ZON21-05 PRD Booklet

City of Glendale — Regular Meeting (2021-06-22)

View PDF Item 43 Meeting page

Extracted text (via pymupdf) 63965 characters
Zanjero Pass
Planned Residential Development
Submitted: April 2021
City of Glendale
DATE RECEIVED
 
 April 20, 2021
City of Glendale
 Planning Division

Page 2
Zanjero Pass: PRD Narrative
Project Team
Site Data
Client:
Dan Bonow
D.R. Horton
20410 North 19th Avenue
Suite 100
Phoenix, Arizona 85081
drbonow@drhorton.com
Planner/ Landscape Architect:
Andy Baron
ABLA
310 East Rio Salado Parkway
Tempe, Arizona 85281
P: (480) 530-0077
andy.baron@ablastudio.com
Legal:
Brennan Ray
Burch and Cracchiolo
1850 North Central Avenue, Suite 1700
Phoenix, Arizona 85004
P: (602) 274-7611
bray@bcattorneys.com
Civil Engineer:
Joshua Robinson
HilgartWilson
2141 E. Highland Ave. Ste. 250
Phoenix, AZ 85016
P: (602) 730-3879
jrobinson@hilgartwilson.com
Project Location:                                                          
Request:                                                                             
General Plan Designation:                                        
Existing Zoning:                                                             
Proposed Zoning:                                                         
Existing Use:                                                                    
Proposed Use:                                                                 
Gross Area:                                                                        
Net Area:                                                                             
Maximum Proposed Dwelling Units:                   
Maximum Proposed Gross Density:                     
Approximate Open Space:                                        
North and east of the northeast corner of 
Citrus Road and Olive Avenue
PRD Amendment 
Medium Density Residential: 3.5-5 du/ac
R1-7 PRD, R1-8 PRD, & R1-10 PRD
R1-6 PRD (50’ Wide), R1-6 PRD (45’ Wide), 
& R1-10 PRD
Single-Family Residential 
Single-Family Residential
171.56 ac.
166.11 ac.
605 Dwelling Units
3.53 du/ac
30.74 ac. (17.9%)

Page 3
Zanjero Pass: PRD Narrative
1.0 Introduction
4
2.0 Existing Conditions
5
3.0 Development Plan Proposal
8
4.0 Development Standards
9
5.0 Design Concept
10
6.0 Infrastructure, Utilities, and Services
14
7.0 Residential Design and Development Guidelines
15
8.0 Phasing
16
9.0 Public Utilities and Services
16
10.0 Maintenance of Streets and Common Areas
16
Table of Contents
Exhibit A: Aerial Vicinity Map
17
Exhibit B: General Plan Map
18
Exhibit C: Existing and Proposed Zoning Maps
19
Exhibit D: Approved Development Plan
20
Exhibit E: Proposed Development Plan
21
Exhibit F: Architectural Elevations
22
Exhibit G: Perimeter Street Sections
130
Exhibit H: Circulation Plan
131
Exhibit I: Landscape Plan
132
Exhibit J: Central Park
133
Exhibit K: Phase 1 Park
134
Exhibit L: Dog Park
135
Exhibit M: Wall Plan
136
Exhibit N: Wall Details
137
Exhibit O: Phase 1 - Primary Entry
138
Exhibit P: Primary Entry Gate and Monument Sig-
nage
139
Exhibit Q: Phase 2 - Primary Entry
140
Exhibit R: Preliminary Drainage Plan
141
Exhibit S: Water Layout Plan
142
Exhibit T: Wastewater Layout Plan
143
Appendices
144

Page 4
Zanjero Pass: PRD Narrative
ABLA, on behalf of D.R. Horton, (the “Applicant”) is pleased to submit this Planned Residential 
Development Amendment application for the Zanjero Pass property to facilitate development 
of a cohesively designed single-family residential community. Zanjero Pass (the “Site” or the 
“Development”) is a 171.56 gross-acre residentially zoned property located north and east of 
the northeast corner of Citrus Road and Olive Avenue in the City of Glendale (the “City”) (see 
Appendix A: Alta Survey and Legal Description). The Site was previously zoned and platted 
in Maricopa County, then later was annexed into the City of Glendale and rezoned with a 
concurrent General Plan amendment in 2015. 
Today, the Applicant, is requesting to amend the approved Zanjero Pass Planned Residential 
Development (PRD) zoning from R1-7 PRD, R1-8 PRD, and R1-10 PRD zoning on the Site to R1-6 
PRD (50’ Wide Lots), R1-6 PRD (45’ Wide Lots), and R1-10 PRD. The purpose of this request is 
to not only amend the existing PRD zoning, but to amend the development plan, development 
standards, and design guidelines to accommodate a range of single-family homes of various 
lot sizes (45’, 50,’ and 80’ wide lots) that will be tailored to the context of the surrounding homes 
and environment.  
The purpose of this request is to allow Zanjero Pass to be developed as a high-quality residential 
community that will be an attractive presence in the area and better reflect current needs and 
market trends while mitigating impacts on the existing homes north and east of the Site. 
1.0 Introduction

Page 5
Zanjero Pass: PRD Narrative
2.0 Existing Conditions
2.1 Site Location
Zanjero Pass is located within the City of Glendale and surrounding by Maricopa County 
jurisdiction. Though the Site was previously zoned PRD in 2015, the Site is undeveloped native 
land. The Site is located approximately one (1) mile from the Loop 303 freeway, approximately 
one and a half (1.5) miles from Northern Parkway, and approximately seven (7) miles from 
Interstate 10 (I-10) Freeway, all of which can connect the Site to the greater Phoenix metropolitan 
area. Additionally, the Site is in close proximity to destinations including White Tank Mountain 
Regional Park (approximately 6 miles), the Wildlife World Zoo (approximately 2.5 miles), Luke 
Air Force Base (approximately 9 miles), and Westgate Entertainment District (approximately 12 
miles) (see Exhibit A: Aerial Vicinity Map).
2.2 Existing Drainage Conditions
The area surrounding the Property generally slopes to the south and east. Although the site is 
not subject to any regulatory floodplains, the Property is affected by minor sources of offsite 
drainage runoff along the north and west sides. These flows are joined by stormwater runoff 
produced onsite as it is routed southeasterly toward the downstream (south and east) sides of 
the Property. These flows are generally conveyed in a series of broad, shallow washes. Refer 
to Appendix B: Preliminary Drainage Report for a depiction of the existing onsite and offsite 
drainage conditions.
2.3 Existing Water Conditions
The Site is located entirely within the EPCOR Water Service Area. The existing water 
infrastructure immediately adjacent to the Site includes a 16-inch water main in Citrus Road, 
a 12-inch water main along Olive Avenue, and an 8-inch water main in 175th Avenue. The 12-
inch water main in Olive Avenue begins at 175th Avenue and extends east to Cotton Lane. The 
8-inch water main in 175th Avenue reduces to 6-inches in size approximately 1,900 LF north 
of Olive Avenue. The Site receives water from the Clearwater Farms Booster Pump Station. 
The Surface Water Treatment Plant is located at the northeast corner of Cactus Road and the 
Beardsley Canal.

