FY22 Capital Budget Draft
Extracted text (via pymupdf)
3553 characters
FACILITIES‐ BUILDING FY 2022 # Capital Replacement Estimate B‐1 Combustion Chamber w/Burner Assembly 26,000 $ B‐2 AAon A/C Unit 62,000 $ B‐3 Repairs to Glycol System (lines, motors, etc) 6,000 $ B‐4 HVAC Replacement 45,000 $ B‐5 Washer & Dryer Replacements (2 sets) 40,000 $ B‐6 Roll In Coolers replacement (2) 20,000 $ B‐7 Tub Liner/HydroWorx 86,000 $ B‐8 LAD Major ‐ Repair concrete slope at clubhouse doors 5,000 $ B‐9 Exterior West Wall Bldg C ‐ Repaint cracking areas 15,000 $ B‐10 Painting Exterior Stadium Gates and Painted Steel 50,000 $ ECR (Unplanned Repairs)/ECRs 208,654 $ FACILITIES/BUILDINGS ‐ Totals 563,654 $ STADIUM FIELD, PRACTICE FIELDS & COMMON # Capital Replacement Estimate F‐1 LAD Cage Turf Replacement ‐ #2 of 2 Cage Locations 35,000 $ F‐2 CWS Cage Turf Replacement #2 of 2 Cage Locations 35,000 $ F‐3 Field Replacement ‐ 2 Fields CWS 250,000 $ F‐4 Turf Replacement ‐ Stadium Dodger Tunnel & Visiting Team Tunnel 9,000 $ F‐5 Turf Replacement ‐ CWS Practice Tunnel 24,000 $ F‐6 LADmi Cages ‐ Drainage/flood prevention: Surface run off. Needs to added ~200 ft drainage to move water when any significant rainfall. Want to protect the new turf being installed in cages & prevent cages from not being usable. 30,000 $ F‐7 LAD Major Cages ‐ Gutter to prevent flooding 30,000 $ F‐8 Public Parking resurfacing & striping 190,000 $ F‐9 Stadium Concrete Repairs/spalling & trip hazards 85,000 $ ReimbGrounds Equip settlement ‐ 3rd of 3 payments re: contested A/R 74,000 $ FIELDS, COMMON AREA Totals 762,000 $ Fixtures, Furniture & Equipment # Capital Repair Estimate FFE1 (3) walk thru security mags 15,000 $ FFE2 (2) Hydroculators 3,500 $ FF&E ‐ Totals 18,500 $ IT (Technology & Communications Infrastructure) # Capital Replacement Estimate IT1 Uninterrupted Power Supply/UPS 4,000 $ IT2 Voice Application Software Upgrade 10,500 $ IT3 Access Layer Network Switches throughout facility 122,450 $ IT4 Interior & Exterior Access Points 167,400 $ IT Totals 304,350 $ LAKE/IRRIGATION Estimate # Capital Replacement L1 Sprinkler heads/valves 15,000 $ L2 Replace valves & lines / Amiad Filtration system 10,000 $ LAKE/IRRIGATION Totals 25,000 $ Capital Replacements Total FYE 2022 1,673,504 $ CAMELBACK RANCH Page 1 of 1