PLANNING AND ZONING Community Development Department 10000 N. El Mirage Road, El Mirage, Arizona 85335 623-876-2996; Fax 623-876-4605; TDD 623-933-3258 www.elmirageaz.gov 1 MEMORANDUM Development Application Review Comments TO: John Meissner, Threaded Studios FROM Jose A. Macias, Senior Planner Development Services Department, Planning & Zoning RE: PZ23-01-01 Sunbelt El Mirage Site Plan Approval DATE: August 21, 2023 Mr. Meissner, Please see the review comments from El Mirage Technical Advisory Committee (TAC) for the proposed site plan approval zoning application mentioned above. BUILDING & SAFETY – Brigham Bennett 1. No comments. ECONOMIC DEVELOPMENT – Tom Doyle 2. No comment. ENGINEERING – Bryce Christo 3. See the attached memorandum and FIRE DEPARTMENT – Fire Chief Michael Long 4. Did not see the location of a fire hydrant on the submitted plans. A hydrant will be required to be installed for the project. PLANNING & ZONING – Jose A. Macias 5. Please add the following statement to the site plan. a. “Any change of use or occupancy of any building or buildings, including additions thereto requiring more parking, shall not be permitted until such additional parking spaces as required by this chapter are furnished.” 6. The preliminary landscape plan has been reviewed and approved by the Senior Planner as part of the development site plan review. The preliminary landscape plan will be included in the zoning application staff report and presented to the Planning and Zoning Commission and City Council where additional stipulations may be imposed. 2 7. All required trees shall be a minimum of 15 gallons in size and at least 50% of those trees must be 24-inch box or larger size. All shrubs shall be a minimum of five gallons in size. All 15-gallon trees must be a minimum of eight feet in height, four feet in spread, and one and one-quarter inches trunk caliper at the ground level. All 24-inch box and larger trees shall be a minimum of ten feet in height, four feet in spread and two and a half inches trunk caliper at the ground level. a. Actions required: Revise the LS plan to meet the 50% of trees to be in a 24” box and 10” in height, four feet in spread and two and a half inches trunk caliper at the ground level. 8. The final landscape plan shall be in conformance with the approved preliminary plan and any stipulated changes or additions and shall be approved by the Zoning Administrator or designee prior to the issuance of a building permit. 9. All changes in landscape plans before, during, or after preliminary or final landscape plan approval and/or landscape installation shall be approved by the Zoning Administrator or his or her designee. 10. A separate sign permit for signs other than for the address and building numbers will be required, this includes monument, pole, wall signs and other sign types permitted. 11. A final plat will be required to record the lot combination, easements and/or dedication of land prior to issuing the Certificate of Occupancy. Separate fees will apply. POLICE DEPARTMENT – Andrew Vanderwerf 12. No comment. PUBLIC WORKS – Scott Ketchmark 13. No comments regarding the Sunbelt Site Plan Approval. If you have any questions regarding these comments or would like to set-up a follow up meeting or call, please feel free to contact my office. Engineering Development Services Department 10000 N El Mirage Road, El Mirage 85335 623-972-8116; Fax 623-876-4605; TDD 623-933-3258 www.elmirageaz.gov MEMORANDUM TO: Jose Macias, Planner/GIS FROM: Bryce Christo, P.E., Assistant City Engineer SUBJECT: Sunbelt Rentals – Development Application Review DATE: 08-07-23 Below are the Engineering Division’s comments for the above referenced submittal prepared in July 2023. These items will have to be addressed prior to the Planning and Zoning Meeting. Context Site Plan 1. Provide an aerial photo of the subject site and surrounding areas. 2. Provide color photographs of subject site and surrounding improvements and show photo reference numbers on the context plan. Phase I Environmental Site Assessment 3. Provide a Phase I ESA. The below items will have to be addressed during the Construction Plan Submittal. Cover Sheet (Sheet CO) 1. Site Data Table a. The Total Land Area is incorrect. b. The Surrounding Property Land Use Section is incorrect. c. The parking required shall be based on 1 space per 400 sf of sales and service buildings and 1 space per 10,000 sf of outdoor display area. 2. Legend – The turning radii for emergency vehicles shall be 19.5’ for inside and 45’ for outside. 3. FIRM Information – The information for the map is outdated. 4. Declaration of Responsible Charge – The project is within El Mirage, not Maricopa County. General Notes (Sheet C100) 5. All applicable City Notes will need to be added including General Information Notes (City Detail EM-101-1), Water Notes (EM-101-7) and possibly Signing & Striping Notes (EM-101-8). 6. Engineer’s Notes – The AAC section to reference is R18-4-213. 7. Dry Well Notes a. Note 1 – Dry wells no longer get registered through ADEQ. b. Note 2 – This note can be removed as City Grading & Drainage Note 6 shall apply. 2 c. Note 3 – The Engineer shall estimate the number of dry wells required and then on site testing during construction will determine if the number of proposed dry wells shall be increased or decreased. All Plans 8. Show all building setback lines. The required setbacks are 20 feet along Butler Drive, 10 feet along El Mirage Road, and 5 feet along the north and west property lines. 