TAC Review Comments

City of El Mirage — Regular Meeting (2022-03-01)

View PDF Item 1 Meeting page

Extracted text (via pymupdf) 3068 characters
PLANNING AND ZONING 
Development Services Department 
10000 N. El Mirage Road, El Mirage, Arizona 85335 
623-876-2996; Fax 623-876-4605; TDD 623-933-3258 
www.elmirageaz.gov 
 
 
MEMORANDUM 
TO: 
 
Tom Wilkerson, Tower Engineering Professionals 
FROM: 
Jose A. Macias, Senior Planner 
 
 
Development Services Department, Planning & Zoning  
RE: 
 
PZ22-01-02 DISH Collocation / 846102  
DATE:  
January 25, 2022 
Mr. Wilkerson, 
Please see the comments from El Mirage Technical Advisory Committee (TAC) 
for the proposed Site Plan and Conditional Use Permit.   
 
BUILDING & SAFETY 
1. No comment. 
ECONOMIC DEVELOPMENT  
2. No comment. 
ENGINEERING 
3. See attached memorandum.  
FIRE DEPARTMENT 
4. No comment.  
PLANNING & ZONING 
5. The applicant shall in consent to the following zoning stipulations. 
1. The right to a use and occupancy permit shall be contingent upon 
the fulfillment of all general and special conditions imposed by the 
Conditional Use Permit procedure. 
2. All the special conditions shall constitute restrictions running with the 
land and shall be binding upon the owner of the land, his or her 
successors or assigns. 
3. All conditions specifically stated under any conditional use listed in 
Zoning Code Chapter 154 shall apply and be adhered to by the 
owner of the land, his or her successors or assigns. 
4. All the special conditions shall be consented to in writing by the 
applicant by adding these stipulations to the site plan.

2 
 
5. The proposed Collocation for wireless communication provider shall 
not generate noise, vibrations, and odors that may become a 
nuisance to the public.  
 
POLICE DEPARTMENT 
6. No comment.  
PUBLIC WORKS 
7. No comment.

Engineering 
Development Services Department 
10000 N El Mirage Road, El Mirage 85335 
623-972-8116; Fax 623-876-4605; TDD 623-933-3258 
www.elmirageaz.gov 
 
 
MEMORANDUM  
 
TO: 
 
Jose Macias, Planner/GIS 
FROM: 
Bryce Christo, P.E., Assistant City Engineer 
SUBJECT: 
Dish Wireless (PXPHX00138A) - Development Application Review  
DATE: 
01-22-22 
 
Below are the Engineering Division’s comments for the above referenced submittal provided in 
January 2022. These items will have to be addressed prior to the Planning and Zoning 
Meeting. 
 
1. None 
 
The below items will have to be addressed during the Construction Plan Submittal. 
 
Site Plan   
1. Add City General Information, General Notes and Dry Utility Notes to the plans. 
2. Show all existing utilities and easements within the proposed limits of disturbance. 
3. The new fiber run from the tower site to the Thunderbird Road right of way shall be 
located within an access/utility easement.  Provide proof of the easement if it is existing 
or submit a legal description and exhibit for review if it is proposed. 
4. Any disturbance to the existing ground, concrete, asphalt, etc. shall be repaired to current 
condition or better. 
 
The above comments are meant to be general in nature and are not considered to be all inclusive. 
Additional comments will arise during the formal permit submittal.