Development Application
Extracted text (via pymupdf)
9858 characters
12/22/2023 PZ23-12-22 2/13/2024 3/5/2024 February 5, 2024 1 | P a g e NARRATIVE – CondiƟonal Use Permit Background Fuel Processing Operators, LLC (FPO) operates a Transmix processing facility at 12126 West Olive Avenue. Transmix is a mixture of gasoline, diesel fuel and jet fuel (collecƟvely "fuel products”), generated during pipeline operaƟons, that no longer conforms to the required specificaƟons for any single/useable fuel product. Fuel products are transported into the Phoenix- area from California and Texas via the pipeline system that terminates at the Phoenix tank farm complex (“Phoenix Terminal”). Fuel products are transported/pumped in batches through the pipeline system wherein one product pushes another through the pipe. During the transportaƟon of fuel products in the pipeline system, mixing occurs at the point of interface between different products/batches (e.g., the point where a gasoline batch interfaces with a diesel fuel batch or jet fuel batch). This interface of mixed product is directed into storage tanks designated specifically for Transmix storage at the Phoenix Terminal. FPO performs a criƟcal role in the fuel supply chain by removing this Transmix from Phoenix Terminal storage and processing it via disƟllaƟon at FPO’s facility back into usable gasoline and diesel fuel products that conform to the appropriate fuel specificaƟons. AddiƟonally, following the disƟllaƟon of Transmix into gasoline and diesel, FPO hydrotreats the diesel disƟlled from Transmix to remove sulfur and ensure that it conforms to Federal ultra-low diesel fuel standards. FPO processes the majority of Transmix generated at the Phoenix Terminal from pipeline operaƟons. Without reliable outlets for the removal of Transmix from Phoenix Terminal storage, Transmix inventory would build to a level where the pipeline is forced to suspend shipments due to Transmix storage/containment limitaƟons. Proposed Project In 2021, FPO purchased the adjacent Maricopa County Assessor Parcel 501-45-015V (“Subject Parcel”) immediately west of and conƟguous with the exisƟng facility property. In October of 2023, City of El Mirage approved the rezoning of Subject Parcel to EI (Employment Industry) per ResoluƟon R23-10-27. FPO intends to use the Subject Parcel for addiƟonal storage of fuel products, a new building for internal quality control tesƟng of fuel products and truck parking with the possible expansion of fuel processing including green and alternaƟve fuels. The future facility operaƟons shall add 5 employees for a total staff of 25 employees. At this point it is not possible to idenƟfy what the alternaƟve and low carbon fuels would be feasible, however renewable diesel, hydrogen, green hydrogen, hydrogenated fuels are in the headlines and could be opƟons for the future development. February 5, 2024 2 | P a g e Project Phasing FPO anƟcipates implementaƟon of this project to occur in mulƟple phases as presented below: • Phase I: AddiƟon of a chain-link fence around the new parcel and joining the exisƟng fencing on the