24602 125th Ave & Desert Cove JOC
11535 E. Germann Rd., Chandler, AZ 85286  P 480-732-9238  F 480-732-9239
Proposal
AZROC  A-110612  B4-110396
To:
City of El Mirage
12145 NW Grand Ave., P.O. Box 26
El Mirage AZ, 85335-
24602
125th Ave & Desert Cove JOC
Peoria Ave & 125th Ave
Project:
1/03/2024
Date of Plans:
Location:
Item No.
Item Description
Quantity
Unit Price
UM
Total Amount
Attn:
 
El Mirage
NA
Engineer:
Phone: (623) 933-1228
Fax:
(623) 876-4601
10
Mobilization
1
$8,750.00
EA
$8,750.00
20
Concrete Driveway with Valley Gutter per MAG 250-1
217
$35.25
SF
$7,631.63
30
Retention Basin 6' Wide x 100' Long 1' Deep 4:1
600
$19.00
SF
$11,400.00
40
Export Dirt
37
$47.00
CY
$1,739.00
45
Drywell, Max Depth = 125 Ft.
1
$51,500.00
EA
$51,500.00
50
Remove AC Pavement
14
$45.00
SY
$630.00
60
Traffic Control
1
$3,965.00
LS
$3,965.00
70
Survey
1
$2,125.00
LS
$2,125.00
80
Materials Testing
1
$2,300.00
LS
$2,300.00
$90,040.63
125th Ave & Desert Cove
90
Sales Tax @ 6.045%
1
$5,442.96
LS
$5,442.96
$5,442.96
Tax
$95,483.59
Grand Total
Special Conditions and Exclusions
*Bid is based on adequate water pressure on site and reasonable access to Fire Hydrant.
*Availability subject to change.
*Includes one mobilization, add $3000.00 for each additional mobilization.
*Material availability and pricing subject to change based on supplier terms and conditions. ABC/Concrete/Asphalt prices are 
projected through 03/30/2024. All increases to be paid by owner/developer.
*Drywell pricing subject to change, depending on owner providing location and drywell specifications.
*Payment will be based on field measured quantities.
*Proposal based on current market labor and material rates/pricing. Proposal subject to change upon increases in market 
labor and material rates/pricing.
*Proposal is good for 20 days.
*Proposal to become an exhibit to the contract.
Tuesday, January 23, 2024
Page 1 of 3

24602 125th Ave & Desert Cove JOC
11535 E. Germann Rd., Chandler, AZ 85286  P 480-732-9238  F 480-732-9239
Proposal
AZROC  A-110612  B4-110396
*Purchase orders must be issued within 20 days to secure crew and equipment availability. Material Availability and pricing 
subject to terms to conditions set in place by material suppliers/manufactures.
*Traffic Control pricing based on 24hr setup. If 24hr is not approved DCS will provide updated pricing for Traffic Control when 
included in the proposal.
*Excludes after hours or weekend inspector cost.
*Excludes any work involving the SWPPP/NPDES. If needed, we will provide a price once the scope of work is defined.
*Excludes bracing of existing utility poles.
*Excludes devegetation of native plants.
*Excludes night or weekend work.
*Excludes removal or relocation of existing obstructions or conflicting utilities.
*Excludes removals not specifically listed on bid schedule.
*Excludes repair of erosion damage and pumping/removal of runoff.
*Excludes repair to pumping or damaged subgrade caused by rain and/or others.
*Excludes ripping and/or blasting of material to construct site grade.
*Hard Rock Clause Grading: Any material that cannot be ripped with a Cat 140H or equal.
Tuesday, January 23, 2024
Page 2 of 3

24602 125th Ave & Desert Cove JOC
11535 E. Germann Rd., Chandler, AZ 85286  P 480-732-9238  F 480-732-9239
Proposal
AZROC  A-110612  B4-110396
Submitted By:
Mike Skrdla
We propose to furnish labor and materials to complete the items of work per the above specifications.  All work to be 
completed in a workmanlike manner  according to standard practices.  Any alteration or deviation from above specifications 
involving extra costs, will be executed only upon written orders, and  will become an extra charge over and above the 
estimate.  All agreements contingent upon strikes, accidents or delays beyond our control.  This proposal may be withdrawn 
by DCS  Contracting if not accepted within thirty days.  If work is not started within 60 days of signed contracts prices are 
subject to adjustment for all items not completed by that date.  Applications for payment submitted by the end of the month 
are due and  payable by the 15th of the following month (15 days).  If payment is not received within forty-five (45) days 
after the application for payment has been submitted, DCS Contracting, Inc. has the right to stop work and terminate the 
contract and recover payment for all work executed to date, including reasonable overhead, profit and damages.  Your 
signature on a copy of this proposal returned to us shall indicate acceptance and this document shall become a contract 
between us and shall be binding  on both parties.  The above prices, specifications and conditions are satisfactory and are 
hereby accepted.
General Conditions
Accepted By:
Date:
Printed Name and Title
Tuesday, January 23, 2024
Page 3 of 3