12/22/2020
[Addition are indicated by underline; deletions by strikeout]
ORDINANCE NO. _____ NEW SERIES
AN ORDINANCE OF THE COUNCIL OF THE CITY OF
GLENDALE, MARICOPA COUNTY, ARIZONA, AMENDING
GLENDALE CITY CODE, TO ADD CHAPTER 30 ARTICLE IV.
- PAVEMENT RESTORATION FEE AND PAVEMENT CUT
RESTRICTIONS.
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GLENDALE as follows:
SECTION 1. That pursuant to Glendale City Code Sec. 2-2, the Pavement Restoration Fee
is hereby adopted as set forth in the Pavement Cut Restrictions Application attached hereto and
incorporated herein by this reference.
SECTION 2. That Glendale City Code, Chapter 30 Article IV. is hereby added to read as
follows:
ARTICLE IV. – Pavement Restoration Fee and Pavement Cut Restrictions.
Sec. 30-81 – Purpose.
(a) The public right-of-way and street infrastructure are unique public resources held in trust
for the benefit of the public. This physically limited resource requires proper
management in order to: maximize its efficiency, minimize the costs to taxpayers,
protect it against foreclosure of future economic expansion because of premature
exhaustion of the public right-of-way, extend pavement life, and to minimize the
inconvenience to and negative effects on the public from use of the public right-of-way
for utility cuts.
(b) To achieve the purpose of this Chapter, utility owners, franchisees and others shall
coordinate their pavement cuts with the city so that all work is done simultaneously, and
the pavement is not excavated or cut more than once within a twelve-month period, and
(in accordance with Sec. 30-83) not within two (2) years after completion of street
construction, reconstruction or renovation.
Sec. 30-82 – Definitions.
The Following definitions are applicable within this Chapter:
CITY ENGINEER: The City's Engineer and his or her designee.
CITY TRANSPORTAION DIRECTOR and his or her designee
EASEMENT, PUBLIC: An area of land over which the City of Glendale coordinates the
locations of public or private improvements, underground or overhead, furnished for the use of
the public; including electricity, gas, steam, communication, telecommunications, data
transmission, cable TV, water, storm drainage, sewage, sidewalks, landscaping, traffic signals,
2
[Addition are indicated by underline; deletions by strikeout]
streetlights, flood control, etc. owned and operated by any person, firm, corporation, municipal
department, or board duly authorized by state or municipal regulations.
GLENDALE PROJECTS: Public improvement projects for which the City of Glendale is the
general contracting agency.
NEW PAVEMENT: Paving material applied in or near the right-of-way to construct a new street,
highway, alley, road or bikeway where no such material previously existed.
PAVEMENT RECONSTRUCTION: Rebuilding a portion of the street by removing all the
pavement material and re-paving.
PAVEMENT RENOVATION: A major rehabilitation of street pavement, which includes mill and
overlay, cold in place recycle, hot in place recycle, fractured aggregate surface treatment, cape
seal, and stress absorbing membrane interlayer or other similar roadway improvement that
physically modifies the surface of the roadway.
PAVEMENT CUT PERMIT FEE: The fee required by the City and deposited into the
Transportations Departments Street Maintenance Program to supplement restoration cost when a
permittee cuts into, excavates, opens, bores, trenches, potholes, damages, or disturbs pavement in
the right-of-way.
PERMIT CHARGES: Fees assessed at the time of issuance of a right-of-way permit that are
intended to cover costs incurred by the City for permit processing, plan review services,
materials testing and inspections. Refer to latest schedule of fees and charges.
PERMITTEE: The governmental entity, person, or business entity that has received a right-of-
way permit pursuant to this section or engaged in construction or maintenance in the right-of-
way.
RIGHT-OF-WAY: An area of land which by deed, conveyance, agreement, easement, dedication,
usage or process of law is reserved or dedicated to the City for public purposes including, but not
limited to, street, highway, alley, public utility, pedestrian walkway, bikeway, or drainage.