9. Show the boundary lines of the property with bearings and distances. 10. A 1-foot Vehicular Non-Access Easement (VNAE) is required along the frontage of El Mirage Road except at the proposed private driveway. 11. An 8’ Public Utility Easement (PUE) is required along El Mirage Road. 12. Plans shall include applicable City Notes. Call out MAG, City, etc. details to be used. Use the City’s 2023 Design & Development Standards Manual (DDSM) as a guide for the final design. Grading & Drainage Plans (Sheets C102 & C103) 13. Show topographic contours. 14. Provide existing and proposed grade shots throughout the project area to show how the site shall be graded and how drainage will flow through the proposed site. Add slopes to the proposed driveway. Show the finished floor of the existing and proposed buildings. 15. There appears to be ponding in the rear of the parcel. Verify that the entire site drains to a basin. 16. Side slopes adjacent to the public right of way, areas where pedestrian access is permitted and within Public Utility Easements (PUE) shall be 6:1 or flatter. There shall be at least two feet of level ground between any wall or vertical obstruction and the top of any side slope grading. 17. The finished floor elevations are required to be a minimum of 12 inches above the 100-year high-water level of any adjacent retention basin and 14 inches above the ultimate outfall of the site. Show the location and elevation of the ultimate outfall for this site. 18. The 100 year water elevation of the proposed retention basins shall be located a minimum of 4 feet away from any structures and shall not be located within any building setbacks, easements, or fire lanes. 19. Show the High Water Level (HWL) and bottom elevations, volumes required and provided and overflow elevations for all basins. 20. The arrows for Section A should be pointing north. 21. The cross sections on Sheet C103 should be labeled A and B. Fire Line Plan (Sheet C104) 22. The turning radii shall be 19.5’ for inside and 45’ for outside. Utility Plan (Sheets 4 & 5) 23. The site shall have a looped water main that connects to two separate water mains, one in Butler Drive and one in El Mirage Road. 24. Water valves are required along the main, approximately every 500 feet, and at locations so that the maximum number of hydrants to be out of service is two. 25. Hydrants shall be spaced at a maximum of 300 feet. Final hydrant locations will be reviewed by the Fire Department. 3 26. Any hydrants within the project site will be private and painted Safety Red per City Detail EM-360 while any offsite hydrants will be public and painted Safety Yellow. All hydrants, public or private, require markers per MAG Detail 122. 27. Domestic and landscape services each require a separate tap, meter and backflow preventer. Meters shall be within the right of way and backflow preventers shall be on private property but not within the PUE. Fire service lines require a separate tap and backflow preventer. 28. This parcel has an existing septic system since there is no sanitary sewer available in the area. The proposed improvements will have to either install a new septic system or connect to the existing system that may require an expansion. All improvements associated with the septic system must be reviewed and approved by Maricopa County Environmental Services Department (MCESD). 29. It is not recommended to install utility lines within the driveway. 30. Show utility horizontal and vertical clearance information per MAG Detail 404 and City Detail EM-402. 31. All aboveground utilities shall maintain a minimum of 6 feet of clearance from all fire hydrants and fire suppression devices per City Detail EM-361. 32. Each proposed driveway shall have at least one streetlight. 33. Show the location of any on-site lighting. A Photometric Plan will be required that shows any light or combination of lights which cause light on a public street, other than lights specifically intended for that purpose, shall not exceed one foot candle as measured from the center line of the street. Show the foot candles along the centerline of El Mirage Road and Butler Drive to verify that the proposed lighting will not exceed the maximum limit. Paving Plan (Sheet C106) 34. The driveways shall be per MAG or City details. Stop signs are recommended at each driveway. Verify all driveways have a minimum throat of 50 feet unless they could potentially be signalized in the future in which the length shall be a minimum of 150 feet. 35. A “Do Not Enter” sign (R5-1, 36”x36”) shall be placed at the proposed El Mirage Road driveway. 36. Verify that any driveway to be used by a truck can accommodate a WB-67 vehicle without encroaching into the adjacent lane. An Autoturn or equivalent exhibit shall be provided. 37. Show the sight distance requirements at each proposed driveway per City Detail EM- 158. 38. Driveway spacing shall adhere to City Code Sections 154.103 (C) and (D) and City Detail EM-259. Show the following distances measured from nearest face of curb to nearest face of curb.: a. Between the proposed driveway on El Mirage Road and Butler Drive. b. Between the proposed driveway on Butler Drive and El Mirage Road. c. Between the proposed driveway on Butler Drove and the existing driveway on Butler Drive. 