CONSULTANT SERVICES CONTRACT 
BETWE EN 
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION 
AND 
BURGESS & NIPLE, INC. 
FOR 
MCDOT TRANSPORTATION SYSTEM PLAN 2050 
WORK ORDER NO. TP073 
    CONTRACT NO. 2025-017 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

CONSULTANT SERVICES 
CONTRACT NO. 2025-017 
TABLE OF CONTENTS 
Table of Contents 
SECTION 1 - SERVICES OF THE CONSULTANT ....................................................................................... 1 
SECTION 2 - PERIOD OF SERVICE ............................................................................................................ 1 
SECTION 3 - PAYMENTS TO THE CONSULTANT ...................................................................................... 2 
SECTION 4 - THE COUNTY’S RESPONSIBILITIES .................................................................................... 2 
SECTION 5 - AMENDMENTS ....................................................................................................................... 3 
SECTION 6 - RECORDS ............................................................................................................................... 3 
SECTION 7 - PROJECT COMPLETION ....................................................................................................... 3 
SECTION 8 - TERMINATION ........................................................................................................................ 3 
SECTION 9 - OWNERSHIP OF DOCUMENTS ............................................................................................. 4 
SECTION 10 - COMPLIANCE WITH LAWS .................................................................................................. 4 
CERTIFICATION REGARDING DEBARMENT AND SUSPENSION: ....................................................... 5 
SECTION 11 - GENERAL CONSIDERATIONS ............................................................................................ 6 
SECTION 12 - SUCCESSORS AND ASSIGNS ............................................................................................ 7 
SECTION 13 - NO KICK-BACK CERTIFICATION ......................................................................................... 7 
SECTION 14 - ANTI-DISCRIMINATION PROVISION ................................................................................... 7 
SECTION 15 - FORCED LABOR .................................................................................................................. 8 
SECTION 16 - INDEMNIFICATION ............................................................................................................... 8 
SECTION 17 - INSURANCE REQUIREMENTS ............................................................................................ 8 
CERTIFICATES OF INSURANCE .......................................................................................................... 10 
CANCELLATION AND EXPIRATION NOTICE ....................................................................................... 10 
SECTION 18 - INFLUENCE ........................................................................................................................ 10 
SECTION 19 - TITLE VI .............................................................................................................................. 11 
SECTION 20 - FORCE MAJEURE .............................................................................................................. 11 
SIGNATURE PAGE ..................................................................................................................................... 13 
CONTRACT ATTACHMENTS 
EXHIBIT A – SCOPE OF WORK 
EXHIBIT B – CONSULTANT’S FEE PROPOSAL 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 1 
CONSULTANT SERVICES 
CONTRACT NO. 2025-017 
CONSULTANT SERVICES 
Pursuant to the provisions of the Arizona Revised Statutes § 11-201 the Maricopa County Board of 
Supervisors has the authority to enter into contracts. 
The Maricopa County Department of Transportation, hereinafter called the “COUNTY”, is desirous of having 
certain professional services performed in connection with Contract No. 2025-017, MCDOT 
TRANSPORTATION SYSTEM PLAN 2050, hereinafter called the “Project”, and as more fully described 
in Exhibit A, Scope of Work, and in accordance with Exhibit B, Fee Proposal, attached; and BURGESS & 
NIPLE, INC. , hereinafter called “CONSULTANT”, with its principal offices located at 1500 North Priest 
Drive, Ste. 102, Tempe, Arizona, 85288, Telephone Number: 602-244-8100, subject to the 
following terms and conditions: 
THEREFORE, the parties hereto mutually agree as follows: 
SECTION 1 - SERVICES OF THE CONSULTANT 
The CONSULTANT, under the general supervision of the COUNTY, Engineering Division Manager, shall 
prepare studies, reports, surveys, plans, drawings, specifications, and cost estimates as are necessary for 
the Project according to the directions and designated standards of the COUNTY, and in accordance with 
Exhibit A, Scope of Work. It is understood and agreed that the COUNTY authorized representative shall be 
the COUNTY Engineering Division Manager or his duly authorized representative, hereinafter called the 
“Agent”. For purposes of this contract, the Agent’s duly authorized representative shall be the Project 
Manager and he/she shall be the sole contact for administering this contract. 
The CONSULTANT shall meet periodically with the Agent so as to keep the COUNTY informed of the 
progress of the work in accordance with the schedule defined in Exhibit A, Scope of Work. 
The CONSULTANT shall promptly advise the Agent of any factors which develop during the Project that 
would likely result in construction or design costs in excess of budgetary constraints. 
SECTION 2 - PERIOD OF SERVICE 
The CONSULTANT shall complete all work in accordance with the time requirements provided in Exhibit A, 
Scope of Work, within FIVE HUNDRED  (500) CALENDAR DAYS after receipt of the Notice to Proceed. 
Should extension of this contract period be necessary, and any such extension(s) continue the date of 
contract performance for a time period of more than one (1) year from the original date of contract expiration, 
adjustment(s) of the CONSULTANT’S fee(s) may, upon agreement by both the COUNTY and the 
CONSULTANT, be made in accordance with the Consumer Price Index for Urban Consumers, Western 
Division, published by the U.S. Department of Labor, Bureau of Labor Statistics, using the published edition 
coinciding with the initial contract expiration date. Any such fee adjustment shall only apply to the extended 
contract time period. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 2 
SECTION 3 - PAYMENTS TO THE CONSULTANT 
The CONSULTANT shall be paid for work under this contract a not-to-exceed amount of ONE MILLION 
FOUR HUNDRED NINETY-NINE THOUSAND NINE HUNDRED EIGHTY-SIX DOLLARS AND NO CENTS 
($1,499,986.00).  A written authorization from the Agent will be required prior to initiating any optional task.  
The COUNTY will pay the CONSULTANT upon completion of the work as accepted by the COUNTY, except 
that progress payments may be made as billed by the CONSULTANT based on approved monthly progress 
reports subject to the limitations set forth in Exhibit A, Scope of Work. No retention shall be withheld from the 
contract 
The CONSULTANT shall provide back-up documentation with each invoice progress payment. The back-up 
documentation shall clearly indicate the classification, hours worked, date, and employee’s name, including 
subconsultants. All backup documentation shall include copies of any subconsultants or vendor invoices.  
The Small Business Enterprise Participation Form (Attachment 1) is to be submitted with each pay 
application or invoice. Any pay application or invoice without this form attached is subject to rejection as not 
being a completed pay application or invoice pursuant to the terms of the contract. 
The final invoice shall be paid to the CONSULTANT, as applicable, within forty-five (45) calendar days after: 
A.
final completion of all work per Exhibit A, Scope of Work,
B.
acceptance of the work by the COUNTY,
C.
the COUNTY’s receipt of the fully executed “Certificate of Performance” form (Attachment 2). Any
final invoice submitted without a Certificate of Performance is subject to rejection as not being a
completed pay application or invoice pursuant to the terms of the contract.
SECTION 4 - THE COUNTY’S RESPONSIBILITIES 
The COUNTY will furnish the CONSULTANT, at no cost to the CONSULTANT, the following information or 
services for this Project: 
A.
One copy of on-hand maps, records, survey ties, benchmarks, or other data pertinent to the Project.
This does not, however, relieve the CONSULTANT of the responsibility of searching records for
additional information, for requesting specific information, or for verification of that information
provided. The COUNTY does not warrant the accuracy or comprehensiveness of any such
information.
B.
All available information and data relative to policies, standards, criteria, and studies, etc. impacting
the Project as identified by the CONSULTANT.
C.
Available staff for consultation with the CONSULTANT during the performance of studies and plan
development in order to identify the problems, needs, and other functional aspects of the Project.
D.
Prompt examination of documents submitted by the CONSULTANT and rendering of decisions
pertaining thereto in order to avoid unreasonable delay in the progress of the work by the
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 3 
CONSULTANT. The COUNTY will keep the CONSULTANT advised concerning the progress of the 
COUNTY’s review of work. 
SECTION 5 - AMENDMENTS 
This contract may be amended by mutual agreement of the COUNTY and the CONSULTANT. 
Any alteration in the Scope of Work that will result in a substantial change in the nature of the Project so as 
to materially increase or decrease the contract fee will require negotiation of an amendment to the contract 
to be executed by the COUNTY and the CONSULTANT. No work shall commence on the change until the 
contract amendment has been approved by the COUNTY and the Agent has notified the CONSULTANT to 
proceed. It is distinctly understood and agreed that no claim for extra work performed, or materials furnished 
by the CONSULTANT will be allowed by the COUNTY except as provided herein, nor shall the 
CONSULTANT do any work or furnish any materials not covered by this agreement unless such work is first 
authorized in writing by the COUNTY in accordance with the Maricopa County Procurement Code. Any such 
work or materials furnished by the CONSULTANT without such written authorization first being given shall 
be at CONSULTANT’s own risk, cost, and expense. The CONSULTANT hereby agrees to make no claim 
for such work or materials furnished without such written authorization. 
SECTION 6 - RECORDS 
Records of the CONSULTANT’S expenses pertaining to this contract and records of accounts between the 
COUNTY and the CONSULTANT shall be kept on a generally recognized accounting basis and shall be 
available upon request to the COUNTY or its authorized representative for audit during normal business 
hours. 
All CONSULTANT and COUNTY procurement records shall be retained for a period of one (1) year and 
disposed of in accordance with the records retention guidelines and schedules approved by the State of 
Arizona Department of Library, Archives, and Public Records unless applicable Federal regulations require 
a longer period of retention. 
SECTION 7 - PROJECT COMPLETION 
If, during the course of this contract, situations arise which prevent completion within the allotted time, the 
Agent may grant an extension. 
SECTION 8 - TERMINATION 
The COUNTY may terminate this contract at any time upon reimbursement to the CONSULTANT of 
expenses that include reasonable charges for time and material for the percentage of work satisfactorily 
completed and provided to the COUNTY. 
The COUNTY reserves the rights to postpone, terminate, or abandon this contract for the CONSULTANT’S 
failure to complete the Project on time or failure to comply with the provisions of the contract. The COUNTY 
also reserves the right to terminate any or all parts of this contract for its own convenience as the COUNTY 
may determine at its sole discretion. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 4 
The COUNTY hereby gives notice that pursuant to A.R.S. § 38-511 “A” this contract may be canceled without 
penalty or further obligation within three (3) years after execution if any person significantly involved in 
initiating, negotiating, securing, drafting, or creating a contract on behalf of the COUNTY is, at any time while 
the contract or any extension of the contract is in effect, an employee or agent of any other party to the 
contract in any capacity or a CONSULTANT to any other party of the contract with respect to the subject 
matter of the contract. Cancellation under this section shall be effective when written notice from the 
Transportation Director is received by all of the parties to the contract. In addition, the COUNTY may recoup 
any fee or commission paid or due to any person significantly involved in initiating, negotiating, securing, 
drafting, or creating the contract on behalf of the COUNTY from any other party to the contract arising as a 
result of the contract. 
The CONSULTANT may terminate this contract in the event of nonpayment of fees as specified in SECTION 
III, PAYMENTS TO THE CONSULTANT. 
SECTION 9 - OWNERSHIP OF DOCUMENTS 
A.
All original documents including, but not limited to studies, reports, tracings, drawings, physical and
computer models, estimates, field notes, investigations, design analysis, calculations, computer
software, and specifications, prepared in the performance of this contract are to be and remain the
property of the COUNTY and are to be delivered to the Agent before final payment is made to the
CONSULTANT. The COUNTY will not reuse, alter or modify these documents without noting such
modifications, alterations, or intent of their reuse, and will hold the CONSULTANT harmless from
any claims arising from such reuse, modifications, or alterations of the documents. The
CONSULTANT may retain reproducible copies of all such documents delivered to the COUNTY.
B.
If the CONSULTANT retains reproducible copies of all such documents delivered to the COUNTY,
the CONSULTANT may not use those documents in regard to current or future claims or litigation
against the COUNTY brought by another party or parties unless the documents are independently
produced in accordance with a court order or procedural rules and notice of such production is given
to the COUNTY immediately and prior to their production.
C.
Copies retained by the CONSULTANT, subconsultant(s), or any related entities are governed by
Arizona Law regarding the use of public records and may not be used for commercial purpose without 
additional written permission from the COUNTY and the payment of all applicable fees.
D.
The COUNTY reserves the right to reuse the documents as it sees fit.
SECTION 10 - COMPLIANCE WITH LAWS 
The CONSULTANT is required to comply with all Federal, State, and local laws, local ordinances and 
regulations. The CONSULTANT’S signature on this contract certifies compliance with the provisions of the 
I-9 requirements of the Immigration Reform and Control Act of 1986 for all personnel that the CONSULTANT
and any subconsultants employ to complete any Project. It is understood that the COUNTY shall conduct
itself in accordance with the provisions of the Maricopa County Procurement Code.
The CONSULTANT warrants that it is in compliance with A.R.S. §41-4401 and further acknowledges: 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 5 
(1)
That the CONSULTANT and its subconsultants, if any, warrant their compliance with all
federal immigration laws and regulations that relate to their employees and their compliance
with A.R.S. §23-214, subsection A; after December 31, 2007, every employer, after hiring
an employee, shall verify the employment eligibility of the employee through the e-verify
program and shall keep a record of the verification for the duration of the employee’s
employment or at least three years, whichever is longer.
(2)
That a breach of a warranty under subsection 1 above, shall be deemed a material breach
of the contract that is subject to penalties up to and including termination of the contracts;
(3)
That the contracting government entity retains the legal right to inspect the papers of any
CONSULTANT or subconsultant employee who works on the contract to ensure that the
CONSULTANT or subconsultant is complying with the warranty provided under subsection
1 above and that the CONSULTANT agrees to make all papers and employment records of
said employee(s) available during normal working hours in order to facilitate such an
inspection.
(4)
That nothing herein shall make any CONSULTANT or subconsultant an agent or employee
of the contracting government entity.
CERTIFICATION REGARDING DEBARMENT AND SUSPENSION: 
(1)
The undersigned (authorized official signing for the CONSULTANT) certifies to the best of
his or her knowledge and belief, that the CONSULTANT, defined as the primary participant
in accordance with 45 CFR Part 76, and its principals:
(a)
are not presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from covered transactions by any Federal
Department or agency;
(b)
have not within a 3-year period preceding this Contract been convicted of or had a
civil judgment rendered against them for commission of fraud or a criminal offense
in connection with obtaining, attempting to obtain, or performing a public (Federal,
State or local) transaction or contract under a public transaction; violation of Federal
or State antitrust statues or commission of embezzlement, theft, forgery, bribery,
falsification or destruction of records, making false statements, or receiving stolen
property;
(c)
are not presently indicted or otherwise criminally or civilly charged by a government
entity (Federal, State or local) with commission of any of the offenses enumerated
in paragraph (2) of this certification; and
(d)
have not within a 3-year period preceding this Contract had one or more public
transaction (Federal, State or local) terminated for cause of default.
(2)
Should the CONSULTANT not be able to provide this certification, an explanation as to why
should be attached to the Contact.
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 6 
(3) 
The CONSULTANT agrees to include, without modification, this clause in all lower tier 
covered transactions (i.e. transactions with subcontractors) and in all solicitations for lower 
tier covered transactions related to this Contract. 
 
SECTION 11 - GENERAL CONSIDERATIONS 
 
A. 
The CONSULTANT shall furnish to the COUNTY for approval, the names of its key employees, and 
of its subconsultants and their key employees, to be used on this Project prior to beginning the work 
under this contract. Any subsequent changes are subject to the written approval of the COUNTY. 
 
B. 
The CONSULTANT shall perform, with its own firm, work amounting to fifty percent (50%) or more 
of the total amount of the contract value. Any deviation may be approved, in writing, at the discretion 
of the Agent. 
 
C. 
The failure of either party to enforce any of the provisions of this contract or to require performance 
of the other party of any of the provisions hereof shall not be construed to be a waiver of such 
provisions, nor shall it affect the validity of this contract or any part thereof, or the right of either party 
to thereafter enforce each and every provision. 
 
