Signed Contract

City of El Mirage — Regular Meeting (2024-09-17)

View PDF Item 5 Meeting page

Extracted text (via pymupdf) 122353 characters
Contract No. EM23-ST01 
Page 1 of 10 
 
CITY OF EL MIRAGE  
PROFESSIONAL SERVICES CONTRACT 
 
 
THIS PROFESSIONAL SERVICES CONTRACT, is made and entered into this 17th day of September, 
2024, by and between the City of El Mirage, an Arizona municipal corporation (“City”), and NFra Inc. 
an Arizona corporation (“Consultant”). 
 
RECITALS 
 
A. The City of El Mirage is authorized and empowered by provisions of the City Code to execute 
contracts for professional services by and through its City Manager;  
 
B. The City desires to contract for Consultant to provide professional engineering services to prepare 
design plans and provide post design services to widen Varney Road providing safe bicycle and 
pedestrian routes from Dysart Road to El Mirage Road (“Services”) as described in the attached 
scope of work (Exhibit “A”) in accordance with the terms of this Contract; 
 
C. Consultant is duly qualified to perform the requested Services. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the mutual promises and obligations set for herein, the parties 
hereto agree as follows: 
 
1.1  
DESCRIPTION, ACCEPTANCE, DOCUMENTATION  
 
Consultant shall act under the authority and approval of the Contract Administrator for the City to 
provide the Services required by this Contract. The Contract Administrator for the City shall be 
Jorge Gastelum, Development Services Director/City Engineer, or designee. The Contract 
Administrator shall oversee the execution of this Contract, assist the Consultant in accessing the 
organization, audit billings, and approve payments. The Consultant shall channel reports and 
special requests through the Contract Administrator. City reserves the right to change the Contract 
Administrator for the City without prior approval of the Consultant.  
 
1.2  
SERVICE DESCRIPTION 
 
Consultant shall provide the Services described in Exhibit “A.” All work will be reviewed, 
evaluated, approved, and monitored by the Contract Administrator to determine acceptable 
completion. Review and approval by the Contract Administrator shall not relieve Consultant of any 
liability for improper, negligent or inadequate services rendered pursuant to this Contract. 
Consultant shall provide all work necessary to assure the Services are completed in a timely and 
efficient manner consistent with service requirements, including, but not limited to, working in 
close interaction with, and interfacing with, City and its designated employees, and working closely 
with others, including other consultants or contractors retained by City.

Contract No. EM23-ST01 
 
 
Page 2 of 10 
1.3 
DOCUMENTATION AND DATA 
 
All documents, including but not limited to, data compilations, studies, and reports which are 
prepared in the performance of this Contract are to be, and remain the property of, the City and are 
to be delivered to the Contract Administrator before final payment is made to the Consultant. 
 
2.1 
FEE SCHEDULE, RECORDS, AUDIT RIGHTS 
 
 
The fee Consultant shall be paid for all Services provided pursuant to the terms of this Contract, 
inclusive of all expenses under this Contract, shall not exceed Two Hundred and Twelve Thousand 
Five Hundred and Seventy-One Dollars ($212,571.00). 
 
 
The Contract Administrator reserves the exclusive right to determine the amount of work performed 
and payment due the Consultant on a monthly basis. Consultant shall maintain all books, paper 
documents, accounting records and other evidence pertaining to such monthly billings and shall 
make such materials available at all reasonable times to the Contract Administrator. Monthly 
billings shall be accompanied by such documentation as the Contract Administrator may require to 
make a determination of work performed and payment due. 
 
Consultant’s records (hard copy, as well as computer readable data) and any other supporting 
evidence deemed necessary by the City to substantiate charges and claims related to this Contract 
shall be open to inspection and subject to audit and/or reproduction by City’s authorized 
representative to the extent necessary to adequately permit evaluation and verification of cost of 
the work, and any invoices, change orders, payments or claims submitted by the Consultant or any 
of its payees pursuant to the execution of the Contract. The City’s authorized representative shall 
be afforded access, at reasonable times and places, to all of the Consultant’s records and personnel 
pursuant to the provisions of this article throughout the term of this contract and for a period of 
three years after last or final payment. 
 
 
Consultant shall require all subconsultants, insurance agents, and material suppliers (payees) to 
comply with the provisions of this article by insertion of the requirements hereof in a written 
contract agreement between Consultant and payee. Such requirements will also apply to any and 
all subconsultants. 
 
 
If any audit in accordance with this article discloses overcharges of any nature by the Consultant 
to the City in excess of one percent (1%) of the total contract billings, the actual cost of the City’s 
audit shall be reimbursed to the City by the Consultant. Any adjustments and/or payments which 
must be made as a result of any such audit or inspection of the Consultant’s invoices and/or records 
shall be made within a reasonable amount of time (not to exceed 90 days) from presentation of 
City’s findings to Consultant.  
 
2.2 
ADDITIONAL SERVICES; PRICE ADJUSTMENT 
   
 
The total Scope of Work to be performed by Consultant in accordance with this Contract is set forth 
herein and in Exhibit “A.” Services not included in this Contract, including Exhibit “A,” will be 
considered Additional Services. Consultant shall not perform any Additional Services without 
written authorization from the City. It shall be presumed that all Services performed/provided by 
Consultant were included in the Contract and contemplated by Consultant as being part of the 
original Scope of Work and the fees set forth herein, unless such Services have been separately 
approved by the City, in writing, as Additional Services. Consultant shall not be paid for any 
Additional Services that are not authorized by the City in writing.

Contract No. EM23-ST01 
 
 
Page 3 of 10 
2.3 
OWNERSHIP 
 
Upon receipt of payment for Services, Consultant grants to City, and shall cause its subconsultants 
to grant to City, the exclusive ownership of any and all copyrights, if any, to evaluations, reports, 
drawings, specifications, project manuals, surveys, estimates, reviews, minutes, and other 
intellectual work product as may be applicable ("Work Product"). This grant is effective whether 
the Work Product is on paper (e.g., a "hard copy"), in electronic format, or in some other form. 
Consultant warrants, and agrees to indemnify, hold harmless and defend City for, from and against 
any claim that any Work Product infringes on third-party proprietary interests. City may reuse the 
Work Product at its sole discretion. In the event the Work Product is used for another project 
without further consultations with Consultant, the City agrees to indemnify and hold Consultant 
harmless from any claim arising out of the Work Product. In such case, City will also remove any 
title block from the Work Product. 
  
3.1 
TERM AND EXTENSION 
 
 
This Contract shall be in full force and effect only when approved and signed by City’s City 
Manager as attested by the City Clerk. This Contract begins on the Effective Date.  All work shall 
be completed by December 31, 2025.   
 
 
In the event the work cannot be completed within the time specified, the Contract Administrator 
may approve a change order extending the time for completion of the work when Contract 
Administrator determines it is in the best interest of the City for such period as the Contract 
Administrator deems reasonable.  A modification for a time extension for completion of the work 
pursuant to this subparagraph shall not entitle Consultant to additional compensation.   
 
3.2 
TERMINATION 
 
3.2.1 
Termination for Cause 
 
 
The City has the right to terminate this Contract for cause in the event Consultant materially 
breaches any provision of this Contract or portion of the Services and fails to remedy the 
breach within five (5) business days of notification of the breach, if the breach is remedial. 
If Consultant fails to remedy the breach or if the breach is not remedial, City may terminate 
this Contract for cause immediately upon written notice to Consultant. In the event the City 
terminates this Contract or any part of the Services as herein provided pursuant to this 
Section 3.2.1, the City shall notify the Consultant in writing, and immediately upon receipt 
of such notice, the Consultant shall discontinue all work under this Contract. 
 
 
Upon termination for cause, Consultant shall immediately deliver to the City all drawings, 
research, data, studies, reports, estimates and any and all other documents or work product 
generated by the Consultant under the Contract, together with all unused material supplied 
by the City. Consultant shall be responsible only for such portion of the work which has 
been completed and accepted by the City. Use of incomplete data by the City shall be the 
City’s sole responsibility. 
 
 
In the event of termination for cause, Consultant shall only be compensated a portion of 
the agreed upon fee for such portion of the work that City agrees, in its sole discretion to 
accept. City shall have no obligation to accept any portion of Consultant’s work if the 
contract is terminated for cause, and shall have no obligation to pay Consultant for any 
portion of the work, if any, not accepted by City.

Contract No. EM23-ST01 
 
 
Page 4 of 10 
 
 
If the Consultant materially fails to fulfill in a timely and proper manner its obligations 
under this Contract, of if the Consultant violates any of the covenants, agreements, or 
stipulations of this Contract, the City may withhold from payment due to the Consultant 
such amounts as are necessary to protect the City’s position for the purpose of set-off until 
such time as the exact amount of damages can be determined. 
 
3.2.2. Termination for Convenience 
 
The City has the right to terminate this Contract for convenience or to abandon any portion 
of the work for which Services have not been performed by the Consultant. In the event 
the City terminates this Contract or any part of the Services as herein provided pursuant to 
this Section 3.2.2, the City shall notify the Consultant in writing, and immediately upon 
receipt of such notice, the Consultant shall discontinue all work under this Contract. 
 
Upon such termination for convenience or abandonment, the Consultant shall immediately 
deliver to the City all drawings, research, data, studies, reports, estimates and any and all 
other documents or work product generated by the Consultant under the Contract, together 
with all unused material supplied by the City. Consultant shall be responsible only for such 
portion of the work which has been completed and accepted by the City. Use of incomplete 
data by the City shall be the City’s sole responsibility. 
 
The Consultant shall receive as compensation in full for Services performed to the date of 
such termination or abandonment, a fee for the percentage of Services actually completed 
and accepted by the City. This fee shall be in an amount to be mutually agreed upon by the 
Consultant and the City, based upon the scope of work set forth in Exhibit “A’ and the 
payment schedule set forth in Article 2, hereof. If mutual agreement cannot be reached 
after reasonable negotiation, the Contract Administrator shall determine the percentage of 
satisfactory completion of each task set forth in the scope of work contained in Exhibit “A” 
and the amount of compensation Consultant is entitled to for such work and the Contract 
Administrator’s determination in this regard shall be final. The City shall make such final 
payment within sixty (60) days after the Consultant has delivered the last of the partially 
completed items. 
 
3.3 
FUNDS APPROPRIATION 
 
If the City Council does not appropriate funds to continue this Contract and pay for charges 
hereunder, the City may terminate this Contract at the end of the current fiscal period. The City 
agrees to give written notice, pursuant to Section 3.2, Termination, of this Contract to the 
Consultant at least thirty (30) days prior to the end of its current fiscal period and will pay to the 
Consultant all approved charges incurred through the end of such period. 
 
The City's fiscal year begins July 1st and ends June 30th each calendar year. The City may make 
payment for Services rendered or costs encumbered only during a fiscal year and for a period of 
sixty (60) days immediately following the close of the fiscal year, under the provisions of Arizona 
Revised Statutes § 42-17108. Therefore, Consultant must submit billings for Services performed 
or costs incurred prior to the close of a fiscal year within forty-five (45) days to allow payment 
within this period.

Contract No. EM23-ST01 
 
 
Page 5 of 10 
4.1 
ENTIRE AGREEMENT 
 
This Contract constitutes the entire understanding of the parties and supersedes all previous 
representations, written or oral, with respect to the Services specified herein. This Contract may 
not be modified or amended except by a written document, signed by authorized representatives of 
each party. 
 
4.2  
ARIZONA LAW 
 
This Contract shall be governed and interpreted according to the laws of the State of Arizona. Any 
action brought to interpret or enforce any provision of this Contract that cannot be administratively 
resolved, or otherwise related to or arising from this Contract, shall be commenced and maintained 
in the state or federal courts of the State of Arizona, Maricopa County, and each of the parties, to 
the extent permitted by law, consents to jurisdiction and venue in such courts for such purposes. 
 
4.3 
COMPLIANCE WITH LAWS 
 
Consultant shall comply with all existing and subsequently enacted federal, state and local laws, 
ordinances, codes, and regulations that are, or become applicable to this Contract. If a subsequently 
enacted law imposes substantial additional costs on Consultant, a request for an amendment may 
be submitted pursuant to this Contract. 
 
4.4 
MODIFICATIONS 
 
Any amendment, modification or variation from the terms of this Contract shall be in writing and 
shall be effective only after approval of all parties signing the original Contract. 
 
4.5 
ASSIGNMENT 
 
Services covered under this Contract shall not be assigned or sublet in whole or in part without the 
prior written consent of the Finance Director and Contract Administrator. 
 
4.6 
SUCCESSORS AND ASSIGNS 
 
This Contract shall extend to and be binding upon Consultant, its successors and assigns, including 
any individual, company, partnership or other entity with or into which Consultant shall merge, 
consolidate or be liquidated, or any person, corporation, partnership or other entity to which 
Consultant shall sell its assets. 
 
4.7 
ATTORNEY’S FEES 
 
In the event either party brings any action for any relief, declaratory or otherwise, arising out of 
this Contract, or on account of any breach or default hereof, the prevailing party may be entitled to 
receive from the other party reasonable attorneys’ fees and reasonable costs and expenses 
determined by the court sitting without a jury or arbitration board, which shall be deemed to have 
accrued on the commencement of such action and shall be enforceable whether or not such action 
is prosecuted to judgment or by arbitration award. 
 
4.8  
INDEPENDENT CONTRACTOR 
 
The Services Consultant provides under the terms of this Contract to the City are that of an

Contract No. EM23-ST01 
 
 
Page 6 of 10 
Independent Contractor, not an employee or agent of the City. The City will report the value paid 
for these Services each year to the Internal Revenue Service (I.R.S.) using Form 1099. 
City shall not withhold income tax as a deduction from contractual payments. As a result of this, 
Consultant may be subject to I.R.S. provisions for payment of estimated income tax. Consultant is 
responsible for consulting the local I.R.S. office for current information on estimated tax 
requirements. Consultant will not be entitled to any benefits provided by City to its employees, 
including, but not limited to, health benefits, workers’ compensation, unemployment coverage, 
deferred compensation, and all other typical employee benefits. 
 
4.9 
CONFLICT OF INTEREST 
 
The City may cancel any contract or agreement, without penalty or obligation, if any person 
significantly involved in initiating, negotiating, securing, drafting or creating the contract on behalf 
of the City’s departments or agencies is, at any time while the contract or any extension of the 
contract is in effect, an employee of any other party to the contract in any capacity or a consultant 
to any other party to the Contract with respect to the subject matter of the Contract. The cancellation 
will be effective when written notice from the City is received by all other parties to the Contract, 
unless the notice specifies a later time (A.R.S. §38-511). 
 
4.10 
 NOTICES 
 
All notices or demands required to be given pursuant to the terms of this Contract shall be given 
to the other party in writing, delivered by hand or registered or certified mail, at the addresses set 
forth below, or to such other address as the parties may substitute by written notice given in the 
manner prescribed in this paragraph. 
 
In the case of Consultant: 
NFra Inc. 
 
 
 
 
Attn: Randy Weyrauch, P.E. 
 
 
 
 
77 East Thomas Road, Suite 200 
 
 
 
 
Phoenix, Arizona 85012 
 
In the case of City: 
 
City of El Mirage 
 
 
 
 
Attn: City Manager 
 
 
 
 
10000 North El Mirage Road 
 
 
 
 
El Mirage, Arizona 85335 
 
With a copy to: 
 
City of El Mirage 
 
 
 
 
Attn: City Attorney 
 
 
 
 
10000 North El Mirage Road 
 
 
 
 
El Mirage, Arizona 85335 
 
Notices shall be deemed received on date delivered, if delivered by hand, and on the delivery date 
indicated on receipt if delivered by certified or registered mail. 
 
4.11  
FORCE MAJEURE 
 
Neither party shall be responsible for delays or failures in performance resulting from acts beyond 
their control. Such acts shall include, but not be limited to, acts of God, riots, acts of war, epidemics, 
governmental regulations imposed after the fact, fire, communication line failures, power failures, 
or earthquakes.

Contract No. EM23-ST01 
 
 
Page 7 of 10 
4.12  
TAXES 
 
Consultant shall be solely responsible for any and all tax obligations which may result out of the 
Consultant’s performance of this Contract. The City shall have no obligation to pay any amounts 
for taxes of any type incurred by the Consultant. 
 
4.13  
ADVERTISING AND PROMOTION 
 
Consultant shall not publish, release, disclose or announce to any member of the public, press, 
official body, or any other third party: (1) any information concerning this Contract, the Services, 
or any part thereof; or (2) any documentation or the contents thereof, without the prior written 
consent of the City, except as required by law or judicial or regulatory process. The name of any 
site on which Services are performed shall not be used in any advertising or other promotional 
context by Consultant without the prior written consent of the City. 
 
4.14 
COUNTERPARTS 
 
 
This Contract may be executed in one or more counterparts, and each originally executed duplicate 
counterpart of this Contract shall be deemed to possess the full force and effect of the original. 
 
4.15 
CAPTIONS 
 
 
The captions used in this Contract are solely for the convenience of the parties, do not constitute a 
part of this Contract and are not to be used to construe or interpret this Contract. 
 
4.16  
SUBCONSULTANTS 
 
During the performance of the Contract, the Consultant may engage such additional subconsultants 
as may be required for the timely completion of this Contract. The addition of any subconsultants 
shall be subject to the prior approval of the City. 
 
In the event of subcontracting, the sole responsibility for fulfillment of all terms and conditions of 
this Contract rests with the Consultant. 
 
4.17  
INDEMNIFICATION 
 
The Consultant agrees, to the fullest extent permitted by law, to indemnify and hold harmless the 
City, its officers, directors and employees (collectively, City) against all damages, liabilities or 
costs, including reasonable attorneys’ fees and defense costs, to the extent caused by the 
Consultant’s negligent performance of professional services under this Contract and that of its 
subcontractors or anyone for whom the Consultant is legally liable. 
 
The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the 
Consultant, its officers, directors, employees and subcontractors (collectively, Consultant) against 
all damages, liabilities or costs, including reasonable attorney’s fees and defense costs, to the extent 
caused by the City’s negligent acts in connection with the Services and the acts of its contractors, 
subcontractors or consultants or anyone for whom the City is legally liable. 
 
