1130 N. Alma School Road, Suite 120, Mesa, AZ 85201 | T: 480.503.2250 | F: 480.503.2258 | www.epsgroupinc.com February 9, 2022 Mr. Bryce Christo 10000 N. El Mirage Road El Mirage, AZ 85335 RE: Dysart Road and Peoria Avenue Retention Basin Design Dear Mr. Christo, As requested, we have prepared the following scope and fee proposal to complete the final design of a new retention basin and connecting pipes per the results of the Dysart Rd-Peoria Ave Drainage Study completed December 2021. This work will be comprised of the following: • Construction of a new 100’x1050’ retention basin located south of Peoria Avenue and east of Dysart Road. • Construction of two new 24” pipes to convey water from north of Peoria Avenue to the basin. • Addition of 3 drywells in the basin. • Landscaping for the basin will consist of decomposed granite only. • The topographic survey will be amended to pick up any specific structures/items. • The drainage memo will be updated as needed for the specific 24” pipe(s) design. • All quantities and costs will be prepared with each plan submittal. Plans will be submitted to the City per the following: • 60% plans will be provided for the proposed improvements. • 100% Plans will be provided incorporating the City’s comments and will be sealed. The following assumptions have been made in association with this modified scope of work: • This project will be integrated into the Dysart Road: Northern Parkway to Peoria Final design project. • No utilities will require relocation. • Geotechnical studies/reports will not be required. • No new water or sewer facilities will be provided. • Fencing for the site is not included. 1130 N. Alma School Road, Suite 120, Mesa, AZ 85201 | T: 480.503.2250 | F: 480.503.2258 | www.epsgroupinc.com • Design for any needed relocation of the irrigation ditch/system is not expected. We appreciate the opportunity to assist the City with this retention basin project. If you have any questions concerning the proposed scope and fixed fee, please let me know. Sincerely, Elijah E. Williams, P.E. Project Manager Fee Estimation Worksheet 2/9/2022 Job No.: 20-1373.03 Labor Class Rate $220.00 $185.00 $160.00 $135.00 $110.00 $100.00 $50.00 $140.00 $100.00 $80.00 $140.00 $125.00 $90.00 DESCRIPTION Principal Project Manager Project Engineer Sr. Engineer Engineer CAD Tecnician Clerical Landscape Architect Senior Landscape Designer Landscape Designer Survey 2-man Project Surveyor Survey Tech Task Cost Supplemental Topographic Survey 6 2 3 $1,360.00 60% Plans 10 18 36 36 $12,290.00 * Final Drainage Report Update 4 8 8 $2,700.00 100% Plans 6 9 18 18 $6,330.00 Design Quantities & Cost Estimates (60%, 100%) 2 4 8 6 $2,490.00 Project Management, Coordination w/Client, Utilities 16 22 $6,480.00 TOTAL HOURS 0 38 53 8 70 60 0 0 0 0 6 2 3 240 SUBTOTAL FEES $0.00 $7,030.00 $8,480.00 $1,080.00 $7,700.00 $6,000.00 $0.00 $0.00 $0.00 $0.00 $840.00 $250.00 $270.00 $31,650.00 $0.00 $3,100.00 $34,750.00 Potling (3 holes) TOTAL FIXED FEE PROJECT: Dysart/Peoria Basin Final Design Reimburseables Subconsultants