Page 6
Zanjero Pass: PRD Narrative
2.4 Existing Wastewater Conditions
Existing wastewater infrastructure immediately adjacent to the Site includes an 18-inch sewer 
main in Citrus Road, which was constructed to serve the Cortessa and White Tank Foothills 
developments. This sewer main conveys wastewater flows southerly to Northern Avenue, 
where a lift station pumps the wastewater flows northerly to the City of Surprise wastewater 
treatment plant. This sewer line is not available to convey sewer flows from the Site. No other 
wastewater infrastructure exists immediately adjacent to the Site. However, as part of the 
Loop 303 Corridor Group Joint Development Agreement, EPCOR will be the sewer service 
provider for the site. As part of the Loop 303 Corridor Joint Development Agreement, EPCOR 
will extend the offsite sewer system to within a ½-mile of the site, at which then DR Horton will 
be responsible for the remaining portion. It Is anticipated that the offsite infrastructure will be 
constructed prior to this site starting wet utility construction. 
2.5 Relationship to Surrounding Properties
The land uses proposed with this PRD Amendment will enhance the existing and future uses 
planned for nearby properties. 
This project site is located within the City of Glendale; however, it is surrounded by Maricopa 
County jurisdiction. The Site is undeveloped land zoned R1-7 PRD, R1-8 PRD, and R1-10 PRD 
and is designated as Medium Density Residential 3.5-5 du/ac on the City’s General Plan (see 
Exhibit B: General Plan Map). To the north, across Cheryl Drive, are large lot single-family 
homes that are zoned RU-43 and designated Low Density Residential 0-1 du/ac on the City’s 
General Plan. To the south is undeveloped land zoned RU-43 and C-1 and designated as Low 
Density Residential 1-2.5 du/ac and General Commercial on the General Plan. South, across Olive 
Avenue, is undeveloped land that has been zoned R1-6 and designated Low Density Residential 
1-2.5 du/ac on the General Plan. To the east is undeveloped land zoned RU-43 and designated 
Low Density Residential 1-2.5 du/ac on the General Plan. East, across 175th Avenue, are large 
lot single-family homes zoned RU-43 and designated Low Density Residential 0-1 du/ac on the 
General Plan. To the west, across Citrus Road, is the Cortessa single-family subdivision zoned 
R1-6 and designated as Medium Density Residential 3.5-5 du/ac on the General Plan.

Page 7
Zanjero Pass: PRD Narrative
2.6 Site Entitlements
In October 2003, the Site was rezoned R1-8 RUPD/PAD and R1-10 RUPD/PAD (Z2003003) 
in Maricopa County. The zoning permitted minimum lot areas of 9,000, 11,500, and 15,000 
square feet. However, due to a lack of sewer solution, the Site was platted with lots averaging 
approximately 35,000 square feet in March 2008 (Book 979 of Maps, Page 26, Maricopa County 
Records) so that septic systems could be used for individual wastewater disposal.
Once the Site was annexed into the City in 2013, the Site was then rezoned to City R1-7, R1-8, 
and R1-10 with a Planned Residential Development (PRD) Overlay (see Exhibit D: Approved 
Development Plan). In addition to the residential rezone, there was a request to rezone an 
approximate seven (7)-acre site from Maricopa County R1-8 to C-1 – Neighborhood Commercial 
in the City. Prior to approval of the zoning case, an amendment to the General Plan was 
approved for Zanjero Pass allowing Residential (3.5-5 du/ac). 
The Site is zoned R1-7 PRD, R1-8 PRD, and R1-10 PRD with a General Plan designation of 
Residential 3.5-5 du/ac. The current PAD Amendment request is to rezone to R1-6 PRD (45’ 
Wide Lots) R1-6 PRD (50’ Wide Lots), and R1-10 PRD (see Exhibit C: Existing and Proposed 
Zoning Map). A General Plan amendment is not being requested as the proposed density of 
3.53 du/gross acre conforms to the General Plan. Please note, the commercial parcel in the 
previous entitlement case is not included as part of this request.

Page 8
Zanjero Pass: PRD Narrative
3.0 Development Plan Proposal
This PRD amendment request allows for a mix of detached, single-family residential lots that 
provide a transition between the smaller lots to the south and west and the larger lots to the 
north and east. The R1-10 PRD zoning will be located at the northern and eastern boundaries 
of the Site, adjacent to the existing large lot single-family homes. The R1-10 PRD zoning will 
include eighty (80) 80’x130’ (10,400 sf) lots. The R1-6 PRD (50’ Wide Lots) zoning will be located 
adjacent to the R1-10 PRD zoning and will include one hundred and ninety-six (196) 50’x120’ 
(6,000 sf) lots. The R1-6 PRD (45’ Wide Lots) zoning will be on the remainder of the Site adjacent 
to Citrus Road and Olive Avenue and include three-hundred and twenty-nine (329) 45’x120’ 
(5,400 sf) lots (see Exhibit E: Proposed Development Plan). See Table 1: Site Data Table below.
Open space is strategically placed throughout the community to provide efficient retention as 
well as visual relief across the Development. Centrally located is a community park providing 
the centerpiece and framework for strategically placed multi-use paths that connect the 
amenities throughout the community. A smaller park is also planned in the southwestern 
portion of the Site. These parks and amenities will be easily accessible to all residents and 
will support recreation and social interaction. The open space makes up approximately 17.9% 
of the gross Site area and promotes an active lifestyle and provides a sense of character and 
community.  
Zanjero Pass is an important component of the overall Loop 303 corridor. It provides a portion 
of the needed residential housing to support the anticipated employment uses along the Loop 
303 corridor. Careful consideration has gone into planning Zanjero Pass to create a high-
quality community that is attractively designed, lushly landscaped with native and desert 
adapted planting, significant amounts of open space and common areas, and provides a 
new and diverse housing opportunity in the area. The proposed plan will better integrate and 
transition densities within the local context. 
Proposed 
Zoning
Gross Acreage
Net Acreage
Unit Count
Gross Density 
(du/ac)
Open Space (ac)
Open Space (%)
R1-6 PRD (Min. 
45' Wide Lots)
92.55
88.43
384.00
4.15
14.88
16.08%
R1-6 PRD (Min. 
50' Wide Lots)
40.14
39.22
141.00
3.51
8.05
20.05%
R1-10 PRD
38.86
35.19
80.00
2.06
7.78
20.02%
Total:
171.55 ac
162.84 ac
605
3.53
30.71 ac
17.90%
Table 1: Site Data