Neither the City nor the Consultant shall be obligated to indemnify the other party in any manner 
whatsoever for the other party’s own negligence or for the negligence of others.

Contract No. EM23-ST01 
 
 
Page 8 of 10 
4.18 
INSURANCE 
 
The Consultant shall secure and maintain at all times that this Contract is in effect, insurance 
coverage which shall include statutory workers’ compensation, comprehensive general and 
automobile liability, owner’s and Consultant’s protective liability insurance and errors and 
omissions professional liability. The comprehensive general and automobile liability limits shall 
be no less than one million dollars ($1,000,000) combined single limit. The owner’s and 
Consultant’s protective liability limits shall be no less than one million dollars ($1,000,000) for 
each occurrence and one million dollars ($1,000,000) policy aggregate naming the City as an 
additional insured. The minimum amounts of coverage for Consultant’s professional liability shall 
be one million dollars ($1,000,000). In other than errors and omissions professional liability, City’s 
and Consultant’s protective liability and worker’s compensation, the City of El Mirage shall be 
named as an additional insured.  
 
All insurance coverage shall be written through a carrier licensed in Arizona, or an approved non-
admitted list of carriers published by the Arizona Department of Insurance, and possessing an A.M. 
Best rating of at least A- or above with policies and forms satisfactory to the City.  
 
The Consultant shall submit to the City a certificate of insurance evidencing the coverage and limits 
stated in the foregoing paragraph within ten (10) days of award of this Contract. City shall not issue 
a “Notice to Proceed” until after Consultant has submitted the certificate of insurance to City. 
Insurance evidenced by the certificate shall not expire or be canceled or materially changed without 
thirty (30) days prior written notice to the City, and a statement to that effect must appear on the 
face of the certificate and the certificate shall be signed by a person authorized to bind the insurer.  
 
The insurance policies, except Workers’ Compensation required by this Contract, shall name the 
City, its agents, representatives, officers, directors, officials and employees as Additional Insureds. 
Consultant shall also submit to the City a copy of Consultant’s insurance policy endorsements 
indicating that the City is an additional insured under Consultant’s insurance policies as required 
herein. 
 
4.19 
FEDERAL AND STATE EMPLOYMENT IMMIGRATION LAWS 
 
To the extent applicable under A.R.S. § 41-4401, Consultant warrants its and its subconsultants’ 
compliance with all federal immigration laws and regulations that relate to their compliance with 
the E-verify requirements under A.R.S. § 23-214(A). Consultant’s or its subconsultants’ breach of 
the above-mentioned warranty shall be deemed a material breach of the Contract and may result in 
the termination of the Contract by the City. The City retains the legal right to randomly inspect the 
papers and records of Consultant and its subconsultants to ensure that the Consultant and its 
subconsultants are complying with the above-mentioned warranty. 
 
The Consultant warrants to keep the papers and records open for random inspection during normal 
business hours by the City. The Consultant shall cooperate with the City’s random inspections 
including granting the City entry rights to Consultant’s property to perform the random inspections 
and waiving its right to keep such papers and records confidential. The failure of Consultant to 
comply with this warranty regarding the keeping of papers and records and cooperating with City’s 
random inspections shall constitute a material breach of the Contract and the City will have the 
right to immediately terminate the Contract.

Contract No. EM23-ST01 
 
 
Page 9 of 10 
4.20 
BOYCOTT OF ISRAEL 
 
Consultant certifies that it is not currently engaged in and agrees for the duration of this Agreement 
that it will not engage in a boycott of Israel as set forth in ARIZ. REV. STAT. § 35-393 and § 35-
393.01 
 
4.21 
CHINA 
 
Pursuant to and in compliance with A.R.S. § 35-394, Consultant hereby agrees and certifies that it 
does not currently, and agrees for the duration of this Agreement that Consultant will not, use: (i) 
the forced labor of ethnic Uyghurs in the People’s Republic of China; (ii) any goods or services 
produced by the forced labor of ethnic Uyghurs in the People’s Republic of China; or (iii) any 
contractors, subcontractors or suppliers that use the forced labor or any goods or services produced 
by the forced labor of ethnic Uyghurs in the People’s Republic of China.  Consultant also hereby 
agrees to indemnify and hold harmless the City, its officials, employees, and agents from any claims 
or causes of action relating to the City’s action based upon reliance upon this representation, 
including the payment of all costs and attorney fees incurred by the City in defending such as action. 
 
4.22 
SEVERABILITY 
 
If any term or provision of this Contract shall be found to be illegal or unenforceable, then 
notwithstanding such illegality or unenforceability, this Contract shall remain in full force and 
effect and such term or provision shall be deemed to be deleted. 
 
 
CITY OF EL MIRAGE  
 
 
CONSULTANT:    
 
 
 
 
 
 
 
 
 
 
 
 
 
By: ______________________________ 
_______________________________  
                      
Print Name 
By: J. Crystal Dyches 
Its: City Manager 
 
 
 
 
 
 
 
 
 
 
By: ______________________________ 
 
 
 
 
 
 
 
 
 
Signature 
 
 
 
 
 
 
 
 
 
Its _______________________________ 
 
 
 
 
 
 
 
 
 
Title 
 
ATTEST: 
 
 
____________________________ 
Sharon Antes, City Clerk 
 
 
 
APPROVED AS TO FORM: 
 
 
___________________________ 
        
Justin Pierce, City Attorney 
Randal Weyrauch
Vice President

Page 10 of 10 
EXHIBIT “A”

NFra Inc.                                       77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                 
                              
                                 
                               a transportation engineering firm 


-XQH


0U%U\FH&KULVWR3(
$VVLVWDQW&LW\(QJLQHHU
&LW\RI(O0LUDJH
1(O0LUDJH5RDG
(O0LUDJH$=

5(

9DUQH\$YHQXH3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV



'\VDUW5RDGWR(O0LUDJH5RDG



3URMHFW,'(/0'$



1)UD3URMHFW1R[[



6FRSHDQG)HH3URSRVDO

'HDU0U&KULVWR

7KDQN \RX IRU WKH RSSRUWXQLW\ WR SURYLGH SURIHVVLRQDO HQJLQHHULQJ GHVLJQ VHUYLFHV IRU WKH &LW\¶V
9DUQH\$YHQXH3HGHVWULDQDQG%LF\FOH,PSURYHPHQWVSURMHFWIURP'\VDUW5RDGWR(O0LUDJH5RDG
$WWDFKHG LV 1)UD¶V VFRSH RI ZRUN DQG IHH SURSRVDO IRU WKH SURMHFW LQFOXGLQJ HIIRUWV IURP RXU
VXEFRQVXOWDQWV6LQFHWKLVSURMHFWLVIHGHUDOO\IXQGHGZHZLOOFRRUGLQDWHZLWK$'27WKURXJKRXWWKH
GHVLJQDQGFRQVWUXFWLRQSURFHVVHV,WLVRXUDVVXPSWLRQWKDWWKH9DUQH\5RDGSURMHFWDQGWKLVSURMHFW
ZLOO EH GHVLJQHG FRQFXUUHQWO\ 3RVW GHVLJQ VHUYLFH IHHV DUH DOVR LQFOXGHG DQG ZH DVVXPHG ERWK
SURMHFWVFDQEHFRPELQHGLQWRRQHELGVHWIRUDGYHUWLVHPHQWDQGERWKSURMHFWVZLOOFRQVWUXFWHGDWWKH
VDPHWLPH$WWKLVWLPHD&LW\FRQWUROOHGGHVLJQDOORZDQFHKDVQRWEHHQLQFOXGHG

1)UD¶VLQVXUDQFHFHUWLILFDWHVDUHDWWDFKHGWRWKHEDFNRIRXUSURSRVDO

,I\RXKDYHDQ\TXHVWLRQVRUQHHGDGGLWLRQDOLQIRUPDWLRQSOHDVHFDOOPHDWRUHPDLO
DWUZH\UDXFK#QIUDLQFXV

6LQFHUHO\

5DQG\:H\UDXFK3(
3URMHFW0DQDJHU

(QFORVXUHV$VQRWHG




/?3URMHFW0DQDJHPHQW?(O0LUDJH?9DUQH\5RDG?6XEPLWWDO?%U\FH&KULVWR9DUQH\$YHQXHB/HWWHUBGRF

NFra Inc.                                             77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                 
                              
                                 
                   a transportation engineering firm 

(;+,%,7$

6&23(2):25.

9$51(<52$'3('(675,$1$1'%,&<&/(,03529(0(176
'<6$5752$'72(/0,5$*(52$'

352-(&7,'12(/0'$


$
%5,()'(6&5,37,212)352-(&7
7KLVSURMHFWZLOOLQYROYHWKHSUHSDUDWLRQRIFRQVWUXFWLRQGRFXPHQWVWRZLGHQ9DUQH\5RDGSURYLGLQJVDIH
ELF\FOH DQG SHGHVWULDQ URXWHV IURP '\VDUW 5RDG WR (O 0LUDJH 5RDG ,PSURYHPHQWV ZLOO LQFOXGH QHZ
SDYHPHQWZLGHQLQJWRSURYLGHDWKUXODQHLQHDFKGLUHFWLRQDQGOHIWWXUQODQHVDWLQWHUVHFWLRQVELNHODQHV
LQ HDFK GLUHFWLRQ FRQFUHWH FXUE DQG JXWWHU VLGHZDONV FRUQHU UDPSV GUDLQDJH SDYHPHQW PDUNLQJV
VLJQLQJDQGDQHQYLURQPHQWDOGRFXPHQW3URMHFWLVIHGHUDOO\IXQGHGDQGZLOOEHDGPLQLVWHUHGWKURXJKWKH
$UL]RQD'HSDUWPHQWRI7UDQVSRUWDWLRQ$'27XVLQJDGHVLJQELGEXLOGPHWKRGRISURFXUHPHQW

%
*(1(5$/5(48,5(0(176



'(6,*167$1'$5'6±$OOGHVLJQZRUNVKDOOFRQIRUPWR
D
 0DULFRSD $VVRFLDWLRQ RI *RYHUQPHQWV 0$* 8QLIRUP 6WDQGDUG 6SHFLILFDWLRQV
DQG'HWDLOVIRU3XEOLF:RUNV&RQVWUXFWLRQZLWKODWHVWUHYLVLRQV

E
&LW\RI(O0LUDJH-DQXDU\6XSSOHPHQWWR0$*8QLIRUP6WDQGDUG'HWDLOV

F
&LW\RI(O0LUDJH'HVLJQDQG'HYHORSPHQW6WDQGDUGV0DQXDO

G
$SSOLFDEOH$UL]RQD3XEOLF6HUYLFHVSHFLILFDWLRQVDQGGHWDLOV

H
$$6+72³3ROLF\RQ*HRPHWULF'HVLJQRI+LJKZD\VDQG6WUHHWV´HGLWLRQ

I
0DQXDORQ8QLIRUP7UDIILF&RQWURO'HYLFHVHGLWLRQ

J
$UL]RQD'HSDUWPHQWRI(QYLURQPHQWDO4XDOLW\ODWHVWEXOOHWLQV

K
&LW\RI(O0LUDJH*HQHUDO1RWHV	'HWDLOV

L
$UL]RQD 'HSDUWPHQW RI 7UDQVSRUWDWLRQ $'27 6WDQGDUG 6SHFLILFDWLRQV IRU 5RDG DQG
%ULGJH&RQVWUXFWLRQRUPRVW&XUUHQWDQGPRVWFXUUHQW6WDQGDUG'HWDLOV

M
7KH )LQDO 3URMHFW $VVHVVPHQW 5HSRUW IRU WKH 9DUQH\ 5RDG 3HGHVWULDQ DQG %LF\FOH
,PSURYHPHQWVSURMHFWZLOOEHXVHGDVWKHEDVLVRIGHVLJQ


352-(&76&+('8/(

3ULRU WR FRPPHQFLQJ GHVLJQ ZRUN 1)UD (1*,1((5 DQG WKH &LW\ RI (O 0LUDJH¶V &RQWUDFW
$GPLQLVWUDWRU&,7<ZLOOPHHWWRGHWHUPLQHWKHSURMHFWVFKHGXOH7KH(1*,1((5ZLOOPHHW
ZLWKWKH&,7<DVQHHGHGWRDVVHVVWKHSURMHFW¶VSURJUHVVLQUHODWLRQVKLSWRWKHGHVLJQVFKHGXOH
7KHGHVLJQIRUWKLVSURMHFWLVDQWLFLSDWHGWREHJLQLQ-XO\DQGEHFRPSOHWHGE\$XJXVW
DOOFRQWLQJHQWRQWKHHQYLURQPHQWDOSURFHVVWKURXJK$'27


&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$

68%0,77$/6
(OHFWURQLFSGI¶VRIWKHFRQVWUXFWLRQSODQVVSHFLILFDWLRQVDQGFRVWHVWLPDWHVZLOOEHVXEPLWWHGDW
WKH  6WDJH ,,,  6WDJH ,9  6WDJH 9 DQG )LQDO 36	( 6HDOHG 3ODQV
6SHFLILFDWLRQVDQG(VWLPDWHVWDJHVRIWKHSURMHFW

7KH (1*,1((5 ZLOO FRRUGLQDWH ZLWK DJHQFLHV KDYLQJ XWLOLWLHV ZLWKLQ WKH SURMHFW OLPLWV $OO
FRUUHVSRQGHQFHDQGXWLOLW\UHVSRQVHVZLOOEHSURYLGHGWRWKH&,7<DQG$'27

'UDZLQJV ZLOO EH SUHSDUHG HOHFWURQLFDOO\ LQ 0LFUR6WDWLRQ 9 IRUPDW 7KHVH GUDZLQJV ZLOO EH
FRQYHUWHG LQWR WKH ODWHVW YHUVLRQ RI $XWR&$' IRU WKH &,7<¶V XVH 5HYLHZ GUDZLQJV ZLOO EH
SURYLGHGWRWKH&,7<$'27DQGXWLOLW\FRPSDQLHVDWHDFKVXEPLWWDOVWDJH)LQDO[SGI
GUDZLQJVZLOOEHVHDOHGE\DQ$UL]RQDSURIHVVLRQDOHQJLQHHU7KH(1*,1((5ZLOOVXEPLWDQ
HOHFWURQLFFRS\SGIRIWKHILQDOGUDZLQJVDQGELGGRFXPHQWVWRWKH&,7<DQG$'27IRUELG
DGYHUWLVHPHQW7KH(1*,1((5ZLOODOVRSURYLGHWKH&,7<DQG$'27HOHFWURQLFYHUVLRQVRIDOO
ELGGRFXPHQWVUHSRUWVDQGRWKHUSURMHFWUHODWHGLQIRUPDWLRQDWWKHFRPSOHWLRQRIWKHSURMHFW7KH
FRYHUVKHHWZLOOEHHOHFWURQLFDOO\VLJQHGE\WKH&LW\

1RWH
6WDQGDUGSODQVKHHWVL]HLV[$16,³'´VL]H$OOSODQVKHHWVVKDOOEHVXLWDEOHIRU
SORWWLQJDWWUXHKDOIVL]H


0((7,1*3$57,&,3$7,217KH(1*,1((5ZLOODWWHQGDQGSUHSDUHPHHWLQJPLQXWHVIRU
WKHIROORZLQJPHHWLQJV7KHPLQXWHVZLOOEHIXUQLVKHGWRWKH&,7<¶V&RQWUDFW$GPLQLVWUDWRUIRU
UHYLHZDQGDSSURYDO

3UH'HVLJQ0HHWLQJ7KH(1*,1((5ZLOOFRRUGLQDWHZLWKWKH&,7<DQG$'27WRHVWDEOLVKWKH
SURMHFWVFRSHRIZRUNVFKHGXOHDQGEXGJHW

.LFNRII0HHWLQJ7KH(1*,1((5ZLOOFRQGXFWDVLWHYLVLWWRXQGHUVWDQGWKHSURMHFWIHDWXUHVWR
GLVFXVVDWWKHNLFNRIIPHHWLQJZLWKWKH&,7<DQG$'27UHSUHVHQWDWLYHV5HSUHVHQWDWLYHVIURP
$'27¶V 8WLOLW\ (QYLURQPHQWDO 5LJKWRI:D\ DQG 'LVWULFW *URXSV ZLOO EH LQYLWHG WR WKH
PHHWLQJ

3URJUHVV 0HHWLQJV 7KH (1*,1((5 ZLOO DWWHQG PHHWLQJV ZLWK WKH &,7<¶6 &RQWUDFW
$GPLQLVWUDWRUDQG$'27WRNHHSERWKDJHQFLHVDEUHDVWRIWKHSURMHFWVWDWXV7KHVHPHHWLQJVZLOO
EHXVHGWRDGGUHVVGHVLJQLVVXHVDQGLVVXHVWKDWZLOODULVHLQWKHSUHSDUDWLRQRIWKHFRQVWUXFWLRQ
GRFXPHQWV7KUHHPHHWLQJVDUHDQWLFLSDWHGDWWKHYDULRXVVXEPLWWDOVWDJHV

&RPPHQW5HVROXWLRQ0HHWLQJV7KH(1*,1((5ZLOOSUHSDUHUHVSRQVHVWRFRPPHQWVDQGGLVFXVV
RSWLRQV WR UHVROYH DOO FRPPHQWV DW HDFK VXEPLWWDO VWDJH 0HHWLQJV DUH DQWLFLSDWHG DW WKH
DQGVXEPLWWDOVWDJHV

&
7$6.6



'$7$&2//(&7,21
7KH(1*,1((5ZLOOYLVLWWKHSURMHFWDUHDDQGWDNHSKRWRVWRFOHDUO\GHILQHWKHQDWXUHRIWKH
ZRUNWREHFRPSOHWHG

7KH&,7<ZLOOVXSSO\WRWKH(1*,1((5DWQRFRVWWKHIROORZLQJLWHPVLIWKH\DUHDYDLODEOH

D
&$'' VWDQGDUGV DQG LQGH[ RI $XWR&$'0LFURVWDWLRQ OHYHOV ,I QRQH DUH DYDLODEOH
(1*,1((5ZLOOXVHVWDQGDUGVDQGLQGH[OHYHOVIURPSDVW&,7<SURMHFWV


