ADOT CAR No.: IGA 21-0008115-I 
AG Contract No.: P0012021000566 
Project Location/Name: Glendale Ave 
Detection Upgrade/Glendale Ave at 20 
Intersections 
Type of Work: Detection Systems 
Federal-aid No.: GLN-0(262)T 
ADOT Project No.: T0306 01D/03D/01C 
TIP/STIP No.: GLN22-061 
CFDA No.: 20.205 - Highway Planning and 
Construction 
Budget Source Item No.:  
 
 
INTERGOVERNMENTAL AGREEMENT 
 
BETWEEN 
THE STATE OF ARIZONA 
AND 
THE CITY OF GLENDALE 
 
 
THIS AGREEMENT (“Agreement”) is entered into this date ________________________________, pursuant 
to the Arizona Revised Statutes (“A.R.S.”) §§ 11-951 through 11-954, as amended, between the 
STATE OF ARIZONA, acting by and through its DEPARTMENT OF TRANSPORTATION (the “State” or 
“ADOT”) and the CITY OF GLENDALE, acting by and through its MAYOR and CITY COUNCIL (the “
City”). The State and the City are each individually referred to as a “Party” and are collectively 
referred to as the “Parties.” 
 
 
I. 
RECITALS 
 
1. The State is empowered by A.R.S. § 28-401 to enter into this Agreement and has delegated 
to the undersigned the authority to execute this Agreement on behalf of the State. 
 
2. The City is empowered by A.R.S. § 48-572 to enter into this Agreement and has by 
resolution, a copy of which is attached and made a part of, resolved to enter into this 
Agreement and has authorized the undersigned to execute this Agreement on behalf of the 
City. 
 
3. The work proposed under this Agreement includes the procurement and installation of 
smart detection systems at approximately 20 locations along Glendale Avenue, “the 
Project”. The Project costs are estimated at $746,512.00, as shown in Exhibit A, attached 
and made a part of this Agreement, which includes federal aid and the City's match. The City 
will administer the design, and the State will advertise, bid and award, and administer the 
construction of the Project.  
 
4. The interest of the State in this Project is the acquisition of federal funds for the use and 
benefit of the City and authorization of such federal funds for the Project pursuant to federal 
law and regulations. The State shall be the designated agent for the City for the Project, if

IGA 21-0008115-I 
 
 
Page 2 of 10 
 
the Project is approved by Federal Highway Administration (FHWA) and funds for the 
Project are available. 
 
THEREFORE, the Recitals set forth above are incorporated into this Agreement and in 
consideration of the mutual terms expressed herein, it is agreed as follows: 
 
 
 
II. SCOPE OF WORK 
 
 
1.   The Parties agree:  
 
a. The Project will be completed, accepted, and paid for in accordance with the 
requirements of the Project plans and specifications. 
 
b. The final Project amount may exceed the initial estimate(s) identified in Exhibit A, and 
in such case, the City is responsible for, and agrees to pay, any and all actual costs 
exceeding the initial estimate. If the final Project amount is less than the initial estimate, 
the difference between the final bid amount and the initial estimate will be de-obligated 
or otherwise released from the Project. The City acknowledges it remains responsible 
for actual costs and agrees to pay according to the terms of this Agreement.  
 
c. The City and ADOT will each separately file a Notice of Intent (NOI) under the 
Construction General Permit (CGP) with the Arizona Department of Environmental 
Quality (ADEQ) before construction begins, if applicable to the Project. 
 
 
 
2. The State will: 
 
a. Execute this Agreement, and if the Project is approved by FHWA and funds for the 
Project are available, be the City's designated agent for the Project. 
 
b.    After this Agreement is executed, and prior to performing or authorizing any work, 
invoice the City for the City's share of the initial Project Development Administration 
(PDA) costs, estimated at $30,000.00.  If PDA costs exceed the estimate during the 
development of design, notify the City, obtain concurrence prior to continuing with the 
development of design, and invoice as determined by ADOT and the City for additional 
costs to complete PDA for the Project. After the Project costs for the procurement of the 
Equipment are finalized invoice or reimburse the City for the difference between actual 
costs and the amount the City has already paid for PDA. 
 
