PLANNING AND ZONING
Community Development Department
10000 N. El Mirage Road, El Mirage, Arizona 85335
623-876-2996; Fax 623-876-4605; TDD 623-933-3258
www.elmirageaz.gov
1
MEMORANDUM
Development Application Review Comments
TO:
Daniel Macias, LGE Design Group
FROM:
Jose A. Macias, Senior Planner - GIS
Development Services Department, Planning & Zoning
RE:
Supply One Site Plan Approval
DATE:
March 1, 2022, Revised 2
Mr. Macias,
Please see the comments from El Mirage Technical Advisory Committee (TAC) for the
development application submitted for the project mentioned above.
BUILDING & SAFETY
1. No comment.
ECONOMIC DEVELOPMENT
2. No comment.
ENGINEERING
3. See attached memorandum.
EPCOR WATER
Sewer
4. G3 is located within EPCOR’s Luke 303 Wastewater District. Wastewater from G3
will be discharged to the EPCOR collection system for conveyance to the Luke
303 Water Reclamation Facility for treatment and disposal.
5. The point of connection to EPCOR sewer will be a future gravity sewer main
located in Dysart Rd. The gravity main will extend 800-feet north of Joe R. Ramirez
Rd. and is scheduled for completion in July 2022 (refer to attached plan sheets).
6. G3 shall pay all associated Luke303 service area impact fees
7. Refer to the attached 2020 EPCOR Developer & Engineering Guide for design
criteria.
2
Water
8. G3 is located within EPCOR’s Agua Fria Water District. The City of El Mirage
(COEM) currently owns the existing water mains located within the EPCOR
service area. EPCOR will acquire ownership of the water mains in the future and
will incorporate those mains into the Agua Fria water system.
9. The point of connection to COEM water is the existing 12-inch main located in
Dysart Rd. south of Peoria Ave.
10. Refer to the attached 2020 EPCOR Developer & Engineering Guide for design
criteria. G3 must provide a water source or water right if the total average day
demand exceeds 1,700 gpd/net acre.
11. Existing agriculture wells located on the site will be conveyed to EPCOR. G3 will
convey land, of no smaller than 100’ x 100’, associated with each well site for
EPCOR to drill replacement wells. If necessary, these sites may be relocated, but
the new sites must be within 660’ of existing well.
12. Fire flow must be in accordance with jurisdictional fire marshal requirements.
13. G3 shall pay all associated Aqua Fria Water District tariff hook-up fees.
14. EPCOR is in communication with the applicant and is working with the applicant
regarding water and sewer.
FIRE DEPARTMENT
15. No comment.
PLANNING & ZONING
(May be addressed with the construction document submittal)
16. Remove the zoning text and line work on the site. The city is applying the
approved PAD zoning destination.
POLICE DEPARTMENT
17. No comment.
3
PUBLIC WORKS
18. No comment.
If you have any questions regarding these comments or would like to set-up a follow up
meeting or call, please feel free to contact my office.
Engineering
Development Services Department
10000 N El Mirage Road, El Mirage 85335
623-972-8116; Fax 623-876-4605; TDD 623-933-3258
www.elmirageaz.gov
MEMORANDUM
TO:
Jose Macias, Planner/GIS
FROM:
Bryce Christo, P.E., Assistant City Engineer
SUBJECT:
G3 – Peoria & Dysart Development Application Review
DATE:
02-16-22 (Updated 03-01-22)
Below are the Engineering Department’s comments for the above referenced submittal provided
in February 2022. These items will have to be addressed prior to the Planning and Zoning
Meeting.
1. The Narrative states that the project is requesting a parking variance due to the proposed
building being a warehouse and that the number of spaces required per City Code is
much greater than is required. A Parking Waiver must be submitted and shall include the
number of spaces required per City Code, the number of spaces actually required by the
site and how that number was determined and explain how additional spaces can be
accommodated if required in the future.
2. It is the City’s understanding that the site will operate 24 hours a day. It shall be
acknowledged that no noise shall be generated at the site that exceeds 55 decibels,
measured at any G3 property line, between 10 pm and 6 am.
The below items will have to be addressed during the Construction Plan Submittal.
Site Plan/Civil Plans
3. The project is responsible for the dedication of 55 feet of right of way, an 8-foot wide
Public Utility Easement (PUE), half street roadway improvements, an eight-foot-wide
detached meandering sidewalk, streetlights, signing/striping and landscaping/irrigation
along the Peoria Avenue frontage. The roadway improvements will require widening the
existing roadway section to include an additional 11-foot wide through lane, 5.5-foot bike
lane, 11.5-foot wide right turn lane and vertical curb and gutter. The project will also be
responsible for any deceleration lanes at the proposed driveways. Offsite plan and profile
sheets will be required. The City of Surprise and Maricopa County also have right of way
along the project frontage and may require plan reviews/permits.
4. The City will construct the five lane (2-M-2) roadway section for the ultimate Dysart
Road and both the right of way and 8-foot PUE along the G3 property has already been
dedicated per the Copperwing Final Plat. The project is responsible for an eight-foot-
wide detached meandering sidewalk, streetlights, ITS conduit and landscaping/irrigation
along the Dysart Road frontage. The project will also be responsible for any deceleration
lanes and associated right of way/easement revisions. Offsite plan and profile sheets will
be required.
2
5. The Site Plan shows a “Potential Phase 1” portion of the building as 608,804 square feet.
Is this project expected to be complete in multiple phases? If so, a Phasing Plan shall be
prepared per Chapter 1, Section F of the City’s Design & Development Standards Manual
(DDSM).
6. The existing half right of way along the 604.90’ portion of the Dysart Road frontage is
60.5 feet wide, not 61.5 feet.
7. Show building setbacks and Jurisdictional boundaries on all plan sets.
8. Requests for Design Exceptions:
a. DE#1 – The number of proposed driveways – The City will wait for the Traffic
Impact Analysis prior to making a final decision on this request.
b. DE#2 – Width of proposed driveways - The City will wait for the Traffic Impact
Analysis prior to making a final decision on this request.
c. DE#3 – Depths of proposed basins – The 6.5 foot deep basins at a 4:1 slope with a
chain link fence are acceptable, however, these basins lie within the floodplain.
See Comment #30.
9. The driveways shall be per MAG or City details. Stop signs are recommended at each
driveway. Verify all driveways have a minimum throat of 50 feet unless they could
potentially be signalized in the future in which the length shall be a minimum of 150 feet.
10. If a driveway is either designated for truck entry or prohibits use by trucks, please
provide the necessary signage. Verify that any driveway to be used by a truck can
accommodate a WB-67 vehicle without encroaching into the adjacent lane.
11. The west edge of Driveway PA1 shall be a minimum of 150 feet away from the east right
of way of the railroad per City Code. The Traffic Impact Analysis shall determine if
additional separation is necessary.
12. Show the sight distance requirements at each proposed driveway per City Detail EM-
158.
13. When parking spaces are adjacent to a sidewalk, the sidewalk shall be a minimum of 6
feet wide or 5 feet wide with parking blocks.
14. Two of the ADA spaces shall be sized and signed as van accessible.
15. The standard parking space dimensions shall be 9’x18’. The drive aisles within the
parking lots shall be a minimum of 25 feet wide for two way traffic. Provide dimensions
of the improvements included the parking spaces, drive aisles, sidewalks, etc.
16. 6-inch MAG type curbing is required around all driveways and parking lots. The curbing
shall be no closer than 3 feet to any property line.
17. Any fire access road shall be designed to handle 75,000 lbs. or more if the site will
accommodate larger vehicles. A Geotechnical Report will be required for this project and
it should provide a recommended design section for this access road and Peoria Avenue.
The minimum inside radius of the fire access road is 19.5 feet and the outside radius is 45
feet.
18. Side slopes adjacent to the public right of way, areas where pedestrian access is permitted
and within Public Utility Easements (PUE) shall be 6:1 or flatter. There shall be at least
two feet of level ground between any wall or vertical obstruction and the top of any side
slope grading.
19. Site walls, including their corresponding footer, shall be located behind/outside the PUE.
20. A chamfer per City Detail EM-161 is required at the Peoria/Dysart intersection.
21. A 1-foot Vehicular Non-Access Easement (VNAE) shall be placed along any property
line that is shared with the railroad except where the proposed spur enters the site.
22. The trash enclosures shall be per City Detail EM-113.
23. Show the location of any exterior signs.
3
24. Plans shall include applicable City Notes. Call out MAG, City, etc. details to be used.
Use the City’s Design & Development Standards Manual (DDSM) as a guide for the final
design.
Preliminary Grading & Drainage Plans
25. Verify the slope does not exceed 2% in any direction within ADA parking spaces.
26. There are several low points within the parking areas with no outlets. How will these
areas drain?
27. Heights and/or elevations for the proposed retaining walls will be required. Structural
drawings for the proposed retaining walls shall be reviewed by the Building Safety
Division. Safety rail is required when the vertical drop is 30 inches or more and
recommended when 12 inches or more.
28. Show the floodplain on the Site Plan. Show the finished floor elevation of the proposed
building versus the base flood elevations of the floodplain. Revise all references of Zone
“X” to Zone “X” (Shaded).
29. The finished floor elevation of the proposed building shall be a minimum of 12 inches
above the 100-year base flood elevations and high-water level of any adjacent retention
basin and 14 inches above the ultimate outfall of the site.
30. In general, development within or modification of the floodplain is discouraged.
Development should be located outside of the 100-year floodplain. If development within
the floodplain is necessary, approval from the Flood Control District of Maricopa County
via a Floodplain Use Permit is required.
31. Two different floodplain lines are shown. Only show the one per the current FIRM Map.
32. The proposed retention basins or underground pipes shall be located a minimum of 4 feet
away from any structures and shall not be located within any building setbacks,
easements, or fire lanes. Basin B3 is located within an irrigation easement and Basins B4
and B5 are within an electrical easement.
33. The chain link fences around the deeper basins will require 20’ wide gates for emergency
access.
34. Trash racks and safety rails are recommended for on-site headwalls.
35. According to the drainage report for the existing rail spur, there is approximately 120 cfs
of offsite flow that crosses Peoria Avenue and runs along the western boundary of the
subject property. With the proposed improvements, how are these flows being routed
through the site?
Preliminary Utility Plans
36. The Utility Plans shall show all utilities and utility easements including electric, gas,
phone and cable.
37. An existing 12-inch irrigation line is shown south of the proposed 10-foot Irrigation
Easement along Peoria Avenue. Is this line going to be relocated or abandoned? This line
is also shown running through Basin B2.
38. The existing water and sanitary sewer in Peoria Avenue belongs to the City of Surprise
and may not be used by the subject site. There is an existing 12-inch water main in Dysart
Road that is available. The developer shall also work with EPCOR to bring sanitary
sewer to the site.
39. Water meters/vaults shall be located within the right of way and backflow preventers
shall be located on private property and not within the PUE.
40. A separate landscaping service, meter and backflow preventer is required.
41. Do not install utilities under any driveways or adjacent concrete aprons.
4
42. Any proposed utilities placed beneath the railroad will require extra protection per BNSF
guidelines.
43. Show utility horizontal and vertical clearance information per MAG Detail 404 and City
Detail EM-402.
44. Water valves are recommended along the fire line, approximately every 500 feet, and at
locations so that the maximum number of hydrants to be out of service is two.
45. Hydrants location/spacing will be reviewed and approved by the Fire Department.
Bollards shall adhere to City Detail EM-364.
46. Hydrants are required every 1,000 feet along the south side of Peoria Avenue. The first
hydrant shall be placed 500 feet west of the hydrant at the Jandoor (APN 501-43-002T)
driveway on the north side of Peoria.
47. Any hydrants within the project site will be private and painted “Safety Red” and any
within the right of way will be public and painted “Safety Yellow” per City Detail EM-
360. All hydrants require markers per MAG Detail 122.
48. The developer is required to perform their own flow test. The City’s Fire Department
(623-583-7968) shall be contacted as a witness. Also notify the Public Works Department
(623-876-4251) one week prior to the test.
49. Show the location of any exterior lighting. A Photometric Plan will be required that
addresses the following:
a. Any lighting used to illuminate an off-street area shall be arranged so as to deflect
light away from any adjoining residential zone or from the public streets. The
source of lights shall be hooded or controlled in some manner so as not to light
adjacent property. The foot candles generated from the proposed site shall be 0.0
at the residential property line to the northeast.
b. Any light or combination of lights which cause light on a public street, other than
lights specifically intended for that purpose, shall not exceed one foot candle as
measured from the center line of the street. Show the foot candles along the
centerline of Peoria Avenue and ultimate Dysart Road to verify that the proposed
lighting will not exceed the maximum limit.
Preliminary Landscape Plans
50. General Landscape Note 17 refers to Fulton Homes. Planting Note 10 refers to Pinal
County. Maintenance Note 2 refers to a Homeowner’s Association.
51. Add City Landscaping and Irrigation Notes (City Detail EM-101-4) to the plan set.
52. Show the proposed sidewalks.
53. Verify that the placement of the Site Distance Easements matches City Detail EM-158.
Add the easements to the intersection of Dysart & Peoria.
54. The well site fence appears to be within the Sight Distance Easement for Driveway PA1.
55. Several trees along Dysart Road are shown within the Sight Distance Easement.
56. All plantings at maturity shall maintain a minimum of 6 feet of clearance from all fire
hydrants and fire suppression devices per City Detail EM-361.
57. No walls or trees shall be placed within the proposed Public Utility Easement (PUE).
58. Trees shall not be placed within 5 feet of any City curb or sidewalk or within 6 feet of
any public utility.
59. The 10’ PUE shown south of the 8’ PUE along Peoria Avenue is shown as an Irrigation
Easement on other plan sets. Which is correct?
60. Add a note to the plans that the maintenance for all landscaping and irrigation shown on
the plans will be the responsibility of the property owner.
61. Irrigation plans will be required.
5
Exterior Elevations
62. No comments
ALTA Survey
63. The Vicinity Map shows the wrong Section.
64. Note 4 – Revise the Firm Map No. to 04013C1680L. Revise Flood Zone to “X”
(Shaded).
65. Legal Description – Proposed Lot 8
a. Lines 1 & 17 refers to the survey marker at the North Quarter Corner as an El
Mirage BCHH while the Map shows it as a flush aluminum cap. Also verify it
belongs to El Mirage as the center of the Peoria Avenue is not within the City.
b. Line 3 shows a length of 2542.02 while the Map shows 2542.00.
c. Line 9 shows a length of 1971.53 while the Map shows 1971.52.
d. Line 15 shows a length of 32.98 while the Map shows 33.00.
e. Line 23 should be 58 seconds East.
f. Line 25 shows a right of way dedication that does not match the amount shown in
the Lot Area section.
66. The Lot Area section refers to a 66 foot right of way dedication but only 55 feet has been
requested by the City. Please revise.
67. Label the floodplain on Sheets 2 and 4.
68. Revise the area of Tract A on Sheet 3 to 0.1860 acres.
69. The existing half right of way along the 604.90’ portion of the Dysart Road frontage is
60.5 feet wide, not 61.5 feet.
Preliminary Drainage Report
70. The finished floor elevation of the proposed building shall be a minimum of 12 inches
above the 100-year base flood elevations and high-water level of any adjacent retention
basin and 14 inches above the ultimate outfall of the site.
71. Section 3.0 - The site is responsible for retaining that drainage from the site and the
adjacent half right of way of both Peoria Avenue and ultimate Dysart Road.
72. Section 5.1 - Use the City Runoff Coefficients per City Code Section 155.054(B)(6)(a).
Concrete = 0.95, roofs/asphalt = 0.85, grass = 0.15 and desert/rock lawn = 0.70.
73. Provide calculations for the retention basins. Provide High Water Level (HWL) and
bottom elevations, volumes required and provided, basin overflow elevations and the low
outfall of the lot.
74. Calculations for the storm drain, catch basin, scuppers, etc. will be required.
75. Calculations will be required to show how the offsite flows will be routed through the
site.
76. Drywell calculations are required.
77. Street calculations for an arterial street (Peoria Avenue) shall verify that:
a. 10 year flows can be carried within the curb and maintain a 12 foot dry lane in
each direction.
b. 100 year flows can be carried within the right of way with a maximum depth of 6
inches over the crown.
78. A Final Drainage Report will be required. The report shall discuss offsite drainage and
provide a Tributary Area Map.
Water Statement (Original comments from the Pre Application review)
79. The water service area for the Copperwing Logistics Center is in the process of being
transferred to EPCOR therefore the water design shall adhere the requirements of
6
EPCOR. The City of El Mirage will still be responsible for fire protection and the design
of that system will be reviewed and approved by the City.
80. Paragraph 2 – The 12-inch water main is in Dysart Road, not Peoria Avenue.
Sewer Statement (Original comments from the Pre Application review)
81. The sanitary sewer service area for the Copperwing Logistics Center is in the process of
being transferred to EPCOR therefore the sewer design shall adhere the requirements of
EPCOR.
82. Paragraph 2 – The nearest sewer main is at the intersection of Peoria Avenue and 129th
Avenue. This sewer belongs to the City of El Mirage Service Area and will not be
available to the G3 property.
Traffic Impact Statement (TIS) (No TIA was provided with the Development Application)
83. A full Traffic Impact Analysis will be required. The TIA shall follow the City’s Traffic
Impact Study Criteria. The report shall review the requirements for deceleration lanes for
the site driveways, determine if any signals warrants are met for the driveways, describe
the effect on the surrounding area from a traffic standpoint and recommend any
improvements to the area to accommodate the proposed site.
84. The TIA shall discuss how many employees are anticipated to be on site during a typical
shift and the number of shifts there will be.
85. See Comment #11 regarding Driveway PA1.
86. Verify the queueing lengths at the guard shacks are sufficient.
87. Are there any concerns or recommendations for the 80-foot wide driveways?
88. Provide an analysis and any recommendations for all of the proposed driveways.
Title Report
89. No comments
Phase I Environmental Assessment
90. Section 3.5 – The City is in the process of transferring the Water and Sewer Service
Areas to EPCOR. There is currently water in Dysart Road and EPCOR is currently
constructing the sanitary sewer in the area.
Miscellaneous
91. A Final Plat will be required to show all right of way and easement dedications. The Plat
shall be reviewed and approved by the City and recorded prior to Certificate of
Occupancy.
92. A Geotechnical Report will be required to provide on-site pavement sections. Verify the
proposed pavement sections can handle 75,000 lbs. for the fire access lane or more if the
trucks entering and existing the site will be heavier.
93. Due to the location of the adjacent Flood Zone “A” and the proposed improvements, a
Floodplain Use Permit (FUP) will be required. Contact the Flood Control District of
Maricopa County to start the process. A copy of the FUP shall be provided to the City
prior to the release of any Engineering permit.
94. A Haul Permit will be required if 500 cubic yards or more of material will be brought
into or out of the site. This will require a separate application, an exhibit showing the haul
route and insurance from the company performing the haul. The fee is $300.
95. An Approval to Construct (ATC) will be required from MCESD for the water and sewer
line extensions. A copy shall be provided to the City prior to the release of any
Engineering permit.
7
96. A Dust Control Permit from the County will be required prior to the release of any
Engineering permit.
97. A Stormwater Pollution Prevention Plan (SWPPP) will be required per the City’s SWPPP
Guidelines document. A Notice of Intent (NOI) from ADEQ will be required prior to
release of any Engineering permit.
98. The City will not release any permits until EPCOR provides the City with their approval
of the water and sewer plans and reports. The applicant is responsible for submitting
plans to EPCOR for review and approval.
99. Any modifications to the farmer’s irrigation system would be an agreement between the
developer and the property owner but the modifications may be reviewed by the City.
The above comments are meant to be general in nature and are not considered to be all inclusive.
Additional comments will arise during the formal permit submittal.
May 2020
1
2020
DEVELOPER & ENGINEERING GUIDE
Prepared by:
EPCOR Water Arizona Inc.
Engineering Department
2355 West Pinnacle Peak Road, Suite 300
Phoenix, Arizona 85027
(623) 445-2400
www.EPCOR.com
May 2020
2
CONTACT LIST
NAME
TITLE
RESPONSIBILITIES
PHONE NO.
E-MAIL
Main Office
General Inquiries
623.445.2400
Customer Service
General Inquiries
800.383.0834
MYwater@epcor.com
Brad Finke
Developer Services
Manager
New Development
Coordination
623.445.2402
BFinke@epcor.com
Steve Brooks
Project Manager
Plan Reviews, Main
Extension Agreements,
Meter Applications
623.445.2447
SBrooks@epcor.com
Jim Thomson
Project Manager
CCN Applications,
Developer Services
623.587.5218
JThomson@epcor.com
Josh Vig
Project Manager
Plan Reviews, Conflict
Reviews, Main Extension
Agreements, Meter
Applications
623.445.2495
JVig@epcor.com
Joe Whelan
Project Manager
Plan Reviews, Main
Extension Agreements,
Meter Applications
623.445.2438
JWhelan@epcor.com
Anthony Beuche
Project Manager
New Development
Coordination,
Engineering Report
Review, Engineering
Inquiries
623-445-2452
ABeuche@epcor.com
Eric Coppinger
Sr. Construction
Inspector
Construction Inspections
623.445.2445 (o)
602.309.1164 (c)
ECoppinger@epcor.com
Eric Ganados
Construction Inspector
Construction Inspections
623.445.2443 (o)
602.358.5548 (c)
EGanados@epcor.com
Garren Willey
Construction Inspector
Construction Inspections
623.445.2445 (o)
480.450.4670 (c)
GWilley@epcor.com
Jamie Patterson
GIS Manager
Mapping,
Record Drawings
623.780.3792
JBPatterson@epcor.com
Kimberly Dotray
Real Property Manager
Real Estate, Easements,
Deeds
623.780.3777
KDotray@epcor.com
Joshua Newby
Environmental
Compliance Program
Coordinator
Backflow Prevention
623.587.5202 (o)
480.450.2077 (c)
JNewby@epcor.com
Doug Kirkland
Industrial Pretreatment
Specialist
Pretreatment, Grease
Interceptors
623.587.5298 (o)
602.763.2192 (c)
DKirkland@epcor.com
May 2020
3
TABLE OF CONTENTS
Note: Throughout this Developer & Engineering Guide, “Utility” means EPCOR Arizona Inc.
CHAPTER 1 - DEVELOPER GENERAL INFORMATION
MAIN EXTENSION PROCESS FLOWCHART ................................................................................ 6
FEE SCHEDULE ............................................................................................................................. 7
SUMMARY OF KEY POINTS IN THE MAIN EXTENSION PROCESS ........................................... 8
WATER METER INSTALLATION CHECKLIST ............................................................................. 10
UTILITY OWNERSHIP OF FACILITIES ........................................................................................ 11
SUBMITTAL LIST .............................................................. 1ERROR! BOOKMARK NOT DEFINED.
REQUIREMENTS FOR DEVELOPER DESIGNED AND BUILT WATER/SEWER
MAIN EXTENSIONS ...................................................................................................................... 13
CERTIFICATES OF ASSURED OR ADEQUATE WATER SUPPLY AND
GRANDFATHERED RIGHTS ......................................................................................................... 16
CHAPTER 2 - ENGINEERING MASTER PLAN AND DESIGN CRITERIA
MASTER PLANNING AND DISTRIBUTION MAIN REQUIREMENTS .......................................... 18
WATER MASTER PLAN OUTLINE .............................................................................................. 20
DESIGN CRITERIA FOR WATER SYSTEMS ............................................................................... 22
DESIGN CRITERIA FOR FIRE LINES ........................................................................................... 27
DESIGN CRITERIA FOR WASTEWATER SYSTEMS ..... ERROR! BOOKMARK NOT DEFINED.8
CHAPTER 3 - CONSTRUCTION DRAWINGS
CONSTRUCTION DRAWING REQUIREMENTS .......................................................................... 33
PLAT DEDICATION VERBIAGE .................................................................................................... 35
AS-BUILT REQUIREMENTS ......................................................................................................... 36
WATER/SEWER “AS-BUILT” CERTIFICATION ............................................................................ 37
CHAPTER 4 - CONSTRUCTION INSPECTION
PROCEDURE FOR SCHEDULING WATER LINE CONSTRUCTION INSPECTIONS ................ 39
PROCEDURE FOR SCHEDULING SEWER LINE CONSTRUCTION INSPECTIONS ................ 40
May 2020
4
CHAPTER 5 - BACKFLOW PREVENTION
BACKFLOW PREVENTION APPROVAL PROCESS ....... 4ERROR! BOOKMARK NOT DEFINED.
