FY23 Pavement Maintenance - P1 Paving PW19-JOCO1
Asphalt C t
Project Location Saw Cut & Repair | “SPN t Concrete Mill & Patch
Installation
129th Ave & St Moritz Intersection $2,378.20
129th Ave & Willow Intersection $4,324.00
El Mirage Rd & Cinnabar (PD East Access) $8,357.50
Palm Ln, Primrose St, and Alto St Sections $17,366.00
Contingiency | | $2,574.30]
| TOTAL | $35,000.00 |
Account to be charged: 131-5-3581-657
P1 Paving and Construction LLC
8550 N 9157 AVE STE. 65 PEORIA, ARIZONA 85345
OFFICE: (623) 594-7174 FAX: (623) 594-7159
|
Paving and
PROPOSAL
Construction
CUSTOMER
ATTN: CASON CHAMBERS - COEM
SUBJECT: Pothole / cracking / alligator repair
ADDRESS: 129* Ave & Saint Moritz intersection
P1 Paving and Construction submits the following proposal for your consideration and acceptance.
Saw cut, remove existing AC - furnish place and compact 4” depth AC - 182 SF - $2,200
8.1% Tax- $178.20
Total - $2,378.20
Proposal includes/excludes the following:
Saw Cutting yes xX no ___ Utility adjustments yes _ no __x_ Prevailing Wage yes no
Survey & Engineering yes — no _x_ Slurry/ Micro Seal yes _ no _x_ Sales Tax yes no
Sub-Grade Prep yes no _x_ Rubberized Asphalt yes _ no _x_ Permits & Testing yes no
Concrete haul off yes no x Barricades yes no x Nights/Weekends yes no
Haul off Asphalt yes xX no Hot Rubber Asphalt Joint yes x no Plant opening fees yes no
Removals __ ___ Sealer _
PROVISIONS:
1. All work is to be measured upon completion and will be billed at the unit cost for the measured quantities with minimum invoice
for the quantity of work stated in the description of work above.
2. Work will not be scheduled until an acceptable contract containing these unit prices, inclusions,
exclusions and provisions have been signed by both parties.
Matt Tormey
P1 Paving and Construction LLC
DATE: 04/11/2023
PRICE GOOD THRU: 06/30/2023 ACCEPTED BY:
| =|*P PP
P1 Paving and Construction LLC
8550 N 915" AVE STE. 65 PEORIA, ARIZONA 85345
OFFICE: (623) 594-7174 FAX: (623) 594-7159
c
2
5
is)
5
Lu
od
a
c
fe)
|
PROPOSAL
ne)
a
S
15
ka
i)
3
a
ie
CUSTOMER
ATTN: CASON CHAMBERS - COEM
SUBJECT: Major pothole repair
ADDRESS: 129* Ave & Willow intersection
P1 Paving and Construction submits the following proposal for your consideration and acceptance.
Saw cut, remove existing AC - furnish place and compact 4” depth AC - 520 SF - $4,000
8.1% Tax- $324
Total - $4,324
Proposal includes/excludes the following:
Saw Cutting yes xX no __ Utility adjustments yes no _x_ Prevailing Wage yes no
Survey & Engineering yes no _x_ Slurry/ Micro Seal yes _ no _x_ Sales Tax yes no
Sub-Grade Prep yes ___ no _x_ Rubberized Asphalt yes no __x_ Permits & Testing yes no
Concrete haul off yes no x Barricades yes no x Nights/Weekends yes no
Haul off Asphalt yes xX no Hot Rubber Asphalt Joint yes x no Plant opening fees yes no
Removals __ ___ Sealer __
PROVISIONS:
1. All work is to be measured upon completion and will be billed at the unit cost for the measured quantities with minimum invoice
for the quantity of work stated in the description of work above.
2. Work will not be scheduled until an acceptable contract containing these unit prices, inclusions,
exclusions and provisions have been signed by both parties.
Matt Tormey
P1 Paving and Construction LLC
DATE: 04/11/2023
PRICE GOOD THRU: 06/30/2023 ACCEPTED BY:
| «|b
P1 Paving and Construction LLC
8550 N 9157 AVE STE. 65 PEORIA, ARIZONA 85345
OFFICE: (623) 594-7174 FAX: (623) 594-7159
c
.2
a
3)
5
i.
oJ
n
\5
fo)
O
a: —_ PROPOSAL
Paving and
CUSTOMER
ATTN: CASON CHAMBERS - COEM
SUBJECT: PD ROADWAY
ADDRESS: EL Mirage Rd & Cinnabar
P1 Paving and Construction submits the following proposal for your consideration and acceptance.