c.     After receipt of the PDA costs, review design plans, specifications , cost estimates and 
other such documents required for the construction bidding and construction for the 
Project, including scoping/design plans and comments required by FHWA to qualify 
projects for and to receive federal funds, provide  design review comments to the City, 
as appropriate.  
 
d. After completion of design review and prior to bid advertisement, invoice the City for 
the actual PDA costs, as applicable, and the City's share of the Project construction costs, 
estimated at $40,841.00. After the Project costs for construction are finalized, the State

IGA 21-0008115-I 
 
 
Page 3 of 10 
 
will either invoice or reimburse the City for the difference between estimated and actual 
costs. De-obligate or otherwise release any remaining federal funds from the 
scoping/design phase of the Project. 
 
e. After receipt of the actual PDA costs, if applicable, and the City's estimated share of the 
Project construction costs, submit all required documentation to FHWA with the 
recommendation that the maximum federal funds programmed for construction of this 
Project be approved. Should costs exceed the maximum federal funds available, it is 
understood and agreed that the City will be responsible for any overage. 
 
f. 
After receipt of FHWA authorization, proceed to advertise for, receive and open bids 
award and enter into a contract with the firm for the construction of the Project. If the 
bid amounts exceed the construction cost estimate, obtain City concurrence prior to 
awarding the contract. After the Project is awarded, invoice the City for the difference 
between estimated and actual costs, if applicable.   
 
g. Notify the City of completion and final acceptance of the Project. At such time, file a 
Notice of Termination (NOT) with ADEQ transferring CGP responsibilities to the City, 
and provide a copy to the City indicating that the State’s maintenance responsibility of 
the Project is terminated, as applicable. 
 
h. Notify the City of completion and final acceptance of the Project, coordinate with the 
City and turnover full responsibility of the Project improvements. 
 
i. 
Not be obligated to maintain the Project, should the City fail to budget or provide for 
proper and perpetual maintenance as set forth in this Agreement.  
 
 
 
3. The City will: 
 
a. Designate the State as the City's authorized agent for the Project. 
b. Within 30 days of receipt of an invoice from the State, pay the City's share of  the initial 
PDA costs, estimated at $30,000.00. Agree to be responsible for actual PDA costs, if 
during the development of design, PDA costs exceed the initial estimate. Be responsible 
and pay for the difference between the estimated and actual PDA costs of the Project 
within 30 days of receipt of an invoice. 
 
c. Prepare and provide design plans, specifications, cost estimates and other such 
documents required for the construction bidding and construction of the Project, 
including scoping/design plans and documents required by FHWA to qualify projects 
for and to receive federal funds; incorporate design review comments from the State, as 
appropriate. 
 
d. Enter into an agreement with the design consultant which states that the design 
consultant will provide professional post-design services as required and requested 
throughout and at completion of the construction phase of the Project. After final 
acceptance of this Project, provide an electronic version of the record drawings to the 
ADOT Project Manager.

IGA 21-0008115-I 
 
 
Page 4 of 10 
 
e. After completion of design, within 30 days of receipt of an invoice from the State and 
prior to bid advertisement, pay to the State, any outstanding PDA costs and the City's 
share of the Project construction costs, estimated at $40,841.00. Be responsible for and 
pay the difference between the estimated and actual construction costs of the Project, 
within 30 days of receipt of an invoice. 
 
f. 
Be responsible for all costs incurred in performing and accomplishing the work as set 
forth under this Agreement, that are not covered by federal funding. Should costs be 
deemed ineligible or exceed the maximum federal funds available, it is understood and 
agreed that the City is responsible for these costs; payment for these costs shall be made 
within 30 days of receipt of an invoice from the State. 
 
g. Certify that all necessary rights of way have been or will be acquired prior to 
advertisement for bid and also certify that all obstructions or unauthorized 
encroachments of whatever nature, either above or below the surface of the Project 
area, shall be removed from the proposed right of way, or will be removed prior to the 
start of construction, in accordance with The Uniform Relocation Assistance and Real 
Property Acquisition Policies Act of 1970 as amended; 49 CFR 24.102 Basic Acquisition 
Policies; 49 CFR 24.4 Assurances, Monitoring and Corrective Action, parts (a) & (b) and 
ADOT Right of Way Procedures Manual: 8.02 Responsibilities, 8.03 Prime Functions, 
9.06 Monitoring Process and 9.07 Certification of Compliance. Coordinate with the 
appropriate State’s Right of Way personnel during any right of way process performed 
by the City, if applicable. 
 