39. All parking spaces shall be striped with a minimum 4-inch painted line. 40. When parking spaces are adjacent to a sidewalk, the sidewalk shall be a minimum of 6 feet wide or parking blocks shall be installed. 41. 6-inch MAG type curbing is required around all driveways and parking lots. The parking lot curbing shall be no closer than 3 feet to any property line. 4 42. Any fire access road shall be a minimum of 26 feet wide and designed to handle 75,000 lbs. A Geotechnical Report will be required for this project and it should provide a recommended design section for this access road. Provide a template that is 20 feet wide with a minimum inside radius of 19.5 feet and an outside radius of 45 feet. 43. It appears the fire access road is running through fuel tanks near the existing 5,000 sf building. Can these be relocated? 44. Provide additional dimensions for the sidewalks, curb radii, etc. 45. The fuel island use shall conform to Arizona Department of Environmental Quality (ADEQ) requirements as stated in Section 4-3(B)(8) of the City’s Design & Development Standards Manual (DDSM). 46. Show any existing and proposed exterior signs. 47. Grading and dry well information shall be placed on the Grading & Drainage Plans. 48. Keynotes a. Keynotes 1 and 2 are the same note. Please provide a copy of the referenced Geotechnical Report. b. Keynote 3 – Label the width of the openings. c. Keynote 4 – Extruded curb is not permitted. The curb must be a MAG type. d. Keynote 6 - Trash enclosures shall meet the minimum requirements of City Detail EM-113. SWPPP Plan (Sheets C107 & C108) 49. A copy of the attached SWPPP Guidelines must be filled out and submitted to the City with the civil plans. All items on that document must be addressed on the SWPPP. 50. Provide protection for the dry wells. 51. Revise the sheet numbers to C108 in the Construction Notes. 52. Update the details on Sheet C108 to the 2018 versions. Preliminary Landscape Plans 53. Add City Landscaping and Irrigation Notes (City Detail EM-101-4) to the plan set. 54. Add the Site Distance Easement per City Detail EM-158 to the existing and proposed driveways and the intersection of Butler/El Mirage. 55. DG is required on all non-paved areas both on site and within the right of way adjacent to the project site. 56. All plantings at maturity shall maintain a minimum of 6 feet of clearance from all fire hydrants and fire suppression devices per City Detail EM-361. 57. No walls or trees shall be placed within any Public Utility Easement (PUE). 58. Trees shall not be placed within 5 feet of any City curb or sidewalk or within 6 feet of any public utility. 59. Add a note to the plans that the maintenance for all landscaping and irrigation shown on the plans will be the responsibility of the property owner. 60. Irrigation plans will be required. Exterior Elevations 61. No comments. ALTA Survey 62. The ALTA survey must be prepared within the last 6 months. Please provide an updated version. 5 63. This plan has not been signed. Title Report 64. The Title Report must be prepared within the last 30 days. Please provide an updated version. Preliminary Drainage Report 65. The finished floor elevation of the proposed building shall be a minimum of 12 inches above the 100-year base flood elevations and high-water level of any adjacent retention basin and 14 inches above the ultimate outfall of the site. 66. The site is responsible for retaining all onsite drainage as well as the drainage of the half rights of way of all public roadways along its frontage, including El Mirage Road and Butler Drive. The calculations shall take the entire onsite and offsite areas into account, not just the proposed area to be developed, in order to determine the basin(s) size(s). 67. The City requires the 100-year storm event to be based on a rainfall of 2.4 inches. 68. Use the City Runoff Coefficients per City Code Section 155.054(B)(6)(a). Concrete = 0.95, roofs/asphalt = 0.85, grass = 0.15 and desert/rock lawn = 0.70. 69. Provide High Water Level (HWL) and bottom elevations, volumes required and provided for all basins. Note the elevation and location of the low outfall of the lot. 70. Drywell calculations are required. It is recommended to use an infiltration rate of 0.1 cfs per drywell. 71. A Final Drainage Report will be required. The report shall provide a Tributary Area Map that breaks down the contributing flow to each basin and/or stormwater structure. Preliminary Water Report 72. Provide a table that shows the Average Day Demand, Max Day Demand and Peak Hour Demand per the attached Water System Design Criteria. 73. A Fire Flow Test must be performed. The City’s Public Works Department must observe the test. Please contact the Public Works Department (623-876-4251) one week prior to the test. 74. The minimum size meter the City allows is a 5/8 inch. Preliminary Sewer Report 75. A Sewer Report is not required as there is no sanitary sewer available in the area. Traffic Impact Statement (TIS) 76. The report is noted as a “Draft”. Please provide a final version. 77. Executive Summary & Attachment B - The City of El Mirage criteria shall be used, not MCDOT. See the City’s Auxiliary Lane Criteria. 