Agreement

City of Glendale — Regular Meeting (2021-05-11)

View PDF Item 6 Meeting page

Extracted text (via pymupdf) 16697 characters
Page 1 of 10 
 
ADOT CAR No.: IGA 20-0008038-I 
AG Contract No.: P001 2021 000347 
Project Location/Name: City of Glendale – 
Near State Farm Stadium 
Type of Work: Adaptive Traffic Signals 
 
Federal-aid No.: 999-M(586) 
ADOT Project No.: M7163 01X/01C 
TIP/STIP No.: NA 
CFDA No.: 20.205 - Highway Planning and 
Construction 
Budget Source Item No.: NA 
 
 
INTERGOVERNMENTAL AGREEMENT 
 
BETWEEN 
THE STATE OF ARIZONA 
AND 
THE CITY OF GLENDALE 
 
 
THIS AGREEMENT (“Agreement”) is entered into this date ________________________________, pursuant 
to the Arizona Revised Statutes (“A.R.S.”) §§  11-951 through 11-954, as amended, between the 
STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or 
“ADOT”) and the CITY OF GLENDALE, acting by and through its MAYOR and CITY COUNCIL (the “
City”). The State and the City are each individually referred to as a “Party” and are collectively 
referred to as the “Parties.” 
 
 
I. 
RECITALS 
 
1. The State is empowered by A.R.S. § 28-401 to enter into this Agreement and has delegated 
to the undersigned the authority to execute this Agreement on behalf of the State. 
 
2. The City is empowered by A.R.S. § 48-572 to enter into this Agreement and has by 
resolution, a copy of which is attached and made a part of, resolved to enter into this 
Agreement and has authorized the undersigned to execute this Agreement on behalf of the 
City. 
 
3. The work proposed under this Agreement between the City and the State is for the 
procurement, installation and technician training of new system hardware and software at 
the City’s existing Traffic Management Center (TMC), Adaptive Signal Control Technology 
(ASCT), at up to 21 intersections, as shown on Exhibit A and Anonymous Re-Identification 
(ARID) sensors at four intersections, for the City’s existing traffic signal system, (the 
“Equipment” or “Project”). The Project will install hardware and software with performance 
reporting capabilities in the City’s five square mile area mainly bounded by Glendale 
Avenue, 91st Avenue, Camelback Road and 99th Avenue, including the Zanjero Boulevard and 
91st Avenue intersection and State Route (SR) 101 interchanges. The Equipment includes 
but is not limited to software licenses, travel time monitoring devices and software, and 
other necessary equipment and software to improve traffic operations in the City. The 
estimated design and installation cost for the Project is $550,000.00, as shown on Exhibit B, 
and is funded by federal grant funds awarded to the State through the Advanced 
Transportation and Congestion Management Technologies Deployment (ATCMTD) grant.

IGA 20-0008038-I 
 
 
Page 2 of 10 
 
The Project is a task that is part of the Loop 101 Mobility Study project addressed in a 
separate agreement, IGA 18-0006911-I between the Parties. The State, through the State’s 
Procurement Process and ADOT Procurement contract(s), will utilize an authorized 
supplier to provide and install the Equipment as outlined in the contract and approved 
plans to complete this Project with the aid and consent of the State and Federal Highway 
Administration (FHWA).  The City will be responsible for maintenance of the Equipment 
 
THEREFORE, the Recitals set forth above and Exhibits A and B, attached hereto and made a part 
hereof, are incorporated into this Agreement and in consideration of the mutual terms expressed 
herein, it is agreed as follows: 
 
 
 
II. SCOPE OF WORK 
 
 
1.   The Parties agree: 
 
a. The Project will be completed, accepted, and paid for in accordance with the 
requirements of the Project plans and specifications. 
 
b.    The final Project amount may exceed the initial estimate(s) identified in Exhibit B, and 
in such case, the City is responsible for, and agrees to pay, any and all actual costs 
exceeding the initial estimate. If the final Project amount is less than the initial estimate, 
the difference between the final bid amount and the initial estimate will be de-obligated 
or otherwise released from the Project. The City acknowledges it remains responsible 
for actual costs and agrees to pay according to the terms of this Agreement. 
 
c.    The State will notify the City of changes in costs between estimated and actual costs as 
soon as practicable. 
 
