Location & Site Photos
Extracted text (via pymupdf)
1377 characters
DRAWN BY: REVIEWED BY: NO. 1 2 EL MIRAGE, ARIZONA DATE REVISION 1ST AVE & VENTURA ST WATER MAIN REPLACEMENT - PROJECT LOCATION 09-26-2024 J.HIEBERT SCALE: 1"=100' File Path:I:\Capital Improvement Projects\24-25 CIP\CDBG\1st Avenue & Ventura Street Water Main Replacement\Project Location Exhibit.dwg VENTURA ST 2ND AVE 1ST AVE EL MIRAGE RD EX. 4" AND 6" ACP WATER MAINS TO BE REPLACED WITH 8" DIP MAIN (818 LF TOTAL) EX. WATER SERVICE LINES TO BE REPLACED WITH 1" AND 2" MUNICIPEX LINES (9 TOTAL) EX. 6" ACP WATER MAIN TO BE REPLACED WITH 8" DIP MAIN (818 LF TOTAL) DRAWN BY: REVIEWED BY: NO. 1 2 EL MIRAGE, ARIZONA DATE REVISION 1ST AVE & VENTURA ST WATER MAIN REPLACEMENT - SITE PHOTOS 10-01-2024 T.WESSEL SCALE: 1"=100' File Path:I:\Capital Improvement Projects\24-25 CIP\CDBG\1st Avenue & Ventura Street Water Main Replacement\Project Location Exhibit.dwg Photo 1 - 1st Avenue at Ventura Street (Looking South) Photo 2 - 1st Avenue at the Cul-De-Sac (Looking North) DRAWN BY: REVIEWED BY: NO. 1 2 EL MIRAGE, ARIZONA DATE REVISION 1ST AVE & VENTURA ST WATER MAIN REPLACEMENT - SITE PHOTOS 10-01-2024 T.WESSEL SCALE: 1"=100' File Path:I:\Capital Improvement Projects\24-25 CIP\CDBG\1st Avenue & Ventura Street Water Main Replacement\Project Location Exhibit.dwg Photo 3 - Ventura Street at El Mirage Road (Looking West) Photo 4 - Ventura Street at 1st Avenue (Looking East)