D. 
If the COUNTY determines that the CONSULTANT had made any errors and/or omissions (E&O) in 
the work product delivered to the COUNTY under the terms of this Contract, the CONSULTANT 
shall make all necessary revisions or corrections resulting from E&O without additional cost to the 
COUNTY. Errors and Omissions is defined as a deviation from the standard of care on the part of a 
design engineering consultant in the performance of architectural and/or engineering services under 
this Contract. The COUNTY shall actively pursue the resolution of E&O’s at the lowest possible level 
within a reasonable timeframe in accordance with the most current version of MCDOT’s Errors and 
Omissions 
by 
Design 
Consultants 
on 
Projects 
Procedure 
No. 
P5305 
(https://www.maricopa.gov/DocumentCenter/View/69060/New-Procedure-P5305-Errors-and-
Omissions-by-Design-Consultants-on-Projects). 
 
E. 
It is mutually understood and agreed that this contract shall be governed by the laws of the State of 
Arizona, both as to interpretation and performance. Any action at law, suit in equity, or judicial 
proceeding for the enforcement of this contract, or any provision thereof, shall be instituted only in 
the courts of the State of Arizona. 
 
F. 
When this contract requires the CONSULTANT to study specific geographic areas of Maricopa 
County the CONSULTANT agrees during the term of this contract and any extensions thereof that 
CONSULTANT will not perform similar services for any clients other than the COUNTY within that 
specific geographic area without the written authorization and approval of the Transportation Director 
of the COUNTY. 
 
G. 
The CONSULTANT agrees that it, its principals, employees, subconsultants, agents and assigns, 
shall not accept employment as CONSULTANTS, expert witnesses or otherwise in any pending or 
contemplated litigation against the COUNTY during the term of this contract and any extensions 
thereof without the written authorization and approval of the Transportation Director of the COUNTY. 
 
H. 
The CONSULTANT agrees that it, its principals, employees, subconsultants, agents and assigns, 
shall not accept employment as CONSULTANTS, expert witnesses or otherwise in any future 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 7 
litigation against the COUNTY in regard to the subject matter of this contract without the written 
authorization and approval of the Transportation Director of the COUNTY. 
I.
It is understood that the COUNTY shall have the right to seek and obtain in any court of competent
jurisdiction an injunction to restrain a violation or alleged violation by the CONSULTANT, its
principals, employees, subconsultants, agents or assigns, of the provisions of F., G., and H. of this
section or of the provisions of B. of Section IX, and the right of action for full damages at law, in
addition to any other remedies provided by this contract. In no case shall a waiver by the COUNTY
of the right to seek relief under this provision constitute a waiver of any other or further violation.
J.
The CONSULTANT shall incorporate stormwater quality best management practices (BMPs) in the
design of the project and comply with the Maricopa County Stormwater Quality Management and
Discharge Control Regulation, the Maricopa County Drainage Policies and Standards, and the
Maricopa County Drainage Regulations, using guidance from the Maricopa County Drainage Design
Manual, Vol. III, Erosion Control.
L.
Written Certification Pursuant to A.R.S. § 35-393.01. If CONSULTANT engages in for-profit activity
and has 10 or more employees, and if this Agreement has a value of $100,000 or more,
CONSULTANT certifies it is not currently engaged in, and agrees for the duration of this Agreement
to not engage in, a boycott of goods or services from Israel. This certification does not apply to
a boycott prohibited by 50 U.S.C. § 4842 or a regulation issued pursuant to 50 U.S.C. § 4842.
SECTION 12 - SUCCESSORS AND ASSIGNS 
This contract shall not be assigned by either party without prior written approval of the other except that the 
CONSULTANT may use in the performance of this contract without prior approval of the COUNTY, personnel 
or services of its related entities and affiliated companies as if they were an integral part of the 
CONSULTANT; and it shall extend to and be binding upon the heirs, executors, administrators, successors 
and assigns of the parties hereto. 
SECTION 13 - NO KICK-BACK CERTIFICATION 
The CONSULTANT warrants that no person has been employed or retained to solicit or secure this contract 
upon any agreement or understanding for a commission, percentage, brokerage, or contingent fee; and that 
no member of the Board of Supervisors or any employee of the COUNTY has any interest, financially or 
otherwise, in the CONSULTANT’S firm. 
For breach or violation of this warranty, the COUNTY shall have the right to annul this contract without liability, 
or at its discretion, to deduct from the contract price or consideration, the full amount of such commission, 
percentage, brokerage, or contingent fee. 
SECTION 14 - ANTI-DISCRIMINATION PROVISION 
The COUNTY will endeavor to ensure in every way possible that small business enterprises shall have every 
opportunity to participate in providing professional services, purchased goods, and contractual services to 
the COUNTY without being discriminated against on the grounds of race, religion, gender, age, disability, or 
national origin. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 8 
The CONSULTANT agrees not to discriminate against any employee or applicant for employment because 
of race, religion, gender, age, disability, or national origin, and further agrees not to engage in any unlawful 
employment practices. The CONSULTANT further agrees to insert the foregoing provisions in all 
subcontracts hereunder. 
SECTION 15 - FORCED LABOR 
By submitting a bid for this solicitation and/or entering into a contract as a result of this solicitation, 
CONSULTANT agrees to comply with all applicable portions of Arizona Revised Statutes Section 35-394. 
Contracting; procurement; prohibition; written certification; remedy; termination; exception; definitions. 
CONSULTANT certifies that it does not currently, and agrees for the duration of the contract, that it will not 
use: 
A.
The forced labor of ethnic Uyghurs in the People’s Republic of China.
B.
Any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of
China.
C.
Any CONSULTANT, subconsultant or suppliers that use the forced labor or any good or services
produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.
D.
If CONSULTANT becomes aware during the term of the agreement that CONSULTANT is not in
compliance with this paragraph, the CONSULTANT shall notify the COUNTY within five business
days after becoming aware of the noncompliance. If the CONSULTANT fails to provide a written
certification to the COUNTY that the CONSULTANT has remedied the noncompliance within 180
days after notifying the COUNTY of its noncompliance, then the agreement terminates, except that
if the agreement termination date occurs before the end of the 180-day period, the agreement
terminates on the agreement termination date.
SECTION 16 - INDEMNIFICATION 
To the fullest extent permitted by law, CONSULTANT shall defend, indemnify, and hold harmless COUNTY, 
its agents, representatives, officers, directors, officials, and employees from and against all claims, damages, 
losses and expenses, including reasonable attorney fees and court costs, but only to the extent caused by 
the negligence, reckless or intentional wrongful conduct of the consultant or others persons employed or 
used by the consultant in the performance of the contract or subcontract. “Other persons employed or used” 
means a subconsultant to a consultant or design professional in any tier, or any other person or entity who 
performs work or design professional services, or provides labor, services, materials or equipment in 
connection with the contract. 
The amount and type of insurance coverage requirements set forth herein will in no way be construed as 
limiting the scope of the indemnity in this paragraph. The scope of this indemnification does not extend to the 
sole negligence of COUNTY. 
SECTION 17 - INSURANCE REQUIREMENTS 
CONSULTANT, at CONSULTANT'S own expense, shall purchase and maintain the herein stipulated 
minimum insurance from a company or companies duly licensed by the State of Arizona and possessing a 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 9 
current A.M. Best, Inc. rating of B++. In lieu of State of Arizona licensing, the stipulated insurance may be 
purchased from a company or companies, which are authorized to do business in the State of Arizona, 
provided that said insurance companies meet the approval of COUNTY. The form of any insurance policies 
and forms must be acceptable to COUNTY. 
All insurance required herein shall be maintained in full force and effect until all work or service required to 
be performed under the terms of the Contract is satisfactorily completed and formally accepted. Failure to do 
so may, at the sole discretion of COUNTY, constitute a material breach of this Contract. 
CONSULTANT’S insurance shall be primary insurance as respects COUNTY, and any insurance or self-
insurance maintained by COUNTY shall not contribute to it. 
Any failure to comply with the claim reporting provisions of the insurance policies or any breach of an 
insurance policy warranty shall not affect the COUNTY’S right to coverage afforded under the insurance 
policies. 
The insurance policies may provide coverage that contains deductibles or self-insured retentions. Such 
deductible and/or self-insured retentions shall not be applicable with respect to the coverage provided to 
COUNTY under such policies. CONSULTANT shall be solely responsible for the deductible and/or self-
insured retention and COUNTY, at its option, may require CONSULTANT to secure payment of such 
deductibles or self-insured retentions by a surety bond or an irrevocable and unconditional letter of credit. 
COUNTY reserves the right to request and to receive, within 10 working days, certified copies of any or all of 
the herein required insurance policies and/or endorsements. COUNTY shall not be obligated, however, to 
review such policies and/or endorsements or to advise CONSULTANT of any deficiencies in such policies 
and endorsements, and such receipt shall not relieve CONSULTANT from, or be deemed a waiver of 
COUNTY’S right to insist on strict fulfillment of CONSULTANT’S obligations under this Contract. 
The insurance policies required by this Contract, except Workers’ Compensation, and Errors and Omissions, 
shall name COUNTY, its agents, representatives, officers, directors, officials and employees as Additional 
Insureds. 
The policies required hereunder, except Workers’ Compensation, and Errors and Omissions, shall contain a 
waiver of transfer of rights of recovery (subrogation) against COUNTY, its agents, representatives, officers, 
directors, officials and employees for any claims arising out of CONSULTANT’S work or service. 
CONSULTANT is required to procure and maintain the following coverages indicated by a checkmark: 

1.
Commercial General Liability. Commercial General Liability insurance and, if necessary, 
Commercial Umbrella insurance with a limit of not less than $2,000,000 for each occurrence, 
$4,000,000 Products/Completed Operations Aggregate, and $4,000,000 General Aggregate 
Limit. The policy shall include coverage for bodily injury, broad form property damage, 
personal injury, products and completed operations and blanket contractual coverage, and 
shall not contain any provision which would serve to limit third party action over claims. There 
shall be no endorsement or modification of the CGL limiting the scope of coverage for liability 
arising from explosion, collapse, or underground property damage. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 10 
 
2. 
Automobile Liability. Commercial/Business Automobile Liability insurance and, if 
unnecessary, Commercial Umbrella insurance with a combined single limit for bodily injury 
and property damage of not less than $2,000,000 each occurrence with respect to any of 
the CONSULTANT’S owned, hired, and non-owned vehicles assigned to or used in 
performance of the CONSULTANT’S work or services under this Contract. 

3.
Workers’ Compensation. Workers’ Compensation insurance to cover obligations imposed 
by federal and state statutes having jurisdiction of CONSULTANT’S employees engaged in 
the performance of the work or services under this Contract; and Employer’s Liability 
insurance of not less than $1,000,000 for each accident, $1,000,000 disease for each 
employee, and $1,000,000 disease policy limit.  
CONSULTANT waives all rights against COUNTY and its agents, officers, directors and 
employees for recovery of damages to the extent these damages are covered by the 
Workers’ Compensation and Employer’s Liability or commercial umbrella liability insurance 
obtained by CONSULTANT pursuant to this agreement. 
 
4.
Errors and Omissions Insurance. Errors and Omissions insurance and, if necessary, 
Commercial Umbrella insurance, which will insure and provide coverage for errors or 
omissions of the CONSULTANT, with limits of no less than $2,000,000 for each claim. 
CERTIFICATES OF INSURANCE 
Prior to commencing work or services under this Contract, CONSULTANT shall furnish COUNTY with 
Certificates of Insurance in a form acceptable to COUNTY, or formal endorsements as required by the 
Contract in the form provided by the COUNTY, issued by CONSULTANT’S insurer(s), as evidence that 
policies providing the required coverages, conditions and limits required by this Contract are in full force and 
effect. Such certificates shall identify this contract number and title. 
In the event any insurance policy(ies) required by this contract is (are) written on a “claims made” basis, 
coverage shall extend for two years past completion and acceptance of CONSULTANT’S work or services 
and as evidenced by annual Certificates of Insurance. 
If a policy does expire during the life of the Contract, a renewal certificate must be sent to COUNTY fifteen 
(15) days prior to the expiration date.
CANCELLATION AND EXPIRATION NOTICE 
Insurance required herein shall not expire, be canceled, or materially changed without thirty (30) days prior 
written notice to COUNTY. 
SECTION 18 - INFLUENCE 
As prescribed in MC1-1202 of the Maricopa County Procurement Code, any effort to influence an employee 
or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct, may be grounds for 
Disbarment or Suspension under MC1-902.  
An attempt to influence includes, but is not limited to: 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 11 
1.
A Person offering or providing a gratuity, gift, tip, present, donation, money, entertainment
or educational passes or tickets, or any type valuable contribution or subsidy;
2.
That is offered or given with the intent to influence a decision, obtain a contract, garner
favorable treatment, or gain favorable consideration of any kind.
If a Person attempts to influence any employee or agent of Maricopa County, the Chief Procurement Officer, 
or his designee, reserves the right to seek any remedy provided by the Maricopa County Procurement Code, 
any remedy in equity or in the law, or any remedy provided by this contract. 
SECTION 19 - TITLE VI 
The Maricopa County Department of Transportation, in accordance with the provisions of Title VI of the Civil 
Rights Act of 1964 (78 Stat. 252.42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all 
bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, 
disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to 
this invitation and will not be discriminated against on the grounds of race, color, or national origin in 
consideration for an award. 
SECTION 20 - FORCE MAJEURE 
Neither party shall be liable for failure of performance, nor incur any liability to the other party on account of 
any loss or damage resulting from any delay or failure to perform all or any part of this contract, if such delay 
or failure is caused by events, occurrences, or causes beyond the reasonable control and without negligence 
of the parties. Such events, occurrences, or causes will include acts of God/nature (including fire, flood, 
earthquake, storm, hurricane, or other natural disaster), war, invasion, act of foreign enemies, hostilities 
(whether war is declared or not), civil war, riots, rebellion, revolution, insurrection, military or usurped power 
or confiscation, terrorist activities, nationalization, government sanction, lockout, blockage, embargo, labor 
dispute, strike, and interruption or failure of electricity or telecommunication service. 
Each party, as applicable, shall give the other party notice of its inability to perform and particulars in 
reasonable detail of the cause of the inability. Each party must use best efforts to remedy the situation and 
remove, as soon as practicable, the cause of its inability to perform or comply. 
The party asserting Force Majeure as a cause for non-performance shall have the burden of proving that 
reasonable steps were taken to minimize delay or damages caused by foreseeable events, that all non-
excused obligations were substantially fulfilled, and that the other party was timely notified of the likelihood 
or actual occurrence which would justify such an assertion, so that other prudent precautions could be 
contemplated. 
(END OF SECTION) 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Page 12 
IN WITNESS WHEREOF, the parties herein have executed this contract. 
BURGESS & NIPLE, INC. 
Consultant’s Firm Name 
By 
Principal of the Firm 
Printed Name 
Title 
Date 
Tax Identification Number 
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION 
RECOMMENDED BY 
By 
Jesse Gutierrez, P.E. 
Date 
Transportation Director/County Engineer 
LEGAL REVIEW 
Approved as to form and within the powers and authority granted under the laws of the State of Arizona to 
the Maricopa County Department of Transportation. 
Deputy County Attorney 
Date 
ACCEPTED AND APPROVED 
By 
Chairman, Board of Supervisors 
 Date 
ATTEST 
By 
Clerk of the Board 
Date 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868
Chairman
September 16, 2025
Edwin Muccillo
9/16/2025
9/16/2025
9/18/2025

