOVE WEEDS & DEBRIS.
(F)
LEVEL THE SOIL SURFACE.
(G)
THE CONTRACTOR SHOULD MATCH THE EXISTING LANDSCAPE ROCK AND ROCK PATTERN, COVERING THE ENTIRE AREA WITH ROCK AND ENSURING NO
GAPS WHERE THE GEOTEXTILE FABRIC IS EXPOSED.
(H)
UNLESS DIRECTED OTHERWISE BY THE CITY INSPECTOR, THE CONTRACTOR MUST COMPLETE ALL REPAIRS AND RESTORATION WORK ON DAMAGED OR
DISTURBED LANDSCAPE IRRIGATION SYSTEMS, ELECTRICAL LINES, AND LIGHTING WITHIN 24 HOURS OF SUCH DAMAGE OR DISRUPTION.
FOR GEOTEXTILE FABRIC, FOLLOW THE MANUFACTURER'S RECOMMENDATIONS FOR RESTORATION. HERE ARE THE ABBREVIATED STEPS
RESTORATION WORK SHOULD BE CARRIED OUT PROMPTLY. UNSATISFACTORY RESTORATION OR DELAYED COMPLETION WILL LEAD TO A HALT IN ALL
CONTRACTOR WORK ON THE OVERALL PROJECT. NO ADDITIONAL PERMITS WILL BE ISSUED UNTIL SATISFACTORY RESTORATION IS COMPLETE, INCLUDING
PREVIOUSLY PERMITTED BUT UNFINISHED WORK.
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
MICRO-TRENCHING SURFACE
RESTORATION NOTES
EM-172-8
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
FIBER-OPTIC CURB MARKER
EM-173
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
BICYCLE EXIT/ENTRANCE RAMP
EM-239
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TURN DIVERTERS - RIGHT TURN LANE
EM-253-1
REVISION DATE: 01/2026
PROHIBITS LEFT TURN IN
PROHIBITS LEFT TURN OUT
PROHIBITS LEFT TURN IN AND OUT
CONSTRUCT MOUNTABLE CURB AND GUTTER PER MAG STD DETAIL 220-2, TYPE "E".
DETECTABLE WARNING PER MAG 340.2.1.
CONSTRUCTION NOTES:
NOTES:
20'R
2'R
40' DRIVEWAY
35'R
55'R
2'R
2'R
6'
20'
20'
2'
40' DRIVEWAY
35'R
20'
2'
20'
6'
2'R
2'R
R3-2 BY PROPERTY OWNER
50'R
70'R
2'R
20'
20'
2'
6'
2'R
2'R
R3-2 BY PROPERTY OWNER
35'R
50'R
2'R
40' DRIVEWAY
70'R
1.
RADII AND DIMENSIONS THAT ARE NOT PROVIDED ON DRAWINGS SHALL BE
DESIGNED BASED ON TRAFFIC DATA AND APPROVED BY THE CITY ENGINEER.
2.
ALL ISLAND CURBS SHALL BE CONSTRUCTED PER MAG STD DETAIL
220-1,VERTICAL CURB AND GUTTER TYPE "A" UNLESS NOTED OTHERWISE.
3.
ALL SIGNING AND STRIPING SHALL BE IN ACCORDANCE WITH THIS DOCUMENT.
R3-2 BY PROPERTY OWNER
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TURN DIVERTERS - NO RIGHT TURN LANE
EM-253-2
REVISION DATE: 01/2026
PROHIBITS LEFT TURN IN
PROHIBITS LEFT TURN OUT
PROHIBITS LEFT TURN IN AND OUT
20'
20'
6'
2'
60'R
80'R
2'R
2'R
40' DRIVEWAY
20'R
40' DRIVEWAY
6'
20'
20'
2'
2'R
2'R
30'R
50'R
70'R
2'R
2'R
20'
20'
40' DRIVEWAY
6'
2'
2'R
2'R
2'R
50'R
70'R
50'R
CONSTRUCT MOUNTABLE CURB AND GUTTER PER MAG STD DETAIL 220-2, TYPE "E".
DETECTABLE WARNING PER MAG 340.2.1.
CONSTRUCTION NOTES:
NOTES:
1.
RADII AND DIMENSIONS THAT ARE NOT PROVIDED ON DRAWINGS SHALL BE
DESIGNED BASED ON TRAFFIC DATA AND APPROVED BY THE CITY ENGINEER.
2.
ALL ISLAND CURBS SHALL BE CONSTRUCTED PER MAG STD DETAIL
220-1,VERTICAL CURB AND GUTTER TYPE "A" UNLESS NOTED OTHERWISE.
3.
ALL SIGNING AND STRIPING SHALL BE IN ACCORDANCE WITH THIS DOCUMENT.
R3-2 BY PROPERTY OWNER
R3-2 BY PROPERTY OWNER
R3-2 BY PROPERTY OWNER
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
DRIVEWAY CRITERIA
EM-259
NOTES:
(1)
DIMENSIONS PROVIDED ARE MINIMUM DESIGN REQUIREMENTS. ACTUAL DIMENSIONS SHALL BE BASED ON A TRAFFIC STUDY
AND SITE SPECIFIC DATA.
(2)
HIGH VOLUME DRIVEWAY WITH TWO (2) OUTBOUND APPROACH LANES, REQUIRES DECELERATION LANE UNLESS OTHERWISE
APPROVED BY THE CITY ENGINEER AND INCREASED TO FOURTY-SIX (46) FEET WITH ADDITION OF RAISED MEDIAN.
(3)
SEE CITY CODE SECTION 154.103 (D).
(4)
SEE CITY CODE SECTION 154.103 (C). THE CITY REQUIRES FULL ACCESS DRIVEWAYS TO BE A MINIMUM OF 660 FEET FROM
SIGNALIZED INTERSECTIONS, MEASURED FROM NEAREST FACE OF CURB TO NEAREST FACE OF CURB.
(5)
ACTUAL MAX WIDTH OF DRIVEWAY IS BASED ON LOT SIZE AND SHALL BE CALCULATED FOR EACH LOT PER CITY CODE
SECTION 72.09 (B) BUT MAY NOT BE MORE THAN 30'.