PREMISES REQUIRING BACKFLOW PREVENTION .... 4ERROR! BOOKMARK NOT DEFINED.
BACKFLOW PREVENTION OPERATIONAL APPROVAL FLOWCHART .................................... 43
CHAPTER 6 - PRETREATMENT REQUIREMENTS
APPROVAL PROCESS .................................................................................................................. 45
PLAN REVIEW ............................................................................................................................... 45
INDUSTRIAL DISCHARGE CRITERIA .......................................................................................... 45
DENTAL FACILITES ...................................................................................................................... 45
FOOD SERVICE FACILITES CRITERIA ....................................................................................... 45
TABLE NO. 1 - DRAINAGE FIXTURE UNITS FOR FOOD SERVICE FACILITES ....................... 46
TABLE NO. 2 - MINIMUM GGI SIZE BASED ON TOTAL DFUs .................................................... 46
TABLE NO. 3 - GGI SIZING FOR UNFINISHED BUILDING SHELLS .......................................... 46
APPENDIX
ENGINEERING DETAILS (INCLUDING GENERAL NOTES AND MATERIAL SPECIFICATIONS)
May 2020
5
CHAPTER 1
DEVELOPER
GENERAL INFORMATION
May 2020
6
Application/Plan Approval Process
Meter Set Process
Agreement Process
Construction Process
Main Extension Process Overview
Application Submittal
Application plus Fee, Design Plans,
and/or Master Plan, if applicable
Application Review:
EPCOR reviews the Application
Package
Plan Review
EPCOR Formal Plan Review,
Comments, and Applicant Revisions
Pre-Application Meeting:
Discuss Service Options and General
Policy and Procedures
Comments/
Issues
Redlines/
Revisions
Conditional Approval
EPCOR issues Conditional Approval of
Plans and/or Master Plan
MXA and/or Master Agreement
Prepared by EPCOR, with
Exhibits Submitted by Applicant
Permit Review
Prepared by Applicant and Reviewed by
EPCOR in preparation for submission
conditional on MXA execution
Warning: EPCOR will not sign any plans or permits until
MXA is executed and all fees as stated in the MXA are paid.
MXA Final Agreement Package
Complete
Easements/Real Property and
any other special permits or licenses:
Prepared by Applicant and Reviewed by
EPCOR
MXA Package Submitted through
EPCOR’s Contract Approval Process for
final approval
Master Agreement Required for
Common or Off-site Facilities, Wells,
Tanks, Booster Stations, etc?
Negotiate
Agreement and
Terms
Approved MXA
Sent to Applicant for Signing and then
Returned to EPCOR for Signing; Applicant
pays Construction Administration Fee
before EPCOR signs the Agreement
Final Approval
Plans and Permits Signed by EPCOR
for Submission by Applicant to
Regulatory Agencies
Pre-Construction Meeting
Arizona Corporation Commission
(“A.C.C.”) Approval
Executed MXA sent by EPCOR
to A.C.C. for Approval
Permit Approvals
All Permits or Authorizations Received
A.C.C.
APROVAL
Yes
No
Resolve Issues
Warning: Construction process CANNOT start
until Utilities Division of A.C.C. approves MXA
Construction Start/Complete
Approval of Construction (AOC)
Applicant’s Engineer Completes AOC Package,
Sends to EPCOR to Sign and Mail to Agency
EPCOR Final Acceptance
Granted after AOC issued and all items required for
Final Acceptance per MXA are satisfied; Hook-Up
Fees due for projects in these Districts: Agua Fria
Wastewater, Mohave Wastewater, Anthem
Wastewater and Anthem Water.
Applicant Requests Meters
(completes forms and submits to
EPCOR with Meter Fees prior to
connection to EPCOR’s water system)
EPCOR Verifies All Fees Required per
MXA are paid by Applicant
EPCOR Sets Meters
One Year Warranty Period Begins
Final Walk-Through Inspection after
One Year, Punch List Items Addressed
by Applicant’s Contractor
Framework
of
Agreement
Complete
Yes
No
2
3
4
1
If project is in the Agua Fria Water
District or Havasu Water District,
applicant pays Hook-Up Fees
within 15 calendar days after
A.C.C. approval
See “Summary of Key Points” for Details Revision Date: January 2015
(MXA = Main Extension Agreement)
May 2020
7
EPCOR WATER
DEVELOPER SERVICES – FEE SCHEDULE
All fees are subject to change.
Review Fee for Master Plan Reports for developments with 100 or less
residential services
•
This Fee is submitted to Utility along with the “Application for Water or
Sewer Main Extension” and with the Master Plan Report.
•
The Types of Master Plan Reports include water, sewer, and reclaimed
water.
$1,500 per report type
Review Fee for Master Plan Reports for developments with more than 100
residential services
•
This Fee is submitted to Utility along with the “Application for Water or
Sewer Main Extension” and with the Master Plan Report.
•
The Types of Master Plan Reports include water, sewer, and reclaimed
water.
$2,500 per report type
Review Fee for Master Plan Reports for commercial developments
•
This Fee is submitted to Utility along with the “Application for Water or
Sewer Main Extension” and with the Master Plan Report.
•
The Types of Master Plan Reports include water, sewer, or reclaimed
water.
$2,500 per report type
Plan Review Fee
•
Does not apply to projects that are “fire protection services only.”
•
This Fee is submitted to Utility along with the “Application for Water or
Sewer Main Extension” and with the first submittal of engineering plans
and specifications to Utility for review.
$5,000
Plan Review Fee – for Fire Protection Services Only
•
This Fee is submitted to Utility along with the “Application for Fire Lines”
and with the first submittal of engineering plans and specifications to
Utility for review.
$2,500
Construction Administration Fee
•
Does not apply to projects that are “fire protection services only.”
•
This fee is due upon execution of the Main Extension Agreement.
•
The developer’s engineer determines the estimated total cost of
construction of the main extension, which is added as an exhibit to the
Main Extension Agreement.
$6,500 + 5% of the
Engineer’s Estimated
Total Cost of
Construction
Line Testing Water Fee
•
This fee is due upon execution of the Main Extension Agreement.
•
This fee is the cost of the water used during testing of the main
extensions (i.e., flushing, chlorination, filling).
9 x (volume of the
main extensions) x
Water Rate per the
applicable Water Tariff
Application for Public Fire Hydrants
•
This fee is due after Utility’s review of the completed Application and
before construction begins.
$750 per hydrant
Hook-Up Fees
As Stated in Tariff
Water Meter Fees
As Stated in Tariff
May 2020
8
SUMMARY OF KEY POINTS
In the MAIN EXTENSION PROCESS
This outline provides an overview of the key procedures involved in administration, design, and
construction of water distribution or sewer collection facilities for developer-funded projects. These
procedures have been designed to promote efficient completion of projects at the lowest possible cost.
Adherence to these procedures will avoid costly delays.
1. When it is determined that a proposed development is within EPCOR Arizona Inc. ("Utility") service area,
the Applicant will complete an Application for Water or Sewer Main Extension ("Application") and will
submit the Application along with engineering plans and a $5,000 Plan Review Fee to Utility. The Plan
Review Fee is a non-refundable contribution intended to cover the initial cost of Utility’s project
management expenses, including reviews of engineering plans, specifications and design reports,
preparation and reviews of the Main Extension Agreement (MXA) and coordination of flow tests where
necessary. The Application is available on EPCOR’s website (HERE).
2. The Plan Review Fee is structured to cover up to two reviews of engineering plans, specifications and
design reports. If the Applicants’ Engineer fails to satisfactorily address Utility’s review comments with its
second submittal, the remaining portion of the Plan Review Fee may not be sufficient to cover Utility’s
time to review the engineer’s third submittal. In that case, or in any other case where the Utility's costs
exceed the Plan Review Fee, Utility will not continue work until a second $5,000 Plan Review Fee is
submitted.
Second reviews of engineering plans are intended to focus only on changes requested from Utility as a
result of the initial review, and will not be considered a complete review. As such, any changes made to
the plans must be clearly identified so the plan reviewer can maximum the use of their time and focus
solely on plan revisions. If other changes have been made to the plans (those not requested from the
Utility), they must be clearly called out as changes, or there is the possibility that these changes could be
rejected during construction, and result in costly delays.
3. Utility will not begin any work until the $5,000 Plan Review Fee is received. Upon receipt of the
Plan Review Fee, Utility will assign a project manager to coordinate with the Applicant’s Engineer to
assist them in developing engineering plans and specifications in accordance with Utility’s requirements.
These requirements are outlined in Utility’s Developer Guide, which is available on EPCOR’s website.
During the course of plan development, the following may be required from the developer:
a. A letter or design report from the Engineer estimating the ultimate population equivalents for the
development, the average and maximum anticipated daily water demands (or wastewater flow rates)
for domestic, irrigation, and fire protection, and the anticipated number and sizes of meters and
service lines and proposed backflow prevention devices.
b. A letter from the jurisdictional fire protection agency setting forth requirements for fire flows, public
fire hydrants, and/or private fire protection systems. These requirements must be incorporated into
the engineering plans. The letter and plans must show the minimum required fire flow shown in
gallons per minute and duration shown in hours.
c. Preliminary plats or final plats showing lot numbers with corresponding street addresses and public
utility easements. A final recorded plat is required prior to final closeout.
d. Easements minimum 12 feet in width for all water/sewer facilities that are out of public right-of-way.
Larger width easements may be required in certain cases. Utility’s easement forms are available
upon request. Draft easement forms, deeds, ALTA surveys and title reports will be submitted for
Utility review prior to recordation of easements or execution of deeds. After Utility approval,
developer will be responsible for recording the easements. A notarized copy of the recorded
document shall be provided to Utility. Recorded off-site easements will be required prior to
construction. Recorded on-site easements are required prior to activation of service.
e. One complete set of final engineering sealed plans (approved by the fire protection agency, the
governing regulatory agency, and Utility).
f.
Copies of Certificates of Approval to Construct as issued by the governing regulatory County or State
agency.
g. A material breakdown sheet in a format approved by Utility showing the quantity, size, and estimated
construction cost of all water/sewer facilities to be conveyed to Utility, including permitting and
engineering costs. This sheet must be signed and sealed by an engineer.
May 2020
9
4. Construction Administration Fee
Before Utility will sign the approval block on the engineering plans, Utility must receive the Construction
Administration fee, described in the Main Extension Agreement. The Construction Administration fee
covers Utility’s estimated construction administration expenses, including inspecting and testing the
construction work, participating in construction progress meetings, reviewing as-built engineering
drawings, coordinating with the Utilities Division of the Arizona Corporation Commission (see paragraph
7 below), coordinating with the governing regulatory County or State agency to obtain the Certificate of
Approval of Construction, reviewing Applicant’s invoices (see paragraph 8.b below), reviewing ALTA
surveys, title reports, easement and deed documents, coordinating meter set requests, and facilitating
other numerous internal project management activities. An invoice for this fee will be sent to the
Applicant at the time the plans are ready to be signed by Utility. The Construction Administration fee
is $6,500 plus 5% of the Engineer’s Estimated Total Cost of Construction. The Engineer’s
Estimated Total Cost of Construction is the agreed-upon cost as detailed in paragraph 3.g above. This
fee is a non-refundable contribution in aid of construction.
5. Where Utility is responsible for constructing the project, the following steps will be taken:
a. Utility will sign / approve the engineering plans provided by the Applicant's Engineer.
b. Applicant’s Engineer will obtain all required permits, including the “Approval to Construct” and the
Certificate of Assured Water Supply, and will furnish copies of these permits to the Utility.
c. The Applicant must specify, in writing, the date for the Utility to put the project out to bid (“Request to
Bid”). Utility will determine the bid due date. Any Applicant requirements regarding time constraints
(construction completion deadlines) must be noted in the Request to Bid. Please note the estimated
time required from the invitation to bid to the start of construction may be four to eight weeks.
d. Utility will solicit bids from qualified contractors.
e. After Utility receives and reviews the bids, Utility will provide Applicant a bid evaluation report that
includes the recommended contractor, the bid amount, and the Contractor’s construction schedule.
If the Applicant deems the contract price or construction schedule is unreasonable, the Applicant
may solicit bids from bonded contractors provided that all bids are submitted by the bid due date
stipulated by Utility. If a lower bid is obtained, or if a bid is obtained at an equal price with a more
preferred construction schedule, Utility may continue to use Utility’s chosen contractor but only if the
chosen contractor meets the terms and conditions of the bid proffered; otherwise, Utility will be
required to contract with the contractor proffering such bid.
f.
Prior to the start of construction, the Applicant will pay to Utility, as a refundable advance in aid of
construction, the cost of the selected Contractor’s bid, plus the estimated cost of Utility’s labor and
overhead, contingency for the construction costs, which is calculated as 10% of the total of
construction and Utility’s labor.
g. After construction completion Utility will issue a final acceptance letter for the project and audit the
projects costs. If the actual costs are less than the amount advanced by the Applicant, Utility will
refund the difference to the Applicant within 30 days after construction completion.
h. Utility will refund the Applicant’s refundable advances in aid of construction in accordance with
Arizona Administrative Code § R14-2-406.D for water and § R14-2-606.C for sewer. Any unrefunded
balance of such advances remaining at the end of the applicable refund period shall become non-
refundable. No interest shall be paid on any amount advanced by Applicant.
6. The Contractor’s insurance coverage must be in the types and amounts required by Utility and must
include Utility as an additional insured. A sample certificate of insurance form with the required coverage
is available upon request. The Contractor is responsible to coordinate the site pre-construction
meetings, inspection schedules and testing of new facilities by notification to Utility two business days
prior to any planned activity.
1. All main extension agreements will be filed with and approved by the Utilities Division of the Arizona
Corporation Commission ("ACC"). No agreement will be approved by the ACC unless accompanied by a
Certificate of Approval to Construct or an exemption letter by the State or County regulatory agency.
Construction shall not begin until approval is received from the Utilities Division of the ACC, which
typically takes a minimum of 4 to 6 weeks.
8. After completion and testing of the new facilities, the following items are required to be submitted to and
approved by Utility prior to activation of water/sewer service:
a. All items listed in section 3
May 2020
10
b. Copies of Certificates of Approval of Construction as issued by the governing regulatory County or
State agency.
c. Applicant’s actual cost breakdown, including copies of all contracts and paid bills, invoices and
other statements of expenses incurred by developer, covering all of the costs of permitting,
design, and construction of the water/sewer facilities
d. Unconditional lien waivers and releases
e. One set of sealed and certified as-built engineering plans on full-size bond paper, and one set on
flash drive or as a PDF file
f. Recorded plat, easements and deeds
g. Backflow Certification, as required per Chapter 5, Backflow Prevention
h. Final walk-through inspection by Utility and resolution of all punch list items
i. Payment of all applicable tariff fees (meter fees, hook-up fees, etc.)
9. For all projects that involve a Main Extension Agreement, the above information is required before Utility
will accept the facilities constructed by the Applicant and before refunds of advances are initiated. After
Utility issues its written final acceptance of the new facilities, project closeout begins, which includes the
final balancing of Applicant advances. Utility will not provide water service until after it provides the
final acceptance letter.
The above steps are not necessarily all inclusive, but rather an outline of critical points in the development of
developer-funded projects. These steps should be referenced when planning such projects. Other specific
project requirements may apply on a case-by-case basis.
WATER METER INSTALLATION CHECKLIST
Before Utility will set a meter, the Applicant is responsible to ensure the following items have been
addressed:
o
Parcel Name, lot and address must be clearly posted in front of the premises.
o
All lot grading must be within six (6) inches of final grade.
o
Meter box must be unbroken (with lid), level and adjusted to final grade.
o
Meter box must be free of all dirt and debris.
o
Meter box must be unobstructed and accessible.
o
Angle valve must be undamaged, flush with box and in correct location (see EPCOR Detail 342-
2)
o
Backflow device (if required – such as for irrigation meters) must be installed prior to meter set.
The Customer shall provide and maintain a private cutoff valve within 18-inches of the meter on the
Customer's side of the meter in accordance with AAC R14-2-405.B.3.
The Applicant must complete a water meter application and attach a clearly visible photo of the water
meter box, lid, and lot sign showing the lot number or address of the property requesting water service.
January 2015
11
UTILITY OWNERSHIP OF FACILITIES
All water facilities on the Utility side of the service meter, including meter, are owned by Utility. All fire
hydrants and related facilities are owned by Utility (except in Mohave County). Fire sprinkler taps, isolation
valves, and that portion of the fire sprinkler services in the street rights-of-way or dedicated public utility
easements are owned by Utility.
All sewer mains are owned by Utility. Utility will repair all leaks and will remove all stoppages in the sewer
main. The property owner is responsible for all leaks and stoppages in the sewer service lateral. For that
portion of the sewer service lateral outside the boundary of the parcel of private property, the property
owner is responsible for all stoppages and Utility is responsible for all structural defects or failures
(including penetration of tree roots). In all cases, when a problem arises with a sewer service lateral within
the boundaries of the private property, the property owner is solely responsible.
Water Meter
Owned by Utility
Property Line
Sewer Service Lateral
Customer is responsible for
all stoppages from house to
sewer main
Water Service Line
Customer is responsible
from house to meter
Water Main
Sewer Main
The water and sewer facilities to be owned by Utility as described above shall become the sole property of
Utility when Utility issues Final Acceptance of such facilities. Full legal and equitable title in the facilities
shall be vested in the Utility, free and clear of any liens, without the requirement of any written document of
transfer to Utility or acceptance by the Utility.
May 2020
12
DEVELOPER SERVICES SUBMITTAL LIST
Item
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15
16.
17.
18.
19.
20.
21.
22.
Code
a,1
c,1
a,1
a,1
a,1
a,1
a,1
d,1
a,1
a,1
a,1
c,2
a,2
c,2
a,1
b,2
a,2
b,2
c,2
a,1
a,2
b,2
Item Description
24" x 36" Blue-line Plan and electronic PDFs of each sheet
Water/Sewer Material Specifications
Property Legal Descriptions in 8 ½” x 11" format suitable for incorporation into the Main
Extension Agreement
Project Drawing showing property, easements, water/sewer facilities and ROWs in 8 ½” x
11" format suitable for incorporation into the Main Extension Agreement
Legal Descriptions in 8½” x 11" format for incorporation into the easement document (if
needed). All legal descriptions shall have a corresponding exhibit.
Engineer’s Estimate of Probable Cost
Certificate of Approval to Construct (ATC)
Main Extension Agreement (MXA)
Master Plans/Design Report for subdivision development
Water/Sewer Service Agreement
Address/Lot Map/CAD File
Trench Compaction Test Results
Final Recorded Property Plat and/or Final Recorded Easement
Backflow Prevention Assembly and Certification Data submitted to Utility’s Backflow
Prevention Specialist for Approval
Pre-treatment Approvals
Certificate of Assured or Adequate Water Supply, whichever applies
Certified As-Built Plans on 24" x 36" bond paper (plus one set on 11” x 17” paper), and
one set as CAD and PDF files
Complete Project Invoice/Cost Data, Approval of Construction (AOC)
Lien Waivers
Well Siting Study
ADWR Non-Exempt Well Permit
ADWR form Request to Change Well Information (change of ownership)
Codes:
a - Typically provided by Engineer
1 - Required prior to Start of Construction
b - Typically provided by the Applicant
2 - Required prior to Final Acceptance
c - Typically provided by Contractor
d - Provided by Utility
*All items listed with code of 1 shall be submitted to the Utility and approved prior to the
Utility’s approval of the Applicant’s construction Plans
May 2020
13
Items from Developer by 2nd plan review submittal:
1.
Current ALTA survey of parcel with the future alignment of Easement mapped (if possible).
2.
Current Title Report for Easement Property.
3.
Boundary Closure Certification of Easement
4.
Signed and Sealed by Engineer 8.5 x 11 Legal Description and Exhibit
5.
Verify Public Access to the Easement, may have to submit Approved Site Plan, showing dedicated public
access
6.
Whenever possible, Easements should be recorded on the Final Plat with EPCOR Dedication Language
provided in our Developer Guide.
7.
GIS Data submittal for Legal Description Exhibit (Mapping see Requirements below). EPCOR requires
digital submission of easement data, including (a) PDF format for the instrument itself, and (b) the geometry
of the easement in GIS (SHAPE or GDB) or CADD (.DWG or .DGN) format. Graphics relating to the
easement shall ne on a separate layer so it can be isolated from adjacent graphics.
Note: All easements must be entered into simultaneously with the related MXA or the related MXA must be in effect
and fully executed prior to delivery of the easement.
Note: The easement grantor need not necessarily be the same party as the Applicant. The easement grantor needs
to be the party that owns the affected real property. In any case, where the Applicant and the easement grantor are
different, consult with EPCOR Real Property Manager (see contact list).
GIS Requirements: The digital easement geometry should conform to the basic topology rules including:
Lines must not overlap
Must not have gaps
Must not intersect with existing parcels
Cannot overlap self
Must be closed polygon (in the case of polygons)
Digital submittals must follow an existing EPCOR spatial reference (coordinate system and horizontal datum):
AZ – Phoenix metro and Tubac: NAD 1983, State Plane Arizona Central, Feet
AZ – Mohave County: NAD 1983, State Plane Arizona West, Feet
NM – Edgewood/Thunder Mountain: NAD 1983, State Plane New Mexico Central, Feet
NM – Clovis: NAD 1983, State Plane New Mexico East, Feet
REQUIREMENTS FOR DEVELOPER-DESIGNED AND BUILT
WATER/SEWER MAIN EXTENSIONS
1.
Applicant shall prepare and submit Water or Sewer Plans in accordance with the requirements
outlined in Chapter Three.
2.
Utility will be available to discuss plan development and design concepts. Applicant is encouraged
to contact Utility prior to plan development for special instructions that may apply to a particular
expansion.
3.
Easements, legal descriptions and exhibits are required for all Utility owned facilities that are not
within dedicated rights-of-way. Easements shall have a minimum width of 20 feet and shall be
centered about the centerline of the Utility-owned facilities. Utility may require wider easements for
larger diameter water or sewer mains or where deeper excavation is required or where soil
conditions require wider trenching. For cases where Utility will have a waterline and sewerline
within the same easement, the easement shall have a minimum width of 30 feet (with a minimum
of 4 feet between edge of pipe and easement boundary). The easement legal descriptions and
exhibits shall be submitted on 8½” X 11” sheets and signed and sealed by a Professional Civil
Engineer or Land Surveyor registered in the State of Arizona. No other utilities are permitted
within EPCOR’s easements except when crossing the easement in 90-degree angles.
4.
Water and sewer mains must have a minimum distance of 12 feet from buildings or retaining
walls, as measured from the edge of the building foundation or wall to the outside of the main. In
rare cases where a water or sewer main must encroach within 12 feet from a building or retaining
wall, additional protection is required. Additional protection may include the use of a sleeve for the
May 2020
14
main, or modifications to the footing of the structure, to prevent damage in the event of a main
break.
5.
For all main extensions, Applicant is responsible to install the main along the entire length of the
Applicant’s property line frontage of that property being developed. The property line frontage is
defined as that portion of a parcel of property that abuts a street, easement, or public rights-of-
way. If a parcel to be developed has more than one frontage, the main shall be extended along all
frontages.
6.