Contract No. 2025-017 
CONSULTANT SERVICES 
ATTACHMENTS 
1.
Maricopa County Small Business Participation Reporting Form
2.
Certificate of Performance
3.
Certificate of Insurance
4.
Title VI Assurances
5.
Consultant Payment Request Form
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
Attachment 1 
Maricopa County Small Business Enterprise Program 
Participation Reporting Form 
This form is to be submitted with each pay application or invoice.  Any pay application or invoice without this 
form attached is subject to rejection as not being a completed pay application or invoice pursuant to the terms 
of the contract. 
_____________________________  
___________________________________ 
Name of Prime Consultant/Contractor 
Contract No. 
_____________________________ 
___________________________________ 
Contact Person 
Project No. 
_____________________________ 
$__________________________________ 
Street Address  
  Amount of this Pay Application/Invoice 
_____________________________ 
City, State  ZIP 
Complete below with information on the SBE firms utilized as subconsultants/subcontractors for this pay 
application/invoice.  If work was self-performed and your firm, as the prime, is an SBE firm pursuant to A.R.S. 
§ 41-1001, et seq., then you may list your firm as the SBE firm.
SBE Firm Name 
SBE Firm Address 
Type of Work 
Performed 
$ Pd to SBE this 
App/Inv 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
$ 
□A mark in this box certifies that no SBE firms were utilized as the prime, subconsultant or
subcontractor with respect to this pay application/invoice.
Date: ___________________ 
___________________________________________ 
Signature 
___________________________________________ 
Printed Name & Telephone Number 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
 Attachment 2 
PERFORMANCE AND PAYMENT OF ALL CLAIMS 
ENGINEERING CONTRACTS 
__ 
 hereby certifies to the Maricopa County Department of Transportation 
(Name of Signer) 
(MCDOT) that all lawful claims for labor, rental of equipment, material used, and any other claims by Burgess & 
Niple, Inc.,  or its subconsultants in connection with the project described in MCDOT Contract No. 2025-017, 
have been paid. 
Burgess & Niple, Inc., understands that with receipt of payment for any previously invoiced amounts, plus any 
retained monies, that this is a settlement of all claims of every nature and kind against MCDOT arising out of the 
performance of  MCDOT’s Contract No. 2025-017  relating to the material, equipment and work covered in 
and required by the contract.  
The undersigned hereby certifies that to his/her knowledge, no contractual disputes exist in regard to this contract and 
that he/she has no knowledge of any pending or potential claims in regard to this contract.  
Upon submission of this document and a separate invoice for any retained funds to MCDOT, invoice processing will 
be completed within sixty (60) calendar days. 
State of Arizona 
) 
)§ 
County of Maricopa 
) 
Signed this _______ day of  
, 20 
 . 
Signature 
Title 
Subscribed and Sworn to before me this 
 day of 
, 20 
. 
Notary Public 
My Commission Expires: 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:
CERTIFICATE NUMBER:
COVERAGES
IMPORTANT:  If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement.  A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW.  THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED.  NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
$
PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS
AUTOS ONLY
NON-OWNED
SCHEDULED
OWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBER
TYPE OF INSURANCE
LTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES  (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB
$
EACH OCCURRENCE
$
AGGREGATE
$
OCCUR
CLAIMS-MADE
DED
RETENTION $
$
PRODUCTS - COMP/OP AGG
$
GENERAL AGGREGATE
$
PERSONAL & ADV INJURY
$
MED EXP (Any one person)
$
EACH OCCURRENCE
DAMAGE TO RENTED
$
PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE
OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT
LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2016 ACORD CORPORATION.  All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
Willis Towers Watson Northeast, Inc.
c/o 26 Century Blvd
P.O. Box 305191
Nashville, TN   372305191  USA
Burgess & Niple, Inc.
330 Rush Alley
Suite 700
Columbus, OH 43215
20250411
Re: MCDOT Contract No. 2025-017 - Transportation System Plan 2050
The Umbrella/Excess policy does not sit excess over Professional Liability coverage.
Maricopa County Department of Transportation, Maricopa County, their agents, representatives, officers, Directors,
Maricopa County Department of Transportation
Contracts Branch
2901 West Durango Street
Phoenix, AZ 85009-6357
04/11/2025
1-877-945-7378
1-888-467-2378
certificates@wtwco.com
National Union Fire Insurance Company of P
19445
Travelers Property Casualty Company of Ame
New Hampshire Insurance Company
25674
23841
Continental Casualty Companies
02186
W38653459
A
2,000,000
1,000,000
25,000
2,000,000
4,000,000
4,000,000
Y
Y
GL 5268138
04/01/2025 04/01/2026
A
2,000,000
04/01/2026
04/01/2025
Y
Y
CA 4489627
B
15,000,000
0
Y
Y
CUP-0Y888377-25-NF
04/01/2025 04/01/2026
15,000,000
WC 072113284
C
Y
1,000,000
No
04/01/2025 04/01/2026
1,000,000
1,000,000
D
Professional Liability
Each Claim:
AEH008215011
04/01/2025 04/01/2026
Aggregate:
Deductible
3919853
27608001
SR ID:
BATCH:
$500,000
$10,000,000
$10,000,000
WTW Certificate Center
Page 1 of 2
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

ACORD 101 (2008/01)
The ACORD name and logo are registered marks of ACORD
© 2008 ACORD CORPORATION.  All rights reserved.
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER:
FORM TITLE:
ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE
Page           of
AGENCY CUSTOMER ID:
LOC #:
AGENCY
CARRIER
NAIC CODE
POLICY NUMBER
NAMED INSURED
EFFECTIVE DATE:
Burgess & Niple, Inc.
330 Rush Alley
Suite 700
Columbus, OH 43215
Officials, employees, and Arizona Department of Transportation, and State of Arizona are included as Additional
Insureds as respects to General Liability, Auto Liability and Umbrella/Excess Liability when required by written
contract.
General Liability, Auto Liability and Umbrella/Excess Liability policies shall be Primary and Non-contributory with
any other insurance in force for or which may be purchased by Additional Insureds when required by written contract.
Waiver of Subrogation applies in favor of Additional Insureds with respects to General Liability, Auto Liability,
Umbrella/Excess Liability and Workers Compensation when required by written contract and permitted by law.
2
2
Willis Towers Watson Northeast, Inc.
See Page 1
See Page 1
See Page 1
See Page 1
25
Certificate of Liability Insurance
W38653459
CERT:
3919853
BATCH:
27608001
SR ID:
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Maricopa County Department of Transportation  
Title VI Assurances 
 
The Maricopa County Department of Transportation (herein referred to as the “Recipient”), HEREBY 
AGREES THAT, as a condition to receiving any Federal financial assistance from the U.S. Department of 
Transportation (DOT), through Federal Highway Administration and Arizona Department of Transportation, 
is subject to and will comply with the following: 
 
Statutory/Regulatory Authorities 
 
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits 
discrimination on the basis of race, color, national origin); 
• 49 C.F.R. Part 21 (entitled Non-discrimination In Federally-Assisted Programs of the Department of 
Transportation—Effectuation of Title VI of the Civil Rights Act of 1964); 
• 28 C.F.R. section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the 
Civil Rights Act of 1964); 
 
The preceding statutory and regulatory cites hereinafter are referred to as the “Acts” and “Regulations,” 
respectively. 
 
General Assurances 
 
In accordance with the Acts, the Regulations, and other pertinent directives, circulars, policy, memoranda 
and/or guidance, the Recipient hereby gives assurances that it will promptly take any measures necessary to 
ensure that: 
 
“No person in the United States shall, on the grounds of race, color, or national origin, be excluded 
from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any 
program or activity,” for which the Recipient receives Federal financial assistance from DOT, 
including the Federal Highway Administration. 
 
The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI 
and other Non-discrimination requirements (The Age Discrimination Act of 1975, and Section 504 of the 
Rehabilitation Act of 1973), by restoring the broad, institutional-wide scope and coverage of these non-
discrimination statutes and requirements to include all programs and activities of the Recipient, so long as 
any portion of the program is Federally assisted. 
 
 
 
 
 
 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Specific Assurances 
 
More specifically, and without limiting the above general Assurance, the Recipient agrees with and gives the 
following Assurances with respect to its Federal Aid Highway Program. 
 
1. The Recipient agrees that each “activity,” “facility,” or “program,” as defined in §§ 21.23 (b) and 
21.23 (e) of 49 C.F.R. § 21 will be (with regard to an “activity”) facilitated, or will be (with regard to 
a “facility”) operated, or will be (with regard to a “program”) conducted in compliance with all 
requirements imposed by, or pursuant to the Acts and the Regulations. 
 
2. The Recipient will insert the following notification in all solicitations for bids, Requests For 
Proposals for work, or material subject to the Acts and the Regulations made in connection with all 
Federal Aid Highway Program and, in adapted form, in all proposals for negotiated agreements 
regardless of funding source: 
 
“The Maricopa County Department of Transportation, in accordance with the provisions of 
Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the 
Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract 
entered into pursuant to this advertisement, disadvantaged business enterprises will be 
afforded full and fair opportunity to submit bids in response to this invitation and will not be 
discriminated against on the grounds of race, color, or national origin in consideration for an 
award.” 
 
3. The Recipient will insert the clauses of Appendix A and E of this Assurance in every contract or 
agreement subject to the Acts and the Regulations. 
 
4.  The Recipient will insert the clauses of Appendix B of this Assurance, as a covenant running with 
the land, in any deed from the United States effecting or recording a transfer of real property, 
structures, use, or improvements thereon or interest therein to a Recipient. 
 
5. That where the Recipient receives Federal financial assistance to construct a facility or part of a 
facility, the Assurance will extend to the entire facility and facilities operated in connection 
therewith. 
 
6. That where the Recipient receives Federal financial assistance in the form, or for the acquisition of 
real property or an interest in real property, the Assurance will extend to rights to space on, over, or 
under such property. 
 
7. That the Recipient will include the clauses set forth in Appendix C and Appendix D of this 
Assurance, as a covenant running with the land, in any future deeds, leases, licenses, permits, or 
similar instruments entered into by the Recipient with other parties: 
 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

a. for the subsequent transfer of real property acquired or improved under the applicable 
activity, project, or program; and 
b. for the construction or use of, or access to, space on, over, or under real property acquired 
or improved under the applicable activity, project or program. 
 
8. That this Assurance obligates the Recipient for the period during which Federal financial assistance is 
extended to the program, except where the Federal financial assistance is to provide, or is in the form 
of, personal property, or real property, or interest therein, or structures or improvements thereon, in 
which case the Assurance obligates the Recipient, or any transference for the longer of the following 
periods: 
 
a. the period during which the property is used for a purpose for which the Federal financial 
assistance is extended, or for another purpose involving the provision of similar services or 
benefits; or 
b. the period during which the Recipient retains ownership or possession of the property. 
 
9. The Recipient will provide for such methods of administration for the program as are found by the 
Secretary of Transportation or the official whom he/she delegates specific authority to give 
reasonable guarantee that it, other recipients, sub-recipients, sub-grantees, contractors, 
subcontractors, consultants, transferees, successors in interest, and other participants of Federal 
financial assistance under such program will comply with all requirements imposed or pursuant to the 
Acts, the Regulations, and this Assurance. 
10. The Recipient agrees that the United States has a right to seek judicial enforcement with regard to any 
matter arising under the Acts, the Regulations, and this Assurance. 
 
 
By signing this ASSURANCE, Maricopa County Department of Transportation also agrees to comply (and 
require any sub-recipients, sub-grantees, contractors, successors, transferees, and/or assignees to comply) 
with all applicable provisions governing Federal Highway Administration or Arizona Department of 
Transportation access to records, accounts, documents, information, facilities, and staff. You also recognize 
that you must comply with any program or compliance reviews, and/or complaint investigations conducted 
by the Federal Highway Administration or Arizona Department of Transportation. You must keep records, 
reports, and submit the material for review upon request to Federal Highway Administration, Arizona 
Department of Transportation, or its designee in timely, complete, and accurate way. Additionally, you must 
comply with all other reporting, data collection, and evaluation requirements, as prescribed by law or 
detailed in program guidance. 
 
 
 
 
 
 
 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Maricopa County Department of Transportation gives this ASSURANCE in consideration of and for 
obtaining any Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid 
and Federal financial assistance extended after the date hereof to the recipients by the U.S. Department of 
Transportation under the Federal Highway Administration and Arizona Department of Transportation. This 
ASSURANCE is binding on Arizona, other recipients, sub-recipients, sub-grantees, contractors, 
subcontractors and their subcontractors, transferees, successors in interest, and any other participants in the 
Federal Aid Highway Program The person(s) signing below is authorized to sign this ASSURANCE on 
behalf of the Recipient. 
 
Maricopa County Department of Transportation 
 
(Name of Recipient) 
 
 
 
by _____________________________________________ DATED ________________________ 
 
(Signature of Authorized Official) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attachments 
Appendices A, B, C, D, E 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
5/5/2025
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

APPENDIX A 
During the performance of this contract, the contractor, for itself, its assignees and successors in interest 
(hereinafter referred to as the “contractor”) agrees as follows: 
1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the 
Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. 
Department of Transportation, Federal Highway Administration or the Arizona Department of 
Transportation, as they may be amended from time to time, which are herein incorporated by reference 
and made a part of this contract. 
2. Nondiscrimination: The contractor, with regard to the work performance by it during the contract, will 
not discriminate on the grounds of race, color, or national origin in the selection and retention of 
subcontractors, including procurements of materials and leases of equipment. The contractor will not 
participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, 
including employment practices when the contract covers any activity, project, or program set forth in 
Appendix B of 49 CFR Part 21. 
3. Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all 
solicitations, either by competitive bidding, or negotiation made by the contractor for work to be 
performed under a subcontract, including procurements of materials, or leases of equipment, each 
potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under 
this contract and the Acts and Regulations relative to Non-discrimination on the grounds of race, color, or 
national origin. 
4. Information and Reports: The contractor will provide all information and reports required by the Acts, 
the Regulations, and directives issued pursuant thereto and will permit access to its books, records, 
accounts, other sources of information, and its facilities as may be determined by the Recipient, the 
Federal Highway Administration or Arizona Department of Transportation to be pertinent to ascertain 
compliance with such Acts, Regulations, and instructions. Where any information required of a contractor 
is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will 
so certify to the Recipient, the Federal Highway Administration, or Arizona Department of 
Transportation, as appropriate, and will set forth what efforts it has made to obtain the information. 
5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non-discrimination 
provisions of this contract, the Recipient will impose such contract sanctions as it or the Federal Highway 
Administration or Arizona Department of Transportation, may determine to be appropriate, including, but 
not limited to: 
a. withholding payments to the contractor under the contract until the contractor complies;  
and/or 
b. cancelling, terminating, or suspending a contract, in whole or in part. 
6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in 
every subcontract, including procurements of materials and leases of equipment, unless exempt by the 
Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect 
to any subcontract or procurement as the Recipient, the Federal Highway Administration, or Arizona 
Department of Transportation may direct as a means of enforcing such provisions including sanctions for 
noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a 
subcontractor or supplier because of such direction, the contractor may request the Recipient to enter into 
any litigation to protect the interests of the Recipient. In addition, the contractor may request the United 
States to enter into the litigation to protect the interests of the United States. 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

APPENDIX B: CLAUSES FOR DEEDS TRANSFERRING UNITED 
STATES PROPERTY 
The following clauses will be included in deeds effecting or recording the transfer of real property, 
structures, or improvements thereon, or granting interest therein from the United States pursuant to the 
provisions of Assurance 4. 
 
NOW, THEREFORE, the U.S. Department of Transportation as authorized by law and upon the condition that 
Maricopa County Department of Transportation will accept title to the lands and maintain the project constructed 
thereon in accordance with Title 23, United States Code the Regulations for the Administration of Federal Aid for 
Highways, and the policies and procedures prescribed by the Arizona Department of Transportation, Federal 
Highway Administration and the U.S. Department of Transportation in accordance and in compliance with all 
requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, 
Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of 
Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 
252;42 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the Maricopa 
County Department of Transportation all the right, title and interest of the U.S. Department of Transportation in 
and to said lands described in Exhibit A attached hereto and made a part hereof. 
 
(HABENDUM CLAUSE) 
TO HAVE AND TO HOLD said lands and interests therein unto Maricopa County Department of Transportation 
and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein 
contained as follows, which will remain in effect for the period during which the real property or structures are 
used for a purpose for which Federal financial assistance is extended or for another purpose involving the 
provision of similar services or benefits and will be binding on the Maricopa County Department of 
Transportation, its successors and assigns. 
 