 
2. The State will: 
 
a. Execute this Agreement, and if the Project is approved by FHWA and funds for the 
Project are available, be the City's designated agent for the Project. 
 
b. Prepare and provide all required documentation pertaining to the Project to FHWA with 
the recommendation that the maximum federal funds programmed for procurement 
and installation of this Project be approved and incorporate comments from the City as 
appropriate.  
 
c. With FHWA authorization, proceed to coordinate with the City regarding Equipment 
specifications to best ensure the requirements of the Project are met.  Solicit and enter 
into a contract(s) with the authorized supplier(s) for the purchase and installation of 
the Equipment. Instruct the vendor to deliver and install Equipment for final 
acceptance. Should costs exceed the maximum federal funds available it is understood 
and agreed that the City will be responsible for any overage. Administer contract(s) for 
the Project and make all payments to the contractor(s).

IGA 20-0008038-I 
 
 
Page 3 of 10 
 
d. Coordinate the installation and testing of Equipment with the City, perform final 
inspection, verify installation of all Equipment was performed and completed in 
compliance with State and FHWA requirements. 
 
e. Not be obligated to maintain the Project, should the City fail to budget or provide for 
proper and perpetual maintenance as set forth in this Agreement. 
 
 
3. The City will: 
 
a. Designate the State as the City's authorized agent for the Project. 
 
b. Coordinate with the State during the procurement process, providing Equipment 
specifications to best ensure the requirements of the Project are met.    
 
c. Be responsible for any costs exceeding the maximum federal funds available for the 
Project. Should costs be deemed ineligible or exceed the maximum federal funds 
available, it is understood and agreed that the City is responsible for these costs; 
payment for these costs shall be made within 30 days of receipt of an invoice from the 
State. 
 
d. Maintain all Project improvements provided for the life of the Equipment. Keep 
complete records of all Equipment installed per this Project in a manner consistent with 
State and FHWA requirements. 
 
e. Certify that the City has adequate resources to discharge the City’s real property related 
responsibilities and ensures that its Title 23-funded projects are carried out using the 
FHWA approved and certified ADOT Right of Way Procedures Manual and that they will 
comply with current FHWA requirements whether or not the requirements are included 
in the FHWA approved ADOT Right of Way Procedures Manual. (23 CFR 710.201). 
 
f. 
Automatically grant to the State, by execution of this Agreement, its agents and/or 
contractors, without cost, the temporary right to enter City rights of way, access City 
signal cabinets, as required, to conduct any and all Equipment installation and  
inspection related activities for the Project. This temporary right will expire with 
completion of the Project. 
 
g. Provide City technicians, as required, for training, access, and testing of the Equipment. 
 
 
III. MISCELLANEOUS PROVISIONS 
 
1. This Agreement shall become effective upon signing and dating of the Determination Letter 
by the State’s Attorney General. 
 
2. Any change or modification to the Project will only occur with the mutual written consent of 
both Parties. 
 
3. The terms, conditions and provisions of this Agreement shall remain in full force and effect 
until completion of the Project and all related deposits and/or reimbursements are made.

IGA 20-0008038-I 
 
 
Page 4 of 10 
 
Any provisions for maintenance shall be perpetual, unless assumed by another competent 
entity.  
 
4. This Agreement may be cancelled at any time up to 30 days before the award of the Project 
contract, so long as the cancelling Party provides at least 30 days’ prior written notice to the 
other Party. It is understood and agreed that, in the event the City terminates this 
Agreement, the City shall be responsible for all costs incurred by the State up to the time of 
termination.  It is further understood and agreed that in the event the City terminates this 
Agreement, the State shall in no way be obligated to complete or maintain the Project.   
 