Prior to commencing construction, Applicant must supply Utility with an "Approval to Construct" as
issued by the Maricopa County Environmental Services Department (for projects in Maricopa
County), by the Santa Cruz County Department of Environmental Quality (for projects in Santa
Cruz County), by the Arizona Department of Environmental Quality (for projects in Mohave
County), or approved delegate. For projects that are exempt from the plan review requirements
per A.A.C. R18-5-505.B.3, the Applicant shall submit to Utility a letter from the applicable regulator
confirming the exemption. The ATC and exemption letter are also required by the Arizona
Corporation Commission ("ACC") when filing main extension agreements with the ACC.
7.
Applicant shall only install materials approved in writing by Utility.
8.
Applicant shall construct all infrastructure in accordance with the Standards and Specifications of
the Arizona Department of Environmental Quality, the Maricopa Association of Governments
(regardless of project location), and the Utility.
9.
Utility will conduct periodic inspections of Applicant’s construction. Utility does not provide full time
on-site inspection. Responsibility for proper installation rests with Applicant. Such inspection as
the Utility personnel may perform in no way relieves Applicant of its responsibility for construction
and installation of the infrastructure.
10.
Applicant shall not make any changes from approved plans and specifications without prior written
approval of Utility. Field Directives authorizing changes in the approved plans and specifications
must be co-signed by Utility and Applicant’s engineer of record prior to construction.
11.
Utility will give final acceptance upon completion of all construction, including final adjustments of
all valve boxes, manholes, meter boxes, etc. and submittal of any other required documentation.
May 2020
15
REQUIREMENTS FOR DEVELOPER-DESIGNED AND BUILT
WATER/SEWER MAIN EXTENSIONS
(CONTINUED)
12.
Unless indicated otherwise by the provisions of the applicable main extension agreement, the
date of final acceptance shall be the date of the Final Acceptance Letter from Utility to Applicant
unless otherwise stated in that letter. Applicant shall be responsible for the repair of the facilities
installed for one year from the date of final acceptance.
13.
In order to establish actual cost of construction, Applicant shall provide copies of all invoices for
material and labor for that portion of the work conveyed to the Utility. The invoices must be
provided in a binder, itemized, and include engineering, construction supervision, actual
installation costs, and any other costs directly associated with the project.
14.
Applicant shall provide unconditional lien releases from all contractors, subcontractors and
material suppliers for all water and sewer construction projects.
15.
Applicant shall provide freshly sealed and certified "As-Built" plans of facilities installed. The “As-
Built” plans shall include the locations of all vertical and horizontal pipe bends, valves, manholes,
sewer taps, etc., by station/offset and northing and easting on State plane coordinates. Applicant
shall provide three sets of as-built drawings on full-size bond paper, one set on 11” x 17” paper,
and one set on flash drive in CAD and PDF formats. The plans must be certified for correctness
by a Professional Civil Engineer or Land Surveyor registered in the State of Arizona. Reference
the “As-Built” section, Chapter Three - Construction Plan Requirements, for detailed “As-Built”
plan requirements.
16.
No refunds for "Advances in Aid of Construction" will be made prior to receipt of invoices, lien
waivers and approved "As-Built" plans.
Utility will not provide water service until after the items above are received and it provides the Final
Acceptance Letter.
May 2020
16
CERTIFICATE OF ASSURED OR ADEQUATE WATER SUPPLY AND
GRANDFATHERED RIGHTS
Prior to the approval of a plat and the issuance of a public report for a new development located within an
Arizona Active Management Area (AMA) (the Utility’s Agua Fria, Anthem, Paradise Valley, Sun City, Sun
City West and Tubac water districts), Arizona law requires that developments secure a 100-year Assured
Water Supply. This can be done in one of two ways:
1) the Applicant secures a Certificate of Assured Water Supply (CAWS) for the proposed
development, or
2) The water provider that will serve the proposed development (in this case, the Utility) has a
Designation of Assured Water Supply (DAWS).
Currently, Utility does not possess a DAWS and it is therefore the Applicant’s responsibility to secure a
Certificate of Assured Water Supply for the proposed development. Accordingly, Utility requires that
developers of subdivisions and commercial properties on lands having Irrigation Grandfathered Rights
(groundwater pumping rights) file with the State to “extinguish” the rights and pledge the rights to the
Applicant’s CAWS. This requirement is included in the main extension agreement.
For new developments located outside of an AMA (the Utility’s Mohave and Havasu water districts),
Arizona law requires that the development apply for a 100-year Adequate Water Supply prior to the platting
and the issuance of the public report. It is the Utility’s policy that all developments have sufficient supplies
and obtain the 100-year Adequate Water Supply.
If Irrigation Grandfathered Rights or Type I Non-Irrigation Grandfathered Rights are associated with the
land to be developed, the Applicant shall, within 30 days of plat recordation or prior to execution of a
Membership Agreement with the Central Arizona Groundwater Replenishment District, whichever occurs
first, submit to the Director of the Arizona Department of Water Resources (ADWR), a notarized
Statement of the Intent to Extinguish the Grandfathered Rights, including the Certificate of Grandfathered
Right to be Extinguished. If the Grandfathered Right is a Type I right, proof of ownership of the land shall
be submitted with the Statement of Intent. Any forms required to be submitted by ADWR shall also be
included with the Statement of Intent.
The Statement of the Intent to Extinguish the Grandfathered rights shall include the statement, “It is
requested that the Director of the Department of Water Resources make the extinguishment credits
available for use by pending CAWS application number [insert appropriate CAWS application number].” A
statement pledging the credits to the appropriate application for a CAWS shall also be indicated as
appropriate on the extinguishment forms submitted. A copy of the Statement of the Intent to Extinguish
Grandfathered Rights with all enclosures and a copy of the ADWR extinguishment forms shall be mailed
to:
EPCOR Arizona Inc.
Attn: Water Resources Manager
2355 West Pinnacle Peak Road, Suite 300
Phoenix, AZ 85027
May 2020
17
CHAPTER 2
ENGINEERING
MASTER PLAN AND DESIGN CRITERIA
May 2020
18
MASTER PLANNING AND DISTRIBUTION MAIN REQUIREMENTS
Utility requires that distribution systems be designed in accordance with Utility’s design requirements,
applicable state and county requirements, any authority having jurisdiction within Utility’s service area,
commonly accepted engineering practices, and other applicable codes or recognized standards.
Distribution systems should be designed with sufficient “looping” and other redundancies as may be
necessary to minimize outages to customers in the event of main breaks, routine maintenance, and
repairs. Avoiding dead-end segments by providing looped distribution circuits also enhances potable
water circulation and reduced age therefore minimizing the formation of disinfection byproducts.
Distribution systems should be sized to accommodate sufficient fire flows as may be required. The design
and sizing of the distribution systems should include a main break analysis to ensure the provision of
adequate fire flows and service to our customers.
As a condition of service, and in addition to the distribution system design standards, Utility requires that
distribution systems include a secondary 8-inch diameter distribution main in addition to the normally
required “backbone” or larger diameter distribution mains. This requirement is most easily achieved by
increasing the size of portions of typically 6-inch diameter distribution piping to 8-inch diameter. The
selected alignment of the secondary 8-inch distribution main would ideally traverse the center of the
development or phase of development, originating and terminating at larger “backbone” mains. This
requirement is not to be construed as a request for over-sizing, rather as a sound engineering design
condition. In accordance with Arizona Corporation Commission rules and regulations, no waterlines less
than 6 inches in diameter will be accepted.
Plan submittals will be reviewed for the inclusion and acceptability of the 8-inch secondary distribution
main and its alignment. An approved water distribution analysis is required to accompany all waterline
Construction Drawings. The analysis shall identify proper distribution system sizing based on the required
flow parameters, as well as the criteria stated in this Developer & Engineering Guide.
Where a land developer has subdivided any piece of land for development by another party, Utility may
require an individual water master plan in line with these guidance notes, unless the principal land
developer’s approved master plan has adequately covered distribution of all individual parcels. All
developers should coordinate with Utility’s Developer Services and Planning Division to identify whether or
not additional master plans are required for their area of development.
Where land is intended to be developed in phases, details and timing of the phases of the development
must be included in the master plan. The phasing information should include details and timing of any
landscaped areas requiring irrigation from the potable water system (where the system tariff structure
allows), especially where this will be effective prior to construction and/or sales of dwelling units.
Master plans will be reviewed by Utility’s Engineering to ensure new developments are coordinated and
consistent with the long term master plans of the relevant service area. Applicants are required to submit
two copies of the master plan and the appropriate electronic files of the hydraulic analysis. Initial master
plan reviews may take up to 8 weeks for initial review depending on the complexity of the project. This
does not include any time needed for revisions and subsequent reviews. Failure to provide two copies of
the master plan as well as electronic files for the hydraulic model may result in a delay of Utility’s review
that may then take more than 8 weeks.
May 2020
19
MASTER PLANNING AND DISTRIBUTION MAIN REQUIREMENTS
(CONTINUED)
A hydraulic analysis using the current version of WaterCAD (or equivalent with prior approval of Utility),
must be performed for the proposed water distribution system and submitted as part of the Master Plan.
The Master Plan shall be prepared in accordance with Utility’s master plan outline. A color exhibit showing
water line locations, sizes, parcel boundaries, junctions, contour elevations, pressure zone boundaries,
etc. shall be submitted as part of the Master Plan. In addition to the hard copy documents required here,
the submittal must also include a copy of the full hydraulic model and any tabular files used for the
hydraulic analysis in electronic format on CD. The Master Plan shall be signed and sealed by a Registered
Professional Civil Engineer in the State of Arizona and submitted to Utility for review and approval.
Any and all criteria not listed herein shall be in accordance with, but not limited to, the following
governmental agency requirements and any such criteria presented in the Master Plan shall be referenced
appropriately for Utility review: Environmental Protection Agency (EPA), Arizona Department of
Environmental Quality, Arizona Department of Water Resources, Maricopa Association of Governments,
Maricopa County Health Code Chapter V (if applicable to development), local jurisdictional Planning and
Zoning Requirements, and appropriate municipality regulations, if development is in a municipality
serviced by Utility. If a development is outside Maricopa County or outside Arizona, it must conform to
regulations and requirements of state and local jurisdictions and governmental agencies. All
developments shall be compliant with AWWA standards. Fire flow requirements shall be determined by
the jurisdictional Fire Marshal and the requirements shall be stated in a letter from the Fire Marshal, which
must be included as an appendix with the Master Plan.
The “Demands” table provided in the Design Criteria in this Chapter shows typical demand values used by
Utility for internal planning purposes. It should be noted, however, that this table may not be applicable to
certain developments. In all instances, engineers should coordinate with Utility’s Developer
Services and Planning Division prior to development of master plans, to ensure appropriate
demand projections are made.
,.
May 2020
20
WATER MASTER PLAN OUTLINE
The following outline shall be used for the preparation of master plan reports:
1. Cover Sheet
a)
Title (Development Name), Date, Revision Date(s)
b)
Applicant and Engineer’s contact information.
c)
Sealed by a Professional Engineer registered in the state of Arizona.
2. Table Of Contents
a)
Sealed by a Professional Engineer registered in the state of Arizona.
3. Executive Summary
a)
1 or 2 pages with emphasis on proposed facilities to serve the development.
4. Introduction
a)
Plan Objective – state purpose of the report
b)
Site Location w/ vicinity map.
c)
Proposed Development
5. Design Criteria
a)
Demands, Pressures, Storage, Booster Pumps, Wells, Distribution System (pipe sizing)
i. Utility Developer Guide criteria
ii. MAG, ADEQ, other governmental agency criteria as applicable
iii. Generally accepted engineering standards (requires Utility approval)
6. Demands
a)
Single family, multi family, commercial, school, open space, parks, landscaping etc.
b)
Details of all zoning obtained within development, including any pending re-zoning applications.
c)
Quarterly projections of demands from beginning of construction (construction water) to buildout,
to include a breakdown of any phasing that may be involved with construction. This should
include an exhibit to show locations, and a schedule showing the expected timing of demand
growth for any phases as applicable. The intention would be to show how demand is projected to
increase at all locations over time through buildout of the development.
d)
Summary narrative of demands table. Discuss which demand scenario governs design (Peak
Hour or Maximum Day plus Fire Flow)
e)
Tabular calculations (spreadsheet) of all demands.
7. Existing Facilities/Conditions
a)
Reference any previous master plans used and their dates as applicable.
8. Proposed Facilities
a)
Required storage, proposed location, or expansion of existing if applicable.
b)
Required booster pump capacity.
c)
Required well capacity, number of wells if applicable.
d)
Distribution system piping, onsite as well as any offsite infrastructure needed.
e)
PRV’s if applicable.
f)
Phasing if applicable. Where facilities will be constructed in phases, the timing and responsible
party for each facility must be defined. If the timing of more than one development in adjacent
areas allows, developers are encouraged to meet and plan with Utility to maximize the possibility
and benefit of regionalization of facilities.
9. Water Model
a)
Describe model used.
b)
Assumptions
i. Pump curves obtained from Utility information/staff or otherwise accepted test
ii. Criteria used in the model.
c)
Results/Discussion – proposed facilities are adequate to serve development based on hydraulics
May 2020
21
10. Summary/Conclusions
a)
Discuss how the objective of report has been met, i.e. proposed facilities will serve the proposed
development in accordance with established criteria.
b)
List major facilities required and phasing as applicable.
11. Appendices
a)
Water Modeling Results Organized by:
i. Average Day
ii. Maximum Day
iii. Peak Hour
iv. Maximum Day plus Fire Flow
b)
The following information is to be included for the above scenarios:
i. Junction/Node report showing node label, elevation, demand in gpm, hydraulic grade line in
feet, pressure in psi, and assigned pressure zone for that node (zone assignment to node
shall be in accordance with the existing operation of the service area and in accordance with
Utility naming conventions). Also, for phased developments, reports and exhibits should
identify those nodes that are active and those that are inactive for various model runs.
ii. Pipe report showing pipe label, start/stop node, length, diameter, Hazen-Williams “C” value,
flow, velocity, headloss, headloss gradient, and intended year of installation.
iii. Pump report showing pump label, elevation, discharge, discharge pump grade, and pump
head. An attachment to the pump reports should also be included to show assumed pump
patterns and efficiency curves for any pumps modeled in the hydraulic analysis.
iv. Valve report showing valve label, elevation, diameter, valve status, and from/to hydraulic
grade line.
v. Tank report showing tank label, base elevation, maximum elevation, volume, hydraulic grade
line, and flow.
vi. Reservoir report showing reservoir label, elevation, hydraulic grade line, and outflow.
vii. A separate fire flow report for the maximum day plus fire flow scenario shall be submitted.
The fire flow report is to show the following information for all nodes: node label, satisfies fire
flow constraint, needed fire flow, available fire flow, total flow available, residual pressure,
minimum system pressure, and minimum system pressure node
viii. An extended period simulation (EPS) model showing storage tank levels varying with time
may be required for complex system designs, to verify adequate fire flow storage and also to
verify that wells have sufficient capacity for tank replenishment during maximum day
demands. Where an EPS model is used, an explanation will be required for the basis of
diurnal demand patterns, and the basis of demand allocation. A clear explanation will also
be required for the naming convention used for the different model scenarios. Finally, detail
will be required on how the source of water has been modeled. A summary of the
techniques used to generate the hydraulic model and engineering analysis should clearly be
described.
c)
11” X 17” (24” X 36” for large developments as applicable) and PDF color exhibit for peak hour.
Average day and maximum day exhibits may be required. Exhibits to include:
i. Pipes and nodes labeled.
ii. Pressures at nodes.
iii. Major roadways labeled.
iv. Pipe size shown by color.
v. Major contour lines shown.
vi. Pressure zone boundaries.
d)
Cost Estimate
*Figures, exhibits, tables, spreadsheets, etc. to be placed in the body of the report where possible.
May 2020
22
DESIGN CRITERIA FOR WATER SYSTEMS
1. Demands1
Land Use
Unit
Average Day Demand
(gal/day/unit)
Max Day
Peaking
Factor
Peak Hour
Peaking
Factor
Active Adult
Dwelling
304
1.8
3.0
Single Family
Dwelling
360
1.8
3.0
Multi Family
Dwelling
240
1.8
3.0
Commercial2
Acre
1,700
1.8
3.0
Warehouse/Big Box Retail
1000 sq.
ft.
30
1.8
3.0
Developed Open Space,
including Parks2, 3
Acre
1,800
n/a
n/a
Schools2
Acre
1,700
n/a
n/a
Resort
Room
446
1.8
3.0
Hotel (no restaurant)
Room
140
1.8
3.0
Hotel (with restaurant)
Room
200
1.8
3.0
1Please contact Utility’s Planning Division for Resource Data on other demand types.
2Acreage is based on gross number of acres.
3Developed Open Space includes general landscaped areas where irrigation will be required, such as
road medians and areas to be maintained by HOAs.
2. Specific Modeling Requirements: Demands should be distributed among nodes to provide a
reasonable reflection of the expected system demand distribution. Where demands are grouped and
represented by only a few nodes those demands should be allocated to the nodes with the highest
elevation as well as the furthest point from the development’s point of supply.
3. Pressures
Minimum Pressures:
55 psi static; 40 psi at peak hour; 20 psi at max day + fire flow
Maximum Pressures:
In accordance with the Uniform Plumbing Code, any structure
experiencing pressures greater than 80 psi shall have an individual
pressure reducing valve on the customer side of the meter. Areas where
many customers experience pressures higher than 80 psi may require a
PRV station or modification to the distribution system, to be approved by
Utility. Distribution systems shall not be designed to operate at pressures
greater than 120 psi.
4. Velocity & Headloss
10 fps maximum velocity for pipes less than 16 inches in diameter
5 fps maximum velocity for pipes 16 inches in diameter or larger
2 fps minimum and 6 fps maximum velocity for well transmission lines
10 ft. headloss maximum per 1,000 linear feet of pipe for pipes less than
16 inches in diameter
8 ft. headloss maximum per 1,000 linear feet of pipe for pipes 16 inches
in diameter or larger
5. Hazen-Williams Coefficient 130 (for new pipes)
Where development models include existing pipes, appropriate coefficients will need to be selected.
Where an existing calibrated model exists, the coefficients in the existing model must be used. If
there is no existing calibrated model, the developer’s engineer will need to consult with Utility’s
planners to identify suitable coefficients.
May 2020
23
6. Fire Flows
Fire flows must be in accordance with jurisdictional Fire Marshal requirements. Provide a written
statement from the jurisdictional Fire Marshal that states the minimum required flows and duration by
class of customer. In the absence of a jurisdictional Fire Marshal, fire flow requirements must be in
accordance with the latest version of the International Fire Code.
7. Storage Requirements
Equalization
30% of max day, plus
Emergency reserve
the greater of 10% of max day OR the storage volume required based on
the fire flow requirements stated above
8. Booster Pump Station
Firm Capacity
Shall meet or exceed the greater of peak hour flow or max day + fire flow
with the largest pump out of service for the pressure zone(s) that the
booster station serves. Shared redundancy between pressure zones
may be acceptable via a PRV (with the prior approval of Utility) provided
adequate redundancy exists in the higher zone.
9. Water Valves
Number of Valves = number of radiating mains at intersection minus one; the unvalved branch is the
line that supplies flow to the intersection.
Valve spacing shall be in accordance with ADEQ Bulletin #10
Valves in well transmission mains shall be kept to a minimum.
10. Wells
Where developments are supplied solely by groundwater wells, the following criteria must be met:
Firm Capacity: Any wellfield supplying a booster station must meet the maximum day demand for
the entire station with the greatest producing well out of service. Single source wellfields are not
allowed. Proposed wells supplying directly into the distribution system are discouraged and will be
reviewed on a case-by-case basis.
Permitted Capacity: The total permitted capacity of a wellfield shall be adequate to meet the
anticipated total annual demand for the development.
Well transmission lines shall have an 8” minimum diameter. Where a transmission line will have
multiple wells connected to it, the pipe shall be sized such that all wells connected to that line can run
simultaneously at their full capacity while meeting the velocity and headloss constraints defined in this
guide. If this cannot be achieved, contact Utility’s Developer Services Division for guidance.
11. Fire Hydrants
Fire hydrant spacing shall be in accordance with the requirements of the local jurisdictional agency.
12. Air/Vacuum Release Valves
Air vacuum release valves shall be located at all high points and at vertical realignments of the water
line.
13. Pressure Reducing Valves
Pressure reducing valves shall be located on transmission/distribution mains to maintain design
pressure ranges in accordance with approved water master plans. These locations must be
coordinated with, and approved by, Utility. PRV sizing shall be based on anticipated
minimum/maximum flow ranges.
May 2020
24
14. Wash Crossings
All waterlines that cross washes or channels shall be MEGALUG restrained joint ductile iron pipe
(Class 350). The depth requirement for placing waterlines under washes or channels shall be the
deeper of the following two cases:
a. Per the Arizona Department of Environmental Quality’s Engineering Bulletin No. 10, the minimum
cover over the pipe shall be greater than or equal to two (2) feet below the scour depth (based on
Scour Analysis described below).
b. The minimum cover over the pipe may be based on the 100-year flow rate of the wash or channel
as shown in the table below. Note that the “additional depth” in the table refers to the depth of
pipe that must be added to the normal cover requirements that are provided in Detail No. 350-1.
100-Year Flow Rate
Additional Depth
1 to 49 cfs
1 foot
50 to 99 cfs
2 feet
100 to 499 cfs
3 feet
Greater than 499 cfs
Scour Depth (based on Scour
Analysis); minimum of 3 feet
Details on the determination of the 100-year flow rate shall be submitted to the Utility for review. The
Scour Analysis shall be in accordance with the Arizona “State Standard for Watercourse System
Sediment Balance” (SS5-96), Guideline 2, Level III, as published by the Arizona Department of Water
Resources (http://www.azwater.gov/azdwr/SurfaceWater/FloodManagement/StateStandards.htm).
The Scour Analysis shall be submitted to the Utility for review for all wash crossings. Note: If a
sediment transport analysis has been performed by the Flood Control District of Maricopa County for
the subject wash crossing, this can be submitted to Utility for review, and this may eliminate the need
for additional analysis.
15. Minimum Residential Potable Water Meter Sizing
All residential meters shall be sized in compliance with the current Uniform Plumbing Code (UPC) and
any applicable municipal or other governmental requirements. For residential meters 1-inch or larger,
the municipality-approved architectural calculations shall be submitted to Utility to document the sizing
of meters. For residences that include fire sprinklers or landscape irrigation, the meter size shall be
the greater of the following:
a. meter size as determined by the current UPC, or
b. from each fire sprinkler zone within the residence, the highest of these fire flows must be in
accordance with the table below (i.e., if the calculated fire sprinkler flow is 31 gpm, then a 1-
inch meter will be required), or
c. the landscape irrigation flow must be in accordance with the table below:
Minimum Required Meter Size
(inches)
Maximum Allowed Fire Flow or
Irrigation Flow (gal/min)
5/8
20
3/4
30
1
50
1 ½
100
2
160
3 and larger
Determined on a case-by-case basis
The maximum flows provided in the table above should only be imposed on the meter for short,
intermittent periods. Meters should not be operated on a continuous 24-hour service at flows greater
than one-half of the maximum flows provided in the table above.
16. Service Line Size
The minimum service line size is 1-inch, installed in accordance with Utility’s STD. DET. 342-2. The
appropriate adapter shall be installed with the meter box as shown on STD. DET. 342-2. Where the
water meter size is greater than 1-inch, the service line must be the same size as the meter. The
May 2020
25
diameter of new service lines cannot exceed 50% of the service main diameter. A new water main
extension may be required where Utility determines that existing main capacity has been exceeded.