Within public right-of-way, the City of Glendale coordinates the locations of public or private
improvements, underground or overhead; including electricity, gas, steam, communication,
telecommunications, data transmission, cable TV, water, storm drainage, sewage, sidewalks,
landscaping, traffic signals, streetlights, flood control, pedestrian, roadway purposes, etc. owned
and operated by any person, firm, company, corporation, municipal department, or board duly
authorized by federal, state, or municipal regulations.
RIGHT-OF-WAY IMPROVEMENT STANDARDS: A set of regulations setting forth the details,
specifications, instructions, and procedures to be followed in the planning, design, installation,
and construction of public or private improvements within the right-of-way or within easements;
formulated by the City Engineer, the County Health Department, the Maricopa Association of
Governments, and other City departments.
RIGHT-OF-WAY PERMIT: An official document issued by the City authorizing performance of
a specified activity or work within the right-of-way and public easements of the City of Glendale
3
[Addition are indicated by underline; deletions by strikeout]
by a person, contractor, company, firm, or corporation duly qualified under the statutes and rules
of the Arizona Registrar of Contractors, unless exempted thereunder. A Right-of-Way Permit
may also authorize specified activity or work involving City utilities or facilities outside the
corporate limits when issued in conjunction with the appropriate permit required for specified
activity or work within another jurisdiction.
STREET MAINTENANCE: Application of slurry and fog seals to street pavement.
Sec. 30-83 – Pavement Restoration Fee, Pavement Cut Restrictions; Exceptions.
(a) Pavement Restoration Fees. A permittee shall pay a pavement restoration fee in
connection with any Right-of-Way Permit to cut into, excavate, open, bore trench or disturb
street pavement within a period of five (5) years after the City's acceptance of street
construction that includes new pavement, pavement renovation or pavement reconstruction at
the location for which the Right-of-Way Permit is being sought. The amount of the pavement
restoration fee shall be deposited into the city’s street fund as established in the City's fee
schedule. The pavement restoration fee shall be paid before a Right-of-Way Permit is issued
unless the permittee has a written agreement with the City that allows for payment of the
pavement restoration fee after the pavement cut is made. The pavement restoration fee will
be in addition to, and will not be offset by, all license and franchise fees, expenses and taxes.
(b) Pavement Cut Restrictions. The City Engineer shall not approve a Right-of-Way Permit
to cut into, excavate, open, bore, trench, or disturb street pavement for a period of two (2)
years after the City's acceptance of street construction that includes new pavement, pavement
renovation, pavement reconstruction, or street maintenance at the location for which the
permit is being sought. The City Engineer may authorize an exception to this pavement cut
restriction under any one of the following conditions:
1. A verifiable emergency exists that endangers life or property;
2. There is an interruption of essential utility service;
3. Utility or other service for buildings is required where no other feasible means of
providing such service exists; or
4. A pavement cut is required by city, county, state or federal regulation.
(c) Between one (1) year and two (2) years after acceptance, if the City Engineer determines,
upon reviewing evidence submitted by the permittee, that the cost to mill and overlay/inlay is
substantially less than the cost of alternate routing for permittee's facilities the permittee may
choose to cut the pavement and perform a mill and overlay/inlay as described in Subsection
(e) below.
(d) If the City Engineer authorizes a pavement cut pursuant to an exception set forth in
Subsection (b) the permittee shall:
1. Pay the pavement restoration fee established by the City Council in the City's fee schedule;
and
4
[Addition are indicated by underline; deletions by strikeout]
2. Repair the pavement, after making the permitted cut, to meet right-of-way improvement
standards.
(e) If the City issues a street cut permit within one (1) year of construction, reconstruction or
renovation of pavement, permittee shall renovate such street by mill and overlay/inlay, for a
minimum of the full width of all lanes impacted by the cut(s) (outside lane includes to the
curb) and for arterial streets extending a minimum length of fifty (50) feet in both directions
from the area of the cut(s) and for collector and residential streets extending a minimum
length of twenty-five (25) feet both directions from the area of the cut(s), all as more
specifically directed by the City Engineer/designee. Provided, however, for one pothole
smaller than two (2) square feet, the requirement to renovate the street by mill and
overlay/inlay shall not apply.
