250016-CONTRACT ROSENDIN ELECTRIC.PDF

Maricopa County — Formal (2025-03-06)

View PDF Item 53 Meeting page

Extracted text (via ocr_local) 45908 characters
Docusign Envelope ID: AASBEAEF-453A-42C0-9F 19-A299564D6B79

Coe

\Ee 53 |

Co av.

JOB ORDER CONTRACTOR (JOC) CONTRACT

MARICOPA COUNTY, ARIZONA

Electrical Job Order Contract for Parks and Recreation

Office of Procurement Services

Serial # 250016-JOC
Contract # 250016-JOC
C-70-

Project # N/A

Parks & Recreation Department, Maricopa County Arizona

Docusign Envelope ID: AASB6AEF-453A-42C0-9F 19-A299564D6B79

Division 0 - Bidding & Contract Requirements

Section Description Number of Pages
00005 Table of Contents ......ccccccccccsssesssseseesecseeessesssseesccseasassssssassesseseeseseeesarsnesenaseeeees 1
00500 Construction Contract. 4
00610 Payment Bond and Performance Bond.. 3
00700 General Conditions Table of Contents .. 6
00700 General Conditions to the Construction Contract 43
Exhibit A — Definitions to the General Conditions . 3
Exhibit B — Alternate Dispute Resolution a)
Exhibit C — Legal Worker Certification .....cccssecsessssecsseeeseeseeseseeseeneenenenteneenes 1
Exhibit D — Request for Proposal for Task Order 1
Exhibit E — Performance Bond and Payment Bond Forms... we 2
Exhibit F — SBE Reporting Document .........secesssseeeseeseneseceesesceseteneneneenenents 1

Exhibit G — Request for Qualifications dated 11/14/24...
Exhibit H — Statement of Qualifications dated 11/14/24...
Exhibit I — Certificate of Insurance for Job Order Contract .......sccseseeeeeeeees 2
Exhibit J — General Requirements for the Job Order Contracts ........eeeeenes

All of the exhibits above are incorporated by reference as though fully set forth herein whether or not
physically attached to this contract.

NOTE: All references to “JOC” in this document are understood to mean the electrical JOC.

END OF SECTION

Docusign Envelope ID: AAQBGAEF-453A-42C0-9F 19-A299564D6B79

SECTION 00500

JOB ORDER CONTRACT

A. EFFECTIVE DATE:

This CONTRACT is entered into by and between the Owner and the Job Order Contractor as
Contract No. 250016-JOC, and shall be effective as of April 23, 2025.

B. OWNER:
MARICOPA COUNTY
c/o Parks and Recreation Department
41835 N. Castle Hot Springs Rd
Morristown, Arizona 85342

Cc. JOB ORDER CONTRACTOR:

Rosendin Electric, Inc.

1375 W. Drivers Wa

Tempe, Arizona 85284

Office: (480) 581-4100; Fax: (480) 921-4144; E-Mail: (Ibreul@rosendin.com).

D. RECITALS:

The scope of work and specifications for a broad range of services will be identified in individual
Task Orders which will be issued by the Owner from time to time. See EXHIBIT D hereto.

NOW THEREFORE, intending to be legally bound and for valuable consideration, the receipt and
sufficiency of which are acknowledged, the Owner and Job Order Contractor agree as follows:

E. AGREEMENT:
Article I. THE CONTRACT

11 The Task Order and other Contract Documents explained in Section 7.1 below and the
definitions which are contained Section 00700, Exhibit A, govern this Job Order Contract.

Article IL. THE WORK

21 The Job Order Contractor shall execute the entire Work described by each Task Order,
including work which is reasonably inferable and necessary to produce the results intended by
the Contract and the Task Order.

Article III. CONTRACT TIME

3.1 The Job Order Contractor shall have access to the area of the Work effective from the date of
the Notice to Proceed for the assigned Task and shall achieve Substantial Completion and Final
Completion of the Work no later than the performance period specified in each Task Order
issued. The length of this Contract for services will be for a period of three (3) years with two
one-year options to extend the contract, but in no event will this Contract’s Term continue
longer than five (5) years from the date of the Contract. The term of this Contract shall not be
extended. All Work issued hereunder must be completed in full by the final expiration date of
this Contract. Extensions to this Contract for years 4 and 5 may only be made by an amendment
signed by both parties. A permission to complete a Task Order that extends into Year 4 or
Year 5 does not extend the Contract in its entirety for the additional year.

3.2 The Job Order Contractor shall achieve Substantial Completion of the Work (as defined in
Section 00700, Article 9.8 herein, and evidenced by a Certificate of Substantial Completion)
not later than as specified in each Task Order.

3.3 The Job Order Contractor shall achieve (as defined in Section 00700, Article 9.9 herein, and
evidenced by a Certificate of Final Completion) no later than as specified in each Task Order.