(6)
ALL DRIVEWAY WINGS OR PC'S WILL BEGIN NO CLOSER THAN FIVE (5) FEET FROM ANY PROPERTY LINE.
RESIDENTIAL (1)
COMMERCIAL / INDUSTRIAL (1)
SINGLE FAMILY
MULTI-FAMILY
SINGLE BUSINESS
MULTI-BUSINESS
STD. CONSTRUCTION DTL.
MAG 250-1 & 2
MAG 250-1 & 2 OR
COEM EM-251-1 & 2
MAG 250-1 & 2 OR
COEM EM-251-1 & 2
MAG 250-1 & 2 OR
COEM EM-251-1 & 2
STANDARD WIDTH (TWO WAY)
16-FT
24-FT
30-FT
30-FT
MIN. WIDTH (ONE WAY)
N/A
20-FT
20-FT
20-FT
MIN. WIDTH (TWO WAY)
12-FT
24-FT
24-FT
24-FT
MAX. WIDTH (TWO WAY)
30-FT (5)
40-FT (2)
40-FT (2)
40-FT (2)
MIN. SPACE BETWEEN DRIVES
(INSIDE EDGE TO INSIDE EDGE)
10-FT
(3)
(3)
(3)
MIN. DISTANCE FROM
INTERSECTION
(CORNER CLEARANCE)
25-FT
(NEAREST PC TO INSIDE
EDGE)
(4)
(4)
(4)
MAX. NUMBER OF DRIVEWAYS
1 PER PROPERTY
2 PER FIRST 19 UNITS
1 PER 100-FT OF STREET
FRONTAGE
(MAX OF 2 PER STREET)
1 PER 225-FT FRONTAGE
3 PER 1200-FT FRONTAGE
2 PER 800-FT FRONTAGE
4 PER 2600-FT FRONTAGE
3 PER 1200-FT FRONTAGE
4 PER 2600-FT FRONTAGE
REVISION DATE: 01/2026
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TRAFFIC SIGNAL POLE ACCESS PAD
EM-265
REVISION DATE: 01/2026
PER PLANS
PER PLANS
5'
5'
6'
6'
R=PER PLANS
SIDEWALK
RAMP C
SAWCUT AND REMOVE EXISTING
RAISED CURB IF PRESENT
6'
SIDEWALK RAMP
POLES CANNOT BE IN
THE ADA AREA
NOTES:
1.
2.
3.
4.
EXACT POLE LOCATION MAY BE ADJUSTED IN THE FIELD
PER CITY TRAFFIC ENGINEER OR DESIGNEE.
ALL IMPROVEMENTS SHALL BE IN THE CITY RIGHT-OF-WAY.
ACCESS PAD DIMENSIONS MAY BE MODIFIED AS
NECESSARY TO FIT EXISTING RAMPS.
PEDESTRIAN BUTTON TO HAVE A MAX REACH OF 10", A
HEIGHT OF 42" (MAX 48"). LOCATION MAY BE ADJUSTED IN
THE FIELD PER CITY TRAFFIC ENGINEER OR DESIGNEE.
CL
ADD CONCRETE ACCESS PAD
PER MAG STD DTL 230
TRAFFIC SIGNAL POLE
FOUNDATION
1'
5' MAX
(TYP)
SINGLE CURB & TERMINATION
PER MAG STD DTL 222
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
TEMPORARY WATER SUPPLY
HYDRANT METER ASSEMBLY
EM-365
REVISION DATE: 01/2026
NOTES:
1.
BACKFLOW ASSEMBLY SHALL BE TESTED
BY A CERTIFIED BACKFLOW ASSEMBLY
TESTER BEFORE USING AND ALSO EACH
TIME THE METER IS MOVED. A CITY
REPRESENTATIVE MUST BE PRESENT
DURING TESTING.
2.
USER MUST REMOVE BACKFLOW
ASSEMBLY WHEN HYDRANT METER IS
REMOVED OR RELOCATED.
3.
USER IS LIABLE FOR ANY DAMAGE TO THE
HYDRANT AND ALL ATTACHMENTS TO THE
HYDRANT.
4.
USER MUST USE GATE VALVE TO
CONTROL FLOW OF WATER, NOT THE
HYDRANT VALVE ASSEMBLY.
5.
ONLY THE CITY MAY MOVE THE HYDRANT
METER.
METAL SUPPORTS (2 EA)
(SUPPLIED BY CONTRACTOR)
SUPPORTS SHALL BE
STEEL AND BE CAPABLE
OF SUPPORTING 120 LB.
REDUCED PRESSURE
BACKFLOW ASSEMBLY
(SUPPLIED BY CONTRACTOR)
2 1
2 " GATE VALVE
WITH 2 1
2 " NIPPLE
WATER METER
(SUPPLIED BY CITY)
2 1
2 " FEMALE NST COUPLING
(SUPPLIED BY CITY)
POTABLE WATER
SYSTEM FIRE
HYDRANT
STANDARD DETAIL NO.
ADOPTED BY COUNCIL:
DECEMBER 2, 2025
WATER / SEWER
VERTICAL SEPARATION
EM-402-2
(1)
EXTRA PROTECTION IS REQUIRED FOR WATER MAINS AND PRIVATE FIRE LINE SERVICES THAT ARE BETWEEN 1 AND 2 FEET ABOVE SEWER MAIN, STORM
DRAIN OR IRRIGATION LINES AND LESS THAN 1 FOOT ABOVE A SEWER SERVICE. EXTRA PROTECTION ALSO REQUIRED WHEN WATER MAINS AND PRIVATE
FIRE LINE SERVICES ARE INSTALLED BELOW SEWER MAIN, STORM DRAIN OR IRRIGATION LINES. REFER TO NOTES BELOW.
(2)
MINIMUM SEPARATION REQUIRED BY CITY. UTILITY OWNER MAY REQUIRE A GREATER SEPARATION.
NOTES:
A.
CLEARANCES ARE MEASURED FROM OUTSIDE OF PIPE TO OUTSIDE OF PIPE.
B.