78. Introduction - The traffic counts provided are for a location 1.5 miles away and were taken prior to opening of Northern Parkway. The City obtain counts in 2023 which resulted in 7,644 vehicles per day in the southbound direction (562 in the am peak hour, 625 in the pm peak hour) and 7,853 per day in the northbound direction (566 in the am peak hour, 682 in the pm peak hour). The counts have been attached. 79. Figure 3 does to match the provided Site Plan. 80. Access – It is noted that “the El Mirage Road proposed access aligns with an existing access to the east, though left turns in and out from both east and west are prohibited 6 by a raised median.” The Site Plan shows the proposed El Mirage Road driveway as an “exit only”. What turning movements are being requested for this driveway? There is also a median break at this intersection. 81. Trip Generation a. The third paragraph refers to Goodyear. Please revise. b. It is noted that the site is 6.96 acres but it is 9.68 acres. 82. What are the volumes expected (daily and am/pm peaks) for each of the driveways, existing and proposed? 83. The values in Tables 13 through 16 do not seem to match the values in Appendix A. 84. Right Turn Lanes a. The City of El Mirage criteria shall be used, not MCDOT. The City Auxiliary Lane Criteria requires any driveway on an arterial, such as El Mirage Road, to have a deceleration lane. However, the Site Plan shows this driveway as an “exit only” so no deceleration is required. The Butler Drive driveways shall be reviewed for right turn lanes. b. This section of the report needs to be revised. c. The speed limit of El Mirage Road in this location is 50 mph. 85. Provide any recommendations for the intersection that the proposed driveway on El Mirage Road creates. Are their any recommendations due to the driveway being constructed within a right turn lane/lane drop? Responsibilities of the Previous Owner 86. The previous owner of the property obtained a permit in 2019 for improvements on the east side of the parcel. Several items that were required as part of that permit were never installed or were allowed to be deferred until the onsite improvements were proposed. These items are noted below and will be required as part of this project. a. An existing fire hydrant along El Mirage Road needs to be relocated to provide at least 1 foot of clearance between the nozzle and back of sidewalk. b. Installation of a 1.5-inch landscape service line and 1.5-inch backflow preventer. c. Installation of a fire hydrant along Butler Drive. d. Installation of the curb termination west of the eastern driveway entrance. e. Installation of a 9-inch thick concrete driveway entrance and 6” vertical curb for the driveway. The proposed Site Plan appears to show removal of the existing driveway entrance. f. Relocation of the existing 25 MPH speed limit sign. The existing sign was removed during construction of the original driveway entrance but was never replaced. g. Installation of three new streetlights along El Mirage Road. h. Installation of landscaping, irrigation, and decomposed granite along the project frontage. Miscellaneous 87. A Final Plat per Chapter 1, Section B-2 of the City’s Design & Development Standard Manual (DDSM) will be required prior to Certificate of Occupancy. The Plat shall show: a. All right of way and easement dedications including PUEs, VNAEs, etc. b. A 1-foot Vehicular Non-Access Easement is required along El Mirage Road except at legitimate driveways. 7 88. A Geotechnical Report will be required to provide asphalt/concrete pavement sections. Verify the proposed pavement sections can handle 75,000 lbs. for any fire access lane or more if the trucks entering and existing the site will be heavier. 89. A Haul Permit will be required if 500 cubic yards or more of material will be brought into or out of the site. This will require a separate application, an exhibit showing the haul route and insurance from the company performing the haul. The fee is $300. 90. An Approval to Construction (ATC) will be required from MCESD for the water line extensions. A copy shall be provided to the City prior to the release of any Engineering permit. 91. A copy of the MCESD approval for the installation of/connection to the septic system shall be provided to the City prior to the release of the Certificate of Occupancy. 92. A Dust Control Permit from the County will be required prior to the release of any Engineering permit. 93. A Notice of Intent (NOI) from ADEQ will be required prior to release of any Engineering permit. 94. Any cutting of the pavement in El Mirage Road and Butler Drive will require Pavement Cut Fees per the most current Fee Schedule. The above comments are meant to be general in nature and are not considered to be all inclusive. Additional comments will arise during the formal permit submittal. United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.552300, -112.324390 Site: TC23048 : N of Northern Avenue : El Mirage Road 4/4/2023 Tuesday SB Interval Start Interval Start 4/4/2023 00:00 119 12:00 7 440 37 00:15 106 12:15 8 00:30 107 12:30 6 00:45 108 12:45 16 01:00 106 13:00 7 445 30 01:15 96 13:15 12 01:30 119 13:30 6 01:45 124 13:45 5 02:00 141 14:00 7 623 32 02:15 184 14:15 10 02:30 152 14:30 4 02:45 146 14:45 11 03:00 139 15:00 16 542 79 03:15 145 15:15 18 03:30 125 15:30 17 03:45 133 15:45 28 04:00 112 16:00 47 504 246 04:15 138 16:15 65 04:30 118 