17. Meter Location
a. Install meters side-by-side, straddling the lines where possible, not at road intersection corners,
and l not adjacent to fire hydrants.
b. Each service line requires a separate tap to the main.
c. Residential fire sprinkler and irrigation water service is permitted through the domestic service line
and meter. Commercial developments require separate water meters for building and landscape.
d. Each parcel of land must have its own separate service line and meter. A single service line and a
master meter can be used for two or more buildings located on the same lot such as an
apartment complex, trailer courts or similar projects covering one lot. In high density applications
where an assured continuous water supply must be maintained, the development must have two
master meters, each with its own service connection to Utility’s main to create a secondary looped
connection to the development.
e. No service connections or fire protection systems will be made to water lines greater than 12
inches in diameter.
f.
Existing service lines that will not be used by a development shall be abandoned and plugged at
the main.
18. Water System Layout
a. To provide appropriate (i) water pressure, (ii) water circulation, (iii) redundancy, and (iv) minimize
taste and odor issues, all water mains must be designed with a minimum of two sources (looped
configuration) – see “Dead-End Lines” below for exceptions.
b. Water and sewer mains must have a minimum distance of 12 feet from buildings or retaining
walls, as measured from the edge of the building foundation or wall to the outside of the main. In
rare cases where a water or sewer main must encroach within 12 feet from a building or retaining
wall, additional protection is required. Additional protection may include the use of a sleeve for the
main, or modifications to the footing of the structure, to prevent damage in the event of a main
break.
c. Ninety-degree (90-degree) fittings are not allowed in rights-of-way.
19. Dead-End Lines
Dead-end lines with no service connections are not allowed. Where dead-end lines with service
connections do occur, cap dead-end lines with a curb stop (blow off) with flushing pipe per EPCOR
Detail 390-1. All dead-end lines will be approved on a case by case basis.
20. Thrust Blocks
Thrust blocks are not allowed in rights-of-way. Use restrained joints per MAG Standard Detail 303-1
and 303-2 in rights-of-way in place of concrete thrust blocks.
(Continued)
May 2020
26
21. Curvilinear Alignments
Design constraints are provided below:
C900, DR14, PVC Pipe
Pipe Diameter Laying Length Max Deflection Angle
Offset per Min. Curve
joint of pipe
6”-12”
20’
2.0o
8.4”
573’
C905, DR14, PVC Pipe
In accordance with AWWA C605-94, section 5.6, the bending of the PVC Pipe barrels larger than
12-inch (300-mm) nominal diameter is not allowed due to the forces required. The curved
alignment of PVC pipelines larger than 12-inch (300-mm) in diameter shall be determined by one-
half the pipe manufacturers published axial-joint-deflection limits. Manufacturer’s technical data
sheets shall be submitted to Utility for review and approval.
Ductile Iron Pipe, AWWA C150/151/153
Pipe Diameter Laying Length Max Deflection Angle
Offset per Min. Curve
joint of pipe
8”-12”
18’
2.5 o
9.4”
413’
14”-16”
18’
2.0 o
7.5”
516’
18”-20”
18’
1.5 o
5.7”
688’
24”
18’
1.0 o
3.8”
1032’
8”-12”
20’
2.5 o
10.4”
459’
14”-16”
20’
2.0 o
8.4”
573’
18”-20”
20’
1.5 o
6.2”
764’
24”
20’
1.0 o
4.1”
1146’
L = laying length
θ = deflection angle
S = offset per joint of pipe
R = radius of curve
R = (L) / {2 x tan (θ / 2)}
θ
May 2020
27
DESIGN REQUIREMENTS FOR FIRE LINES
1. Fire line connections to Utility’s mains shall be used for fire protection systems only. Metered services
cannot be connected to fire lines.
2. The minimum size fire line connection shall be 4 inches.
3. For fire lines, backflow prevention devices are required within 75 feet of the main. If the building riser
is within 75 feet from the main, then a vertically mounted backflow prevention device may be located
on the building riser. If the building riser is further than 75 feet from the main, then a backflow
prevention device shall be installed as close as practicable to the service connection (property line).
4. Backflow prevention devices are not required for private hydrant connections that are not looped and
that do not have fire sprinkler connections.
5. Backflow prevention devices shall have been issued a certificate of approval by the University of
Southern California Foundation for Cross-Connection Control and Hydraulic Research. The certificate
of approval shall be forwarded to Utility’s Backflow Prevention Specialist prior to Utility’s Final
Acceptance of the fire lines.
6. Backflow prevention devices shall not be located in rights-of-way, sidewalks, driveways, visibility
triangles, or other locations where accidental damage or visibility obstruction would likely occur.
7. Backflow prevention devices shall be fully accessible for testing, repairs, and replacement. There
shall be an unobstructed radius of not less than four - feet from the outer perimeter of each backflow
prevention device.
8. Per the Uniform Plumbing Code (610.2), in the absence of specific pressure drop information, the
diameter of the inlet or outlet of any backflow prevention device or its connecting piping shall not be
less than the diameter of such water distribution piping to the fixtures served by the device. If
available, pressure drop information shall be provided with the submitted plans.
9. Per the Uniform Plumbing Code (603.3.11), looped on-site fire line systems shall have backflow
preventers at each point of connection to the public water system.
10. A control valve is required at ALL fire line connections to public water mains. The control valve shall
not be located in sidewalks, driveways, curbs or gutters.
11. Thrust blocks are not allowed in rights-of-way.
May 2020
28
DESIGN CRITERIA FOR WASTEWATER SYSTEMS
A hydraulic analysis must be performed for the proposed wastewater collection system and submitted as
part of the Master Plan. The design methodology shall be presented and appropriately referenced. The
results of this analysis shall be presented in tabular form with at least the following information presented:
•
pipe number
•
to/from manhole number
•
pipe size
•
pipe slope (slopes that are less than minimum design shall be noted)
•
average daily flow
•
peak hour flow
•
d/D ratio at peak hour
•
velocity at peak hour
An analysis of sewer force mains must be performed, including impacts due to pump surge, and
submitted as part of the master plan. Force main hydraulic losses shall be performed using the Darcy-
Wiesbach equation. A 24” X 36” color exhibit, as well as PDF, showing flow contributing area, sewer line
number and manhole number locations, flow direction, property boundaries, contour elevations, etc. shall
be submitted as part of the Master Plan. The Master Plan shall be signed and sealed by a Registered
Professional Engineer and submitted to Utility for review and approval.
1. Average Daily Wastewater Design Flows
Land Use
Unit
Average Daily Flow
(gal/day/unit)
Peak Hour
Peaking Factor
Active Adult
Dwelling
190
3.0
Single Family
Dwelling
240
3.0
Multi Family
Dwelling
180
3.0
Commercial1
Acre
1,500
3.0
Warehouse/Big Box Retail
1000 sq. ft.
25
3.0
Schools1
Acre
1,500
3.0
Resort
Room
380
3.0
Hotel (no restaurant)
Room
100
3.0
Hotel (with restaurant)
Room
150
3.0
1Acreage is based on gross number of acres.
2. Minimum / Maximum Slopes (Manning’s Roughness Coefficient of 0.013)
Pipe Diameter
(inches)
Minimum
Slope (%)
Minimum
Velocity (ft./sec)
Maximum
Slope (%)
Maximum
Velocity (ft./sec)
8
0.368
2.1
6.760
9
10
0.300
2.2
5.020
9
12
0.257
2.3
3.937
9
15
0.208
2.4
2.924
9
18
0.163
2.4
2.293
9
21
0.144
2.5
1.867
9
24
0.130
2.6
1.562
9
27
0.111
2.6
1.335
9
30
0.104
2.7
1.160
9
May 2020
29
3. Sewer Capacity Ratio
The ratio of flow depth in the pipe to the diameter of the pipe shall not exceed 0.75 in peak hour flow
conditions.
4. Minimum Pipe Diameter
The minimum sewer main diameter is 8 inches.
5. Depth of Cover
a. Sewer mains greater than 12 inches in diameter shall have a minimum of 7 feet 6 inches of cover.
b. Sewer mains 12 inches in diameter or less shall have a minimum of 6 feet of cover.
c. Sewer service lines shall have a minimum of 5 feet of cover at the property line.
6. Wash Crossings
All sewer lines that cross washes or channels shall be concrete-encased PVC. The depth
requirement for placing sewer lines under washes or channels shall be based on the 100-year flow
rate of the wash or channel as shown in the table below.
100-Year Flow Rate
Minimum Depth from Bottom
of Wash to Top of Pipe
1 to 49 cfs
5 feet
50 to 99 cfs
6 feet
100 to 499 cfs
7 feet
Greater than 499 cfs
Scour Depth (based on Scour
Analysis) plus 3 feet; minimum
of 7 feet
Details on the determination of the 100-year flow rate shall be submitted to EPCOR for review. The
Scour Analysis shall be in accordance with the Arizona “State Standard for Watercourse System
Sediment Balance” (SS5-96), Guideline 2, Level III, as published by the Arizona Department of Water
Resources (http://www.azwater.gov/azdwr/SurfaceWater/FloodManagement/StateStandards.htm).
The Scour Analysis shall be submitted to Utility for review for all wash crossings.
The sewer lines must be designed and constructed with an extension of at least 10 feet beyond the
boundary of the 100-year storm scouring.
7. Manhole Rim Elevations
All manhole rim elevations must be above the 100-year floodplain elevation. Concealed pick-hole
manhole covers are required where covers are located within 3 feet of the edge of a gutter, in areas
that are unpaved, in areas that are prone to flooding, and in all areas within Mohave County. Rim
elevations should be set 0.2 feet above finish grade in all unpaved areas. Manholes are not permitted
in washes without prior approval from Utility.
8. Minimum Manhole Diameter
a. The minimum manhole diameter for sewer lines that are 15 inches in diameter or greater is 5 feet.
b. The minimum manhole diameter for any sewer line that is 10 feet or deeper below finished ground
surface (to bottom of pipe) is 5 feet.
c. The minimum manhole diameter for all other conditions not met above is 4 feet.
Note: All sewer manholes shall have a 30-inch frame and cover.
May 2020
30
9. Manhole Spacing
Manholes shall be installed at all grade changes, size changes, alignment changes, sewer
intersections, and to comply with the following spacing requirements:
Sewer Pipe Diameter
(inches)
Maximum Manhole Spacing
(feet)
8 to less than 18
500
18 to less than 36
600
36 to less than 60
800
10. Manhole Stub Outs and Knock Outs
Stubs from manholes are not allowed. Knock outs may be provided in manholes for future main
extensions when required by EPCOR.
11. Manhole Linings
All manholes shall be lined in accordance with EPCOR Detail No. 100-4.
12. Manhole Invert Drops
a. If a manhole has a sewer direction change that is less than 45 degrees, then the manhole should
be designed for a 0.1-foot drop across the manhole.
b. If a manhole has a sewer direction change that is greater than or equal to 45 degrees, then the
manhole should be designed for a 0.2-foot drop across the manhole.
c. Drop manholes should be per MAG Standard Detail No. 426
13. Cleanouts
Cleanouts, instead of manholes, may be installed at the end of sewer lines that are less than 200 feet
in length. Service connections are not allowed at the ends of cleanouts or within 4 feet of a cleanout.
14. Force Mains
a. Force mains shall be designed to maintain a minimum flow velocity of 3 feet per second and a
maximum flow velocity of 7 feet per second.
b. Appropriate valves and controls are required to prevent draining back to the lift station.
c. Air release valves shall be installed at all high points along the force main to eliminate air
accumulation.
15. Curvilinear Alignments
SDR 35 PVC Sewer Pipe
Pipe Diameter Laying Length Max Deflection Offset per Min.Curve
Angle joint of pipe
8”-15”
12.5’ *
2.5
6.5”
287’
8”-15”
20’
2.5
10.5” 458’
The use of reduced pipe lengths must be clearly noted on the construction plans for Contractor’s
attention.
16. Service Lines
No bends in sanitary sewer service lines are allowed except for services that are 12 feet deep or
deeper, which may use vertical bends. For services that are 12 feet deep or deeper, 45-degree bends
(or smaller bends) may be used as illustrated below.
May 2020
31
Sewer Main
45-degree Bends
(or smaller)
At least 12
Feet Deep
Existing sewer service lines that have been stubbed out to a property shall be used; however, where
the use of stubbed out lines are not feasible, the existing lines shall be abandoned and capped at the
sanitary sewer main.
May 2020
32
CHAPTER 3
CONSTRUCTION DRAWINGS
May 2020
33
CONSTRUCTION DRAWING REQUIREMENTS
1. Label all construction drawings "Water” and/or “Sewer" as applicable.
2. Construction drawings shall be designed and scaled to fit on 24" x 36" sheets of paper.
3. A Professional Civil Engineer registered in the State of Arizona must sign the construction drawings.
4. Construction drawings shall meet the requirements of the Arizona Department of Environmental
Quality, Engineering Bulletin #10 and A.A.C. R18-5-502 for water, Engineering Bulletin #11 and A.A.C.
R18-9-E301 for Sewer.
5. Submit all design calculations and other supporting data with the construction drawings.
6. Show the Utility’s "Material Specifications" and "General Notes" on the drawings, as well as all
itemized quantities separated for facilities that will be Utility-owned versus those that will not be Utility-
owned. Show the Utility’s logo, water and/or sewer owner information, the Utility’s approval signature
block and As-Built block on the cover sheet of the drawings.
7. Identify the Applicant-owned facilities and Utility-owned facilities.
8. The drawings shall include the Northing + Easting Coordinate System. For projects within Maricopa
County and Tubac, the coordinate system should be NAD1983, State Plane Arizona Central Zone, US
Feet. For projects within Mohave County, the coordinate system should be NAD1983, State Plane
Arizona West Zone, US Feet.
9. Sewer drawings shall include sewer services to the easement or right-of-way line.
10. Water drawings shall show the size and location of all water services and meters. Stubs for services
for future development will be approved on a case by case basis.
11. Waterlines 12” or larger, and sewer lines 8” or larger, shall be shown in profile with the appropriate
elevations (plan and profile views). Vertical deflections of waterlines shall be profiled regardless of
size. Utility crossings of any waterline shall be shown in profile and dimensioned for minimum
clearances and/or separations. All sewer mains shall be profiled.
12. Show all referenced details required by the Utility on the drawings. Clearly reference where the
appropriate detail item is called out.
13. Show easements for Utility-owned facilities on private property. If a plat is not required, submitted for
approval on 8 ½” X 11” sheets, a metes and bounds easement legal description and exhibit signed
and sealed by a Professional Civil Engineer or Land Surveyor registered in the State of Arizona. .
14. Submit drawings to the Utility for review and approval in the following two ways:
1. Drawings with less than 10 sheets: pdf on a flash drive, CD or emailed to the project manager.
2. Drawings with more than 10 sheets: pdf on a flash drive, CD, and one hard copy delivered to the
project manager.
Note: Electronic submittals may be provided by Applicant established FTP site.
15. Submit an itemized Engineer's cost estimate for construction of Utility-owned facilities, sealed and
certified by a Professional Civil Engineer, registered in the State of Arizona. Provide these estimates
on 8 ½” X 11" sheets of paper separately for water and sewer.
16. The drawings shall include a Master Water and/or Sewer Drawings sheet.
17. Provided a site plan showing roadways and facilities on 8 ½” X 11" sheets of paper.
May 2020
34
18. The drawings shall include a summary table showing quantities for all sewer and water constructed
items. Include sizes and materials.
19. Show stationing and roadway centerline offset of the water and sewer mains and related
appurtenances.
20. The cover sheet of the drawings shall contain an index map showing water and/or sewer facilities as
well as the corresponding sheet number. Include a key map on each subsequent plan view sheet.
21. Show station and offset, along with northing and easting coordinates for waterlines, all valves, fittings,
vertical and horizontal offsets, hydrants, meters and services.
22. Show station and offset, along with northing and easting coordinates for sewer lines, manholes,
cleanouts and services.
23. Include the following information on the cover sheet of the drawings:
UTILITY OWNER INFORMATION
WATER AND/OR SEWER OWNER/OPERATOR
2355 West Pinnacle Peak Road, Suite 300
Phoenix, Arizona 85027
(623) 445-2400
24. The Utility owner information with logo, and the Utility’s General Notes, Material Specifications and
Standard Details are available in digital format. Digital files are located on EPCOR’s website. For
assistance, please contact the Developer Services Department as listed in the Contact List section in
this guide.
May 2020
35
PLAT DEDICATION VERBIAGE
The following plat dedication verbiage shall be on the final recorded plat if any of the facilities to be owned
by the Utility will be outside of dedicated rights-of-way and separate easements are not provided:
PERPETUAL WATER AND SEWER EASEMENT (‘EASEMENTS”) AS DESCRIBED IN THE PLAT ARE
GRANTED TO EPCOR WATER ARIZONA INC, AND ITS SUCCESSORS AND ASSIGNS
(COLLECTIVELY, “GRANTEE”), TO CONSTRUCT, OPERATE, AND MAINTAIN WATER AND SEWER
LINES AND APPURTENANT FACILITIES (COLLECTIVELY, “FACILITIES”) UPON, ACROSS, OVER AND
UNDER THE SURFACE OF THE EASEMENTS, TOGETHER WITH THE RIGHT TO OPERATE,
REPAIR, REPLACE, MAINTAIN, AND REMOVE THE FACILITIES FROM THE PREMISES; TO ADD OR
TO ALTER THE FACILITIES, AND TO PROVIDE GRANTEE WITH REASONABLE INGRESS AND
EGRESS TO THE FACILITIES. GRANTEE WILL HAVE UNRESTRICTED ACCESS TO THE
EASEMENT FOR THE ACTIVITIES DESCRIBED ABOVE AND FORMAL NOTIFICATION OR APPROVAL
BY ANY ASSOCIATION PRIOR TO ACCESSING THE EASEMENT WILL NOT BE REQUIRED.
GRANTOR SHALL NOT ERECT OR CONSTRUCT OR PERMIT TO BE ERECTED OR CONSTRUCTED
ANY BUILDING, STRUCTURE OR SIMILAR IMPROVEMENT WITHIN THE LIMITS OF THE EASEMENT
GRANTED HEREIN, GRANTOR SHALL NOT, NOR PERMIT, THE GRADE OVER GRANTEE’S
FACILITIES TO BE SUBSTANTIALLY ALTERED WITHOUT, IN EACH INSTANCE, THE PRIOR
WRITTEN CONSENT OF GRANTEE, AND GRANTOR AGREES THAT NO OTHER PIPES OR
CONDUITS SHALL BE PLACED WITHIN THE PREMISES SUBJECT TO THE EASEMENT GRANTED
HEREIN, EXCEPT PIPES CROSSING GRANTEE’S FACILITIES AT RIGHT ANGLES, IN WHICH CASE,
A MINIMUM VERTICAL DISTANCE OF TWO (2) FEET (AS MEASURED FROM THE CLOSEST POINTS
ON THE OUTSIDE EDGES) SHALL BE MAINTAINED BETWEEN GRANTEE’S FACILITIES AND SUCH
OTHER PIPES OR CONDUITS. UNLESS GRANTEE EXPRESSLY CONSENTS IN WRITING
OTHERWISE, ANY AND ALL SEWER PIPES CROSSING THE EASEMENT GRANTED HEREIN SHALL
BE LAID BELOW GRANTEE’S FACILITIES. HOWEVER, GRANTOR SHALL HAVE THE RIGHT TO
CONSTRUCT AND ERECT FENCES, TO INSTALL LANDSCAPING, PARKING FACILITIES AND
DRIVEWAYS, AND TO ESTABLISH OTHER USES THAT ARE NOT INCONSISTENT WITH USES
WITHIN THE LIMITS OF SAID EASEMENT IN A MANNER THAT WILL NOT UNREASONABLY
INTERFERE WITH GRANTEE’S ACCESS TO THE FACILITIES.
May 2020
36
“AS-BUILT” PLAN REVIEW REQUIREMENTS
1.
Plans shall be 24” x 36” (two blue line copies), each submittal until approved.
2.
Plans must be fully approved and signed by all required agencies.
3.
Sealed and Certified by a Professional Civil Engineer or Land Surveyor registered in the State of
Arizona.
4.
Station/offset and state plane northing/easting coordinates on all water fittings, including valves,
tees, bends, all vertical and horizontal changes, etc.
5.
Station/offset and state plane northing/easting coordinates on all sewer manholes, clean-outs and
other facilities.
6.
Swing ties to fixed points may be required for commercial projects that do not have a roadway
centerline for stationing within a reasonable distance from the project.
7.
Distances from lot lines to sewer taps.
8.
Call out all water and sewer pipe lengths between fittings and branches.
9.
Elevations for all DIP sections regardless of the pipe diameter.
10.
As-Built profiles for all sewer lines 8” and larger including manhole rim and invert elevations.
11.
As-Built profiles for all water lines 12” and larger.
12.
As-Built all changes in pipe materials and sizes.
13.
Correct street names, addresses and lot numbers.
14.
Written approval by the Utility is required prior to submitting three sets of as-built drawings on full-
size bond paper, one set on 11” x 17” paper, and one set on flash drive in both CAD and PDF
formats.
15.
The Utility’s receipt and approval of as-builts is a condition to the Utility’s final approval of water
and sewer facilities. In addition, no refunds will be issued on facilities until as-builts have been
received and approved by the Utility and the Utility’s final acceptance has been granted.
May 2020
37
WATER/SEWER “AS-BUILT” CERTIFICATION
The following “As-Built” certification shall be on the cover sheet of the plans:
WATER/SEWER “AS-BUILT” CERTIFICATION
I hereby certify that the “as-built” measurements as shown herein were
made under my supervision or as noted, and are correct to the best of my
knowledge after due review. Additionally, I hereby certify that all mains
and services have been installed within the limits of easements dedicated
to EPCOR Water Arizona Inc., or inside dedicated street rights-of-way or
public utility easements.
Seal
May 2020
38
CHAPTER 4
CONSTRUCTION INSPECTION
May 2020
39
PROCEDURE FOR SCHEDULING
WATER LINE CONSTRUCTION INSPECTIONS
To schedule appointments, contact the Utility’s Construction Inspection Division at (602) 309-1164, or see
the “Contact List” near the front of this guide for direct phone numbers.
NOTE: When appointments are arranged at least 48 hours in advance, the inspection/test will be
conducted as scheduled.
When appointments are requested for the same day, the Utility’s Construction Inspector will
conduct the inspection/test based upon his availability.
The Utility’s Construction Inspector and the Applicant’s contractor can schedule the following items in the
field:
-
Open trench before pipe is installed in trench.
-
After pipe, bends, fittings, joint restraints, etc. has been installed in trench, but before
backfilling is started to verify position and type.
-
All waterlines - Inspection after backfill, installation of marking tape and prior to other
backfilling of trench.
-
After bedding (from bottom of trench to one [1] foot above pipe) has been placed into
trench and properly compacted.
-
After each lift of backfill material has been placed into the trench and properly compacted.
-
Blocking and thrust blocks where required.
-
Compaction sampling.
-
Pressure test for tapping sleeve.
-
Pressure test for waterline.
-
Waterline chlorine injection.
-
Bacteriological sampling.
-
Operational Inspection, Final Inspection and re-inspection if required.
NOTE: If the Applicant’s Contractor proceeds with construction before having approval of the Utility’s
Construction Inspector, the Applicant’s Contractor will be required to expose the pipeline, valve,
thrust blocks, etc., at no cost to the Utility, to permit inspection by the Utility’s Construction
Inspector. The required exposure of pipeline by the Applicant’s contractor shall not deem
acceptance of facility by the Utility. The Utility reserves the right to reject any facility not properly
scheduled for inspection by the Utility for any reason. The rejection shall be final.
May 2020
40
PROCEDURE FOR SCHEDULING
SEWER LINE CONSTRUCTION INSPECTIONS
To schedule appointments, contact the Utility’s Construction Inspector at (623) 309-1164.
NOTE: When appointments are arranged at least 48 hours in advance, the inspection/test will be
conducted as scheduled.
When appointments are scheduled for the same day, the Utility’s Construction Inspector will
conduct the inspection/test based upon Construction Inspector’s availability.
