Contract # C20-0783

City of Glendale — Regular Meeting (2021-08-24)

View PDF Item 16 Meeting page

Extracted text (via ocr_local) 55804 characters
C20-0783 |

CONSTRUCTION AGREEMENT

This Construction Agreement ("Agreement") is entered into this A Ad ay of Sepp, 20 a , and
is effective between the City of Glendale, an Arizona municipal corporation ("City"), and Recon Restoration, Inc.,
an Arizona corporation authorized to do business in the State of Arizona (“Contractor").

RECITALS

A. City intends to undertake a project for the benefit of the public, with public funds, that is more fully set
forth in Exhibit A attached ("Project");

B. City desires to retain the services of Contractor to perform those specific duties and produce the specific
work as set forth in the Project;
c. City and Contractor desite to memorialize their agreement with this document.
AGREEMENT

The parties hereby agree as follows:
1. Project.

11 Scope. Contractor will provide all services and material necessary to assure the Project is
completed timely and efficiently consistent with Project requirements, including, but not limited to,
working in close interaction and interfacing with City and its designated employees, and working
closely with othets, including other contractors, providers or consultants retained by City.

1.2 Project Team.

a. Project Manager. Contractor will designate an employee as Project Manager with sufficient
training, knowledge, and experience to, in the City's opinion, to complete the Project and
handle all aspects of the Project such that the work produced by Contractor is consistent
with applicable standards as detailed in this Agreement.

b. Project Team.

(1) The Project Manager and all other employees assigned to the Project by
Contractor will comprise the "Project Team."

(2) Project Manager will have responsibility for and will supervise all other employees
assigned to the Project by Contractor.

c. Sub-contractors.
(4) Contractor may engage specific technical contractor (each a "Sub-contractor") to
furnish certain service functions.
(2) Contractor will remain fully responsible for Sub-contractor's services.
(3) Sub-contractors must be approved by the City, unless the Sub-contractor was

previously mentioned in the response to the solicitation.

(4) Contractor shall certify by letter that contracts with Sub-contractors have been
executed incorporating requirements and standards as set forth in this Agreement.

2. Schedule. The Project will be undertaken in a manner that ensures it is completed in a timely and efficient
manner. The Project shall be completed in accordance with the schedule contained in Exhibit A.

1/2/20

Contractor’s Work.

3.1

3.2

3.3

3.4

3.5

3.6

Standard. Contractor must perform services in accordance with the standards of due diligence,
care, and quality prevailing among contractors having substantial experience with the successful
furnishing of services and materials for projects that are equivalent in size, scope, quality, and other
criteria under the Project and identified in this Agreement.

Licensing. Contractor warrants that:

a. Contractor and Sub-contractors will hold all appropriate and required licenses, registrations
and other approvals necessary for the lawful furnishing of setvices ("Approvals"); and

b. Neither Contractor nor any Sub-contractor has been debarred or otherwise legally
excluded from contracting with any federal, state, or local governmental entity
("Debarment").

(1) City is under no obligation to ascertain or confirm the existence or issuance of any
Approvals or Debarments or to examine Contractor's contracting ability.

(2) Contractor must notify City immediately if any Approval or Debarment changes
during the Agreement’s duration and the failure of the Contractor to notify City as
required will constitute a material default of this Agreement.

Compliance.

a. Services and materials will be furnished in compliance with applicable federal, state, county
and local statutes, rules, regulations, ordinances, building codes, life safety codes, or other
standards and criteria designated by City.

b. Contractor must not discriminate against any employee or applicant for employment on
the basis of race, color, religion, sex, national origin, age, marital status, sexual orientation,
gender identity or expression, genetic characteristics, familial status, U.S. military veteran
status or any disability. Contractor will require any Sub-contractor to be bound to the
same requirements as stated within this section. Contractor, and on behalf of any
subcontractors, warrants compliance with this section.

Coordination; Interaction,

a. If the City determines that the Project requires the coordination of professional services or
other providers, Contractor will work in close consultation with City to proactively interact
with any other contractors retained by City on the Project ("Coordinating Entities").

b. Subject to any limitations expressly stated in the budget, Contractor will meet to review the
Project, schedules, budget, and in-progress work with Coordinating Entities and the City as
often and for durations as City reasonably considers necessary in order to ensure the timely
work delivery and Project completion.

c. If the Project does not involve Coordinating Entities, Contractor will proactively interact
with any other contractors when directed by City to obtain or disseminate timely
information for the proper execution of the Project.

Hazardous Substances. Contractor is responsible for the appropriate handling, disposal of, and if
necessary, any remediation and all losses and damages to the City, associated with the use, release
or thteat of release of any pollutant, contaminant or hazardous substances by Contractor in
connection with completion of the Project.

Warranties. At any time within two years after completion of the Project, Contractor must, at
Conttractor’s sole expense and within 20 days of written notice from the City, uncover, correct and
remedy all defects in Contractor’s work. City will accept a manufacturet’s warranty on approved
equipment.

1/2/20

5.

3.7.

Bonds. Upon execution of this Agreement, and if applicable, Contractor must furnish Payment
and Performance Bonds as required under A.R.S. § 34-608.

Compensation for the Project.

Compensation. Contractor's compensation for the Project, including those furnished by its Sub-
contractors will not exceed $228,500.00, as specifically detailed in Exhibit B ("Compensation").

41

4.2

Change in Scope of Project. The Compensation may be equitably adjusted if the originally
contemplated scope of setvices as outlined in the Project is significantly modified by the City.

a.

Adjustments to the Scope or Compensation require a written amendment to this
Agreement and may require City Council approval.