Page 9
Zanjero Pass: PRD Narrative
4.0 Development Standards
The Site shall conform to the City of Glendale Development Standards except as indicated in 
this PAD or in Table 2: Proposed Development Standards as shown below.
50' wide lots
45' wide lots
Minimum Lot Area (sf)
10,000
6,000
5,400
Minimum Width
80'
50'
45'
Minimum Depth
130'
120'
120'
Front Setback 4
15'-20'2
15'-20'2
15'-20'2
Side Setback4
5' & 10'3
5'3
5'3
Street Side Setback4
10'
5'
5'
Rear Setback4
19'
20'
20'
Lot Coverage
45%
55%/50%5
55%/50%5
1—Two story maximum, refer to Section 7.300 for accessory buildings.
2—15 feet to living area, or side entry garage, 20 feet to face of garages.
5—Maximum lot coverage is 55% when less than 7,000 S.F. lot area and 50% when exceeding 7,000 S.F. lot area.
Table 2: Proposed Development Standards
R1-6 PRD1
R1-10 PRD1
Description
4—Architectural design elements, including but not limited to, window bays, fireplaces, 
proches/patios, or similar, may encroach into building setback up to 3 feet.
3 —Minimum 10 feet separation between buildings on adjacent lots within R1-6 and minimum 15-
foot separation between buildings on adjacent lots within R1-10.

Page 10
Zanjero Pass: PRD Narrative
5.0 Design Concept
5.1 Housing Product
Zanjero Pass is a traditional single-family detached subdivision that will provide high-quality 
housing products and architectural elevations. A variety of product types will allow for diversity 
in streetscape throughout the subdivision. Styles such as Bungalow, Farmhouse, Spanish, 
modern Desert, and Modern are included to complement the surrounding environment and 
desired character of the area (see Exhibit F: Architectural Elevations). 
Design elements and features will be incorporated into the community to promote a 
harmonious and distinctive atmosphere by:
•	
Creating visual interest through articulation of wall planes;
•	
Varying roof forms and other similar methods;
•	
Utilizing four-sided architecture; and
•	
Providing architectural treatments to large wall expanses.
Housing standards will create an interesting streetscape by establishing the following 
architectural options:
•	
A minimum of three architectural styles will be provided within the Site.
•	
No adjacent home or home directly across the street shall have the same elevation or 
roofline.
•	
For all pitched roofs, homebuilders shall provide at least twelve (12) inches of roof overhang 
(eave) to all walls.
The following architectural details and materials may be provided:
	
•	
Gable or hipped rooflines;
•	
Stucco or concrete fiber siding;
•	
Brick or stone veneers;
•	
Wrought iron details;
•	
Decorative tri pipe details;
•	
Tile roofs;
•	
Side entry garages;
•	
Balconies or patios;
•	
Divided light windows;
•	
Decorative Shutters; and
•	
Decorative molding, pilasters, or wainscoting.

Page 11
Zanjero Pass: PRD Narrative
5.2 Circulation
Regional transportation is provided by the Loop 303 Freeway that runs north-south 
approximately one mile from the Site. Additionally, the Site is within seven miles of Northern 
Parkway and Interstate 10. 
The Site is accessed from both Citrus Road and Olive Avenue with two access points on Citrus 
Road and one on Olive Avenue. Both Citrus Road and Olive Avenue are arterial streets that will 
need half street improvements. The Site features six-foot (6’) detached sidewalks along both 
Citrus Road and Olive Avenue, as well as a ten-foot (10’) decomposed granite trail along Citrus 
Road.  The street conditions can be found in Exhibit G: Perimeter Street Sections.
A well-connected internal street network is provided to allow residents convenient access to 
the amenity and open space areas. Five-foot (5’) detached sidewalks lead into the Site from 
the Citrus Road and Olive Avenue entryways and continue around the roundabout and portions 
of the centralized park area. Five-foot (5’) concrete trails are located throughout the Site in 
the open space, parks, and landscape paseos. Additionally, five-foot (5’) attached sidewalks 
are provided adjacent to the internal streets and residential units. The Site circulation can be 
found on Exhibit H: Circulation Plan. 
A Traffic Impact Study (TIS) has been prepared by CivTech for Zanjero Pass, see Appendix C: 
Traffic Impact Study.

Page 12
Zanjero Pass: PRD Narrative
5.3 Landscape and Open Space
The landscape and open space areas of the Site are designed to occupy approximately 30.74 
acres (17.9%). The open space has been dispersed throughout the Site to provide efficient 
retention as well as visual relief across the development. The planned open space includes a 
five-acre (5ac.) centralized park, smaller neighborhood park, dog park, landscape buffers, and 
view sheds. 
The largest programmed open space amenity is the five-acre (5 ac.) park centrally located in 
the development (see Exhibit J: Central Park). The park offers several active and passive open 
space opportunities promoting an active lifestyle for residents of the community. Within the 
park there is a large active turf area, tree bosque with tables, tot lot, with a shade ramada and 
shaded seating nodes with benches and tables. Additionally, the park offers pickleball courts, 
a bocce ball court, and multi-use sport field. These amenities are positioned along five-foot (5’) 
sidewalks and four-foot (4’) soft trails that surround and connect through the park.
The second park within the Site is approximately 1.21 acres and located in the southwest region 
of the Site in Phase 1 of the development (see Exhibit K: Phase 1 Park). The park includes a 
large active turf area, landscaped areas with shade trees, a play structure, and ramada. In 
close proximity to the Phase 1 park is the dog park which can be accessed by five-foot (5’) 
concrete sidewalks. The dog park includes a ramada and two fenced in dog runs, small and 
large (see Exhibit L: Dog Park). 
Additional open spaces and landscaped areas are situated along the perimeter of the Site to 
establish an inviting and welcoming feel into the development including detached sidewalks 
along both Citrus Road and Olive Avenue and a large, decomposed granite trail along Citrus 
Road.
The amenities and open spaces are easily accessible to all Zanjero Pass residents and are 
a major component of the community’s identity. The modern desert landscape palette 
will complement the surrounding architecture and environment. Playing off the historical 
character of the area, authentic and natural materials, along with patterned landscape will be 
utilized (see Exhibit I: Landscape Plan).