The Maricopa County Department of Transportation, in consideration of the conveyance of said lands and 
interests in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors 
and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from 
participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility 
located wholly or in part on, over, or under such lands hereby conveyed [.] [and]* (2) that the Maricopa County 
Department of Transportation will use the lands and interests in lands and interests in lands so conveyed, in 
compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. 
Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-
assisted programs of the U.S. Department of Transportation, Effectuation of Title VI of the Civil Rights Act of 
1964, and as said Regulations and Acts may be amended, [and (3) that in the event of breach of any of the above-
mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and 
facilities on said land, and that above described land and facilities will thereon revert to and vest in and become 
the absolute property of the U.S. Department of Transportation and its assigns as such interest existed prior to this 
instruction].* 
 
*Reverter clause and related language to be used only when it is determined that such a clause is necessary in 
order to make clear the purpose of Title VI.  
 
 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

APPENDIX C: CLAUSES FOR TRANSFER OF REAL PROPERTY 
ACQUIRED OR IMPROVED UNDER THE ACTIVITY, FACILITY, OR 
PROGRAM 
The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered 
into by the Maricopa County Department of Transportation pursuant to the provisions of Assurance 
7(a): 
A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal 
representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby 
covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that: 
1.  In the event facilities are constructed, maintained, or otherwise operated on the property 
described in this (deed, license, lease, permit, etc.) for a purpose for which a U.S. Department 
of Transportation activity, facility, or program is extended or for another purpose involving 
the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will 
maintain and operate such facilities and services in compliance with all requirements imposed 
by the Acts and Regulations (as may be amended) such that no person on the grounds of race, 
color, or national origin, will be excluded from participation in, denied the benefits of, or be 
otherwise subjected to discrimination in the use of said facilities, 
B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities 
thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.* 
C. With respect to licenses, leases, permits, etc., in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
enter or re-enter the lands and facilities thereon, and the above described lands and facilities will 
there upon revert to and vest in and become the absolute property of the Maricopa County 
Department of Transportation and its assigns*. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
*Reverter clause and related language to be used only when it is determined that such a clause is necessary to 
make clear the purpose of Title VI. 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

APPENDIX D: CLAUSES FOR CONSTRUCTION/USE/ACCESS TO 
REAL PROPERTY ACQUIRED UNDER THE ACTIVITY, FACILITY OR 
PROGRAM 
The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements 
entered into by Maricopa County Department of Transportation pursuant to the provisions of 
Assurance 7(b): 
A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal 
representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby 
covenant and agree (in the case of deeds and leases add, “as a covenant running with the land”) that 
(1) no person on the ground of race, color, or national origin, will be excluded from participation in, 
denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that 
in the construction of any improvements on, over, or under such land, and the furnishing of services 
thereon, no person on the ground of race, color, or national origin, will be excluded from 
participation in, denied the benefits of, or otherwise be subjected to discrimination, (3) that the 
(grantee, licensee, lessee, permittee etc.) will use the premises in compliance with all other 
requirements imposed by or pursuant to the Acts and Regulations, as amended set forth in this 
Assurance. 
B. With respect to (licenses, leases, permits, etc.), in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
terminate the (license, permit, etc., as appropriate) and to enter or re-enter or re-enter and repossess 
said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) 
had never been made or issued.* 
C. With respect to deeds, in the event of breach of any of the above Non-discrimination covenants, 
Maricopa County Department of Transportation will there upon revert to and vest in and become the 
absolute property of Maricopa County Department of Transportation and its assigns.* 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
*Reverter clause and related language to be used only when it is determined that such a clause is necessary 
in order to make clear the purpose of Title VI.  
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

APPENDIX E 
During the performance of this contract, the contractor, for itself, its assignees, and successors in 
interest (hereinafter referred to as the “contractor”) agrees to comply with the following 
nondiscrimination statutes and authorities; including but not limited to: 
 
Pertinent Non-Discrimination Authorities: 
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits 
discrimination on the basis of race, color, national origin): and 49 CFR Part 21. 
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 
4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because 
of Federal or Federal-aid programs and projects); 
Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of 
sex); 
• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits 
discrimination on the basis of disability); and 49 CFR Part 27; 
The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits 
discrimination on the basis of age); 
Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, 
(prohibits discrimination based on race, creed, color, national origin, or sex); 
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and 
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and 
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or 
activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and 
contractors, whether such programs or activities are Federally funded 
or not); 
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of 
disability in the operation of public entities, public and private transportation systems, places of 
public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by 
Department of Transportation regulations at 49 C.F.R. parts 37 and 38; 
• The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits 
discrimination on the basis of race, color, national origin, and sex); 
• Executive Order 12898, which ensures discrimination against minority populations by discouraging 
programs, policies, and activities with disproportionately high and adverse human health or 
environmental effects on minority and low-income populations; 
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, 
and resulting agency guidance, national origin discrimination includes discrimination because of 
limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable 
steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 
74100); 
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from 
discriminating because of sex in education programs or activities (20 U.S.C. 1687 et seq). 
Docusign Envelope ID: 7414DE3C-D59B-48D7-9CCB-AF9DB3778374
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Contract No. 2025-017 
  
An interactive Consultant Payment Request Form is available on the 
Maricopa County Department of Transportation website: 
 
https://www.maricopa.gov/DocumentCenter/View/1078/Project-Specific-Consultant-Payment-Request-Form-
PDF?bidId= 
 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

EXHIBIT A 
 
SCOPE OF WORK 
 
CONTRACT NO. 2025-017 
 
MCDOT TRANSPORTATION SYSTEM PLAN 2050 
 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Scope of Work 
Transportation System Plan 2050 
 
 
Consultant: 
 
Project No: 
Contract No.: 
TP073 
2025-017 
 
 
Maricopa County Department of Transportation 
2901 W. Durango Street 
Phoenix, AZ 85009 
 
 
 
 
 
 
January 2025 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050  
Scope of Work 
Project No.: TP022 
 
Contract No.: 2025-017 
Revised: January 2025 
 
Page 2 of 11 
Table of Contents 
Background ......................................................................................................................................... 3 
Purpose and Need .............................................................................................................................. 3 
Study Area ........................................................................................................................................... 3 
Plan Management and Administration ............................................................................................. 3 
Administration ................................................................................................................................ 4 
Schedule Development and Maintenance .................................................................................... 4 
Project Communication ................................................................................................................. 4 
Progress Meetings ..................................................................................................................... 4 
Advisory Committee Meetings .................................................................................................. 4 
Individual Stakeholder Meetings ............................................................................................... 5 
TAB and BOS Meetings .............................................................................................................. 5 
Plan Management and Administration Deliverables ................................................................... 5 
Public Outreach .................................................................................................................................. 5 
Public Meetings .............................................................................................................................. 5 
Summary Handout ......................................................................................................................... 6 
Public Outreach Deliverables ......................................................................................................... 6 
Proposed Project Approach .............................................................................................................. 6 
Project Phasing .................................................................................................................................. 6 
Phase One – Work Plan ................................................................................................................. 6 
Phase One Deliverables ............................................................................................................. 7 
Phase Two – Baseline Conditions ................................................................................................ 7 
Phase Two Deliverables ............................................................................................................. 9 
Phase Three: Transportation System Needs Analysis ................................................................ 9 
Phase Three Deliverables........................................................................................................... 9 
Phase Four – Vision ....................................................................................................................... 9 
Phase Four Deliverables ........................................................................................................... 10 
Phase Five – Implementation Plan ............................................................................................. 10 
Phase Five Deliverables ........................................................................................................... 11 
Phase Six – Final Report .............................................................................................................. 11 
Phase Six Deliverables ............................................................................................................. 11 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 3 of 11 
 
SCOPE OF WORK 
Background 
The Maricopa County Department of Transportation (MCDOT) Transportation System Plan (TSP) 
provides information on the current transportation system and sets the framework for future 
transportation needs in unincorporated Maricopa County. In 1997, MCDOT implemented the first 
TSP; it was later updated in 2007, 2017, and 2021. Transportation is critically important as the 
County continues to grow and develop. Planning must take a proactive approach to 
accommodate the changing needs of current and future residents. To accomplish this, MCDOT 
changed the TSP update cycle from a 10-year cycle to a 5-year cycle, initially starting with 
adoption year 2020. Due to the 2020 Pandemic, the adoption was delayed until 2021 however 
MCDOT still desires to keep the 5-year cycle and seeks adoption in year 2025.  
Purpose and Need 
The purpose of this plan is to set an expectation for the future transportation system as 
population, development, technology, and other factors affect Maricopa County, specifically in 
unincorporated areas. This effort is needed to provide a clear representation of opportunities and 
constraints to achieve a well-connected transportation system that functions for all users.  
Study Area 
The Study Area includes unincorporated Maricopa County. The Project Influence Area includes 
all of Maricopa County.  Portions of Pinal, Pima, Yuma, La Paz, Yavapai, and Gila counties adjacent 
to Maricopa County may be referenced as necessary. The primary focus will be on MCDOT 
facilities within the Study Area. However, some analysis will be conducted for the Project 
Influence Area to determine how MCDOT facilities are impacted by the region.  
Plan Management and Administration 
TSP 2050 will be managed by the MCDOT Systems Planning Branch. The Consultant Team will 
perform all technical analyses, produce all graphic and outreach material, and provide support as 
described in this Scope of Work. All work herein shall be completed within 18 months (inclusive 
of BOS approval and final document submittals) after Notice-to-Proceed (NTP) has been issued. 
The schedule assumes timely reviews of deliverables by MCDOT staff. The schedule shall be 
structured to provide all meeting, delivery, and review times. Review time shall be shown as 25 
working days after the draft submittal (five working days for internal MCDOT review, five working 
days for the Consultant Team to complete revisions, 10 working days for external Advisory 
Committee review, and five working days for the Consultant Team to complete 2nd round of 
revisions) unless otherwise advised by the MCDOT Project Manager.  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 4 of 11 
 
Administration 
The Consultant Team will setup and administer the project. This includes tracking activities to 
ensure deliverables are prepared and submitted on schedule, preparing monthly progress reports, 
preparing monthly invoices, and conducting Consultant Team coordination meetings. The 
Consultant Team will maintain a file sharing page (i.e. OneDrive) for all items to be reviewed by 
the project team. 
Schedule Development and Maintenance 
The Consultant Team will prepare and submit an initial detailed project schedule in Microsoft 
Project during Phase One and will provide an updated schedule at the onset of each subsequent 
phase. At a minimum, the schedule will be updated monthly.  
Project Communication 
The Consultant Team will participate in all meetings with, at minimum, one member attending 
each meeting. The Consultant Team will work with the MCDOT Project Manager to schedule and 
coordinate all meeting dates, times, and locations. Unless directed otherwise, the Consultant 
Team will prepare meeting agenda, materials, and summaries for distribution to meeting 
attendees. Each summary should include, at minimum, attendee list, detailed summary of the 
meeting, opportunities/challenges, action items and next steps.  
The Consultant Team shall maintain an internal meeting tracker to track the progress of the 
project. This will include the date of the meeting, time, duration, attendance, key points, and next 
steps for each meeting held.  
Progress Meetings 
The Consultant Team Project Manager and the MCDOT Project Manager shall meet, at minimum, 
biweekly. These meetings may include other support staff as needed. Also included under 
progress meetings are comment resolution meetings, and major phase/task kickoff meetings. 
Advisory Committee Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, shall identify an Advisory 
Committee that includes internal MCDOT staff and all partner agencies in the County and the 
adjacent surrounding area. The Advisory Committee will provide technical and stakeholder input 
to the plan. It is anticipated an initial kickoff meeting with partnering activities will be held with 
subsequent meetings occurring, at minimum, after the draft submittal of each Technical 
Memorandum, for up to 10 meetings. It is anticipated the advisory committee meetings will be 
virtual to allow for a greater attendance of those in outlying areas with the exception of the 
workshops which will be held in person.  
The Consultant Team, under the direction of the MCDOT Project Manager, will work to provide 
telecommunication for the Advisory Committee, which may include sending emails or calling 
members of the Advisory Committee to progress the project in a timely matter. The Consultant 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 5 of 11 
 
Team will maintain a file sharing page (i.e. OneDrive) for all items to be reviewed by the Advisory 
Committee.  
Individual Stakeholder Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, will conduct up to 15 
coordination meetings with individual stakeholders, as needed. It is anticipated that these 
meetings would be in person to foster collaboration.  
TAB and BOS Meetings 
The Consultant Team will assist and provide support in developing presentations, handouts, 
graphics, and other material related to the development of TSP 2050 for the Technical Advisory 
Board (TAB) and the Board of Supervisors (BOS) meetings. The Consultant Team is not required 
to attend these meetings unless directed by the MCDOT Project Manager; an allowance of up to 
four meetings is included. 
Plan Management and Administration Deliverables 
The Consultant Team shall provide the following deliverables for each phase: 
• 
Invoices  
• 
Progress Reports 
• 
Schedule and Subsequent Updates, as changes occur 
• 
Meeting Materials and Summaries  
o Progress Meetings 
o Advisory Committee Meetings 
o Individual Stakeholder Meetings 
o TAB and BOS Meetings (attended by Consultant Team) 
• 
Meeting Tracker 
Public Outreach 
Public Meetings 
It is anticipated public meetings will be held starting in Phase Two of the project and as requested 
and/or recommended by the MCDOT Project Manager. Each meeting will include a preparation 
meeting with the Consultant Team, MCDOT Systems Planning Branch, and MCDOT 
Communications Branch. Activities may include the following: 
• 
Webpage (electronic engagement) – publicize in coordination with MCDOT 
Communications Branch 
• 
Interactive Map – coordinate with Maricopa County OET, anticipate a new map with each 
phase to track input  
• 
Presentations to municipalities and HOAs – assume coordination and preparation for up 
to 15 presentations, assume Consultant Team attendance at seven presentations 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 6 of 11 
 
• 
Youth Participation – assume identifying up to 10 groups/events to participate in 
visioning 
The Consultant Team and the MCDOT Project Manager will work with the MCDOT 
Communications Branch to develop a plan in Phase One for public outreach. The Consultant 
Team will provide all necessary data and graphic material. Project information will be available 
on the dedicated project webpage and will serve as the public portal. An online public outreach 
effort will be taken for each phase, starting with Phase Two; the Consultant Team will coordinate 
with MCDOT to update the webpage for each phase. 
Summary Handout 
A high-quality summary handout shall be created by the Consultant Team for the public and 
TAB/BOS to learn about each phase of the plan. Each handout shall include public outreach and 
technical highlights of phase elements displayed with various visual graphics.  
Public Outreach Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
• 
Public Outreach Materials 
• 
Summary Handouts 
Proposed Project Approach  
The proposed project is phased to appropriately guide the work effort to achieve the overall 
project purpose and need. The phases include: 
• 
Phase One – Work Plan  
• 
Phase Two – Baseline Conditions 
• 
Phase Three – Transportation System Needs Analysis 
• 
Phase Four – Vision Plan 
• 
Phase Five – Next Steps 
• 
Phase Six – Final Report 
Project Phasing  
The following outlines anticipated task efforts and deliverables for each project phase.  
Phase One – Work Plan 
The Consultant Team will develop a work plan that defines at a minimum: 
• 
Design theme/templates for project and final report in line with County branding 
• 
Detailed schedule 
• 
Study Area 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 7 of 11 
 
