CTS Corporate Office: 1971 E ST., Ste 111, Tempe, AZ 85288 
 
 
 
 
 
 
 
 
 
 
 
 
 
                             
 
 
 
                                                      
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name 
City of El Mirage – City Hall NVR Replacement 
 
 
Presented To 
 
 
 
 Proposal/and Scope of Work 
State Contract # CTR056380 
 
Due Date: 
3/17/2023  
 
Respectfully Submitted By: 
Curtis Johnson 
O: (480) 377 - 0225 Ext:238 
M: (602) 397-0688 
cjohnson@ctscabling.com 
 
 
Corporate Technology Solutions, LLC 
1971 E 5th St., Ste 111 
Tempe, AZ 85281 
O: 480-377-0225 
www.ctscabling.com 
 
Structured Cabling  Fiber Optic  Access Control  Intrusion Detection  Video Surveillance  Audio/Video  Intercom/Paging 
PHOENIX                  TUCSON

Quote: 23290 
 
2 | P a g e  
 
SCOPE OF WORK  
 
CTS will provide install additional video surveillance equipment at the El Mirage City Hall. 
 
NVR:   
The existing TruVision NVR has failed, and the unit is obsolete. CTS will provide and install 
a new BCD Video storage server preconfigured with RAID 5 with Milestone Xprotect 
Professional + video management system. Retention calculations are estimated and based 
on the following. Proposal is based on a total of 40 cameras needing to be recorded and a 
total of 40 camera licenses have been included. Calculations for storage have been based 
on a total of 60 cameras.  
 
 
 
 
Option 1: 
• 
60 Cameras at a 2MP resolution, 15 frames per second, H.264 Codec, recording on 
motion %, and estimated 30 days retention. This would require approximately 154 
Mbit/s and require 50.164 TB of storage.  
 
 
 
Option 2: 
• 
60 Cameras at a 4MP resolution, 15 frames per second, H.264 Codec, recording on 
motion %, and estimated 30 days retention. This would require approximately 280 
Mbit/s and require 90.77 TB of storage.  
 
***Proposal is based on utilizing existing cameras and that all cameras are ONVIF 
compatible. This would allow for recording the ONVIF profile S video stream to the 
NVR.  
 
CTS has included 2 hours of customer training on the video management system and labor 
to install up to 3 client licenses on customer PC. 
  
Cameras will be programmed based on the above-mentioned parameters but may be 
adjusted for best usability.  
 
Assumptions: 
• 
All work will be performed during normal business hours unless otherwise required.  
• 
Proposal assumes all existing camera are ONVIF compatible.

Quote: 23290 
 
3 | P a g e  
 
 
 
 
PROVISIONS 
 
All OSP (outside plant cabling) are estimates only. CTS will verify the actual lengths prior to installation with true 
tape and provide a credit or cost impact document before the installation.  
 
Any additional work not specified in this scope of work or any additional work request from customer will result in 
a CTS change order. 
 
This proposal pricing is good for a period of 30 days unless otherwise noted.  
 
Where material prices fluctuate, CTS reserves the right to adjust pricing if there are changes in material pricing.  
Written documentation from our suppliers to verify this condition can be provided.  
 
Customer is responsible for any freight charges if the customer requests an expedited time frame. 
 
CTS will require a project schedule showing all times the facility will be available.  Including but not limited to, facility 
events, closures or limitations that may affect continuous work.  Without a schedule, there is no way for CTS to 
commit to an end date for completion.   Delays in the schedule will delay the completion date.  Any requested 
overtime to improve the completion date will constitute a change order.  
 
Any schedule changes or project delays due to work areas not being available during the scheduled time,  and or any 
other interruptions  outside of CTS control, including but not limited to delay by other trades or customer could 
result in additional cost to customer.  Written notification is required 5 days prior to any schedule changes. 
 
This SOW assumes normal day shift of 8 continuous working hours between 5am and 5 pm, unless otherwise 
specified and agreed to in writing.  Any work outside of this time frame may be subject to additional shift premiums. 
 