Page 13
Zanjero Pass: PRD Narrative
5.4 Walls and Fences
The theme wall design along the perimeter streets will reflect the patterns and forms of the 
landscaping and entry features. A combination of painted split-face and smooth face block 
will create a unique pattern with brick veneer columns that will set apart the subdivision and 
will complement the entry features. The theme walls will be provided throughout the Mountain 
View Road entry and adjacent to landscaped areas as well. Partial view fence is provided when 
adjacent to landscape paseos to expand views from individual lots (see Exhibit M: Wall Plan 
and Exhibit N: Wall Details).       
5.5 Monumentation
Entry monuments are the first element to welcome residents and visitors to the community. 
Enhanced entry and gateway monumentation and overall project theming will be provided at 
the two gated entrances along Citrus Road. The landscape medians, patterned grove trees, 
and accent walls convey a sense of arrival that is consistent with the overall development. 
The primary entry, at Sunnyslope Lane, will have vehicular entry gates and entry monument 
signage with common elements. The entry gate is steel with brick veneer pilaster walls and 
stone veneer walls on each end and steel pedestrian gates. The signage is a stucco sign wall 
with a metal shelf and halo lit letters. The brick veneer and stone veneer walls with precast 
caps from the entry gates are incorporated into the monument signage as well (Exhibit O: 
Phase 1 – Primary Entry and Exhibit P: Primary Entry Gate and Monument Signage). 
The second primary entry at Mountain View Road will be constructed in Phase 2 of the 
development. The monumentation will complement the primary entry monumentation by 
utilizing the same style and materials (Exhibit Q: Phase 2 – Primary Entry).

Page 14
Zanjero Pass: PRD Narrative
6.0 Infrastructure, Utilities, and Services
The proposed onsite stormwater management concept for the Project consists of grading the 
lots to drain from the backyard to the streets, and the streets to drain toward a series of surface 
retention basins. Street conveyance shall occur as either surface flow within the right-of-way 
or in a system of underground storm drains. The retention basins will have sufficient capacity 
to retain runoff from the 100-year 2-hour storm event. Culverts and conveyance channels will 
be placed in locations where there is a need to convey offsite flows to their natural drainage 
paths. The offsite flow approaching the northern and western boundaries will be routed around 
the site using the perimeter roadways or drainage corridors placed within the adjacent open 
space tracts. Culverts will be constructed where the anticipated drainage crossings occur.
100-year post development runoff at locations where flows exit the Project will not exceed 
the pre-developed runoff thus preventing adverse impacts downstream of the Zanjero Pass 
property. The ultimate site outfall will remain at the two southeastern corners of the property. 
All finished floor elevations will be set a minimum of 12 inches above the high adjacent 100-
year water surface elevation and 14 inches above the emergency overflow elevation of any 
adjacent retention basin. Drainage design will be conducted in accordance with all applicable 
City of Glendale and Maricopa County Drainage standards and regulations.
Refer to Exhibit R: Preliminary Drainage Plan for an illustration of the proposed drainage 
management system. A Preliminary Drainage Report has been prepared by HilgartWilson.  A 
copy of the report is provided in Appendix B: Preliminary Drainage Report.
6.1 Water and Wastewater
Water
The Project will be served by an internal network of looped 8-inch waterlines. A larger 12- inch 
waterline will be installed along Olive Avenue. It will tie into the existing 16-inch water main in 
Citrus Road and extend east to 175th Avenue, where it will tie into the existing 12- inch water 
main along Olive Avenue. The looped water system infrastructure for the Project will make two 
connections to the existing 16-inch water main in Citrus Road, one connection to the proposed 
12-inch water main in Olive Avenue, one connection to the existing 8-inch waterline in 175th 
Avenue, and one connection to the existing 6-inch waterline in 175th Avenue. Refer to Exhibit 
S: Water Layout Plan for an illustration of the proposed water system.

Page 15
Zanjero Pass: PRD Narrative
Wastewater
The Project will be served by an internal network of 8-inch gravity sewer lines. The gravity 
sewer lines in the north and east portions of the Project will generally route wastewater from 
each of the units to 175th Avenue along the east side of the site, where the onsite collection lines 
will have two points of connection to a proposed 8-inch gravity sewer main in 175th Avenue. 
The 8-inch gravity sewer main in 175th Avenue will convey wastewater flows south toward 
Olive Avenue. The gravity sewer lines in the west portion of the Project will route wastewater 
to the southern boundary, where the onsite collection lines will have one point of connection to 
a proposed 8-inch gravity sewer main in Olive Avenue. The 8- inch sewer main in Olive Avenue 
will convey wastewater flows east towards 175th Avenue. The proposed 8-inch gravity sewer 
mains in Olive Avenue and 175th Avenue will tie into a proposed manhole at the intersection 
of Olive Avenue and 175th Avenue. A sewer line will then extend easterly in Olive Avenue and 
will connect to the regional wastewater infrastructure being constructed by EPCOR. Refer to 
Exhibit T: Wastewater Layout Plan for an illustration of the proposed wastewater system. 
The Project shall conform to the Zoning District Regulations of the City of Glendale Code of 
Ordinances, Section 5.300 except as amended as in Section 4.0, Table2, Amended Single 
Residence Districts Development Standards of this document.
The Project is significantly in compliance and meets the intent of the Residential Design and 
Development Manual (RDDM). Appendix D: Residential Design and Development Manual 
Project Compliance responds to the specific design elements as they relate to the Project. 
As the Project proceeds through the design process, additional guidelines within the RDDM 
may be waived as long as justification is provided.
7.0 Residential Design and Development Guidelines

