PSC Amendment No. 1

City of El Mirage — Regular Meeting (2024-02-06)

View PDF Item 3 Meeting page

Extracted text (via pymupdf) 13562 characters
Page 1 of 2 
 
AMENDMENT NO. 1 
PROFESSIONAL SERVICES CONTRACT 
 
 
This AMENDMENT NO. 1 to the LEA-Architects L.L.C., PROFESSIONAL SERVICES 
CONTRACT (“Contract”) executed on September 8, 2022, is made and entered into this 6th day of 
February 2024, (“Effective Date”) by and between the City of El Mirage, an Arizona municipal 
corporation (“City”), and LEA-Architects L.L.C., an Arizona corporation (“Consultant”), 
collectively (“the Parties”). 
 
 
RECITALS 
 
 
WHEREAS, the City and the Consultant entered into a Professional Services Contract to 
provide professional architectural and engineering services for the design of a new Public Works 
building, executed on September 8, 2022; and, 
 
WHEREAS, the City has requested the Consultant to prepare a scope of work for 
construction administrative services and compensation for those additional services as set forth in 
"Exhibit A"; and,   
 
WHEREAS, the City has reviewed and agreed to amend the original Contract as stated.  
 
 
CONTRACT AMENDMENT 
 
 
NOW, THEREFORE, in consideration of the mutual promises and obligations set forth 
herein, the parties, hereby agree to amend the Contract as follows: 
 
1. The Consultant shall provide construction administrative services, as described in the 
attached scope of services set forth in Exhibit "A".   
 
2. The Contract shall be amended to include compensation for these additional services in 
an amount not to exceed $68,393.00 and for a total Contract amount of $227,408.50.  
 
3. The Contract term shall be extended until December 31, 2024.  
 
4. Except as specifically modified above, all of the remaining terms and conditions of said 
Contract shall remain and continue in full force and effect. 
 
 
[Signature page follows]

Page 2 of 2 
IN WITNESS WHEREOF, the parties have executed this Contract Amendment as of the 
date first above written. 
 
 
CITY:  
 
 
 
 
  
 
CONSULTANT: 
City of El Mirage 
 
 
 
  
 
LEA-Architects L.L.C. 
 
 
 
 
_____________________________  
 
 
By:_____________________________   
By:  J. Crystal Dyches                   
 
 
 
 
        Print Name 
Its:   City Manager 
 
 
 
 
 
 
 
 
 
By:______________________________ 
 
 
 
 
 
 
 
 
 
               Signature 
ATTEST: 
 
 
 
 
 
 
 
 
 
Its:____________________________ 
__________________________ 
 
 
 
 
 
 
By:  Sharon Antes 
 
 
 
 
 
 
 
Its:   City Clerk 
 
 
 
 
APPROVED AS TO FORM: 
 
 
___________________________ 
Justin Pierce, City Attorney 
Lance Enyart, AIA
Principal

Exhibit ‘A’

Page 1 
Attachment A 
 
SCOPE OF WORK 
City of El Mirage 
Public Works Building   
10355 N. 121st Ave. 
Scope of Construction Administration (CA) Services 
May 22, 2023 
 
PROJECT DESCRIPTION:   
 
Construction Delivery Method – Design-Bid-Build 
 
Project Scope of Work:  
• 
El Mirage Public Works Building – 6,400 SF 
 
 
I. 
GENERAL REQUIREMENTS 
 
A. PROJECT MANAGEMENT  
1. The Architect shall provide internal project management and control for all 
aspects of the construction administration.  Included in this task are review of the 
contractor’s project schedule, records, correspondence, quality control activities, 
and correspondence with City staff. 
 
B. QUALITY CONTROL (QA / QC) 
1. The Architect is responsible for quality control of his work.  The Architect shall 
provide a list of sub-consultants for the project, which will not be changed without 
the approval of the City of El Mirage 
 
C. PROJECT SCHEDULE 
1. Submit monthly status reports indicating progress of the CA and conformance 
with the project Construction schedule.  
 