&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$
E
5HFRUGHGSODWVDQGUHFRUGGUDZLQJVIRUWKHVWUHHWVLQYROYHGDQGGHYHORSPHQWVZLWKLQWKH
SURMHFWOLPLWVLQFOXGLQJWKH)LQDO3URMHFW$VVHVVPHQW

F
)HHVIRURWKHUDJHQFLHVWRFRQGXFWUHYLHZV

G
8WLOLW\0DSVDQGOLVWRINQRZQXWLOLW\FRQWDFWV

H
0DVWHUZDWHUDQGVHZHUSODQV

I
6DPSOHSODQVVSHFLILFDWLRQVDQGHVWLPDWHVIURPVLPLODUSURMHFWV

J
%LGWDEXODWLRQVIRUUHFHQWSURMHFWVLQ(O0LUDJH


87,/,7<$1',17(5*29(510(17$/$*(1&<&225',1$7,21
D
7KH(1*,1((5ZLOOQRWLI\DQGFRRUGLQDWHZLWKWKHXWLOLW\FRPSDQLHVLQDFFRUGDQFHZLWK
WKH&HQWUDO$UL]RQD&RRUGLQDWLQJ&RPPLWWHH¶VPublic Improvement Project Guide,QLWLDO
FRQWDFWZLWKXWLOLW\FRPSDQLHVZLOOEHPDGHXQGHUWKHGDWDFROOHFWLRQWDVNZKHQUHFRUG
GUDZLQJV DUH EHLQJ FROOHFWHG ([LVWLQJ DQG SURSRVHG XWLOLWLHV WKDW DUH NQRZQ ZLOO EH
VKRZQRQWKHSUHOLPLQDU\DQGILQDOFRQVWUXFWLRQSODQV6HUYLFHVWRLQGLYLGXDOSURSHUWLHV
ZLOOQRWEHVKRZQRQWKHSODQVXQOHVVWKLVLQIRUPDWLRQLVSURYLGHGE\WKH&,7<

E
%DVHPDSSLQJSUHSDUHGE\WKH(1*,1((5DQGGHWDLOLQJRINQRZQXWLOLW\IDFLOLWLHVZLOO
EHWUDQVPLWWHGWRWKHXWLOLW\FRPSDQLHV7KHLUFRPPHQWVZLOOEHLQFRUSRUDWHGLQWRWKHEDVH
PDSV

F
7KH (1*,1((5 ZLOO REWDLQ DSSURYDOV IURP WKH YDULRXV XWLOLWLHV DQG JRYHUQPHQWDO
DJHQFLHVWKDWLQFOXGH$36&HQWXU\/LQN&R[6:*DVDQGRWKHUXWLOLWLHVLGHQWLILHG7KH
(1*,1((5 ZLOO VXEPLW SODQV IRU UHYLHZ WR HDFK DJHQF\ DQG DVVLVW WKH DJHQF\ LQ
UHVROYLQJXWLOLW\FRQIOLFWV

G
8QGHUJURXQG XWLOLWLHV VXFK DV ZDWHU OLQHV VHZHU OLQHV VWRUP GUDLQV HOHFWULF JDV
WHOHSKRQHFDEOH79LUULJDWLRQHWFWKDWDUHVKRZQWRFRQIOLFWZLWKWKHQHZGHVLJQVKDOO
EH FRRUGLQDWHG IRU UHORFDWLRQ 3RWKROLQJ RI H[LVWLQJ XWLOLWLHV ZLOO EH FRQGXFWHG DW
QHFHVVDU\ORFDWLRQVWRUHVROYHSRWHQWLDOFRQIOLFWV$QDOORZDQFHIRUWHQSRWKROHVKDV
EHHQ LQFOXGHG VHH DWWDFKHG VFRSH RI ZRUN IURP 6DIH6LWH 8WLOLW\ 6HUYLFHV IRU PRUH
LQIRUPDWLRQ

H
7KH(1*,1((5ZLOOSURYLGHWKH&,7<DOLVWRIFRQIOLFWVWKDWUHTXLUHSRWKROLQJIRUWKH
&,7<¶VDSSURYDO

I
7KH(1*,1((5ZLOOEHUHVSRQVLEOHIRUUHYLHZLQJUHORFDWLRQSODQVSURGXFHGE\XWLOLW\
FRPSDQLHV WR FRQILUP XWLOLW\ FRQIOLFWV DUH HOLPLQDWHG DQG WKDW SURSRVHG XWLOLW\
LQVWDOODWLRQVFRQIRUPWRWKH&,7<¶VUHTXLUHPHQWV8WLOLW\UHORFDWLRQVWKDWDUHDQWLFLSDWHG
LQFOXGH
D7ZR'\VDUW8QLILHG6FKRRO'LVWULFWVWUHHWOLJKWSROHV
E)RXU$36VWUHHWOLJKWSROHV
F8QGHUJURXQGLQJRIDQ$36RYHUKHDGSRZHUOLQH
G$ERYHJURXQGHOHFWULFDOFRQGXLW
H2QHDERYHJURXQGHOHFWULFDOER[
I)RXUILUHK\GUDQWV
J3ULYDWHLUULJDWLRQGLWFK

J
7KH(1*,1((5ZLOOUHTXHVWDGHVLJQ%OXH6WDNHWRDVVLVWZLWKORFDWLQJH[LVWLQJXWLOLWLHV

&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$

K
7KHXWLOLW\VSHFLDOSURYLVLRQVVKDOOLQFOXGHWKHIROORZLQJ

L
/LVWRIXWLOLW\FRPSDQLHVLQWKHDUHDDQGFRQWDFWSHUVRQ¶VQDPHDQGWHOHSKRQH
QXPEHU

LL
$VWDWHPHQWWKDWWKHUHDUHQRFRQIOLFWVRUDVWDWHPHQWXWLOLW\LVLQFRQIOLFW

LLL
:RUNWREHSHUIRUPHGE\XWLOLW\FRPSDQLHVGXULQJSURMHFWFRQVWUXFWLRQ

LY
&RPSOHWLRQ GDWH RU VFKHGXOH IRU HDFK XWLOLW\ FRQIOLFW WR EH UHPRYHG E\ XWLOLW\
FRPSDQ\

Y
:RUNWREHSHUIRUPHGIRUWKHXWLOLW\FRPSDQ\E\WKH&RQWUDFWRU

L
7KH(1*,1((5ZLOOFRRUGLQDWHZLWK$'27¶V8WLOLW\&RRUGLQDWRUWRFRPSOHWHWKHXWLOLW\
FOHDUDQFHOHWWHUWKDWLVUHTXLUHGIRUELGDGYHUWLVHPHQW


6859(<
(1*,1((5ZLOOSHUIRUPDFRQYHQWLRQDOJURXQGVXUYH\WKDWSURYLGHVFRPSUHKHQVLYHGHVLJQOHYHO
WRSRJUDSKLFPDSSLQJ5RDGZD\FHQWHUOLQHFRQWUROVZLOOEHHVWDEOLVKHGE\ORFDWLQJPRQXPHQWV
DORQJVWUHHWV+RUL]RQWDODQGYHUWLFDOFRQWUROVKDOOEHEDVHGRQ1$'1$9''DWXPSHU&LW\
RI(O0LUDJH7RSRJUDSKLFGDWDVKDOOEHFROOHFWHGHOHFWURQLFDOO\ZLWK3RLQW1XPEHU(OHYDWLRQ
DQG'HVFULSWLRQDOOVKDOOEHRQVHSDUDWHOHYHOV6XUYH\IRUPDWVKDOOIROORZ&,7<¶VJXLGHOLQHV
ZLWKFHOOVVXLWDEOHIRUSORWWLQJDW 
VFDOH7RSRJUDSKLFSRLQWVDQGVXUYH\FRQWUROSRLQWVZLOO
EH SURYLGHG LQ DQ $6&,, SRLQWV ILOH IRUPDW WRSRJUDSKLF PDSSLQJ IXUQLVKHG LQ 0LFURVWDWLRQ
IRUPDWDQHOHFWURQLF'70ILOHDQGKDUGFRSLHVRIDOOILHOGQRWHV

D /RFDWHH[LVWLQJPRQXPHQWVDQGHVWDEOLVKFRQWUROIRUHDFKURDGZD\ZLWKLQWKHSURMHFWOLPLWV
7KHKRUL]RQWDODQGYHUWLFDODFFXUDF\VKDOOEHVXLWDEOHIRUILQDOGHVLJQWKDWLQFOXGHVUHPRYDO
DQGUHSODFHPHQWRIH[LVWLQJSDYHPHQWZLWKSRVLWLYHURDGZD\FURVVVORSHV
E *36SURFHGXUHVZLOOEHXVHGIRUWKHWRSRJUDSKLFVXUYH\
F 3UHSDUHEDVHPDSVKRZLQJDOOGDWDGHULYHGIURPWKHVXUYH\
G &URVVVHFWLRQVRQ9DUQH\5RDGVKDOOH[WHQGIURPULJKWRIZD\OLQHWRULJKWRIZD\OLQHDW
IRRWLQWHUYDOVIURP'\VDUW5RDGHDVWFXUEUHWXUQVWR(O0LUDJH5RDGZHVWFXUEUHWXUQV$W
GULYHZD\VFURVVVHFWLRQVZLOOH[WHQGSDVWWKHH[LVWLQJULJKWRIZD\OLQH&URVVVHFWLRQVZLOO
H[WHQGIHHWRQDOOVLGHVWUHHWV
H &URVVVHFWLRQVVKDOOLQFOXGHDWDPLQLPXPHGJHVRIDVSKDOWFHQWHUOLQHRIURDGZD\FXUEDQG
JXWWHUVLGHZDONDQGQDWXUDOJURXQGDWH[LVWLQJULJKWRIZD\
I $OORWKHUWRSRJUDSKLFIHDWXUHVLQFOXGLQJLGHQWLILFDWLRQDQGVXUYH\RIEOXHVWDNHGXWLOLWLHV
J 6HHDWWDFKHGVFRSHRIZRUNDQGIHHSURSRVDOIURP5LFN(QJLQHHULQJIRUPRUHLQIRUPDWLRQ


*(27(&+1,&$/,19(67,*$7,21
(1*,1((5VKDOOREWDLQDSHUPLWIURPWKH&,7<WRSHUIRUPJHRWHFKQLFDOLQYHVWLJDWLRQVIRUWKLV
SURMHFW )RXU WHVW ERULQJV IHHW LQ GHSWK RU SULRU DXJHU UHIXVDO ZLOO EH WDNHQ WR GHWHUPLQH
VXEVXUIDFHFRQGLWLRQVDQGWRREWDLQUHSUHVHQWDWLYHVDPSOHVIRUODERUDWRU\DQDO\VHV/DERUDWRU\
DQDO\VHVZLOOGHWHUPLQHWKHH[LVWLQJSDYHPHQWVWUXFWXUDOVHFWLRQVDQGWKHUHFRPPHQGHGSDYHPHQW
VWUXFWXUDOVHFWLRQVEDVHGRQDFROOHFWRUVWUHHWFODVVLILFDWLRQ7HVWERULQJORFDWLRQVZLOOEH%OXH
6WDNHGE\DSULYDWHXWLOLW\ORFDWRU(1*,1((5ZLOOSURYLGHDJHRWHFKQLFDOPHPRRIWKHILQGLQJV
DQGUHFRPPHQGDWLRQVIRUHDUWKZRUNWUHQFKLQJSLSHVDQGSDYHPHQWVWUXFWXUDOVHFWLRQV


&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$
/DERUDWRU\DQDO\VHVRIUHSUHVHQWDWLYHVDPSOHVZLOOLQFOXGH

D 0RLVWXUH&RQWHQWDQG'U\'HQVLW\
E 'LUHFW6KHDU
F 0LQXV1R6LHYHDQG3ODVWLFLW\,QGH[
G 6WDQGDUG3URFWRU

6HHDWWDFKHGVFRSHRIZRUNDQGIHHSURSRVDOIURP1LQ\R	0RRUHIRUPRUHLQIRUPDWLRQ


52$':$<'(6,*1
(1*,1((5ZLOOSUHSDUHURDGZD\SODQVIRUWKHIROORZLQJLWHPV

D $VSKDOWLF &RQFUHWH 3DYHPHQW 9DUQH\ 5RDG EHWZHHQ '\VDUW 5RDG DQG WK $YHQXH LV
DVVXPHG WR EH ZLGH HQRXJK WR SURYLGH DQ HDVWERXQG DQG ZHVWERXQG WUDYHO ODQH IOXVK
FRQWLQXRXV OHIW WXUQ ODQH DQG ELNH ODQHV LQ HDFK GLUHFWLRQ ([FHSW 9DUQH\ 5RDG ZLOO EH
ZLGHQHGIURP'\VDUW5RDGWRΖHDVWWRDFFRPPRGDWHWKHHDVWERXQGELNHODQH)URPWK
$YHQXHWR(O0LUDJH5RDGDWUDYHOODQHDQGELNHODQHZLOOEHSURYLGHGLQHDFKGLUHFWLRQDQG
9DUQH\5RDGZLOOEHZLGHQHGWRSURYLGHOHIWWXUQODQHVDWLQWHUVHFWLRQV([LVWLQJDVSKDOWLF
SDYHPHQW ZLOO EH VDZFXW DQG ZLGHQHG DQG WKH UHPDLQLQJ SDYHPHQW VKDOO UHPDLQ LQSODFH
ZLWKRXWDQ\UHKDELOLWDWLRQ1HZSDYHPHQWVWUXFWXUDOVHFWLRQVZLOOEHDVUHFRPPHQGHGLQWKH
JHRWHFKQLFDOUHSRUW5RDGZD\ZLGHQLQJZLOORFFXUDWWKHIROORZLQJORFDWLRQV
 1RUWKVLGHIURP'\VDUW5RDGWRILUVWGULYHZD\HDVWRILQWHUVHFWLRQ
 6RXWKVLGHIURPWK$YHQXHWRILUVWGULYHZD\MXVWZHVWRI(O0LUDJH5RDG
 0LQLPXPLPSURYHPHQWVDUHDQWLFLSDWHGSDVWWKHFXUEUHWXUQVRQVLGHVWUHHWV

E &XUEDQG*XWWHU1HZFXUEDQGJXWWHUZLOOEHSURYLGHGDWDOOURDGZD\ZLGHQLQJVHFWLRQVDQG
DWVLGHVWUHHWFXUEUHWXUQV

F &RUQHU5DPSV1HZFRUQHUUDPSVZLOOEHSURYLGHGDWWKH'\VDUW5RDGHDVWFXUEUHWXUQVERWK
GULYHZD\VWR'\VDUW+LJK6FKRRODOOIRXUFRUQHUVDWWK$YHQXHDQGVRXWKFXUEUHWXUQVDW
WK$YHQXH$OORWKHUFRUQHUUDPSVDUHH[SHFWHGWRVDWLVI\$'$UHTXLUHPHQWVDQGVKDOOEH
SURWHFWHGLQSODFH

G 9DOOH\ *XWWHU DQG $SURQV 1HZ YDOOH\ JXWWHU DQG DSURQV ZLOO EH SURYLGHG DW ERWK DFFHVV
SRLQWVWR'\VDUW0LGGOH6FKRROQRUWKDQGVRXWKOHJVRIWK$YHQXHDQGVRXWKOHJRIWK
$YHQXH

H 6LGHZDONV 1HZ FRQFUHWH VLGHZDONV ZLOO EH DGGHG DORQJ WKH ZLGHQHG VHFWLRQV RI 9DUQH\
5RDG ERWK VLGHV RI 9DUQH\ 5RDG ZKHUH WKHUH FXUUHQWO\ LV QR VLGHZDON DQG DW LVRODWHG
ORFDWLRQVRQWKHQRUWKVLGHRI9DUQH\5RDGWRUHSODFHH[LVWLQJVLGHZDONZLWKIRRWZLGH
VLGHZDONV /RFDWLRQV DQG ZLGWK RI VLGHZDONV ZLOO EH DV VKRZQ LQ WKH )LQDO 3URMHFW
$VVHVVPHQW

I 'ULYHZD\V1HZFRQFUHWHGULYHZD\VZLOOEHSURYLGHGWRDOOSURSHUWLHVRQWKHVRXWKVLGHRI
9DUQH\5RDG7HPSRUDU\FRQVWUXFWLRQHDVHPHQWVZLOOEHQHHGHGIRULPSURYHPHQWV

J 0DQKROHVDQG9DOYHV0DQKROHVDQGYDOYHVWKDWDUHORFDWHGZLWKLQDQHZSDYHGVXUIDFHZLOO
EHDGMXVWHGWRILQLVKHGJUDGHZLWKFRQFUHWHFROODUV

K &URVV6HFWLRQVZLOOEHSURYLGHGDWIRRWLQWHUYDOVDORQJ9DUQH\5RDG

&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$


'5$,1$*('(6,*1
7KH(1*,1((5ZLOOGHVLJQQHZSDYHPHQWFURVVVORSHVDQGQHZORQJLWXGLQDOFXUEDQGJXWWHU
JUDGHVWRPD[LPL]HWKH9DUQH\5RDGJXWWHUVORSHWRSURYLGHSRVLWLYHGUDLQDJH([LVWLQJJUDGHV
PD\ GLFWDWH VORSHV OHVV WKDQ GHVLUDEOH XQOHVV H[LVWLQJ SDYHPHQW LV UHPRYHG DQG VDJV DUH
LQWURGXFHGZKLFKZLOOUHTXLUHGUDLQDJHRXWIDOOVZKLFKDUHQRQH[LVWHQWZLWKLQWKHSURMHFWOLPLWV
3HU WKH )LQDO 3URMHFW $VVHVVPHQW SDYHPHQW GUDLQDJH ZLOO EH GLVFKDUJHG LQWR UHWHQWLRQ
FRQYH\DQFHGLWFKHVORFDWHGEHKLQGWKHVRXWKFXUEDQGJXWWHUZKLFKZLOOEHFRQYH\HGWRZDUGVLGH
VWUHHWVDQGGLVFKDUJHGEDFNRQWR9DUQH\5RDG,IFRYHUDOORZVDQHLJKWLQFK+'3(SLSHZLOOEH
SURYLGHGDWDOOGULYHZD\VWRFRQYH\WKHGUDLQDJHLQWKHGLWFK$OOGUDLQDJHLPSURYHPHQWVPXVW
UHPDLQZLWKLQH[LVWLQJULJKWRIZD\

