Extracted text (via pymupdf)
2974 characters
El Mirage Street Light Pole 4th Ave & Well St 4th Ave & Well St Submitted to: City of El Mirage Project: Bid Number: 22143 Bid Date: 1/30/2023 El Mirage, AZ 12145 N. W. Grand Ave El Mirage, AZ 85335 USA Addendum #: 0 Bryce Christo Phone Number: (623) 876-2974 Cell Number: (623) 980-9980 Email: bchristo@elmirageaz.gov Attention: Total Price Unit Price Unit Item Description Item # Estimated Quantity ****************************************************************************************************** $7,399.65 $7,399.65 1.00 1 EACH Install Direct Bury 30'6" APS Pole With 5,100 Lumen LED $1,877.11 $1,877.11 1.00 2 EACH Install APS Pull Box $7,176.65 $110.41 65.00 3 LF Bore 2.5 In SL Conduit To Single Phase Transformer $6,063.25 $242.53 25.00 4 LF Tie Into Pull Box & Transformer $6,646.54 $6,646.54 1.00 4 LS Asphalt Restoration $2,101.96 $2,101.96 1.00 5 LS GC-Traffic Control $31,265.16 Total Bid Price: • Terms: Net 30 Days ****************************************************************************************************** • This proposal is based on the following information: Plans: El Mirage Street Light WA685523 Plans used were: El Mirage Street Light WA685523 Prepared by: APS Addenda Received: 0 ****************************************************************************************************** • · Exclusions: Sales Tax, Permits, Bonding Fees, Const. Survey/Staking, Compaction Testing & Inspection Fees. Engineering, Locate, Hard Dig or Rock Excavation. Hard Dig Defined As Any Material A 416 Cannot Dig Effectively At A Production Rate OF 30 LF Per Hour At An Average Depth of 5ft. Century Link TMB/TTC- Provided By Others. Existing Utilities. Dust Control Permit, SWPP by Other. Prices are good for 30 days. Quantities are approximate and final payment is to be based on actual field measurement. Irrigation Permit. ****************************************************************************************************** • Inclusions: We propose to furnish labor, equipment, and materials - complete in accordance with the plans and specifications supplied to us for the above mentioned project. All material is guaranteed to be as specified. All work will be completed in a workmanlike manner according to the standard practices. Any alternations or deviations from the above specifications involving extra costs, will be executed only upon written orders and will become an extra charge over the above proposed estimate. ****************************************************************************************************** Page 1 of 2 1/30/2023 4:03:16 PM B&F Contracting Inc. bfcontracting.com ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: B&F Contracting, Inc. (Proposal) Authorized Signature: Estimator: Cole Anderson 602-292-6516 canderson@bfcontracting.com Page 2 of 2 1/30/2023 4:03:16 PM B&F Contracting Inc. bfcontracting.com