Sec. 30-86 – Supervision and Inspection of Work.
(a) The city may make any inspections deemed necessary regarding permits issued under
this Article IV. During the construction, the city will inspect all trenching, backfilling,
Pavement Cut(s), and other work as deemed necessary by the City Engineering
Department, such as maintaining the integrity of the existing subgrade, and
compaction conforming to City Engineering Design Standards. Any construction
utilizing electrical connections must obtain an electrical inspection from the city.
(b) In addition to obtaining a Right of Way and Pavement Cut Permit pursuant to this
chapter, before beginning any excavation in any city right-of-way, construction of or
on any highway, sidewalk, curb, gutter or driveway approach, planting, trimming or
removing trees, making, placing or causing an obstruction in any city right-of-way,
the permittee shall notify the City Engineer and / or the City’s Transportation
Director at least seventy-two (72) hours in advance of the exact date and time work
will commence unless, in the case of a continuing maintenance permit this
requirement is not imposed. Upon completion of all work authorized in the permits,
the applicant shall notify the City Engineer and / or the City’s Transportation
Director. Applicants are to comply with Chapter 24, Article III, Division 2 of the City
Code regarding traffic management.
(c) No work shall be deemed to be completed until notification of completion is given
and the work is approved by the City Engineer or designee. Any public service
corporation as defined in Title 40, Arizona Revised Statutes and any holder of a
Telecommunications license or franchise from the city shall be permitted to pay the
city monthly the amount billed for city inspection, review and plan review services
provided to public service corporations and telecommunications licensees due to
construction activities in the public right of way during the prior month. The amount
shall be due within thirty days of the date of the billing and if unpaid shall accrue
interest from the due date at the rate of one and one-half percent per month, not to
exceed eighteen percent per year. A public service corporation or telecommunications
licensee shall have the right during regular business hours upon reasonable notice to
5
[Addition are indicated by underline; deletions by strikeout]
examine and make copies of the city's records pertaining to costs for inspection,
review and plan review services.
Sec. 30-87 – Termination.
The Pavement Cut Permit is subject to termination by the City Engineering Department if:
(a) The applicant fails to comply with the requirements of the Permit or this chapter or
any other rule or regulation validly adopted by the City Council applicable to the
Pavement Cut Permit.
(b) The applicant fails to pay when due, any fee as required by the Pavement Cut Permit.
(c) If the applicant fails to pay any fee, the applicant cannot begin any new Pavement
Cut(s) until such fee is paid in full to bring them current. A penalty amount of up to
twice the original Permit fee may be assessed for failing to pay or for failing to obtain
a Pavement Cut Permit prior to conducting any Pavement Cut(s).
Sec. 30-88 – Cease and desist orders.
Whenever any work is being done contrary to the provisions of this Article IV., the
Transportation Director and/or the City Engineer may order the unauthorized work stopped by
notice in writing served on any person engaged in the doing or causing such unauthorized work
to be done, and any such person shall immediately upon receipt of such notice stop such
unauthorized work. Any person performing work in the right-of-way shall have a copy of a valid
encroachment permit and Pavement Cut Permit issued by the city at the site and make such
permit available for inspection by the city at all times work is being performed or property or
equipment is located in the right-of-way.
Secs. 30-89—30-100. – Reserved.
---END---
SECTION 3. That the provisions of this Ordinance and the Pavement Restoration Fee as
set forth in the Pavement Cut Permit Application are in full force with an effective date 30 days
after the adoption of this Ordinance.
PASSED, ADOPTED AND APPROVED by the Mayor and Council of the City of
Glendale, Maricopa County, Arizona, this ___ day of ___ , 2020.
Mayor Jerry P. Weiers
ATTEST:
6
[Addition are indicated by underline; deletions by strikeout]
Julie K. Bower, City Clerk
(SEAL)
APPROVED AS TO FORM:
Michael D. Bailey, City Attorney
REVIEWED BY:
Kevin R. Phelps, City Manager