MINIMUM SEPARATION AND EXTRA PROTECTION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN ARIZONA ADMINISTRATIVE CODE
AAC R18-5-502, MAG SPEC. 610, AND MAG STANDARD DETAIL 404-1; OR AS APPROVED BY THE CITY.
REVISION DATE: 01/2026
WATER / SEWER
VERTICAL SEPARATION
REQUIREMENT TABLE
TYPE OF UTILITY CROSSING
WATER SERVICE
DISTRIBUTION
WATER MAIN
SEWER MAIN
SEWER SERVICE
DRY UTILITIES
(2)
PRIVATE
FIRELINE
SERVICE
STORM DRAIN/
CULVERTS &
IRRIGATION (2)
TYPE OF WATER / SEWER UTILITY
DISTRIBUTION
WATER MAIN
ABOVE UTILITY
6-INCH
MIN.
1-FOOT
MIN.
1-FOOT
MIN. (1)
6-INCH
MIN. (1)
1-FOOT
MIN.
1-FOOT
MIN.
1-FOOT
MIN. (1)
DISTRIBUTION
WATER MAIN
BELOW UTILITY
6-INCH
MIN.
1-FOOT
MIN.
2-FEET
MIN. (1)
2-FEET
MIN. (1)
1-FOOT
MIN.
1-FOOT
MIN.
2-FEET
MIN. (1)
PRIVATE FIRELINE
SERVICE ABOVE
UTILITY
6-INCH
MIN.
1-FOOT
MIN.
1-FOOT
MIN. (1)
6-INCH
MIN. (1)
1-FOOT
MIN.
1-FOOT
MIN.
1-FOOT
MIN. (1)
PRIVATE FIRELINE
SERVICE BELOW
UTILITY
6-INCH
MIN.
1-FOOT
MIN.
2-FEET
MIN. (1)
2-FEET
MIN. (1)
1-FOOT
MIN.
1-FOOT
MIN.
2-FEET
MIN. (1)
WATER SERVICE
ABOVE OR BELOW
UTILITY
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
1-FOOT
MIN.
SEWER MAIN
ABOVE UTILITY
6-INCH
MIN.
2-FEET
MIN. (1)
1-FOOT
MIN.
6-INCH
MIN.
1-FOOT
MIN.
2-FEET
MIN. (1)
1-FOOT
MIN.
SEWER MAIN
BELOW UTILITY
6-INCH
MIN.
1-FOOT
MIN. (1)
1-FOOT
MIN.
6-INCH
MIN.
1-FOOT
MIN.
1-FOOT
MIN. (1)
1-FOOT
MIN.
SEWER SERVICE
ABOVE UTILITY
6-INCH
MIN.
2-FEET
MIN. (1)
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
2-FEET
MIN. (1)
1-FOOT
MIN.
SEWER SERVICE
BELOW UTILITY
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN.
6-INCH
MIN. (1)
1-FOOT
MIN.
APPENDIX C
Development Services
Engineering Division
10000 N. El Mirage Road, El Mirage, AZ 85335
623-972-8116; Fax 623-876-4605; TDD 623-933-3258
www.elmirageaz.gov
SWPPP Guidance Document
(Storm Water Pollution Prevention Plan)
Development/Project Name:
______________________________________________
Parcel Number(s):
______________________________________________
Address/Location:
______________________________________________
Net Area (Acres):
______________________________________________
Disturbed Area (Acres):
______________________________________________
The City of El Mirage requires all development that disturbs one acre or more to submit the
required Storm Water Pollution Prevention Plan (SWPPP), including the Notice of Intent (NOI).
The owner/developer is still required to submit all required documents to the Arizona
Department of Environmental Quality (ADEQ) as required by law. The site
https://azdeq.gov/node/1143 is designed to provide you with a quick and easy way to file a
Notice of Intent (NOI) online for permit coverage, apply for a waiver, or file a Notice of
Termination (NOT) to terminate coverage under the AZPDES Construction General Permit,
AZG2025-001 or call ADEQ at (844) 827-4768 for assistance.
In addition, the SWPPP shall include all requirements of Maricopa County Rule 310 and all
requirements of the El Mirage City Code as it pertains to storm water. Copies of all
requirements, forms and guidance are available in the latest version of the Drainage Design
Manual for Maricopa County Volume III Erosion Control available at the Flood Control District,
2801 West Durango, Phoenix, Arizona 85009, Phone No (602) 506-1501.
This checklist serves to minimize redline comments on the check prints and to maintain
consistency among plan reviewers on plans for Storm Water and Dust Control Management.
Plan approval, issuing permits, and certain grading clearances depend on compliance with the
comments made on the check prints and this checklist. The engineer of record shall satisfy
themselves of the completeness and accuracy of the design. This review shall serve as a courtesy
review only. The Owner is ultimately responsible to ensure that all of the requirements outlined
under AZPDES are followed.
Please upload this checklist and the check prints with your next submittal. Discussion of
redline comments on plans or this checklist should be directed to the City Plan Reviewer.
2
GENERAL REQUIREMENTS:
Sheets to be 24" X 36"
Separate Storm Water Management Plans shall be submitted with grading and drainage
plan at time of First review.
Cover sheet is required on plans of more than two sheets.
Site Information – to be included on the First/Cover sheet:
Project title block with name and address of project.
Legal description of project location.
Total site area (acres).
Total area of disturbance (acres).
Vicinity map with north arrow.
Index of plan sheets if more than one plan sheet.
Owner's/Developer’s name, address, and telephone number.
Engineer’s name, address, and telephone number.
Contractor’s name, address and telephone number. If contractor is not known,
leave this area blank for future completion.
Add Storm Water Pollution Prevention (SWPPP) Notes to plan. Notes can be found here
(see City Detail EM-101-9).
SWPPP Certification – The site owner (operator) or his authorized representative shall
sign and certify the plan. In signing, the person certifies that the information is true and
assumes liability for the plan. The registrant preparing the plan may be liable to the site
operator/owner. However, ultimate responsibility – for purposes of violations, and fines
shall lie with the site operator/owner and site contractor.