Docusign Envelope ID: AASBGAEF-453A-42C0-9F 19-A299564D6B79

Article IV. CONTRACT SUM

4.1

4.2

43

Article V.
5.1

Article VI.
6.1

The Owner shall pay the Job Order Contractor in current funds for the Job Order Contractor’s
performance of individual Task Orders in an aggregate amount not to exceed Fifteen Million

ollars ($15,000,000.00) in total, and not to exceed Five Million Dollars ($5,000,000.00) per
Fiscal Year, which Fiscal Year shall be designated by the Owner as beginning on July Ist and
ending on June 30th of the next calendar year. The single maximum value of a task issued
shall not exceed $2,000,000.00. The Owner does not guarantee a minimum Contract Sum
under this Contract, and Job Order Contractor, in accepting this Contract, does not expect a
minimum Contract Sum. Payments will be made in accordance with the sum negotiated for
each specific Task Order.

Maricopa County, at its sole discretion, may require the Job Order Contractor to purchase from
aspecified or designated County supplier (le. Home Depot) any and/or all available materials
applied or installed by the Job Order Contractor or its subcontractors for a Task Order. The
materials purchased by the Job Order Contractor(s), or its subcontractor(s), shall be purchased
by the Job Order Contractor(s), or its subcontractor’s, using their own funds and/or credit. Any
discounts offered to the JO 2, the County’s material supplier shall be passed through to the
County without markup. The County is not a party to these transactions and any issue/disputes
shall be resolved without the involvement of the County.

FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION COSTS UP TO $250,000.00

Overhead must be all inclusive and include all “costs of doing business”. The County will not
pay separately for items such as, but not limited to warranty, project closeout, home office
expense, personal safety equipment, safety personnel, unless safety personnel is specifically
required for the Work being performed and approved by the Owner. The Job Order Contractor
agrees the overhead shall be no more than 8% and the fee shall be capped at 5%.

FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION OVER $250,000.00

Overhead must be all inclusive and include all “costs of doing business”. The County will not
pay separately for items such as, but not limited to warranty, project closeout, home office
expense, personal safety equipment, safety personnel, unless safety personnel is specifically
required for the Work being performed and approved by the Owner. Overhead cost and
percentages in addition to Job Order Contractor fee(s) shall be negotiated between the Job
Order Contractor and the County for any projects exceeding $250,000.00.

PROGRESS PAYMENTS

Progress payments will be made in accordance with Article 9 of the General Conditions to the
Job Order Contract.

FINAL PAYMENT

Final Payment will be made in accordance with Article 9 of the General Conditions to the Job
Order Contract.

Article VII. CONTRACT DOCUMENTS

71

The Contract consists of the following documents incorporated herein by this reference:

7.1.1 The Job Order Contract ~ Section 00500.
7.1.2 The General Conditions to the Job Order Contract — Section 00700.

7.1.3 Permits, Change Orders, Change Directives, amendments or modifications to the Contract.

7.1.4 Any and all documents issued during the procurement process for this Contract.

7.1.5 Task Order documents including, but not limited to, Task Orders, associated plans and

specifications.

Docusign Envelope ID: AASBGEAEF-453A-42C0-9F 19-A299564D6B79

7.1.6
TAT

7.1.8

71.9

Any addenda to any issued Task Orders or other Contract documents.
Exhibits to Section 00700:

Exhibit A — Definitions to the General Conditions

Exhibit B — Alternate Dispute Resolution

Exhibit C — Legal Worker Certification

Exhibit D — Request for Proposal for Task Order

Exhibit E ~ Performance Bond and Payment Bond Forms
Exhibit F - SBE Reporting Document

Exhibit G — Request for Qualifications dated 10/24/24
Exhibit H — Statement of Qualifications dated 10/24/24 __
Exhibit I — Certificate of Insurance for Job Order Contract.
Exhibit J — General Requirements for the Job Order Contracts

All of the exhibits listed above are incorporated by reference as though fully set forth,
whether or not they are physically attached to this Contract.

All amendments to this Contract shall be in writing and approved/signed by both parties.
Maricopa County Office of Procurement Services shall be responsible for approving all
amendments for Maricopa County.

UNIFORM ADMINISTRATIVE REQUIREMENTS:

When applicable and by entering into this Contract the Contractor agrees to comply with
all applicable provisions of Title 2, Subtitle A, Chapter II, PART 200—UNIFORM
ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT
REQUIREMENTS FOR FEDERAL AWARDS contained in Title 2 C.F.R. § 200 et seq.

Docusign Envelope ID: AASB6AEF-453A-42C0-9F 19-A299564D6B79

IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first
above written, in counterparts, each of which shall, without proof or accounting for the other counterparts,
be deemed an original contract.

Electrical Job Order Contract

250007-JOC
DocuSigned by:
[Post Degrassi February 13, 2025
Principal (Signature) Date
Paolo Degrassi 94-1242813
Printed Name Federal Tax Identification Number
President 142881 A, B, C-10 & C7
Title License Number
Net 14 Days 90924
Vendor Terms NIGP Commodity Code (Advantage)

COUNTY OF MARICOPA, ARIZONA

RECOMMENDED BY: ACCEPTED AND APPROVED:
Department Head Date Chairman, Board of Supervisors Date
ATTEST:
Clerk of the Board Date
LEGAL REVIEW

Approved as to form and within the powers and
authority granted under the laws of the State of
Arizona to Maricopa County.