16:30 70 04:45 136 16:45 64 05:00 152 17:00 104 456 384 05:15 114 17:15 84 05:30 94 17:30 106 05:45 96 17:45 90 06:00 88 18:00 120 308 518 06:15 80 18:15 136 06:30 86 18:30 134 06:45 54 18:45 128 07:00 56 19:00 142 220 516 07:15 52 19:15 144 07:30 46 19:30 130 07:45 66 19:45 100 08:00 56 20:00 100 200 452 08:15 54 20:15 132 08:30 55 20:30 117 08:45 35 20:45 103 09:00 36 21:00 73 119 346 09:15 26 21:15 88 09:30 32 21:30 96 09:45 25 21:45 89 10:00 19 22:00 112 61 372 10:15 20 22:15 84 10:30 13 22:30 68 10:45 9 22:45 108 11:00 12 23:00 92 55 391 11:15 15 23:15 100 11:30 12 23:30 101 11:45 16 23:45 98 24 Hour Total 7376 00:00 - 12:00 12 Hour Count 3403 Peak Hour 06:30 Peak Volume 548 Factor 0.95 12:00 - 00:00 12 Hour Count 3973 Peak Hour 14:00 Peak Volume 623 Factor 0.85 United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.552300, -112.324390 Site: TC23048 : N of Northern Avenue : El Mirage Road 4/5/2023 Wednesday SB Interval Start Interval Start 4/5/2023 00:00 108 12:00 12 417 71 00:15 96 12:15 24 00:30 96 12:30 11 00:45 117 12:45 24 01:00 108 13:00 16 472 60 01:15 106 13:15 18 01:30 139 13:30 13 01:45 119 13:45 13 02:00 130 14:00 15 640 59 02:15 174 14:15 17 02:30 189 14:30 13 02:45 147 14:45 14 03:00 136 15:00 28 596 113 03:15 154 15:15 26 03:30 152 15:30 35 03:45 154 15:45 24 04:00 163 16:00 50 595 278 04:15 146 16:15 78 04:30 142 16:30 80 04:45 144 16:45 70 05:00 160 17:00 93 522 393 05:15 142 17:15 84 05:30 120 17:30 114 05:45 100 17:45 102 06:00 90 18:00 109 333 525 06:15 86 18:15 122 06:30 81 18:30 144 06:45 76 18:45 150 07:00 66 19:00 141 245 493 07:15 71 19:15 138 07:30 51 19:30 114 07:45 57 19:45 100 08:00 64 20:00 111 203 465 08:15 44 20:15 140 08:30 52 20:30 120 08:45 43 20:45 94 09:00 54 21:00 96 157 420 09:15 44 21:15 110 09:30 30 21:30 100 09:45 29 21:45 114 10:00 18 22:00 95 76 372 10:15 16 22:15 93 10:30 24 22:30 100 10:45 18 22:45 84 11:00 8 23:00 76 42 396 11:15 16 23:15 100 11:30 13 23:30 96 11:45 5 23:45 124 24 Hour Total 7943 00:00 - 12:00 12 Hour Count 3645 Peak Hour 06:30 Peak Volume 573 Factor 0.96 12:00 - 00:00 12 Hour Count 4298 Peak Hour 14:15 Peak Volume 646 Factor 0.85 United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.552300, -112.324390 Site: TC23048 : N of Northern Avenue : El Mirage Road 4/6/2023 Thursday SB Interval Start Interval Start 4/6/2023 00:00 108 12:00 7 430 35 00:15 116 12:15 9 00:30 94 12:30 7 00:45 112 12:45 12 01:00 100 13:00 10 474 33 01:15 126 13:15 3 01:30 116 13:30 12 01:45 132 13:45 8 02:00 108 14:00 8 573 33 02:15 185 14:15 8 02:30 160 14:30 7 02:45 120 14:45 10 03:00 126 15:00 12 532 75 03:15 130 15:15 17 03:30 136 15:30 28 03:45 140 15:45 18 04:00 158 16:00 45 586 243 04:15 156 16:15 56 04:30 152 16:30 70 04:45 120 16:45 72 05:00 140 17:00 70 525 356 05:15 150 17:15 90 05:30 138 17:30 104 05:45 97 17:45 92 06:00 102 18:00 103 346 520 06:15 84 18:15 142 06:30 84 18:30 138 06:45 76 18:45 137 07:00 58 19:00 150 238 503 07:15 72 19:15 125 07:30 58 19:30 106 07:45 50 19:45 122 08:00 42 20:00 116 207 436 08:15 52 20:15 102 08:30 64 20:30 106 08:45 49 20:45 112 09:00 32 21:00 102 128 406 09:15 33 21:15 104 09:30 37 21:30 96 09:45 26 21:45 104 10:00 18 22:00 78 89 364 10:15 22 22:15 96 10:30 27 22:30 100 10:45 22 22:45 90 11:00 18 23:00 93 87 395 11:15 24 23:15 103 11:30 25 23:30 95 11:45 20 23:45 104 24 Hour Total 7614 00:00 - 12:00 12 Hour Count 3399 Peak Hour 06:15 Peak Volume 567 Factor 0.95 12:00 - 00:00 12 Hour Count 4215 Peak Hour 15:45 Peak Volume 606 Factor 0.96 United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.563826, -112.324498 Site: TC23048 : S of Olive Avenue : El Mirage Road 4/4/2023 Tuesday NB Interval Start Interval Start 4/4/2023 00:00 92 12:00 15 401 43 00:15 103 12:15 14 00:30 108 12:30 7 00:45 98 12:45 7 01:00 97 13:00 15 443 33 01:15 95 13:15 6 01:30 121 13:30 6 01:45 130 13:45 6 02:00 158 14:00 8 603 42 02:15 144 14:15 10 02:30 164 14:30 14 02:45 137 14:45 10 03:00 168 15:00 15 632 37 03:15 152 15:15 9 03:30 165 15:30 6 03:45 147 15:45 7 04:00 160 16:00 7 667 102 04:15 168 16:15 23 04:30 173 16:30 34 04:45 166 16:45 38 05:00 138 17:00 22 550 253 05:15 166 17:15 54 05:30 112 17:30 62 05:45 134 17:45 115 06:00 122 18:00 70 436 390 06:15 116 18:15 111 06:30 109 18:30 105 06:45 89 18:45 104 07:00 76 19:00 98 288 468 07:15 80 19:15 106 07:30 62 19:30 105 07:45 70 19:45 159 08:00 49 20:00 154 206 497 08:15 59 20:15 136 08:30 52 20:30 96 08:45 46 20:45 111 09:00 43 21:00 100 203 372 09:15 69 21:15 88 09:30 47 21:30 102 09:45 44 21:45 82 10:00 55 22:00 69 171 343 10:15 48 22:15 82 10:30 35 22:30 86 10:45 33 22:45 106 11:00 51 23:00 98 119 346 11:15 20 23:15 74 11:30 20 23:30 80 11:45 28 23:45 94 24 Hour Total 7645 00:00 - 12:00 12 Hour Count 2926 Peak Hour 07:30 Peak Volume 554 Factor 0.87 12:00 - 00:00 12 Hour Count 4719 Peak Hour 16:00 Peak Volume 667 Factor 0.96 United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.563826, -112.324498 Site: TC23048 : S of Olive Avenue : El Mirage Road 4/5/2023 Wednesday NB Interval Start Interval Start 4/5/2023 00:00 87 12:00 21 398 75 00:15 102 12:15 13 00:30 117 12:30 25 00:45 92 12:45 16 01:00 98 13:00 16 492 57 01:15 108 13:15 11 01:30 138 13:30 14 01:45 148 13:45 16 02:00 134 14:00 24 651 58 02:15 153 14:15 10 02:30 186 14:30 6 02:45 178 14:45 18 03:00 155 15:00 18 580 56 03:15 138 15:15 8 03:30 145 15:30 10 03:45 142 15:45 20 04:00 162 16:00 16 618 