Additional services which are outside the scope of the Project and not contained in this
Agteement may not be performed by the Contractor without prior written authorization
from the City.

Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should
any conflict arise between the provisions of this Agreement and the provisions found in
the Exhibits and accompanying attachments, the provisions of this Agreement shall take
priority and govern the conduct of the patties.

Billings and Payment.

5.1

5.2

5.3

Applications.
a. Unless Exhibit B (Compensation) dictates otherwise, the Contractor will submit monthly

invoices (each, a "Payment Application") to City's Project Manager and City will remit
payments based upon the Payment Application as stated below.

The period covered by each Payment Application will be one calendar month ending on
the last day of the month.

Payment,

a.

After a full and complete Payment Application is received, City will process and remit
payment within 30 days.

Payment may be subject to or conditioned upon City's receipt of:
(1) Completed work generated by Contractor and its Sub-contractors; and

(2) Unconditional waivers and releases on final payment from Sub-contractors as City
may reasonably request to assure the Project will be free of claims arising from
required performances under this Agreement.

Review and Withholding. City's Project Manager will timely review and certify Payment
Applications.

va.

If the Payment Application is rejected, the Project Manager will issue a written listing of
the items not approved for payment.

City may withhold an amount sufficient to pay expenses that City reasonably expects to
incur in correcting the deficiency or deficiencies rejected for payment.

Contractor will provide, by separate cover, and concurrent with the execution of this
Agreement, all required financial information to the City, including City of Glendale
Transaction Privilege License and Federal Taxpayer identification numbers.

City will temporarily withhold Compensation amounts as required by A.R.S. § 34-221(C).

1/2/20

Termination.

6.1 For Convenience. City may terminate this Agreement for convenience, without cause, by
delivering a written termination notice stating the effective termination date, which may not be less
than 15 days following the date of delivery.

a. Contractor will be equitably compensated any services and materials furnished prior to
receipt of the termination notice and for reasonable costs incurred.

b. Contractor will also be similarly compensated for any approved effort expended and
approved costs incurred that are directly associated with Project closeout and delivery of
the required items to the City.

6.2 For Cause. City may terminate this Agreement for cause if Contractor fails to cure any breach of

this Agreement within seven days after receipt of written notice specifying the breach.

a

Contractor will not be entitled to further payment until after City has determined its
damages. If City's damages resulting from the breach, as determined by City, are less than
the equitable amount due but not paid Contractor for Service and Repair furnished, City
will pay the amount due to Contractor, less City's damages.

If City's direct damages exceed amounts otherwise due to Contractor, Contractor must pay
the difference to City immediately upon demand; however, Contractor will not be subject
to consequential damages more than $1,000,000 or the amount of this Agreement,
whichever is greater.

Insurance. For the duration of the term of this Agreement, Contractor shall procure and maintain
insurance against claims for injuries to persons or damages to property which may arise from or in
connection with the performance of all tasks or work necessary to complete the Project as herein defined.
Such insurance shall cover Contractor, its agent(s), representative(s), employee(s) and any subcontractors.

71 Minimum Scope and Limit of Insurance. Coverage must be at least as broad as:

a.

Commercial General Liability (CGL): Insurance Services Office Form CG 00 01,
including products and completed operations, with limits of no less than $1,000,000 per
occurrence for bodily injury, personal injury, and property damage. If a general aggregate
limit applies, either the general aggregate limit shall apply separately to this project/location
or the general aggregate limit shall be twice the required occurrence limit.

Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code
1 (any auto), with limits no less than $1,000,000 per accident for bodily injury and property
damage.

Worker’s Compensation: Insurance as required by the State of Arizona, with Statutory
Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per
accident for bodily injury or disease.

72 Other Insurance Provisions. The insurance policies required by Section 7.1 above must contain,
or be endorsed to contain the following insurance provisions:

a.

The City, its officers, officials, employees and volunteers are to be covered as
additional insureds of the CGL and automobile policies for any liability arising from or
in connection with the performance of all tasks or work necessary to complete the Project
as herein defined. Such liability may arise, but is not limited to, liability for materials, parts
or equipment furnished in connection with any tasks, or work performed by Contractor or
on its behalf and for liability arising from automobiles owned, leased, hired or borrowed
on behalf of the Contractor. General liability coverage can be provided in the form of an
endorsement to the Contractor’s existing insurance policies, provide such endorsement is
at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 23 37, if later
revisions are used.

1/2/20

7.3

74

75

7.6

7.7

7.8

b. For any claims related to this Project, the Contractor’s insurance coverage shall be
ptimary insurance as respects the City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by the City, its officers, officials, employees or
volunteers shall be in excess of the Contractor’s insurance and shall not contribute with it.

c. Each insurance policy required by the Section shall provide that coverage shall not be
canceled, except after providing notice to the City.

Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating
of no less than A: VII, unless the Contractor has obtained prior approval from the City stating that
a non-conforming insurer is acceptable to the City.

Waiver of Subrogation. Contractor hereby agrees to waive its rights of subrogation which
any insurer may acquire from Contractor by virtue of the payment of any loss. Contractor agrees
to obtain any endorsement that may be necessary to effect this waiver of subrogation. The
Workers’ Compensation Policy shall be endorsed with a waiver of subrogation in favor of the City
for all work performed by the Contractor, its employees, agent(s) and subcontractor(s).