5. The City shall indemnify, defend, and hold harmless the State, any of its departments, 
agencies, officers or employees (collectively referred to in this paragraph as the “State”) 
from any and all claims, demands, suits, actions, proceedings, loss, cost and damages of 
every kind and description, including reasonable attorneys' fees and/or litigation expenses 
(collectively referred to in this paragraph as the “Claims”), which may be brought or made 
against or incurred by the State on account of loss of or damage to any property or for 
injuries to or death of any person, to the extent caused by, arising out of, or contributed to, 
by reasons of any alleged act, omission, professional error, fault, mistake, or negligence of 
the City, its employees, officers, directors, agents, representatives, or contractors, their 
employees, agents, or representatives in connection with or incident to the performance of 
this Agreement. The City’s obligations under this paragraph shall not extend to any Claims 
to the extent caused by the negligence of the State, except the obligation does apply to any 
negligence of the City which may be legally imputed to the State by virtue of the State’s 
ownership or possession of land. The City’s obligations under this paragraph shall survive 
the termination of this Agreement. 
 
6. The State shall include Section 107.13 of the 2008 version of the Arizona Department of 
Transportation Standard Specifications for Road and Bridge Construction, incorporated into 
this Agreement by reference, in the State’s contract with any and all contractors, of which 
the City shall be specifically named as a third-party beneficiary. This provision may not be 
amended without the approval of the City. 
 
7. Should the federal funding related to this Project be terminated or reduced by the federal 
government, or Congress rescinds, fails to renew, or otherwise reduces apportionments or 
obligation authority, the State shall in no way be obligated for funding or liable for any past, 
current or future expenses under this Agreement. 
 
8. The cost of the Project under this Agreement includes indirect costs approved by the FHWA, 
as applicable. 
 
9. The Parties warrant compliance with the Federal Funding Accountability and Transparency 
Act of 2006 and associated 2008 Amendments (the "Act").  Additionally, in a timely manner, 
the City shall provide information that is requested by the State to enable the State to 
comply with the requirements of the Act, as may be applicable.  
 
10. The City acknowledges and will comply with Title VI of the Civil Rights Act Of 1964. 
 
11. This Agreement shall be governed by and construed in accordance with Arizona laws.

IGA 20-0008038-I 
 
 
Page 5 of 10 
 
12. This Agreement may be cancelled in accordance with A.R.S. § 38-511. 
 
13. The City shall retain all books, accounts, reports, files and other records relating to the 
Agreement for five years after completion of the Project. These documents shall be subject 
at all reasonable times to inspection and audit by the State. Such records shall be produced 
by the City at the request of ADOT.  
 
14. This Agreement is subject to all applicable provisions of the Americans with Disabilities Act 
(Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable Federal regulations under 
the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement shall comply with 
Executive Order Number 2009-09 issued by the Governor of the State of Arizona and 
incorporated by reference regarding “Non-Discrimination.” 
 
15. Non-Availability of Funds: Every obligation of the State under this Agreement is conditioned 
upon the availability of funds appropriated or allocated for the fulfillment of such 
obligations. If funds are not allocated and available for the continuance of this Agreement, 
this Agreement may be terminated by the State at the end of the period for which the funds 
are available. No liability shall accrue to the State in the event this provision is exercised, 
and the State shall not be obligated or liable for any future payments as a result of 
termination under this paragraph. 
 
16. In the event of any controversy, which may arise out of this Agreement, the Parties agree to 
abide by arbitration as is set forth for public works contracts if required by A.R.S. § 12-1518.  
 