*The below box shall be placed on the plans and signed there, not on this document
SWPPP CERTIFICATION
I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the operator
or operators who manage this system, or those operators directly responsible for gathering
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations. In addition, I certify
that the permittee will comply with all terms and conditions stipulated in General Permit No.
AZG2025-001 issued by the Director.
_______________________________
_____________________________
Printed Name
Job Title
_______________________________
_____________________________
Signature
Company Name
3
Contractor Certification – ADEQ also requires that the contractors and subcontractors
responsible for implementing measures in the SWPPP be listed in the plan with the
measures for which they are responsible, and that they sign a certification statement that
they understand the permit requirements as reflected on the SWPPP .
*The below box shall be placed on the plans and signed there, not on this document
CONTRACTOR CERTIFICATION
I (Printed Individual’s Name) acting as (Job Title) for the (contractor/subcontractor’s name), an
authorized representative, having reviewed this Storm Water Management Plan (SWPPP) and all
of the relevant documents, do hereby certify that I understand all components of this plan and
will perform all required inspections and maintenance activities as required; and that I will
maintain all necessary and required records at the job site and up to date.
_______________________________
Signature
Provide a legend identifying grades, symbols, and lines, etc.
Maricopa County Rule 310 permit #_____
ADEQ tracking number AZCON_____
All sheets shall have the qualified Arizona registrant’s seal and original signature prior to
plan submittal.
North arrow and bar scale
The following is a checklist of information that is to be included in the SWPPP. Additional
information regarding the data to be included in the SWPPP is provided in the Construction
General Permit issued by ADEQ. The Construction General Permit can be downloaded from:
https://static.azdeq.gov/permits/cgp/2025permit.pdf
Existing Conditions – show existing contours, floodplain limits and any stormwater
structures on or adjacent to the project site.
Construction Activity Description - the SWPPP must contain a description of the purpose
or goal(s) of the construction project (e.g., a single-family residential, commercial
development, etc.). Additionally, the SWPPP must list all soil-disturbing activities
necessary to complete the project (i.e., clearing, excavating, and stockpiling).
Final Slope Grades - Location and steepness of slopes after grading.
Final Drainage Patterns – Drainage patterns of the site after major grading activities and
the location of the points where storm water will discharge from the site.
Disturbed Areas - Location and areas of soil disturbing activities or the total area of the
site where soil will be disturbed. (This must be identified on the map and area called-out).
Undisturbed Areas – The SWPPP shall reflect all areas designated as being undisturbed.
This would include Natural open space, jurisdictional washes (Per section 404 of the
CWA), etc. All designated areas must be delineated/ and fenced-off in the field.
Offsite Flows – Show location of offsite flows including quantities. If offsite flows are
being rerouted through the site, a note should be added to reflect the no disturbance zone.
Erosion and Sediment Controls – The SWPPP must describe the erosion and sediment
4
controls to be used during construction. Such controls include stabilization measures for
disturbed areas and structural controls to divert runoff and remove sediments. Selected
controls must be per the Best Management Practices (BMP) outlined in the latest Drainage
Design Manual for Maricopa County Volume III Erosion Control (ECM).
Best Management Practices (BMPs) – Structural devices or non-structural practices that
are designated to prevent pollutants from entering into storm water flows, to direct flows of
storm water or to treat polluted storm water flows. The emphasis should be placed on
eliminating the source of pollutant(s). All selected BMPs details must be shown on the plan
sheets or included as part of the Storm Water Management Plan.
Sediment Basins - Show location of all temporary or permanent sediment basins to be
installed. Temporary basins may be substituted for permanent basins during grading phase
only. These basins must provide at least 3,600 cubic feet of storage for every acre of
contributing land.
Other Controls – The SWPPP must also include controls that address other potential
sources of storm water pollution, such as:
Construction site waste material storage.
Preventing offsite tracking of sediments and generation of dust.
Hazardous material storage (i.e., fuel, equipment oil, etc.)
Equipment maintenance/ parking areas.
Post-Construction – The SWPPP must include a description of storm water management
controls that will be installed to control pollutants after construction completion.
Future Activities – The SWPPP shall address all grading activities to be performed on any
site that is part of the “greater common plan or development” (i.e., construction of
individual lot(s) within a subdivision).
Location of Controls – the BMPs selected for the site must be shown on the SWPPP,
including the location of each measure used for erosion and sediment control, storm water
management, and other pollution controls.
Inspection and Maintenance Plan – The SWPPP must contain a description of the
procedures that will be used to maintain the BMPs on site. The plan shall include an
inspection and maintenance checklist for each control measure. The checklist must address
specific items to inspect for and evaluation criteria.
Description of Controls – The SWPPP shall include a list of the BMPs to be used at the
site, describing each control and its purpose. Many of the BMPs selected from the ECM
already contain the descriptions and purpose.
Sequence of Major Activities – The SWPPP shall contain a sequence of major activities.
The sequence should address the installation of all controls, earth disturbing activities, and
stabilization activities, and the maintenance required for the controls. The sequence should
indicate, clearly, the order in which these activities will take place along with a proposed
timeline associated with each activity.
In developing a sequence of major activities, the following general principals should be
followed:
1. Install down slope and side slope perimeter controls before the land disturbing activity
occurs.
2. Cover or stabilize disturbed areas as soon as possible. (Under ADEQ’s general permit,
disturbed areas of the construction site that will not be re-disturbed must be stabilized
within 14 days of the most recent land disturbance).
3. Time construction activities to limit impact from seasonal climate changes or weather
events.
5
4. Delay construction of infiltration measures until the end of the construction project, if
possible. Otherwise, provide proper Storm Water Management Controls to eliminate
potential sources of pollution.
5. Do not remove temporary perimeter controls until after all upstream areas are finally
stabilized.
Additional Comments - The following are additional comments specific to this site:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
01-01-26
APPENDIX D
Development Services
Engineering Division
10000 N. El Mirage Road, El Mirage, AZ 85335
623-972-8116; Fax 623-876-4605; TDD 623-933-3258
www.elmirageaz.gov
Guidance for Design of Striping and Signing Plans
The following are general comments to assist you in the preparation of the Striping and
Signing Plans. These comments are not meant to be all inclusive:
Provide a cover page with as-built certification statement, Blue Stake note, key map,
project name, address, location, legal description, notes section, etc.