• 
Project Influence Area 
• 
Data collection and file sharing plan 
• 
Advisory committee database 
• 
Anticipated key issues and challenges 
• 
Conflict resolution plan 
• 
Detailed phases, including advisory committee meetings and public outreach 
Quality assurance and quality control plan including: 
o Checklists of items to be reviewed prior to each submittal 
o Monthly quality progress reports 
o Procedures for conducting QA/QC activities 
o Person(s) responsible for conducting QA/QC 
Phase One Deliverables 
The Consultant Team shall provide the following deliverables for Phase One: 
• 
Draft and Final Work Plan 
Advisory Committee Database (Excel) 
Phase Two – Baseline Conditions 
Phase Two includes researching and gathering existing and future data to assess and evaluate 
baseline conditions. The Consultant Team will identify, collect, analyze, map, and document 
(including dates) relevant baseline conditions including trends, and traffic generators, etc. that 
would impact the transportation system. As part of this process the Consultant Team will work 
closely with the Advisory Committee, both individually and collectively, to form a broad consensus 
of the baseline conditions within the Project Influence Area. The following system components 
will be identified as available from readily available GIS data sources (e.g. MCDOT, FCDMC, and 
MAG): 
o Topography 
o Floodplains 
o Drainage Features 
o Environmental Features 
o Regional Recreational Facilities  
o Land Use 
o Zoning 
o Demographics 
o Bridges 
o Parks 
o Roadway Surface Type 
o Roadway Pavement Type 
o Vehicular Traffic Counts 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 8 of 11 
 
o Bicycle Traffic Counts 
o Vehicular Traffic Projections (based on MAG regional travel demand model) 
o Electric Charging Stations 
o Number of vehicular travel lanes 
o Shoulders 
o Sidewalks 
o Curbs 
o Curb Ramps 
o Guardrail 
o Transit Facilities  
o Roadway Classification  
o Crashes 
The following system datasets will be created from reviewing current aerial imagery, readily 
available GIS data sources, and recently completed MCDOT/jurisdiction plans, and performing 
calculations as necessary: 
o Shared Use Paths  
o Sidewalk Buffers 
o Crosswalks 
o Medians 
o Bike Lanes 
o Clear Zones (width for facility type)  
o Level of Service (based on MCDOT service volume tables)  
o APS and pedestrian push buttons 
o Special Corridors (Over weight, Over height, Emergency bypass, etc.) 
An excel catalog will be created for collected documents and datasets. The Consultant Team 
shall modify datasets as necessary. Data modifications shall be coordinated with MCDOT Asset 
Management. Data obtained shall follow the Data Collection Plan as documented in the 
associated Work Plan for the project.  
The Consultant Team will conduct a review of the MAG regional travel demand model. The review 
will include the investigation of up to eight subareas. Screenline analyses will be conducted for 
the identified subareas. Thematic mapping will be prepared for TAZs and model links to review 
growth trends in the subareas. The Consultant Team will work collaboratively with the MCDOT 
Systems Planning Branch and the Maricopa County Planning and Development Department to 
confirm the observed trends and determine the potential need for model refinements. It is 
assumed the MCDOT-MAG datasets align and can be used without post-processing. 
The Consultant Team will perform an assessment of all data collected to establish baseline 
metrics for performance measures that will be further refined in Phase 4. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 9 of 11 
 
The Consultant Team will summarize the baseline condition data, review of the MAG regional 
travel demand model, and provide the baseline metrics for performance measures in a technical 
memorandum.  
Phase Two Deliverables 
The Consultant Team shall provide the following deliverables for Phase Two: 
• 
Catalog and Datasets 
• 
Draft and Final Technical Memorandum – Baseline Conditions 
Phase Three: Transportation System Needs Analysis  
Using the deliverables from Phase Two, the Consultant Team shall review and identify needed 
changes or updates to the MCDOT Project Rating System (PRS) to ensure the system is efficient 
and applicable to a variety of project types (e.g. ITS improvements). It is anticipated the 
Consultant Team will utilize the Planning Tool that make up the PRS and recommend updates to 
MCDOT as needed. 
The Consultant Team will comprise a system wide needs list within the Study Area. The list will 
include, at minimum, roadway name, which associated at/to/from roadway names, MCDOT route 
data for current MCDOT Maintained Roadways, and planning level cost. Each identified segment 
should include data for all transportation modes/user needs. Intersections shall be tracked within 
the segmented list and have the capability to stand alone. The Consultant Team will provide 
project parameters for input into the PRS. 
The Consultant Team will evaluate system needs for 2025, 2030, 2040, and 2050 planning 
horizons. It is assumed that complete projects will be identified for the nearer term; longer term 
needs will incorporate a policy-based recommended investment choice model to allocate future 
funds across different investment types. The recommended investment choices will be informed 
through scenario planning workshops in Phase Four.  
 
Phase Three Deliverables 
The Consultant Team shall provide the following deliverables for Phase Three: 
• 
Transportation System Needs List (GIS and Table format) 
• 
Draft and Final Technical Memorandum – Transportation System Needs Analysis 
Phase Four – Vision 
The Consultant Team shall prepare a report to update goals, objectives, strategies, and 
performance measures from TSP 2040. The Consultant Team will work with the Advisory 
Committee to refine the goals, objectives, and strategies, and update the performance measures 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 10 of 11 
 
for each strategy that will improve the system. The Consultant Team shall update the tracking 
system for the defined performance measures.  
A series of three facilitated scenario planning workshops will be conducted to further investigate 
the identified needs in Phase Three. The Consultant Team will staff the meetings with key team 
members including a facilitator and subject expert. The first workshop will serve as an 
introduction, provide background information, and foster brainstorming on the changing world of 
transportation. The second workshop will identify assumptions, probabilities, potential risks, 
potential impacts, potential policy needs, and potential decision points (triggers). The third 
workshop will present the findings, potential changes in travel demand, and identification of 
potential future actions. It is assumed that each workshop will last no more than one-half working 
day. It is assumed that up to four scenarios will be investigated. 
The Consultant Team shall conduct a peer review of up to four counties/cities/MPOs to compare 
the following with other agencies. Any needed refinement should be coordinated with the 
Advisory Committee to ensure the overall vision of the system is identified. 
• 
Established goals, objectives, strategies, and performance measures.  
• 
Roadway, bicycle, and pedestrian standard design features (e.g. standard bike lane, rolled 
curb, diagonal curb ramp, 12-foot travel lane). 
• 
Types and impact of current and new technology on the transportation system. 
The Consultant Team will work with the MCDOT Systems Planning Branch to review the needs 
and define projects that satisfy the identified goals, objectives, strategies, and more forward the 
performance measures. The Consultant Team will test the projects for general practicality (e.g. 
project limits) and comprehensiveness (i.e. ITS, capacity, alternative modes) budgeted for in 
Phase Three. 
Phase Four Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
• 
Performance Measure Tracking System 
• 
Draft and Final Technical Memorandum – Vision 
Phase Five – Implementation Plan 
The Consultant Team will provide an analysis on the next steps to accomplish the established 
vision from Phase Four. This will include an implementation plan for every planning horizon. The 
Consultant Team shall build on the peer review from Phase 4 and provide an analysis of existing 
and potential funding sources for unincorporated Maricopa County. Revenue forecast(s) will be 
provided to the Consultant Team by MCDOT (assumed from Elliott D. Pollack & Company). The 
Consultant Team will prepare a scenario matrix based on receiving potential funds; up to four 
scenarios will be assessed. A no build, no fund (i.e. discontinuation of Regional Area Road Fund 
Arterial Lifecycle Program) scenario will be included in the analysis. Scenarios shall include the 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 11 of 11 
 
cost of maintenance for the existing and proposed system improvements. The Consultant Team 
will work with the MCDOT Systems Planning Branch to evaluate MCDOT staffing needs to 
implement the plan.   
The Consultant Team will work with MCDOT Systems Planning Branch to utilize the MCDOT 
Planning Tool to create a comprehensive project database that provides all members of MCDOT 
staff access to project information. 
The Consultant Team will work with MCDOT Systems Planning Branch to identify new policies or 
revisions to existing policies for plan implementation. Potential policies could address integration 
of connected vehicle/autonomous vehicles and impacts to infrastructure, Electric Vehicle (EV) 
integration, ITS improvements, active transportation implementation, development construction 
phasing requirements to mitigate scalloped street scenarios, and grants to fund potential 
improvements. It is assumed that up to five policies will be investigated. These policies may help 
establish and inform project needs. 
Phase Five Deliverables 
The Consultant Team shall provide the following deliverables for Phase Five: 
• 
Draft and Final Technical Memorandum – Next Steps 
• 
Project Database 
Phase Six – Final Report 
The Consultant Team will prepare the Draft and Final Report encapsulating the efforts taken in 
Phase One through Phase Five.  
Phase Six Deliverables 
The Consultant Team shall provide the following deliverables for Phase Six: 
• 
Draft and Final Report 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

EXHIBIT B 
 
CONSULTANT’S FEE PROPOSAL 
 
CONTRACT NO. 2025-017 
 
MCDOT TRANSPORTATION SYSTEM PLAN 2050 
 
 
  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

1500 N. Priest Drive  |  Suite 102  |  Tempe, AZ 85288  |  602.244.8100 
Beverly Krumm 
Contracts Officer 
Maricopa County Department of Transportation 
2901 W. Durango Street 
Phoenix, AZ 85009 
Re: Contract No.: 2025-017 
Transportation System Plan 2050 
Fee Proposal 
 
 
April 23, 2025 
 
 
 
Dear Ms. Krumm: 
 
Burgess & Niple is pleased to submit the attached Fee Proposal for the Transportation System Plan 2050, Contract 
Number 2025-017. 
 
Please do not hesitate to contact me for any questions. 
 
Respectfully, 
 
 
 
 
Jason Pagnard 
Vice President 
jason.pagnard@burgessniple.com 
 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Scope of Work 
Transportation System Plan 2050 
 
 
Consultant: 
Burgess & Niple, Inc.  
Project No: 
Contract No.: 
TP073 
2025-017 
 
 
Maricopa County Department of Transportation 
2901 W. Durango Street 
Phoenix, AZ 85009 
 
 
 
 
 
 
April 2025 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050  
Scope of Work 
Project No.: TP022 
 
Contract No.: 2025-017 
Revised: January 2025 
 
Page 2 of 11 
Table of Contents 
Background ......................................................................................................................................... 3 
Purpose and Need .............................................................................................................................. 3 
Study Area ........................................................................................................................................... 3 
Plan Management and Administration ............................................................................................. 3 
Administration ................................................................................................................................ 4 
Schedule Development and Maintenance .................................................................................... 4 
Project Communication ................................................................................................................. 4 
Progress Meetings ..................................................................................................................... 4 
Advisory Committee Meetings .................................................................................................. 4 
Individual Stakeholder Meetings ............................................................................................... 5 
TAB and BOS Meetings .............................................................................................................. 5 
Plan Management and Administration Deliverables ................................................................... 5 
Public Outreach .................................................................................................................................. 5 
Public Meetings .............................................................................................................................. 5 
Summary Handout ......................................................................................................................... 6 
Public Outreach Deliverables ......................................................................................................... 6 
Proposed Project Approach .............................................................................................................. 6 
Project Phasing .................................................................................................................................. 6 
Phase One – Work Plan ................................................................................................................. 6 
Phase One Deliverables ............................................................................................................. 7 
Phase Two – Baseline Conditions ................................................................................................ 7 
Phase Two Deliverables ............................................................................................................. 9 
Phase Three: Transportation System Needs Analysis ................................................................ 9 
Phase Three Deliverables .......................................................................................................... 9 
Phase Four – Vision ....................................................................................................................... 9 
Phase Four Deliverables........................................................................................................... 10 
Phase Five – Implementation Plan ............................................................................................. 10 
Phase Five Deliverables ........................................................................................................... 11 
Phase Six – Final Report .............................................................................................................. 11 
Phase Six Deliverables ............................................................................................................. 11 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 3 of 11 
 
SCOPE OF WORK 
Background 
The Maricopa County Department of Transportation (MCDOT) Transportation System Plan (TSP) 
provides information on the current transportation system and sets the framework for future 
transportation needs in unincorporated Maricopa County. In 1997, MCDOT implemented the first 
TSP; it was later updated in 2007, 2017, and 2021. Transportation is critically important as the 
County continues to grow and develop. Planning must take a proactive approach to 
accommodate the changing needs of current and future residents. To accomplish this, MCDOT 
changed the TSP update cycle from a 10-year cycle to a 5-year cycle, initially starting with 
adoption year 2020. Due to the 2020 Pandemic, the adoption was delayed until 2021 however 
MCDOT still desires to keep the 5-year cycle and seeks adoption in year 2026.  
Purpose and Need 
The purpose of this plan is to set an expectation for the future transportation system as 
population, development, technology, and other factors affect Maricopa County, specifically in 
unincorporated areas. This effort is needed to provide a clear representation of opportunities and 
constraints to achieve a well-connected transportation system that functions for all users.  
Study Area 
The Study Area includes unincorporated Maricopa County. The Project Influence Area includes 
all of Maricopa County.  Portions of Pinal, Pima, Yuma, La Paz, Yavapai, and Gila counties adjacent 
to Maricopa County may be referenced as necessary. The primary focus will be on MCDOT 
facilities within the Study Area. However, some analysis will be conducted for the Project 
Influence Area to determine how MCDOT facilities are impacted by the region.  
Plan Management and Administration 
TSP 2050 will be managed by the MCDOT Systems Planning Branch. Burgess & Niple 
(Consultant) will perform all technical analyses, produce all graphic and outreach material, and 
provide support as described in this Scope of Work. Michael Baker International (Subconsultant) 
will support Consultant. Together, Consultant and Subconsultant are the Consultant Team. All 
work items are identified in this Scope of Work; work items to be completed by Subconsultant 
are indicated in Subconsultant Scope of Work. 
All work herein shall be completed within 18 months (inclusive of BOS approval and final 
document submittals) after Notice-to-Proceed (NTP) has been issued. The schedule assumes 
timely reviews of deliverables by MCDOT staff. The schedule shall be structured to provide all 
meeting, delivery, and review times. Review time shall be shown as 25 working days after the 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 4 of 11 
 
draft submittal (five working days for internal MCDOT review, five working days for the Consultant 
Team to complete revisions, 10 working days for external Advisory Committee review, and five 
working days for the Consultant Team to complete 2nd round of revisions) unless otherwise 
advised by the MCDOT Project Manager.  
Administration 
The Consultant Team will setup and administer the project. This includes tracking activities to 
ensure deliverables are prepared and submitted on schedule, preparing monthly progress reports, 
preparing monthly invoices, and conducting Consultant Team coordination meetings. The 
Consultant Team will maintain a file sharing page for all items to be reviewed by the project team. 
Schedule Development and Maintenance 
The Consultant Team will prepare and submit an initial detailed project schedule in Microsoft 
Project during Phase One and will provide an updated schedule at the onset of each subsequent 
phase. At a minimum, the schedule will be updated monthly.  
Project Communication 
The Consultant Team will participate in all meetings with, at minimum, one member attending 
each meeting. The Consultant Team will work with the MCDOT Project Manager to schedule and 
coordinate all meeting dates, times, and locations. Unless directed otherwise, the Consultant 
Team will prepare meeting agenda, materials, and summaries for distribution to meeting 
attendees. Each summary should include, at minimum, attendee list, detailed summary of the 
meeting, opportunities/challenges, action items and next steps.  
The Consultant Team shall maintain an internal meeting tracker to track the progress of the 
project. This will include the date of the meeting, time, duration, attendance, key points, and next 
steps for each meeting held.  
Progress Meetings 
The Consultant Team Project Manager and the MCDOT Project Manager shall meet, at minimum, 
biweekly. These meetings may include other support staff as needed. Also included under 
progress meetings are comment resolution meetings, and major phase/task kickoff meetings. 
Advisory Committee Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, shall identify an 
Advisory Committee that includes internal MCDOT staff and all partner agencies in the County 
and the adjacent surrounding area. The Advisory Committee will provide technical and 
stakeholder input to the plan. It is anticipated an initial kickoff meeting with partnering activities 
will be held with subsequent meetings occurring, at minimum, after the draft submittal of each 
Technical Memorandum, for up to 10 meetings. It is anticipated the advisory committee meetings 
will be virtual to allow for a greater attendance of those in outlying areas with the exception of 
the workshops which will be held in person.  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 5 of 11 
 
The Consultant Team, under the direction of the MCDOT Project Manager, will work to provide 
telecommunication for the Advisory Committee, which may include sending emails or calling 
members of the Advisory Committee to progress the project in a timely matter. The Consultant 
Team will maintain a file sharing page for all items to be reviewed by the Advisory Committee.  
Individual Stakeholder Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, will conduct up to 15 
coordination meetings with individual stakeholders, as needed. It is anticipated that these 
meetings would be in person to foster collaboration.  
TAB and BOS Meetings 
The Consultant Team will assist and provide support in developing presentations, handouts, 
graphics, and other material related to the development of TSP 2050 for the Technical Advisory 
Board (TAB) and the Board of Supervisors (BOS) meetings. The Consultant Team is not required 
to attend these meetings unless directed by the MCDOT Project Manager; an allowance of up to 
four meetings is included. 
Plan Management and Administration Deliverables 
The Consultant Team shall provide the following deliverables for each phase: 
 