121 04:15 146 16:15 13 04:30 162 16:30 31 04:45 148 16:45 61 05:00 190 17:00 32 636 243 05:15 169 17:15 40 05:30 144 17:30 76 05:45 133 17:45 95 06:00 129 18:00 84 427 411 06:15 108 18:15 99 06:30 98 18:30 90 06:45 92 18:45 138 07:00 84 19:00 104 304 497 07:15 87 19:15 118 07:30 59 19:30 119 07:45 74 19:45 156 08:00 68 20:00 144 253 452 08:15 64 20:15 112 08:30 57 20:30 100 08:45 64 20:45 96 09:00 52 21:00 98 205 357 09:15 56 21:15 111 09:30 41 21:30 70 09:45 56 21:45 78 10:00 30 22:00 107 141 382 10:15 45 22:15 96 10:30 38 22:30 86 10:45 28 22:45 93 11:00 24 23:00 98 73 396 11:15 20 23:15 108 11:30 16 23:30 102 11:45 13 23:45 88 24 Hour Total 7883 00:00 - 12:00 12 Hour Count 3105 Peak Hour 07:15 Peak Volume 537 Factor 0.86 12:00 - 00:00 12 Hour Count 4778 Peak Hour 14:15 Peak Volume 672 Factor 0.90 United Civil Group 2803 N. 7th Avenue Lat, Long 24 Hour Volume, per Channel (Volume factor 0.5) Street Location : 33.563826, -112.324498 Site: TC23048 : S of Olive Avenue : El Mirage Road 4/6/2023 Thursday NB Interval Start Interval Start 4/6/2023 00:00 107 12:00 17 416 42 00:15 97 12:15 7 00:30 96 12:30 14 00:45 116 12:45 4 01:00 88 13:00 25 498 51 01:15 121 13:15 6 01:30 136 13:30 10 01:45 153 13:45 10 02:00 151 14:00 10 667 40 02:15 162 14:15 10 02:30 200 14:30 13 02:45 154 14:45 7 03:00 193 15:00 6 647 31 03:15 140 15:15 4 03:30 170 15:30 13 03:45 144 15:45 8 04:00 144 16:00 12 611 118 04:15 164 16:15 24 04:30 148 16:30 40 04:45 155 16:45 42 05:00 156 17:00 30 590 244 05:15 170 17:15 46 05:30 128 17:30 61 05:45 136 17:45 107 06:00 112 18:00 84 386 455 06:15 92 18:15 120 06:30 76 18:30 115 06:45 106 18:45 136 07:00 90 19:00 135 325 578 07:15 85 19:15 141 07:30 79 19:30 117 07:45 71 19:45 185 08:00 64 20:00 156 252 532 08:15 76 20:15 122 08:30 52 20:30 146 08:45 60 20:45 108 09:00 52 21:00 83 193 365 09:15 54 21:15 100 09:30 45 21:30 82 09:45 42 21:45 100 10:00 40 22:00 102 154 349 10:15 46 22:15 62 10:30 40 22:30 97 10:45 28 22:45 88 11:00 34 23:00 80 95 393 11:15 24 23:15 104 11:30 23 23:30 107 11:45 14 23:45 102 24 Hour Total 8032 00:00 - 12:00 12 Hour Count 3198 Peak Hour 07:45 Peak Volume 609 Factor 0.82 12:00 - 00:00 12 Hour Count 4834 Peak Hour 14:15 Peak Volume 709 Factor 0.89 Development Services Engineering Division 10000 N. El Mirage Road, El Mirage, AZ 85335 623-972-8116; Fax 623-876-4605; TDD 623-933-3258 www.elmirageaz.gov SWPPP Guidance Document (Storm Water Pollution Prevention Plan) Development/Project Name: ______________________________________________ Parcel Number(s): ______________________________________________ Address/Location: ______________________________________________ Net Area (Acres): ______________________________________________ Disturbed Area (Acres): ______________________________________________ The City of El Mirage requires all development that disturbs one acre or more to submit the required Storm Water Pollution Prevention Plan (SWPPP), including the Notice of Intent (NOI). The owner/developer is still required to submit all required documents to the Arizona Department of Environmental Quality (ADEQ) as required by law. The site https://azdeq.gov/node/1143 is designed to provide you with a quick and easy way to file a Notice of Intent (NOI) online for permit coverage, apply for a waiver, or file a Notice of Termination (NOT) to terminate coverage under the AZPDES Construction General Permit, AZG2020-001 or call ADEQ at (844) 827-4768 for assistance. In addition, the SWPPP shall include all requirements of Maricopa County Rule 310 and all requirements of the El Mirage City Code as it pertains to storm water. Copies of all requirements, forms and guidance are available in the latest version of the Drainage Design Manual for Maricopa County Volume III Erosion Control available at the Flood Control District, 2801 West Durango, Phoenix, Arizona 85009, Phone No (602) 506-1501. This checklist serves to minimize redline comments on the check prints and to maintain consistency among plan reviewers on plans for Storm Water and Dust Control Management. Plan approval, issuing permits, and certain grading clearances depend on compliance with the comments made on the check prints and this checklist. The engineer of record shall satisfy themselves of the completeness and accuracy of the design. This review shall serve as a courtesy review only. The Owner is ultimately responsible to ensure that all of the requirements outlined under AZPDES are followed. Please return this checklist and the check prints with your next submittal. Discussion of redline comments on plans or this checklist should be directed to the City Plan Reviewer. 2 GENERAL REQUIREMENTS: Sheets to be 24" X 36"; submit two sets of plans. Separate Storm Water Management Plans shall be submitted with grading and drainage plan at time of First review. Cover sheet is required on plans of more than two sheets. Site Information – to be included on the First/Cover sheet: Project title block with name and address of project. Legal description of project location. Total site area (acres). Total area of disturbance (acres). Vicinity map with north arrow. Index of plan sheets if more than one plan sheet. Owner's/Developer’s name, address, and telephone number. Engineer’s name, address, and telephone number. Contractor’s name, address and telephone number. If contractor is not known, leave this area blank for future completion. Add Storm Water Pollution Prevention (SWPPP) Notes to plan. Notes can be found here (see City Detail EM-101-9). SWPPP Certification – The site owner (operator) or his authorized representative shall sign and certify the plan. In signing, the person certifies that the information is true and assumes liability for the plan. The registrant preparing the plan may be liable to the site operator/owner. However, ultimate responsibility – for purposes of violations, and fines shall lie with the site operator/owner and site contractor. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the operator or operators who manage this system, or those operators directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. In addition, I certify that the permittee will comply with all terms and conditions stipulated in General Permit No. AZG2020-001 issued by the Director. _______________________________ _____________________________ Printed Name Job Title _______________________________ _____________________________ Signature Company Name 3 Contractor Certification – ADEQ also requires that the contractors and subcontractors responsible for implementing measures in the SWPPP be listed in the plan with the measures for which they are responsible, and that they sign a certification statement that they understand the permit requirements as reflected on the SWPPP . I (Printed Individual’s Name) acting as (Job Title) for the (contractor/subcontractor’s name), an authorized representative, having reviewed this Storm Water Management Plan (SWPPP) and all of the relevant documents, do hereby certify that I understand all components of this plan and will perform all required inspections and maintenance activities as required; and that I will maintain all necessary and required records at the job site and up to date. _______________________________ Signature Provide a legend identifying grades, symbols, and lines, etc. Maricopa County Rule 310 permit #_____ ADEQ tracking number AZCON_____ All sheets shall have the qualified Arizona registrant’s seal and original signature prior to plan submittal. North arrow and bar scale The following is a checklist of information that is to be included in the SWPPP. Additional information regarding the data to be included in the SWPPP is provided in the Construction General Permit issued by ADEQ. The Construction General Permit can be downloaded from: https://static.azdeq.gov/permits/azpdes/cgp_permit.pdf Existing Conditions – show existing contours, floodplain limits and any stormwater structures on or adjacent to the project site. Construction Activity Description - the SWPPP must contain a description of the purpose or goal(s) of the construction project (e.g. a single-family residential, commercial development, etc.). Additionally, the SWPPP must list all soil-disturbing activities necessary to complete the project (e.g. clearing, excavating, and stockpiling). Final Slope Grades - Location and steepness of slopes after grading. Final Drainage Patterns – Drainage patterns of the site after major grading activities and the location of the points where storm water will discharge from the site. Disturbed Areas - Location and areas of soil disturbing activities or the total area of the site where soil will be disturbed. (This must be identified on the map and area called-out). Undisturbed Areas – The SWPPP shall reflect all areas designated as being undisturbed. This would include Natural open space, jurisdictional washes (Per section 404 of the CWA), etc. All designated areas must be delineated/ and fenced-off in the field. Offsite Flows – Show location of offsite flows including quantities. If offsite flows are being rerouted through the site, a note should be added to reflect the no disturbance zone. Erosion and Sediment Controls – The SWPPP must describe the erosion and sediment controls to be used during construction. Such controls include stabilization measures for disturbed areas and structural controls to divert runoff and remove sediments. Selected controls must be per the Best Management Practices (BMP) outlined in the latest Drainage Design Manual for Maricopa County Volume III Erosion Control (ECM). 4 Best Management Practices (BMPs) – Structural devices or non-structural practices that are designated to prevent pollutants from entering into storm water flows, to direct flows of storm water or to treat polluted storm water flows. The emphasis should be placed on eliminating the source of pollutant(s). All selected BMPs details must be shown on the plan sheets or included as part of the Storm Water Management Plan. Sediment Basins - Show location of all temporary or permanent sediment basins to be installed. Temporary basins may be substituted for permanent basins during grading phase only. These basins must provide at least 3,600 cubic feet of storage for every acre of contributing land. Other Controls – The SWPPP must also include controls that address other potential sources of storm water pollution, such as: Construction site waste material storage. Preventing offsite tracking of sediments and generation of dust. Hazardous material storage (e.g. fuel, equipment oil, etc.) Equipment maintenance/ parking areas. Post-Construction – The SWPPP must include a description of storm water management controls that will be installed to control