Verification of Coverage. Within 10 days of the Effective Date of this Agreement, Contractor
shall furnish the City with original certificates and amendatory endorsements, or copies of any
applicable insurance language effecting the coverage required by this Agreement. All certificates
and endorsements must be received and approved by the City before work commences. Failure to
obtain, submit or secure the City’s approval of the required insurance policies, certificates or
endorsements prior to the City’s agreement that work may commence shall not waive the
Contractor’s obligations to obtain and verify insurance coverage as otherwise provided in this
Section. The City reserves the right to require complete, certified copies of all required insurance
policies, including any endorsements or amendments, required by this Agreement at any time
during the Term stated herein.

Contractot’s failure to obtain, submit or secure the City’s approval of the required insurance
policies, certificates or endorsements shall not be considered a Force Majeure or defense for any
failure by the Contractor to comply with the terms and conditions of the Agreement, including any
schedule for performance or completion of the Project.

Subcontractors. Contractor shall require and shall verify that all subcontractors maintain
insurance meeting all requirements of this Agreement.

Special Risk or Circumstances. The City reserves the right to modify these insurance
requirements, including any limits of coverage, based on the nature of the risk, prior experience,
insurer, coverage or other circumstances unique to the Contractor, the Project or the insurer.

Indemnification.

a. To the fullest extent permitted by law, Contractor must defend, indemnify, and hold
harmless City and its elected officials, officers, employees and agents (each, an
"Indemnified Party," collectively, the "Indemnified Parties"), for, from, and against any and
all claims, demands, actions, damages, judgments, settlements, personal injury (including
sickness, disease, death, and bodily harm), property damage (including loss of use),
infringement, governmental action and all other losses and expenses, including attorneys!
fees and litigation expenses (each, a "Demand or Expense"; collectively, "Demands or
Expenses") asserted by a third-party (e, a person or entity other than City or Contractor)
and that arises out of or results from the breach of this Agreement by the Contractor or
the Contractor’s negligent actions, ettors or omissions (including any Sub-contractor or
other person or firm employed by Contractor), whether sustained before or after
completion of the Project.

b. This indemnity and hold harmless provision applies even if a Demand or Expense is in
part due to the Indemnified Party's negligence or breach of a responsibility under this
Agreement, but in that event, Contractor shall be liable only to the extent the Demand or

5 \

1/2/20

10.

i.

Expense results from the negligence or breach of a responsibility of Contractor or of any
person or entity for whom Contractor is responsible.

c. Contractor is not required to indemnify any Indemnified Parties for, from, or against any
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault
solely attributable to the Indemnified Party.

E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Contractor warrant
their compliance and that of its subcontractor with all federal immigration laws and regulations that relate to
their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The Contractor
ot subcontractor’s breach of this warranty shall be deemed a material breach of the Agreement and may
result in the termination of the Agreement by the City under the terms of this Agreement. The City retains
the legal right to randomly inspect the papers and records of the other party to ensure that the other party is
complying with the above-mentioned warranty. The Contractor and subcontractor warrant to keep their
respective papers and records open for random inspection duting normal business hours by the other party.
The parties shall cooperate with the City’s random inspections, including granting the inspecting party entry
rights onto their respective properties to perform the random inspections and waiving their respective rights
to keep such papers and records confidential.

No Boycott of Israel. The Parties agree that they are not currently engaged in and agree that for the
duration of the Agreement they will not engage in, a boycott of Israel, as that term is defined in A.R.S. §35-
393. Unless and until the District Court’s injunction in Jordabl v Brnovich, 336 F.Supp.3d 1016 (D.Atiz. 2018)
is stayed or lifted, the Anti-Israel Boycott Provision (A.R.S. §35-393.01 (A)) Gf applicable to this agreement)
is unenforceable and the City will take no action to enforce it.

Conflict. Contractor acknowledges this Agreement is subject to A.RS. § 38-511, which allows for
cancellation of this Agreement in the event any person who is significantly involved in initiating,
negotiating, securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or
consultant of any other party to this Agreement.

Attestation of PCI Compliance. When applicable, the Consultant will provide the City annually with a
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an
officer of Consultant with oversight responsibility.

Notices.

42.1 Anotice, request or other communication that is required or permitted under this Agreement (each
a“Notice") will be effective only if:

The Notice is in writing, and

b. Delivered in person or by private express overnight delivery service (delivery charges
ptepaid), certified or registered mail (return receipt requested).

c. Notice will be deemed to have been delivered to the person to whom it is addressed as of
the date of receipt, if
(4) Received on a business day, or before 5:00 p.m., at the address for Notices

identified for the Party in this Agreement by U.S. Mail, hand delivery, or overnight
courier on or before 5:00 p.m.; or

(2) ‘As of the next business day after receipt, if received after 5:00 p.m.
d. The burden of proof of the place and time of delivery is upon the Party giving the Notice.

e. Digitalized signatures and copies of signatures will have the same effect as original
signatures.

1/2/20

14.

15.

12:2 Representatives.

a.

Contractor. Contractor's representative ("Contractor's Representative") authorized to act
on Contractor's behalf with respect to the Project, and his or her address for Notice
delivery is:

Recon Restoration, Inc.

c/o Mark Edgerton

11811 N Tatum Blvd #3031
Phoenix, AZ, 85028
(480)200-8354
mark@reconrestore.com

City. City's representative ("City's Representative") authorized to act on City's behalf, and
his or her address for Notice delivery is:

City of Glendale

c/o Jamie Macfarlane, Revitalization Coordinator
Community Revitalization Division

5850 W Glendale Ave, Suite 107

Glendale, AZ 85301

(623)930-3670

Jmacfarlane@glendaleaz.com

With required copies to:

City of Glendale City of Glendale

City Manager City Attorney

5850 West Glendale Avenue 5850 West Glendale Avenue

Glendale, Arizona 85301 Glendale, Arizona 85301

Concurrent Notices.