The Utility’s Construction Inspector and the Developer’s contractor can schedule the following items in the
field:
- Tying off sewer plugs.
-
Open trench before pipe is laid into trench.
-
After pipe has been installed in trench and before backfilling is started.
-
After each lift of backfill material has been placed into the trench and properly compacted.
-
Each new manhole, including manhole coatings.
-
Connecting to an existing manhole.
-
Installation of service tap before service line is connected to saddle.
-
Low-pressure air test on sewer line.
-
Post manhole ring adjustment Hydrovac to ensure MH and lines do not have debris.
-
Operational Inspection, Final inspection and re-inspection if required.
-
The Contractor shall uniform slope test all sewer lines, including sewer service lines, by video
recording and shall vacuum or water test all manholes in accordance with A.A.C. R18-9-E301.
These tests shall be conducted prior to operational inspection and coordinated with the
Utility’s Construction Inspector. Documented results and video recordings shall be submitted
to the Utility for approval - via DVD or flash drive.
NOTE: If the Applicant’s Contractor proceeds with construction before having approval of the Utility’s
Construction Inspector, the Applicant’s Contractor will be required to expose the pipeline,
manhole, etc., at no cost to the Utility, to permit inspection by the Utility’s Construction Inspector.
The required exposure of pipeline by the Applicant’s Contractor shall not deem acceptance of
facility by the Utility. The Utility reserves the right to reject any facility not properly scheduled for
inspection by the Utility for any reason. The rejection shall be final.
May 2020
41
CHAPTER 5
BACKFLOW PREVENTION
May 2020
42
BACKFLOW PREVENTION APPROVAL PROCESS
Approval Process (see flowchart)
1.
The Applicant will submit Backflow Prevention Assembly (BPA) specifications with the Design
Plans during the Application Process. Specifications shall include location of the proposed BPA,
the manufacturer, model, and size of BPA, and the purpose of the waterline on which the BPA will
be installed (fire line, irrigation, domestic/multipurpose). The Applicant will include the class of fire
line. All BPA’s must be lead free in accordance with the definition of lead free in section 1417 of
the Safe Drinking Water Act.
2.
After approval of the BPA specifications by the Utility’s Project Manager, the Applicant will install
and test the BPA in accordance with A.A.C. R-18-4-215F, EPCOR standards, and approved
Design Plans. The Applicant will submit the post installation test report to the Project Manager.
3.
The Applicant/Contractor will schedule the operational inspection of the BPA with the Utility’s
Construction Inspector.
4.
The Construction Inspector will confirm the correct installation of the BPA.
5.
Once the Construction Inspector confirms correct installation of BPA the new water service passes
Utility Final Inspection (provided that all other Operational Inspection items have no deficiencies).
PREMISES REQUIRING BACKFLOW PREVENTION
All water lines which do not serve a single family residence require a backflow prevention assembly (BPA).
BPA’s must be approved by University of Southern California Foundation for Cross-Connection Control
and Hydraulic Research (USC-FCCCHR). The approval list may be found on the USC-FCCCHR website.
BPA’s increase in degree of protection from DCDA’s to RP’s. The highest degree of protection for a cross-
connection is an Air Gap.
IRRIGATION - A Reduced Pressure Principle Assembly (RP) is the only BPA that can be used for
irrigation.
FIRE LINES – A Double Check Detector Assembly (DCDA) is the minimum protection BPA that can be
used for class 1 & 2 fire protection lines.
DOMESTIC / MULTIPURPOSE SERVICE – An RP is the only BPA allowed for a service line that is not a
class I or II FIRE LINE.
HIGH HAZARD APPLICATIONS – Air Gaps will be required for water lines servicing areas with high
hazard of contamination. High hazard applications will be determined on a case by case basis.
May 2020
43
BACKFLOW PREVENTION OPERATIONAL APPROVAL FLOWCHART
Test report with premise identification forwarded to Environmental Compliance Program Coordinator.
Developer Services Construction Inspector confirms presence of BPA:
YES
NO
The Applicant submits BPA specifications with the Design Plans during the
application process,
Project Manager reviews the Design Plans for completeness and
approves the plans when all requirements are met.
Project Manager notified of questionable installation; the Applicant advised of
necessary corrections.
New water service passes Utility final inspection, provided that all other Operational
Inspection items have no deficiencies.
Installation corrections completed.
The Applicant installs and tests the BPA in accordance with A.A.C. R-18-4-215F, EPCOR standards,
and approved design plans. The test report shall be submitted to the Project Manager.
May 2020
44
CHAPTER 6
PRETREATMENT REQUIREMENTS
May 2020
45
PRETREATMENT APPROVAL PROCESS
Approval Process
1. Applicant shall prepare and submit Sewer Plans in accordance with the requirements outlined in
Chapter Three.
2. The Utility’s Pretreatment Program Coordinator (PPC) will be available to discuss pretreatment
requirements. The Applicant is encouraged to contact the Utility’s Pretreatment Coordinator for
special instructions that may apply to developments which will have an industrial or commercial
discharge to the sewer.
3. If the business occupying the building is expected to generate an industrial or commercial (such as
car wash or food service) wastewater discharge, then the Applicant or business owner must fill out an
Industrial Discharge Sewer Agreement (IDSA) application and submit the application, with plans, to
the PPC.
Pan Review
The plan review shall confirm the need, size, location, and other requirements of the pretreatment
necessary to control discharges. Written approval from the Utility must be obtained prior to installation of
the pretreatment equipment. The review of such plans and operating procedures shall in no way relieve
the user from the responsibility of modifying such facilities as necessary to produce discharge acceptable
to the Utility in accordance with the Tariffs approved by the Arizona Corporation Commission (ACC).
Industrial Discharge Criteria
If the discharges expected from this facility are subject to the requirements of 40 CFR 405 – 471 the
Applicant must contact the Pretreatment Coordinator to obtain an IDSA application and a Baseline
Monitoring Report as required by 40 CFR 403.12.
Dental Facilities
Dental Facilities are required to fill out a One-time Dental Compliance Report as required in 40 CFR
441.10. Contact the Utility’s PPC for the Compliance Report.
Food Services Facilities Criteria
Any drains that are used to convey wastewater that has the potential to contain grease from food
preparation and cleaning operations must discharge to a properly sized Gravity Grease Interceptor (GGI),
Hydro-mechanical Grease Interceptor (HGI) when appropriate, or an alternative grease intercepting
device (note, the use or placement of industrial food grinders and/or garbage disposals in food
establishments will not be allowed). This includes, but is not limited to: drains from pre-rinse and or pre-
wash sinks; one, two, three or four compartment sinks; meat prep sinks; wok stoves; kitchen floor drains;
floor sinks; soup kettles; rotisseries with drains; steam ovens with drains; food prep sinks; hand wash
sinks; dishwashers; self-cleaning ventilation/exhaust hood; food waste disposal units and mop sinks. No
waste from water closets, urinals, and other fixtures conveying human waste shall drain into or through the
GGI.
Any business requiring a GGI shall have that GGI serving that business only. Shared GGIs are only
allowed under limited circumstance and must be approved by the Utility. Any approval for a shared GGI
will require the owner or property manager to be responsible for the maintenance of the GGI. This
agreement must be in writing and be provided to the Utility prior to any approval of shared GGIs.
All GGIs and associated plumbing shall be designed and installed by a licensed plumber or contractor.
GGIs shall be installed for easy access, inspection and cleaning. Each compartment shall be accessible
by a traffic rated manhole. The inlet and outlet manholes shall be located directly above the inlet and
outlet piping “Ts”, per EPCOR Detail 450-1. The “T” on the inlet piping must be provide with a removable
cap. Sweeping cleanouts must be installed before and after the GGI.
The sizing of the interceptor shall be determined using the following Tables 1-3 (Sizing based on Uniform
Plumbing Code 2012). If the GGI is being sized for a vacant shell building, Table 3 shall be used to
determine the GGI volume. Alterative grease interceptor-type devices may be used with prior approval.
May 2020
46
Table 1
Drainage Fixture Units for Food Service Facilities
Fixture Type
Drainage Fixture Unit (DFU)
Value
Quantity
Total
∗
2-Compartment Sink
2
∗
3-Compartment Sink
3
∗
Automatic Dishwasher less than 2
inch Drain
3
∗
Automatic Dishwasher
greater than 2 inch Drain
6
∗
Food Prep Sink
2
Hand Sink
2
Mop Sink/Mop Basin
3
∗
Pre-Rinse Sink
3
∗
Sink w/Food Waste
3
∗
Rotisserie w/Drain
3
∗
Tilt Soup Kettle
3
∗
Wok Stove
4
Floor Drain 2” & 3”
2
Floor Sink 2”
4
Floor Sink 3”
6
Floor Sink 4”
8
TOTAL DFUs
* Fixture type not specifically identified in the 2012 Uniform Plumbing Code. DFU value assigned for
calculation convenience.
Table 2: Minimum GGI Size based on Total DFUs
Total DFUs (from Table 1)
GGI Volume (gallons)
Up to 21 DFUs
750 gallons
22-35 DFUs
1000 gallons
36-90 DFUs
1250 gallons
91-172 DFUs
1500 gallons
173-216 DFUs
2000 gallons
217-307 DFUs
2500 gallons
308-342 DFUs
3000 gallons
For total DFU counts greater than 342, please contact EPCORs Pretreatment
Coordinator.
Table 3: GGI sizing for Unfinished Building Shells
GGI Inlet Pipe Size (inches)
GGI Size (gallons)
2”
750 gallons
3”
1000 Gallons
4”
2000 Gallons
May 2020
47
APPENDIX
ENGINEERING DETAILS
(Including General Notes and Material Specifications)
GENERAL NOTES:
1.
Any changes from approved plans must be submitted to EPCOR for written approval
prior to installation.
2.
Contractor shall keep a clean, current set of contract drawings as a record of the location
of all work completed as part of the project. Revisions, additions, and deletions shall be
annotated on the record set of drawings in Red. Contractor shall ensure that
survey-grade GPS equipment is used to record northing, easting, and elevation data for
certain buried appurtenances. For water mains, appurtenances to be located include
valves, crosses, tees, bends, reducers, and other fittings as required by the construction
inspector. For sewer mains, appurtenances include the rim and invert elevations of
manholes, clean-outs and other features as required. GPS coordinates will utilize the
North American Datum (NAD) 1983, State Plane Arizona Central Zone in Maricopa and
Santa Cruz counties, and State Plane Arizona West Zone in Mohave County. All units
will be in US feet. Prior to completion of the work, provide the red-lined drawings to the
Engineer of record for preparation of the project Record Drawings. Final completion will
not be made until the Engineer of Record receives satisfactory red-lined drawings.
3.
Contractor shall notify EPCOR Construction Inspections Department 48 hours in
advance of any construction. Use the Contact List in EPCOR's Developer Guide to
schedule inspection (EPCOR general phone number is 623-445-2400). When
appointments for inspection are arranged at least 48 hours in advance, the
inspection/test will be conducted as scheduled, otherwise the request will be scheduled
based on availability.
4.
Contractor shall be responsible for obtaining required permits and inspections from
appropriate governmental agencies for all work in public rights-of-way (Maricopa County
Department of Transportation, City Engineering Department, etc.). Inspections by
EPCOR do not relieve contractor of responsibility to obtain required inspections from
other interested governmental agencies (Building Safety, Fire District, etc.).
5.
All work and testing shall be in accordance with Maricopa Association of Governments
(MAG) Standard Specifications and Details unless otherwise stated on plans.
6.
All potable waterlines and fittings shall have NSF-PW seal. All materials and products
used in the potable water system shall conform to NSF Standards 60 and 61 in
accordance with AAC R18-4-213. All materials shall be lead-free as defined in AAC
R18-4-101 and R18-4-107.
7.
Pipe Separation:
a. Separation between water and sewer lines will be a minimum of 6 feet from outside
edge to outside edge of pipe. Two feet separation is required between water lines,
storm drains, and dry utilities.
b. Vertical and Horizontal separation of pipes and pipe crossings of varying degrees of
water quality shall be in accordance with State & local government requirements.
8.
Dip Section: All dip sections shall be constructed of restrained ductile iron pipe (DIP)
per EPCOR's STD. DET. 370-1. All dip sections shall be joint restrained DIP with
polyethylene wrap for the entire length per MAG SEC. 610.6. Joint restrained lengths
will follow MAG STD. DET. 303-1 and 303-2. Anchor blocks/thrust blocks must be
installed for vertical bends per MAG STD. DET. 381. Air/Vacuum release valves are
required at all highpoints and at vertical realignments of the water line.
9.
Concrete Encasement: All water and sewer encasements shall follow MAG STD. DET.
404-1. When a water line must be constructed under a sewer or reclaimed water line,
the water line must be a minimum of 2' below the sewer or reclaimed water line and
extra protection is required. Protection for the sewer main should be constructed with
mechanical joint or restrained joint ductile iron pipe for a distance of ten feet on both
sides of the water main. A full length of DIP will be centered over/under the water main.
When DIP is not used for the sewer main, both the water and sewer lines will be
encased in concrete for a length of 10' on both sides of the crossing, per MAG STD.
DET. 404-2. Refer to MAG STD. DET. 404-1 regarding force mains. All encasements
require rebar and class "C" concrete.
10. Gate valves shall be resilient seated in accordance with EPCOR's "Water Material
Specifications" and MAG SEC. 630.3.
11. Valve supports shall be in accordance with MAG STD. DET. 301.
12. Valve boxes shall be in accordance with MAG STD. DET. 391-1, type C.
Note: Valve box lids used in City of Surprise shall be Bingham & Taylor,
Model # CUL5LHVTSK4WCL35
13. Water Valve Debris Caps: Debris caps are required when water valves are constructed
within 2 feet of the edge of gutter, in areas that are unpaved, and areas prone to
flooding. Valves should be set 2-tenths above finish grade in all unpaved areas.
Concrete collar with carsonite marker is required on all valve locations outside of
right-of-way.
14. Concrete thrust blocks shall be in accordance with MAG STD. DET. 380. Thrust blocks
are NOT allowed in Right-of-ways (ROWs). Restrained joints per MAG STD. DET. 303-1
& 2 shall be used in ROWs in place of concrete thrust blocks. 90-degree fittings are
NOT allowed in ROW's, but may be used in other areas as approved by EPCOR.
15. Field lock gaskets are not allowed.
16. Water services 2 inches and smaller shall be in accordance with EPCOR STD. DET.
342-2.
17. Fire hydrants located on "Dead End" water mains shall have a blow-off, in accordance
with EPCOR STD. DET. 390-1, installed at the end of the water main.
18. Hydrant coating: "Safety Yellow". Complete hydrant preparation prior to inspection for
painting. Inspection is also required after painting for contractor to receive final
acceptance.
19. Pumper nozzle shall be oriented to provide best accessibility for fire truck. All hydrant
ports must be lubricated with a food-grade lubricant, or NSF 60 product.
20. Fire hydrants shall be in accordance with EPCOR STD. DET. 360-1 or 360-2 as
indicated on the Plan. In Mohave County, fire hydrants shall be in accordance with
EPCOR STD. DET. 360-2.
DATE:
DETAIL NO.
100-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
GENERAL NOTES
GENERAL NOTES (CONTINUED)
21. Reclaimed waterlines shall be installed in accordance with MAG SEC. 601, 610 and 616.
Testing shall be in accordance with MAG SEC. 610 and 611 including
disinfection/chlorination. Final flushing and bacteriological testing as specified in MAG
SEC 611.15 shall not be required.
22. Any shutdown to EPCOR's system requires a minimum of 48 hours notice to EPCOR's
Inspector. Shutdowns will only be allowed on Tuesdays, Wednesdays and Thursdays.
Time restrictions may also apply.
23. Concealed Pick-hole Manhole Covers: Concealed Pick-hole manhole covers are
required when the edge of the manhole covers are constructed within 3 feet of the edge
of gutter, in areas that are unpaved, and areas prone to flooding. Manholes should be
set 2-tenths above finish grade in all unpaved areas. Concrete collar with carsonite
marker is required on all manhole locations outside of right-of-way. Concealed Pick-hole
manhole covers are required for all manholes in Mohave County.
24. Water Pressure Testing: All water lines will be tested per MAG SEC. 610.15.
Modifications to these specifications include; the testing to be at a minimum of 200 psi,
higher test pressures may be required in certain circumstances, and loss/leakage
calculations will be based upon a maximum of 1500-feet, starting with the smallest
diameter pipe.
25. The Contractor is required to uniform slope test all sewer lines by video and vacuum test
all manholes in accordance with A.A.C. R18-9-E301. Deflection testing shall be
performed per MAG SEC. 615.11. Testing documentation and flash drives shall be
submitted to EPCOR Development Services Project Manager for approval prior to
acceptance. All required repairs are the responsibility of the contractor and must be
coordinated with EPCOR inspectors.
26. Sewer Testing: All sewer mains and laterals shall be pressure tested and video tested.
All sewer mains shall also be mandrill tested. The maximum allowable sag is 0.5 inches.
27. When using mechanical plugs to test sewer mains/manholes contractor must follow
EPCOR STD. DET. 420.
28. In Mohave County, solid sleeves are not allowed as a remedy to a failed pressure test
on a new line.
3.
Use only a University Of Southern California Foundation For Cross-Connection
Control and Hydraulic Research (USC) APPROVED assembly.
4.
Backflow prevention assemblies shall have a certificate of approval issued by
USC-FCCCHR, or other approved third-party certifying entity unrelated to the product
manufacturer or vendor, in accordance with AAC R18-4-215. All assemblies shall be
installed in accordance with EPCOR standard details. No assembly shall be placed in
service unless it has been tested and is functioning as designed. A certified test must
be submitted to EPCOR Cross Connection Specialist (Backflow Prevention) for
approval. Approval of water facilities will not be granted prior to backflow prevention
approval.
5.
Locate assembly within 36 inches of water meter unless otherwise directed by Utility's
Cross-Connection Specialist.
6.
All Pressure Vacuum Breaker Assemblies shall be installed a minimum of 12 inches
above all downstream piping and outlets.
7.
Use lead free solder only.
8.
CLEARANCES:
a. Wall or structure: Minimum 36”
b. Above finish grade: Minimum 12” – Maximum 24”
9.
Fire Lines: provide usage-tamper switches & wiring to alarm system where required by
fire department. Note: Fire Lines longer than 75' require backflow assembly at
property line or EPCOR approved location. Such Fire Lines must have backflow
prevention assemblies with a metered bypass.
APPROVAL PROCESS FOR BACKFLOW PREVENTION ASSEMBLIES:
1.
All new backflow prevention assemblies (BPAs) shall be tested and functioning as
designed prior to Approval in accordance with AAC R18-4-215.
2.
Developer/Contractor/Customer shall forward passing test report with required BPA
information to EPCOR Cross Connection Specialist, marked pending approval.
3.
EPCOR Cross Connection Specialist (Backflow Prevention) will notify
Developer Services that an approved backflow prevention assembly test has
been received, and this project is ready for an approval inspection.
4.
A Construction Inspector then schedules an Approval Inspection
with the Developer/Contractor/Customer.
5.
EPCOR Construction Inspector confirms presence of BPA, and confirms proper
installation guidelines have been followed.
6.
Backflow Prevention approval process complete.
7.
Approval may be granted provided all other required Operation Inspection items have
no deficiencies.
BACKFLOW PREVENTION GENERAL NOTES:
1.
Backflow Prevention Devices: All landscape and commercial water services require
backflow prevention devices, meeting the requirements of EPCOR. Backflow devices
shall be in place prior to meters being set. Testing of the backflow devices may be
completed after the installation of the meter.
2.
Contact Utility Cross-Connection Specialist (Backflow Prevention) at (623) 445-2411
for approved assembly list, inspections and testing.
100-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
GENERAL NOTES (CONTINUED)
BACKFLOW PREVENTION GENERAL NOTES
BACKFLOW PREVENTION APPROVAL PROCESS NOTES
DATE:
DETAIL NO.
WATER SYSTEM MATERIAL SPECIFICATION
DISTRIBUTION PIPING
·
C900 Polyvinyl Chloride (PVC): In accordance with American Water Works Association
(AWWA) Standard C900 for pipe diameters thru 12”: DR=14, elastomeric-gasket
bell-end.
·
Ductile Iron Pipe, mortar-lined (DIP) shall be used for pipe diameters greater than 12”.
·
Ductile Iron Pipe, mortar-lined (DIP): In accordance AWWA Standards C150 & C151
Mortar lining shall be in accordance with AWWA C104. All Ductile Iron Pipe shall be
polyethylene wrapped for the entire length in accordance with MAG SEC. 610.6. 6"
through 14" diameter must be Pressure Class 350 minimum: 16" through 24" must be
Pressure Class 250 Minimum, 30" and larger must be Pressure Class 150 minimum.
·
In Paradise Valley and Chaparral (Fountain Hills) Districts, Ductile Iron Pipe only. PVC
is not permitted.
·
Concrete Pressure Pipe, Steel Cylinder Type: In accordance with AWWA Standard
C303 and MAG SEC. 758 for pipe diameters greater than 24”. Manufacturer's technical
data sheets shall be submitted to EPCOR for review and approval. Service taps are
not permitted on concrete pressure pipe.
DISTRIBUTION FITTING
·
Push-on or mechanical joint in accordance with AWWA C111 and MAG SEC. 750.4.
Joint restraints, where required, shall be Mechanical Restrained Joint with product
approved by EPCOR or flanged joint for lengths in accordance with MAG STD. DET.
303-2. Field lock gaskets are not allowed.
WATER LINE VALVE
·
Mueller, Clow, Kennedy, or M&H resilient wedge seated Gate Valve in accordance with
MAG SEC. 630.3 with valve box and cover in accordance with MAG STD. DET. 391-1
Type "C" minimum lid weight of 16lbs. Valves installed outside the pavement or in the
flow line of a roadway shall have a debris cap installed per MAG STD. DET. 392.
Butterfly valves are not allowed without EPCOR Approval.
CONTROL VALVES (MOHAVE COUNTY ONLY)
·
The external tubing needs to be stainless steel, not copper. CLA-VAL is the only
acceptable manufacturer.
TAPPING SLEEVE & VALVE
·
Stainless Steel - Approved manufacturers are Cascade, JCM, and Smith-Blair.
·
Paradise Valley District may require a bypass on valves on 12” or larger pipe. Contact
EPCOR for approval on a case-by-case basis.
WATER SERVICE
·
For taps, pipe and fittings for water services through 2", the size shall be in accordance
with EPCOR's STD. DET. 342-2. Requests for larger sizes must be submitted for
review and approval. Minimum water service line size diameter shall be 1”.
·
Tubac District requires meter setters on all projects.
·
2” meter setters are required for critical service developments in Paradise Valley and
Anthem Districts.
·
Approved Saddles, all Iron Pipe Thread Tap and bronze strap: For PVC, Jones J-995,
Jones J-996, Mueller H-13000 Series; For Ductile Iron Pipe, Ford 202B, Jones J-979,
Mueller BR2B Series, Mueller BR2S Series.
·
All brass fittings must be manufactured by Ford, Mueller, or James Jones. All angle
meter stops must include locking wings.
·
All corp stops and angle valves must be ball style. All fittings must be "pac-joint" type.
·
All brass must be lead free.
FIRE HYDRANTS
·
All hydrants will be Wet Barrel (unless Dry Barrel hydrants are required by local
jurisdiction) and be manufactured by Clow or Jones. Break-off check valve shall be
Clow.
·
All hydrants shall be equipped with national standard hose threads.
TRACER WIRE
·
See EPCOR's STD. DET. 350-1. Tracer wire must be used for all water lines.
DIP SECTIONS
·
All dip sections shall be constructed of restrained ductile iron pipe (DIP) per EPCOR's
STD. DET. 370-1. All dip sections shall be joint restrained DIP with polyethylene wrap
for the entire length per MAG SEC. 610.6. Joint restrained lengths will follow MAG
STD. DET. 303-1 and 303-2. Anchor blocks/thrust blocks must be installed for vertical
bends per MAG STD. DET. 381.