This SOW includes one mobilization only.  Changes that required additional starts and stops may be subject to 
additional charges via a change order.  This would include, but not limited to, storage, equipment rentals, travel 
expenses, and other expenses incurred. 
 
This quotation assumes that all existing and new conduits are properly sized with pull string installed and that any 
new conduits, pathways, wire mold, power poles, core holes, sleeves, and floor boxes, not mentioned in the above 
scope of work, will be provided and installed by other vendors and will be ready prior to cable installation. 
 
Phone Systems, Network Devices, Active Equipment are not included, unless otherwise stated in the scope of work.  
Any other Control Components are NOT included in this proposal as directed, unless otherwise specified.  It is the 
assumption that the owner will provide its own system to perform the functions as needed. 
 
Patch Cords are not included unless otherwise stated in the scope of work.  
 
All Contracts and/or Purchase Orders will be subject to monthly progress billings. 
 
Retention dollars are to be paid within 60 days after the completion of our original scope of work, regardless of the 
total job completion. 
 
Any project valued at $2500 or above is subject to a pre-lien. 
 
Effective Jan 1, 2015, customer is responsible for supplying CTS with Arizona Transaction Privilege Tax Exemption 
Form (TPT 5000) or Prime Contractor’s Certificate (TPT 5005) as applicable. 
 
Credit card payments shall be assessed a 3.5% convenience fee.

Quote: 23290 
 
4 | P a g e  
 
 
 
COSTS 
 
 
 
 
 
 
 
 
 
Option 1
Materials 
23,122.00
Labor
2,660.00
Misc 
Sub Total 
25,782.00
Tax Rate
9.300%
0.000%
Material Tax 2150.35
Labor Tax
0.00
Total 
27,932.35
PRODUCT 
PART NUMBER 
DESCRIPTION 
UOM QTY
BCD Video
BCD208-PVS-310-80T-16
(1) Xeon Silver 4310 - (2) 8GB DDR4 RAM - (2) 240GB
EA
1
Milestone
XPPPLUSBL
XProtect Professional+ Base License (BL)
EA
1
Milestone
XPPPLUSDL
XProtect Professional + Device License (DL)
EA
40
Milestone
YXPPPLUSDL
1 Year Care Plus for XProtect Professional+ DL
EA
40
CTS 
CTS 
Labor to install clients on customer PC
EA
3
Labor Only
CTS 
Labor to program and test
EA
1
Labor Only
CTS 
Project Management Hours
EA
1
Labor Only
CTS 
Owner Training
EA
1
Option 2
Materials 
25,073.00
Labor
2,582.00
Misc 
Sub Total 
27,655.00
Tax Rate
9.300%
Material Tax
2331.79
Labor Tax
0.00
Total 
29,986.79
PRODUCT 
PART NUMBER 
DESCRIPTION 
UOM QTY
BCD Video
BCD208-PVS-310-120T-20 (1) Xeon Silver 4310 - (2) 8GB DDR4 RAM - (2) 240GB
EA
1
Milestone
XPPPLUSBL
XProtect Professional+ Base License (BL)
EA
1
Milestone
XPPPLUSDL
XProtect Professional + Device License (DL)
EA
40
Milestone
YXPPPLUSDL
1 Year Care Plus for XProtect Professional+ DL
EA
40
CTS 
CTS 
Labor to install clients on customer PC
EA
3
Labor Only
CTS 
Labor to program and test
EA
1
Labor Only
CTS 
Project Management Hours
EA
1
Labor Only
CTS 
Owner Training
EA
1

Quote: 23290 
 
5 | P a g e  
 
Payment Terms: Net 30 (Monthly Project Billing Applies) 
Material: FOB – Project Site 
 
 
Print Name:  
___________________________________________________________ 
 
Accepted by: 
 __________________________________________________________ 
 
Title: 
 
 __________________________________________________________ 
 
Date: 
 
 ____________________________ 
 
 
P.O. #   
____________________________ 
 
Billing 
Address: 
__________________________________________________________ 
 
 
 
__________________________________________________________