h. Certify that the City has adequate resources to discharge the City’s real property related 
responsibilities and ensures that its Title 23-funded projects are carried out using the 
FHWA approved and certified ADOT Right of Way Procedures Manual and that they will 
comply with current FHWA requirements whether or not the requirements are included 
in the FHWA approved ADOT Right of Way Procedures Manual. (23 CFR 710.201) 
 
i. 
Not permit or allow any encroachments on or private use of the right of way, except 
those authorized by permit. In the event of any unauthorized encroachment or 
improper use, the City shall take all necessary steps to remove or prevent any such 
encroachment or use. Provide a copy of encroachment permits issued within the Project 
limits to the State.       
 
j. 
Automatically grant to the State, by execution of this Agreement, its agents and/or 
contractors, without cost, the temporary right to enter City rights of way, as required, to 
conduct any and all construction and preconstruction related activities for the Project, 
on, to and over said City rights of way. This temporary right will expire with completion 
of the Project. 
 
k. Investigate and document utilities within the Project limits; submit findings to ADOT 
determining prior rights or no prior rights; approve an easement within the final right 
of way to re-establish the prior right location for those utilities with prior rights. 
 
l. 
Be obligated to incur any expenditure should unforeseen conditions or circumstances 
increase Project costs. Be responsible for the cost of any City requested changes to the 
scope of work of the Project, such changes will require State and FHWA approval. Be 
responsible for any contractor claims for additional compensation caused by Project

IGA 21-0008115-I 
 
 
Page 5 of 10 
 
delay attributable to the City. Payment for these costs will be made to the State within 
30 days of receipt of an invoice from the State. 
 
m. After notification of final acceptance by the State, assume and maintain full 
responsibility of the Project, including Storm Water Pollution Prevention Plans (SWPPP) 
inspections, maintenance, and required documentation, until final stabilization is 
reached. Provide the NOI number to the State and the Contractor, accept CGP 
responsibilities at time of transfer, and file an NOT with ADEQ when final stabilization is 
reached, as applicable. 
 
n. After completion and final acceptance of the Project, agree to maintain and assume full 
responsibility of the Project and all Project components. 
 
 
   
III. MISCELLANEOUS PROVISIONS 
 
1. This Agreement shall become effective upon signing and dating of the Determination Letter 
by the State’s Attorney General. 
 
2. Any change or modification to the Project will only occur with the mutual written consent of 
both Parties. 
 
3. The terms, conditions and provisions of this Agreement shall remain in full force and effect 
until completion of the Project and all related deposits and/or reimbursements are made. 
Any provisions for maintenance shall be perpetual, unless assumed by another competent 
entity.  
 
4. This Agreement may be cancelled at any time up to 30 days before the award of the Project 
contract, so long as the cancelling Party provides at least 30 days’ prior written notice to the 
other Party. It is understood and agreed that, in the event the City terminates this 
Agreement, the City shall be responsible for all costs incurred by the State up to the time of 
termination. It is further understood and agreed that in the event the City terminates this 
Agreement, the State shall in no way be obligated to complete or maintain the Project.   
 
5. The City shall indemnify, defend, and hold harmless the State, any of its departments, 
agencies, officers or employees (collectively referred to in this paragraph as the “State”) 
from any and all claims, demands, suits, actions, proceedings, loss, cost and damages of 
every kind and description, including reasonable attorneys' fees and/or litigation expenses 
(collectively referred to in this paragraph as the “Claims”), which may be brought or made 
against or incurred by the State on account of loss of or damage to any property or for 
injuries to or death of any person, to the extent caused by, arising out of, or contributed to, 
by reasons of any alleged act, omission, professional error, fault, mistake, or negligence of 
the City, its employees, officers, directors, agents, representatives, or contractors, their 
employees, agents, or representatives in connection with or incident to the performance of 
this Agreement. The City’s obligations under this paragraph shall not extend to any Claims 
to the extent caused by the negligence of the State, except the obligation does apply to any 
negligence of the City which may be legally imputed to the State by virtue of the State’s 
ownership or possession of land. The City’s obligations under this paragraph shall survive 
the termination of this Agreement.