Furnish, place and compact 3” depth AC millings — 6300 SF - $7,750
8.1% Tax- $607.50
Total - $8,357.50
Proposal includes/excludes the following:
Saw Cutting yes no __x_ Utility adjustments yes no _x_ Prevailing Wage yes no
Survey & Engineering yes _ no _x_ Slurry/ Micro Seal yes no _x_ Sales Tax yes no
Sub-Grade Prep yes _ no _x_ Rubberized Asphalt yes no _x___ Permits & Testing yes no
Concrete haul off yes no x _ Barricades yes no x _ Nights/Weekends yes no
Haul off Asphalt yes “no x Hot Rubber Asphalt Joint yes “no x Plant opening fees yes no
Removals _ ___ Sealer __
PROVISIONS:
1. All work is to be measured upon completion and will be billed at the unit cost for the measured quantities with minimum invoice
for the quantity of work stated in the description of work above.
2. Work will not be scheduled until an acceptable contract containing these unit prices, inclusions,
exclusions and provisions have been signed by both parties.
Matt Tormey
P1 Paving and Construction LLC
DATE: 04/11/2023
PRICE GOOD THRU: 06/30/2023 ACCEPTED BY:
alana
P1 Paving and Construction LLC
8550 N 915" AVE STE. 65 PEORIA, ARIZONA 85345
OFFICE: (623) 594-7174 FAX: (623) 594-7159
PROPOSAL
c
2
aa)
5)
3
a
4+
wn
c
fo)
UO
| Paving and
CUSTOMER
ATTN: CASON CHAMBERS - COEM
SUBJECT: Large crack repair
ADDRESS: Palm Ln between Dreyfus & Dahlia, Primrose St between Dahlia & Rosewood and
Alto St between Soledad & Dreyfus
P1 Paving and Construction submits the following proposal for your consideration and acceptance.
Mill 3” depth with 2’ skidsteer mill head, clean prep and patch back 3” depth AC —
estimated 1890 SF @ $8.50 / SF - $16,065
Tax - $1,301
Total - $17,366
All cuts to be kept perpendicular to the existing roadway
Proposal includes/excludes the following:
Saw Cutting yes _ no _x_ Utility adjustments yes no __x__ Prevailing Wage yes no
Survey & Engineering yes _ no _x_ Slurry/ Micro Seal yes no _x_ Sales Tax yes no
Sub-Grade Prep yes — no _x_ Rubberized Asphalt yes _ no _x_ Permits & Testing yes no
Concrete haul off yes no xX Barricades yes no x _ Nights/Weekends yes no
Haul off Asphalt yes x no Hot Rubber Asphalt Joint yes x no Plant opening fees yes no
Removals a ___ Sealer _
PROVISIONS:
1. All work is to be measured upon completion and will be billed at the unit cost for the measured quantities with minimum invoice
for the quantity of work stated in the description of work above.
2. Work will not be scheduled until an acceptable contract containing these unit prices, inclusions,
exclusions and provisions have been signed by both parties.
Matt Tormey
P1 Paving and Construction LLC
DATE: 04/11/2023
PRICE GOOD THRU: 06/30/2023 ACCEPTED BY:
| =|*P PP
Pavement Management Program
62052
$4,500,000.00
Highways and Streets
Capital Improvement
Department:
Type:
Project Number:
Total Capital Cost:
Request description:
The pavement management program is a 30-year plan to preserve and extend the life of city streets through a variety of maintenance practices. These include seal
coating, mill and overlay, and reconstruction projects.
The 2021 National Community Survey found that 67% of El Mirage residents rank the quality of city pavement highly, 76% consider it easy to travel by car in the city, and
67% feel it is important to focus on the overall quality of the transportation system in the next 2 years.
Modified - Added $900,000 in costs for FY27.
Capital Costs FY2023 FY2024 FY2025 FY2026 FY2027 Total
Planning $0.00
Design $0.00
Engineering $0.00
Land/Right-of-way $0.00
Construction/Maintenance $900,000.00 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $4,500,000.00
Other $0.00
Total $900,000.00 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $4,500,000.00
Funding Source FY2023 FY2024 FY2025 FY2026 FY2027 Total
111 - General Fund $0.00
114 - Court $0.00
121 - Court Enhancement $0.00
128 - Towing $0.00
131 - HURF $900,000.00 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $4,500,000.00
141 - LTAF $0.00
148 - CDBG $0.00
149 - Special Projects $0.00
156 - Capital Streets $0.00
511 - Water $0.00
516 - Ranchettes $0.00
541 - Sewer $0.00
591 - Sanitation $0.00
Total $900,000.00 $900,000.00 $900,000.00 $900,000.00 $900,000.00 $4,500,000.00
Account Codes (Capital Costs):
131-5-3581-657
$4,500,000.00
$4,500,000.00
Additional Information
Type of Project Resurface Current Road
Strategic Priority Superior Infrastructure
Division Operations
Grant Funding No
Bond Eligible No
Project Status Modified
62
AGREEMENT
THIS AGREEMENT (s made and entered into this Sw aay of 0 e : -
e & {hereinafter referred to as "Contractor’) and the Cily of EI Mirage, Arizona, a
muntelpal corporation, (hereinafter refarred to as *City’).