Invoices  
 
Progress Reports 
 
Schedule and Subsequent Updates, as changes occur 
 
Meeting Materials and Summaries  
o Progress Meetings 
o Advisory Committee Meetings 
o Individual Stakeholder Meetings 
o TAB and BOS Meetings (attended by Consultant Team) 
 
Meeting Tracker 
Public Outreach 
Public Meetings 
It is anticipated public meetings will be held starting in Phase Two of the project and as requested 
and/or recommended by the MCDOT Project Manager. Each meeting will include a preparation 
meeting with the Consultant Team, MCDOT Systems Planning Branch, and MCDOT 
Communications Branch. Activities may include the following: 
 
Webpage (electronic engagement) – publicize in coordination with MCDOT 
Communications Branch 
 
Interactive Map – coordinate with Maricopa County OET, anticipate a new map with each 
phase to track input  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 6 of 11 
 
 
Presentations to municipalities and HOAs – assume coordination and preparation for up 
to 15 presentations, assume Consultant Team attendance at seven presentations 
 
Youth Participation – assume identifying up to 10 groups/events to participate in 
visioning 
The Consultant Team and the MCDOT Project Manager will work with the MCDOT 
Communications Branch to develop a plan in Phase One for public outreach. The Consultant 
Team will provide all necessary data and graphic material. Project information will be available 
on the dedicated project webpage and will serve as the public portal. An online public outreach 
effort will be taken for each phase, starting with Phase Two; the Consultant Team will coordinate 
with MCDOT to update the webpage for each phase. 
Summary Handout 
A high-quality summary handout shall be created by the Consultant Team for the public and 
TAB/BOS to learn about each phase of the plan. Each handout shall include public outreach and 
technical highlights of phase elements displayed with various visual graphics.  
Public Outreach Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
 
Public Outreach Materials 
 
Summary Handouts 
Proposed Project Approach  
The proposed project is phased to appropriately guide the work effort to achieve the overall 
project purpose and need. The phases include: 
 
Phase One – Work Plan  
 
Phase Two – Baseline Conditions 
 
Phase Three – Transportation System Needs Analysis 
 
Phase Four – Vision Plan 
 
Phase Five – Next Steps 
 
Phase Six – Final Report 
Project Phasing  
The following outlines anticipated task efforts and deliverables for each project phase.  
Phase One – Work Plan 
The Consultant Team will develop a work plan that defines at a minimum: 
 
Design theme/templates for project and final report in line with County branding 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 7 of 11 
 
 
Detailed schedule 
 
Study Area 
 
Project Influence Area 
 
Data collection and file sharing plan 
 
Advisory committee database 
 
Anticipated key issues and challenges 
 
Conflict resolution plan 
 
Detailed phases, including advisory committee meetings and public outreach 
Quality assurance and quality control plan including: 
o Checklists of items to be reviewed prior to each submittal 
o Monthly quality progress reports 
o Procedures for conducting QA/QC activities 
o Person(s) responsible for conducting QA/QC 
Phase One Deliverables 
The Consultant Team shall provide the following deliverables for Phase One: 
 
Draft and Final Work Plan 
Advisory Committee Database (Excel) 
Phase Two – Baseline Conditions 
Phase Two includes researching and gathering existing and future data to assess and evaluate 
baseline conditions. The Consultant Team will identify, collect, analyze, map, and document 
(including dates) relevant baseline conditions including trends, and traffic generators, etc. that 
would impact the transportation system. As part of this process the Consultant Team will work 
closely with the Advisory Committee, both individually and collectively, to form a broad consensus 
of the baseline conditions within the Project Influence Area. The following system components 
will be identified as available from readily available GIS data sources (e.g. MCDOT, FCDMC, and 
MAG): 
o Topography 
o Floodplains 
o Drainage Features 
o Environmental Features 
o Regional Recreational Facilities  
o Land Use 
o Zoning 
o Demographics 
o Bridges 
o Parks 
o Roadway Surface Type 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 8 of 11 
 
o Roadway Pavement Type 
o Vehicular Traffic Counts 
o Bicycle Traffic Counts 
o Vehicular Traffic Projections (based on MAG regional travel demand model) 
o Electric Charging Stations 
o Number of vehicular travel lanes 
o Shoulders 
o Sidewalks 
o Curbs 
o Curb Ramps 
o Guardrail 
o Transit Facilities  
o Roadway Classification  
o Crashes 
The following system datasets will be created from reviewing current aerial imagery, readily 
available GIS data sources, and recently completed MCDOT/jurisdiction plans, and performing 
calculations as necessary: 
o Shared Use Paths  
o Sidewalk Buffers 
o Crosswalks 
o Medians 
o Bike Lanes 
o Clear Zones (width for facility type)  
o Level of Service (based on MCDOT service volume tables)  
o APS and pedestrian push buttons 
o Special Corridors (Over weight, Over height, Emergency bypass, etc.) 
An excel catalog will be created for collected documents and datasets. The Consultant Team 
shall modify datasets as necessary. Data modifications shall be coordinated with MCDOT Asset 
Management. Data obtained shall follow the Data Collection Plan as documented in the 
associated Work Plan for the project.  
The Consultant Team will conduct a review of the MAG regional travel demand model. The review 
will include the investigation of up to eight subareas. Screenline analyses will be conducted for 
the identified subareas. Thematic mapping will be prepared for TAZs and model links to review 
growth trends in the subareas. The Consultant Team will work collaboratively with the MCDOT 
Systems Planning Branch and the Maricopa County Planning and Development Department to 
confirm the observed trends and determine the potential need for model refinements. It is 
assumed the MCDOT-MAG datasets align and can be used without post-processing. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 9 of 11 
 
The Consultant Team will perform an assessment of all data collected to establish baseline 
metrics for performance measures that will be further refined in Phase 4. 
The Consultant Team will summarize the baseline condition data, review the MAG regional travel 
demand model, and provide the baseline metrics for performance measures in a technical 
memorandum.  
Phase Two Deliverables 
The Consultant Team shall provide the following deliverables for Phase Two: 
 
Catalog and Datasets 
 
Draft and Final Technical Memorandum – Baseline Conditions 
Phase Three: Transportation System Needs Analysis  
Using the deliverables from Phase Two, the Consultant Team shall review and identify the needed 
changes or updates to the MCDOT Project Rating System (PRS) to ensure the system is efficient 
and applicable to a variety of project types (e.g. ITS improvements). It is anticipated the 
Consultant Team will utilize the Planning Tool that make up the PRS and recommend updates to 
MCDOT as needed. 
The Consultant Team will comprise a system wide needs list within the Study Area. The list will 
include, at minimum, roadway name, which associated at/to/from roadway names, MCDOT route 
data for current MCDOT Maintained Roadways, and planning level cost. Each identified segment 
should include data for all transportation modes/user needs. Intersections shall be tracked within 
the segmented list and have the capability to stand alone. The Consultant Team will provide 
project parameters for input into the PRS. 
The Consultant Team will evaluate system needs for 2025, 2030, 2040, and 2050 planning 
horizons. It is assumed that complete projects will be identified for the nearer term; longer term 
needs will incorporate a policy-based recommended investment choice model to allocate future 
funds across different investment types. The recommended investment choices will be informed 
through scenario planning workshops in Phase Four.  
 
Phase Three Deliverables 
The Consultant Team shall provide the following deliverables for Phase Three: 
 
Transportation System Needs List (GIS and Table format) 
 
Draft and Final Technical Memorandum – Transportation System Needs Analysis 
Phase Four – Vision 
The Consultant Team shall prepare a report to update goals, objectives, strategies, and 
performance measures from TSP 2040. The Consultant Team will work with the Advisory 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 10 of 11 
 
Committee to refine the goals, objectives, and strategies, and update the performance measures 
for each strategy that will improve the system. The Consultant Team shall update the tracking 
system for the defined performance measures.  
A series of three facilitated scenario planning workshops will be conducted to further investigate 
the identified needs in Phase Three. The Consultant Team will staff the meetings with key team 
members including a facilitator and subject expert. The first workshop will serve as an 
introduction, provide background information, and foster brainstorming on the changing world of 
transportation. The second workshop will identify assumptions, probabilities, potential risks, 
potential impacts, potential policy needs, and potential decision points (triggers). The third 
workshop will present the findings, potential changes in travel demand, and identification of 
potential future actions. It is assumed that each workshop will last no more than one-half working 
day. It is assumed that up to four scenarios will be investigated. 
The Consultant Team shall conduct a peer review of up to four counties/cities/MPOs to compare 
the following with other agencies. Any needed refinement should be coordinated with the 
Advisory Committee to ensure the overall vision of the system is identified. 
 
Established goals, objectives, strategies, and performance measures.  
 
Roadway, bicycle, and pedestrian standard design features (e.g. standard bike lane, rolled 
curb, diagonal curb ramp, 12-foot travel lane). 
 
Types and impact of current and new technology on the transportation system. 
The Consultant Team will work with the MCDOT Systems Planning Branch to review the needs 
and define projects that satisfy the identified goals, objectives, strategies, and more forward the 
performance measures. The Consultant Team will test the projects for general practicality (e.g. 
project limits) and comprehensiveness (i.e. ITS, capacity, alternative modes) budgeted for in 
Phase Three. 
Phase Four Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
 
Performance Measure Tracking System 
 
Draft and Final Technical Memorandum – Vision 
Phase Five – Implementation Plan 
The Consultant Team will provide an analysis on the next steps to accomplish the established 
vision from Phase Four. This will include an implementation plan for every planning horizon. The 
Consultant Team shall build on the peer review from Phase 4 and provide an analysis of existing 
and potential funding sources for unincorporated Maricopa County. Revenue forecast(s) will be 
provided to the Consultant Team by MCDOT (assumed from Elliott D. Pollack & Company). The 
Consultant Team will prepare a scenario matrix based on receiving potential funds; up to four 
scenarios will be assessed. A no build, no fund (i.e. discontinuation of Regional Area Road Fund 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 11 of 11 
 
Arterial Lifecycle Program) scenario will be included in the analysis. Scenarios shall include the 
cost of maintenance for the existing and proposed system improvements. The Consultant Team 
will work with the MCDOT Systems Planning Branch to evaluate MCDOT staffing needs to 
implement the plan.   
The Consultant Team will work with MCDOT Systems Planning Branch to utilize the MCDOT 
Planning Tool to create a comprehensive project database that provides all members of MCDOT 
staff access to project information. 
The Consultant Team will work with MCDOT Systems Planning Branch to identify new policies or 
revisions to existing policies for plan implementation. Potential policies could address integration 
of connected vehicle/autonomous vehicles and impacts to infrastructure, Electric Vehicle (EV) 
integration, ITS improvements, active transportation implementation, development construction 
phasing requirements to mitigate scalloped street scenarios, and grants to fund potential 
improvements. It is assumed that up to five policies will be investigated. These policies may help 
establish and inform project needs. 
Phase Five Deliverables 
The Consultant Team shall provide the following deliverables for Phase Five: 
 
Draft and Final Technical Memorandum – Next Steps 
 
Project Database 
Phase Six – Final Report 
The Consultant Team will prepare the Draft and Final Report encapsulating the efforts taken in 
Phase One through Phase Five.  
Phase Six Deliverables 
The Consultant Team shall provide the following deliverables for Phase Six: 
 
Draft and Final Report 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
ESTIMATED DIRECT LABOR
PERSON
BILLING
CLASSIFICATION
HOURS
RATE/HOUR
TOTAL
Senior Project Manager
491
                        
107.83
$                 
52,945
$         
Senior Transportation Engineer
1,212
                     
68.32
$                   
82,804
$         
Transportation Engineer
958
                        
54.79
$                   
52,489
$         
GIS/Data Analyst
1,378
                     
56.31
$                   
77,595
$         
Senior Planner
208
                        
69.79
$                   
14,516
$         
Planner
1,602
                     
41.04
$                   
65,746
$         
Contract Administrator
16
                          
51.17
$                   
819
$              
5,865
                     
  Hours
Estimated Labor Cost
346,914
$       
Overhead
188%
652,198
$       
Subtotal
999,112
$       
ESTIMATED DIRECT EXPENSES
(Listed By Item At Estimated Actual Cost - NO MARKUP)
Travel
801
$                      
Plotting
$
Miscellaneous Expenses
-
$                       
Total Estimated Expenses
801
$              
ESTIMATED OUTSIDE SERVICES AND CONSULTANTS
Firm
Cost
Michael Baker International
400,161
$               
Total Estimated Outside Services
400,161
$       
PROFIT (Direct Labor +Overhead)
10%
99,911.23
      