IGA 21-0008115-I 
 
 
Page 6 of 10 
 
6. The State shall include Section 107.13 of the 2008 version of the Arizona Department of 
Transportation Standard Specifications for Road and Bridge Construction, incorporated into 
this Agreement by reference, in the State’s contract with any and all contractors, of which 
the City shall be specifically named as a third-party beneficiary. This provision may not be 
amended without the approval of the City.  
 
7. The cost of scoping and design work under this Agreement is to be covered by the federal 
funds programmed for this Project, up to the maximum available. The City acknowledges 
that actual Project costs may exceed the maximum available amount of federal funds, or that 
certain costs may not be accepted by FHWA as eligible for federal funds. Therefore, the City 
agrees to pay the difference between actual costs of the Project and the federal funds 
received.  
 
8. Should the federal funding related to this Project be terminated or reduced by the federal 
government, or Congress rescinds, fails to renew, or otherwise reduces apportionments or 
obligation authority, the State shall in no way be obligated for funding or liable for any past, 
current or future expenses under this Agreement. 
 
9. The cost of the Project under this Agreement includes indirect costs approved by FHWA, as 
applicable. 
 
10. The Parties warrant compliance with the Federal Funding Accountability and Transparency 
Act of 2006 and associated 2008 Amendments (the “Act”). Additionally, in a timely manner, 
the City will provide information that is requested by the State to enable the State to comply 
with the requirements of the Act, as may be applicable. 
 
11. The City acknowledges and will comply with Title VI of the Civil Rights Act Of 1964. 
 
12. The City acknowledges compliance with federal laws and regulations and may be subject to 
the CODE OF FEDERAL REGULATIONS, TITLE 2, PART 200 (also known as The Uniform 
Grant Guidance). Entities that expend $750,000.00 or more (on or after 12/26/14) of 
federal assistance (federal funds, federal grants, or federal awards) are required to comply 
by having an independent audit in accordance with §200.331 Subpart F. Either an electronic 
or hardcopy of the Single Audit is to be sent to Arizona Department of Transportation 
Financial Management Services within the required deadline of nine months of the sub 
recipient fiscal year end.   
ADOT – FMS 
Attn: Cost Accounting Administrator 
206 S 17th Ave. Mail Drop 204B 
Phoenix, AZ 85007 
SingleAudit@azdot.gov                        
 
13. Pursuant  to 23 USC 102(b), the City will repay all federal funds reimbursements for 
preliminary engineering costs on the Project if it does not advance to right of way 
acquisition or construction within 10 years after federal funds were first made available.    
 
14. This Agreement shall be governed by and construed in accordance with Arizona laws. 
 
15. This Agreement may be cancelled in accordance with A.R.S. § 38-511.

IGA 21-0008115-I 
 
 
Page 7 of 10 
 
16. The City shall retain all books, accounts, reports, files and other records relating to the 
Agreement for five years after completion of the Project. These documents shall be subject 
at all reasonable times to inspection and audit by the State. Such records shall be produced 
by the City at the request of ADOT.  
 
17. This Agreement is subject to all applicable provisions of the Americans with Disabilities Act 
(Public Law 101-336, 42 U.S.C. 12101-12213) and all applicable federal regulations under 
the Act, including 28 CFR Parts 35 and 36. The Parties to this Agreement shall comply with 
Executive Order Number 2009-09 issued by the Governor of the State of Arizona and 
incorporated in this Agreement by reference regarding “Non-Discrimination.” 
 
18. Non-Availability of Funds: Every obligation of the State under this Agreement is conditioned 
upon the availability of funds appropriated or allocated for the fulfillment of such 
obligations. If funds are not allocated and available for the continuance of this Agreement, 
this Agreement may be terminated by the State at the end of the period for which the funds 
are available. No liability shall accrue to the State in the event this provision is exercised, 
and the State shall not be obligated or liable for any future payments as a result of 
termination under this paragraph. 
 
19. In the event of any controversy, which may arise out of this Agreement, the Parties agree to 
abide by arbitration as is set forth for public works contracts if required by A.R.S. § 12-1518. 
 