MARKING TAPE
·
See EPCOR's STD. DET. 350-1. Marking tape must be used for all water lines and
services.
MARKING POSTS
·
Carsonite marking posts are required for all water valves located outside of ROW and
outside of paved areas, installed with concrete collar.
ALL OTHER ITEMS
·
In accordance with MAG Specifications.
·
Where MAG standards are specified, those standards are applicable.
100-3
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
WATER SYSTEM
MATERIAL SPECIFICATION
DATE:
DETAIL NO.
SEWER SYSTEM MATERIAL SPECIFICATION
COLLECTION MAINS
·
SDR35 PVC sewer pipe in accordance with MAG Specifications, ASTM D-3034,
and ASTM F-679 or US Pipe Protecto 401 ceramic epoxy ductile iron pipe. All
Ductile iron pipe shall be polyethylene wrapped for the entire length in accordance
with MAG SEC. 610.6
SEWER SERVICE
·
SDR35 PVC sewer pipe in accordance with MAG Specifications, including Marker
Ball and ASTM D-3034.
MANHOLES
·
Precast Concrete in accordance with MAG Specifications, except that no steps shall
be installed in any manholes. Each manhole shall be treated with “Insecta” insect
treatment as soon as that manhole is raised to grade, after lining is complete and
prior to final acceptance. All sewer manholes shall be lined, including the base, with
one of the following products, as applied by a certified applicator:
···
NeoPoxy NPR-5300 Series epoxy
···
Raven 405/A10
···
Sauereisen 210
···
Sewer Shield 100
As a minimum, lining is required under the following conditions:
- Manholes for sewers that are 10" in diameter, or larger
- Manholes for sewers that are 10' in depth, or greater
-Manholes that receive wastewater from force mains
-Drop manholes
-Manholes deemed necessary by EPCOR
MANHOLE COVER
·
Cast Iron in accordance with MAG Specifications. All manholes shall have a 30”
frame and cover, Neenah R-1743. Lid to be stamped "Sanitary Sewer" in
accordance with MAG Detail 424. No agency identification shall be added. See
EPCOR's STD. DET. 100-2 for information on water tight manhole covers.
ALL OTHER ITEMS
·
In accordance with MAG Specifications.
FORCE MAINS
·
PVC pressure pipe in accordance with AWWA C900 or C905, Griffin H2Sewer Safe
or US Pipe Protecto 401 Ductile Iron Pipe, min. pressure class 150. All ductile iron
pipe shall be polyethylene wrapped for the entire length in accordance with MAG
SEC. 610.6.
SEWER SYSTEM MATERIAL SPECIFICATION (CONTINUED)
MARKING POSTS
·
Carsonite marking posts are required for all sewer mains outside of ROW and
outside of paved areas, and are required for force mains greater than 16 inches in
diameter.
TRACER WIRE
·
See EPCOR's STD. DET. 350-1. Tracer wire must be used for all sewer force
mains.
MARKING TAPE
·
See EPCOR's STD. DET. 350-1. Marking tape must be used for all sewer lines and
services.
ALL OTHER ITEMS
·
In accordance with MAG Specifications.
·
Where MAG standards are specified, those standards are applicable regardless of
project location.
100-4
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
SEWER SYSTEM
MATERIAL SPECIFICATION
DATE:
DETAIL NO.
RECLAIMED WATER SYSTEM MATERIAL SPECIFICATION
DISTRIBUTION PIPING
·
C900 Polyvinyl Chloride (PVC): In accordance with American Water Works
Association (AWWA) Standard C900 for pipe diameters up to 12”; DR=18,
elastomeric-gasket bell-end.
·
In Mohave County, all PVC must be DR14 only. DR18 is not permitted.
·
C905 Polyvinyl Chloride (PVC): In accordance AWWA Standard C905 for pipe
diameters greater 12”; DR=18, elastomeric-gasket bell end.
·
Ductile Iron Pipe (DIP): In accordance with AWWA Standards C150 & C151. Motar
lining shall be in accordance with AWWA C104. All Ductile Iron Pipe shall be
polyethylene wrapped for the entire length in accordance with MAG SEC. 610.6. 6"
through 14" diameter must be Pressure Class 350 minimum: 16" through 24" must
be Pressure Class 250 minimum, 30" and larger must be Pressure Class 150
minimum.
·
All pipe shall be appropriately identified through integral coloring and wording of the
pipe, stenciling of the pipe, or pipe sleeving (pipe socks) in accordance with MAG
SEC. 616. Marking tape shall be installed in accordance with EPCOR's STD. DET.
350-1.
FITTINGS
·
Push-on or mechanical joint in accordance with MAG SEC. 750. Joint restraints,
where required, shall be Mechanical Restraint Joint with product approved by the
Utility for lengths in accordance with MAG STD. DET. 303-2.
VALVES
·
Mueller, Clow, Kennedy, or M&H resilient wedge seated Gate Valve in accordance
with MAG SEC. 630.3 with valve box and cover in accordance with MAG Detail
391-1 Type "C" minimum lid weight of 16lbs.
·
Valve riser pipes shall be painted purple (Seymour Safety Purple) inside and out.
Debris caps with identification tag shall be installed in accordance with MAG STD.
DET. 392, MAG SEC. 616, and EPCOR's STD. DET. 600-1.
SERVICES
·
Taps, pipe and fittings for water services 1-1/2” and 2" size shall be in accordance
with EPCOR's STD. DET. 610-1. Larger sizes to be submitted for approval. No
services smaller than 1-1/2” will be approved by EPCOR.
RECLAIMED WATER SYSTEM MATERIAL SPECIFICATION (CONT'D)
DIP SECTIONS
·
All dip sections shall be constructed of restrained ductile iron pipe (DIP) per
EPCOR's STD. DET. 370-1. All dip sections shall be joint restrained DIP with
polyethylene wrap for the entire length per MAG SEC. 610.6. Joint restrained
lengths will follow MAD STD. DET. 303-1 and 303-2 and appropriately identified in
accordance with MAG SEC. 616. Anchor blocks/thrust blocks must be installed for
vertical bends per MAG STD. DET. 381.
MARKING TAPE
·
Wording per MAG SEC. 616 to be used on all reclaimed water mains. The marking
tape shall be printed “Caution: Reclaimed Water Line” on Purple Tape for reclaimed
water lines.
ALL OTHER ITEMS
·
In accordance with MAG Specifications.
·
Where MAG standards are specified, those standards are applicable regardless of
project location.
100-5
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
RECLAIMED WATER SYSTEM
MATERIAL SPECIFICATION
DATE:
DETAIL NO.
AIR GAP
DATE:
DETAIL NO.
300-1
AIR GAP
CURB
STREET
OVERFLOW LEVEL
LANDSCAPED
MEDIAN AREAS
TYPICAL FLOOD IRRIGATION STYLE AIR GAP
AIR GAP
³ 2 Ø
BASIN
OVERFLOW LEVEL
INLET PIPE
TYPICAL BASIN STYLE AIR GAP
WM
NOTES:
1.
AN AIR GAP IS A PHYSICAL SEPARATION BETWEEN THE END OF A POSSIBLE
WATER SUPPLY PIPE AND THE OVERFLOW LEVEL OF AN OPEN OR
NON-PRESSURIZED BASIN.
2.
AIR GAP DISTANCE TO BE MEASURED FROM BOTTOM OF PIPE TO
OVERFLOW LEVEL
3.
AIR GAP DISTANCE TO ALWAYS BE AT LEAST TWICE THE INLET PIPE
DIAMETER, AND IN NO CASES LESS THAN 1".
4.
CONTACT EPCOR CROSS CONNECTION SPECIALIST (BACKFLOW
PREVENTION) @ 623-587-5202 FOR APPROVED ASSEMBLY LIST,
INSPECTIONS AND TESTING.
5.
SEE EPCOR'S STD. DET. 100-2 FOR MORE INFORMATION.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
Ø
Ø
³ 2 Ø
12" - 2" REDUCED PRESSURE PRINCIPLE ASSEMBLY
DATE:
DETAIL NO.
310-1
MATERIAL LIST:
1.
USC APPROVED ASSEMBLY, (SUBMIT TO EPCOR FOR APPROVAL).
2.
TEST COCKS WITH BRASS PLUGS (4).
3.
3 PC BRASS UNION 12" MAX FROM ASSEMBLY
4.
ALL COPPER FITTINGS, TYPE 'K' COPPER TUBING
5.
VANDALISM AND/OR FREEZE PROTECTION ENCLOSURE (OPTIONAL)
6.
4" CONCRETE SLAB W/PVC SLEEVES FOR ENCLOSURE (OPTIONAL)
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1.
SEE EPCOR'S STD. DET. 100-2 FOR BACKFLOW PREVENTION GENERAL
NOTES.
2.
TO CONNECT TO GALVANIZED LINES, USE A BRASS FITTING. FOR PVC
LINES USE A COPPER FEMALE ADAPTER X PVC MALE ADAPTER
FITTING (OR A SCH 80 PVC NIPPLE).
x 4
2 X PVC SLEEVE
12" MIN WHEN CONNECTING
TO A PVC LINE
12"MIN
36"MAX
3
2
5
1
4
6
MINIMUM 6-INCH
SAND SHADING
FOR ALL SMALL
PIPING
MIN. 24" UNLESS
SPECIFIED
OTHERWISE BY
EPCOR
3" - 10" REDUCED PRESSURE PRINCIPLE ASSEMBLY
RP2 EXCEPT F/L
DATE:
DETAIL NO.
310-2
6
7
4
24" MAX.
12" MIN.
5
1
2
3
FINISH GRADE
48"
MIN.
48"
MIN.
24" MIN.
8
FLOW
MATERIAL LIST:
1.
USC APPROVED ASSEMBLY, (SUBMIT TO EPCOR FOR APPROVAL).
2.
TEST COCKS WITH BRASS PLUGS (4).
3.
USE FLANGED DUCTILE IRON FOR ABOVE GROUND PIPE & FITTINGS.
RESTRAINED JOINTS SHALL BE USED BELOW GROUND.
4.
MEGALUG M.J. FITTING-FOR AC PIPE USE FCA
5.
ADJUSTABLE PIPE SUPPORTS (2)
6.
CONCRETE SLAB MINIMUM 6" THICK X 24" WIDE
7.
CONCRETE THRUST BLOCK-12" WIDE X 12" THICK MINIMUM TO
UNDISTURBED EARTH. USE 2-3/4" ZINC COATED, THREADED RODS,
BOLTED TO FLANGES, BOTH SIDES TYPICAL; (4 TOTAL).
NOTE: IN LIEU OF CONCRETE THUST BLOCK, A 3'x3'x1/4" STEEL ANGLE,
AS SHOWN IN EPCOR STD. DET. 345-2, MAY BE USED.
8.
JOINT RESTRAINTS PER M.A.G. STD. DET. 303-1 AND 303-2
NOTES:
1.
SEE EPCOR'S STD. DET. 100-2 FOR BACKFLOW PREVENTION GENERAL
NOTES.
2.
BACKFILL UNDER ASSEMBLY SHALL BE 95% COMPACTION
3.
FOR FIRE LINE USAGE-TAMPER SWITCHES & WIRING MAY BE NEEDED BY FIRE
DEPARTMENT OR DISTRICT.
4.
FOR FIRE LINES, A REDUCED PRESSURE DETECTOR ASSEMBLY WITH METER
IS REQUIRED. METER SHALL HAVE AN AMR REGISTER.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
OS&Y
OS&Y
12" - 2" PRESSURE VACUUM BREAKER ASSEMBLY
DATE:
DETAIL NO.
310-3
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
MATERIAL LIST:
1.
USC APPROVED ASSEMBLY, (SUBMIT TO EPCOR FOR APPROVAL).
2.
TEST COCKS WITH BRASS PLUGS (4).
3.
3 PC BRASS UNION 12" MAX FROM ASSEMBLY
4.
ALL COPPER FITTINGS, TYPE 'K' COPPER TUBING
5.
VANDALISM AND/OR FREEZE PROTECTION ENCLOSURE (OPTIONAL)
6.
4" CONCRETE SLAB W/PVC SLEEVES FOR ENCLOSURE (OPTIONAL)
NOTES:
1.
SEE EPCOR'S STD. DET. 100-2 FOR BACKFLOW PREVENTION
GENERAL NOTES.
2.
TO CONNECT TO GALVANIZED LINES, USE A BRASS FITTING. FOR
PVC LINES USE A COPPER FEMALE ADAPTER X PVC MALE
ADAPTER FITTING (OR A SCH 80 PVC NIPPLE).
2 X PVC SLEEVE
3
5
4
6
MINIMUM 6-INCH
SAND SHADING
FOR ALL SMALL
PIPING
12" MIN. / 36" MAX.
MIN. 24" UNLESS
SPECIFIED
OTHERWISE BY
EPCOR
12" MIN WHEN CONNECTING TO A PVC LINE
1" - 10" DOUBLE CHECK DETECTOR ASSEMBLY
DATE:
DETAIL NO.
320-1
6
7
4
24" MAX.
12" MIN.
5
1
2
3
FINISH GRADE
48"
MIN.
24" MIN.
8
MATERIAL LIST:
1.
U.S.C. (ALSO UL/FM FOR FIRELINES) APPROVED ASSEMBLY, (SUBMIT TO
EPCOR FOR APPROVAL).
2.
TEST COCKS WITH BRASS PLUGS (4).
3.
FLANGED DUCTILE IRON PIPE & FITTINGS ABOVE GROUND MEGALUG
RECOMMENDED BELOW GROUND.
4.
MEGALUG M.J. FITTING-FOR AC PIPE USE F.C.A.
5.
ADJUSTABLE PIPE SUPPORTS (2)
6.
CONCRETE SLAB MINIMUM 6" THICK x 24" WIDE
7.
CONCRETE THRUST BLOCK-12" WIDE x 12" THICK MINIMUM TO
UNDISTURBED EARTH. USE 2-3/4" ZINC COATED, THREADED RODS,
BOLTED TO FLANGES, BOTH SIDES TYPICAL; (4 TOTAL).
NOTE: IN LIEU OF CONCRETE THRUST BLOCK, A 3'x3'x1/4" STEEL ANGLE,
AS SHOWN IN EPCOR STD. DET. 345-2, MAY BE USED.
8.
JOINT RESTRAINTS PER M.A.G. STD. DET. 303-1 & 303-2.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1.
SEE EPCOR'S STD. DET. 100-2 FOR BACKFLOW PREVENTION GENERAL
NOTES.
2.
FOR FIRE LINES, A REDUCED PRESSURE DETECTOR ASSEMBLY WITH METER
IS REQUIRED. METER SHALL HAVE AN AMR REGISTER.
FLOW
48"
MIN.
SECTION VIEW
PLAN VIEW
24" MIN.
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION
ASSEMBLY
FOR TEMPORARY USE ON HYDRANT METERS
DATE:
DETAIL NO.
330
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
WATER METER
SUPPORTS (2 EA.)
SUPPLIED BY
CONTRACTOR
2" GATE VALVE
W/ NIPPLE; FOR
CHAPARRAL
DISTRICT
(FOUNTAIN
HILLS) THIS
MUST BE A 3"
GATE VALVE
REDUCED PRESSURE
BACKFLOW ASSEMBLY
(SUPPLIED BY
CONTRACTOR)
POTABLE WATER
SYSTEM FIRE
HYDRANT
NOTES:
1.
PROPER BACKFLOW PROTECTION REQUIRED BY EPCOR.
2.
USER MUST INSTALL A REDUCED PRESSURE PRINCIPLE
BACKFLOW PREVENTION ASSEMBLY ON EACH HYDRANT METER
BEFORE USING WATER.
3.
BACKFLOW ASSEMBLY MUST BE TESTED BY A RECOGNIZED,
CERTIFIED BACKFLOW ASSEMBLY TESTER BEFORE USING AND
ALSO EACH TIME METER IS MOVED.
4.
USER MUST REMOVE BACKFLOW ASSEMBLY WHEN HYDRANT
METER IS REMOVED OR RELOCATED.
5.
USER IS LIABLE FOR ANY DAMAGE TO HYDRANT METER AND
FITTINGS.
6.
USER MUST USE GATE VALVE TO CONTROL FLOW OF WATER.
POTABLE WATER SERVICE CONNECTION
1" THRU 2" SERVICE W/ CORRESPONDING METER
DATE:
DETAIL NO.
342
NOTES:
1.
SEE EPCOR'S WATER SYSTEM MATERIAL SPECIFICATIONS FOR APPROVED
SADDLES.
2.
AMR METER (ONLY) TO BE SET BY EPCOR UPON PAYMENT OF FEES.
3.
MINIMUM #4 BOX ON 1-1/2 INCH OR LARGER - #2 BOX FOR ALL SERVICES UP
TO 1 INCH.
4.
CONCRETE METER BOX PER M.A.G. STD. DET. 320 BOX NO. 2 OR 4 W/ STEEL LID
TO BE SET PERPENDICULAR TO BACK OF WALK OR CURB. BOX TO MATCH
SLOPE OF FINISH GRADE AND SET 1" ABOVE FINISH GRADE OR BACK OF WALK
OR CURB. 4a 2 INCH DIAMETER OPENING
5.
NO BOXES IN DRIVEWAYS OR SIDEWALKS.
6.
6 INCH SAND SHADING AND BEDDING ON SERVICE.
7.
CAL WESTERN INC TYPE CAL102 BLUE POLY SLEEVE REQUIRED IN MOHAVE
COUNTY ONLY. TRACER WIRE REQUIRED ON TOP OF SLEEVE.
8.
MOHAVE COUNTY REQUIRES A COMPRESSION PINCH NUT AT THE SADDLE.
9.
AAC R14-2-405.B.3 STATES, "WHERE SERVICE IS BEING PROVIDED FOR THE
FIRST TIME, THE CUSTOMER SHALL PROVIDE AND MAINTAIN A PRIVATE
CUTOFF VALVE WITHIN 18 INCHES OF THE METER ON THE CUSTOMER'S SIDE
OF THE METER."
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
WATER MAIN
COPPER PIPE
ROLL TYPE "K"
EDGE OF
SIDEWALK
PROPERTY OR
EASEMENT LINE
BALL STYLE CORP STOP WITH
COMPRESSION TYPE NUT
PLAN VIEW
SECTION A-A
30" MIN.
COVER ON
SERVICE
ALL SERVICES
SECTION B-B
TO BUILDING
A
A
B
B
30" MIN.
30°
1" MIN. FOR ALL SERVICES
8"
1
1
4
BALL STYLE ANGLE METER VALVE
W/ PAC-JOINT CONNECTION & LOOP
FOR LOCK
FEMALE I.P. THREAD
METER FLANGE
6
4a
2 INCH HOLE TO BE
CENTERED IN REAR
HALF SECTION OF
METER BOX LID
STREET
℄ OF ANGLE VALVE
4" VERTICAL CLEARANCE
1" MIN - 3" MAX
3", 4", & 6"
POTABLE WATER METER VAULT
DATE:
DETAIL NO.
345-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
4
FL.x PE DIP SPOOL 48"
MIN. LENGTH (TYP)
2'MIN.
(TYP)
5'
10'-6"
A
A
AGGREGATE BASE
COMPACTED TO 95%
SECTION A-A
36" MIN
5'-8"
FINISH GRADE
15"MIN.
18"MAX.
WATER MAIN
6"
5'
MATERIALS LIST:
1.
ALL PIPING TO BE JOINT RESTRAINED, MIN. PRESSURE CLASS 150, DIP. JOINT
RESTRANTS TO BE FLANGED OR MEGALUG.
2.
PRE-CAST VAULT, OLD CASTLE 5106-WA OR EPCOR APPROVED EQUAL.
3.
6' x 4' ALUMINUM ACCESS DOOR WITH SPRING ASSIST RATED FOR H-20 LOADING.
HALLIDAY PRODUCTS H2R7248 OR EPCOR APPROVED EQUAL. VAULT DOOR
SYSTEM WILL HAVE 2" DIAMETER TO ALLOW FOR ANTENNAE. THE HOLE SHOULD
BE IN A LOCATION THAT ALLOWS EASE OF INSTALLATION, ALLOW VAULT DOORS
TO OPEN FULLY, AND HAVE ENOUGH CABLE TO NOT BIND.
3
PLAN
2
6
7
8
4
5
6
3
1
10
9
ALUMINUM BOLT ON LADDER WITH SAFETY EXTENSION, HALLIDAY PRODUCTS LIB
AND LIE OR EPCOR APPROVED EQUAL.
2" DOUBLE STRAP BRONZE SADDLES PER EPCOR'S STD. DET. 342-2 AND A 2"
LOCKABLE BALL VALVE.
MUELLER OR CLOW RESILIENT SEATED FLANGED NRS GATE VALVE WITH HAND
WHEEL IN ACCORDANCE WITH M.A.G. SECTION 630.3.
STRAINER REQUIRED WITH INSTALLATION OF METER.
ALL METERS THAT ARE 3 INCHES OR LARGER MUST BE COMPOUND METERS.
EPCOR WILL PROVIDE ALL COMPOUND METERS. CONTRACTOR WILL NEED TO
COORDINATE PICK-UP AND INSTALLATION WITH EPCOR STAFF
FLANGED X FCA DIP SPOOL, MINIMUM 3 PIPE DIAMETERS LENGTH.
EPCOR APPROVED CHECK VALVE.
ADJUSTABLE PIPE SUPPORTS (2)
NOTE:
LARGER METER VAULTS REQUIRE SPECIAL DESIGN AND EPCOR APPROVAL.
6.
7.
8.
9.
10.
VAULT LID MUST HAVE
TWO 2-INCH DIAMETER
HOLES. HOLE LOCATION
TO BE DETERMINED BY
UTILITY.
5.
4.
VB&C PER
M.A.G. STD.
DET. 391-1,
TYPE C
GROUT FILL VOID
TO MAKE PIPE
PENETRATION
WATER TIGHT.
DOOR
OPENING
DIRECTION
5
11.
11
6"
FINISH
GRADE
CONCRETE
BASE W/ DRAIN
ABOVE GROUND POTABLE WATER METER
( 3", 4" & 6" )
DATE:
DETAIL NO.
345-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
PLAN VIEW
SECTION VIEW
90° DUCTILE IRON
ELL FLANGED FITTING (TYP)
FINISHED GRADE
6" THICK CONCRETE SLAB-
3000 PSI- CLASS A
12" MINIMUM
NEPTUNE BRONZE STRAINER
CURB STOP & TWO DOUBLE BRONZE
STRAP SADDLES (TYP); CURB STOPS
TO HAVE LOCKABLE WINGS;
PADLOCKS PROVIDED BY EPCOR
PIPE
SUPPORT;
TYP.- SEE
BELOW
CONCRETE SLAB
GATE VALVE-DUCTILE IRON, RISING STEM TYPE
FLANGED, RESILIENT SEAT, AWWA C-905 (TYP)
DUCTILE IRON PIPE SPOOL-
LENGTH AS REQUIRED (TYP)
DUCTILE IRON 90° MJ FITTING
DUCTILE IRON SPOOL PIPE
(STRAINER AND METER PROVIDED BY EPCOR AFTER
NEPTUNE WATER METER RECEIPT OF PAYMENT FROM CONTRACTOR/DEVELOPER.
CONTRACTOR MAY CONTACT EPCOR PROJECT MANAGER
TO OBTAIN MAKE AND MODEL INFORMATION FOR METER)
DUCTILE IRON SPOOL PIPE
DUCTILE IRON
FLANGED CONCENTRIC
REDUCER (TYP)
2" TYPE 'K' HARD
COPPER BYPASS
PIPE
6" DIAMETER x 3' TALL SCHEDULE
40 GALVANIZED PIPE BOLLARD,
FILL WITH CONCRETE, PAINT YELLOW
-LOCATE MIN 1' FROM CONCRETE
-MAY REQUIRE UP TO 6 BOLLARDS
3" x 3" x 1/4" STEEL ANGLE.