$ QHZ FRQFUHWH VFXSSHU ZLOO EH UHTXLUHG WR UHSODFH WKH H[LVWLQJ VFXSSHU RQ WKH QRUWK VLGH RI
9DUQH\5RDGDORQJWKH'\VDUW+LJK6FKRROSURSHUW\

2IIVLWH UXQRII JHQHUDOO\ IORZV IURP QRUWK WR VRXWK '\VDUW VFKRROV DQG GHYHORSPHQWV KDYH
LQWHUFHSWHGDQGUHWDLQHGRIIVLWHIORZV7KLVSURMHFWZLOOQRWDGGUHVVRIIVLWHIORZV

$Q LQLWLDO DQG ILQDO GUDLQDJH GHVLJQ PHPR ZLOO EH SUHSDUHG WR GRFXPHQW H[LVWLQJ FRQGLWLRQV
SURSRVHGLPSURYHPHQWVDQGFDOFXODWLRQVIRUSDYHPHQWVSUHDGLQOHWVL]HGLWFKFRQILJXUDWLRQV
GLWFKYROXPHVSLSHVL]HLIQHHGHGDQGUHWHQWLRQEDVLQYROXPHVLIQHHGHG


:$7(56(:(5$1'27+(5&,7<87,/,7,(6
1RQHZRUUHORFDWHG&LW\XWLOLWLHVDUHUHTXLUHGRUDQWLFLSDWHGZLWKWKHURDGZD\LPSURYHPHQWV6HH
6HFWLRQ I IRU RWKHU GU\ XWLOLW\ FRQIOLFWV WKDW ZLOO QHHG WR EH FRRUGLQDWHG DQG DGGUHVVHG ZLWK
LQGLYLGXDOXWLOLW\FRPSDQLHV


5,*+72):$<($6(0(176
1HZ ULJKWRIZD\ LV QRW DQWLFLSDWHG 1HZ WHPSRUDU\ FRQVWUXFWLRQ HDVHPHQWV 7&( DUH
DQWLFLSDWHGDWHDFKRIWKHSURSRVHGGULYHZD\VRQWKHVRXWKVLGHRI9DUQH\5RDG$QHZ7&(ZLOO
EHQHHGHGDORQJWKH'\VDUW+LJK6FKRROSURSHUW\WRDFFRPPRGDWHWKHSURSRVHGLPSURYHPHQWV
1HZ LPSURYHPHQWV RWKHU WKDQ GULYHZD\V DQG DORQJ '\VDUW +LJK 6FKRRO ZLOO EH FRQVWUXFWHG
ZLWKLQH[LVWLQJ&,7<ULJKWRIZD\5LFN(QJLQHHULQJ¶VSURSRVDOLQFOXGHVDQDOORZDQFHEXGJHWWR
SUHSDUHWZHQW\ILYHOHJDOGHVFULSWLRQVDQGH[KLELWVIRUQHZ7&(¶V7LWOHUHSRUWVLIQHHGHG
ZLOOEHSURYLGHGE\WKH&,7<

(1*,1((5ZLOOFRRUGLQDWHZLWK$'27¶V5LJKWRI:D\&RRUGLQDWRUWRFRPSOHWHWKHULJKWRI
ZD\FOHDUDQFHWKDWLVQHHGHGIRUELGDGYHUWLVHPHQW


/$1'6&$3,1*,55,*$7,21
1HZ GHFRPSRVHG JUDQLWH DQGRU FREEOH URFN ZLOO EH LQVWDOOHG RQ ERWK VLGHV RI 9DUQH\ 5RDG
ZLWKLQWKHH[LVWLQJULJKWRIZD\$OORWKHUODQGVFDSLQJZLOOEHSURWHFWHGLQSODFHRUUHVWRUHGWR
H[LVWLQJFRQGLWLRQ1HZODQGVFDSLQJDQGLUULJDWLRQLPSURYHPHQWVDUHQRWUHTXLUHG


(19,5210(17$/
7KH(1*,1((5ZLOOEHUHVSRQVLEOHIRUHYDOXDWLQJWKHHQYLURQPHQWDOFRPSRQHQWVRIWKHSURMHFW
DQG SUHSDULQJ D &DWHJRULFDO ([FOXVLRQ &( GRFXPHQW 7KH (1*,1((5 ZLOO FRRUGLQDWH ZLWK
$'27¶V (QYLURQPHQWDO &RRUGLQDWRU WR REWDLQ WKH HQYLURQPHQWDO FOHDUDQFH WKDW LV QHHGHG WR
DGYHUWLVH WKH SURMHFW 6HH DWWDFKHG VFRSH RI ZRUN DQG IHH SURSRVDO IURP /RJDQ 6LPSVRQ IRU
DGGLWLRQDOLQIRUPDWLRQ




&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$

67250:$7(532//87,2135(9(17,213/$16
7KH(1*,1((5ZLOOEHUHVSRQVLEOHIRUSUHSDULQJHURVLRQFRQWUROSODQVWRDGGUHVVFRQVWUXFWLRQ
RIWKHSURSRVHGLPSURYHPHQWV


'(02/,7,21$1'5(/2&$7,21
7KH (1*,1((5 ZLOO EH UHVSRQVLEOH IRU WKH LGHQWLILFDWLRQ RI UHPRYDOV DQG UHORFDWLRQV 7KHVH
IHDWXUHVZLOOEHLGHQWLILHGRQWKHURDGZD\GUDLQDJHRUWUDIILFSODQVZKHUHDSSURSULDWH


75$)),&3$9(0(170$5.,1*6,*1,1*
7KH (1*,1((5 ZLOO EH UHVSRQVLEOH IRU SUHSDULQJ VLJQLQJ DQG SDYHPHQW PDUNLQJ SODQV WR
DGGUHVVWKHQHZWUDYHOODQHVELNHODQHVDQGVLJQLQJWKDWLVUHTXLUHGIRUWKLVSURMHFW1HZZD\
ILQGLQJVLJQVDQGVLJQVHPEHGGHGLQWKHFRQFUHWHVLGHZDONZLOOEHSURYLGHGDW'\VDUW5RDGWK
$YHQXHDQG(O0LUDJH5RDG:D\ILQGLQJVLJQVZLOOEHFRPSULVHGRIDGHFRUDWLYHSRVWZLWKVLJQV
DWWDFKHGWRWKHSRVWVLPLODUWRVWUHHWQDPHVLJQV


75$)),&&21752/3/$1&216758&7,213+$6,1*6(48(1&,1*
7KH(1*,1((5ZLOOEHUHVSRQVLEOHIRUSUHSDULQJPDLQWHQDQFHRIWUDIILFSODQVIRUFRQVWUXFWLRQ
DQGZLOOFRPSO\ZLWKWKHPRVWFXUUHQWHGLWLRQVRIWKH&LW\RI(O0LUDJH&LW\RI3KRHQL[DQG
$'277UDIILF&RQWUROUHTXLUHPHQWV&RQVWUXFWLRQSKDVLQJDQGVHTXHQFLQJUHTXLUHPHQWVZLOOEH
LQFOXGHGDVSDUWRIWKHSURMHFWWUDIILFFRQWUROSODQV7KH(1*,1((5ZLOOSUHSDUHGHWDLOHGVSHFLDO
SURYLVLRQVWKDWUHTXLUHDFFHVVWRDOOUHVLGHQWVDQGEXVLQHVVHVDQGPLQLPL]HWKHWLPHDFFHVVZLOO
EHXQDYDLODEOHGXULQJFRQVWUXFWLRQ(PHUJHQF\DFFHVVJDUEDJHSLFNXSDQGPDLOGHOLYHU\ZLOOEH
DYDLODEOHDWDOOWLPHV

7KH&2175$&725VKDOOEHUHVSRQVLEOHIRUREWDLQLQJFRQVWUXFWLRQSHUPLWVIURPWKH&,7<


%,'',1*3+$6(

$'27ZLOODGPLQLVWHUWKHELGGLQJSKDVHLQFOXGLQJWKHDGYHUWLVHPHQWELGGLQJDQGDZDUG7KH
(1*,1((5 ZLOO FRRUGLQDWH ZLWK $'27¶V &RQWUDFW DQG 6SHFLILFDWLRQV &	6 6SHFLDOLVW WR
HQVXUHSODQVVSHFLILFDWLRQVDQGELGVFKHGXOHDUHLQWKHFRUUHFWIRUPDWIRUELGDGYHUWLVHPHQW


63(&,$/3529,6,216
7KH(1*,1((5ZLOOGHYHORS6SHFLDO3URYLVLRQVIRULWHPVGHWDLOVDQGSURFHGXUHVQRWDGHTXDWHO\
FRYHUHG E\0$* 8QLIRUP 6WDQGDUG 6SHFLILFDWLRQV IRU 3XEOLF :RUNV &RQVWUXFWLRQ &LW\ RI (O
0LUDJH6XSSOHPHQWV$'276WDQGDUG6SHFLILFDWLRQVIRU5RDGDQG%ULGJH&RQVWUXFWLRQDQGRWKHU
VSHFLILFDWLRQV6SHFLDO3URYLVLRQVDQG$'27¶VVWRUHGVSHFLILFDWLRQVZLOOEHSURYLGHGDWWKH
DQGVXEPLWWDOV)LQDOVHDOHGVSHFLILFDWLRQVZLOOEHSURYLGHGIRUELGDGYHUWLVHPHQW



&267(67,0$7(6
7KH(1*,1((5ZLOOSUHSDUHRSLQLRQRISUREDEOHFRQVWUXFWLRQFRVWHVWLPDWHVDWWKH
DQG)LQDOVXEPLWWDOV7KH(1*,1((5ZLOOFRRUGLQDWHZLWK$'27¶V&	66SHFLDOLVWWR
FRQILUP DQGRU UHILQH XQLW SULFLQJ EDVHG RQ $'27¶V PRVW UHFHQW ELGV 7KH (1*,1((5 ZLOO
SURYLGH$'27&	6DELGVFKHGXOHIRUELGDGYHUWLVHPHQW


3267'(6,*16(59,&(6
$'27 ZLOO DGPLQLVWHU WKH FRQVWUXFWLRQ SKDVH RI WKH SURMHFW 7KH (1*,1((5 ZLOO SURYLGH
FRQVWUXFWLRQ VXSSRUW E\ UHYLHZLQJ VKRS GUDZLQJV UHVSRQGLQJ WR UHTXHVWV IRU LQIRUPDWLRQ
UHTXHVWV IRU FODULILFDWLRQ UHVROYLQJ FRQIOLFWV DQG SURYLGLQJ JHQHUDO VXSSRUW WR WKH
&2175$&725

2QHUHSUHVHQWDWLYHIURPWKH(1*,1((5ZLOODWWHQGWKHSUHFRQVWUXFWLRQPHHWLQJZLWKWKH&,7<
$'27 DQG &2175$&725 WR GLVFXVV WKH GHVLJQ SODQV DQG SURSRVHG FRQVWUXFWLRQ DFWLYLWLHV
0HHWLQJLVDQWLFLSDWHGWREHWZRKRXUVLQOHQJWK

&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$

&RQVWUXFWLRQ REVHUYDWLRQV ZLOO EH SURYLGHG E\ WKH (1*,1((5 ZLWK WKH LQWHQW RI UHQGHULQJ
SURIHVVLRQDO RSLQLRQV UHJDUGLQJ WKH TXDOLW\ RI WKH FRPSOHWHG FRQVWUXFWLRQ VWULFWO\ UHODWHG WR
(1*,1((5¶6GHVLJQVFRSHRIZRUNIRUWKHSURMHFW7KLVWDVNVKRXOGQRWEHFRQVWUXHGWRZDUUDQW
WKHZRUNRIDQ\FRQWUDFWRU2QHUHSUHVHQWDWLYHIURPWKH(1*,1((5ZLOODWWHQGWKHSURMHFWVLWHWR
REVHUYHFRQVWUXFWLRQDQGWRGLVFXVVDQGUHVROYHLVVXHVRUFRQIOLFWV7KUHHPHHWLQJVDUHDQWLFLSDWHG
DQGLQFOXGHSUHSDUDWLRQDQGPHHWLQJDWWHQGDQFHZKLFKDUHHVWLPDWHGWREHWKUHHKRXUVLQOHQJWK
7KH(1*,1((5ZLOODOVRDWWHQGYLUWXDOPHHWLQJVDVQHHGHGWRDVVLVWWKHFRQVWUXFWLRQWHDP

7KH(1*,1((5ZLOOUHYLHZDQGUHVSRQGWRVKRSGUDZLQJVXEPLWWDOVWRHQVXUHPDWHULDOVVDWLVI\
GHVLJQUHTXLUHPHQWV

7KH (1*,1((5 ZLOO UHYLHZ DQG UHVSRQG WR UHTXHVW IRU LQIRUPDWLRQ 5),¶V DQG UHTXHVW IRU
FODULILFDWLRQ5)&¶VWKDWDUHUHODWHGWR(1*,1((5¶6GHVLJQSODQV

7KH (1*,1((5 ZLOO DWWHQG D SURMHFW ZDON WKUX DQG SURYLGH D SXQFK OLVW RI LWHPV WKDW WKH
FRQWUDFWRUQHHGVWRDGGUHVVWRFRPSO\ZLWKWKHGHVLJQGRFXPHQWV

7KH (1*,1((5 ZLOO SUHSDUH UHFRUG GUDZLQJV EDVHG RQ &2175$&725¶6 UHGOLQHG GUDZLQJV
WKDWKDYHEHHQDSSURYHGE\WKHFRQVWUXFWLRQVXUYH\RU

'
&203(16$7,21

&RPSHQVDWLRQZLOOEHRQDQRWWRH[FHHGEDVLV
'HVLJQ6HUYLFH)HH 

3RVW'HVLJQ6HUYLFHV)HH


727$/ 

(
$668037,216
D ,I QHHGHG WKH &,7< ZLOO REWDLQ ULJKWRIHQWU\ DFFHVV IURP SURSHUW\ RZQHUV WR VXUYH\ GULYHZD\
DFFHVVHVRIIRI9DUQH\5RDG
E 1HZ ULJKWRIZD\ DFTXLVLWLRQV DUH QRW DQWLFLSDWHG &,7< KDV VXIILFLHQW ULJKWRIZD\ WR FRPSOHWH
SURMHFW5LFN(QJLQHHULQJ¶VIHHSURSRVDOLQFOXGHVDQDOORZDQFHWRSUHSDUHOHJDOGHVFULSWLRQVDQG
H[KLELWVIRUWHPSRUDU\FRQVWUXFWLRQHDVHPHQWV,IQHHGHG&,7<ZLOOSURYLGHWLWOHUHSRUWVIRULPSDFWHG
SURSHUWLHV7KHIHHGRHVQRWLQFOXGHERXQGDU\VXUYH\RUULJKWRIZD\FDOFXODWLRQV
F /DQGVFDSLQJDQGLUULJDWLRQSODQVDUHQRWUHTXLUHGRULQFOXGHG'HFRPSRVHGJUDQLWHDQGFREEOHURFN
ORFDWLRQVZLOOEHVKRZQRQWKHW\SLFDOVHFWLRQVRUURDGZD\SODQV
G 7UDIILFVLJQDOZRUNLVQRWUHTXLUHGRULQFOXGHG$WUDIILFUHSRUWLVQRWUHTXLUHG
H 1HZVHZHUZDWHURUUHFODLPHGZDWHUOLQHGHVLJQVDUHQRWUHTXLUHGRULQFOXGHG
I 'UDLQDJH GLWFKHV UHIHUHQFHG LQ WKH )LQDO 3URMHFW $VVHVVPHQW DUH DGHTXDWH WR KDQGOH GHVLJQ IORZV
ZLWKLQWKH9DUQH\5RDGULJKWRIZD\'HVLJQVIRUQHZVWRUPGUDLQV\VWHPVDQGUHWHQWLRQEDVLQVDUH
QRWUHTXLUHGRULQFOXGHG
J 3DYHPHQWZLGHQLQJWRSURYLGHOHIWWXUQODQHVDWLQWHUVHFWLRQVZLOOQRWUHVWULFWORQJLWXGLQDOGUDLQDJH
IORZVDORQJQHZFXUEDQGJXWWHUV,IVDJFRQGLWLRQVDUHLQWURGXFHGDFKDQJHRUGHUPD\EHUHTXLUHGWR
DGGUHVVGUDLQDJHLQWHUFHSWLRQDQGFRQYH\DQFH
K &2175$&725VKDOOEHUHVSRQVLEOHIRUREWDLQLQJSHUPLWVIURPWKH&,7<DQGRU$'27
L
3XEOLFRXWUHDFKLVQRWUHTXLUHGRULQFOXGHG
M
1RLPSURYHPHQWVDUHQHHGHGRQWKHZHVWOHJRIWKH'\VDUW5RDGLQWHUVHFWLRQRUWKHZHVWOHJRI(O
0LUDJH5RDGLQWHUVHFWLRQLQFOXGLQJFRUQHUUDPSV
N &RQVWUXFWLRQ$GPLQLVWUDWLRQ6HUYLFHVDUHQRWUHTXLUHGRULQFOXGHG
O
3ODQVFDQEHSUHSDUHGE\UHIHUHQFLQJ0$*GHWDLOV'HWDLOVGRQRWQHHGWREHLQFOXGHGLQWKHSODQVHW
P $'27ZLOODVVLVWZLWKDOOFOHDUDQFHVDQGDGYHUWLVHWKHSURMHFW
Q 8WLOLW\ FRRUGLQDWLRQ PHHWLQJV JHQHUDO DGPLQLVWUDWLRQ DQG VXEFRQVXOWDQW FRRUGLQDWLRQ FDQ EH
FRQGXFWHGLQFRQMXQFWLRQZLWKWKH&LW\¶VVW$YHQXHSURMHFWUHGXFLQJWKHRYHUDOOGHVLJQFRVW