By:

Deputy County Attorney

Date:

Parks and Recreation
MARICOPA COUNTY, ARIZONA

250016-JOC
ELECTRICAL JOB ORDER CONTRACT FOR PARKS AND RECREATION

SERIAL # 250016-JOC
CONTRACT NO. 250016-JOC
COMPANY NAME: Rosendin Electric

Please fill out the following rate chart with the hourly rates that match the staff classification
description. Rates shall be provided EXCLUSIVE of Overhead and Profit. Please utilize these staff
classifications and do not add or modify any classifications.

STAFF CLASSIFICATION BILLING HOURLY RATE
Project Manager $103.00
General Foreman $ 70.61
Journeyman $ 59.52
Apprentice $ 56.21
Laborer $ 35.27

Markups for quoted work is limited to the following overhead and profit percentages:

Overhead — 8%
Profit - 5%

DATE (MMIDDIYYYY)

@
ACORD CERTIFICATE OF LIABILITY INSURANCE =u

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER ap \ EPI NAME’ Certificates Department

1D 44394] artners Insurance Centers (EPIC) [San Ramon - Branch PHONE», 925-244-7700 FAX vo: 925-901-0671

P. O. Box 5003 EMAL 5, EPICcerts@epicbrokers.com

Lic#0B29370 INSURER(S) AFFORDING COVERAGE NAIC #

San Ramon CA 94583 INSURER A: Zurich American Insurance Company 16535

INSURED . ROSEHOL| supers: American Guarantee & Liability Ins Co 26247

Rosendin Holdings, Inc. -

P.O. Box 49070 INSURER C: The Continental Insurance Company 35289

San Jose, CA 95161 INSURER D: American Zurich Insurance Company 40142
INSURERE: Steadfast Insurance Company 26387
INSURER F

COVERAGES CERTIFICATE NUMBER: 84688285. REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR |ADDL|SUBR| Pi F POLIC’
ee ‘TYPE OF INSURANCE WD POLICY NUMBER (mQDoW THD | MMO TT) LIMITS
A | X | COMMERCIAL GENERAL LIABILITY Y | Y | GLO432985401 41112024 41112025 | EACH OCCURRENCE. $5,000,000
| DAMAGE TO RENTED
CLAIMS-MADE OccUR PREMISES (Ea occurrence) __| $300,000
| | MED EXP (Any one person) $10,000
|__| PERSONAL & ADV INJURY _| $5,000,000
GENL AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $10,000,000
poucy |X] 58% [__] toc PRODUCTS - COMPIOP AGG | $ 10,000,000
OTHER: s
A | AUTOMOBILE LIABILITY Y | ¥ | BAP432985301 4mi2024 | 4/4/2025 | GOMBINEDSINGLELIMIT’ | $5,000,000
X | ANY AUTO BODILY INJURY (Per person) | $
[| OWNED SCHEDULED i
L | ONLY [| scuse BODILY INJURY (Per accident) $
X | HIRED X | NON-OWNED PROPERTY DAMAGE $
| % | AUTOS ONLY AUTOS ONLY | (Per accident)
X _| Happ $1K DED. $
B UMBRELLALIAB =| X | occur Y | Y | Sxs495630301 4/1/2024 41112025 | EACH OCCURRENCE $10,000,000
X | EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000
veo | X [ ReTENTIONS 9 $
D. [WORKERS COMPENSATION Y 4 PER OTH-
WORKERS COMPENSATION vi WC432985501 4/1/2024 yi2025 |X [EER re | [OR
ANYPROPRIETOR/PARTNERYEXECUTIVE E.L. EACH ACCIDENT $1,000,000
OFFICER/MEMBEREXCLUDED? NIA
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEE] $ 1,000,000
ifyas, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT | $ 1,000,000
C | 2nd Layer Excess 6080468836 41112024 41112025 | Per OcolAga $15,000,000
E | ProfiPoll wiMold, £0C442427601 41112024 4/1/2025 | $100,000 SIR $12,000,000 Ec/Agg
A | Contractors Equipment CPP446481301 41/2024 | 4/1/2025 | $80,000 Ded $18,434,898

DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space Is required)
Rented/Leased Equipment:

Carrier: Zurich American Insurance Company - NAIC: 16535

Policy: CPP446481301

Policy Term: 04/01/2024 - 04/01/2025

Limits: $5,250,000 Per One Item / Deductible: $50,000 Per Occurrence

See Attached...

CERTIFICATE HOLDER CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.

Maricopa County Office of Procurement Services

320 West Lincoln Street AUTHORIZED REPRESENTATIVE

Phoenix AZ 85003 2

© 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD

RJROSENDIN

STATEMENT OF QUALIFICATIONS FOR
JOB ORDER CONTRACTOR

SERIAL #250016-JOC
CONTRACT #250016-JOC —

Due Date: THURSDAY, NOVEMBER 14, 2024
Due Time: 2:00PM, PHOENIX TIME (M.S.T.)

NOTICE OF CONFIDENTIALITY: The information provided may be privileged, confidential and protected from disclosure. If the reader is not the intended recipient, or an employee or agent responsible for
delivering this content to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. lf you have received this information in error
please notify us immediately.