Provide City “General Information”, “General Notes” and “Signing & Striping Notes” on
the plans.
Pavement arrow markings in left and right turn lanes are located at both the beginning
and end of the storage lane. Arrows shall adhere to MCDOT Pavement Marking Manual
(PMM) Detail 5-36.
“Right-Turn Only” (R3-5, 30”x36”) signs are to be located at both the beginning and end
of the storage lane, adjacent to pavement arrow marking. “Begin Right Turn Lane – Yield
to Bikes” (R4-4, 36”x30”) signs shall be placed at the beginning of the taper of right turn
lanes.
Standard bike lane striping will be 6-inch solid white line except where adjacent to a
right-turn lane in which the line should be 8-inch solid white. Bike lanes shall have a
minimum width of 5.5 feet, measured from edge to edge or edge to face of curb. Green
bike lanes shall receive 4 or more coats, based on manufacturer’s recommendations, of
StreetBond SB150 CL pavement coating, Celtic Green in color. See City Detail EM-116.
Bike lane symbol and arrow shall adhere to MUTCD Figure 9C-3, Type B.
Right or left turn striping will be an 8-inch solid white line.
4” solid white pavement edge lines shall be used on streets that do not have curb and
gutter.
4” broken lines shall be accomplished by a 10-foot stripe with a 30-foot space.
Stop bars and crosswalk shall be 12 inches in width. If there are no crosswalks at the stop
bar locations, then the stop bar shall be 24 inches in width.
Raised Pavement Markers (RPMs) are required at all edge-lines, lane-lines, centerlines
and holding bars. RPMs shall not be installed adjacent to bike lanes.
Median striping shall adhere to City Detail EM-133 and MCDOT PMM Details 5-54 and
5-55.
01/01/26
APPENDIX F
APPENDIX H
Engineering
Development Services
10000 N. El Mirage Road, El Mirage, AZ 85335
623-972-8116; TDD 623-933-3258
www.elmirageaz.gov
STREET LIGHT STANDARDS
1. Street Lighting for Development and Capital Improvement Projects
a. Introduction - This Chapter outlines the City’s policy for the planning and
installation of street lighting and identifies requirements for preparing street light
plans and documents to submit to the City for review and approval.
b. Purpose - The purpose of this document is to provide guidance to developers in
planning and installation of street lighting for public and private streets within the
City. Developers are responsible for all design and installation costs of street
lighting on private and public streets within a subdivision and along all perimeter
streets in conjunction with their projects.
c. General Information – Arizona Public Service (APS) owns, operates and
maintains street lighting for the public streets within the corporate limits of the
City of El Mirage.
i. A.R.S. Title 49 - The Environment, Chapter 7 - Light Pollution contains
requirements for shielding of outdoor light fixtures as well as the
prohibition of mercury vapor light fixtures. The provisions of Title 49
apply to both public and private lighting systems.
ii. Streetlight installation and electricity for streetlights in new development
containing private streets will be provided by agreement between the
developer and APS. Plans for streetlights on private streets shall comply
with the requirements as described herein.
iii. The operating and maintenance costs associated with the streetlights
within the private street subdivision will be the sole responsibility of the
Homeowners Association, management company, etc.
Engineer: Streetlight plans shall be prepared by a Professional Electrical Engineer, registered in
the State of Arizona. The Engineer shall seal each sheet and any photometric lighting
calculations as requested by the City.
Plan Submittal: Street light plans submitted to the City for review shall be electronic (PDF).
Fees: The developer shall pay all plan review and permit fees.
Permit: A permit shall be obtained prior to installation of streetlights.
2
2. Design Guidelines for Public Roadways
a. All new subdivisions, new roadways, and in-fill projects on existing roadways
shall use LED luminaires as specified herein unless otherwise approved by the
City Engineer. LED luminaires are the standard for all installations and shall
conform to the most current City Standards and Specifications. Contact the
Development Services Department for current approved products list of LED
luminaires.
b. Streetlight plans shall be submitted with the civil improvement plans.
c. All streetlights must be indicated on the improvement plans.
d. Photometric plans are required with all streetlight plans.
i. The photometric plans shall show that 0.0 footcandles reach any adjacent
residential property.
ii. Any light or combination of lights which cause light on a public street,
other than lights specifically intended for that purpose, shall not exceed
one foot candle as measured from the center line of the street. The
photometric plans shall show the foot candles along the adjacent street
centerlines to verify that the proposed lighting will not exceed the
maximum limit.
e. Spacing of streetlights shall be pursuant to Table A below.
i. For roads that are wider than shown in Table A due to deceleration lanes,
dual left turn lanes, on-street parking, landscape islands, etc., the street
light spacing shall be reduced by 15%.
ii. With approval of the City Engineer or designee, the maximum spacing
shown below may be exceeded by 10% when there are extenuating
circumstances such as utility conflicts.
iii. For roads of non-standard cross sections or other circumstances in which
the requirements of this document cannot be met, the City may require
photometric calculations.
iv. The maximum spacing may also be revised if based on the
recommendations of the Electrical Engineer.
TABLE A
STREET LIGHT SPACING FOR STANDARD DISTRICTS
Roadway Type
Width FC-FC
(ft)
Nominal
Lumens
Maximum
Spacing (ft)
Spacing Type
Local/Private
32
5000
225
Single Side
Collector
44
9000
215
Single Side
Minor Arterial
68
15500
280
Staggered*
Major Arterial
92
15500
225
Staggered*
* Staggered spacing is the distance between lights on same side of street.
f. The type of streetlight to be installed, standard or transit style, is determined by
the Streetlight Master Plan within Appendix I.
3
g. Pole heights, arm types and foundation types to be used on standard local,
collector, and arterial streets shall be per Table B below.