&LW\RI(O0LUDJH
9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
([KLELW$


$
R *HQHUDO QRWHV VKHHW 6:333 GHWDLO VKHHW DQG VSHFLILFDWLRQV FDQ EH VKDUHG ZLWK WKH &LW\¶V VW
$YHQXHSURMHFWUHGXFLQJWKHRYHUDOOGHVLJQFRVW
S 9DUQH\5RDGDQGVW$YHQXHSURMHFWVZLOOEHGHVLJQHGFRQFXUUHQWO\DQGFRPELQHGLQWRRQHELG
SDFNDJHIRUDGYHUWLVHPHQW,QDGGLWLRQSURMHFWVLWHYLVLWVDQGHIIRUWVIRUJHRWHFKQLFDOHQYLURQPHQWDO
DQGSRWKROHLQYHVWLJDWLRQVZLOOEHFRPELQHGIRUERWKSURMHFWV,I9DUQH\5RDGDQGVW$YHQXHDUH
QRWGHVLJQHGDWWKHVDPHWLPHDQGRUFRQVWUXFWHGRQWKHVDPHVFKHGXOHVHQJLQHHUDQGVXEFRQVXOWDQWV
UHVHUYHWKHULJKWWRUHYLVLWGHVLJQDQGSRVWGHVLJQIHHV
T ([LVWLQJURDGZD\EHWZHHQ'\VDUW5RDGDQGWK$YHQXHLVZLGHHQRXJKWRSURYLGHWZRWUDYHOODQHV
DFRQWLQXRXVOHIWWXUQODQHDQGELNHODQHVLQHDFKGLUHFWLRQ([FHSWSDYHPHQWZLOOQHHGWREHZLGHQHG
IURP'\VDUW5RDGWR¶HDVWWRDFFRPPRGDWHDQHDVWERXQGELNHODQH6LGHZDONZLOOQHHGWREH
DGGHGRQWKHVRXWKVLGHRI9DUQH\5RDGIXOOOHQJWKZLWKLQWKHVHOLPLWV

/?3URMHFW0DQDJHPHQW?(O0LUDJH?9DUQH\5RDG?6XEPLWWDO?9DUQH\$YHQXHB6FRSHRI:RUNB([KLELW$BGRF

(;+,%,7%
1)UD,QF
&OLHQW&LW\RI(O0LUDJH
3URMHFW9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
'HVLJQ&RVW3URSRVDO
(67,0$7('',5(&7/$%25'(6,*16(59,&(6
(VWLPDWHG
$YJ+RXUO\
/DERU
&ODVVLILFDWLRQ
/DERU+RXUV
5DWH
&RVW
3URMHFW0DQDJHU



6HQLRU3URMHFW(QJLQHHU



'HVLJQHU7HFKQLFLDQ




7RWDO(VWLPDWHG/DERU1)UD

(67,0$7('',5(&7(;3(16(6
0LOHDJH7ULSV[0LOHV#PLOH

7RWDO(VWLPDWHG([SHQVHV1)UD

(67,0$7('',5(&7/$%2568%&2168/7$176
/RJDQ6LPSVRQ(QYLURQPHQWDO

1LQ\R	0RRUH*HRWHFKQLFDO

5LFN(QJLQHHULQJ6XUYH\

5LFN(QJLQHHULQJ/HJDO'HVFULSWLRQV	([KLELWV$OORZDQFH

6DIH6LWH8WLOLW\6HUYLFHV//&3RWKROLQJ+ROHV$OORZDQFH

7RWDO(VWLPDWHG6XEFRQVXOWDQW/DERU

68%727$/'(6,*16(59,&(6

(67,0$7('',5(&7/$%253267'(6,*16(59,&(6
(VWLPDWHG
$YJ+RXUO\
/DERU
&ODVVLILFDWLRQ
/DERU+RXUV
5DWH
&RVW
3URMHFW0DQDJHU



6HQLRU3URMHFW(QJLQHHU



'HVLJQHU7HFKQLFLDQ




7RWDO(VWLPDWHG/DERU1)UD

68%727$/3267'(6,*16(59,&(6

&,7<&21752//(''(6,*1$//2:$1&(

/803680727$/


&2168/7$176,*1$785(
'$7(
),*85(65281'('727+(1($5(67'2//$5


([KLELW%
1)UD,QF
&OLHQW&LW\RI(O0LUDJH
3URMHFW9DUQH\5RDG3HGHVWULDQDQG%LF\FOH,PSURYHPHQWV
3URMHFW,'1R(/0'$
'HVLJQ&RVW3URSRVDO














































$
%
&
'
(
)
*
9DUQH\5RDGZD\,PSURYHPHQWV
727$/
3URMHFW
6HQLRU
'HVLJQHU
126+76
+566+7
+2856
0DQDJHU
3URMHFW
7HFKQLFLDQ
'(6,*16(59,&(6
(QJLQHHU
5RDGZD\3ODQV
&RYHU6KHHW.H\0DS6KHHW,QGH[8WLOLW\&RQWDFWV






*HQHUDO1RWHVDQG/HJHQG6KHHWV






4XDQWLW\6XPPDU\6KHHW






7\SLFDO6HFWLRQV3666KHHWV






*HRPHWULF&RQWURO6KHHW






&RUQHU5DPS'HWDLO6KHHWV5DPSV






6SHFLDO'HWDLO6KHHWV:DOO8WLOLWLHV0LVF






,QWHUVHFWLRQ*UDGLQJ6KHHWV






5RDGZD\3ODQDQG3URILOH6KHHWV






'ULYHZD\3URILOH6KHHWV'ULYHZD\V






'UDLQDJH3ODQDQG3URILOH6KHHWV






'UDLQDJH'HWDLO6KHHWV6FXSSHU3URILOH'LWFK&XUE2SHQLQJ0LVF






6LJQLQJ6WULSLQJDQG:D\)LQGLQJ6LJQDJH6KHHWV






7UDIILF&RQWURO3ODQ&RQVWUXFWLRQ3KDVLQJ6HTXHQFLQJ6KHHWV






6:3333ODQDQG'HWDLO6KHHWV






5RDGZD\3ODQV6XEWRWDO






0LVFHOODQHRXV,WHPV
*HQHUDO$GPLQLVWUDWLRQ
1$
1$




5HVHDUFK'DWD&ROOHFWLRQ'HVLJQ%OXHVWDNH5HFRUG'UDZLQJV
1$
1$




6XEFRQVXOWDQW&RRUGLQDWLRQIRU'HVLJQDQG(QYLURQPHQWDO&OHDUDQFH
1$
1$




6FRSLQJ.LFNRII3URJUHVV&RPPHQW5HVROXWLRQ0HHWLQJV
1$
1$




8WLOLW\&RRUGLQDWLRQ8WLOLW\&OHDUDQFH/HWWHU
1$
1$




'UDLQDJH5HSRUWZLWK&DOFXODWLRQV
1$
1$




4XDQWLWLHV(VWLPDWHV%LG6FKHGXOH$'27)RUPDW
1$
1$




6SHFLILFDWLRQV$'27)RUPDW&RRUGLQDWLRQZLWK$'27&	6
1$
1$




4$4&
1$
1$




0LVFHOODQHRXV,WHPV6XEWRWDO




727$/'(6,*16(59,&(6






3267'(6,*16(59,&(6
*HQHUDO$GPLQLVWUDWRQ

1$




3UH&RQVWUXFWLRQ0HHWLQJ

1$




2SLQLRQVDQG0LOHVWRQH2EVHUYDWLRQV6LWH9LVLWV

1$




&RQWUDFWRU$'27DQG&LW\&RRUGLQDWLRQ

1$




6KRS'UDZLQJ5HYLHZV

1$




5HYLHZ5),
V5)&
V

1$




9LUWXDO0HHWLQJVZLWK$'27DQG&LW\

1$




3URMHFW&RPSOHWLRQ:DON7KUX3XQFK/LVW

1$




3UHSDUDWLRQRI5HFRUG'UDZLQJV

1$




727$/3267'(6,*16(59,&(6





(VWLPDWHRI/DERU+RXUVE\6KHHWV

51 West Third Street   Suite 450   Tempe, Arizona 85281   Phone: 480.967.1343   Fax: 480.966.9232   www.logansimpson.com 
May 29, 2024 
Randy Weyrauch, PE 
Transportation Engineer 
NFra Inc. 
77 East Thomas Road, Suite 200 
Phoenix, AZ 85012 
 
Re: ADOT TRACS No. Pending 
 
Federal Aid No. Pending 
 
Varney Road, Dysart Road to El Mirage Road 
 
Logan Simpson Project No. 2330933C215580B 
 
Dear Randy Weyrauch: 
Logan Simpson is pleased to submit this Scope of Work and Fee Estimate for the anticipated work to 
complete the environmental clearance and associated technical resources reports for the above-
referenced project. Fieldwork for this project have been combined with another City project (121st 
Avenue, Ramirez Road to Peoria Avenue).  
 
The Environmental Planner in our office that has been assigned to this project is Marshall Hayes. 
Should you have any questions please do not hesitate to contact Marshall at (480) 967-1343 or via 
e-mail at mhayes@logansimpson.com. We look forward to working with you on this project. 
Sincerely, 
 
 
Patricia R. McCabe 
Principal Environmental Planner 
 
 
 
 
Attachments: (1) Scope of Work; (2) Task Order Worksheet; (3) Derivation of Fee; and (4) Terracon 
Scope of Work
 
EXHIBIT C

S c o p e o f W o r k 
Varney Road, Dysart Road to El Mirage Road 
Logan Simpson Project No.: 2330933C215580B 
 
G E N E R A L 
The City of El Mirage (City), in coordination with the Arizona Department of Transportation (ADOT) is 
planning a pedestrian and bicycle improvement project on approximately one mile of Varney Road within 
Maricopa County, Arizona. The project begins at Dysart Road and extends one mile east to El Mirage 
Road. The project fills a gap in the existing pedestrian and bicycle facilities located along adjacent 
roadways and neighborhoods to the north, east, and west of the corridor. The project will include installing 
pedestrian and bicycle facilities along Varney Road, providing Americans with Disabilities Act (ADA) 
improvements, utility relocations, and installing drainage improvements. Logan Simpson will prepare 
documentation based on a 150-foot-wide project area extending one mile.  
The project will be constructed within the existing City right-of-way (ROW). No new ROW is expected to 
be needed but temporary construction easements may be needed. Logan Simpson assumes a contractor 
use area for parking, staging, and stockpiling would be within the project area and that no separate 
staging areas would be needed. Temporary lane closures and the use of flaggers to direct traffic may be 
needed. No detours are anticipated to be needed. It is not expected that access to Dysart High School 
would be restricted.  
Logan Simpson will conduct environmental investigations and prepare technical resource documentation 
to support the National Environmental Policy Act (NEPA) compliance for the project. It is anticipated that 
a Categorical Exclusion (CE) is the appropriate level of NEPA documentation for the project. The CE is 
anticipated to be prepared by ADOT Environmental Planning (EP) in the CE Checklist format in accordance 
with 23 U.S.C. 326 and a Memorandum of Understanding dated January 4, 2021, as executed by the 
Federal Highway Administration (FHWA) and ADOT. It is anticipated that ADOT EP will also prepare the 
Environmental Commitments and that ADOT will coordinate any necessary reviews of the draft CE 
Checklist with the City and other ADOT EP staff.  
The following activities are excluded from this Scope of Work: 
`
Preparation of a Project Data and Field Review Form 
`
Preparation of the CE Checklist or Environmental Commitments 
`
Public meeting attendance 
`
Preparation of environmental considerations 
`
Flagging of cultural resources sites for avoidance; inventory of traditional cultural properties; 
separate historic road documentation; preparation of Section 106 agreement documents or 
treatment plans; or archaeological monitoring, testing, and/or data recovery 
`
Preparation of a detailed Biological Evaluation or Biological Assessment 
`
Formal Section 7 consultation with the US Fish and Wildlife Service (USFWS) 
`
Management Indicator Species Report or Migratory Bird Analysis Report 
`
Species-specific surveys 
`
Wild and scenic river coordination 
`
No business demographic surveys will be required. 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 2 
 
`
Sole source aquifer coordination with the US Environmental Protection Agency 
`
Clean Water Act Section 404 jurisdictional delineation, individual permit, or pre-construction 
notification for project construction. If during the design of the project it is determined that 
jurisdictional washes will be impacted, a Section 404 permit will be required and a modification 
to this scope of work will be necessary    
`
Clean Water Act Section 401 Individual Water Quality Certification for project construction 
`
Visual resources field visit, coordination, visual technical analysis or report, or simulations 
`
Natural Resources Conservation Service Farmland Conversion Impact Rating Corridors form 
`
Section 4(f) resources summary, consultation letters or Individual Section 4(f) evaluation 
document 
`
Phase I Environmental Site Assessment or hazardous materials monitoring 
`
Separate geotechnical clearance 
`
Quantitative noise or air analyses 
`
Environmental Justice Evaluations 
 
If, at any time, ADOT determines that an Environmental Assessment or Environmental Impact Statement 
is required, Logan Simpson will submit a Task Order Revision to this Scope of Work. If any work is 
necessary outside of the project area, a Task Order Revision will be needed. 
TASK 1. KICK-O FF MEETING 
One Logan Simpson staff member will prepare for and attend a virtual project kick-off meeting. It is 
assumed that the meeting will be 2 hours in duration. Logan Simpson will provide NFra with an 
environmental summary from the meeting for incorporation into the overall meeting notes prepared by 
NFra or ADOT. 
TASK 2. HA ZARDO US MATERIAL S 
Terracon, as a subconsultant to Logan Simpson, will prepare a Preliminary Initial Site Assessment (PISA) 
and Lead-Based Paint and Asbestos reports (refer to attached Terracon Scope of Work). The PISA will 
consist of a records search and site visit to determine if hazardous materials concerns are located within 
the project area. Logan Simpson will review the report and provide any edits to Terracon for revision prior 
to submitting to NFra and ADOT. Any mitigation measures for the project identified in the PISA will be 
included by ADOT EP in the Environmental Commitments, as needed. 
TASK 3. CULTURAL RESOURCES  
This project uses federal funds administered by the FHWA; therefore, it is considered a federal 
undertaking subject to compliance with Section 106 (54 USC § 306108) of the National Historic 
Preservation Act (NHPA; 54 USC § 300101 et seq.) and its implementing regulations (36 CFR Part 800). 
ADOT is serving on behalf of the FHWA as the lead federal agency responsible for Section 106 compliance, 
per the 2020 Programmatic Agreement (PA) regarding implementation of Federal-Aid Transportation 
Projects in the State of Arizona. The area of potential effect (APE) for this undertaking encompasses the 
300-foot-wide road segments along Varney Road and 121st Avenue within Section 23, Township 3 North 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 3 
 
(T3N), Range 1 West (R1W). Due to the involvement of City-owned ROW easement, the undertaking is also 
subject to compliance with the Arizona Antiquities Act (AAA; ARS § 15-1631, ARS § 41-841 et seq.), as 
administered by the Arizona State Museum (ASM). 
Logan Simpson will complete a Class III (intensive, pedestrian) cultural resources survey to identify 
National Register of Historic Places (NRHP) and Arizona Register of Historic Places (ARHP)-eligible and 
listed properties in the APE and assess any effects the undertaking may have on historic properties. Tasks 
associated with the effort will include (1) performing a Class I records search; (2) conducting the Class III 
field survey; (3) preparation of a draft technical report with a Section 106 consultation cover letter; and 
(4) project curation. Logan Simpson’s key personnel involved with the undertaking will meet the Secretary 
of the Interior’s Professional Qualifications for Archaeology and will include individuals listed as qualified 
Principal Investigator (PI) and Project Director (PD) on Logan Simpson’s AAA blanket permit for non-
collection archaeological survey of state land. 
Task 3.1. Cl ass I R ecords Se arch 
Prior to field survey Logan Simpson will complete a Class I cultural resources records search for the APE 
and a surrounding ½-mile buffer area (the “study area,” collectively). Based on landownership in the study 
area, the records review will virtually examine relevant records from the National Register Information 
System, an online database of properties that have been listed on the NRHP; AZSITE, an online database 
of documented cultural resources within the state; and the ADOT Historic Preservation Team (HPT) online 
portal. The ½-mile buffer area for the 121st Avenue segment of the APE includes land managed by the 
Bureau of Land Management (BLM). Therefore, relevant project and site records also will need to be 
obtained through an in-person or virtual appointment with the BLM Hassayampa Field Office in Phoenix. 
In addition, historical documents, such as General Land Office (GLO) and United State Geologic Survey 
(USGS) maps as well as Flood Control District of Maricopa County (FCDMC) historical aerials, will be 
evaluated for potentially undocumented cultural properties. The results of the records research will help 
guide the field survey (Task 3.2) and will be summarized in the technical report (Task 3.3). 
Task 3.2. Cl ass I II Field Survey 
Preliminary research suggests that the APE has not been previously surveyed for cultural resources. The 
APE is located within a heavily developed industrial area, and the roadway is paved. Even so, ground 
surface is accessible in a few locations along the southern edges of the road ROW (although it appears 
to be disturbed on aerial photographs). Logan Simpson will conduct a Class III cultural resources survey 
of areas within the APE where the ground surface is accessible. The survey will be conducted under the 
terms and conditions of our ASM-issued AAA blanket permit for non-collection survey on state land 
(including municipal land) in Arizona. All cultural resources identified during survey will be evaluated 
according to the ASM site criteria, as defined in the 1995 Revised Site Definition Policy. If present, cultural 
resources meeting ASM site criteria will be documented according to standards outlined in the ASM site-
recording manual, which is accepted by SHPO. For each cultural resources site, the field crew will 
complete the ASM site form and produce a detailed site map; describe all site attributes, such as features 
and environment in detail; conduct an intensive in-field analysis of artifacts; and photograph the site area 
and environment, surface features, diagnostic artifacts, and any areas of disturbance. All cultural 
resources sites within the APE will be evaluated for NRHP/ARHP-eligibility based on their integrity and 
significance under the four criteria outlined in 36 CFR 60 and per guidelines presented in National Register 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 4 
 