Page 16
Zanjero Pass: PRD Narrative
Utilities to serve the development are currently available or will be brought to the site during 
development. Following are the various utility providers for the property.
Water:	
	
EPCOR
Wastewater:	 	
EPCOR
Electrical Service:	
Arizona Public Service (APS)
Telephone:	
	
Century Link
	
Cable TV:	
	
Cox Communications
Gas:	
	
	
Southwest Gas Company
	
Fire Protection:	
City of Glendale Fire Department
Police Protection:	
City of Glendale Police Department
Refuse	
	
Allied Waste
School District	
Dysart Unified School District
8.0 Phasing
9.0 Public Utilities and Services
The Site is planned to be developed in three phases; however, phasing will be dependent on 
market conditions, industry factors, and/or business considerations. If phased, the required 
infrastructure shall be in place at the time of development.
10.0 Maintenance of Streets and Common Areas
Perimeter streets surrounding the Site are public and maintained by their respective 
jurisdictions. The streets within the Site will be private streets. The private streets will 
be constructed in accordance with design standards established by the City and will be 
maintained by the Zanjero Pass Homeowner’s Association (HOA). Private common areas will 
be maintained by the Zanjero Pass HOA as well.

Zanjero Pass: Project Narrative
Page 17
Exhibit A: Aerial Vicinity Map

Zanjero Pass: Project Narrative
Page 18
Exhibit B: General Plan Map

Zanjero Pass: Project Narrative
Page 19
Exhibit C: Existing and Proposed Zoning Maps

Zanjero Pass: Project Narrative
Page 20
Exhibit D: Approved Development Plan

Zanjero Pass: Project Narrative
Page 21
Exhibit E: Proposed Development Plan

Zanjero Pass: Project Narrative
Page 22
Exhibit F: Architectural Elevations

Zanjero Pass: Project Narrative
Page 23

Zanjero Pass: Project Narrative
Page 24

Zanjero Pass: Project Narrative
Page 25
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4090 C
Stucco System
Concrete Roof Tile
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
19’-1”
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 26
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4090 D
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
20’-5”
Decorative Wooden Shutters
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 27
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4090 E
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
19’-0”
15’-3”
13’-1”

Zanjero Pass: Project Narrative
Page 28
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4091 A
Stucco System
Concrete Roof Tile
Decorative Gable Pipes
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-4 3/4”
Decorative Wraught Iron Detail

Zanjero Pass: Project Narrative
Page 29
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4091 B
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
26’-4 1/8”

Zanjero Pass: Project Narrative
Page 30
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4091 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-4 3/4”

Zanjero Pass: Project Narrative
Page 31
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4093 A
Stucco System
Concrete Roof Tile
Decorative Gable Pipes
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-6”

Zanjero Pass: Project Narrative
Page 32
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4093 B
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
27’-8”

Zanjero Pass: Project Narrative
Page 33
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 4093 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-6”

Zanjero Pass: Project Narrative
Page 34
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 A
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Gable Pipe Detail
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
26’-0 1/2”

Zanjero Pass: Project Narrative
Page 35
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 B
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
6
12
TYP
0’-0”
10’-1 1/8”
20’-7”
28’-3 3/4”
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 36
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4095 C
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
25’-10 3/8”

Zanjero Pass: Project Narrative
Page 37
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4097 A
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
27’-3 1/4”

Zanjero Pass: Project Narrative
Page 38
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4097 B
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
20’-7”
28’-9 1/2”
Decorative Wooden Shutters
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 39
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 4097 C
ARABELLA
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
4
12
TYP
0’-0”
10’-1 1/8”
20’-7”
27’-3 1/4”
Decorative Wooden Shutters

Zanjero Pass: Project Narrative
Page 40
Plan 4090 , Elevation C
Plan 4090 , Elevation D
Plan 4090 , Elevation E
Plan 4091 , Elevation A
Plan 4093 , Elevation A
Plan 4091 , Elevation B
Plan 4093 , Elevation B
Plan 4091 , Elevation C
Plan 4093 , Elevation C

Zanjero Pass: Project Narrative
Page 41
Plan 4090 , Elevation C
Plan 4090 , Elevation D
Plan 4090 , Elevation E
Plan 4091 , Elevation A
Plan 4093 , Elevation A
Plan 4091 , Elevation B
Plan 4093 , Elevation B
Plan 4091 , Elevation C
Plan 4093 , Elevation C

Zanjero Pass: Project Narrative
Page 42
Plan 4095 , Elevation A
Plan 4095 , Elevation B
Plan 4095 , Elevation C
Plan 4097 , Elevation A
Plan 4097 , Elevation B
Plan 4097 , Elevation C

Zanjero Pass: Project Narrative
Page 43
Plan 4095 , Elevation A
Plan 4095 , Elevation B
Plan 4095 , Elevation C
Plan 4097 , Elevation A
Plan 4097 , Elevation B
Plan 4097 , Elevation C

Zanjero Pass: Project Narrative
Page 44
ARABELLA
50’ Wide Plans -Phoenix, Arizona
Plans 5017, 5029 and 5041
Plan 5017 , Elevation A
Plan 5041 , Elevation A
Plan 5017 , Elevation B
Plan 5041 , Elevation B
Plan 5017 , Elevation C
Plan 5041 , Elevation C
Plan 5029 , Elevation A
Plan 5029 , Elevation B
Plan 5029 , Elevation C

Zanjero Pass: Project Narrative
Page 45
ARABELLA
50’ Wide Plans -Phoenix, Ari
Plans 5017, 5029 and 5041
Plan 5017 , Elevation F
Plan 5041 , Elevation F
Plan 5017 , Elevation N
Plan 5041 , Elevation N
Plan 5029 , Elevation F
Plan 5029 , Elevation N

Zanjero Pass: Project Narrative
Page 46
ARABELLA
50’ Wide Plans -Phoenix, Arizona
Plans 5017, 5029 and 5041
Plan 5029 , Elevation A
Plan 5029 , Elevation B
Plan 5029 , Elevation C
Plan 5041 , Elevation A
Plan 5041 , Elevation B
Plan 5041 , Elevation C
Plan 5017 , Elevation A
Plan 5017 , Elevation B
Plan 5017 , Elevation C