TOTAL ESTIMATED FEE
1,499,986
$    
CONTRACT TIME 
500 Calendar Days
4/23/2025
(Figures Rounded To The Nearest $1)
Edwin J. Muccillo
Date
DERIVATION OF COST PROPOSAL SUMMARY
/23/2025
Page 1 of 1
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
Scale
No
Shts
Hours/
Sheet
Sr. Project 
Manager
Sr. Transportation 
Engineer
Transportatio
n Engineer
GIS/Data 
Analyst
Senior 
Planner
Planner
Contract 
Administrator
Total
TASK
ESTIMATED STAFF HOURS - PHASE
Plan Management and Administration 
191
267
20
28
72
16
594.0
Project Set Up
12
12.0
Administration/Project Management
54
80
134.0
Invoicing and Monthly Progress Reports
10
20
16
46.0
Schedule Maintenance (monthly updates)
16
16.0
Meeting Tracker
10
10.0
Establish File Sharing Site
8
8.0
Internal Team Coordination Meetings (weekly = 56)
16
32
8
10
66.0
Progress Meetings (bi-weekly = 28)
48
48
96.0
Advisory Committee Meetings (10)
40
60
20
20
20
160.0
Individual Stakeholder Meetings (15)
15
15
30.0
TAB and BOS Meetings (4)
8
8
16.0
Public Outreach
114
204
172
112
602.0
Public Meetings
40
40
24
16
120.0
Webpage
4
12
16.0
Interactive Map
24
24.0
Coordination with OET
16
16.0
Presentations to Municipalities and HOAs (Prepare for 15; attend 7)
14
60
20
94.0
Youth Participation (10 groups/events)
60
80
80
40
260.0
Public Outreach Plan Review
12
12.0
Summary Handout (6 phases)
12
24
24
60.0
Phase One - Work Plan
14
43
60
22
78
217.0
Develop Detailed Schedule
4
4
24
32.0
Develop Design Theme/Templates
4
8
20
32.0
Develop Map Package
2
8
16
26.0
Study Area and Project Influence Area
2
8
10.0
Data Collection and File Sharing Plan
2
4
4
10.0
Develop Advisory Committee Database
1
4
5.0
Anticipated Key Issues and Challenges
2
4
6.0
Conflict Resolution Plan
1
2
4
7.0
Quality Assurance and Quality Control Plan
1
4
8
8
21.0
Draft Work Plan
8
16
16
40.0
Work Plan QA/QC
2
4
6.0
Final Work Plan
2
4
4
2
10
22.0
4/23/2025
Page 1 of 4
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
Scale
No
Shts
Hours/
Sheet
Sr. Project 
Manager
Sr. Transportation 
Engineer
Transportatio
n Engineer
GIS/Data 
Analyst
Senior 
Planner
Planner
Contract 
Administrator
Total
TASK
ESTIMATED STAFF HOURS - PHASE
Phase Two - Baseline Conditions
14
124
160
448
326
1072.0
Research and Data Collection 
8
16
48
72.0
Identify, Analyze and Summarize Data
4
12
12
28.0
Topography
1
8
4
13.0
Floodplains
1
8
4
13.0
Drainage Features
1
8
4
13.0
Environmental Features (Built Env., Natural Features)
1
8
8
17.0
Regional Recreational Facilities
1
8
4
13.0
Land Ownership
1
8
4
13.0
Existing and Future Land Use
1
8
8
17.0
Zoning
1
8
4
13.0
Development
2
8
12
22.0
Demographics
2
8
22
32.0
Title VI
2
8
24
34.0
Activity Centers
1
8
4
13.0
Bridges
1
4
8
13.0
Parks
1
4
8
13.0
Roadway Surface Type
1
4
8
13.0
Roadway Pavement Type 
1
4
8
13.0
Vehicular Traffic Counts
1
4
8
13.0
Bicycle Traffic Counts (MBI
2
2.0
Vehicular Traffic Projections
1
24
8
33.0
Electric Charging Stations (MBI)
2
2.0
Vehicular Travel Lanes
1
4
8
13.0
Shoulders
1
4
8
13.0
Sidewalks (MBI)
2
2.0
Curbs 
1
4
8
13.0
Curb Ramps (MBI)
2
2.0
Guardrail
1
4
8
13.0
Transit Facilities
1
4
8
13.0
Roadway Classification
2
4
8
14.0
Crashes
2
16
8
26.0
Shared Use Paths (MBI)
2
2.0
Sidewalk Buffer (MBI)
2
2.0
Crosswalks (MBI)
2
2.0
Medians (MBI)
2
2.0
Bike Lanes (MBI)
2
2.0
Clear Zones (MBI)
2
2.0
Level of Service-based on MCDOT Service Volume Tables
4
32
16
52.0
APS and Pedestrian Push Buttons (MBI)
2
2.0
Special Corridors-Over Weight/Height, Emergency, Bypass, etc. (MBI)
2
2.0
Review Jurisdictional Plans and Studies
8
24
32.0
Coordination with MCDOT Asset Management
6
8
40
54.0
MAG TDM Review - 8 sub areas
2
16
24
42.0
Conduct Screenline Analysis and Mapping
2
20
60
82.0
Growth Trends Analysis
16
24
40.0
Identify Baseline Metrics
6
24
24
54.0
Draft Baseline Conditions TM
12
16
8
48
84.0
Document Setup
2
8
10.0
Baseline Conditions QA/QC
12
8
4
24.0
Final Baseline Conditions TM
2
4
16
16
38.0
Phase Closeout
4
12
4
20.0
4/23/2025
Page 2 of 4
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
Scale
No
Shts
Hours/
Sheet
Sr. Project 
Manager
Sr. Transportation 
Engineer
Transportatio
n Engineer
GIS/Data 
Analyst
Senior 
Planner
Planner
Contract 
Administrator
Total
TASK
ESTIMATED STAFF HOURS - PHASE
Phase Three - Transportation System Needs Analysis
10
148
272
296
102
828.0
Review and Identify PRS Changes
16
24
40.0
Coordinate PRS Runs
24
60
84.0
Identify System Needs
24
40
80
46
190.0
Develop System Needs Costs
16
40
16
72.0
Develop Projects
16
140
48
204.0
Project Practicality Review
16
24
24
64.0
Draft Transportation System Needs Analysis TM
16
20
20
40
96.0
Transportation System Needs Analysis QA/QC
8
8
16.0
Final Transportation System Needs Analysis TM
2
8
8
16
8
42.0
Phase Closeout
4
8
8
20.0
Phase Four- Vision Plan
64
154
136
84
72
268
778.0
Update Goals, Objectives, Strategies and Performance Measures
8
24
16
16
64.0
GOSPM Meeting with MCDOT
4
6
10.0
Update Performance Measure Tracking System
2
4
4
60
70.0
Scenario Planning Workshop 1
10
20
16
24
70.0
Scenario Planning Workshop 2
10
20
16
24
70.0
Scenario Planning Workshop 3
10
20
16
24
70.0
Scenario Planning Documentation
12
24
16
44
96.0
Scenario Model Runs (MAG coordination)
64
64.0
Identify Peer Review Agencies
4
4
8
16.0
Draft GOSPM Peer Review
20
20
40.0
Peer Review QA/QC
2
4
6.0
Final GOSPM Peer Review
2
4
12
18.0
Draft Standard Design Features Peer Review
20
20
40.0
Peer Review QA/QC
2
4
6.0
Final Standard Design Features Peer Review
2
4
12
18.0
Draft Technology Impacts Peer Review (MBI)
4
4.0
Peer Review QA/QC (MBI)
4
4.0
Final Technology Impacts Peer Review (MBI)
4
4.0
Draft Vision TM
8
8
32
48.0
Vision QA/QC
8
8
16.0
Final Vision TM
4
4
16
24.0
Phase Closeout
4
8
8
20.0
4/23/2025
Page 3 of 4
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
Scale
No
Shts
Hours/
Sheet
Sr. Project 
Manager
Sr. Transportation 
Engineer
Transportatio
n Engineer
GIS/Data 
Analyst
Senior 
Planner
Planner
Contract 
Administrator
Total
TASK
ESTIMATED STAFF HOURS - PHASE
Phase Five - Next Steps
64
212
266
64
136
400
1142.0
Develop Implementation Plan
16
40
32
100
188.0
Review and Update Recommended Investment Choice Model
8
8
16
12
44.0
Analyze Funding Scenarios
16
24
40.0
Existing and Potential Revenue Projections
4
16
20
60
100.0
Life Cycle System Costs
4
16
20
60
100.0
Evaluate MCDOT Staffing Needs
4
4
4
12.0
Draft Funding Analysis White Paper
4
6
16
26.0
Funding Analysis White Paper QA/QC
8
8
16.0
Final Funding Analysis White Paper
4
16
4
24.0
Develop Comprehensive Project Database
16
40
56.0
Policy Coordination
8
8
16
32.0
Draft Policies (3 B&N + 2 MBI)
16
20
60
60
156.0
Policies QA/QC (5)
20
24
12
56.0
Final Policies (3 B&N + 2 MBI))
20
16
60
60
156.0
Draft Next Steps TM
16
16
16
24
72.0
Next Steps QA/QC
8
8
16.0
Final Next Steps TM
8
16
4
28.0
Phase Closeout
4
8
8
20.0
Phase Six - Final Report
20
60
44
264
244
632.0
Theme/Template
20
20
40.0
Develop Infographics
120
120.0
InDesign
80
80.0
Consolidate Content
16
80
96.0
Finalize Report Mapping Needs
20
20
40.0
Draft Final Report
20
20
60
100.0
Final Report QA/QC
12
16
28.0
Final Report
8
16
8
24
56.0
Phase Closeout
8
24
40
72.0
491
1212
958
1378
208
1602
16
5865.0
4/23/2025
Page 4 of 4
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Burgess & Niple, Inc. 
PROJECT NO. TP073
Contract No. 2025-017
Travel
A. Local Mileage at
0.70
$                 
1,144
                
miles
Subtotal Travel
801
$                 
Plotting
B.  Exhibits at
exhibits
C.  Plots at
plots
-
$                  
D.  Plan Submittals
Half Size Bond Copies at
Copies
Full Size Bond Copies at
Copies
Subtotal Plotting
-
$                  
Miscellaneous Expenses
C. Other
-
$                  
Subtotal Miscellaneous Expenses
-
$                  
ESTIMATED OUTSIDE SERVICES & CONSULTANTS
Michael Baker International
400,161
$          
TOTAL ESTIMATED OUTSIDE SERVICES
400,161
$          
TOTAL ESTIMATED EXPENSES  
400,962
$          
ESTIMATE OF DIRECT EXPENSES
/23/2025
Page 1 of 1
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Scope of Work 
Transportation System Plan 2050 
Consultant: 
Michael Baker International 
Project No: 
Contract No.: 
TP073 
2025-017 
Maricopa County Department of Transportation 
2901 W. Durango Street 
Phoenix, AZ 85009 
April 2025 
Michael Baker International
Scope of Work elements highlighted yellow
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050 
Scope of Work 
Project No.: TP022 
Contract No.: 2025-017 
Revised: January 2025 
Page 2 of 11 
Table of Contents 
Background ......................................................................................................................................... 3 
Purpose and Need .............................................................................................................................. 3 
Study Area ........................................................................................................................................... 3 
Plan Management and Administration ............................................................................................. 3 
Administration ................................................................................................................................ 4 
Schedule Development and Maintenance .................................................................................... 4 
Project Communication ................................................................................................................. 4 
Progress Meetings ..................................................................................................................... 4 
Advisory Committee Meetings .................................................................................................. 4 
Individual Stakeholder Meetings ............................................................................................... 5 
TAB and BOS Meetings .............................................................................................................. 5 
Plan Management and Administration Deliverables ................................................................... 5 
Public Outreach .................................................................................................................................. 5 
Public Meetings .............................................................................................................................. 5 
Summary Handout ......................................................................................................................... 6 
Public Outreach Deliverables ......................................................................................................... 6 
Proposed Project Approach .............................................................................................................. 6 
Project Phasing .................................................................................................................................. 6 
Phase One – Work Plan ................................................................................................................. 6 
Phase One Deliverables ............................................................................................................. 7 
Phase Two – Baseline Conditions ................................................................................................ 7 
Phase Two Deliverables ............................................................................................................. 9 
Phase Three: Transportation System Needs Analysis ................................................................ 9 
Phase Three Deliverables .......................................................................................................... 9 
Phase Four – Vision ....................................................................................................................... 9 
Phase Four Deliverables........................................................................................................... 10 
Phase Five – Implementation Plan ............................................................................................. 10 
Phase Five Deliverables ........................................................................................................... 11 
Phase Six – Final Report .............................................................................................................. 11 
Phase Six Deliverables ............................................................................................................. 11 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 3 of 11 
 
SCOPE OF WORK 
Background 
The Maricopa County Department of Transportation (MCDOT) Transportation System Plan (TSP) 
provides information on the current transportation system and sets the framework for future 
transportation needs in unincorporated Maricopa County. In 1997, MCDOT implemented the first 
TSP; it was later updated in 2007, 2017, and 2021. Transportation is critically important as the 
County continues to grow and develop. Planning must take a proactive approach to 
accommodate the changing needs of current and future residents. To accomplish this, MCDOT 
changed the TSP update cycle from a 10-year cycle to a 5-year cycle, initially starting with 
adoption year 2020. Due to the 2020 Pandemic, the adoption was delayed until 2021 however 
MCDOT still desires to keep the 5-year cycle and seeks adoption in year 2026.  
Purpose and Need 
The purpose of this plan is to set an expectation for the future transportation system as 
population, development, technology, and other factors affect Maricopa County, specifically in 
unincorporated areas. This effort is needed to provide a clear representation of opportunities and 
constraints to achieve a well-connected transportation system that functions for all users.  
Study Area 
The Study Area includes unincorporated Maricopa County. The Project Influence Area includes 
all of Maricopa County.  Portions of Pinal, Pima, Yuma, La Paz, Yavapai, and Gila counties adjacent 
to Maricopa County may be referenced as necessary. The primary focus will be on MCDOT 
facilities within the Study Area. However, some analysis will be conducted for the Project 
Influence Area to determine how MCDOT facilities are impacted by the region.  
Plan Management and Administration 
TSP 2050 will be managed by the MCDOT Systems Planning Branch. Burgess & Niple (Consultant) 
will perform all technical analyses, produce all graphic and outreach material, and provide support 
as described in this Scope of Work. Michael Baker International (Subconsultant) will support 
Consultant. Together, Consultant and Subconsultant are the Consultant Team. All work items 
are identified in this Scope of Work; work items to be completed by Subconsultant are indicated 
in Subconsultant Scope of Work. 
All work herein shall be completed within 18 months (inclusive of BOS approval and final 
document submittals) after Notice-to-Proceed (NTP) has been issued. The schedule assumes 
timely reviews of deliverables by MCDOT staff. The schedule shall be structured to provide all 
meeting, delivery, and review times. Review time shall be shown as 25 working days after the draft 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 4 of 11 
submittal (five working days for internal MCDOT review, five working days for the Consultant 
Team to complete revisions, 10 working days for external Advisory Committee review, and five 
working days for the Consultant Team to complete 2nd round of revisions) unless otherwise 
advised by the MCDOT Project Manager.  
Administration 
The Consultant Team will setup and administer the project. This includes tracking activities to 
ensure deliverables are prepared and submitted on schedule, preparing monthly progress reports, 
preparing monthly invoices, and conducting Consultant Team coordination meetings. The 
Consultant Team will maintain a file sharing page for all items to be reviewed by the project team. 
Schedule Development and Maintenance 
The Consultant Team will prepare and submit an initial detailed project schedule in Microsoft 
Project during Phase One and will provide an updated schedule at the onset of each subsequent 
phase. At a minimum, the schedule will be updated monthly.  
Project Communication 
The Consultant Team will participate in all meetings with, at minimum, one member attending 
each meeting. The Consultant Team will work with the MCDOT Project Manager to schedule and 
coordinate all meeting dates, times, and locations. Unless directed otherwise, the Consultant 
Team will prepare meeting agenda, materials, and summaries for distribution to meeting 
attendees. Each summary should include, at minimum, attendee list, detailed summary of the 
meeting, opportunities/challenges, action items and next steps.  
The Consultant Team shall maintain an internal meeting tracker to track the progress of the 
project. This will include the date of the meeting, time, duration, attendance, key points, and next 
steps for each meeting held.  
Progress Meetings 
The Consultant Team Project Manager and the MCDOT Project Manager shall meet, at minimum, 
biweekly. These meetings may include other support staff as needed. Also included under 
progress meetings are comment resolution meetings, and major phase/task kickoff meetings. 
Advisory Committee Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, shall identify an Advisory 
Committee that includes internal MCDOT staff and all partner agencies in the County and the 
adjacent surrounding area. The Advisory Committee will provide technical and stakeholder input 
to the plan. It is anticipated an initial kickoff meeting with partnering activities will be held with 
subsequent meetings occurring, at minimum, after the draft submittal of each Technical 
Memorandum, for up to 10 meetings. It is anticipated the advisory committee meetings will be 
virtual to allow for a greater attendance of those in outlying areas with the exception of the 
workshops which will be held in person.  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 5 of 11 
 
The Consultant Team, under the direction of the MCDOT Project Manager, will work to provide 
telecommunication for the Advisory Committee, which may include sending emails or calling 
members of the Advisory Committee to progress the project in a timely matter. The Consultant 
Team will maintain a file sharing page for all items to be reviewed by the Advisory Committee.  
Individual Stakeholder Meetings 
The Consultant Team, with the direction of the MCDOT Project Manager, will conduct up to 15 
coordination meetings with individual stakeholders, as needed. It is anticipated that these 
meetings would be in person to foster collaboration.  
TAB and BOS Meetings 
The Consultant Team will assist and provide support in developing presentations, handouts, 
graphics, and other material related to the development of TSP 2050 for the Technical Advisory 
Board (TAB) and the Board of Supervisors (BOS) meetings. The Consultant Team is not required 
to attend these meetings unless directed by the MCDOT Project Manager; an allowance of up to 
four meetings is included. 
Plan Management and Administration Deliverables 
The Consultant Team shall provide the following deliverables for each phase: 
• 
Invoices  
• 
Progress Reports 
• 
Schedule and Subsequent Updates, as changes occur 
• 
Meeting Materials and Summaries  
o Progress Meetings 
o Advisory Committee Meetings 
o Individual Stakeholder Meetings 
o TAB and BOS Meetings (attended by Consultant Team) 
• 
Meeting Tracker 
Public Outreach 
Public Meetings 
It is anticipated public meetings will be held starting in Phase Two of the project and as requested 
and/or recommended by the MCDOT Project Manager. Each meeting will include a preparation 
meeting with the Consultant Team, MCDOT Systems Planning Branch, and MCDOT 
Communications Branch. Activities may include the following: 
• 
Webpage (electronic engagement) – publicize in coordination with MCDOT 
Communications Branch 
• 
Interactive Map – coordinate with Maricopa County OET, anticipate a new map with each 
phase to track input  
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 6 of 11 
•
Presentations to municipalities and HOAs – assume coordination and preparation for up
to 15 presentations, assume Consultant Team attendance at seven presentations
•
Youth Participation – assume identifying up to 10 groups/events to participate in
visioning
The Consultant Team and the MCDOT Project Manager will work with the MCDOT 
Communications Branch to develop a plan in Phase One for public outreach. The Consultant 
Team will provide all necessary data and graphic material. Project information will be available 
on the dedicated project webpage and will serve as the public portal. An online public outreach 
effort will be taken for each phase, starting with Phase Two; the Consultant Team will coordinate 
with MCDOT to update the webpage for each phase. 
Summary Handout 
A high-quality summary handout shall be created by the Consultant Team for the public and 
TAB/BOS to learn about each phase of the plan. Each handout shall include public outreach and 
technical highlights of phase elements displayed with various visual graphics.  
Public Outreach Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
•
Public Outreach Materials
•
Summary Handouts
Proposed Project Approach 
The proposed project is phased to appropriately guide the work effort to achieve the overall 
project purpose and need. The phases include: 
•
Phase One – Work Plan
•
Phase Two – Baseline Conditions
•
Phase Three – Transportation System Needs Analysis
•
Phase Four – Vision Plan
•
Phase Five – Next Steps
•
Phase Six – Final Report
Project Phasing 
The following outlines anticipated task efforts and deliverables for each project phase. 
Phase One – Work Plan 
The Consultant Team will develop a work plan that defines at a minimum: 
•
Design theme/templates for project and final report in line with County branding
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 7 of 11 
 