D. COORDINATION 
1. AGENCIES: 
 
LEA Architects LLC (LEA) shall provide coordination necessary with the 
designated City of El Mirage project manager who will assist with coordination 
with City Departments having an interest or authority over the project.  
 
II. 
MEETING PARTICIPATION 
As part of the contractual relationship with the City of El Mirage, the Architect shall 
attend meetings.  The Architect shall review minutes prepared by the general contractor 
that outline meeting discussions and address action items and the responsible parties.  
LEA-Architects and the City of El Mirage Project Manager shall review and approve all 
minutes.  Meetings included in this scope of work include the following: 
 
Meeting Type 
Number of 
Meetings 
Preconstruction Meeting  
1 
Construction Administration – Const. Meetings 
32 
Construction Administration – Site Inspections 
                                  (in conjunction with Const. Meetings)  
16 
Construction Administration – Punch List 
2 
Total 
51 
 
 
 
 
 
LEA –Architects, LLC

Page 2 
PROJECT DESIGN TEAM 
 
ARCHITECT 
 
 
 
 
LEA - Architects, LLC 
AIA AZ Sustainable Firm of the Year 2012 
1730 East Northern Avenue Suite 110 
Phoenix, AZ 85020 
www.lea-architects.com 
 
Principal Architect:                Lance Enyart AIA 
Sr. Project Manager:              Randy Jones RA 
 
STRUCTURAL ENGINEER 
 
 
 
7047 E. Greenway Pkwy, Suite 250 
Scottsdale, AZ 85254 
p. 480-398-7729 
 
Structural Engineer:        Greg Brickey PE 
MECHANICAL / PLUMBING / ELECTRICAL 
ENGINEER 
 
 
 
` 
` 
 
 
7201 N. Dreamy Draw Drive, Suite 200 
Phoenix, AZ 85020 
602.943.4116 
www.mpeconsult.com 
 
MPE Eng.:    Mark Peterson PE 
CIVIL ENGINEER 
 
 
 
7878 N. 16th St., Suite 300 
Phoenix, AZ 85020 
602-957-1155 
www.dibblecorp.com/ 
Civil Engineer:            Adrian Carvajal, PE 
LANDSCAPE ARCHITECT 
 
 
 
 
 
DESIGN ETHIC  
7525 E. 6th Ave 
Scottsdale, AZ 85252 
(480) 225-7077 
www.designethic.net 
 
Landscape Architect:     Brandon Paul, PLA

Page 3 
D.  General Assumptions and Clarifications  
1. 
We have not included additional costs for submittal to USGB for LEED Certification.    
2. 
We have included limited coordination of FF&E. It is our understanding that these 
items will be purchased by City of El Mirage.  
3. 
We have not included coordination, specification or procurement of any desktop 
computer equipment, copiers, fax machines, or other office equipment. It is our 
understanding that these items will be purchased by City of El Mirage. We will 
provide power outlets in accordance with the requirements provided by City of El 
Mirage as part of our base scope of services. 
 
E.  City of El Mirage Responsibilities  
1. 
Participate in Construction meetings 
2. 
Coordinate interdepartmental communication 
3. 
Pay all permit submittal fees 
4. 
Procure FF&E, security systems, access control systems, CCTV, and Alert Monitor 
via City vendors 
 
BASE SCOPE OF SERVICES: 
 
GENERAL PROJECT ADMINISTRATION SERVICES 
 
• 
LEA will perform its duties outlined by the contract solely and completely through a 
representative designated by the City of El Mirage. 
 
• 
LEA will consult with the Owner, attend Project meetings, and communicate with members 
of the Project Team.  Coordinate the services provided by the Architect’s consultants with 
those services provided by the Owner and the Owner’s consultants. 
 