TABLE B
STREET LIGHT SPECIFICATIONS
Roadway
Type
Street Light
Type
Mounting
Height
Mast Arm
Foundation Required**
Local
Standard
25’-11”
20”x6”
No
Local
Transit*
33’-2”
24”
No
Collector
Standard
32’-11”
3’x8’
No
Collector
Transit*
27’-11”
24”
Yes
Arterial
Standard
39’-3”
8’x8’
No
Arterial
Transit*
27’-11”
24”
Yes
*Transit style street lights and all related appurtenances are required to be powder coated color
Cardinal #T013-BK62 (textured black) or approved equivalent
**No foundation required means the pole shall be installed via direct bury
h. Luminaires on all El Mirage roadways shall be 3000K Correlated Color
Temperature (CCT) unless otherwise approved by the City.
i. Streetlights on lot frontages in residential areas shall be located at property lines
whenever possible.
j. Streetlight poles shall be centered 1-foot behind the sidewalk where sidewalks are
attached to the back of curb. Streetlight poles shall be placed 4-feet from back of
curb where no sidewalk exists or where the sidewalk is detached from the curb,
unless there is limited right of way, in which case the poles shall be placed in a
location that will allow sidewalk to be placed in the future.
k. Cul-de-sacs shall contain at least one streetlight.
l. Streetlight poles shall not be located in the corner radius of intersections.
m. Local-to-local and local-to-collector intersections shall have at least one
streetlight. Preferred streetlight location for “T” intersections is at the top of the
“T”.
n. Local-to-arterial, collector-to-collector, and collector-to-arterial intersections shall
contain two (2) streetlights.
o. Arterial-to-arterial and arterial-to-parkway intersections shall contain four (4)
streetlights typically located on the signal poles.
p. Streetlight plans shall be coordinated with streetlights mounted on traffic signals
at signalized intersections.
q. All future and existing streetlights adjacent to and within 300 feet of the first
proposed streetlight shall be indicated with stationing and centerline offsets.
r. Plans must clearly indicate any construction phasing.
s. Backgrounds shall be grayed back, except for roadway centerlines, roadway
station numbers, water lines and fire hydrants.
4
t. Streetlight plans for public and private streets shall be prepared as separate plan
sets each with its own cover sheet.
u. Three-foot clearances around street lights are required in all directions. Five-foot
clearance from trees and plants, at maturity, is required in all directions.
3. General Notes
Public Street Lighting Requirements shall include:
a. Stationing: Stationing of public streetlight equipment or facilities shall be based
on the same stationing as the civil engineering design. Where civil engineering
design is not required for the proposed project, stationing shall be based on a
known survey monument on a public street centerline.
b. Future Streetlight Locations: Where future/planned street lighting (i.e., future
widening of the opposite side of the street) is referenced or relied upon by a
lighting analysis to meet the required lighting levels for the proposed project, the
proposed future streetlight locations shall be indicated on the streetlight design
sheets.
c. Incorporation Into Civil Design: When the streetlight design is in conjunction
with other infrastructure improvements, the streetlight design sheets shall be
incorporated into the civil engineering design set. The streetlight engineer shall
coordinate with the project’s civil engineer.
4. Design Guidelines For Private Streets
The developer is responsible for all costs associated with the design and installation of
streetlight system on private streets. Unless otherwise approved by the City Engineer,
streetlights on private streets shall be “Dark Sky Friendly Lighting” as certified by the
International Dark Sky Association.
Streetlights for private streets shall comply with the same design standards and plan
submittal requirements as public streets, unless otherwise approved by the City. Any
modification to a private street lighting system must be reviewed and approved by the
City.
5. Utility Companies
The City of El Mirage is only serviced by one electric company; Arizona Public Service
(APS). Once the streetlight plans are approved by the City of El Mirage, the developer
shall provide the approved plans to and coordinate all final design, electrical service
criteria, and needs with APS. APS will then submit the final design to the City for
approval.
01-01-26
APPENDIX J
TRAFFIC IMPACT STUDY CRITERIA
City of El Mirage, Arizona
Revised January 1, 2026
2
TABLE OF CONTENTS
Page
INTRODUCTION
-----------------------------------------
3
STUDY REQUIREMENTS
-----------------------------------------
3
STUDY CLASSIFICATIONS
-----------------------------------------
3
TRAFFIC STUDY ANALYSIS
AND APPROACH
-----------------------------------------
4
Study Area
-----------------------------------------
4
Study Time Frame
-----------------------------------------
4
Analysis Time Periods
-----------------------------------------
4
Data Collection
-----------------------------------------
5
Trip Generation
-----------------------------------------
6
Trip Distribution and Assignment
-----------------------------------------
6
Traffic Analysis
-----------------------------------------
6
REPORT FORMAT
-----------------------------------------
8
COORDINATION WITH OTHER
PUBLIC AGENCIES
-----------------------------------------
9
REPORT SUBMITTALS
-----------------------------------------
9
AUXILIARY LANE CRITERIA
-----------------------------------------
9
DRIVEWAY CRITERIA
-----------------------------------------
9
3
INTRODUCTION
The purpose of this document is to provide criteria for the preparation of Traffic Impact
Studies for new land developments or additions to existing developments and to establish
the report format for these studies.
STUDY REQUIREMENTS
A Traffic Impact Study prepared by a Registered Professional Engineer in the State of
Arizona is required when a proposed development is anticipated to generate 100 or more
trips per day or as the City deems necessary unless waived in writing by the City
Engineer. In some cases, the City may allow a Traffic Impact Study with a reduced
scope. If the Traffic Impact Study is waived, a Traffic Impact Statement is required that
includes (a) discussion of the site access(es), (b) the total vehicle trips that will be
generated by the development, using the Institute of Transportation Engineers (ITE) Trip
Generation publication (most recent edition), (c) effect of the improvements on the
surrounding area from a traffic standpoint and (d) an exhibit that shows the distances
between the proposed and existing driveways.
STUDY CLASSIFICATIONS
Traffic Impact Studies will be classified into three categories:
Category I-
Those developments that are estimated to generate 500 vehicle
trips or less during either of the a.m. or p.m. peak hours.
Category II-
Those developments that are estimated to generate more than 500
vehicle trips during either of the a.m. or p.m. peak hours but not
more than 1,000 peak hour trips.
Category III-
Those developments that are estimated to generate more than 1,000
vehicle trips during either of the a.m. or p.m. peak hours.