Zanjero Pass: Project Narrative
Page 47
ARABELLA
50’ Wide Plans -Phoenix, Arizona
Plans 5017, 5029 and 5041
Plan 5029 , Elevation F
Plan 5029 , Elevation N
Plan 5041 , Elevation F
Plan 5041 , Elevation N
Plan 5017 , Elevation F
Plan 5017 , Elevation N

Zanjero Pass: Project Narrative
Page 48
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6505, 6510 and 6515
Plan 6505 , Elevation A
Plan 6515 , Elevation A
Plan 6505 , Elevation B
Plan 6515 , Elevation B
Plan 6505 , Elevation C
Plan 6515 , Elevation C
Plan 6510 , Elevation A
Plan 6510 , Elevation B
Plan 6510 , Elevation C

Zanjero Pass: Project Narrative
Page 49
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6505, 6510 and 6515
Plan 6505 , Elevation F
Plan 6515 , Elevation F
Plan 6505 , Elevation M
Plan 6515 , Elevation M
Plan 6505 , Elevation N
Plan 6515 , Elevation N
Plan 6510 , Elevation F
Plan 6510 , Elevation M
Plan 6510 , Elevation N

Zanjero Pass: Project Narrative
Page 50
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6505, 6510 and 6515
Plan 6510 , Elevation A
Plan 6510 , Elevation B
Plan 6510 , Elevation C
Plan 6515 , Elevation A
Plan 6515 , Elevation B
Plan 6515 , Elevation C
Plan 6505 , Elevation A
Plan 6505 , Elevation B
Plan 6505 , Elevation C

Zanjero Pass: Project Narrative
Page 51
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6505, 6510 and 6515
Plan 6510 , Elevation F
Plan 6510 , Elevation M
Plan 6510 , Elevation N
Plan 6515 , Elevation F
Plan 6515 , Elevation 
Plan 6515 , Elevation C
Plan 6505 , Elevation F
Plan 6505 , Elevation M
Plan 6505 , Elevation N

Zanjero Pass: Project Narrative
Page 52
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6520 and 6525
Plan 6525 , Elevation A
Plan 6525 , Elevation B
Plan 6525 , Elevation C
Plan 6520 , Elevation A
Plan 6520 , Elevation B
Plan 6520 , Elevation C

Zanjero Pass: Project Narrative
Page 53
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6520 and 6525
Plan 6525 , Elevation F
Plan 6525 , Elevation M
Plan 6525 , Elevation N
Plan 6520 , Elevation F
Plan 6520 , Elevation M
Plan 6520 , Elevation N

Zanjero Pass: Project Narrative
Page 54
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6520 and 6525
Plan 6525 , Elevation A
Plan 6525 , Elevation B
Plan 6525 , Elevation C
Plan 6520, Elevation A
Plan 6520 , Elevation B
Plan 6520 , Elevation C

Zanjero Pass: Project Narrative
Page 55
ARABELLA
65’ Wide Plans -Phoenix, Arizona
Plans 6520 and 6525
Plan 6525 , Elevation F
Plan 6525 , Elevation M
Plan 6525 , Elevation N
Plan 6520, Elevation F
Plan 6520 , Elevation M
Plan 6520 , Elevation N

Zanjero Pass: Project Narrative
Page 56
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3530 A
Arabella
12’-1 1/8”
Stucco System
Decorative Wrought Iron Detail
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
16’-11 1/2”

Zanjero Pass: Project Narrative
Page 57
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3530 B
Arabella
11’-1 1/8”
0’-0”
10’-1 1/8”
16’-11 1/2”
Stucco System
Decorative Gable Pipe
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP

Zanjero Pass: Project Narrative
Page 58
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3530 C
Arabella
12’-1 1/8”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Available
5
12
TYP
0’-0”
9’-1 1/8”
16’-11 1/2”

Zanjero Pass: Project Narrative
Page 59
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3530 F
Arabella
13’-1 1/8”
0’-0”
9’-1 1/8”
16’-10 1/2”
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown
Dual Pane Low-E
Windows
5
12
TYP

Zanjero Pass: Project Narrative
Page 60
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3530 N
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1 1/8”
15’-6”
11’-1 1/8”

Zanjero Pass: Project Narrative
Page 61
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 A
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1”
17’-0”

Zanjero Pass: Project Narrative
Page 62
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 B
Arabella
0’-0”
9’-1”
17’-0”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
Decorative Gable 
Pipe Detail

Zanjero Pass: Project Narrative
Page 63
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 C
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1”
17’-0”
12’- 10 1/8”

Zanjero Pass: Project Narrative
Page 64
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3534 F
Arabella
0’-0”
9’-1 1/8”
17’-0”
12’-1”
Board and Batton System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
5
12
TYP
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 65
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3545 A
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
17’-11 1/2”

Zanjero Pass: Project Narrative
Page 66
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3545 B
Arabella
0’-0”
10’-1 1/8”
17’-11 1/2”
Stucco System
Decorative Gable Pipe
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
Plan 3545 B

Zanjero Pass: Project Narrative
Page 67
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3545 C
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Available
5
12
TYP
0’-0”
10’-1 1/8”
17’-11 1/2”

Zanjero Pass: Project Narrative
Page 68
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 A
0’-0”
9’-1”
27’-5”
Arabella
10’-1”
Stucco System
Decorative Wrought Iron Detail
Concrete Roof Tile
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
19’-7”

Zanjero Pass: Project Narrative
Page 69
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3545 N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
5
12
TYP
0’-0”
10’-1”
18’-0”
Arabella

Zanjero Pass: Project Narrative
Page 70
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 A
0’-0”
9’-1”
27’-5”
Arabella
10’-1”
Stucco System
Decorative Wrought Iron Detail
Concrete Roof Tile
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
19’-7”

Zanjero Pass: Project Narrative
Page 71
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 B
0’-0”
9’-1”
19’-7”
27’-4”
Arabella
Stucco System
Decorative Gable Pipe
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP

Zanjero Pass: Project Narrative
Page 72
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 C
Arabella
10’-1”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1”
19’-7”
27’-6”

Zanjero Pass: Project Narrative
Page 73
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 F
Arabella
0’-0”
9’-1”
11’-1”
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
5
12
TYP
19’-7”
27’-6”

Zanjero Pass: Project Narrative
Page 74
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3551 N
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
4
12
TYP
0’-0”
9’-1 1/8”
19’-7”
25’-11”
11’-1 1/8”