Bulletin 15, How to Apply the National Register Criteria for Evaluation. As such, all cultural resources will be 
evaluated based on an appropriate time-place-theme historic context. 
Based on preliminary research, few cultural resources sites have been documented in the previously 
surveyed areas in the APE vicinity. Furthermore, the APE does not appear to have encompassed any 
buildings or structures prior to the 1980s. Construction of the segments of Varney Road and 121st Avenue 
occurred sometime after 1985. Therefore, it is expected that no new sites or historic resources will be 
documented within the accessible areas of the APE.   
Task 3.3. Technical Report and Cover Letter 
Upon completion of the Class III survey, and assuming no cultural resource sites or historic properties are 
identified during fieldwork, Logan Simpson will prepare a draft report using the SHPO Survey Report 
Summary Form (SRSF) format. This document will summarize the method and results of the Class I and 
III inventories and provides cultural resources management recommendations for the undertaking. We 
anticipate submitting the draft SRSF to the client within approximately 20 business days after completing 
the survey fieldwork. Logan Simpson will revise the SRSF based on reviewer comments from ADOT, SHPO, 
and ASM. Following formal acceptance of the SRSF, the final SRSF will be provided to the client for their 
project’s compliance requirements and curated with the ASM (see below).  
The draft technical report and consultation letters will be submitted electronically to ADOT for review 
within 30 calendar days from the end of Class III field survey. Logan Simpson will address all comments 
and submit revised electronic copies of the report and cover letter to ADOT; ADOT will be responsible for 
submitting the report and letter to consulting agencies and Tribes and tracking all responses. Comments 
from the reviewing parties will be addressed within two weeks of receipt of all comments. Logan Simpson 
will provide final electronic copies of the report and updated consultation letters to ADOT for distribution 
to consulting agencies and Tribes.  
Task 3.4. Pro ject Curation 
Following formal acceptance of the report, Logan Simpson will prepare the report and other project 
documents for curation in perpetuity at ASM. Note that ASM charges a mandatory registration fee for all 
projects, plus additional fees for documentation and digital curation. We estimate the ASM fee to be 
approximately $500, although a formal quote request will be submitted following receipt of a notice to 
proceed to determine the actual fee.  
CULTURAL ASSUMPTIONS:  
x
No fieldwork or travel costs have been included in this scope and fee; fieldwork will be conducted 
concurrently a nearby City project (121st Avenue, Ramirez Road to Peoria Avenue) 
x
The APE and/or study area as defined above will not change; no new ROW or temporary 
construction easements will be needed. 
x
In-person records check at ASM ARO will not be required. 
x
No archival research is scoped for this effort, including research at local historical societies 
and/or repositories. 
x
ADOT will not require site flagging. 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 5 
 
x
No Section 4(f) analysis is necessary for cultural resources. 
x
The Class I and/or Class III effort will not include identification or evaluation of any historic state 
highway system roadways or arterial streets. 
x
Historic building/structure/district inventory and evaluation is not included. This also excludes 
evaluation of a potential historic commercial district or historic streetscape for which sidewalks 
and other features may be contributors. 
x
No cultural resources sites or historic properties will be identified and documented during the 
Class III survey. If any cultural resources sites or historic properties are identified and require 
documentation, a contract modification will be required to address the additional labor and 
registration fees. 
x
Land ownership within the APE is assumed to be City and private. Logan Simpson is not 
responsible for obtaining private rights-of-entry or notifying property owners prior to survey. 
x
Historic laterals are present not the south of the APE. We assume none of these structures will 
need to be formally documented. If these structures do require formal documentation, then 
contract modification will be required to address the additional labor. 
TASK 4. PUBLIC A ND AGENCY SCOP I NG 
Public and agency scoping will be conducted in accordance with ADOT EP Guidelines for Agency and 
Public Scoping for Projects with Categorical Exclusions and Biological Scoping Guidelines (May 2021). 
Logan Simpson will prepare and submit draft public and agency scoping letters and the distribution list 
to NFra and ADOT for review and approval. The scoping letters will be prepared on City letterhead with 
City signature. Preparation of the scoping letters will occur following team approval of the project 
description. Logan Simpson will prepare the list of agencies according to ADOT EP guidelines. The public 
mailing list will be prepared based on landowners adjacent to the project area using Maricopa County 
assessor data. 
Prior to mailing, electronic copies of the draft scoping letters and distribution lists will be provided to the 
City for review. Upon addressing City edits, Logan Simpson will provide the materials to the ADOT EP 
NEPA planner assigned to this project for their review and approval. Following incorporation of up to two 
rounds of review comments, Logan Simpson will mail the approved public and agency scoping letters and 
assumes no more than 60 letters will be mailed. Logan Simpson will coordinate with ADOT, City and NFra 
regarding comments received from agencies and will provide up to 3 comment responses via phone or 
email. Logan Simpson will provide a record of all scoping materials to ADOT EP, City, and NFra for the 
project record. 
TASK 5. BIOLOGIC AL RESOURCES 
Logan Simpson will prepare an ADOT Biological Evaluation Short Form (BESF) for this project. Logan 
Simpson will utilize the Arizona Game and Fish Department (AGFD) On-line Environmental Review Tool 
report and USFWS Information, Planning, and Conservation (IPaC) species list that have been provided by 
ADOT EP; access online and GIS-based natural resource data to obtain current information regarding 
threatened and endangered (T&E) species occurrences in the project area; and document the absence of 
suitable habitat for T&E species in the BESF. A site visit will be conducted concurrently with a nearby City 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 6 
 
project (121st Avenue, Ramirez Road to Peoria Avenue) to accurately depict the current ground conditions. 
Costs for the site investigation is included under the aforementioned project.  
 
An electronic copy of the draft report will be provided to the City and ADOT EP; following incorporation of 
up to two rounds of review comments from ADOT EP, an electronic copy of the final report will be provided 
to ADOT EP for approval. 
 
We are assuming at this time that no detailed species analysis or species-specific surveys will be required. 
If any TES species need to be evaluated in detail (i.e., in a Biological Evaluation), or a request for species-
specific surveys is made, a Task Order Revision to this Scope of Work will be necessary. 
BIOLOGICAL ASSUMPTIONS:  
x
No fieldwork or travel costs have been included in this scope and fee; fieldwork will be conducted 
concurrently a nearby City project (121st Avenue, Ramirez Road to Peoria Avenue). 
TASK 6. PROJECT MANAGEMENT, COORDINATION, AN D MEETINGS 
In addition to the kick-off meeting addressed in Task 1, one Logan Simpson staff member will prepare for 
and attend up to four, 1-hour progress meetings anticipated to occur via teleconference. Logan Simpson 
will review design plans for compliance and prepare the scope of work description for ADOT’s completion 
of the CE checklist. Logan Simpson will provide ADOT EP with copies of environmental compliance 
documentation for the CE, as needed (e.g., project description, biological document, and hazardous 
materials reports). Logan Simpson will provide ADOT, City, and NFra with schedule updates and project 
coordination efforts over the course of the 6-month NEPA process, and will coordinate with ADOT EP. 
Logan Simpson will also assist with coordination efforts to determine ground disturbance and the need 
for a stormwater pollution prevent plan (SWPPP) which would be needed if ground disturbance exceeds 
one acre. If project coordination efforts for the project exceed this estimation, a Task Order Revision will 
be necessary. At the completion of the project, Logan Simpson will complete project close out and submit 
records to NFra, City, and ADOT.  
 
EXHIBIT C

Logan Simpson Scope of Work 
Varney Road, Dysart Road to El Mirage Road 
May 29, 2024 
Page 7 
 
Exhibit A. 
 
EXHIBIT C

Logan Simpson Design Inc.
Project Name: Varney Road, Dysart 
Road to El Mirage Road
LSD # 2330933C215580B
Date: 5/29/2024
PM: Marshall Hayes
Math check done by: 
Environmental 
Planner/ Scientist, 
Sr.
Sr.  Biologist
Archaeologist-Sr.
Archaeologist
Associate 
Archaeologist
Cultural Principal 
Investigator
Architectural 
Historian/ 
Historian
GIS Analyst/ 
Technician-Sr.
GIS Analyst/ 
Technician
Subtotal
Subtotal 
Terracon
Total
Total Labor
Tasks
Hours
Costs
3,482.94
and Exp.
Task 1. Kick-off Meeting
One staff member prepares for and 
attends a virtual (2hr) kick-off meeting
3
0
3
524.25
$             
-
$               
524.25
$         
Provide Nfra with environmental 
summary
1
0
1
174.75
$             
-
$               
174.75
$         
Subtotal Task 1 Labor
4
0
0
0
0
0
0
0
0
4
699.00
$             
0
-
$               
699.00
$         
Task 2. Hazardous Materials
Terracon prepares PISA, LBP, and 
ACM reports
0
0
0
-
$                       
1
3,482.94
$  
3,482.94
$      
Logan Simpson review
3
0
3
524.25
$             
-
$               
524.25
$         
Subtotal Task 2 Labor
3
0
0
0
0
0
0
0
0
3
524.25
$             
1
3,482.94
$  
4,007.19
$      
Task 3.  Cultural Resources
Coordination/permitting/meetings
0
0
4
8
12
1,163.12
$          
-
$               
1,163.12
$      
Mobization/Demobilization
0
0
2
2
1
1
6
500.90
$             
-
$               
500.90
$         
Background 
0
0
4
10
2
4
2
10
32
2,568.04
$          
-
$               
2,568.04
$      
Site Recording n/a 
0
0
0
-
$                       
-
$               
-
$                   
Draft Report SRSF
0
4
16
4
8
8
6
46
4,184.92
$          
-
$               
4,184.92
$      
QAQC
0
9
6
2
17
1,844.21
$          
-
$               
1,844.21
$      
Final Report SRSF
0
0
4
4
2
10
710.64
$             
-
$               
710.64
$         
Compliance
0
0
6
6
2
14
1,261.78
$          
-
$               
1,261.78
$      
Subtotal Task 3 Labor
0
0
13
36
20
31
13
4
20
137
12,233.61
$        
0
-
$               
12,233.61
$    
Task 4. Public and Agency Scoping
Prepare public and agency scoping 
letters and distribution lists
14
0
14
2,446.50
$          
-
$               
2,446.50
$      
Revisions
3
0
3
524.25
$             
-
$               
524.25
$         
Mailings
5
0
5
873.75
$             
-
$               
873.75
$         
Subtotal Task 4 Labor
22
0
0
0
0
0
0
0
0
22
3,844.50
$          
0
-
$               
3,844.50
$      
Task 5.  Biological Resources
BESF, QAQC
0
16
0
1
17
1,848.21
$          
-
$               
1,848.21
$      
Coordination
0
2
0
2
218.20
$             
-
$               
218.20
$         
Subtotal Task 5 Labor
0
18
0
0
0
0
0
1
0
19
2,066.41
$          
0
-
$               
2,066.41
$      
Task 6.  Project Management, 
Coordination, and Meetings
One staff member prepares for and 
attends up to four (1-hr) progress 
meetings via teleconference
6
0
6
1,048.51
$          
-
$               
1,048.51
$      
Status and schedule updates, design 
plan review, SWPPP disturbance 
calculation
18
0
18
3,145.50
$          
-
$               
3,145.50
$      
Subtotal Task 6 Labor
24
0
0
0
0
0
0
0
0
24
4,194.01
$          
0
-
$               
4,194.01
$      
Subtotal Labor Hours
53
18
13
36
20
31
13
5
20
209
23,561.78
$        
1
3,482.94
$  
27,044.72
$    
Subtotal Labor Costs
$9,261.75
$1,963.80
$1,448.85
$2,836.80
$1,212.00
$3,285.69
$1,509.43
$513.05
$1,530.41
209
$23,561.78
3,482.94
$
3,482.94
$  
27,044.72
$    
Labor
23,561.78
$        
Expenses
3,482.94
$          
Total Fee
27,044.72
$        
Direct Expenses
Page 1 of 1
EXHIBIT C

PROJECT NAME: Varney Road, Dysart Road to El Mirage Road
CONTRACT NO.: 2022-006
TRACS NO.: Pending
FIRM: Logan Simpson Design Inc.
TASK NO.: 
DBE STATUS: No
REVISION NO.:
DATE: 5/29/2024
LSD PROJECT NO.: 2330933C215580B
DERIVATION OF COST PROPOSAL SUMMARY
ESTIMATED DIRECT LABOR
ESTIMATED
AVG. HOURLY
LABOR
CLASSIFICATION
LABOR HOURS
RATE
COSTS
Environmental Planner/ Scientist, Sr.
53.0
64.71
$  
 
$3,429.63
Sr.  Biologist
18.0
40.40
$  
 
$727.20
Archaeologist-Sr.
13.0
41.27
$  
 
$536.51
Archaeologist
36.0
29.18
$  
 
$1,050.48
Associate  Archaeologist
20.0
22.44
$  
 
$448.80
Cultural Principal Investigator
31.0
39.25
$  
 
$1,216.75
Architectural Historian/ Historian
13.0
43.00
$  
 
$559.00
GIS Analyst/ Technician-Sr.
5.0
38.00
$  
 
$190.00
GIS Analyst/ Technician
20.0
28.33
$  
 
$566.60
TOTAL LABOR HRS.
209.0
TOTAL ESTIMATED LABOR
$8,724.97
NEGOTIATED OVERHEAD-% of Estimated Labor
145.50%
$12,694.83
PAO 22.07
SUB-TOTAL DIRECT LABOR
$21,419.80
ESTIMATED OUTSIDE SERVICES
COST
Terracon Consultants Inc.
$3,482.94
SUB-TOTAL ESTIMATED OUTSIDE SERVICES
$3,482.94
TOTAL ESTIMATED COST TO CONSULTANT
$24,902.74
FIXED FEE = (Direct Labor + Overhead) X Multiplier
10%
$2,141.98
TOTAL ESTIMATED COST
$27,044.72
5/29/2024
Signature
Date  
Signature
EXHIBIT C

4685 S Ash Ave, Ste H-4
Tempe, AZ  85282-6767
P 480-897-8200
F 480-897-1133
Terracon.com
Facilities  |  Environmental |  Geotechnical  |  Materials
September 26, 2023
Mr. Marshall Hayes, Environmental Planner
Logan Simpson
51 West Third Street, Suite 450
Tempe, Arizona 85281
Re: 
Scope & Cost Proposal
Preliminary Initial Site Assessment and Limited Asbestos and Lead Paint Sampling
Varney Road
Dysart Road to El Mirage Road
El Mirage, Maricopa County, Arizona
Logan Simpson Project No. TBD
ADOT TRACS No. TBD
Federal No. TBD
Terracon Proposal No. P65237665
Dear Mr. Hayes:
Terracon is pleased to submit this cost proposal for providing environmental services for the
subject project. The proposed services include a Preliminary Initial Site Assessment (PISA)
and limited asbestos containing material (ACM) and lead paint sampling. This proposal
includes an outline of the project information provided to us, the proposed scope of services,
our fee, and the proposed schedule.
A. PROJECT INFORMATION
As we understand, Logan Simpson is undertaking environmental services for the Arizona
Department of Transportation (ADOT) for an improvement project. A description of the
project has been provided to Terracon by Logan Simpson:
The City of El Mirage (City), in coordination with ADOT is planning a pedestrian and bicycle
improvement project on approximately one mile of Varney Road within Maricopa County,
Arizona. The project begins at Dysart Road and extends one mile east to El Mirage Road. The
project fills a gap in the existing pedestrian and bicycle facilities located along adjacent
roadways and neighborhoods to the north, east, and west of the corridor. The project will
include installing pedestrian and bicycle facilities along Varney Road, providing Americans with
Disabilities Act (ADA) improvements, utility relocations, and installing drainage improvements.
Logan Simpson will prepare documentation based on a 150-foot-wide project area extending
one mile.
EXHIBIT C

Proposal for PISA and Limited Asbestos & Lead Paint Sampling
Logan Simpson | El Mirage, Arizona
September 26, 2023 | Terracon Proposal No. P65237665
Facilities  |  Environmental |  Geotechnical  |  Materials
ii
The project will be constructed within the existing City right-of-way (ROW). No new ROW is
expected to be needed but temporary construction easements may be required. Logan
Simpson assumes a contractor use area for parking, staging, and stockpiling would be within
the project area and that no separate staging areas would be needed. Temporary lane
closures and the use of flaggers to direct traffic may be required. No detours are anticipated
to be needed.
We understand that ADOT will require a PISA and limited ACM and lead paint sampling for the
project.
B. SCOPE OF SERVICES
Terracon estimates that the field studies for the PISA site reconnaissance and ACM and lead
paint sampling may be conducted during one site visit over a period of one working day
utilizing one field professional. We assume that ADOT will provide necessary site access and
traffic control for assessment activities performed by Terracon. The PISA and the ACM and
lead paint sampling will be submitted under separate covers.
Preliminary Initial Site Assessment
Terracon will prepare a PISA for the areas identified above. The PISA will include a site
reconnaissance, site photographs, and review of a regulatory database report. Field work for
the PISA will be performed by staff that is 40-hour OSHA HAZWOPER certified, and that meet
the definition of an Environmental Professional by the ASTM E1527-21 standard. The report
will include a completed ADOT PISA Form. We anticipate that the draft PISA will be issued
within approximately five weeks after receiving written authorization to proceed and access to
the site.
Limited ACM Sampling
Terracon proposes to conduct limited ACM sampling within the project limits for materials
identified for disturbance during construction. Terracon understands that improvements will
potentially impact suspect ACM such as concrete and other materials associated within the
project area. Terracon will conduct a visual assessment of the readily accessible portions of
the proposed project area to identify homogeneous materials suspected of being ACM.
Suspect ACM will be physically assessed for friability and evidence of damage or degradation.
Terracon does not intend to sample concrete features which will not be disturbed by the
project.
Samples of suspect ACM will be collected for laboratory analysis by an USEPA AHERA-
accredited asbestos Building Inspector. A copy of the inspector’s AHERA accreditation will be
included in the report. Bulk sample collection will be conducted in general accordance with the
sampling protocols outlined in USEPA 40 CFR 763.86, Subpart E. At least three samples of
each homogeneous material will be collected, per AHERA protocols. We estimate collection of
up to 30 samples. If the actual number of samples collected exceeds the estimate, additional
samples will be invoiced at unit rate of $6.14 per sample. If the number of additional samples
EXHIBIT C