(63) All notices to City's representative must be given concurrently to City Manager
and City Attomey.

(2) A notice will not be considered to have been received by City's representative until

the time that it has also been received by City Manager and City Attorney.

(3) City may appoint one or more designees for the purpose of receiving notice by
delivery of a written notice to Contractor identifying the designee(s) and their
respective addresses for notices.

Changes. Contractor or City may change its representative or information on N otice, by
giving Notice of the change in accordance with this section at least ten days prior to the
change.

Financing Assignment. City may assign this Agreement to any City-affiliated entity, including a non-
profit corporation or other entity whose primary purpose is to own ot manage the Project.

Term.

14.1 The term of this contract is one year, which shall commence on the Effective Date of this
Agreement. This Agreement will terminate on the one-year anniversary of its Effective Date.

Entire Agreement; Survival; Counterparts; Signatures.

15.1 Integration. This Agreement contains, except as stated below, the entire agreement between City
and Contractor and supersedes all prior conversations and negotiations between the parties
regarding the Project or this Agreement.

a.

Neither Party has made any representations, warranties or agreements as to any matters
concerning the Agreement's subject matter. |

7

|
|
i 1/2/20
:

16.

17.

b. Representations, statements, conditions, or warranties not contained in this Agreement will
not be binding on the parties.

c. Any solicitation, addendums and responses submitted by the Contractor are incorporated

fully into this Agreement as Exhibit A. Any inconsistency between Exhibit A and this
Agreement will be resolved by the terms and conditions stated in this Agreement.

15.2 Interpretation.

a. The parties fairly negotiated the Agreement's provisions to the extent they believed
necessary and with the legal representation they deemed appropriate.

b. The parties are of equal bargaining position and this Agreement must be construed equally
between the parties without consideration of which of the parties may have drafted this
Agreement.

c The Agreement will be interpreted in accordance with the laws of the State of Arizona.

15.3. Survival. Except as specifically provided otherwise in this Agreement each warranty,
representation, indemnification and hold harmless provision, insurance requirement, and every
other right, remedy and responsibility of a Party, will survive completion of the Project, or the
earlier termination of this Agreement.

15.4 Amendment. No amendment to this Agreement will be binding unless in writing and executed by
the parties. Any amendment may be subject to City Council approval.

15.5 Remedies. All rights and remedies provided in this Agreement are cumulative and the exercise of
any one or more right or remedy will not affect any other rights or remedies under this Agreement
or applicable law.

15.6 Severability. If any provision of this Agreement is voided or found unenforceable, that
determination will not affect the validity of the other provisions, and the voided or unenforceable
provision will be reformed to conform to applicable law.

15.7 Counterparts. This Agreement may be executed in counterparts, and all counterparts will together
comprise one instrument.

Dispute Resolution. Any controversy or claim arising out of or relating to this contract, or the breach
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any
court having jurisdiction thereof.

Exhibits. The following exhibits, with reference to the term in which they are first referenced, are
incorporated by this reference.

Exhibit A Project
Exhibit B Compensation
Exhibit C Federal Laws & Regulations

(The remainder of this page left blank intentionally. Signatures appear on the following page.)

1/2/20

The parties enter into this Agreement as of the date shown above.

City of Glendale,
an Arizona municipal corporation

hl. box

By: Kevin Phelps
Its: City Manager.

Mel lileb-

ie BL Bower // (SEAL)
Ju Clerk

APPROVED AS TO FORM:

Oey

Michael D\Bajey J)

City Attorney

Recon Restoration, Inc.,
an Arizona Corporation

Niky lhl

By: Mark Edgerton f/
Its: President

WOMEN-OWNED/MINORITY BUSINESS [ ] YES [ X]NO

10

'
}
i
| 1/2/20
i
T
i

EXHIBIT A
CONSTRUCTION AGREEMENT

PROJECT
The project will include all labor, materials and equipment necessary to complete the Uniform Federal Accessibility

Standard (UFAS) modernization of 3 public housing units located at the Cholla Vista Apartment community, 5320
W Maryland Ave, Glendale, AZ 85301, as provided in the attached price quotation and supporting documentation.

City of Glendale
Public Housing - Cholla Vista Apartments
UFAS Modernization of Units 15, 22 & 31

HI20001-CDBG
Bid Package

a foe Project#: CV UFAS Mod
COG Public Housing - CV UFAS Modernization
Table of Contents

' Page
Notice of Bid 3
Bid Instructions 4
Bid Proposal Form+ 5-6
Bid Tabulation & Specifications+ 7-10
Schedule 11
Plans 12
UFAS Checklist 13-26
Pictures 27-55
General Requirments 56-61
Wage Determination 62-67
HUD Form 5369-A+ 67-70
Federal Forms packet 71-108

1) Labor Standards Provisions Acknowledgement*
2) Certification of Eligibility*
3) Certification of Understanding & Authorization*
4) Certification for Applicable Fringe Benefit Payments**
5) Wage Deduction Authorization for Federally Assisted Projects**
6) Payroll Authorization**
7) Payroll Instructions
8) Preconstruction checklist for Contractors: meeting labor standards contract
requirements
9) HUD-4010 Labor Standard Provisions
10) Poster WH-1321, Notice to Employees
11) Poster OFCCP-1420, Equal Employment Opportunity is the law
12) Payroll Form WH-347 (with instructions)
13) Applicable Wage decision (Above)
14) TIN form**
15) DUNS/SAM.gov+*
16) Everify
17) Section 3
18) MWBE
+ required to be included in bid submittal
*required to be filled out during contract signing
**required to be filled out prior to construction
Sample Contract 109-144