1375 W Drivers Way

RR OSENDIN 75 W Drivers Way

T: 480.581.4100
F: 480.921.4144
www.rosendin.com

AZ LICENSE #ROC034937R-11, ROC105241C-11, LEAD. INSPIRE. BUILD.

ROC111444A-17, ROC158637B-1, ROC158638A
November 14, 2024

Mr. Paul Shamrock
160 S. 4th Avenue
Phoenix, AZ 85003

Statement of Qualifications - Serial# 250016-JOC - Electrical Job Order Contractor For Parks and Recreation

Mr. Shamrock and Members of the Selection Committee:

On behalf of Rosendin it is my pleasure to present our qualifications for consideration and selection as part of the
Maricopa County Job Order Contracting program. Rosendin has the program management team experience to
manage all facets of the work; we have direct experience constructing electrical installations and modifications at
a number of County facilities, with service continuing to the present. Our capabilities include complete electrical
services, providing an extraordinary level of service to Maricopa County, with a commitment to complete all Task
Orders safely, on-time and on-budget.

Rosendin is a 100% Employee Owned Corporation, with 105 years of experience in the electrical industry; we
have operated continuously in Arizona since 1994. As a single source we can assist directly with design, or we can
work with the City's representatives to commence pre-construction and construction activities in tandem, greatly
increasing the success of meeting any demanding schedule. Rosendin offers proven experience in integrating
construction expertise, safety, estimating and engineering into our projects. Since we are a 100% employee
owned Corporation, we are quality-driven and each of us has an important stake in what is delivered to our
customers.

| will serve as the Program Manager/ Senior Project Manager and Single Point-of-Contact, directing our team
from initial scoping through close-out and warranty for each task order. This assures the County a continuity of
service from Rosendin that is a critical factor of a successful Job Order Contract program. My responsibilities will
include the effective administration of the contract; direct contact information is provided below.

Our project management team offers the County unsurpassed experience in managing both the design and
construction phase of electrical projects of any size. They are prepared to work with the County's staff and
consultants to clearly define the scope of work for each task order, developing accurate estimates and schedules,
secure longlead equipment and provide the resources necessary to complete the work.

Rosendin‘s project team is supported as needed by our leading-edge Building Information Modeling (BIM) group
and in-house prefabrication shop. Rosendin's capabilities allow us to take on challenging projects in environments
ranging from municipal and commercial buildings, datacenters, hospitals, aviation, education, and sports and
entertainment facilities, including projects with a focus on renewable resources.

| thank you for your consideration. Our team is looking forward to providing continuing Job Order Contracting
services to Maricopa County, and to hold in-depth discussion of your program needs and how we can serve
them. For program questions or additional information please do not hesitate to contact me at the numbers
listed below.

Sincerely,

Lounrennce Breub

Lawrence Breul

Program Manager

Phone: (602)722-5001
E-mail: lbreul@rosendin.com

ROSENDIN SOQ - Serial #250016 - JOC | November 14, 2024 Rar OSENDIN

QUALIFICATIONS | Prior Experience

Prior Experience

Rosendin Electric is an experienced provider of JOC and On-call construction and maintenance of
electrical systems services, with resources that are scalable to the scope of the project or task order.
The Project Team selected to manage the Maricopa County Electrical Job Order Contractor for Parks
and Recreation is based out of our Tempe office, and is familiar with the demands for efficiency and

cost effective management strategy required for a successful partnership under such programs.

Relevant reference projects or JOC programs are provided for review. The programs and
projects presented are illustrative of our broad industry and JOC Program experience.

Rosendin’s Unique Qualifications:
« Safety - nationally recognized program

= Scalable labor resources to fit the project scope
® Available In-house Electrical Engineering (AZ RPE’s)

* Industry-leading Building Information Modelling (BIM) resources

JOC Program Description: Rosendin holds a
current contract with the Maricopa County
Facilities District. Scope includes both on-call
electrical and general electrical consulting
services. Task orders under this JOC have
included general upgrades and retrofits to
existing facilities, tenant improvement projects,
and design-build services. Projects included Parks
and Recreation locations, service upgrades to
the 9-1-1 Call Center (while operational), several
general power and lighting projects, and UPS
backup systems for the Maricopa County Courts.

Average Number Of Projects Annually:
20+ (est.)

Same Team Members: Larry Breul (Program
Manager); Tony DeVito (Project / Task Order
Manager); Jay Randall (Superintendent);
Candace McConnell (Project Executive);
Suzanne Saulnier (Project Manager)

Service Provided: JOC Contractor, Electrical
design and construction

ROSENDIN SOQ - Serial #250016 - JOC | November 14, 2024

1 Maricopa County Facilities District - Electrical Job Order
Contractor Serial #200037-JOC (active JOC program)

Design Phase Cost Estimating Experience:
Provided both formal and informal design
phase estimating, dependent on the project
scope; milestone conceptual estimating during
design development provided as required

Design Phase Constructability Reviews:

Formal reviews provided when scope and
budget appropriate; Job walk review with County
project and facility managers for all projects;
Benefits achieved: Budget appropriate review
efforts, accompanied by clear definition of
scope, yielded efficient and safe construction
while saving the County money and/or time

Client References: See attachments Maricopa
County Facilities District; Eric Barcon; 602.372.171

Similar Project Features:
» JOC Program - Electrical Services
= Public Spaces, Government
Offices & Secure Facilities
« Backup Power (UPS Systems)

R ROSENDIN

1] Prior Experience

JOC Program Description: Rosendin provides
JOC-class electrical services for the Salt River
Pima-Maricopa Indian Community. We are
responsible for all on-call electrical services,
including electrical engineering and general
electrical consulting needs. Construction
activity under the contract has included general
upgrades to public facilities, retrofits to existing
facilities, tenant improvement projects, and
design build projects. These projects included
community park lighting upgrades, the
Nation's President / Vice President Office TI
upgrade, the Social Services Building, and the
Healthcare Facility Office tenant improvements.