Proposal for PISA and Limited Asbestos & Lead Paint Sampling
Logan Simpson | El Mirage, Arizona
September 26, 2023 | Terracon Proposal No. P65237665
Facilities  |  Environmental |  Geotechnical  |  Materials
iii
exceeds 10% of the original estimate, Terracon will notify the client and request a change
order.
Sample collection will result in some isolated damage. Terracon will not be responsible for
repair or touch-up of sample locations. Reasonable efforts to access suspect materials within
known areas of restricted access (e.g., crawl spaces) will be made provided these areas are
not determined to be permit-required confined spaces, or to pose a health or safety risk to
Terracon personnel.
A laboratory accredited by the National Voluntary Laboratory Accreditation Program (NVLAP)
will analyze bulk material samples by visual estimation using polarized light microscopy
(PLM). If PLM results merit re-analysis by the more quantitative point counting technique,
Terracon will contact the client to discuss and receive authorization. Copies of the laboratory
analysis report, the chain of custody, and the laboratory’s accreditation certificates will be
appended to the report.
Limited Lead Paint Sampling
The limited Lead Paint sampling will be performed by an EPA certified lead-based paint
Inspector or Risk Assessor per 40 CFR part 745 following HUD Guidelines. Terracon will collect
bulk paint chip samples of paint layers down to but not including the substrate. The paint chip
samples will be submitted to a laboratory recognized by the EPA’s National Lead Laboratory
Accreditation Program (NLLAP) program for Flame Atomic Absorption (FLAA) analysis.
Terracon estimates up to 2 paint chip samples may be required for laboratory analysis as part
of the proposed scope of work. If the actual number of samples collected exceeds the
estimate, additional samples will be invoiced at unit rate of $10.23 per sample. If the number
of additional samples exceeds 10% of the original estimate, Terracon will notify the client and
request a change order.
Results of the limited lead paint sampling will be reported with the ACM sampling and copies
of the laboratory analysis report, the chain of custody, and the laboratory’s accreditation
certificates will be appended to the report.
C.COMPENSATION
The cost for our services, including all field work, database reports, and report preparations
have been based on the scope of work outlined above, estimates of time required to complete
the various services. The total cost estimate is $3,482.94 and a derivation of the cost
proposal summary is attached.
Site Access and Safety
Client shall secure all necessary site related approvals, permits, licenses, and consents
necessary to commence and complete the Services and will execute any necessary site access
agreement.  Consultant will be responsible for supervision and site safety measures for its
own employees, including following applicable state and local COVID related requirements,
EXHIBIT C

Proposal for PISA and Limited Asbestos & Lead Paint Sampling
Logan Simpson | El Mirage, Arizona
September 26, 2023 | Terracon Proposal No. P65237665
Facilities  |  Environmental |  Geotechnical  |  Materials
iv
but shall not be responsible for the supervision or health and safety precautions for any third
parties, including Client’s contractors, subcontractors, or other parties present at the site. In
addition, Consultant retains the right to stop work without penalty at any time Consultant
believes it is in the best interests of Consultant’s employees or subcontractors to do so in
order to reduce the risk of exposure to the coronavirus. Client agrees it will respond quickly to
all requests for information made by Consultant related to Consultant’s pre-task planning and
risk assessment processes. Client acknowledges its responsibility for notifying Consultant of
any circumstances that present a risk of exposure to the coronavirus or individuals who have
tested positive for COVID-19 or are self-quarantining due to exhibiting symptoms associated
with the coronavirus.
The fee is valid for 90 days from the date of this proposal and is based on the assumption
that all field services will be performed under safety Level D personal protective procedures
and that only one site visit will be made by Terracon personnel. The lump sum fee is based on
the assumptions and conditions provided at the time of this proposal.
We appreciate your consideration of Terracon for this work and look forward to working as
your environmental consultant on this and future projects.
Sincerely,
Terracon Consultants, Inc.
Eric Lyding, P.E.
Noelle J. Espinosa, PhD
Project Environmental Engineer
Group Manager
Enclosure:
Derivation of Cost Proposal Summary
EXHIBIT C

DIRECT LABOR:
Estimated
Labor
Man-hours
Rate
Cost
4
$58.17
$232.68
15.5
$42.12
$652.86
3
$27.38
$82.14
1
$25.03
$25.03
--------------
Total Labor Rate Cost:
$992.71
PAO 22.01 NegotiatedOverhead Cost (185.17%):
$1,838.20
Labor Cost:
$2,830.91
Fee (10%):
$283.09
Negotiated FCCM (0.53%)
$5.26
Total Labor
23.5
$3,119.26
DIRECT EXPENSES:
Mileage - (74 miles at ($0.625 per mile))
$46.25
$46.25
OUTSIDE SERVICES:
--------------
$317.43
--------------
 TOTAL COST:
$3,482.94
___________________________________
9/26/2023
Noelle J. Espinosa, Group Manager
Date
 Total Outside Services
Administrative
 Total Direct Expenses
DERIVATION OF COST PROPOSAL
SUMMARY
     Classification
Environmental Coordinator
Engineer
CADD Technician
EXHIBIT C

Federal Aid No.: TBD
LS Project No.:
TRACS No:  TBD
Project Name:
Task Name:
Total
Mobilization/ Demobilization
Travel to and from site
-
1.5
-
-
1.5
Mobilization/ Demobilization Total
0
1.5
0
0
1.5
Utility Coordination, Permitting and Right of Entry Coordination
Traffic Safety Coordination
1
1
-
-
2
Bluestake Clearance Coordination
-
-
-
-
0
Miscellaneous Permits (ADWR, Local Government, Flood Control, Railroad, etc.)
-
-
-
-
0
Utility Coordination, Permitting and Right of Entry Coordination Total
1
1
0
0
2
Field Study
General Data Review
-
1
-
-
1
Site Reconnaissance
-
2
-
-
2
General Test Pit Sampling & Logging
-
-
-
-
0
Fissure Data Review, Trench Logging & Mapping
-
-
-
-
0
Fissure Reconnissance
-
-
-
-
0
Field Study Total
0
3
0
0
3
Project Management, Meetings, & Scheduling
Project & Miscellaneous Management
1
1
-
-
2
ADEQ Records Review
-
-
-
-
0
Coordinate Field Study
-
1
-
-
1
Miscellaneous Design Meetings
-
-
-
-
0
Project Management, Meetings, Scheduling, & Site Visits Total
1
2
0
0
3
Design & Reporting
Preliminary Initial Site Assessment & Asbestos/Lead Paint Survey Reports
-
8
3
1
12
QC/ QA Review
2
-
-
-
2
Design & Reporting Total:
2
8
3
1
14
Grand Total
4
15.5
3
1
23.5
Percent of Total
17%
66%
13%
4%
100%
Varney Road
CADD
Technician
Administrative
Environmental
Coordinator
Engineer
EXHIBIT C

EXHIBIT C

Lab Testing
Database Report (EDR)
1
112.77
$
/ea
$112.77
Lead Based Paint (Flame AA Analysis)
2
10.23
$
/ea
$20.46
Asbestos Analysis
30
6.14
$
/ea
$184.20
$317.43
$317.43
TOTAL COSTS FOR LAB TESTING
ASTM
DESIGNATION
TEST
SUBTOTAL COSTS FOR LAB TESTING
TOTAL
PROJECT
Federal ID No.:  TBD
TRACS No.:  TBD
Task Name:  Miller Road ITS
PROPOSED
UNITS
UNIT RATE
EXHIBIT C

Prepared for:
Eric Lyding
Terracon: AZ
4685 S Ash Avenue, Suite: H-4
Tempe, AZ 85282
Issue Date:01/27/2023
Quote ID-Version #: 11576-1
Expiration Date:01/31/2023
Renewal pricing for: 012023
Dear Eric Lyding,
Sincerely,
Lori Litwiller
Regional Account Manager
Lori.Litwiller@eurofinset.com
Ph: 623-298-1022
Page 1 of 6
Marlton, NJ: 3000 Lincoln Drive East, Suite A, Marlton, NJ 08053*(866) 871-1984 
Phoenix, AZ: 1501 West Knudsen Drive, Phoenix, AZ 85027*(800) 651-4802 
Thank you for the opportunity to provide this proposal.  Per your request, I have attached the 
service pricing proposal from 
 P&K.  As an 
 P&K client, you will benefit 
from:
Convenience 
Mobile apps that make your work easier with instant alerts when reports are ready, access to all
your project results, and much more. 
Analytical services for mold, fungi, bacteria, asbestos, USP <797>, allergens, and more.
Products division offering sampling supplies and equipment at competitive prices.
Over 60 service and drop-off locations across the United States.
Superior Client Service 
A Project Manager who is assigned to you as your primary contact for your needs.
Cutting-edge LIMS technology called LabServeTM, which provides secure online access 24/7 to
all your projects, reports, invoices, supply orders, and more.
Lab reports that fit your needs, including report formats to help you interpret your data.
Trust 
Led by highly respected IAQ experts including Dave Gallup and Dr. Harriet Burge.
An extensive list of accreditations from leading organizations and government agencies.
Quality systems that ensure full confidence for the quality and accuracy of your results.
Highly trained analysts, including many with advanced degrees.
No conflicts of interest. Some of our competitors operate consulting services that compete
against you. We don't. We serve you with honesty and integrity!
As you can see,
 P&K offers you tremendous value with the industry’s 
leading service, qualifications, and experience. 
The following quotation contains detailed pricing and turnaround times, based on your service needs.  
This quotation is subject to 
 P&K’s Standard Terms and Conditions, unless otherwise 
agreed upon in writing.  Please review all documents and feel free to contact me with any questions. 
EXHIBIT C

Prepared for:
Eric Lyding
Terracon: AZ
4685 S Ash Avenue, Suite: H-4
Tempe, AZ 85282
01/27/2023
11576-1
01/31/2023
Renewal pricing for: 012023
Lori Litwiller
Regional Account Manager
Lori.Litwiller@eurofinset.com
Ph: 623-298-1022
Page 2 of 6
Turnaround Time & Pricing
Service
Price
Per
Standard TAT
business days
Standard
Five
Day
Next
Day
Same
Day
Holiday
Weekend
ASBESTOS
Asbestos PLM
sample
3
$6.14
$5.00
$9.21
$12.28
$16.37
 
Price Per Layer > 3
$0.00
$0.00
$0.00
$0.00
$0.00
Asbestos TEM Chatfield (sub-contracted)
sample
5
$61.38
N/A
N/A
N/A
N/A
Asbestos-airborne fiber count (NIOSH 7400)
sample
3
$8.18
$8.18
$12.27
$16.36
$24.54
Asbestos-EPA 1000 point count
layer
3
$102.30
N/A
$153.45 $204.60 $306.90
Asbestos-EPA 400 point count
layer
3
$18.41
N/A
$27.62
$36.82
$55.23
Asbestos-TEM Qualitative P/A (sub-contracted)
sample
5
$61.38
N/A
$92.07
N/A
N/A
Other
FAA Lead EPA SW846 3050B/7420 Method (sub-contract)
sample
5
$10.23
N/A
$15.35
N/A
N/A
ICP/MS Lead EPA 200.8 Method (sub-contract) - Water
sample
5
$10.23
N/A
N/A
N/A
N/A
Lead - Flame AA
sample
5
$10.23
N/A
$15.35
$20.46
$30.69
Issue Date:
Quote ID-Version # :
Quote Expiration:
EXHIBIT C

3202 East Harbour Drive  |  Phoenix, Arizona 85034  |  p. 602.243.1600  | www.ninyoandmoore.com
May 28, 2024
Proposal No. 12PHX02-05198
Mr. Randy Weyrauch, PE
NFra, Inc.
77 East Thomas Road, Suite 200
Phoenix, Arizona 85012
Subject:
Proposal to Provide Geotechnical Engineering Services
Varney Road Improvements
Dysart Road to El Mirage Road
El Mirage, Arizona
Project ID# ELM-2020-DA-001
Dear Mr. Weyrauch:
Ninyo & Moore is pleased to submit this proposal to provide geotechnical engineering services for 
the above-mentioned project. This proposal is based on the information that we received from your 
office and it outlines our scope of services, project assumptions, anticipated schedule, and fee for 
this phase of the project.
SITE AND PROJECT DESCRIPTION 
The project site is located along Varney Road from Dysart Road to El Mirage Road in 
El Mirage, Arizona, a distance of about 5,200 linear feet. The improvements will include widening on 
the north side of from Dysart Road to the first driveway and on the south side from 129th Avenue to 
El Mirage Road. We have been asked to prepare this proposal to conduct the geotechnical and 
pavement design tasks for the improvements. 
SCOPE OF SERVICES 
Our scope of services for this phase of the project is summarized below:
x
Review available published and in-house geotechnical reports, topographic information, soil 
surveys, geologic literature, and aerial photographs of the project area.
x
Obtain El Mirage permits or permissions to conduct the field work.
x
Conduct a field trip to the site for a visual pavement surface reconnaissance.
EXHIBIT D

Ninyo & Moore   |   Varney Road Improvements, Dysart Road to El Mirage Road, El Mirage, Arizona   |   12PHX02-05198   |   May 28, 2024
x
Conduct a site visit to select and mark out the proposed exploration locations.
x
Contact Arizona 811 to evaluate utility locations prior to our field work.
x
Arrange for appropriate traffic control measures.
x
Perform a geotechnical exploration, which will include the excavating of four soil borings. These 
borings will extend 10 feet deep and will be advanced with a truck-mounted drill rig equipped 
with hollow-stem augers.
x
Collect soil samples in the borings for laboratory testing and analysis. The boreholes will be 
backfilled with soil spoils and asphalt cold-patch material. Ninyo & Moore personnel will log the 
borings in general accordance with the Unified Soil Classification System and ASTM D2488 by 
observing cuttings. The soil samples will be transported to a Ninyo & Moore laboratory for testing.
x
Perform laboratory testing that will generally consist of moisture content and dry densities, 
gradation, Atterberg limits, and corrosivity (including pH, minimum electrical resistivity, soluble 
sulfate, soluble sulfides, and chloride contents) testing.
x
Prepare a Geotechnical Engineering that will contain the logs of the exploratory borings and 
results of the laboratory testing. The report will include a cover letter sealed by a Professional 
Engineer licensed in the State of Arizona. The report will include the following:
o
Description of work scope, laboratory, and field procedures;
o
Subsurface soil, rock (if encountered), and groundwater conditions;
o
Boring logs and laboratory test results;
o
General seismic characteristics;
o
Maps and boring plans;
o
Excavation characteristics of on-site soils;
o
Earthwork factors;
o
Potential for re-use of on-site soils;
o
Subgrade preparation measures;
o
Percolation test results;
o
Pavement sections; and
o
Corrosivity test results; including pH, minimum electrical resistivity, soluble sulfides, soluble 
sulfates, and chlorides.
EXHIBIT D

Ninyo & Moore   |   Varney Road Improvements, Dysart Road to El Mirage Road, El Mirage, Arizona   |   12PHX02-05198   |   May 28, 2024
ASSUMPTIONS 
We have made the following geotechnical engineering assumptions in the preparation of this 
proposal:
x
The pavement design does not need to follow Arizona Department of Transportation (ADOT) 
guidelines. 
x
Any environmental permits or reports need to gain access to the sites, will be obtained by others.
x
No off-duty Police Officer presence is needed during our field work.
x
Our field work will be done during normal, daylight hours.
x
The site is accessible to normal, two-wheel drive, truck-mounted drilling equipment, and site 
access will be granted.
x
One set (round) of review comments is anticipated.
SCHEDULE 
We can initiate this project immediately and could begin the field work in about four weeks after we 
receive right-of-entry. The anticipated field work should take about one week to finish, and the 
scheduled laboratory testing could be finished in about two weeks thereafter. After the laboratory 
work is done, the report can typically be finished in two weeks. Preliminary recommendations can 
typically be provided about two weeks after the field work is done.
FEE 
We propose to perform the work scope described above for a fee of $8,500 (Eight Thousand Five 
Hundred Dollars). Any additional services, not included in the aforementioned scope, will be charged 
on a time-and-materials basis in accordance with our current Schedule of Fees. If this proposal 
meets your expectations, please provide formal authorization in the form of a subconsultant 
agreement, purchase order, or work authorization form.
EXHIBIT D

Ninyo & Moore   |   Varney Road Improvements, Dysart Road to El Mirage Road, El Mirage, Arizona   |   12PHX02-05198   |   May 28, 2024
Ninyo & Moore appreciates the opportunity to provide services on this project and we look forward 
to working with you.
Respectfully submitted,
NINYO & MOORE
Steven D. Nowaczyk, PE
Managing Principal Engineer
SDN/tlp
EXHIBIT D

May 29, 2024
Randy Weyrauch, PE
NFra Inc.
77 E. Thomas Road, Suite 200
Phoenix, AZ 85012
602-443-6066
rweyrauch@nfrainc.us
SUBJECT: Varney Road Topography, El Mirage, Arizona
Dear Randy:
Rick is pleased to submit this proposal to provide professional surveying services for the above 
referenced property.
SCOPE OF WORK
Figure 1 - Survey Limits
EXHIBIT E

Page 2 of 8
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\2024\Mapping\NFRAINC_VarneyRd_ElMirageAZ.doc
TOPOGRAPHIC SURVEY FOR DESIGN
x
Location and elevation of existing surface utilities and improvements within Survey Limits 
(Including top of nut of water valves).
x
Full width cross sections of roadways at 50’ intervals within Survey Limits from right of 
way to right of way. Dysart Road, El Mirage Road and Side Street intersections shall be 
surveyed 100' North and/or South beyond Varney Road. Also include drive shots on south 
side of Varney Road beyond the right of way on each driveway so location of driveway can 
be determined.
x
Plot locations of underground utility lines per the record agency maps available at the time 
of the survey.
x
Contours will be provided at 1-foot intervals.
x
Survey Control – Horizontal coordinates shall be Arizona State Plane adjusted to ground 
and the vertical datum shall be NAVD 88 (unless otherwise directed)
x
Provide topographic base map in electronic format to be used for Civil Engineering Design.
TOPOGRAPHIC SURVEY FEE
Rick will provide the above services for a fee of $10,155.00. Any printing and miscellaneous processing 
fees are extra and not a part of this agreement.
*Fee does not include boundary survey or right of way calculations.
Allowance for 25 legal descriptions and exhibits for Temporary Construction Easements $12,500.00
TIMELINE
Rick will provide the above services in approximately 25-30 working days from notice to proceed and 
receipt of the title report.
EXHIBIT E