• 
Detailed schedule 
• 
Study Area 
• 
Project Influence Area 
• 
Data collection and file sharing plan 
• 
Advisory committee database 
• 
Anticipated key issues and challenges 
• 
Conflict resolution plan 
• 
Detailed phases, including advisory committee meetings and public outreach 
Quality assurance and quality control plan including: 
o Checklists of items to be reviewed prior to each submittal 
o Monthly quality progress reports 
o Procedures for conducting QA/QC activities 
o Person(s) responsible for conducting QA/QC 
Phase One Deliverables 
The Consultant Team shall provide the following deliverables for Phase One: 
• 
Draft and Final Work Plan 
Advisory Committee Database (Excel) 
Phase Two – Baseline Conditions 
Phase Two includes researching and gathering existing and future data to assess and evaluate 
baseline conditions. The Consultant Team will identify, collect, analyze, map, and document 
(including dates) relevant baseline conditions including trends, and traffic generators, etc. that 
would impact the transportation system. As part of this process the Consultant Team will work 
closely with the Advisory Committee, both individually and collectively, to form a broad consensus 
of the baseline conditions within the Project Influence Area. The following system components 
will be identified as available from readily available GIS data sources (e.g. MCDOT, FCDMC, and 
MAG): 
o Topography 
o Floodplains 
o Drainage Features 
o Environmental Features 
o Regional Recreational Facilities  
o Land Use 
o Zoning 
o Demographics 
o Bridges 
o Parks 
o Roadway Surface Type 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 8 of 11 
 
o Roadway Pavement Type 
o Vehicular Traffic Counts 
o Bicycle Traffic Counts 
o Vehicular Traffic Projections (based on MAG regional travel demand model) 
o Electric Charging Stations 
o Number of vehicular travel lanes 
o Shoulders 
o Sidewalks 
o Curbs 
o Curb Ramps 
o Guardrail 
o Transit Facilities  
o Roadway Classification  
o Crashes 
The following system datasets will be created from reviewing current aerial imagery, readily 
available GIS data sources, and recently completed MCDOT/jurisdiction plans, and performing 
calculations as necessary: 
o Shared Use Paths  
o Sidewalk Buffers 
o Crosswalks 
o Medians 
o Bike Lanes 
o Clear Zones (width for facility type)  
o Level of Service (based on MCDOT service volume tables)  
o APS and pedestrian push buttons 
o Special Corridors (Over weight, Over height, Emergency bypass, etc.) 
An excel catalog will be created for collected documents and datasets. The Consultant Team 
shall modify datasets as necessary. Data modifications shall be coordinated with MCDOT Asset 
Management. Data obtained shall follow the Data Collection Plan as documented in the 
associated Work Plan for the project.  
The Consultant Team will conduct a review of the MAG regional travel demand model. The review 
will include the investigation of up to eight subareas. Screenline analyses will be conducted for 
the identified subareas. Thematic mapping will be prepared for TAZs and model links to review 
growth trends in the subareas. The Consultant Team will work collaboratively with the MCDOT 
Systems Planning Branch and the Maricopa County Planning and Development Department to 
confirm the observed trends and determine the potential need for model refinements. It is 
assumed the MCDOT-MAG datasets align and can be used without post-processing. 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 9 of 11 
The Consultant Team will perform an assessment of all data collected to establish baseline 
metrics for performance measures that will be further refined in Phase 4. 
The Consultant Team will summarize the baseline condition data, review the MAG regional travel 
demand model, and provide the baseline metrics for performance measures in a technical 
memorandum.  
Phase Two Deliverables 
The Consultant Team shall provide the following deliverables for Phase Two: 
•
Catalog and Datasets
•
Draft and Final Technical Memorandum – Baseline Conditions
Phase Three: Transportation System Needs Analysis 
Using the deliverables from Phase Two, the Consultant Team shall review and identify the needed 
changes or updates to the MCDOT Project Rating System (PRS) to ensure the system is efficient 
and applicable to a variety of project types (e.g. ITS improvements). It is anticipated the 
Consultant Team will utilize the Planning Tool that make up the PRS and recommend updates to 
MCDOT as needed. 
The Consultant Team will comprise a system wide needs list within the Study Area. The list will 
include, at minimum, roadway name, which associated at/to/from roadway names, MCDOT route 
data for current MCDOT Maintained Roadways, and planning level cost. Each identified segment 
should include data for all transportation modes/user needs. Intersections shall be tracked within 
the segmented list and have the capability to stand alone. The Consultant Team will provide 
project parameters for input into the PRS. 
The Consultant Team will evaluate system needs for 2025, 2030, 2040, and 2050 planning 
horizons. It is assumed that complete projects will be identified for the nearer term; longer term 
needs will incorporate a policy-based recommended investment choice model to allocate future 
funds across different investment types. The recommended investment choices will be informed 
through scenario planning workshops in Phase Four.  
Phase Three Deliverables 
The Consultant Team shall provide the following deliverables for Phase Three: 
•
Transportation System Needs List (GIS and Table format)
•
Draft and Final Technical Memorandum – Transportation System Needs Analysis
Phase Four – Vision 
The Consultant Team shall prepare a report to update goals, objectives, strategies, and 
performance measures from TSP 2040. The Consultant Team will work with the Advisory 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 10 of 11 
 
Committee to refine the goals, objectives, and strategies, and update the performance measures 
for each strategy that will improve the system. The Consultant Team shall update the tracking 
system for the defined performance measures.  
A series of three facilitated scenario planning workshops will be conducted to further investigate 
the identified needs in Phase Three. The Consultant Team will staff the meetings with key team 
members including a facilitator and subject expert. The first workshop will serve as an 
introduction, provide background information, and foster brainstorming on the changing world of 
transportation. The second workshop will identify assumptions, probabilities, potential risks, 
potential impacts, potential policy needs, and potential decision points (triggers). The third 
workshop will present the findings, potential changes in travel demand, and identification of 
potential future actions. It is assumed that each workshop will last no more than one-half working 
day. It is assumed that up to four scenarios will be investigated. 
The Consultant Team shall conduct a peer review of up to four counties/cities/MPOs to compare 
the following with other agencies. Any needed refinement should be coordinated with the 
Advisory Committee to ensure the overall vision of the system is identified. 
• 
Established goals, objectives, strategies, and performance measures.  
• 
Roadway, bicycle, and pedestrian standard design features (e.g. standard bike lane, rolled 
curb, diagonal curb ramp, 12-foot travel lane). 
• 
Types and impact of current and new technology on the transportation system. 
The Consultant Team will work with the MCDOT Systems Planning Branch to review the needs 
and define projects that satisfy the identified goals, objectives, strategies, and more forward the 
performance measures. The Consultant Team will test the projects for general practicality (e.g. 
project limits) and comprehensiveness (i.e. ITS, capacity, alternative modes) budgeted for in 
Phase Three. 
Phase Four Deliverables 
The Consultant Team shall provide the following deliverables for Phase Four: 
• 
Performance Measure Tracking System 
• 
Draft and Final Technical Memorandum – Vision 
Phase Five – Implementation Plan 
The Consultant Team will provide an analysis on the next steps to accomplish the established 
vision from Phase Four. This will include an implementation plan for every planning horizon. The 
Consultant Team shall build on the peer review from Phase 4 and provide an analysis of existing 
and potential funding sources for unincorporated Maricopa County. Revenue forecast(s) will be 
provided to the Consultant Team by MCDOT (assumed from Elliott D. Pollack & Company). The 
Consultant Team will prepare a scenario matrix based on receiving potential funds; up to four 
scenarios will be assessed. A no build, no fund (i.e. discontinuation of Regional Area Road Fund 
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Page 11 of 11 
Arterial Lifecycle Program) scenario will be included in the analysis. Scenarios shall include the 
cost of maintenance for the existing and proposed system improvements. The Consultant Team 
will work with the MCDOT Systems Planning Branch to evaluate MCDOT staffing needs to 
implement the plan.   
The Consultant Team will work with MCDOT Systems Planning Branch to utilize the MCDOT 
Planning Tool to create a comprehensive project database that provides all members of MCDOT 
staff access to project information. 
The Consultant Team will work with MCDOT Systems Planning Branch to identify new policies or 
revisions to existing policies for plan implementation. Potential policies could address integration 
of connected vehicle/autonomous vehicles and impacts to infrastructure, Electric Vehicle (EV) 
integration, ITS improvements, active transportation implementation, development construction 
phasing requirements to mitigate scalloped street scenarios, and grants to fund potential 
improvements. It is assumed that up to five policies will be investigated. These policies may help 
establish and inform project needs. 
Phase Five Deliverables 
The Consultant Team shall provide the following deliverables for Phase Five: 
•
Draft and Final Technical Memorandum – Next Steps
•
Project Database
Phase Six – Final Report 
The Consultant Team will prepare the Draft and Final Report encapsulating the efforts taken in 
Phase One through Phase Five. 
Phase Six Deliverables 
The Consultant Team shall provide the following deliverables for Phase Six: 
•
Draft and Final Report
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Transportation System Plan 2050
Michael Baker International, Inc.
PROJECT NO.  TP073
Contract No. 2025-017
ESTIMATED DIRECT LABOR
PERSON
BILLING
CLASSIFICATION
HOURS
RATE/HOUR
TOTAL
Project Manager  
298
                       
115.40
$                
34,389
$         
Senior Transportation Planner 
588
                       
63.11
$                  
37,109
$         
 Sr. Project Engineer 
44
                         
74.12
$                  
3,261
$           
Transportation Planner  
360
                       
52.23
$                  
18,803
$         
Subject Matter Expert 
190
                       
62.95
$                  
11,961
$         
Technical Advisor 
192
                       
100.23
$                
19,244
$         
Senior Modeler 
38
                         
62.63
$                  
2,380
$           
Designer/GIS 
558
                       
39.26
$                  
21,907
$         
Project Assistant
40
                         
43.68
$                  
1,747
$           
2,308
                    
  Hours
Estimated Labor Cost
150,801
$       
Overhead
140.86%
212,418
$       
Subtotal
363,219
$       
ESTIMATED DIRECT EXPENSES
(Listed By Item At Estimated Actual Cost - NO MARKUP)
Travel
81
$                       
Plotting
540
$                     
Miscellaneous Expenses
-
$                      
Total Estimated Expenses
621
$              
ESTIMATED OUTSIDE SERVICES AND CONSULTANTS
Firm
Cost
.
-
$                      
-
$                      
Total Estimated Outside Services
PROFIT (Direct Labor +Overhead)
10%
36,321
           
TOTAL ESTIMATED FEE
400,161
$       
CONTRACT TIME 
Calendar Days
(Figures Rounded To The Nearest $1)
Consultant Firm Signature
Date
4/17/2025
DERIVATION OF COST PROPOSAL SUMMARY
3/26/2013
Page 1 of 1
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

Michael Baker International, Inc.
PROJECT NO  TP073
Contract No. 2025-017
Project 
Manager  
Senior 
Transportation 
Planner 
 Sr. Project 
Engineer 
Transportation 
Planner  
Subject Matter 
Expert 
Technical 
Advisor 
Senior Modeler 
Designer/GIS 
Project 
Assistant
Total
Hours by 
Task
115.40
$         
63.11
$           
74.12
$           
52.23
$           
62.95
$           
100.23
$         
62.63
$           
39.26
$           
43.68
$           
2
4
6.0
26
98
20
168
6
4
272
12
606.0
Research/obtain/evaluate existing data sets 
10
28
6
48
104
196.0
Research/obtain/evaluate external source data and create new data sets
10
44
10
80
6
4
136
6
296.0
Reporting on MBI identified data sets (existing plus newly created) 
6
26
4
40
32
6
114.0
6
36
4
14
10
4
24
6
104.0
52
108
6
14
46
80
36
342.0
Refine goals/performance measures
14
12
2
28.0
Peer review (2 agencies) 
4
32
4
14
6
12
72.0
Scenario Planning workshops
34
64
14
32
74
24
242.0
66
130
14
86
116
80
64
12
568.0
MBI Implementation Plan
60
88
10
74
36
10
48
6
332.0
Policy paper prep - Technology plus 1 other
6
42
4
12
80
70
16
6
236.0
12
20
12
8
6
58.0
134
192
78
16
38
162
4
624.0
32
32
64.0
14
26
6
24
70.0
32
80
72
38
138
4
364.0
56
54
16
126.0
 
Total Hours by Position
298
588
44
360
190
192
38
558
40
2308.0
Task 6 - Draft & Final Report
TASK
Task 3 - Transportation System Needs Analysis
Task 1 - Work Plan
Task 4 – Vision
Task 5 – Implementation Plan  
Public Outreach & Project Meetings 
   Task - Project Communication/Coordination/Administration
Task 2 - Baseline Conditions 
Task – Advisory Committee Meetings
Task - Youth Workshops/Stakeholder Meetings
Task - Virtual Open House Meetings
ESTIMATED STAFF 
 3/26/2013
Page 1 of 1
Docusign Envelope ID: 829DFB36-DC5A-4108-AB9F-7BF34ECC6868

#
Michael Baker International, Inc.
PROJECT NO.  TP073
Contract No. 2025-017
Travel
A. Local Mileage at
0.54
$                 
150
 
miles
miles
Subtotal Travel
81
$
 
Plotting
B. Exhibits at
0.25
$
exhibits
-
$
 
C. Vellum Plots a
5.70
$
- 
plots
-
$
 
D. Plan Submittals
Half Size Bond Copies
60
95%
100
Sealed
MCDOT Distribution List
Work Prints (CADD)
Check Prints (CADD)
QC Sets
File Copy
Working Sets (Final)
Extra Sets
Total Sets
- 
- 
- 
- 
Est. No. of Dwgs/Set
Total Sheets
- 
- 
- 
- 
$0.11/Sheet
-
$
 
-
$
 
-
$
 
-
$
 
$1.95/Set Binding
-
$
 
-
$
 
-
$
 
-
$
 
Total Costs/Submittal
-
$
 
-
$
 
-
$
 
-
$
 
-
$
 
E. Copying - 8.5 x 11 Copies
Specs and Estimates
Est. No. Of Shts
No. of Copies
No. Submittals
Total Sheets
Miscellaneous Copies
Total 8.5 x 11 Copies
$0.11/Sheet
Subtotal Plotting
540
$
 
Miscellaneous Expenses
Roll Plots
Subtotal Miscellaneous Expenses
-
$
 
ESTIMATED OUTSIDE SERVICES & CONSULTANTS
-
$
 
-
$
 
TOTAL ESTIMATED OUTSIDE SERVICES
-
$
 
TOTAL ESTIMATED EXPENSES  
621
$
 
ESTIMATE OF DIRECT EXPENSES
3/26/2013
Page 1 of 1