Average Number Of Projects Annually: 20

Completed During Budget Year:
Dependent on PO release

Average Cost of Projects: $900,000 (est.)

Same Team Members: Tony DeVito

(Project / Task Order Manager); Jay Randall
(Superintendent); Candace McConnell (Project
Executive); Suzanne Saulnier (Project Manager)

4 | ROSENDIN SOQ - Serial #250016 - JOC | November 14, 2024

2 Salt River Pima-Maricopa Indian Community (SRPMIC) - On-Call
Electrical Services (JOC) (Active)

Service Provided: On-call / JOC electrical
design and construction contractor

Design Phase Cost Estimating Experience:
Rosendin provides both complete (formal and
informal) design phase estimating, dependent on
the project scope; milestone conceptual estimating
during design development provided if required

Design Phase Constructability Reviews: Formal
reviews provided when scope and budget
appropriate; Typically job walk review with
project and facility managers for all projects;
Benefits achieved: Budget appropriate review
efforts, accompanied by clear definition of scope,
yielded efficient and safe construction while
saving the Community money and/ or time

Client References: See attachments

Similar Project Features:

» On-call JOC) Services

+ General Building / Tenant Improvements

« Sports Fields

« Design Services (as needed)

» Ongoing Critical Operations service (data center)

RROSENDIN

1| Prior Experience

JOC Program Description: Rosendin provides
both on-call and task order electrical services
for a global-class retail home delivery
corporation at multiple locations in the Phoenix
Metropolitan area. Scope includes general
tenant improvements, automated warehouse
system maintenance and installations, energy
efficient lighting retrofits, and general

electrical systems maintenance and repair.

Average Number Of Projects Annually: 20+
Completed During Budget Year: N/A
Average Cost of Projects: $15,000 (est.)

Same Team Members: Jay Randall
(Superintendent); Candace McConnell (Project
Executive); Suzanne Saulnier (Project Manager),
Tony DeVito (Project / Task Order Manager)

Service Provided: Electrical Contractor;
Electrical services

JOC Program Description: Rosendin has provided
both on-call and task order electrical services for
this global retail corporation for the last two years.
Scope includes general tenant improvements,
automated warehouse system maintenance and
installations, energy efficient lighting retrofits, and
general electrical systems maintenance and repair.

Average Number Of Projects Annually:
$250K-800K Annually

Completed During Budget Year: N/A
Average Cost of Projects: $1K-$50K (est.)

Same Team Members: Larry Breul (Program
Manager); Jay Randall (Superintendent),
Candace McConnell (Project Executive);
Suzanne Saulnier (Project Manager)

OSENDIN SOQ - Serial #250016 - JOC | November 14, 2024

3 TJX / Marshalls, Various Locations -

On-Call Electrical Services

Design Phase Cost Estimating Experience:
Rosendin provides initial cost estimates based
on job walks and discussion of customer
needs for smaller projects; for larger scopes
design document review and site visits are
used to determing budget and schedule.

Design Phase Constructability Reviews:
Discussion between Rosendin Project Manager and
Superintendent, along with any design consultant
and the facilty manager, determines best approach
to achieve NEC compliance and optimal work
sequencing; Benefits Achieved: Minimal disruption
to operations and no un-planned shutdowns

Client References: Confidential Client

Rosendin has selected this project to emphasize
both our available resources and the commercial
sector clients we work with. The fulfilment center
locations are operational 24/7/365 and Rosendin
provides skilled management and labor to
prevent and minimize disruption to services.

4 FUNKO, Buckeye, AZ - On-Call Electrical Services

Service Provided: Electrical Contractor;
Electrical services

Design Phase Cost Estimating Experience:
Rosendin provides initial cost estimates based
on job walks and discussion of customer
needs for smaller projects; for larger scopes
design document review and site visits are
used to determing budget and schedule.

Design Phase Constructability Reviews:
Discussion between Rosendin Project Manager and
Superintendent, along with any design consultant
and the facilty manager, determines best approach
to achieve NEC compliance and optimal work
sequencing; Benefits Achieved: Minimal disruption
to operations and no un-planned shutdowns

Client References: Roger Freeman — Facility Manager
(623) 203-6472 roger.freeman@funko.com

RGROSENDIN

1| Prior Experience

JOC Program Description: Rosendin
provides electrical services including design
build facility improvements, electrical
infrastructure diagnostic assistance, etc.)