NOTICE OF BIDS”

: NOTICE EIS HEREBY GIVEN: THAT THE cry OF GLENDALE, = ARIZONA WiLt RECEIVE BIDS FOR to
"FURNISHING THE FOLLOWING:

_ COMMUNITY HOUSING CHOLLA VISTA APARTMENTS ‘UFAS MODERNIZATION,
wo. UNITS 15, 22'& 31, PHYSICAL IMPROVEMENT. PROJECT (CDBG), APUBLIC.°
: HOUSING PROJECT LOCATED: AT 5320 W MARYLAND AVENUE, GLENDALE, Az 85304 coe

"\” eTHIS PROJECT PROVIDES AN OPPORTUNITY FOR SECTION 3 BUSINESSES FOR BIDDING oa near
_ POTENTIAL FOR SECTION 3 JOB OPPORTUNITIES. DAVIS BACON IS. APPLICABLE*.

we “THE: DOCUMENTS EXPLAINING THE SCOPE OF WORK WILL BE AVAILABLE o

- BY EMAILING JMACFARLANE@GLENDALEAZ, COM UNTIL 11:00AM ON AUGUST. 6, aay
"--.2020 AFTER WHICH A MANDATORY BID CONFERENCE WILL BE HELD ON AUGUST: 7; coe

2020 AT 10: OOAM A AT: 5320 Ww: MARYLAND AVENUE, UNIT 15, ¢ GLENDALE, AZ 85301.

EACH BID WILL BE IN ACCORDANCE WITH ‘SPECIFICATIONS AND INSTRUCTIONS CONTAINED oe
: oo THEREIN AND: ALL FEDERAL RULES AND: REGULATIONS WILL’ APPLY: :

a EACH BID SHALL BE SEALED, IDENTIFIED. AND RECEIVED BY: :
“THE CITY. OF GLENDALE, COMMUNITY: REVITALIZATION: OFFICE AT
-:5850.W-GLENDALE AVE, SUITE‘107, GLENDALE, AZ. 85301-2599.
7ON | OR. BEFORE | /FRIDAY, AUGUST: 21, 2020 @ A :00 PM

: IF THERE ARE ANY - QUESTIONS REGARDING THE BID PROCESS OR | BID. :
a “DOCUMENTS, PLEASE CONTACT JAMIE MACFARLANE AT THE COMMUNITY =:
"REVITALIZATION OFFICE AT 623-930- 3670 OR JMACFARLANE@GLENDALEAZ, CoM. -

THE CITY OF GLENDALE RESERVES THE RIGHT TO:ACCEPT OR REJECT ANY OR ALL BIDS: AND
eae Es TO, WAIVE INFORMALITIES. . 3

‘cry OF GLENDALE
-BY: KEVIN R, PHELPS ”
: _ CTY MANAGER - foes

PUBLISH: GLENDALE ia wie 23, ‘sabia 2020.

, COG Public Housing - cv UFAS Modernization

7 Bid Instructions

“Bid Tabulation & Specifications ..
“HUD, form'5369-A

Contractor will perform the work in 90 day from signed contract:

‘Projéct#: CV UFAS Mod

The Coritractor shall has familiarized themselves with: the proposed project/work to be: a
performed-on the Owner’s property located at the above stated “ “project address” as
described in the bid package including but not limited to work description,

specifications, plans, general conditions, sample contract, etc. The undersigned has ,
carefully examined the job‘site and become: aware of any pre- -existing Challenges, :

barriers or inconveniences. :

Bid Conference and Bid opening as described in the Notice of Bid.

“> Contractor shall submit the following documents with: their bid.

Bid Proposal Form

‘DUNS/SAM. gov (Provide: a Print o out ‘of your active SAM. Gov Reistation)

; Work will commence within 7 days of recieving the written NTP

‘ “Units 15 and 22 will be vacant ‘and. will needed to be completed first: Thereafter, the.
tenant from 31. will move ‘into 15 of:-22 and work | of unit 31-can ‘commence.

: City of Glendale:
’ Community Revitalization
5850 W Glendale Ave, Suite 107 -

a (623)930-3670

-.BID PROPOSAL

: Project Name: 120002 "TI Public. Housing oe Vista UFAS Modernization
- Project Owner:.| ‘City of Glendale ~

": Project Address::| 5320 W. Maryland Avenue, | Unit 35, 22 & 31 Endy

Contractor:

Bidding Contacts

. Phone it:

Email:

, AZ ROC license By oy we , ’ ‘License Classification:

| have.complete the Contractor Application: a YES” ‘or. -O:NO.- .
lf afiswer is “NO” please be prepared to submit with your: bid or: shortly after as it will be a pre: requisite ofa contract award.

The undersigned has familiarized themselves swith the! proposed  project/work to be performed ¢ on n the Owner's property located at
- the above stated “prdject address” as described in the bid package including but not limited to work description; specifications,
plans, general conditions, sample contract, etc. The undersigned has carefully examined: the lob s site and become. aware of-any pre-
existing: challenges, b barriers or’ inconvéniences. : :

A bid i is being submitted i in the amount of S

, "Attached | isan itemized. ‘summary that provides a breakdown of the bid into applicable categories "and list al Subcontractors to be .

: -used i in connection with the outlines work.