The developer should first estimate the number of vehicle trips that will be
generated by the proposed development and provide this information along with the other
suggested study elements of the Traffic Impact Study to the City for Review and approval
prior to the start of construction.
4
TRAFFIC STUDY ANALYSIS AND APPROACH
The following presents the specific items to be included in a Traffic Impact Study.
Study Area
a) All site driveways
All categories
b) All major intersections within 1 mile of the study site,
either signalized or un-signalized.
All categories
c) All driveways where traffic movements could be
affected by new driveway traffic movements.
All categories
d) Additional locations as requested by the reviewing
agency.
All categories
Study Time Frame
The study should include, as a minimum, an analysis of the expected traffic conditions
for the time period when the development is expected to open. The opening day
conditions should include all of the proposed development traffic as if the development
was fully completed and occupied.
Additional study years should be included as follows:
Category I:
Opening year and 5 years in the future.
Category II:
Opening year, 5 years and 10 years in the future.
Category III: Opening year, 5 years, 10 years and 20 years in the future.
The study for phased construction developments should include an analysis for each year
that planned new phased construction is to be started. In addition, the required 5, 10 or 20
year analysis after the start of the last phase of the development as stated above for the
specific categories.
Analysis Time Periods
The study should include an analysis of the impact of the development traffic for the
typical adjacent street peak hour conditions which normally occur within the time periods
from 6:00 to 9:00a.m. and 3:30 to 6:30p.m. on a typical weekday and an analysis of the
impact of the development daily weekday traffic generated on the adjacent street system
and site driveways. In addition, if requested by the City, additional time periods and or
weekend analysis may be required in the study if the developer has unusual peaking
5
characteristics or if the adjacent non-site traffic conditions warrant an analysis of other
peak traffic time periods.
Data Collection
The traffic impact study should include information on the following existing and
proposed conditions within the study area:
a) Traffic Volumes
1. Existing and proposed traffic volumes for the adjacent existing and
proposed intersections and driveways to include daily weekday a.m. peak
hour and p.m. peak hour (and other time periods as noted in the previous
section). Daily traffic volumes should be provided as a 24-hour directional
roadway section count and peak hour volumes should be provided by
specific intersection or driveway turning movement directions.
2. Existing traffic volume data should be adjusted to average conditions
based on City adjustment factors or appropriate adjustment factors
available from other public agencies.
3. Projected traffic volumes should be based on available traffic projections
from the Maricopa Association of Governments (MAG), other appropriate
documented traffic projected sources or historical traffic volume trends.
Projected traffic volumes shall include adjustments, as necessary, to
reflect other adjacent future development.
b) Land Use
1. Existing and proposed land use in the study area should be discussed and
included in the study as it impacts the proposed development street system
or driveways.
c) Roadway Conditions
1. Existing and proposed roadway conditions shall be identified including
pavement type, width, traffic lanes, medians, curb and gutter, speed limits,
horizontal and vertical curvature and traffic control devices.
d) Crash Experience
1. Crash experience should be documented for the past 36-month time period
for the adjacent roadway system included within the study area.
6
Trip Generation
The trip generation for the proposed development shall be estimated using the latest
edition of Trip Generation published by ITE. Exceptions to the use of this document
must be approved by the City and may include actual traffic generation counts from a
similar existing facility having the same size and surrounding area characteristics or from
other recognized sources that provide trip generation data not included in the ITE manual.
If proposed within the Traffic Impact Study, adjustments to the site traffic generation
should be documented to reflect site traffic interaction, pass-by traffic, use of other
modes of transportation, carpooling or other means of trip reduction. Trip reduction
methods should be discussed with the City prior to use within the report.
Trip Distribution and Assignment
Site traffic shall be assigned to the proposed site driveways and street intersections
included within the study area based on an analysis of the market area for the proposed
development. The market area will vary based on the type and location of the
development. However, as a minimum, the following guidelines should be used:
● Residential trip distribution should be based on the locations of employment
and commercial attractions and the available street system.
● Commercial, industrial and office trip distribution should be based on the
surrounding population densities and the available street system.
The area to be constructed in the development of the site trip distribution should normally
be within a 10-mile radius of the study site. However, other conditions of the proposed
development, the adjacent street system and the location of site traffic attractors and
generators may indicate the need to expand or reduce the area of influence.
Traffic Analysis
The study should include the following minimum items for analysis.
a) Traffic flow conditions, including the level of service using the latest edition of
the Highway Capacity Manual (Special Report 209, Transportation Research
Board)
1. An analysis of the existing traffic conditions.
2. An analysis of the future non-site traffic conditions.
3. An analysis of the traffic conditions with the addition of site traffic.
7
b) Roadway capacity conditions using generally accepted daily volume traffic
demand compared to roadway cross sections.
1. Existing traffic conditions
2. Future non-site traffic conditions.
3. Future traffic conditions with the addition of site traffic.
c) Intersection and driveway traffic control device requirements using results of the
items below and the Federal Highway Administrations (FHWA) Manual on
Uniform Traffic Control Devices for Streets and Highways (edition adopted by
the Arizona Department of Transportation)
1. Existing conditions.
2. Future non-site conditions.
3. Future total traffic conditions.
d) Intersection and driveway geometrics using recognized accepted formulas with
documentation provided within the report.
1. Analyze adequacy or need for additional through traffic lanes or auxiliary
right or left turn lanes for existing, future non-site and future total traffic
conditions and include storage requirements.
2. Analyze potential conflicts of proposed driveway locations with existing
and/or proposed adjacent driveways or intersection traffic lane
configurations for the future total traffic conditions.
e) Crash summary and identification of trends and/or potential safety hazards.
f) Other analysis as requested by the City or as may be required due to the type and
location of the proposed development.
1. Weaving analysis.
2. Parking analysis.
3. On-site circulation including queuing analysis at major on-site turning
movement locations and for drive thru lanes. The effective length of a
vehicle shall be measured in increments of 25-feet. Drive thru
establishments shall be provided with adequate queue storage capacity to
accommodate normal peak queues for the specified land use.