Average Number Of Projects
Annually: $250K — $2M Annually

Completed During Budget Year: N/A
Average Cost of Projects: $5K-$800K (est.)

Same Team Members: Larry Breul (Program
Manager); Jay Randall (Superintendent);
Candace McConnell (Project Executive);
Suzanne Saulnier (Project Manager)

Service Provided: Electrical Contractor;
Electrical services

Owner High-Priority Areas of Interest:

5 Confidential Client, Various Locations - On-Call Electrical Services

Design Phase Cost Estimating Experience:
Rosendin provides initial cost estimates based
on job walks and discussion of customer
needs for smaller projects; for larger scopes
design document review and site visits are
used to determing budget and schedule.

Design Phase Constructability Reviews:
Discussion between Rosendin Project Manager and
Superintendent, along with any design consultant
and the facilty manager, determines best approach
to achieve NEC compliance and optimal work
sequencing; Benefits Achieved: Minimal disruption
to operations and no un-planned shutdowns

Client References: (Confidential Client)
Jeremy George (719) 321-8091
jeremy.george@getcruise.com

Rosendin is experienced building projects under traditional Design-Bid-Build, CMR, CMAR, JOC and IDIQ,
Design- Build and IPD (Integrated Project Delivery) contract terms.

Our firm is flexible in approach, and understands that the scope of work can determine the best
contracting method (GMP, Lump Sum, etc.) for a given project.

Rosendin is a member of

* The American Institute of Architects
Design-Build Institute of America

The National Electrical Contractors Association

« US Green Building Council

« The Associated General Contractors of America

United Contractors

Associated General Contractors of California

» Construction Leadership Council

ROSENDIN SOG - Serial #250016 - JOC | November 14, 2024

R ROSENDIN

2 | Project Team

a) Organization Chart Maricopa County

D>
AS 7

Personnel highlighted in geld bexes are the key
personnel that will work directly with Maricopa
Caunty program personnel and management.

Program Management Field Management

Lawrence (Larry) Breul Jay Randall
Program Manager Superintendent

Executive Commitment Safety Management

Rick Brown
Regional Safety Director

Candace McConnell
Project Manager

Project Management Project Management Field Management

Tony DeVito Suzanne Saulnier Task Order Specific
Project Manager Project Manager General Foreman

b) Current and Projected Workloads and c) Staff Time Dedicated to Program

Current and Projected staff workloads are average weekly percentages and include considerations
for fluctuations dependent on multiple JOC contract activity. The proposed Rosendin team has
been working together on JOC or On-Call Service programs for over 9 years, with the exception of
Suzanne Saulnier and Candace McConnell, who joined Rosendin in 2018 and 2016, respectively.

d) Examples Of Common Projects

The proposed JOC Program Team has worked together for most of the duration of their tenures at
Rosendin, assuring continuity of process and efficiency for the County. Larry Breul, Program Manager,

and Tony DeVito, Project Manager, have each managed multiple task orders associated with the Maricopa
County Facilities Electrical JOC (Serial #14084); Suzanne Saulnier have also been directly involved with this
program. Candace McConnell has provided executive oversight for JOC programs and other projects from
the beginning of her association with this team.

e) Proposed Subconsultants and f) Example Projects with Proposed Consultant Firms (none)

Rosendin is not proposing specific subconsultants. Under Arizona Title 34 Procurement
rules task order specific subconsultants will be selected primarily on a qualifications basis,
with input from Maricopa County's program management. The Rosendin team is prepared
to work with consultants selected by the County; please note that Rosendin has in-house
electrical engineering capabilities that are available as needed for specific task orders.

Owner Priority: Shared Project Success (Section 1 Prior Experience)

Rosendin's proposed JOC Team successfully worked together in various
configurations on Projects #1-5 as listed in Section 1 of this proposal.

OSENDIN SOQ - Serial #250016 - JOC | November 14, 2024 Rar OSENDIN

2 | Project Team

LAWRENCE (LARRY) BREUL | Program Manager

Lawrence (Larry) Breul will be Rosendin’s Project Manager for the duration of the JOC. Lawrence will
be our in support on the contract due to the diverse locations throughout the state and to make sure
we have all of the skilled resources provided for the scope of work the JOC includes.

Current / Projected Workload (%): 60% / 60%
Time Dedicated To Parks & Rec JOC Program (%): 40% (estimated)
+ Maricopa County Electrical Services JOC; Role: Program Manager (Project #1) Rosendin: 18 Years

* Maricopa County Electrical Services - Parks and Recreation JOC; Industry: 30+ Years
Role: Program Manager (See Resume, Appendix B)

JAY RANDALL | Superintendent

As Superintendent Jay will be responsible for ensuring construction staffing, materials and equipment
resources are available and on-site for installation when required.

Current / Projected Workload (%): 80% / 80%

Time Dedicated To Parks & Rec JOC Program (%): 20% (estimated)

+ TUX/ Marshalls, On-Call Electrical Services Role: Superintendent (Project #3) |
+ SRPMIC On-call Electrical Services; Role: Superintendent (Project #2) Rosendin: 26 Years
* Maricopa County Electrical Services JOC; Role: Superintendent (Project #1) Industry: 38 Years

CANDACE MCCONNELL | Project Executive

Candace MConnell will provide overall JOC Program management, ensuring a high level of service
for the City of Scottsdale. As Operations Manager she has successfully directed multiple project
teams performing electrical construction for both private and governmental organizations.