17. The Parties shall comply with the applicable requirements of A.R.S. § 41-4401. 
 
18. The Parties shall certify that all contractors comply with the applicable requirements of 
A.R.S. §35-393.01. 
 
19. The Parties shall comply with all applicable laws, rules, regulations and ordinances, as may 
be amended. 
 
20. All notices or demands upon any Party to this Agreement shall be in writing and shall be 
delivered electronically, in person, or sent by mail, addressed as follows: 
 
For Agreement Administration: 
Arizona Department of Transportation 
Joint Project Agreement Section 
205 S. 17th Avenue, Mail Drop 637E 
Phoenix, AZ 85007 
JPABranch@azdot.gov 
 
 
 
 
 
 
 
 
 
City of Glendale  
Attn: Tony Abbo 
6210 W Myrtle Avenue, Suite 112 
Glendale, AZ 85308 
623.930.2761 
TAbbo@glendaleaz.com

IGA 20-0008038-I 
 
 
Page 6 of 10 
 
For Project Administration: 
Arizona Department of Transportation 
Transportation Systems Management & 
Operations 
1801 W Jefferson St, Suite 120, Mail Drop 102M 
Phoenix, AZ 85007 
AMcguire@azdot.gov 
 
For Financial Administration:  
Arizona Department of Transportation 
Transportation Systems Management & 
Operations 
1801 W Jefferson St, Suite 120, Mail Drop 102M 
Phoenix, AZ 85007 
AMcguire@azdot.gov 
 
City of Glendale  
Attn: Allan Galicia 
6210 W Myrtle Avenue, Suite 112 
Glendale, AZ 85308 
623.930.2761 
AGalicia@glendaleaz.com 
 
 
City of Glendale  
Attn: Allan Galicia 
6210 W Myrtle Avenue, Suite 112 
Glendale, AZ 85308 
623.930.2761 
AGalicia@glendaleaz.com 
 
 
 
21. Any revisions to the names and addresses above may be updated administratively by either 
Party and shall be in writing. 
 
22. In accordance with A.R.S. § 11-952 (D), attached and incorporated in this Agreement is the 
written determination of each Party’s legal counsel that the Parties are authorized under 
the laws of this State to enter into this Agreement and that the Agreement is in proper form. 
 
 
 
IN WITNESS WHEREOF, the Parties have executed this Agreement the day and year first above 
written. 
 
CITY OF GLENDALE  
 
 
 
By ______________________________ 
        JERRY P. WEIERS 
        Mayor 
STATE OF ARIZONA 
Department of Transportation 
 
 
By ______________________________ 
       BRENT A. CAIN, PE 
       Division Director 
 
 
ATTEST: 
 
 
By ______________________________ 
        JULIE K. BOWER 
        City Clerk

Page 7 of 10 
 
IGA 20‐0008038‐I 
 
ATTORNEY APPROVAL FORM FOR THE CITY OF GLENDALE 
 
I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona, 
acting by and through its DEPARTMENT OF TRANSPORTATION, and the CITY OF GLENDALE, an 
agreement among public agencies which, has been reviewed pursuant to Arizona Revised Statutes 
§§ 11-951 through 11-954 and declare this Agreement to be in proper form and within the powers 
and authority granted to the City under the laws of the State of Arizona. 
 
No opinion is expressed as to the authority of the State to enter into this Agreement. 
 
 
_____________________________________________________            _________________________________ 
City Attorney  
 
 
 
                       Date

IGA 20-0008038-I 
 
 
Page 8 of 10 
 
Exhibit A – Project Area Map

IGA 20-0008038-I 
 
 
Page 9 of 10 
 
Exhibit A – Proposed ASCT Locations 
*Numbered in order of priority

IGA 20-0008038-I 
 
 
Page 10 of 10 
 
EXHIBIT B 
 
Cost Estimate 
 
 
M7163 01X/01C  
 
The federal funds will be used for the design, procurement and installation of the Project. The 
estimated Project costs are as follows:  
 
Procurement: 
 
 
Federal-aid funds  
 
$  550,000.00        
 
 
 
 
Estimated TOTAL Project Cost 
 
  
$ 550,000.00