Page 3 of 8
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\2024\Mapping\NFRAINC_VarneyRd_ElMirageAZ.doc
PROPOSAL ASSUMPTIONS:
1.
Video or in-person meetings requested by the client shall be billed T&M beyond the fee noted above. 
2.
Any printing and miscellaneous municipal processing fees are extra and not a part of this agreement.
3.
This fee assumes there are no additional survey requirements other than what is stated above in this proposal. 
4.
Authorized overtime will be charged 1.5 times the rates shown on the attached rate sheet.
5.
A 15% fee for administration, coordination and handling will be added to all subcontracted services.
6.
Additional Legal Descriptions and Exhibits, if necessary, will be drafted at $700 per occurrence.
Client Initials_____
Sincerely,
Eric Sostrom, RLS 
Land Surveyor
Associate, Survey Manager
Ryan Hall,
Survey Manager
ACCEPTED THIS                                            DAY OF                                          , 2024
BY: ________________________________________________________________
                                                  CLIENT
Invoices for this project to be addressed to: 
 
Company:  _______________________________________________________________________ 
 
Address:  ________________________________________________________________________ 
 
City/State/Zip:  __________________________________________________________________ 
 
Telephone:  ___________________________________  Email:  ________________ ____________ 
 
Contact person:  __________________________________________________________________ 
 
Please complete, sign and return a copy to RICK 
EXHIBIT E
13th
June
NFra Inc.
RW
NFra Inc.
77 E. Thomas Road, Suite 200
Phoenix, Arizona 85012
602-443-6066
rweyrauch@nfrainc.us
Randy Weyrauch

Page 8 of 8
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\2024\Mapping\NFRAINC_VarneyRd_ElMirageAZ.doc
EXHIBIT E

9DUQH\5G,PSURYHPHQWV(/0LUDJH
2SSRUWXQLW\1DPH
23B9DUQH\5G,PSURYHPHQWV(/
0LUDJH
4XRWH1DPH




&OLHQWZLOOSURYLGHDYDLODEOHXWLOLW\ORFDWLRQLQIRUPDWLRQDVZHOODVSURMHFWGDWXPLQIRUPDWLRQWR6DIH6LWHWRDLG
LQIDFLOLWDWLQJWKLVSURMHFW
$³7HVW+ROH´ZLOOEHFRQVLGHUHGRQHH[FDYDWLRQXSWRIHHWGHHSZLWKODWHUDO³EHOOLQJ´RIXSWRDZLGWKRI
IHHW([FDYDWLQJLQH[FHVVRIIHHWLQGHSWKZLOOEHFRQVLGHUHGRXWRIVFRSH
7HVW+ROHVZLOOEHEDFNILOOHGSHURZQHUDJHQF\VSHFLILFDWLRQV
$VSKDOW RQ FRQFUHWH SDYHPHQW VXUIDFHV ZLOO EH UHVWRUHG SHU PHWKRG LQGLFDWHG LQ )HHV VHFWLRQ ,I ORFDO
DXWKRULW\UHTXLUHVDGLIIHUHQWUHVWRUDWLRQDQ\DGGLWLRQDOFRVWVZLOOEHSDVVHGRQWR&OLHQW7KHVHFKDUJHVLI
DSSOLFDEOHZLOOEHGHWHUPLQHGGXULQJWKHSHUPLWWLQJVWDJHDQGDQ\IHHFKDUJHZLOOEHSUHVHQWHGWR&OLHQW
&RULQJSDYHPHQWLQH[FHVVRIWKLFNQHVVZLOOUHVXOWLQDQDGGLWLRQDOIHHRISHUKROH






6DIH6LWHZLOOYHULI\PDUNLQJVDQGDVVHVVWKHVXFFHVVSUREDELOLW\RIWHVWKROHORFDWLRQVLQGLFDWHGE\FOLHQW
SULRUWRH[FDYDWLRQXWLOL]LQJYDULRXVJHRSK\VLFDOORFDWLQJPHDQV7HVWKROHORFDWLRQVPD\EHDGMXVWHGRU
HOLPLQDWHGEDVHGRQWKHUHVXOWVRIWKLVLQYHVWLJDWLRQDQGXSRQGLVFXVVLRQZLWKDQGDSSURYDORIFOLHQW
6DIH6LWHZLOOVXSSO\DYDFXXPH[FDYDWLRQFUHZRQWKHSURMHFWVLWHIRUGLJJLQJWHVWKROHVDQGGRFXPHQWLQJ
XWLOLW\ORFDWLRQV
8SRQH[SRVXUHRIDWDUJHWXWLOLW\6DIH6LWHZLOOUHFRUGXWLOLW\W\SHVL]HPDWHULDODQGGHSWKRIFRYHURIHDFK
,I/LQH,WHPFKDUJHVIRU6XUYH\DUHVKRZQLQ)HHV6HFWLRQWKHQ6DIH6LWHZLOOSURYLGHVXUYH\DQGD&$'PDS
ILOHE\D5HJLVWHUHG/DQG6XUYH\RUWRGRFXPHQWWKHORFDWLRQVDQGHOHYDWLRQVRISRWKROHGXWLOLWLHV,IQR/LQH
,WHPIRU6XUYH\LVVKRZQWKHQSULFLQJDVVXPHV6XUYH\DQG&$'ZLOOEHSURYLGHGE\RWKHUV
6DIH6LWHZLOOSURYLGHD7HVW+ROH6XPPDU\5HSRUWGHWDLOLQJWKLVLQIRUPDWLRQ
6DIH6LWHZLOOLQGLFDWHWKHORFDWLRQVRIH[SRVHGXWLOLWLHVE\PDUNLQJWKHJURXQGVXUIDFHXVLQJ3.QDLOVRUVWDNH
FKDVHUVQ\ORQEUXVKHV
9DUQH\5G'\VDUWWR(O0LUDJH(O0LUDJH$=

6LWH$GGUHVV
(7KRPDV5G
3KRHQL[$=
%LOOLQJ$GGUHVV
UZH\UDXFK#QIUDLQFXV
(PDLO

3KRQH
1)UD,QF
$FFRXQW1DPH
5DQG\:H\UDXFK
&RQWDFW1DPH
9DUQH\5G,PSURYHPHQWV(/0LUDJH
2SSRUWXQLW\1DPH

([SLUDWLRQ'DWH
23
2SSRUWXQLW\

4XRWH1XPEHU

&UHDWHG'DWH
/LFHQVHV$=52&1916&
(PDLO%LGV#VDIHVLWHOOFFRP

3KRQH
1UG'U
*OHQGDOH$UL]RQD
&RPSDQ\$GGUHVV
6DIH6LWH8WLOLW\6HUYLFHV//&
&XVWRPHU,QIRUPDWLRQ
:RUN6LWH,QIR
6FRSHRI:RUN
7HUPVDQG&RQGLWLRQV
EXHIBIT F

9DUQH\5G,PSURYHPHQWV(/0LUDJH
2SSRUWXQLW\1DPH
23B9DUQH\5G,PSURYHPHQWV(/
0LUDJH
4XRWH1DPH
7KLV$FFHSWDQFHEHFRPHVDSDUWRIWKH3URSRVDO/HWWHU
7KH3URSRVDOLVKHUHE\DFFHSWHGDFFRUGLQJWRWKH6FRSHRI:RUNDQG7HUPVDQG&RQGLWLRQVFRQWDLQHGWKHUHLQ6DIH
6LWH8WLOLW\6HUYLFHV//&LVDXWKRUL]HGWRSURFHHGZLWKWKHZRUNGHVFULEHGWKHUHLQ3D\PHQWZLOOEHPDGHDFFRUGLQJ
WRWKHSD\PHQWWHUPVVSHFLILHGLQWKH3URSRVDO$Q\XQSDLGEDODQFHUHPDLQLQJEH\RQGWKHGXHGDWHZLOOEHVXEMHFWWR
LQWHUHVWDWDQDQQXDOUDWHRISHUPRQWK

7RWDO3ULFH
b
7HVWKROHVRIGHSWKVLQH[FHVVRI
ZLOOUHVXOWLQDQDGGLWLRQDOFKDUJHRIHDFK'LJJLQJLQH[FHVVRIಬZLOOEH
FRQVLGHUHGRXWRIVFRSHDQGZLOOEHELOOHGDWSHUKRXU&OLHQWZLOOEHFRQWDFWHGIRUDSSURYDOEHIRUHZRUNFDQSURFHHG
$GGLWLRQDOXWLOLWLHVEH\RQGWDUJHWXWLOLW\IRXQGDQGGRFXPHQWHGLQDWHVWKROHZLOOEHFKDUJHGDWHDFK
&OLHQWZLOOSURYLGH&$'SURMHFWILOHVWKDWLQFOXGHKRUL]RQWDOGDWXPDQGYHUWLFDOFRQWUROLQIRUPDWLRQVRWKDWRXU5/6FDQ
HVWDEOLVKWKHFRUUHFWGDWXPFRQWUROZKHQVXUYH\LQJILHOGUHVXOWV,IQRWSURYLGHGSULRUWRRXUVXUYH\LQJZHZLOOHVWDEOLVKWKH
GDWXPFRQWUROWREHXVHGIRUWKHGHOLYHUDEOHV,IUHTXHVWHG6DIH6LWHFDQFRQYHUWWR&OLHQWಬVSURMHFWGDWXPDIWHU
GHOLYHUDEOHVDUHSURYLGHGIRUDIHHRI
$GGLWLRQDO7HUPV
$SSUR[8WLOLW\7HVW+ROHV3RWKROHVDORQJ9DUQH\5GEHWZHHQ'\VDUW	(O0LUDJHH[DFWORFDWLRQV7%'
0LQ)HHRI3RWKROHVLIZRUNFDQEHVFKHGXOHGFRQFXUUHQWO\ZLWKVW$YHSURMHFW23
$GGLWLRQDO3RWKROHVEH\RQGZLOOEHELOOHGDWHDFKSOXVDVSKDOWUHLQVWDWHPHQWLIUHTXLUHG
'HVFULSWLRQ








3ULFLQJDVVXPHVWHVWKROHORFDWLRQVDUHDFFHVVLEOHZLWKLQ¶ZLWKYDFXXPWUXFN)XUWKHUGLVWDQFHVVXFKDV
UHDURIORWVZLOOEHFRQVLGHUHGRXWRIVFRSHDQGDGGLWLRQDOIHHVZLOOEHSUHVHQWHGWR&OLHQWIRUDSSURYDO
6KRXOGFDOLFKHWUHHURRWVFRQFUHWHURFNVLQH[FHVVRI´GLDPHWHURURWKHUPDWHULDOVHQFXPEHUYDFXXP
H[FDYDWLRQZRUNZLOOEHKDOWHGIRUWKDWWHVWKROHDQGUHIHUUHGEDFNWR&OLHQWIRUDOWHUQDWLYHVROXWLRQVZKLFKPD\
LQFOXGHDXWKRUL]DWLRQWRFRQWLQXHZRUNDW+RXUO\5DWH
7UDIILFFRQWUROFRVWVDUHLQFOXGHGZKHUHDSSOLFDEOH
([SHFWHG3HUPLWWLQJ%RQGLQJFRVWVLIDQ\KDYHEHHQLQFOXGHGLQWKLVSURSRVDO$Q\RXWRIRUGLQDU\FRVWV
LQFXUUHG GXH WR JRYHUQLQJ DJHQF\ UHTXLUHPHQWV ZLOO EH SUHVHQWHG WR &OLHQW IRU DSSURYDO DV DGGLWLRQDO IHH
DPRXQW
,I H[FDYDWLRQ VSRLOV DUH GHWHUPLQHG WR EH SRWHQWLDOO\ KD]DUGRXV ZDVWH E\ DQ HQIRUFHPHQW DJHQF\ KDYLQJ
MXULVGLFWLRQWKHQWKHFRVWRIWHVWLQJDQGGLVSRVDOZLOOEHSDVVHGWKURXJKWRFOLHQW:RUNZLOOFHDVHXQWLO&OLHQW
KDVEHHQQRWLILHGDQGDJUHHPHQWRQKRZWRSURFHHGKDVEHHQUHDFKHG
6DIH6LWHZLOOH[HUFLVHGXHGLOLJHQFHLQLGHQWLI\LQJDQGORFDWLQJDOOXWLOLWLHV+RZHYHUGXHWRIDFWRUVEH\RQGRXU
FRQWUROLQFOXGLQJODFNRIPDSVLQDFFXUDF\RIPDSVODFNRIDERYHJURXQGLQGLFDWLRQVRIXWLOLWLHVWKHSUHVHQFH
RIXQNQRZQDQGQRQHOHFWURPDJQHWLFDOO\FRQGXFWLYHXWLOLWLHVDQGVRLOFRQGLWLRQVEHLQJQRQFRQGXFLYHWR*35
VFDQV6DIH6LWHFDQQRWJXDUDQWHHWKDWDOOXWLOLWLHVZLOOEHIRXQG
3D\PHQWWHUPVDUH1HWGD\VXQOHVVRWKHUDUUDQJHPHQWVKDYHEHHQPDGH
1HZ&XVWRPHU3ROLF\3D\PHQWZLOOEHUHTXLUHGE\FUHGLWFDUGIRUWKHILUVWMREFRPSOHWHGRULIWKHMRELVRYHU
ZHZLOOUHTXLUHDUHWDLQHUWREHSDLGSULRUWRFRPPHQFHPHQWRIZRUN:HSUHIHUSD\PHQWLVPDGH
YLD$&+:LUH7UDQVIHURWKHUZLVHFUHGLWFDUGWUDQVDFWLRQVZRXOGUHTXLUHDQDGGLWLRQDO)HH$IWHUWKHILUVW
MREFRPSOHWHGLQYRLFLQJWHUPVZLOOEHVWDQGDUG1HW'D\V
6LWH6SHFLILF'HWDLOV
3URMHFW)HH
3URGXFW
/LQH,WHP'HVFULSWLRQ
6DOHV3ULFH
4XDQWLW\
7RWDO3ULFH
([FDYDWLQJ7HVW+ROHVXSWR
LQ'HSWK
3HU3RWKROH+ROH0LQLPXP)HH



$QFLOODU\&RVWV3HUPLWWLQJ7UDIILF&RQWURO%DFNILOO(WF
b



6XUYH\	6WDPSHG5HSRUW
b



$&6XUIDFH5HVWRUDWLRQ&RUH	5HLQVWDWH
3HU&RUH	5HLQVWDWH0LQ)HHRI



$&&(37$1&(67$7(0(17$1'$87+25,=$7,2172352&(('
EXHIBIT F

9DUQH\5G,PSURYHPHQWV(/0LUDJH
2SSRUWXQLW\1DPH
23B9DUQH\5G,PSURYHPHQWV(/
0LUDJH
4XRWH1DPH
)RUDFFHSWDQFHDQGVFKHGXOLQJRIWKHVHVHUYLFHVSOHDVHVLJQVFDQDQGUHWXUQWKLVSDJHWRELGV#VDIHVLWHOOFFRPRU
ID[WR6DIH6LWH#
1)UD,QF

9LFH3UHVLGHQW
5DQGDO:H\UDXFK
EXHIBIT F

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
INSR
ADDL SUBR
LTR
INSD WVD
PRODUCER
CONTACT
NAME:
FAX
PHONE
(A/C, No):
(A/C, No, Ext):
E-MAIL
ADDRESS:
INSURER A :
INSURED
INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER
POLICY EFF
POLICY EXP
TYPE OF INSURANCE
LIMITS
(MM/DD/YYYY)
(MM/DD/YYYY)
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES  (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE
$
DAMAGE TO RENTED
CLAIMS-MADE
OCCUR
$
PREMISES (Ea occurrence)
MED EXP (Any one person)
$
PERSONAL & ADV INJURY
$
GEN'L AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE
$
PRO-
POLICY
LOC
PRODUCTS - COMP/OP AGG
JECT 
OTHER:
$
COMBINED SINGLE LIMIT
$
(Ea accident)
ANY AUTO
BODILY INJURY (Per person)
$
OWNED
SCHEDULED
BODILY INJURY (Per accident)
$
AUTOS ONLY
AUTOS
HIRED
NON-OWNED
PROPERTY DAMAGE
$
AUTOS ONLY
AUTOS ONLY
(Per accident)
$
OCCUR
EACH OCCURRENCE
CLAIMS-MADE
AGGREGATE
$
DED
RETENTION $
PER
OTH-
STATUTE
ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMIT
DESCRIPTION OF OPERATIONS below
INSURER(S) AFFORDING COVERAGE
NAIC #
COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE
EXPIRATION
DATE
THEREOF,
NOTICE
WILL
BE
DELIVERED
IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW.
THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES
CERTIFICATE NUMBER:
REVISION NUMBER:
CERTIFICATE HOLDER
CANCELLATION
© 1988-2015 ACORD CORPORATION.  All rights reserved.
ACORD 25 (2016/03)
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
NFRAI-1
OP ID: AB
09/20/2023
Teresa Alvarado
Stuckey Ins & Assoc Agencies
2850 E Camelback Rd, Suite 325
Phoenix, AZ 85016
Mary Lodwick
602-264-5533
602-279-9336
teresa.alvarado@stuckeyinsurance.com
Hartford Casualty Insurance Co
Twin City Fire Ins Co
NFra Inc
77 E Thomas Rd. #200
Phoenix, AZ 85012
Hartford Fire Ins Co
A
X
2,000,000
X
X
84SBWBV6109
09/01/2023 09/01/2024
300,000
10,000
2,000,000
4,000,000
X
4,000,000
2,000,000
A
84SBWBV6109
09/01/2023 09/01/2024
X
X
X
X
1,000,000
A
84SBWBV6109
09/01/2023 09/01/2024
1,000,000
10000
X
X
B
84WEGNQ7012
09/01/2023 09/01/2024
1,000,000
N
1,000,000
1,000,000
C
59OH0394142-23
09/01/2023 09/01/2024 Per Claim
2,000,000
Aggregate
2,000,000
Professional Liability - Claims Made - Retro date Full prior acts
Re: Project: ELM-2020-DA-001; Varney Raod Pedestrian and Bicycle
Improvements
City of El Mirage is named as additional insureds as respects to general
liability.
CZELM-2
City of El Mirage
10000 N. El Mirage Road
El Mirage, AZ 85335
602-264-5533
29424
29459
19682
Professional Liab