Current / Projected Workload (%): 85% / 85%

Time Dedicated To Parks & Rec JOC Program (%): 15% (estimated)
+ TJX/ Marshalls, On-Call Electrical Services Role: Project Executive (Project #3) Rosendin: 8 Years
+ SRPMIC On-call Electrical Services; Role: Project Executive (Project #2) Industry: 29 Years
+ Maricopa County Facilities District Electrical Services JOC (Project #1)

SUZANNE SAULNIER | Project Manager

Suzanne will provide administrative support to the project team, including managing both
construction and financial management documentation.

Current / Projected Workload (%): 60% / 60%

Time Dedicated To Parks & Rec JOC Program (%): 40% (estimated)

* TX/ Marshalls, On-Call Electrical Services Role: Project Manager (Project #3) ph
+ — SRPMIC On-call Electrical Services; Role: Project Manager (Project #2) Rosendin: 5 Years
* Maricopa County Electrical Services JOC; Role: Project Manager (Project #1) Industry: 22 Years

TONY DEVITO | Project Manager

Tony's experience as Project Manager includes JOC and On-call Services program management. His
broad experience is a strong foundation for management of multiple task orders and projects.

Current / Projected Workload (%): 80% / 80%

Time Dedicated To Parks & Rec JOC Program (%): 15% (estimated)

+ TJX / Marshalls, On-Call Electrical Services Role: Project Manager (Project #3) .
+ SRPMIC On-call Electrical Services; Role: Project Manager (Project #2) Rosendin: 16 Years
+ Maricopa County Facilities District Electrical Services Industry: 30 Years

3 | Subcontractor Selection Plan

Rosendin will select subcontractors under Arizona Title 34 Procurement rules: task order subcontractors
will be selected primarily on a qualifications basis. Engagement of any subcontractors will be
discussed with the Maricopa County Parks and Recreation program management team.

The basis of our Subcontracting Plan is to select subcontractors early in the design or
preconstruction phase of a Project. Our goal is to futilize the unique skills and experiences
of each subcontractor to provide the best possible soutions to specific project scopes.

Our Subcontractor Selection Plan (specific to project scope) includes evaluation of a firm's Technical
skills and resources, Safety Record, and availability to meet the proposed schedule. Proposals are
evaluated and ranked, and where appropriate, Bid Evaluatons and Analysis will be a factor.

a) Determining Subcontractor Qualifications

Rosendin examines subcontractor company history, financial stability (bonding capacity,
ability to meet insurance requirements), AZ ROC licensing history, company workload,
and related project experience when evaluating subcontractors. A firm’s Safety Record is
a critical consideration. Other considerations, dependent on anticipated scope of work,
include ability to assist with Preconstruction in a Design-Build environment.

b) Minimum number of qualified subcontractors for each trade

Rosendin will engage, to the extent possible based on current market conditions,

a minimum of two subcontractors for each trade. For specialty work scope we

may elect to sole-source, in consultation with Maricopa County.

c) Range of years subcontractors have worked with Rosendin

Rosendin typically works with subcontractors that have teamed with us for

two years or more. We actively engage and mentor DBE firms, and evaluate

potential new business partners and subcontractors when appropriate.

d) Reference contacts

Reference contacts for major trade subcontractors are provided in the Appendix section.

ROSENDIN SOG - Serial #250016 - JOC | November 14, 2024 Rur OSENDIN

4 | Project Management Plan

Applying Rosendin’s Experience and Qualifications

Our team has extensive experience with JOC and design-assist projects; we understand the importance

of adhering to budget and maintaining the schedule. Rosendin has established a number of internal
company standards that help us achieve these goals while providing the best outcome for the team

and the project overall. Our work within JOC programs demonstrates the value of coordination and
communication between the initiating parties, other stakeholders, and the Rosendin project team. Prompt,
open communication and feedback on constructability and scheduling concerns promotes success.

a) Design Phase Process

Adopted processes, used selectively and appropriately dependent on scope of work, help

us establish and meet expectations for our team and projects. The most important factor in
controlling both cost and schedule is communication, realistic and honest evaluations from the
first estimate through the project completion. For many task orders the process outlined may not
be applied; we present them here to demonstrate processes and tools available to our team.

Provide Estimate Updates as Design Develops

= Continuously review progress estimate

* Provide pricing on design alternatives; provide value engineering
® Provide pricing based on continuous constructability review
Provide Estimates at DD and CD Milestones

* Coordination with project and design team to incorporate all system requirements,
develop comprehensive commissioning and testing programs to ensure
the final system will perform and meet all project requirements

= Provide detailed estimates; review estimates with project team
«Provide narrative report noting estimate assumptions, qualifications, etc.
Development of Firm Fixed Price or GMP

«Provide detailed estimate based on completed documents

* Provide narrative report noting estimate assumptions and qualifications
= Review estimate with project team

b) Subcontractor Selection

As outlined in Section 3 Rosendin will engage task order subcontractors in
consultation with Maricopa County. Selection will be based on qualifications and
best-value to ensure overall project budget and schedule success.