The undersigned agrees to commence work within Seven (7) days after receipt of a written Notice to’:
Proceed” and to complete the work with i in . | Consecutive days thereafter, unless modified by
Change Order. ; : ;

In the event the undersigned is the successful bidder, he agrees to comply with all conditions and requirements of the bid and
. Contract docunients and, upon request; to submit additional information regarding his qualifications and financial ability to -
: satisfactorily complete the work and to furnish, simultaneously with the execution. of the contract, Certificates of Insurance showing

a coverage of the contractor and all subcontractors for the protection of the Owner and workers.

’ The bidder. understands that ‘a written "Acceptance of the Bid Proposal" will be.issued followed by a "Notice of Contract Award" by
. the Owner, to be delivered: to the successful bidder within thirty (30) days following contract award. If such notice is not received
within the prescribed time period; the contractor has.the option of withdrawing his bid.

. Name: :

- Signature:

Title: oe ce on ; Date:

The ‘contractor bidding‘ ‘on thisjobm must be.a licensed as a Contractor pursuant-to Chapter 10, Title 32 ‘of the Arizona Revised Statutes. An incomplete bid will be :

: ‘rejected. . : 1

Glendale,-AZ'85301:.. -:

SUB-CO NTRACTO RS .

5850

City of Glendale
Community Revitalization
Ww ‘Glendale Ave, Suite 107

. Glendale, AZ 85301:
(623)930-3670

= eta sub- Contractors:are held aiccountéble to the same requirements as the General Contractor and it is the General Contractors responsibility to
ensure this compliance. If you have not determined a Sub-Contractor for a particular trade lease ni note so and [provide the information prior to the

‘commencement of the work. -

Sub-Contractors Name: |”

Trade: | -

. AZ ROC License #:

License Classification: °

Sib-Contractors Name:

; Trade;

az ROC License #:

‘License Classification:

Sub- Contractors = Name wt

“Trade: ;

“AZ ROC License #

License Classification: -

"Sub:Contractors Name: ye

“Trade:

AZ ROC License i oo

- -|’License Classification: |" -

- Sub-Contractors Name: :

-Licénse Classification: ~

Sub-Contractors Name: | © - }

Trade:

AZ-ROC License #: |

License Classification: ©

Sub-Contractors Name:

Trade:

. az ROC Licensé #

Liténse Classification:

: Sub: Contractors Name:

“Trade: |

~ AZ ROC License #:

Sub-Contractors Name: | - |

Trade:

“AZ ROC License #: |

1
License Classifi¢ation:

"__ City of Glendale- “Community Housing C Di
Cholla Vista Apartments ~

5320W Maryland ‘Avenue.

_ Glendale, Arizona 85301

Unit #15, 22 & 32

a : -: 7+ ‘Cholla Vista Apartment UFAS Modernization
Company Name: . - . = y — ve 7 ——

. I JUNI Ca EET Uae 7 SER NITLH3: aia]