 
III. 
ARCHITECTURAL CONSTRUCTION ADMINISTRATION (CA) PHASE SERVICES 
(LEA Architects LLC)  
 
TASK 1.0 – CONSTRUCTION PHASE SERVICES  
1. 
The Architect shall attend, and review minutes prepared by the Contractor 
of the pre-construction conference as scheduled by the City of El Mirage. 
2. 
The Architect shall review all shop drawings, samples and other 
submittals within two weeks of receipt of the item to determine 
compliance with the drawings and specifications.  The Architect shall note 
approval or disapproval on the items and retain two copies for the project 
record. 
3. 
The Architect shall provide a written response to all requests for 
clarification and interpretation by the contract documents during 
construction within five days unless granted an extension by the City of El 
Mirage. 
4. 
The Architect shall attend construction meetings (virtual and in-person), 
perform on-site observations of the work at the request of the Contractor.   
5. 
The Architect shall co-prepare a final punch list with the City of El Mirage 
Project Manager; participate in final inspections, equipment, and system 
start-ups as necessary.   
6. 
The Architect shall make periodic site visits in support of the City of El 
Mirage for the purpose of determining general compliance with the 
approved project drawings, plans, and specifications.  The specific 
scheduling for the site visits shall be determined in advance with the City 
of El Mirage.  It is imperative that work be observed prior by the Architect 
prior to being covered by subsequent construction.  Deviations in work 
from the plans and specifications shall be brought to the attention of the 
City of El Mirage in writing.

Page 4 
7. 
Special inspections as required based on the design of the project 
including but not necessarily limited to; structural steel welds, concrete, 
structural masonry, and bolts installed in concrete  
 
TASK 2.0 – POST CONSTRUCTION PHASE SERVICES (Additional Service)  
1. 
The Architect will review Contractor Furnished Operations & Maintenance 
Manuals (O&M Manuals) 
2. 
The Architect shall prepare Record Drawings (electronic media) showing 
significant changes in the work made during the construction process, 
based -on neatly and clearly marked-up contract drawings, prints, and 
other data furnished by the Contractor(s) and the applicable Addenda, 
Clarifications, and Change Orders that have occurred during the Project. 
These record digital record documents (as-builts) shall be provided to the 
City of El Mirage PM.