Whereas, City Issued Request for Proposal (herelnafter "RFP) No. PW18 - JOG01 seeking proposals from
contractors to provide Job Order Contracting for asphalt, concrete, and grading projects on property owned aniifor
controlled by City; and,
1
Whereas, Contractor submitted a response to City RFP No, PW19 - JOCO! offering ta provide Job Order
Contracting for asphalt, conorate, and grading projects from identified property owned and/or controlled by oily
(hereinafter “Proposal’); and, :
Whereas, City has determined that Contractor's Proposal Is In conformance with the requirements of RRP
No, PWi9- JOCO1 and best meets the needs of the City. . :
NOW, THEREFORE, Contractor and City hereby agree as follows: ;
1. Contractor agrees, al its own cost and expense, to do all the work and furnish all the equipment, parsennel
materials necessary to provide, in a gaod and substantial manner and to tha satisfaction of the City, the following
work, Job Order Contracting for asphalt, concrete, and grading projects, In accordance with the City of El
RFP No. PWi9 ~ JOC04 and Contractors Proposal In response to RFP No. PW19 - JOCO1, which are
Specially referred to and by euch reference made @ part hereof in thelr entirety, RFP No. PW19 - JOCO1 stall
consist of the following documents, which are incorporated herein by this rafarence: Notice of Request
Proposals; Inatructions and Proposal Conditions; Scope of Work and Projact Specifications; General Terms ahd
Conditions; Proposal; Bid Tab; Appendb:s; and Exhibit’s, ;
2. Cily agrees to pay Contractor, and Contractor agreas to accept, a8 full compensation for fumishing all equipment,
personnel and materials and for doing all the work contemplated and embraced In this Agreement, the amounts gat
farth in Contractos‘s Proposal in response to RFP No. PW19 - JOCO1, i
3. The City hereby promises and agrees with the Contractor to retain, and does heraby retain, Contractor to provide
the equipment, and personnel and materials and to do the work acaording to the terms and conditions herein
contained and raferred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner
and upon the conditions as provided; and the said parties for themselves, thelr helrs, executors, administrators,
successors and assigns, do hereby agree to the full performance of the covenants herein contained, i
4. It ts further expressly agread by and between the pariles that should there be any conflict between the or
this Agreemant, RFP No, PW18 - JOC0? or the Proposal, then this Agreement and the provisions terme of RFP No,
PW19 - JOCO1 shail control and nothing herein shall ba considered as an acceptance of the terms of the aal
Proposal canfilcting herewith or RFP No. PW18 - JOC01, unless expressly so stated herein, i
5. Timais of the essence to the terms of this contract |
6, FEDERAL AND STATE EMPLOYMENT IMMIGRATION LAWS, To the extent applicable under ARS, § 41
4401, Contractor warrante its and its subcontractors compliance with all federal Immigration laws and regulations tha
telate to thelr compliance with the E-verify requirements under ARS, § 23-214(A). Contraotors or It
subcontractors’ breach of the above-mentioned warranty ahall be deemed a material breach of the Agreement ani
may result in the termination of the Agreement by the City of El Mirage. The City of 1 Mirage retains the legal right
randomly Inapect tha papers and records of Contractor and Ite subcontractors ta enaure that the Contractor and it
subcontractors are complying with the above-mentioned warranty,
The Contractor warrants to keep the papers and records open for random 'nspection during normal business,
hours by the Cy of Et Mlrege. The Contractor shall cooperate with the City of El Mlrage's random Inspections,
Including granting the City entry rights to Contractor's property to perform the random Inspections and walving Its!
ight to keep auch papers and records confidential. The fallura of Contractor to comply with this warranty]
regarding the kasping of papars and records and cooperating with the City's random Inspections shall conetituta|
@ material breach of the Agreement and the City shall have the right to Immediately terminate the Agreament. ,
Page 31 of 32
PWI9- JOCO!