BOLT TO FLANGE, EACH
END WITH ONE BOLT. COAT
WITH COAL TAR EPOXY (16
MILS) REQUIRED
TOP OF CONCRETE SLAB
TO BE 1" ABOVE
SURROUNDING FINISH GRADE
MECHANICAL JOINT RESTRAINED DIP FROM TAP;
MIN LENGTH OF 10 FEET; ALL UNDERGROUND DIP
SHALL BE POLYETHYLENE WRAPPED
FLOW
FLOW
48"
PIPE SUPPORT-FLANGE TYPE BOLT TO
CONCRETE SLAB (MAINLINE & BYPASS)
95% COMPACTED SUB-GRADE
MIN 10 FEET OF MECHANICAL
JOINT RESTRAINED DIP.
MIN LENGTH OF 4 PIPE
DIAMETERS
NOTES:
1. AN EPCOR APPROVED BACKFLOW
PREVENTION ASSEMBLY IS REQUIRED
DOWNSTREAM OF THE METER.
2. ALL ABOVE GROUND PIPING/VALVES
SHALL BE PAINTED DESERT SAND TO
MATCH COLOR OF CAGE ENCLOSURE.
3. METER & STRAINER TO BE PROTECTED
WITH A LOCKABLE HINGED CLAMSHELL
ENCLOSURE; TOP PORTION IS HINGED
AND HAS HANDLES TO ALLOW TOP
PORTION TO BE LIFTED OPEN TO ALLOW
FULL ACCESS TO METER AND STRAINER;
WHEN OPENED, TOP PORTION SHALL
STAY IN OPEN POSITION WITHOUT
ASSISTANCE; METAL ENCLOSURE SHALL
BE CAPABLE OF WITHSTANDING A
MINIMUM OF 200 POUNDS PER SQUARE
FOOT WITHOUT ANY PERMANENT
DEFLECTION OR DISTORTION;
POWDERCOATED WITH EPCOR
APPROVED COLOR, DESERT SAND; MAKE
& MODEL OF ENCLOSURE SHALL BE
APPROVED BY EPCOR PRIOR TO
INSTALLATION; ENCLOSURE SHALL BE
BOLTED TO CONCRETE SLAB; SIDE OF
ENCLOSURE ABOVE PIPE SHALL BE
ENCLOSED AND BELOW PIPE MAY BE
OPEN
12" MINIMUM
MIN LENGTH OF 4 PIPE
DIAMETERS
ENTIRE LENGTH IS HINGED
PADLOCK PROVIDED BY EPCOR
SEE NOTE 3
DUCTILE IRON SPOOL PIPE- 12" LONG MIN.
DUCTILE IRON SPOOL PIPE- 12" LONG MIN.
* METER ASSEMBLIES 8" AND LARGER ARE TO BE DESIGNED BY
DEVELOPER'S ENGINEER AND APPROVED BY EPCOR
PRESSURE REDUCING VALVE (PRV) VAULT
DATE:
DETAIL NO.
346
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
6 IN
6 IN
6 IN
6 FT
2 FT
3 FT
1.5 FT MINIMUM
AGGREGATE BASE
COMPACTED TO 95%
12 IN
6 IN
6 IN OF CRUSHED ROCK
8 IN x 8 IN x 8 IN
CONCRETE BASE
ADJUSTABLE
SUPPORT
PIPE TRENCH DETAIL
DATE:
DETAIL NO.
350-1
NOTES:
1.
TRENCH WILL BE IN ACCORDANCE WITH M.A.G. SECTION 601.
2.
ONE SACK ABC SLURRY (CLSM) TO BE IN ACCORDANCE WITH M.A.G. SECTION 728.
3.
DEPTH OF BURY TO BE MIN. 48" IN ALL STREETS. DEPTH OF BURY FOR WATER
LINES IN OTHER AREAS TO BE AS FOLLOWS:
A) 36" MIN. FOR MAINS 8" DIAMETER AND SMALLER.
B) 48" MIN. FOR MAINS 10" DIAMETER AND LARGER.
4.
WASHED CRUSHED ROCK TO BE IN ACCORDANCE WITH M.A.G. SECTION 716.2 AND
TABLE 716-2.
SAND TO BE IN ACCORDANCE WITH M.A.G. SECTION 701.3.
ABC TO BE IN ACCORDANCE WITH M.A.G. SECTION 702.2 AND TABLE 702-1.
5.
TRACER WIRE IS TO BE BROUGHT UP TO GRADE AT EACH FIRE HYDRANT TO
GROUND / VALVE BOX. FOR LONG RUNS, THE TRACER WIRE IS TO BE BROUGHT UP
AT LEAST EVERY 300 FEET INSIDE A TRACER BOX SUCH AS A SNAKEPIT
MAGNETIZED TRACER BOX BY COPPERHEAD INDUSTRIES OR APPROVED EQUAL.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
PIPE MARKING TAPE
MARKING TAPE SHALL BE LOCATED 18 INCHES BELOW
GROUND SURFACE.
WORDING PER M.A.G. SEC. 616 TO BE USED FOR ALL
WATER, & RECLAIMED WATER LINES AND SERVICES.
THE MARKING TAPE SHALL BE PRINTED ON STANDARD
COLORED NON-DETECTABLE TAPE. LETTERING SHALL
BE BLACK, 1-12" HEIGHT MINIMUM.
RECLAIMED WATER LINES SHALL USE PURPLE TAPE &
SHALL READ "CAUTION: RECLAIMED WATER LINE"
POTABLE WATER LINES SHALL USE BLUE TAPE & SHALL
READ "CAUTION: POTABLE WATER LINE"
RAW & NON-POTABLE WATER LINES SHALL USE
YELLOW TAPE & SHALL READ "RAW WATER MAINS"
AND/OR "NON-POTABLE WATER MAINS".
SEWER AND SERVICE LINES SHALL USE GREEN TAPE &
SHALL READ "CAUTION: SEWER LINE".
BACKFILL
·
IN NON-SAW CUT AREAS TO
BE NATIVE MATERIAL
SCREENED AT 4" OR LESS
·
IN SAW CUT AREAS TO BE ONE
SACK ABC SLURRY OR AS
SPECIFIED BY R.O.W. AGENCY.
SEE
SEE NOTE 1
NOTE 3
6"
MIN.
12"
PIPE ZONE
FROM MIN. 6" BELOW BOTTOM OF PIPE TO MIN. 12"
ABOVE TOP OF PIPE BACKFILL WITH THE
FOLLOWING PER NOTE 4:
A.
WATER LINES
· MARICOPA & SANTA CRUZ COUNTIES = ABC
· MOHAVE COUNTY = SAND PER M.A.G. 701.3
B.
RECLAIMED WATER LINES
· MARICOPA & SANTA CRUZ COUNTIES = ABC
MOHAVE COUNTY = SAND PER M.A.G. 701.3
C.
SEWER FORCE MAIN
· MARICOPA & SANTA CRUZ COUNTIES = ABC
MOHAVE COUNTY = SAND PER M.A.G. 701.3
D.
GRAVITY SEWER LINES
· ALL SERVICE AREAS = 3
8" CRUSHED WASHED
ROCK (NO REJECTS)
TRACER WIRE #12 GAUGE COPPER
WIRE. WIRE NUTS NEED TO BE DRY
SPLICE WATER-PROOF GEL PACKS.
WATER AND SEWER SERVICES
(all Utility service areas)
MINIMUM 6" SAND BEDDING AND 6" SAND
SHADING. BACKFILL AS PER DETAIL.
STEEL CASING
DATE:
DETAIL NO.
350-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
A
B
5"
2.5"
4"
2"
RISER
RUNNERS
8 INCH BRICK AND CEMENT MORTAR
SEAL
APS CASING SPACER
PIPE BELL O.D.
STEEL CASING
ASTM A-252
GRADE B
WATERLINE
INSTALLATION TO BE IN
ACCORDANCE WITH
MANUFACTURER'S
SPECIFICATIONS
8 INCH BRICK AND CEMENT MORTAR
SEAL
ADVANCED PRODUCTS & SYSTEMS, INC. (APS)
CASING SPACERS, MODEL SSI
1'
1'
MAX
MAX
12" MIN
0.5'
CASING SPACERS SHOULD BE SPACED
A MAXIMUM OF FOUR FEET FROM EACH
SIDE OF THE PIPE JOINT. MAXIMUM
DISTANCE BETWEEN TWO SPACERS
SHALL BE 10 FEET
SLEEVE DETAIL
A
A
A
B
B
8" WIDE CASING SPACERS
CASCADE WATERWORKS
STYLE CCS PLACED AT 10
FOOT INTERVALS
SECTION
A
PLAN
45°
TYP
22.5°
22.5°
22.5°
22.5°
A*
A* = SPACING PER
MANUFACTURER'S
RECOMMENDATIONS
(4' MAXIMUM)
45°
45°
1 3/8"
MIN
CASING SPACERS
12" MIN BANDS
WITH 2" MIN
RUNNER WIDTH
NOTES:
1.
CASING SPACERS SHALL BE PER
SPECIFICATIONS
2.
END SEAL TO BE ADVANCED PRODUCTS AND
SYSTEMS, INC. MODEL A C PULL-ON TYPE
3.
NO FILL IN ANNULAR SPACE
4.
MINIMUM CASING SIZE SHALL BE 12 INCHES
LARGER OUTSIDE DIAMETER OF CARRIER PIPE
5.
A CASING SPACER MUST BE PLACED WITHIN 2
FEET OF EACH END OF THE CASING PIPE
DUCTILE IRON
CARRIER PIPE
GROUNDING
IF REQUIRED
STEEL CASING PIPE
PIPE TRENCH DETAIL FOR SERVICES
DATE:
DETAIL NO.
NOTES:
1.
TRENCH WILL BE IN ACCORDANCE WITH M.A.G. SECTION 601.
2.
ONE-HALF SACK ABC SLURRY (CLSM) TO BE IN ACCORDANCE
WITH M.A.G. SECTION 728.
3.
DEPTH OF BURY TO BE MIN. 36" IN STREETS.
4.
SAND TO BE IN ACCORDANCE WITH M.A.G. SECTION 701.3.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
BACKFILL
IN NON-SAW CUT AREAS TO BE
NATIVE MATERIAL SCREENED AT 4"
OR LESS AND IN SAW CUT AREAS
TO BE 1/2 SACK ABC SLURRY OR AS
SPECIFIED BY R.O.W. AGENCY.
SEE
SEE NOTE 1
NOTE 3
6"
BEDDING
WATER AND SEWER SERVICES
MINIMUM 6" SAND BEDDING AND 6" SAND
SHADING. BACKFILL AS PER ABOVE.
18"
MAX
350-3
TYPICAL FOR 1" AND 2" PIPE
6" MIN.
POTABLE AIR RELEASE VALVE
DATE:
DETAIL NO.
351-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1.
VANDAL ENCLOSURE TO BE "QEM 1 GUARDSHACK" OR EPCOR APPROVED EQUAL.
2.
COPPER LINE FROM MAIN TO AIR RELEASE VALVE TO BE INSTALLED WITH POSITIVE SLOPE TO PREVENT BLOCKAGE.
3.
PROVIDE PER EPCOR'S WATER SPECIFICATIONS APPROVED MATERIALS LIST.
4.
MAG STD. DET. 140-1 PROTECTION BOLLARDS IN TRAFFIC AREAS.
5.
ALL ABOVE GROUND AIR RELEASE VALVES MUST BE PRE-APPROVED BY EPCOR. UNDERGROUND AIR RELEASE VALVES PER EPCOR'S STD. DET. 351-3.
SEE EPCOR'S STD. DET. 100-3
FOR APPROVED SADDLES.
2" SOFT TYPE "K" COPPER PIPE, EXTEND LINE
BEYOND PAVEMENT WHEN MAIN LINE IS IN
STREET. PROVIDE MIN. OF 6" SAND SHADING.
IN MOHAVE COUNTY COPPER PIPE SHALL BE
IN POLYWRAP SLEEVING.
2" BRASS NIPPLE
AIR RELEASE VALVE
(CRISPIN/VALVEMATIC)
2' MIN
FROM EDGE
OF CURB OR
SIDEWALK
2" SCH 80 PVC 90° ELBOWS
8" MIN
CLR. SPACE
CONC. BASE - 4" THICK. BASE
DIMENSIONS 12" GREATER THAN
INSIDE DIMENSIONS OF VANDAL
ENCLOSURE
VANDAL ENCLOSURE,
CENTER ON CONC. BASE
S.S. SCREEN W/S.S. CLAMP
PAC-JOINT
2" CURB STOP
PAC-JOINT X IPT
SLEEVE BETWEEN
COPPER PIPE AND
CONCRETE SLAB
2" CORP STOP IPT
STREET ELBOW
POTABLE UNDERGROUND AIR RELEASE VALVE
DATE:
DETAIL NO.
351-3
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1) IF MULTIPLE ARV's ARE INSTALLED, EACH BOX MUST BE SEPARATED BY 3' MINIMUM.
2) PROVIDE PER EPCOR'S WATER SPECIFICATIONS APPROVED MATERIALS LIST.
SEE EPCOR'S STD. DET. 100-3
FOR APPROVED SADDLES.
2" SOFT TYPE "K" COPPER
PIPE, EXTEND LINE BEYOND
PAVEMENT WHEN MAIN LINE
IS IN STREET. IN MOHAVE
COUNTY, THE COPPER PIPE
SHALL BE IN POLYWRAP
SLEEVING.
2" AIR RELEASE
VALVE (CRISPIN
OR VALVEMATIC)
2' MIN
FROM EDGE OF
CURB OR SIDEWALK
36" DIA FRP MANHOLE W/ H20 LOAD RATING
& IN ACCORDANCE W/ ASTM D-3753
2" CURB STOP PAC-JOINT X IPT
2" CORP STOP IPT
UNION FITTING
12" ABC BASE, 95% COMPACTION
PER M.A.G. SECT. 601.4.4
3" CLEAN GRAVEL
2" BRASS 90° ELBOW
3" THICK CONCRETE SUPPORT
MIN. CLEARANCE 6" ALL SIDES
2" PVC (SCH. 80)
90° ELBOW
CONCRETE THRUST BLOCK
PER M.A.G. STD. DET. 380
POLYWRAPPED 2" PVC 90°
ELBOW (SCH. 80)
4"
MIN.
2" PVC (SCH. 80)
90° ELBOW
24" FRAME & COVER
PER MAG STD DET 424
2" SCH 80 PVC
12"
MIN.
1/8" STAINLESS STEEL MESH SCREEN
WITH STAINLESS STEEL CLAMPS
ALL ABOVE GROUND PIPE TO BE
PAINTED WITH UV RESISTANT PAINT
(MIN. OF 10 MILS THICKNESS). PAINT
TO MATCH SURROUNDING LANDSCAPE
1 SACK CLSM PER M.A.G.
SECT. 728 12" MIN TO
UNDISTURBED GROUND
12" CONCRETE COLLAR
2" BELOW FINISH GRADE
MANHOLE COVER
TO BE LABELED:
45° OR 90° BEND
AS NEEDED IN PVC SLEEVE
6"
6"
MIN.
FERNCO COUPLING
WITH SS BANDS
PVC
SLEEVE
PAC-JOINT
STREET ELBOW
CASING JACK-AND-BORE DETAIL
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
22 12°
2' MIN
CLR
R/W
R/W
5' MIN
5' MIN
22 12° ALLOWABLE VARIATION
IN LOCATION OF GROUT
HOLES EACH SIDE. A MIN OF 3
GROUT CONNECTIONS SHALL
BE PROVIDED
CASING I.D.
TYPICAL GROUT CONNECTION DETAIL
CASING PIPE GROUTING DETAIL
TYPICAL GROUT CONNECTION
TYPICAL JACK AND BORE SECTION
NOTES:
1. ALL WORK ON JACK AND BORE SHALL CONFORM TO MAG STANDARD SPECIFICATIONS
SECTION 602 UNLESS OTHERWISE NOTED.
2.
CASING SHALL EXTEND A MINIMUM OF FIVE FEET BEYOND THE RIGHT-OF-WAY.
3.
FOR CASING PIPE 36 INCHES OR LARGER, GROUT CONNECTIONS SHALL BE INSTALLED.
GROUT CONNECTIONS SHALL BE PROVIDED AT A MAXIMUM SPACING OF 10 FEET.
4.
CARRIER PIPE SHALL BE PLACED IN ACCORDANCE WITH MAG STANDARD
SPECIFICATIONS. JOINT RESTRAINTS SHALL BE INSTALLED FOR THE SECTION OF
CARRIER PIPE INSIDE THE CASING PIPE.
5.
THE REQUIREMENTS FOR THE TYPE OF SOIL AND LEVEL OF COMPACTION OF THE PIPE
EMBEDMENT MUST BE FOLLOWED UP TO THE ENDS OF THE PIPE CASING.
6.
IF THERE IS WATER IN THE PIPE AT THE TIME OF INSTALLATION, SEEPAGE OF WATER IS
POSSIBLE AND RUNNING GROUNDS CONDITIONS MAY BE ANTICIPATED. WHERE THESE
CONDITIONS EXIST, THE CUTTING HEAD SHALL BE SHIELDED TO AVOID LOSS OF
SUPPORT FOR THE PIPE.
7.
DURING ANY DIRECTIONAL BORING OPERATIONS, PRECAUTIONS SHALL BE TAKEN TO
ENSURE STORM WATER RUNOFF WILL NOT FLOW INTO THE JACKING PITS.
8.
TRENCHLESS CONSTRUCTION DRIVING AND RECEIVING PITS FOR CONSTRUCTIONAL
SAFETY SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS.
9.
CONTRACTOR TO NOTIFY INSPECTOR 48 HOURS IN ADVANCE PRIOR TO BORING.
10. CASING PIPE SHALL BE WELDED STEEL ASTM A-252 GRADE B.
11. CARRIER PIPE SHALL BE DUCTILE IRON WITH MEGA-LUG JOINT RESTRAINTS, SERIES 1100.
12. FOR RAILROAD CROSSINGS, REFER TO RAILROAD OWNER REQUIREMENTS.
STEEL TUNNEL LINER PLATE
2" STD STEEL PIPE HALF
COUPLING
2" CAST IRON PLUG
Water
Sewer
Minimum
Minimum
Minimum
Minimum
Carrier Pipe
Diameter (inches)
Casing Pipe
Diameter (inches)
Casing Pipe Wall
Thickness (inch)
Casing Pipe
Diameter (inches)
Casing Pipe Wall
Thickness (inch)
4
24
3/8
30
3/8
6
24
3/8
30
3/8
8
30
3/8
36
3/8
10
30
3/8
36
3/8
12
36
3/8
42
1/2
14
36
3/8
42
1/2
15
36
3/8
42
1/2
16
36
3/8
42
1/2
18
42
1/2
48
1/2
20
42
1/2
48
1/2
21
42
1/2
48
1/2
24
48
1/2
54
5/8
27
48
1/2
54
5/8
30
60
5/8
66
3/4
36
60
5/8
66
3/4
42
72
3/4
78
3/4
48
80
1
86
1
CARRIER
PIPE
STEEL
CASING PIPE
60° ALLOWABLE VARIATION OF
GROUT CONNECTION
PIPE
℄
EXISTING
GROUND
3/16
352-1
DATE:
DETAIL NO.
CASING SPACER DETAIL
DATE:
DETAIL NO.
352-2
A
B
5"
2.5"
4"
2"
RISER
RUNNERS
MEG-A-LUG JOINT
RESTRAINT O.D.
STEEL CASING
ASTM A-252
GRADE B
CARRIER PIPE
INSTALLATION TO BE IN
ACCORDANCE WITH
MANUFACTURER'S
SPECIFICATIONS
8 INCH BRICK AND CEMENT MORTAR
SEAL
1'
1'
MAX
MAX
B*
ALL CARRIER PIPE INSIDE
CASING PIPE WILL BE MEG-A-LUG
JOINT RESTRAINED, SERIES 1100
CASING PIPE DETAIL
A
A
A
B
B
8" WIDE CASING SPACERS
PLACED AT 6 FOOT
INTERVALS ON 36" AND
SMALLER DIAMETER
CARRIER PIPE
SECTION
A
PLAN
45°
TYP
22.5°
22.5°
22.5°
22.5°
A*
A* = SPACING PER
MANUFACTURER'S
RECOMMENDATIONS
(6' MAXIMUM)
1 3/8"
MIN
NOTES:
1.
NO FILL IN ANNULAR SPACE
2.
A CASING SPACER MUST BE PLACED WITHIN 2
FEET OF EACH END OF THE CASING PIPE
3.
CASING SPACERS SHALL BE APS (SSI)
OR CASCADE TYPE (CCS)
DUCTILE IRON
CARRIER PIPE
GROUNDING
IF REQUIRED
B* = 8" MINIMUM ON 36" AND SMALLER
DIAMETER CARRIER PIPE
12" MINIMUM FOR GREATER THAN
36" DIAMETER CARRIER PIPE.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
22.5°
22.5°
22.5°
22.5°
DRY BARREL FIRE HYDRANT INSTALLATION
DATE:
DETAIL NO.
360-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1.
SEE EPCOR STD. DET. 100-1 FOR FIRE HYDRANT GENERAL NOTES.
2.
ALL JOINT RESTRAINTS PER M.A.G. STD. DET. 303- 1 & 2 AND M.A.G. SECT. 750.3.
3.
VALVE BOX PER M.A.G. STD. DET. 391-1-C.
4.
ALL VALVE OPERATING NUTS SHALL BE A MAX OF 36 INCHES BELOW GROUND
SURFACE.
5.
DRY BARREL HYDRANTS SHALL BE MUELLER "CENTURION", CLOW "MEDALLION",
OR KENNEDY "K81D", WITH NATIONAL STANDARD HOSE THREADS. NO
APPROVED EQUALS WILL BE ACCEPTED.
UNDISTURBED GROUND
FIRE HYDRANT
18" MIN
TEE (FLG.
WATER MAIN
VALVE SUPPORT
VARIES
VALVE BOX
18" MIN.
WATER MAIN
BLOW-OFF
6" GATE VALVE
FLG X MJ
6" CLASS
350 DIP PIPE
CRUSHED ROCK
BACKFILL TO 1'
ABOVE SHOE
3' MIN
4" MAX
VALVE SUPPORT
VARIES
VALVE BOX
6" GATE VALVE
FLG. X MJ
6" CLASS 350
DIP PIPE (TYP)
CRUSHED ROCK
BACKFILL TO 1'
ABOVE SHOE.
UNDISTURBED
GROUND
5' OR GREATER
RESTRAINED
JOINTS
FIRE HYDRANT
OUTLET)
4" MAX
18" MIN
3' MIN
TEE (FLG.
WATER MAIN
OUTLET)
DEEP
STANDARD
6.
PROVIDED A MINIMUM 3 FOOT DIAMETER CLEARANCE AROUND HYDRANT.
WET BARREL FIRE HYDRANT INSTALLATION
DATE:
DETAIL NO.
360-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTES:
1.
SEE EPCOR STD. DET. 100-1 FOR FIRE HYDRANT GENERAL NOTES.
2.
ALL JOINT RESTRAINTS PER M.A.G. STD. DET. 303- 1 & 2 AND M.A.G. SECT. 750.3.
3.
ALL JOINTS SHALL BE RESTRAINED, INCLUDING MAIN AT TEE ENDS.
4.
APPROVED HYDRANTS INCLUDE: CLOW* AND JONES (*CLOW HYDRANTS SHALL BE
MODEL 860 WITH 2 1/2" FEMALE NPT ON TOP OF
HYDRANT TO ALLOW FOR PRESSURE MONITORING).
5.
THE 6 INCH GATE VALVE SHALL BE FLANGED BY MECHANICAL JOINT.
6.
PROVIDE A MINIMUM 3 FOOT DIAMETER CLEARANCE AROUND HYDRANT.