perimeter of the exisƟng parcels. The chain-link fencing between the exisƟng parcels and subject parcel will be removed. • Phase II: ConstrucƟon of onsite fuel storage tanks with containment area; overhead distribuƟon pipes to exisƟng plant faciliƟes; water main loop with hydrants & water cannons; Dry uƟlity lines (Electrical, communicaƟons, Air); mass grading and retenƟon basins; Offsite roadway improvements including new access to Olive Avenue; 6-foot-high masonry screen wall and offsite landscape area along the property frontage. • Phase III: ConstrucƟon of an approximate 5,000 square-foot building (Laboratory/office Building) on central-east porƟon of Subject Parcel for quality control tesƟng of fuel products; Onsite perimeter access drive; and Truck/employee parking lot. • Phase IV: ConstrucƟon of approximately 7,500 square-foot of various fuel processing faciliƟes; a 3,500 square foot OperaƟons building; and a 4,000 S.F. concrete slab for hydrogen and nitrogen storage tanks. Project Schedule The Project schedule is anƟcipated to follow the phased approach presented above. FPO anƟcipates implemenƟng the following: Phase I: End of Q2 2024 Phases II: End of Q4 2025 Phase III: End of Q4 2026 Phase IV: End of Q4 2027 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROJECT DATA PROPERTY ADDRESS: 12126 W. OLIVE AVENUE EL MIRAGE, ARIZONA 85335 PARCELS: 501-45-015V 226,638 SQ. FT. (5.20 ACRES) ZONE: EI 501-45-015J 48,739 SQ. FT. (1.12 ACRES) ZONE: EI 501-45-015H 156,996 SQ. FT. (3.60 ACRES) ZONE: EI JURISDICTION: CITY OF EL MIRAGE PARKING: 1 STALL PER 350 S.F. FOR EI ZONED INDUSTRIAL BUILDINGS 5,000 S.F. OFFICE/LAB BUILDING: 5000/350 = 15 STALLS 3,500 S.F. OPERATIONS BUILDING: 3500/350 = 10 STALLS REQUIRED STANDARD STALLS: 25 STALLS (27 PROVIDED) REQUIRED ADA STALLS: 2 STALLS (2 PROVIDED) CONDITIONAL USE: FUEL OPERATIONS (PROCESSING & STORAGE) GREEN TECHNOLOGY AND ALTERNATIVE FUELS GASOLINE, RENEWABLE GASOLINE, DIESEL, BIO-DIESEL, ETHANOL METHANOL, GREEN HYDROGEN, HYDROGEN & HYDROGENATED FUELS PROJECT DESCRIPTION MODIFICATIONS TO EXISTING FUEL STORAGE VOLUME AND EXPANSION OF FUEL PROCESSING FACILITIES ON 5-ACRE PARCEL (APN 501-45-015V) THAT INCLUDES NEW OLIVE AVENUE FRONTAGE IMPROVEMENTS, ADDITIONAL FUEL STORAGE TANKS & CONTAINMENT AREAS, A NEW TRUCK/EMPLOYEE PARKING AREA, NEW 5,000 S.F. LABORATORY/OFFICE AND 3,500 S.F. OPERATION BUILDINGS. LEGAL DESCRIPTION A PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 3 NORTH, RANGE 1 WEST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, BEING MORE PARTIALLY DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF SAID SECTION 25 FROM WHICH THE SOUTH QUARTER CORNER BEARS SOUTH 89 DEGREES 22 MINUTES 02 SECONDS EAST, A DISTANCE OF 2644.88 FEET; THENCE SOUTH 89 DEGREES 22 MINUTES 02 SECONDS EAST ALONG THE SOUTH LINE OF SAID SOUTHWEST QUARTER OF SECTION 25, A DISTANCE OF 655.04 FEET; THENCE LEAVING SAID SOUTH LINE, NORTH 00 DEGREES 00 MINUTES 52 SECONDS WEST, A DISTANCE OF 55 FEET TO A POINT ON THE SOUTH RIGHT OF WAY LINE OF OLIVE AVENUE, SAID POINT ALSO BEING THE POINT OF BEGINNING: THENCE CONTINUING NORTH 00 DEGREES 00 