pollutants after construction completion. Future Activities – The SWPPP shall address all grading activities to be performed on any site that is part of the “greater common plan or development” (e.g. construction of individual lot(s) within a subdivision). Location of Controls – the BMPs selected for the site must be shown on the SWPPP, including the location of each measure used for erosion and sediment control, storm water management, and other pollution controls. Inspection and Maintenance Plan – The SWPPP must contain a description of the procedures that will be used to maintain the BMPs on site. The plan shall include an inspection and maintenance checklist for each control measure. The checklist must address specific items to inspect for and evaluation criteria. Description of Controls – The SWPPP shall include a list of the BMPs to be used at the site, describing each control and its purpose. Many of the BMPs selected from the ECM already contain the descriptions and purpose. Sequence of Major Activities – The SWPPP shall contain a sequence of major activities. The sequence should address the installation of all controls, earth disturbing activities, and stabilization activities, and the maintenance required for the controls. The sequence should indicate, clearly, the order in which these activities will take place along with a proposed timeline associated with each activity. In developing a sequence of major activities, the following general principals should be followed: 1. Install down slope and side slope perimeter controls before the land disturbing activity occurs. 2. Cover or stabilize disturbed areas as soon as possible. (Under ADEQ’s general permit, disturbed areas of the construction site that will not be re-disturbed must be stabilized within 14 days of the most recent land disturbance). 3. Time construction activities to limit impact from seasonal climate changes or weather events. 4. Delay construction of infiltration measures until the end of the construction project, if possible. Otherwise, provide proper Storm Water Management Controls to eliminate potential sources of pollution. 5. Do not remove temporary perimeter controls until after all upstream areas are finally 5 stabilized. Additional Comments - The following are additional comments specific to this site: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 01-01-23 DESCRIPTION CRITERIA AVERAGE DAY DEMAND - SINGLE FAMILY RESIDENTIAL Gallons per capita per day (gpcd)(1) 117 Density (people per dwelling unit)(2) 3.35 AVERAGE DAY DEMAND - MULTI-FAMILY/COMMERCIAL/INDUSTRIAL Land Use Category(3) Varies PEAKING FACTORS Maximum Day / Average Day 1.7 Peak Hour / Maximum Day 1.7 Peak Hour / Average Day 2.9 VELOCITY CRITERIA Maximum Day Condition Max Velocity < 5 fps Peak Hour Condition Max Velocity ≤ 7 fps Max Day Plus Fire Flow Condition Max Velocity < 10 fps HEAD LOSS CRITERIA Maximum Day Condition 2 to 7 feet per 1,000 feet of pipe Peak Hour Condition < 10 feet per 1,000 feet of pipe PRESSURE CRITERIA Max Day Plus Fire Flow Condition Min Residual Pressure of 20 psi Peak Hour Condition Min System Pressure of 40 psi FIRE DEMAND CRITERIA Single Family Residential 1,500 gpm at 2 hours All Other Land Uses 3,500 gpm for 4 hours NOTES: (1) Average per capita water use per 2012 Water and Wastewater Master Plan provided by Wilson Engineers (2) Persons per household per US Census Bureau (2020) (3) Use latest version of City of Phoenix Design Standards Manual for Water and Wastewater Systems. Other values may be used with prior approval from the Engineering Division WATER SYSTEM DESIGN CRITERIA DESCRIPTION CRITERIA AVERAGE DAY DEMAND - SINGLE FAMILY RESIDENTIAL Gallons per capita per day (gpcd)(1) 58.5 Density (people per dwelling unit)(2) 3.35 AVERAGE DAY DEMAND - MULTI-FAMILY/COMMERCIAL/INDUSTRIAL Land Use Category(3) Varies PEAKING FACTORS Dry Weather Peaking Factors (Applied to Average Flows) Per AAC R18-9-E301.D (see next page) Wet Weather Peaking Factors (Applied to Peak Flows) 1.17 VELOCITY CRITERIA Gravity Mains 2 fps ≤ Velocity ≤ 8 fps Force Mains 3 fps ≤ Velocity ≤ 7 fps FLOW DEPTH CRITERIA (d/D) FOR DRY WEATHER PEAK HOUR FLOWS d/D for new sewer with diameter less than 10 inches 0.50 d/D for new sewer with diameter 12 inches and above 0.75 (AAC R18-9-E301.D.e.iii) FLOW DEPTH CRITERIA (d/D) FOR WET WEATHER PEAK HOUR FLOWS d/D for designing new sewer pipe < 0.90 d/D for evaluating existing pipe in developed areas < 1.00 HEAD LOSS CRITERIA Gravity pipe Manning's n=0.013 Pressure pipe Hazen Williams' C=120 MANHOLES When smaller pipe joins larger pipe Match Crowns Invert drop through manhole 0.20 feet NOTES: (1) Average per capita water use per 2012 Water and Wastewater Master Plan provided by Wilson Engineers (2) Persons per household per US Census Bureau (2020) (3) Use latest version of City of Phoenix Design Standards Manual for Water and Wastewater Systems. Other values may be used with prior approval from the Engineering Division WASTEWATER SYSTEM DESIGN CRITERIA Upstream Population Dry Weather Peaking Factor 100 3.62 200 3.14 300 2.90 400 2.74 500 2.64 600 2.56 700 2.50 800 2.46 900 2.42 1,000 2.38 1,001 to 10,000 PF = (6.330 x p-0.231) + 1.094 10,001 to 100,000 PF = (6.177 x p-0.233) + 1.128 More than 100,000 PF = (4.500 x p-0.174) + 0.945 PF = Dry Weather Peaking Factor p = Upstream Population AAC R18-9-E301.D