7.
THE HYDRANT SHALL HAVE 2 - 2 12" PORTS, AND 1 - 4 12" PORT.
8.
ALL HYDRANTS SHALL HAVE NATIONAL STANDARD HOSE THREADS.
9.
VALVE BOX PER M.A.G. STD. DET. 391-1-C.
VALVE BLOCKING
VALVE BOX
MUST BE INSTALLED
LEVELED AND SQUARE
TO SHOE
THREE PORT WET
BARREL FIRE HYDRANT
3' MIN
ALL PORTS 20" MIN
24 MAX FROM
FINISHED GRADE
6" BREAKAWAY
FINISHED GRADE
CONC. SHOCK
SLAB 24" x 24" x 6"
CLASS C PER MAG
SPEC SEC 725
BREAK - OFF
CHECK VALVE
BY CLOW
(NO "OR EQUALS")
8" MIN
6"
6 INCH GATE VALVE
FLANGE x M.J.
SECTION
PLAN VIEW
6 INCH DUCTILE IRON
PIPE PRESSURE CLASS 350
WATER
MAIN
6 INCH GATE VALVE
FLANGE x M.J.
1' MIN FROM HYDRANT
NOZZLE TO BACK OF
SIDEWALK
WATER MAIN
BLOW-OFF
VERTICAL RE-ALIGNMENT
OF WATER MAINS
DATE:
DETAIL NO.
370-1
NOTES:
1.
ALL JOINT RESTRAINTS ARE TO BE MEG-A-LUG, SIGMA, EEBA OR STAR, NO
FIELD LOCS OR UNIFLANGE, FOR LENGTHS IN ACCORDANCE w/ M.A.G. STD.
DET. 303-2
2.
PIPE IS TO BE DUCTILE IRON, MINIMUM PRESSURE CLASS 150.
3.
ALL DUCTILE IRON PIPE SHALL BE POLYETHYLENE WRAPPED FOR THE
ENTIRE LENGTH IN ACCORDANCE WITH M.A.G. SECT. 610.6
4.
BEGIN/END RESTRAINED JOINT STATIONING TO BE SHOWN ON THE
APPROVED CONSTRUCTION DRAWINGS. ALL BENDS & FITTINGS SHALL HAVE
STATIONING AND ELEVATION SHOWN ON THE APPROVED CONSTRUCTION
DRAWINGS. THE BOTTOM ELEVATION OF THE CONFLICT AND THE TOP
ELEVATION OF THE DUCTILE IRON PIPE AT THE CENTERLINE OF THE
CONFLICT SHALL BE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS.
SOLID SLEEVE, IF REQUIRED
RESTRAINED
JOINT
FITTINGS
REMAINDER OF TRENCH TO BE BACKFILLED
PER M.A.G. OR LOCAL REQUIREMENTS
BELL & SPIGOT OR
BELL & BELL AS REQUIRED
BELL & BELL
RESTRAINED JOINT
FITTINGS (SEE
NOTE #5 FOR ALL
VERTICAL BENDS)
24" MIN. CLEARANCE. BACKFILLED
PER EPCOR STD. DET. 350-1
DUCTILE IRON PIPE
RESTRAINED JOINT LENGTHS PER M.A.G. STD. DET. 303-2
NEW/EXIST PIPE OR CONFLICT
NEW/EXIST PIPE OR CONFLICT
PIPE BACKFILL PER
EPCOR STD. DET. 350-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
MIN. 10
FEET
MIN. 10
FEET
5.
INSTALL ANCHOR BLOCKS/THRUST BLOCKS AT ALL VERTICAL BENDS PER
M.A.G. STD. DET. 381.
6.
AIR RELEASE VALVES ARE REQUIRED ON THE HIGH POINT OF VERTICAL
REALIGNMENT.
POTABLE CURB STOP (BLOW OFF)
WITH FLUSHING PIPE
DATE:
DETAIL NO.
390-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
BOX TO BE 1 INCH ABOVE GRADE
WATER MAIN
2" CORP STOP
NOTES:
1.
NO SOLDERED JOINTS
2.
CARSONITE MARKER REQUIRED.
3.
SOFT COPPER TO BE USED IN ROADWAY.
STEEL METER BOX
COVER PER M.A.G. STD.
DET. 311 (WITHOUT SLOT)
CONCRETE WATER
METER BOX NO. 4 PER
M.A.G. STD. DET. 320
2" HARD TYPE
"K" COPPER PIPE
SEE NOTE 3.
2" TAPPED CAP
(CAST IRON)
2" PAC JOINT
FITTING
2"x6" MPT x SLIP
6"
PIPE TO BE IN
POLYWRAP (MOHAVE
CO. ONLY)
2" BRASS ELL
DISHED AROUND FITTING
WHEN THRUST BLOCK
POURED AGAINST CAP.
MECHANICAL
RESTRAINED JOINT
TEMPORARY MANHOLE PLUG
DATE:
DETAIL NO.
420
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
SECTION VIEW
TOP VIEW
CHANNEL PER M.A.G.
STD. DET. 420-3
CONCRETE
MANHOLE BASE
PER M.A.G. STD.
DET. 420-2
90° MIN.
DIAMETER PER PLAN
OTHER
PIPE TYPES
CLAY PIPE
2"x4" BOARD
TETHER
CHAIN/CABLE
MECHANICAL PLUG
2"x4" BOARD
PIPE CONNECTION
PER M.A.G. STD.
DET. 420-2
TETHER
CHAIN/CABLE
MECHANICAL PLUG
PIPE CONNECTION
PER M.A.G. STD.
DET. 420-2
PRECAST MANHOLE
BASE PER M.A.G.
STD. DET. 420-2
TYPICAL GRAVITY/SOLIDS
INTERCEPTOR
DATE:
DETAIL NO.
450-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
ALL GRADIENT RISERS, INCLUDING THE MANHOLE FRAME
WILL HAVE THE INTERIOR SEALED WITH NON-SHRINK GROUT
PIPE CONNECTIONS SHALL BE FLEXIBLE CONNECTIONS AND
COMPLY WITH ASTM C923 OR ASTM C1644 FOR PRECAST
INTERCEPTORS; OR SECTION 7 OF C923 OR ASTM C1644 FOR
MATERIALS OTHER THAN PRECAST CONCRETE.
MANHOLE, FRAME, COVER, AND COLLAR MUST BE
WATERTIGHT (GASKETED), ANCHORED, DOES NOT SLIDE,
AND SUPPORTS ANTICIPATED LOADS. REFERENCE M.A.G.
DETAILS 422 AND 424-1.
OUTLET AND BAFFLE PLUMBING: MUST BE OPEN TOPPED, 12”
DISTANCE FROM INTERNAL FLOOR TO END OF PIPE AND
EXTEND 5” ABOVE THE LIQUID LEVEL. INTERNAL PIPING
SHALL BE 4” DIAMETER.
CONSTRUCTION & SPECIFICATIONS TO MOST CURRENT
REVISIONS OF ASTM C1613/ ASTM F2649/IAPMO/ANSI Z1001
2-WAY CLEANOUT ON THE OUTLET LINE. VENT
INTERCEPTOR TO ROOF.
WATER TEST AND REPAIR: INSPECTED BY EPCOR
PRETREATMENT COORDINATOR PER ASTM C1613; IAPMO
Z1001 OR NPCA BEST PRACTICES GUIDELINES.
ACCESS: MINIMUM 2: ON LARGER SIZES EACH PLUMBING
FITTING (INLET, BAFFLE AND OUTLET) SHALL HAVE THE
REQUIRED AND STIPULATED ACCESS OPENING, RISERS
AND COVERS.
SUITABLE SUB-BASE BEDDING WITH GRANULAR MATERIAL
SHALL BE PREPARED TO HANDLE ANTICIPATED LOADS.
CONTACT EPCOR PRETREATMENT AT
PRETREATMENT@EPCOR.COM
FOR INSPECTION/TESTING.
INLET AND OUTLET PLUMBING MUST HAVE TEE'S.
INLET TEE MUST HAVE A CAP
1
2
3
4
5
6
7
8
NOTES:
10
2
3
2
1
TOP VIEW
SIDE SECTION VIEW
FINISHED GRADE
OUTLET
INLET
VENT
7
4
4
4
7
(COVERS & RINGS REMOVED)
6
9
11
12
11
11
12
TYPICAL HYDROMECHANICAL
GREASE INTERCEPTOR (HGI)
DATE:
DETAIL NO.
450-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
PLAN VIEW
LID *
INLET
1/4" GALVANIZED DIAMOND PLATE OR EQUIVALENT
BAFFLES
(2 OR 3 TYPICAL)
NOTES:
1.
PERFORMANCE STANDARDS: MUST BE CERTIFIED
PER (PDI) G-101 / ASME A112.14.3 / CSA B481 OR MOST
CURRENT REVISIONS .
2.
A FLOW CONTROL DEVICE MUST BE INSTALLED TO
MANUFACTURES' SPECIFICATION ON THE INLET PIPE
PRIOR TO ENTERING THE HYDROMECHANICAL
GREASE INTERCEPTOR (HGI). FLOW CONTROL MUST
BE ACCESSIBLE FOR MAINTENANCE.
3.
HGI MAY BE INSTALLED ABOVE GROUND OR BELOW
FLOOR GRADE.
4.
HGI MUST BE EASILY ACCESSIBLE FOR INSPECTION
AND MAINTENANCE.
5.
FILL WITH CLEAN WATER PRIOR TO START UP.
6.
HGI MUST BE INSPECTED PRIOR TO BACKFILL BY
EPCOR PRETREATMENT COORDINATOR.
7.
USE AND SIZE TO BE APPROVED BY EPCOR
PRETREATMENT- INSPECTED BY PRETREATMENT
COORDINATOR.
9.
PROPER AIR CONTROL IS CRITICAL TO THE
OPERATION OF AN HGI. AIR INTAKE ON THE
INLET AND VENTED WASTE ON THE OUTLET.
10.
CONTACT EPCOR PRETREATMENT AT
PRETREATMENT@EPCOR.COM
FOR SHOP DRAWING
SUBMITTAL AND INSPECTION/TESTING.
SECTION
FLOW
CONTROL
DEVICE
AIR INTAKE
VENTED
WASTE
* LID MUST BE CAPABLE OF SUPPORTING ANTICIPATED LOADS
RECLAIMED WATER
ID TAG AND DECAL
DATE:
DETAIL NO.
600-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
VALVE TAG:
3"x8"x316" PURPLE POLYETHYLENE PLASTIC WITH
MINIMUM 12" HIGH BLACK LETTERING IN ACCORDANCE
WITH M.A.G. SECTION 616. TAG TO BE ATTACHED WITH
STAINLESS STEEL WIRE.
IDENTIFICATION DECAL:
5"x16"x316" PURPLE POLYETHYLENE PLASTIC WITH
MINIMUM 1" HIGH BLACK LETTERING IN ACCORDANCE
WITH M.A.G. SECTION 616. DECAL TO BE ATTACHED WITH
AN EPOXY ADHESIVE.
RECLAIMED WATER SERVICE CONNECTION
DATE:
DETAIL NO.
610-1
NOTES:
1.
SEE EPCOR STD. DET. 100-3 FOR APPROVED SADDLES.
2.
METER TO BE SET BY EPCOR UPON PAYMENT OF FEES.
3.
CONCRETE METER BOX PER M.A.G. STD. DET. 320 BOX NO. 2 OR 4 W/ STEEL
LID W/ 2 INCH DIAM. OPENING TO BE SET PERPENDICULAR TO BACK OF WALK
OR CURB. BOX TO MATCH SLOPE OF FINISH GRADE AND SET 1" ABOVE FINISH
GRADE OR BACK OF WALK OR CURB. 3a 2 INCH DIAMETER OPENING.
4.
IDENTIFICATION DECAL PER EPCOR STD. DET. 600-1.
5.
VALVE TAG PER EPCOR STD. DET. 600-1.
6.
RECLAIMED LINE COPPER PIPE TO BE WRAPPED WITH PURPLE
POLYETHYLENE TAPE.
7.
ANGLE BALL METER VALVE TEE HEAD TO BE STAMPED "RECLAIMED WATER".
8.
CAL WESTERN INC TYPE CAL102 PURPLE POLY SLEEVE REQUIRED IN MOHAVE
COUNTY ONLY. TRACER WIRE REQUIRED ON TOP OF SLEEVE.
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
WATER MAIN
EDGE OF
SIDEWALK
PROPERTY OR
EASEMENT LINE
BALL STYLE CORP STOP WITH
COMPRESSION TYPE NUT
PLAN VIEW
SECTION A-A
30" MIN.
COVER ON
SERVICE
ALL SERVICES
SECTION B-B
TO BUILDING
A
A
B
B
30" MIN.
30°
8"
1
1
4
BALL STYLE ANGLE METER VALVE
W/COMPRESSION CONNECTION & LOOP
FOR LOCK
FEMALE I.P. THREAD
METER FLANGE
6
3a
2 INCH HOLE TO BE
CENTERED IN REAR
QUARTER SECTION OF
METER BOX LID
STREET
8
6
8
COPPER PIPE
ROLL TYPE "K"
1 1
2" or 2" WITH
6 INCH SAND
SHADING
4
2
7
5
RECLAIMED WATER
UNDERGROUND AIR RELEASE VALVE
DATE:
DETAIL NO.
620-2
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
NOTE:
IF MULTIPLE ARV's ARE INSTALLED, EACH BOX MUST BE SEPARATED BY 3' MINIMUM.
2' MIN
FROM EDGE OF
CURB OR SIDEWALK
36" DIA FRP MANHOLE W/ H20 LOAD RATING
& IN ACCORDANCE W/ ASTM D-3753
2" CURB STOP PAC-JOINT X IPT
UNION FITTING
12" ABC BASE, 95% COMPACTION
PER M.A.G. SECT. 601.4.4
3" CLEAN GRAVEL
2" BRASS 90° ELBOW
3" THICK CONCRETE SUPPORT
MINIMUM CLEARANCE 6" ALL SIDES
FERNCO COUPLING
W/ STAINLESS STEEL
BANDS
2" GALVANIZED
90° ELBOW
CONCRETE THRUST BLOCK
PER M.A.G. STD. DET. 380
POLYWRAPPED 2" PVC 90°
ELBOW (SCH. 80)
4"
MIN.
2" PVC
90° ELBOW
24" FRAME & COVER
PER MAG STD DET 424
2" SCH 80 PVC
12"
MIN.
1/8" STAINLESS STEEL MESH SCREEN
WITH STAINLESS STEEL CLAMPS
1 SACK CLSM PER M.A.G.
SECT. 728 12" MIN TO
UNDISTURBED GROUND
12" CONCRETE COLLAR
2" BELOW FINISH GRADE
MANHOLE COVER
TO BE LABELED:
45° OR 90° BEND
AS NEEDED
6"
6"
MIN.
2" SOFT TYPE "K" COPPER
PIPE WRAPPED WITH PURPLE
POLYETHYLENE TAPE. EXTEND
LINE BEYOND PAVEMENT
WHEN MAIN LINE IS IN STREET.
IN MOHAVE COUNTY, COPPER
PIPE SHALL BE IN POLYWRAP
SLEEVING.
AIR RELEASE VALVE
(CRISPIN/VALVMATIC)
STENCILED "RECLAIMED
WATER" IN ACCORDANCE
WITH M.A.G. SECT. 616.
ALL ABOVE GROUND PIPE TO BE PAINTED
WITH UV RESISTANT PAINT (10 MIL MIN.
THICKNESS). COLOR TO MATCH
SURROUNDING LANDSCAPE WITH
"RECLAIMED WATER" STENCILED ON PIPE
IN ACCORDANCE WITH M.A.G. SECT. 616.
IDENTIFICATION
DECAL PER EPCOR
STD. DET. 600-1.
VALVE TAG PER EPCOR STD. DET. 600-1
PVC
SLEEVE
SEE EPCOR'S STD. DET. 100-3
FOR APPROVED SADDLES.
2" CORP STOP IPT
PAC-JOINT
STREET ELBOW
RECLAIMED WATER CURB STOP (BLOW OFF)
WITH FLUSHING PIPE
DATE:
DETAIL NO.
630-1
2355 W Pinnacle Peak Rd, Ste 300
Phoenix, AZ 85027
P 623.445.2400 F 623.587.1044
July '20
BOX TO BE 1 INCH ABOVE GRADE
RECLAIMED WATER MAIN
2" CORP STOP
2" BRASS ELL
NOTES:
1.
NO SOLDERED JOINTS
2.
CARSONITE MARKER REQUIRED.
3.
SOFT COPPER TO BE USED IN ROADWAY.
STEEL METER BOX
COVER PER M.A.G. STD.
DET. 311 (WITHOUT SLOT)
CONCRETE WATER
METER BOX NO. 4 PER
M.A.G. STD. DET. 320
2" HARD TYPE
"K" COPPER PIPE
SEE NOTE 3.
2" TAPPED CAP
(CAST IRON)
2" PAC JOINT
FITTING
2"x6" MPT x SLIP
6"
PIPE TO BE IN POLYWRAP
(MOHAVE CO. ONLY)
DISHED AROUND FITTING
WHEN THRUST BLOCK
POURED AGAINST CAP.
IDENTIFICATION DECAL PER
EPCOR STD. DET. 600-1.
VALVE TAG PER EPCOR
STD. DET. 600-1.
MECHANICAL
RESTRAINED JOINT
PEORIA AVE
CACTUS RD
THUNDERBIRD RD
GREENWAY RD
LITCHFIELD RD
EL MIRAGE RD
60
GRAND AVENUE
OLIVE AVE
NORTHERN AVE
NORTHERN
DYSART RD
PKWY
143RD AVE
COPPERWING SEWER INFRASTRUCTURE
DATE
DSGN BY
DRWN BY
PLAN REVIEWED BY
SHEET
THIS PLAN SET IS THE SOLE PROPERTY OF THE ENGINEER. NO ALTERATIONS TO THESE PLANS ARE ALLOWED WITHOUT WRITTEN AUTHORIZATION FROM EPCOR
DATE
FOR EPCOR USE ONLY
EPCOR PROJECT #1009147
DATE
PLAN APPROVED BY
REV
REV DATE
DESCRIPTION
N
N
UTILITY COORDINATION
BENCHMARK:
SHEET INDEX:
OWNER:
ENGINEER:
VICINITY MAP
LOCATION MAP
CADASTRAL LOCATION:
T3N, R1W, S26, 27, 28, 33, 34 & 35
COPPERWING SEWER INFRASTRUCTURE
WATER/SEWER
"AS-BUILT"
CERTIFICATION:
EPCOR PROJECT #1009147
G1
COVER SHEET
G2
LEGEND & ABBREVIATIONS
G3-G6
GENERAL NOTES
G7
KEY MAP & PROFILE
G8
SURVEY CONTROL SHEET
SS1-SS24 OLIVE SEWER PLAN & PROFILE
SS25-SS32 DYSART SEWER PLAN & PROFILE
D1-D3
SEWER DETAILS
LS1
LIFT STATION SITE PLAN
LS2
LIFT STATION GRADING & DRAINAGE PLAN
LS3
LIFT STATION MECHANICAL PIPING
LS4-LS5
LIFT STATION MECHANICAL PIPING SECTION
LS6
LIFT STATION WET WELL
LS7-LS8
SPECIAL DETAILS
S1.0-S1.2
STRUCTURAL NOTES
S1.3-S1.5
STRUCTURAL DETAILS
S2.0
LIFT STATION FOUNDATION PLAN
S3.0
LIFT STATION STRUCTURAL DETAILS
E1
ELECTRICAL LEGEND, NOTES & ABBREVIATIONS
E2
ELECTRICAL SPECIFICATIONS - I
E3
ELECTRICAL SPECIFICATIONS - II
E4
ELECTRICAL SPECIFICATIONS - III
E5
ELECTRICAL OVERALL SITE PLAN
E6
SINGLE LINE DIAGRAM
E7
CONDUIT BLOCK DIAGRAM
E8
CONTROL SCHEMATICS - I
E9
CONTROL SCHEMATICS - II
E10
ELECTRICAL ELEVATIONS
E11
ELECTRICAL DETAILS - I
E12
ELECTRICAL DETAILS - II
I1
P&ID LEGEND
I2
P&ID - I
I3
P&ID - II
L101
LANDSCAPE NOTES AND LEGEND
L102
IRRIGATION NOTES AND LEGEND
L103
IRRIGATION NOTES AND LEGEND
L201
LANDSCAPE AND IRRIGATION PLANS
L401
LANDSCAPE AND IRRIGATION DETAILS
L402
LANDSCAPE AND IRRIGATION DETAILS
L403
LANDSCAPE AND IRRIGATION DETAILS
APPROVALS:
JUL 2021
MJL
CGS
COVER SHEET
G1
1 OF 81
PROJECT
LOCATION
PROJECT
LOCATION
SEWER
1
2
3-6
7
8
9-32
33-40
41-43
LIFT STATION
3
09/2021
MCDOT COMMENTS
1
08/2021
BID ADDENDUM
4
09/2021
LANDSCAPE PLANS
44
45
46
47-48
49
50-51
52-54
55-57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
5
10/2021
EL MIRAGE COMMENTS
10-05-2021
P
COPPERWING SEWER INFRASTRUCTURE
DATE
DSGN BY
DRWN BY
PLAN REVIEWED BY
SHEET
THIS PLAN SET IS THE SOLE PROPERTY OF THE ENGINEER. NO ALTERATIONS TO THESE PLANS ARE ALLOWED WITHOUT WRITTEN AUTHORIZATION FROM EPCOR
DATE
FOR EPCOR USE ONLY
EPCOR PROJECT #1009147
DATE
PLAN APPROVED BY
REV
REV DATE
DESCRIPTION
1
08/2021
BID ADDENDUM
2
08/2021
BID ADDENDUM 2
DYSART RD
N
JUL 2021
MJL
CGS
SEWER PLAN & PROFILE
SS30
38 OF 72
REFERENCE NOTES
REFERENCE NOTES
CONSTRUCTION NOTES
REMOVAL NOTES
81
P
SS31
COPPERWING SEWER INFRASTRUCTURE
DATE
DSGN BY
DRWN BY
PLAN REVIEWED BY
SHEET
THIS PLAN SET IS THE SOLE PROPERTY OF THE ENGINEER. NO ALTERATIONS TO THESE PLANS ARE ALLOWED WITHOUT WRITTEN AUTHORIZATION FROM EPCOR
DATE
FOR EPCOR USE ONLY
EPCOR PROJECT #1009147
DATE
PLAN APPROVED BY
REV
REV DATE
DESCRIPTION
1
08/2021
BID ADDENDUM
2
08/2021
BID ADDENDUM 2
5
10/2021
EL MIRAGE COMMENTS
DYSART RD
N
JUL 2021
MJL
CGS
SEWER PLAN & PROFILE
39 OF 81
REFERENCE NOTES
REFERENCE NOTES
CONSTRUCTION NOTES
REMOVAL NOTES
COPPERWING SEWER INFRASTRUCTURE
DATE
DSGN BY
DRWN BY
PLAN REVIEWED BY
SHEET
THIS PLAN SET IS THE SOLE PROPERTY OF THE ENGINEER. NO ALTERATIONS TO THESE PLANS ARE ALLOWED WITHOUT WRITTEN AUTHORIZATION FROM EPCOR
DATE
FOR EPCOR USE ONLY
EPCOR PROJECT #1009147
DATE
PLAN APPROVED BY
REV
REV DATE
DESCRIPTION
1
08/2021
BID ADDENDUM
2
08/2021
BID ADDENDUM 2
5
10/2021
EL MIRAGE COMMENTS
DYSART RD
N
JUL 2021
MJL
CGS
SEWER PLAN & PROFILE
SS32
40 OF 81
REFERENCE NOTES
REFERENCE NOTES
CONSTRUCTION NOTES
REMOVAL NOTES