LINE ~ UNIT - UNIT UNIT: :
(TEM # 5 PRICE__ |. TOTAL é price. | torat.[&]° price |-ToTat ||SPECIFICATIONS ..:.. i _.
ae pe er 7 Building Permits, All Items listed in The scope of workalltobe Completed per any applicable Tocal, State or Federal Codes and
001} 1 =~ $0.00] = $0.60 $0.00} $0.00] Regulations. Work with COG to ape fc for Building Permit, zero fees for City project Refer to UFAS checklist for accessibility req.
o02]- 1° |: ve $0.00 $0.00] DEMOLITION - See plans
= - Framing , : 7 _ 7 : :
Recénfigire walls per plans fori new battiroom: and widen opening for inter doors, Provide an atte’ iccess as inthe Bathioom a
lunit. Inctuding by not limited to... toe
Relocating the laundry room door
Relocating the valve wall of the shower 2” east for a 60" Roll In shower
am . Alt erab bar backing
003} « - $0.00} $0.00}
: insulation | - eae
et Attic insulation to be R38'blown-in cellulose _
| a : fe-place any wall Insulatién that was removed during demolition
- 004) « $0.00) 1° $0.00} $0.00}
To Electrical:
Relocate receptacles, switched and fixtures as needed. Includés wiring and trim.  eletirical plan Kitchen GFCI's and switches
above countertop to be mounted at 38" AFF, Any recepticles-or switches to remain In existing location will have hew
receptical.switched and trim Installed. Replace smoke detectors are installed ahd are hardwired & interconhected and CO as _
. required. Are-fault required in bedrooms. kitchen and Bath to-be GFIC. Switches e White'rocker style, Recepticles to'be white
land cover plates to: be white. nl Te
2. Does each Kiave a clear floor space of 30” naere
2. thermostats
lb. heating/air. conditioning *
. lc. light switches |” -
: 6. electrical wall outlets (cannot bie lower than Fe
. 2. 1S the Highest arid Lowest Operable Part within each?:
. fa. Forward approach (Fig. S{a)): 15” to 48”. .
fb. Side approach (Fig. 6(b)): 9” to 54".
Jc. Forward approach over an obstruction léss. than 20” deep (Fig. Stuns no higher than 48”;
7 ld. Forward approach over an obstruction 20 to'25" deep (Fig: $(b)}: fio higher than 44”.
: le. Side reach over an‘obstruction no moré than 10" deep (Fig. 6(b)}: no higher than,54”.
: 00s] ‘i : $0.00 | - $0.00 $0.00] Side reach over an obstruction 10” to 24” deep (Fig. 6(c)}: no higher than 46”.
° ° Plumbing (Water, Sewer, Gas) : = :
Relocate lines as required per. plans. install new 1 washe? Box with new 1/4 turn valves anid ait hammer installed.:Chéck for
‘gs a sooo) eaten of kitchen sink; water heater, shower Valve and drain, tollet,’sink and vent pipes. Air hammer arrestors required on all
: HVAC : ; : a : 7 :
Provide and install new 14 SEER heat purnp package roof, mounted HVAC unit. Remove existing unit and disposed of off-site in
legal dump. Remove existing upducts: Relocate Air return. Mechanical contractor to properly sized unit to heat and cool residencd
per 2012 IEC, Provide caiculations.as required.:New.R-8 flex duct work shall be installed including new registers, air return; and
jump ducts. install includes any necessary electrical connections, plenums, stands, condehsate lines, pads, insulation, piping, ~
Freon, pans, straps‘and any other items for a fully operational system. If the existing over/under is adequate it may be reused, °
. Provide and install new programmable thermostat with clear space 30” x 48” at max 48” AFF. Extra care to not cut or damage
trusses or other structural components when installing: Also, include new energy star exhaust fan in the bathroom. Range hood -
duct if neédéd. Unit to be Carrier, Taine, York, Rhéem or Equal. Provide owner w/factory warranty, manual, & 4 yrcontrattor °
warranty.
+** Contractor to provide all applicable informiation tia will not be scented without this),
Manufacture: :
Model:
: Size: eo
SEER: EER: =| HSPF:° "”..- AFUE:
T-Stat: . a : .
. aan : : Warranty: - . : :
- 007].1-|° = $0.60} 1- “$0.00 $0.00} /Bath Exhaust: Manufacturs Model _ CFM:
: : ° : Doors & Trim w/ Hardware -.
Exterior doors to remain but shall be modified with’ ADA thieshold and weatherize.
ALL NEW Pre-hung 1 3/8" hollow ore masonite 6 panel interiot doors. See plans for s siziné and swing: Sinelude 2.1/4" colonial
casing. : : :
Provide and Install new door hardware {interior door operiing ronge inot to exceed 5 pound:
Bed/Bath Lever: Kwikset Balboa Satin Nickel Bed/Bath Lever Mode! # 300BL15’6ALRC
Hall/Closet Lever: Kwikset Balboa Satin Nickel Hall/Closet Lever Model # 200BL 15 6AL RC’
Exterior Lever: Kwikset Balboa Satin Nickel Exteior Entry Lever and Single Cylinder Deadbolt Combo Pack Model it 69081 15 cP
K6 (2 sets for rear éntry and 2 sets for front entry)” :
Baseboard: 2 1/4" colonial base mouiding
Include any other hardware necessary for a.coniplete instalstion of dootd and tiim-
Shelving: Fiberboard with bullnose edge, and cleating me ,
: All Bed?oom closets get two-16" stielves,oie at 40” and one st a0 &iods,
‘ool « a : Sao 4 : $0.00 g0.00]|t2undry gets one 12" shelf at 60".
‘y- i on ° Drywall & Tape/Texture - .
Replace all areas where drywall was removed.
Remove acustic texture from celling in living."
Ceiling: 1/2" sag resistant drywall
. Walls: 1/2" drywall
Plumbing Walls: Non-paperface backer board tDenshsi (includes bntire ebathroom, washer/érver wall and 4’.on each’side of the
J centerline of the kitchen sink} a |
“* $0.09] $0.00} Ré-texture the eritire ‘unit where needed with range peel ype texture