8
4. Site access quantity, location and traffic lane configuration.
g) Mitigation measurements
All recommended on-site and off-site improvements required to mitigate projected
traffic congestion or safety issues shall be identified with the resultant traffic flow
conditions indicated for comparison to the “before conditions”.
REPORT FORMAT
The Traffic Impact Study should include the following items and report sections:
a) Title page.
b) Table of contents and list of figures and tables.
c) Introduction including description of project, purpose of report and executive
summary.
d) Proposed development description including location, land use and proposed use.
Include vicinity map on site plan.
e) Study area description.
f) Existing conditions including site land use, adjacent roadway description and
traffic volumes. Include summary of existing traffic counts, graph of existing
(adjacent) daily and peak hour traffic and roadway condition diagrams.
g) Projected traffic including site traffic generations, distributions and assignment
and non-site traffic for each time period to be analyzed. Include tabular data as
needed to show trip rate formulas used in the study and a summary of the site
traffic assignment. Graphics should be included showing the daily and peak hour
volumes for each analysis time period included in the study for both the site and
non-site traffic.
h) Total traffic should be shown for each analysis time period.
i) Traffic analysis showing tabular and graphic results of the analyses.
j) Summary and conclusions.
k) Appendix providing any material related to the traffic study data collection and
study results.
9
COORDINATION WITH OTHER PUBLIC AGENCIES
If applicable, the requirements for the Traffic Impact Study as noted in this document
may need to be coordinated with the requirements of other local agencies such as
adjacent cities or towns, the Maricopa County Department of Transportation or the
Arizona Department of Transportation. Any deviation from the requirements of this
document due to the requirements of other agencies should be presented in written form
to the City for review and approval or denial.
REPORT SUBMITTALS
The Traffic Impact Study shall be submitted to the City for review with the online permit
application.
AUXILIARY LANE CRITERIA
Use the City of El Mirage Auxiliary Lane Criteria Memorandum
DRIVEWAY CRITERIA
See City of El Mirage Detail EM-259
APPENDIX Q
DESCRIPTION
CRITERIA
AVERAGE DAY DEMAND - SINGLE FAMILY RESIDENTIAL
Gallons per capita per day (gpcd)(1)
117
Density (people per dwelling unit)(2)
3.35
AVERAGE DAY DEMAND - MULTI-FAMILY/COMMERCIAL/INDUSTRIAL
Land Use Category(3)
Varies
PEAKING FACTORS
Maximum Day / Average Day
1.7
Peak Hour / Average Day
2.9
VELOCITY CRITERIA
Maximum Day Condition
Max Velocity < 5 fps
Peak Hour Condition
Max Velocity ≤ 7 fps
Max Day Plus Fire Flow Condition
Max Velocity < 10 fps
HEAD LOSS CRITERIA
Maximum Day Condition
2 to 7 feet per 1,000 feet of pipe
Peak Hour Condition
< 10 feet per 1,000 feet of pipe
HAZEN WILLIAMS COEFFCIENT
All Pipe Materials
C=130
PRESSURE CRITERIA
Max Day Plus Fire Flow Condition
Min Residual Pressure of 20 psi
Peak Hour Condition
Min System Pressure of 40 psi
FIRE DEMAND CRITERIA
Single Family Residential
Determined by Fire Dept.
All Other Land Uses
Determined by Fire Dept.
NOTES:
(1) Average per capita water use per 2012 Water and Wastewater Master Plan provided by Wilson Engineers
(2) Persons per household per US Census Bureau (2020)
(3) Use latest version of City of Phoenix Design Standards Manual for Water and Wastewater Systems.
Other values may be used with prior approval from the Engineering Division
WATER SYSTEM DESIGN CRITERIA FOR EL MIRAGE SERVICE AREA
DESCRIPTION
CRITERIA
AVERAGE DAY DEMAND - SINGLE FAMILY RESIDENTIAL
Gallons per capita per day (gpcd)(1)
58.5
Density (people per dwelling unit)(2)
3.35
AVERAGE DAY DEMAND - MULTI-FAMILY/COMMERCIAL/INDUSTRIAL
Land Use Category(3)
Varies
PEAKING FACTORS
Dry Weather Peaking Factors (Applied to Average Flows)
Per AAC R18-9-E301.D (see next page)
Wet Weather Peaking Factors (Applied to Dry Weather Peak Flows)
1.17
VELOCITY CRITERIA
Gravity Mains
2 fps ≤ Velocity ≤ 8 fps
Force Mains
3 fps ≤ Velocity ≤ 7 fps
FLOW DEPTH CRITERIA (d/D) FOR DRY WEATHER PEAK HOUR FLOWS
d/D for new sewer with diameter 10 inches or less
0.50
d/D for new sewer with diameter 12 inches and above
0.75 (AAC R18-9-E301.D.e.iii)
FLOW DEPTH CRITERIA (d/D) FOR WET WEATHER PEAK HOUR FLOWS
d/D for designing new sewer pipe
< 0.90
d/D for evaluating existing pipe in developed areas
< 1.00
HEAD LOSS CRITERIA
Gravity pipe
Manning's n=0.013
Pressure pipe
Hazen Williams' C=120
MANHOLES
When smaller pipe joins larger pipe
Match Crowns
Invert drop through manhole
0.20 feet
NOTES:
(1) Average per capita water use per 2012 Water and Wastewater Master Plan provided by Wilson Engineers
(2) Persons per household per US Census Bureau (2020)
(3) Use latest version of City of Phoenix Design Standards Manual for Water and Wastewater Systems. Other
values may be used with prior approval from the Engineering Division
WASTEWATER SYSTEM DESIGN CRITERIA FOR EL MIRAGE SERVICE AREA
Upstream Population
Dry Weather Peaking Factor
100
3.62
200
3.14
300
2.90
400
2.74
500
2.64
600
2.56
700
2.50
800
2.46
900
2.42
1,000
2.38
1,001 to 10,000
PF = (6.330 x p-0.231) + 1.094
10,001 to 100,000
PF = (6.177 x p-0.233) + 1.128
More than 100,000
PF = (4.500 x p-0.174) + 0.945
PF = Dry Weather Peaking Factor
p = Upstream Population
AAC R18-9-E301.D