Zanjero Pass: Project Narrative
Page 75
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3556 A
Arabella
Stucco System
Decorative Wrought Iron Detail
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1”
19’-7”
26’-10”

Zanjero Pass: Project Narrative
Page 76
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3556 B
Arabella
0’-0”
9’-1”
19’-7”
26’-9 1/2”
Stucco System
Decorative Gable Pipe
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP

Zanjero Pass: Project Narrative
Page 77
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3556 C
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Available
5
12
TYP
0’-0”
9’-1”
19’-7”
26’-9 1/2”

Zanjero Pass: Project Narrative
Page 78
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3556 F
Arabella
0’-0”
9’-1”
26’-8”
19’-7”
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown
Dual Pane Low-E
Windows
5
12
TYP

Zanjero Pass: Project Narrative
Page 79
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 3556 N
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1”
25’-6”
19’-7”
12’-1”

Zanjero Pass: Project Narrative
Page 80
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 3580 A
Stucco System
Concrete Roof Tile
Decorative Wrought Iron Detail
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
12’-1 1/8”  
19’-7”
26’-3”
9’-1 1/8”

Zanjero Pass: Project Narrative
Page 81
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 3580 B
Stucco System
Decorative Tri Gable Pipe Detial
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
12’-1 1/8”  
19’-7”
26’-5 1/2”
9’-1 1/8”

Zanjero Pass: Project Narrative
Page 82
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 3580 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
12’-1 1/8”  
19’-7”
26’-5 1/2”
9’-1 1/8”

Zanjero Pass: Project Narrative
Page 83
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 3580  F
Vertical Siding
Concrete Roof Tile
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint
5
12
TYP
Standard Ledgestone Shown
0’-0”
12’-1 1/8”  
19’-7”
26’-5 1/2”
9’-1 1/8”

Zanjero Pass: Project Narrative
Page 84
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 3580 N
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Stucco System
4
12
TYP
Standard Ledgestone Shown
0’-0”
12’-1 1/8”  
19’-7”
25’-1 1/4”
9’-1 1/8”

Zanjero Pass: Project Narrative
Page 85
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
ARABELLA
Plan 5017 A
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Decorative Wrought Iron Detail
Decorative Wooden Shutters
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
13’-1 1/8”
19’-0 1/2”

Zanjero Pass: Project Narrative
Page 86
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
ARABELLA
Plan 5017 B
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Decorative Gable Pipe Detail
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
0’-0”
9’-1 1/8”
13’-1 1/8”
19’-0 1/2”
5
12
TYP

Zanjero Pass: Project Narrative
Page 87
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
ARABELLA
Plan 5017 C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Decorative Wooden Shutters
Dual Pane Low-E
Windows
0’-0”
9’-1 1/8”
13’-1 1/8”
19’-0 1/2”
Standard Ledgestone Shown
Accent Paint w/
Special Stucco Finish
5
12
TYP

Zanjero Pass: Project Narrative
Page 88
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
ARABELLA
Plan 5017 F
Vertical Siding
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
0’-0”
9’-1 1/8”
20’-1”
5
12
TYP

Zanjero Pass: Project Narrative
Page 89
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
ARABELLA
Plan 5017 N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown
0’-0”
9’-1 1/8”
11’-1 1/8”
17’-1 3/4”
4
12
TYP
Accent Paint w/
Special Stucco Finish

Zanjero Pass: Project Narrative
Page 90
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5029  A
Arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
20’-1”
11’-1 1/8”
Decorative Wooden Shutters
Dual Pane Low-E
Windows
Decorative Wrought Iron Detail

Zanjero Pass: Project Narrative
Page 91
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5029 B
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Accent Paint w/
Special Stucco Finish
Decorative Gable Pipe Detail
5
12
TYP
0’-0”
9’-1 1/8”
20’-1”
12’-1 1/8”
Dual Pane Low-E
Windows
Arabella

Zanjero Pass: Project Narrative
Page 92
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5029  C
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1 1/8”
20’-1”
12’-1 1/8”
Dual Pane Low-E
Windows
Arabella

Zanjero Pass: Project Narrative
Page 93
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5029 F
Verticle Siding
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown
5
12
TYP
0’-0”
9’-1 1/8”
20’-1”
Dual Pane Low-E
Windows
Arabella

Zanjero Pass: Project Narrative
Page 94
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5029  N
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
4
12
TYP
0’-0”
9’-1 1/8”
17’-11 7/8”
11’-1 1/8”
Dual Pane Low-E
Windows
Arabella

Zanjero Pass: Project Narrative
Page 95
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5041 A
arabella
Stucco System
Decorative Gable Pipe Detail
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
9’-1 1/8”
13’-1 1/8”
20’-1”

Zanjero Pass: Project Narrative
Page 96
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5041 B
arabella
0’-0”
9’-1 1/8”
13’-1 1/8”
20’-1”
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wrought 
Iron Detail
Accent Paint w/
Special Stucco Finish
5
12
TYP

Zanjero Pass: Project Narrative
Page 97
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5041 C
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wrought Iron 
Detail
Accent Paint w/
Special Stucco Finish
Standard Ledgestone Shown
5
12
TYP
0’-0”
12’-1 1/8”
9’-1 1/8”
20’-1”

Zanjero Pass: Project Narrative
Page 98
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5041 F
arabella
0’-0”
9’-1 1/8”
14’-1 1/8”
20’-1”
Vertical Siding
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
5
12
TYP
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 99
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 5041 N
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown 
4
12
TYP
0’-0”
9’-1 1/8”
13’-1 1/8”
18’-0”

Zanjero Pass: Project Narrative
Page 100

Zanjero Pass: Project Narrative
Page 101

Zanjero Pass: Project Narrative
Page 102

Zanjero Pass: Project Narrative
Page 103

Zanjero Pass: Project Narrative
Page 104

Zanjero Pass: Project Narrative
Page 105

Zanjero Pass: Project Narrative
Page 106

Zanjero Pass: Project Narrative
Page 107

Zanjero Pass: Project Narrative
Page 108

Zanjero Pass: Project Narrative
Page 109

Zanjero Pass: Project Narrative
Page 110

Zanjero Pass: Project Narrative
Page 111

Zanjero Pass: Project Narrative
Page 112
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515 A
Stucco System
Concrete Roof Tile
Decorative Wrought Iron Detail
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 
15’-1 1/8”
22’-9”