The Gontrastor further agrees to Include the following language in alt aubcontracts entered into by Contractor
with any person or entily to perform work on the Aereement and (6 terminate the agreement with any
subcontractor who violates any of the warranties set forth in sald language. below. . :
Ta the extant applicable under A.R.8. § 41-4401, Subcontractor warrants to Gontyactor and the City of E)
Mirage Subcontraotar's compliance with all federal immigration faws and regulations that relate to ite
compliance with the E-verify requirements under A.R.S, § 23-214(A), Subcontreators breach of the
above-mentioned waranty shall be deemed a materia) bieach of the Agreament and may result In the
termination of the subcontract by Contractor at the direction of the Clty of Ei Mirage. Subcontractor further
acknowledges the Gly Of &! Mirage’ right to randomly inspect tha paperd and records of Subcontraator
to enaure that Su otor ls comiplying with the above-mentioned warrenty, ‘ ;
Subcontractor warrente to Koop the papers and records open: for random inepadtian during normal
bysindas houra by Cily of E! Mirage, Subcontractor shall cooperate with Clty of El Mirage's random
Inspections Iroluding granting the City entry iighta to Suboontréstor’s propetty to pesformn the rardom
Inspections and waiving thelr téapaotive righta to keep such papars and racoida confidential. The falturo
of Subcontradter to'comply with thie Warranty regarding the keeping of pagers and recofde and fallure to
cooperate with the City’s ratidorn inepections shall constitute a mietertal bréaich of the Agréement arid the
Clty shalt have the right to immediately raquire Contreotor to terminate the Agreement with Subcontractor,
7, ATTORNEY'S FEES & DISPUTE RESOLUTION. in the event either party brings any action for any relief;
declaratory or otherwise, arleing aut of thla Contract, or on acoount of any breach.or default hereof, the pravaliing
party shall be entitled to racelve fram the other party raaeonable attorneys’ fees and reagorighle costs and enees,
determined by the court éltting without @ jury or arbitration board, which shall ba deemed to Have accrued on the.
commeroerent of such action and shall be enforceabla whether or not euch gation fs proseduted to Judgment or by:
asbitrallan award.
As an alternative to filing a law sult to resolve the dispute, the partes may elect to arbitrate the dispute, Eaon party
shall select a competent and [rnpartial arbitrator. The two selected arbitrators ehall appoint a third arbitrator. if the
{wo eppalnted arbitratora cannot agree on a third, they may petition a judge having competent jurisdiction to select
the third arbitrator, or they may resign thelr appointment Jointly or individually eo that tha parties may renew the,
solaction process. The written award of two of the three arbitrators shall bind the partis. The cost of the arbitrators:
and any expert witnesses stiall bs bore by the party that hired them. ‘The cost of the third arbitrator end other
expenses of the arbitration shall be sharéd equally by the parties. The arbitration shall teke plate In the City of El!
Mirage. State court rules of procedure and evidence shall be governing. ‘
Executed and entered into on the date first written above.
GiTy: CONTRACTOR:
r Ory johes
Its: City Manager
Attest:
& Laser) dl fly Clerk a
Page 32 of 32
PW19~JOCOI
Finance Department
E Ne of 10000N. El Mirage Road, El Micage 85335
{ L IRAGE 623-876-2953; Fax 623-972-8110; TDD 623-933-3258
GRAND HERITAGE, BRIGHT FUTURE!
www.elmirageaz.gov
CONTRACT NO.: PW19-JOCO01 AMENDMENT NO. 2.- Asphalt, Concrete,
and Grading Projects
Pi Paving & Construction, LLC
In accordance with the provisions of the above referenced contract, the contract is amended as
follows:
1. TERM OF AGREEMENT
This Agreement shall be effective as of the date first set forth above and shall expire on
June 30,2023 unless terminated, cancelled, or extended as otherwise provided herein.
P1 Paving & Construction, LLC
8550 N 91° Avenue, Ste. 65
Peoria, AZ 85345
Mmatt@ p1paving.com
ALL OTHER PROVISIONS OF THE CONTRACT SHALL REMAIN IN THEIR ENTIRETY.
Contractor hereby acknowledges receipt of, and agreement with, the amendment. A signed
copy must be filed with the City of El Mirage Procurement Office. The above referenced
Contract Amendment is hereby executed:
For the Contractor: ‘or the City:
»), LEE ane By: Nuon Olid
{ :
Name: Mate T Of meg Name: Valence B de
i
Title: [Pera fron [Menage Title: Proc: eat: Admuvshocty
Date: Z ‘4, LE Date: Ys loe.