¢) Schedule Management and Control Process: Planning, Project Engineering, Scheduling,
and Field Management

Rosendin employs leading-edge construction management programs, we are always

evaluating new program options while maintaining our proven core systems. All

project management staff are skilled in the use of the Microsoft Office suite of

tools. Global management of project financials is performed using Oracle.

Planning and Project Engineering: Rosendin employs multiple tools for project planning,
dependent on the scale of the project. For simple projects, internal documents are produced

OSENDIN SOQ - Serial #250016 - JOC | November 14, 2024 R, ROSENDIN

4 | Project Management Plan

using Excel. For more complex work our industry-leading BIM (Building Information Modeling
group, based in Tempe) services can be used for modeling and coordination. Elements of project
planning are incorporated into the Prolog program, detailed below under Project Engineering.

Prolog is our current program for managing the project engineering portions of our
contracts (Submittals, RFl’s, etc.). This program also incorporates modules for generating
Bills of Material for purchasing, Meeting Minutes, and Material Tracking.

Scheduling: When the scale of the project warrants, our teams use Microsoft Project to generate critical path
schedules. For smaller projects we use a simple milestone schedule generated in Microsoft Project or Excel,

Field Management Team Software: Our field teams use About Time for field labor management; they also
use Plangrid for coordination of drawings and specifications, dependent on the scope of the project.

5 | Budget and Scope Management Capability

a) Budget and Scope Management Process

The foundation of a successful JOC contract is communication and commitment.
During the pre-construction or design phase of a Task Order a clear definition of
scope, agreed to by all stakeholders, is essential. Successful establishment of a task
order budget is directly dependent on reaching the clear definition of scope.

Our experience as an On-Call or JOC contractor includes Task Orders where the scope was
difficult to define. A solution is to provide a not-to-exceed budget, backed by timely submission
of vouchers and invoices to keep the Owner's project management staff fully informed

and aware of costs. For Task Orders where construction drawings are available detailed
estimates are produced and are available for review with the County's representatives.

For the execution of a Task Order, to meet “on-time and on-budget” goals, planning, implementing the plan,
monitoring progress, adjustment and correction if necessary, and completion is a simple summary of actions.

To manage and control both scope and budget, proper documentation, clear reporting

and invoicing is essential. Regular meetings to assess progress on task orders and overall
program performance are part of our approach to managing JOC or On-Call services contracts.
Larry Breul, along with Rosendin’s JOC Program Manager Tony DeVito, have demonstrated

this ability while managing JOC contracts for Maricopa County and SRPMIC.

6 | Team Approach Capability

a) Working As A Team: Interaction with all Project Stakeholders

Successful projects depend on clear communication, understanding and agreement by all parties of
what is expected. Larry Breul, assisted by field supervisory staff, will work with the Parks and Recreation
project team, JOC Program personnel, facility representatives, and design consultants to produce

a detailed SOW upon which our estimate will be based. Larry has significant experience leading
project teams to develop solutions that best fit the project goals and budget considerations.

A significant factor in the success of a JOC Services program is flexibility in approach
to estimating dependent on the work. This flexibility must be coupled to mutual trust
between all parties. Larry Breul has demonstrated this to our current JOC Program
clients, as evidenced by the contract renewals to maximum statutory terms.

OSENDIN S04 - Serial #250016 - JOC | November 14, 2024 Ror OSENDIN

6 | Team Approach Capability

For the majority of task orders Rosendin’s project team will be able to advise the County representatives
onan informal design-assist basis; we will also work with the County's selected engineers, contractors
and vendors to provide safe, quality installations. Our team has the experience to develop workable
alternate solutions where practical, potentially reducing cost and improving the schedule.

We are flexible in our approach. By working with all stakeholders we will provide best-
fit solutions for proposed tasks, helping the County evaluate the best way to achieve
the goals and purpose of a task order. In addition, Rosendin has the resources to readily
scale installation crew size to the specific needs of a task order or project.

7 |Expedited Completion of Project

a) Practices and Procedures to Save Time Compelting This Project

JOC Programs typically feature multiple task orders constructed over the duration of the
contract. To save time on specific task orders, dependent on scope, Rosendin will utilize our
Prefabrication Department where applicable to deliver repeatable assemblies to project sites.

The best practice to save time is the investment in planning based on the agreed upon
scope of work. Timely procurement based on a well-managed submittal process is essential.
Just-in-time delivery of materials to minimize handling at the site is a simple time-

saving solution that also improves safety for all personnel, including the public.

Rosendin has a 12,000 SF prefabrication facility at our Tempe campus that can accomadate 30 or
more personnel to support multiple projects. Our warehouse also has a Vendor Managed Inventory
of commodity electrical components, streamlining the order assembly and site delivery process.

Owner High Priority Focus: Current local market Material Supply and Cost Forecasting

Rosendin’s Purchasing Group tracks commodity and base industry pricing on both
a national and local basis. This provides opportunities for strategic purchases
of commodity materials when applicable to the scale of a project.

ROSENDIN SOG - Serial #250016 - JOC | November 14, 2024 Rar OSENDIN