Zanjero Pass: Project Narrative
Page 113
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515 B
Stucco System
Decorative Tri Gable Pipe Detial
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 
15’-1 1/8”
22’-9”

Zanjero Pass: Project Narrative
Page 114
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515 C
Stucco System
Concrete Roof Tile
Standard Ledgestone Shown
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 
15’-1 1/8”
22’-9”

Zanjero Pass: Project Narrative
Page 115
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515  F
Vertical Siding
Concrete Roof Tile
Decorative Wrought Iron Detail
Decorative Wooden Shutters
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint
5
12
TYP
0’-0”
10’-1 
23’-9”
Standard Ledgestone Shown
15’-1 1/8”

Zanjero Pass: Project Narrative
Page 116
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515 M
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint
4
12
TYP
0’-0”
9’-1 1/8”
19’-2 9/16”
Standard Ledgestone Shown
14’-1 1/8”

Zanjero Pass: Project Narrative
Page 117
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Arabella
Plan 6515 N
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
4
12
TYP
Accent Paint
Standard Ledgestone Shown
0’-0”
10’-1 
20’-3 3/4”
14’-1 1/8”

Zanjero Pass: Project Narrative
Page 118
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 A
arabella
Stucco System
Concrete Roof Tile
Decorative Wrought Iron Detail
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
Accent Paint w/
Special Stucco Finish
0’-0”
10’-1 1/8”
22’-5 1/2”
12’-1 1/8”
5
12
TYP

Zanjero Pass: Project Narrative
Page 119
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 B
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Gable Pipe 
Detail
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
22’-9 1/2”
12’-7 1/8”
11’-1 1/8”

Zanjero Pass: Project Narrative
Page 120
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 C
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Accent Paint w/Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
22’-7 1/2”
13’-1 1/8”

Zanjero Pass: Project Narrative
Page 121
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 F
arabella
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
5
12
TYP
0’-0”
10’-1 1/8”
20’-11 3/4”
18’-1 1/8”
12’-1 1/8”
Vertical Siding
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 122
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 M
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown 
4
12
TYP
0’-0”
10’-1 1/8”
21’-5”
16’
18’-5 1/4”

Zanjero Pass: Project Narrative
Page 123
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6520 N
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown 
4
12
TYP
0’-0”
10’-1 1/8”
19’-7”
13’-1 1/8”

Zanjero Pass: Project Narrative
Page 124
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 A
arabella
Stucco System
Concrete Roof Tile
Decorative Wrought Iron Detail
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Wooden Shutters
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
24’-2 1/2”
13’-1 1/8”

Zanjero Pass: Project Narrative
Page 125
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 B
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Decorative Gable Pipe 
Detail
Accent Paint w/
Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
24’-2 1/2”
14 ’-1 1/8”

Zanjero Pass: Project Narrative
Page 126
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 C
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
eta
Accent Paint w/Special Stucco Finish
5
12
TYP
0’-0”
10’-1 1/8”
24’-2 1/2”
13’-1 1/8”
Standard Ledgestone Shown

Zanjero Pass: Project Narrative
Page 127
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 F
arabella
Vertical Siding
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Dual Pane Low-E
Windows
Standard Ledgestone Shown
5
12
TYP
0’-0”
10’-1 1/8”
24’-2 1/2”
13’-1 1/8”

Zanjero Pass: Project Narrative
Page 128
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 M
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown 
4
12
TYP
0’-0”
10’-1 1/8”
21’-6”
16’-0”

Zanjero Pass: Project Narrative
Page 129
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Perspective
Plan 6525 N
arabella
Stucco System
Concrete Roof Tile
Garage Door -
See Matrix for Actual Garage Door Style
Standard Ledgestone Shown 
4
12
TYP
0’-0”
10’-1  1/8”
21’-6”
13’-1 1/8”

Zanjero Pass: Project Narrative
Page 130
Exhibit G: Perimeter Street Sections

Zanjero Pass: Project Narrative
Page 131
Exhibit H: Circulation Plan

Zanjero Pass: Project Narrative
Page 132
Exhibit I: Landscape Plan

Zanjero Pass: Project Narrative
Page 133
Exhibit J: Central Park

Zanjero Pass: Project Narrative
Page 134
Exhibit K: Phase 1 Park

Zanjero Pass: Project Narrative
Page 135
Exhibit L: Dog Park

Zanjero Pass: Project Narrative
Page 136
Exhibit M: Wall Plan

Zanjero Pass: Project Narrative
Page 137
Exhibit N: Wall Details

Zanjero Pass: Project Narrative
Page 138
Exhibit O: Phase 1 - Primary Entry

Zanjero Pass: Project Narrative
Page 139
Exhibit P: Primary Entry Gate and Monument Signage

Zanjero Pass: Project Narrative
Page 140
Exhibit Q: Phase 2 - Primary Entry

Zanjero Pass: Project Narrative
Page 141
Exhibit R: Preliminary Drainage Plan
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
OLIVE AVE
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
CITRUS RD
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
175TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
176TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
177TH AVE
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
MOUNTAIN VIEW RD
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 3
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
ON-XX

Zanjero Pass: Project Narrative
Page 142
Exhibit S: Water Layout Plan
8.0 INCHES
6.0 INCHES
12.0 INCHES
16.0 INCHES
30.0 INCHES
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 2
PHASE 2
PHASE 3
PHASE 2
PHASE 3
PHASE 3
PHASE 2
PHASE 3
PIPE DIAMETER LEGEND
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436

Zanjero Pass: Project Narrative
Page 143
Exhibit T: Wastewater Layout Plan
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 1
PHASE 2
PHASE 2
PHASE 2
PHASE 3
PHASE 2
PHASE 3
PHASE 3
PHASE 2
PHASE 3
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
P: 602.490.0535 / F: 602.368.2436
COLOR CODING LEGEND
PIPE DIAMETER (IN)
<=  8.0
<=  10.0
<=  18.0
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
ONSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
OFFSITE SEWER
<=  12.0

Page 144
Zanjero Pass: PRD Narrative
Appendices
Appendix A: A.L.T.A. Survey and Legal Description
Appendix B: Preliminary Drainage Report
Appendix C: Traffic Impact Study
Appendix D: Residential Design and Development Manual Project Compliance