MINUTES 52 SECONDS WEST, A DISTANCE OF 365.38 FEET; THENCE SOUTH 89 DEGREES 22 MINUTES 02 SECONDS EAST, A DISTANCE OF 365.38 FEET; THENCE SOUTH 00 DEGREES 00 MINUTES 52 SECONDS EAST, A DISTANCE OF 620.32 FEET TO A POINT ON THE SOUTH RIGHT OF WAY LINE OF SAID OLIVE AVENUE; THENCE NORTH 89 DEGREES 22 MINUTES 02 SECONDS WEST AND ALONG THE SOUTH RIGHT OF WAY LINE OF SAID OLIVE AVENUE, A DISTANCE OF 365.38 FEET TO THE POINT OF BEGINNING. SAID PARCEL CONTAINS 226,637 SQUARE FEET OR 5.203 ACRES, MORE OR LESS PRELIMINARY RETENTION CALCS REQUIRED RETENTION: APN: 501-45-015V Vr=C(P/12)A, P=2.40 PER CITY OF EL MIRAGE, Cweighted= 0.74 ROW AREA = 20,100 S.F., ONSITE AREA = GROSS AREA - CONTAINMENT AREA = 204,258 S.F. TOTAL VOLUME REQUIRED = 33,416 CU.FT. BASIN 1 (HWL=1096.0, BOT.=1093.0) = 24,741 CU.FT. BASIN 2 (HWL=1094.0, BOT.=1091.0) = 19,687 CU.FT. BASIN 3 (HWL=1096.0, BOT.=1094.0) = 3,010 CU.FT. BASIN 4 (HWL=1094.0, BOT.=1092.0) = 2,996 CU.FT. TOTAL VOLUME PROVIDED = 50,434 CU.FT. REQUIRED RETENTION: APN 501-45-015H & -015J Vr=C(P/12)A, P=2.40 PER CITY OF EL MIRAGE, Cweighted= 0.76 ROW AREA = 16,775 S.F., ONSITE AREA = GROSS AREA - CONTAINMENT AREA = 185,831 S.F. TOTAL VOLUME REQUIRED = 30,642 CU.FT. BASIN A (HWL=1093.0, BOT.=1090.5) = 32,239 CU.FT. BASIN B (HWL=1094.0, BOT.=1093.0) = 3,453 CU.FT. BASIN C (HWL=1094.0, BOT.=1093.0) = 352 CU.FT. BASIN D (HWL=1095.0, BOT.=1094.0) = 482 CU.FT. TOTAL VOLUME PROVIDED = 36,526 CU.FT. BASIN PERCOLATION OWNER FUEL PROCESSING OPERATORS, LLC 12126 W OLIVE AVENUE EL MIRAGE, ARIZONA 85335 Phone: (865) 469-6839 CONTACT: MICHAEL BRANDON michael.brandon@pilottraavelcenters.com CIVIL ENGINEER GERVASIO & ASSOC., INC. 77 E. THOMAS RD., SUITE 120 PHOENIX, ARIZONA 85012 Phone: (602) 285-1720 CONTACT: JOHN ULIBARI, P.E. jdu@gervasioeng.com ENVIROMENTAL CONSULTANT ENCORE CONSULTING, LLC 950 W. ELLIOT ROAD TEMPE, ARIZONA 85284 Phone: (480) 322-1585 CONTACT: LYNN NIEWIADOMSKI lynn@encore-consulting.net W. OLIVE AVENUE N. 121ST AVENUE FUTURE Tanks/Containment 22,400 S.F. FUTURE Hydrogen & Nitrogen Storage 4,000 S.F. FUTURE Parking (Employee & Truck) & Solar Electrolysis Operation 58,500 S.F. FUTURE OPERATIONS, GREEN TECHNOLOGY & ALTERNATIVE FUEL PROCESSING 71,500 S.F. PARCEL 1 APN 501-45-015V 226,632.700 SF 5.2028 AC± APN 501-45-015W CP Zoning PARCEL 2 APN 501-45-015J 48,738.920 SF 1.1189 AC± PARCEL 3 APN 501-45-015H 179,620.900 SF 4.1235 AC± APN 501-45-015R BASIN 1 BASIN 2 BASIN 3 BASIN 4 BASIN A BASIN B BASIN C BASIN D APN 501-45-015U CP Zoning APN 501-45-923 CP zoning S89°22'02"E 302.02' S89°22'02"E 365.38' S0°02'05"E 576.87' N0°02'05"W 179.64' S0°02'05"E 756.51' 50.0' HC N0°00'52"W 620.32' 50.0' N89°22'02"W 365.38' FUTURE OFFICE/LABORATORY (STEEL BLDG) 5,000 SF FUTURE OPERATIONS BLDG. (STEEL BLDG) 3,500 SF HC SEE SP2 FOR NEW OFFSITE & FRONTAGE FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING SIDE A FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING SIDE B FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING SIDE C FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING SIDE D FUEL PROCESSING OPERATORS – 3,500 S.F. BUILDING