Schedule B - engine equipment
Extracted text (via pymupdf)
2098 characters
Schedule B: Upgrades and Equipment Item Mod / Equipment Description Price 1 RV AC Install Coleman Mach III AC on cab roof and wire to shoreline outlet 7,542.00 $ 2 Headsets David Clark 4-position with pump panel outlet 9,834.00 $ 3 Power Strips x 2 Surge protected in compartments powered by shoreline - compt. TBD 1,088.00 $ 4 Drug Box OTE Model 19502E 12v/120v locking drug refrigerator - compt. TBD 3,694.00 $ 5 RR1 Tray Floor-mounted rollout tray w/ Turtle Tile 1,318.00 $ 6 Turtle Tile All compartment shelves and floors to have Turtle Tile 1,019.00 $ 7 Light Tower Command Light KL 409D-H4 installed on cab roof with wind deflector 27,205.00 $ 8 Replace SCBA Seats Replace five (5) SCBA seatbacks with standard (non-SCBA) Bostrom Sierra 500 backs 4,317.00 $ 9 SCBA Brackets Add four (4) SCBA brackets in compartment - TBD 463.00 $ 10 Suction Hose Delete two (2) lengths hard suction and trays 184.00 $ 11 Bell Provide and install chrome brass bell on front bumper 3,982.00 $ 12 Back Board Storage Provide and install storage sleeve in the hose bed area 1,063.00 $ 13 Cupholders Provide and install cupholders and USB ports for forward-facing seats in rear of cab 1,712.00 $ 14 TPM Provide and install Doran 360HD tire pressure monitoring system 1,802.00 $ 15 Lighting Upgrade Add three (3) LED warning lights on each side, one (1) LED brow scene light and one (1) LED mini-brow scene lighting over each rear cab door 15,956.00 $ 16 Final Inspection Final inspection trip for three (3) department representatives. All expenses shall be for the account of RedSky Emergency Vehicles and include air fare, hotel, all meals, and ground transportation. Department representatives shall be accompanied by RedSky representative. RedSky will provide two week’s notice of final inspection dates and make all travel arrangements. 6,000.00 $ TOTAL 87,179.00 $