20. The Parties shall comply with the applicable requirements of A.R.S. § 41-4401. 
 
21. The Parties shall certify that all contractors comply with the applicable requirements of 
A.R.S. §35-393.01.  
 
22. The Parties shall comply with all applicable laws, rules, regulations and ordinances, as may 
be amended. 
 
23. All notices or demands upon any Party to this Agreement shall be in writing and shall be 
delivered electronically, in person, or sent by mail, addressed as follows: 
 
 
For Agreement Administration: 
Arizona Department of Transportation 
Joint Project Agreement Section 
205 S. 17th Avenue, Mail Drop 637E 
Phoenix, AZ 85007 
JPABranch@azdot.gov 
 
 
For Project Administration: 
Arizona Department of Transportation 
Project Management Group 
205 S. 17th Avenue, Mail Drop 614E 
Phoenix, AZ 85007 
PMG@azdot.gov 
 
 
 
City of Glendale 
Attn: Allan Galicia 
6210 W. Myrtle 
Glendale, AZ 85301 
agalicia@glendaleaz.com 
 
 
 
City of Glendale 
Attn: Allan Galicia 
6210 W. Myrtle 
Glendale, AZ 85301 
agalicia@glendaleaz.com

IGA 21-0008115-I 
 
 
Page 8 of 10 
 
For Financial Administration:  
Arizona Department of Transportation 
Project Management Group 
205 S. 17th Avenue, Mail Drop 614E 
Phoenix, AZ 85007 
PMG@azdot.gov 
 
 
City of Glendale 
Attn: Allan Galicia 
6210 W. Myrtle 
Glendale, AZ 85301 
agalicia@glendaleaz.com 
 
24. Any revisions to the names and addresses above may be updated administratively by either 
Party and shall be in writing. 
 
25. In accordance with A.R.S. § 11-952 (D), attached and incorporated in this Agreement is the 
written determination of each Party’s legal counsel that the Parties are authorized under 
the laws of this State to enter into this Agreement and that the Agreement is in proper form. 
 
 
 
IN WITNESS WHEREOF, the Parties have executed this Agreement the day and year first above 
written. 
 
CITY OF GLENDALE 
 
 
 
By ______________________________ 
        JERRY P. WEIERS 
        Mayor 
STATE OF ARIZONA 
Department of Transportation 
 
 
By ______________________________ 
       STEVE BOSCHEN, PE 
       Division Director 
 
 
ATTEST: 
 
 
By ______________________________ 
        JULIE K. BOWER 
         City Clerk

Page 9 of 10 
 
IGA 21-0008115-I 
 
ATTORNEY APPROVAL FORM FOR THE CITY OF GLENADLE 
 
I have reviewed the above referenced Intergovernmental Agreement between the State of Arizona, 
acting by and through its DEPARTMENT OF TRANSPORTATION, and the CITY OF GLENDALE, an 
agreement among public agencies which, has been reviewed pursuant to Arizona Revised Statutes 
§§ 11-951 through 11-954 and declare this Agreement to be in proper form and within the powers 
and authority granted to the City under the laws of the State of Arizona. 
 
No opinion is expressed as to the authority of the State to enter into this Agreement. 
 
_____________________________________________________            _________________________________ 
MICHAEL BAILEY 
 
 
 
 
  DATE 
City Attorney

IGA 21-0008115-I 
 
 
Page 10 of 10 
 
EXHIBIT A 
 
Cost Estimate 
 
 
T0306 01D/03D/01C 
 
The federal funds will be used for the scoping/design and construction of the Project, including 
the construction engineering (CE) and administration cost. The estimated Project costs are as 
follows:  
 
ADOT Project Development Administration (PDA) Cost, non-federal-aid: 
 
PDA costs*  
$     30,000.00     
 
 
Subtotal – PDA* 
 
$    30, 000.00  
 
 
Construction: 
 
 
Federal-aid funds @ 94.3%  
 
$   675,671.00     
 
City’s match @ 5.7% 
  
$     40,841.00       
 
Subtotal – Construction** 
 
 
$ 716,512.00               
 
Estimated TOTAL Project Cost 
 
  
$ 746,512.00           
 
Total Estimated City Funds 
 
  
$    70,841.00             
 
Total Federal Funds 
 
 
 
$ 675,671.00           
 
 
 
 
 * (Included in the City Estimated Funds) 
** (Includes 15% CE (this percentage is subject to change, any change will require concurrence 
from the City) and 5% Project contingencies)