MANHOUR BREAKDOWN 
BY TASK/PERSONNEL
FIRM:
LEA-Architects LLC
       CLIENT:
City of El Mirage
PROJECT El Mirage Public Works Building  - Cosntruction Administration 
DATE:
May 22, 2023
Tasks
Description
Project Principal
Sr. Project 
Manager
Project 
Architect
BIM/CADD 
Operator
Clerical
TOTAL 
HOURS
COST         
(LUMP SUM) 
Engineering 
Fees (LS) 
Additional 
Services 
(Lump Sum)
Engineering 
Services 
Reimbursables 
(Allowances)
TOTAL COST
$205.00
$145.00
$140.00
$105.00
$58.00
1.0
A
1.1-A
Attend Pre-Construction Meeting
2.0
2.0
0.0
0.0
0.0
4.0
700.00
$           
700.00
$          
1.2-A
Proj. Mtg's  (20 - Virtual / 16 - On-site)
10.0
44.0
8.0
8.0
2.0
72.0
10,506.00
$      
10,506.00
$     
1.3-A
Site Inspections - (16) included
8.0
26.0
8.0
8.0
2.0
52.0
7,486.00
$        
7,486.00
$       
1.4-A
RFI's, Field Orders, Change Order Review
2.0
16.0
6.0
6.0
1.0
31.0
4,258.00
$        
4,258.00
$       
1.5-A
PR's,  Change Order Review
2.0
8.0
4.0
4.0
1.0
19.0
2,608.00
$        
2,608.00
$       
1.6-A
Shop Drawing/ Submittals Review
4.0
40.0
4.0
6.0
2.0
56.0
7,926.00
$        
7,926.00
$       
1.7-A
Misc Coordination w/ PM
4.0
12.0
0.0
4.0
1.0
21.0
3,038.00
$        
3,038.00
$       
1.8-A
Misc Coordination w/ Engineers
2.0
12.0
2.0
8.0
2.0
26.0
3,386.00
$        
3,386.00
$       
1.9-A
Punch lists
1.0
12.0
0.0
2.0
2.0
17.0
2,271.00
$        
2,271.00
$       
1.10-A
Record Document Verification
1.0
4.0
4.0
4.0
1.0
14.0
1,823.00
$        
1,823.00
$       
1.11-A
Coordination of FF&E's
2.0
2.0
2.0
2.0
0.0
8.0
1,190.00
$        
1,190.00
$       
Structural Engineer (BDA Design) CA Services
2,400.00
$       
2,400.00
$       
   IBC Required Special Structural Inspections             
(20 Trips) - BDA Design
8,000.00
$       
8,000.00
$       
Mech./Plumbing/Electrical Engineer (PACE) CA 
Services - (2) Site Inspections
3,550.00
$       
3,550.00
$       
Landscape Architect (Design Ethic) CA Services
1,200.00
$       
1,200.00
$       
Civil (Dibble) CA Services - (3) Site Inspections / 
Meetings
4,415.00
$       
4,415.00
$       
Reimbursable expenses
500.00
$           
500.00
$          
SUB-TOTAL HOURS
38.0
178.0
38.0
52.0
14.0
65.0
SUB-TOTAL COSTS
$7,790.00
$25,810.00
$5,320.00
$5,460.00
$812.00
45,192.00
$      
11,565.00
$     
8,000.00
$       
500.00
$           
64,757.00
$     
2.0
C
2.1-C
O&M Manual Review
1.0
3.0
0.0
0.0
2.0
6.0
756.00
$           
756.00
$          
2.2-C
Preparation of Record Drawings
2.0
2.0
0.0
16.0
0.0
20.0
2,380.00
$        
2,380.00
$       
SUB-TOTAL HOURS
3.0
5.0
0.0
16.0
2.0
26.0
SUB-TOTAL COSTS
$615.00
$725.00
$0.00
$1,680.00
$116.00
3,136.00
$        
-
$                
-
$                
-
$                 
3,136.00
$       
TOTAL HOURS 
41.0
183.0
38.0
68.0
16.0
91.0
TOTAL COSTS 
$8,405.00
$26,535.00
$5,320.00
$7,140.00
$928.00
48,328.00
$      
11,565.00
$     
8,000.00
$       
500.00
$           
67,893.00
$     
TOTAL BASIC CA SERVICES FEE SUMMARY 
Architectural Total Base CA Fee 
48,328.00
$      
Consulting Engineering Base CA Fee 
11,565.00
$      
Structural Total Base CA Fee
2,400.00
$      
Mechanical / Plumbing / Electrical Total Base CA Fee 
3,550.00
$      
Landscape Architect Total Base CA Fee
1,200.00
$      
Civil Engineer Total Base CA Fee
4,415.00
$      
TOTAL
59,893.00
$      
of $7.5 Million Construction Budget
TOTAL ADDITIONAL SERVICES FEE SUMMARY 
Special Structural Inspection (Allowance)
8,000.00
$        
TOTAL BASIC SERVICES WITH REQUIRED 
ADDITIONAL SERVICES FEE SUMMARY 
TOTAL ADDITIONAL SERVICES (ALLOWANCES) FEE SUMMARY 
 Reimbursable Expenses (Allowance) 
500.00
$           
0.01% of $7.5 Million Construction Budget
El Mirage Public Works Building 
SUB-TOTAL COST
Construction Administration Services - Special Services
SUB-TOTAL COST
LEA-ARCHITECTS LLC   MANHOURS - Attachment B
Construction Administration Services 
El Mirage Public Works Building 
TOTAL COST
El Mirage Public Works Building 
67,893.00
$                     
El Mirage Public Works Building 
LEA-ARCHITECTS
 MANHOUR BREAKDOWN
1