Paint
Paint entire unit. .
Ali paint lead free. All surfaces clean/dry. Remove loose, blistered, staling, deteriorated paint. Secure loose materials, set nails, fil
holes, dents & cracks. Remove all deteriorated glazing compound & reglaze. Paint when temp Is from 40-100 deg. No shows
through, runs, sags or brush marks. Ail unpainted hardware, electrical trim, light fixtures to be paint free. No windows shall be
painted shut. Remove ALL paint from glass, inside and out. Primé any bare'stirfaces. Low VOC Latex (Dunn-Edwards, Behr,
010 ‘$0.00] $0.00} 1. $0.00] |Sherwin-Williams or Equal), Color: to be provided by housing, Sheen: Seml Gloss.
Flooring ~ .
All flooring to stay except where removal is necessary. Attempt to remove whole pieces.
Prep flooring as necessary, level floor as néeded and remove all debris. Install ceramic tile using the appropriate adhesive. Clean
surplus adhesive from joints prior to grouting, Grout with 1/4” think grout lines. Clean all the tile face and apply silicone sealant td
shower.
. 2 IMS International Mojave Sand 20 in. x 20 in. Glazed Ceramic Floor and Wall Tile Model # NMOJASAND20X20
011) ‘$0.00 $0.00} 1 $0.00] custom Building Products Polyblend #180 Sandstone Sanded Grout
: . ° Lighting “ a
Provide and install the following lighting, including setting any new boxes & switches.
Kitchen Recessed Lighting: 6" cans with trim
Bathroom Celling Mount: Hampton Bay 2-Light White Mushroom Flushmiount Model # J0105H
Bathroom Vanity Wall Mount: Hampton Bay 3-Light Brushed Nickel Vanity Light Model # EGM21393A-4/8N
Laundry Ceiling Mount: Hampton Bay 2-Light White Mushroom Flushmount Model # JO105H .
Living Room Ceiling Fan w/Light: Hampton Bay Lyndhurst 82 in. Indoor White Ceiling Fan Model # 51012
Bedroom 1 Celling Fan w/Light: Hampton Bay Lyndhurst 52 joor White Ceiling Fan Model # 51012
012 $0.00] 1 $0.00} | Bedroom 2'Ce ‘an w/Light: Hampton Bay Lyndhurs' ia lodel # 51
Kitchen Cabinets ; ; :
Provide and install new prefinished wall and base cabinets. New Cabinet installation shall follow provided cabinet layout. New
layouts must be approved by the City of Glendale. Cabinets shall meet or exceed the below listed standards and new layouts
must meet the NATIONAL KITCHEN & BATH ASSOCIATION design standards. All cabinets shall be labeled with the manufactures
Irame and shall-be FHA Approved. . .
**Fi¢ld measure, verify and approve all sizes prior to ordering.
***LAYOUT: Match existing ***COLOR: TBD ***SPECIES: OAK
BACK PANEL: min, 3/8" particle. ***END PANEL: min. 1/2" particle. ***FACE FRAME: 3/4” solid wood.
/***CABINET INTERIOR: wood patterned laminate. =
***SHELVING: 3/4” particle w/ wood patterned laminate, adjustable, full depth.
*** DRAWERS: 3/4" solid wood, dovetall joints, min 3/16" plywood bottom.
+** DRAWER GUIDES: undermount, soft/self-closing, min 70lbs cap.
1+**HINGES: soft/self-closing, concealed, 6-way adjustable,
+**TRIM: Solid wood stained to match.
'+**TOE KICK: min, laminated particle, color to match. . :
***Provide Handles for doors and drawers a. For wall cabinets, locate near the bottom. For base cabinets, locate near the top.
Operable with one hand without tight grasping, pinching, or twisting of the wrist. .
013) $0.00) $0.00} 1. $0.00]! vitchen Cauntertan Heicht to he 24” may and work surface area ta have knee clearance of atleast 30" wide min and at least 27”
: Laminate Countertop oe > ; a ~ : .
Remove existing couinter top and demo and dispose of offsite. Install new laminate counter top including 4" splash at rear and
lend walls: Now top will be scribed to fit all walls, Caulk any remaining seams or gaps with vinyl caulking (color to match as closely
as possible), Surface must be level. Secure counter.top cabinets using approved industry standards. responsible for providing rise
material for securing top.
***Color: To be determined by owner _
014 $0.00 $0.00f 1 Edge: Square with rounded corners -
- Cultured Marble Vanity Top & Shower Surround . : :
: : Provide and install new white cultured marble vanity top in bathroom including any mounting hardware and 3 piece cultured
015) $0.00] 4 $0.00] riarble shower surround, ceiling helght with soap dish and corner shelf and front arid back corners :
Provide and Install American Standard, Declyn Wall-Mounted Bathroom Sink in White Model # 0321.026.020,
top rim Is no more than 34" A.FF., Bottom of apron is at least 25” A:F.F., At a point 8” back from front edge the lavatory Is clear
knee space at 27" high. Clear floor space is at least 30"x48" deep (that extends 17" to 19" under the lavatory)
Includes Chrome P-trap, (2) 1/2 in. Nominal Compression inlet x 3/8 In. 0.0: Compression Outlet 1/4-Turn Angle Valve, (2) 3/8
. in. OD x 1/2 in. IPS x 30 In. Faucet Supply Line Braided Stainless Steel, backing in wall per manufacture specs and Handy Shield
016 * $0.00 $0.00] 1 $0.00] MAXX Soft ADA Under-Lavatory Protector Model # 2003W and any other parts of labor for a complete installation.
_. Provide and Install Glacier Bay Constructor 4 in, Centerset 2-Handle.Mid-Are Bathroom Faucet in Chrome Model # F512CO33CP
017] $0.00 $0.00) 2 $0.00
Provide and Install a 60"x 30" Roll-In Shower Pan - Left-hand Drain needed. includes all necessary backing, plumbing and any
lother material required for a complete install. :
Roll-In Shower Pan
12, Roll-in: 30” deep by 60” (58 %4" Is acceptable) wide
a, Clear fioor spiace at least 36” by 60”
Shower Grab Bars (Side, Back and Control wall)
1. Is centerline mounted between 33” and’36” above the floor
2. Between 1%” and 1%” in diameter
ons 1 50,00 soo) 1 0.00 5. Is the space between the grab bar and the wall 1 4" exactly
; ; Showar fixture: Provide and install chrome Single lever pressure balance valve, one fixed spray faucet with handheld shower
with slide bar .or equal. Includes any additional in-wall plumbing and any other items required for a complete installation.
shower Controls:
11. Mounted between 38” and 48” above the floor
12. Located between the open side and the centerline of the shower
3.-Operable w/ one hand and not require tight grasping or twisting of the wrist
tub Shower Spray Unit:
: . : 1. Can the shower head be fixed and handheld
o19| $0.00) $0.00 1 $0.00]|2. Is there a hose and is it at least 60” long (59” Is acceptable.)
7 Not Used
020) $0.00} $0.00] 1 $0.00)
5 Toilet Grab Bars
. Provide and install 42" Side grab bar at toilet to be mounted 33”-36" A.F.F.. Diameter to be 1 1/2" -1 1/4". Mounted no more
than 12" off hack wall. Space between grab bar and wall in 1 1/2". Includes 54” long 2x12 blocking in wall
: - Provide and install 36" back grab bar at tollet to be mounted 33-36" A.F-F.. Diameter to be 11/2" -1 1/4". Mounted no more
_ 021] _ $0.00 $0.00] 1 $0.00] |than 6" off side wall, Space between grab bar and wall in 4 1/2", Includes 48" long 2x12 blocking in wall.
Provide and Install Franklin Brass Futura Bath Accessory Kit in Polished Chrome (4-Piece) Model # DS2400PC. Toilet dispenser to
be mounted at 24” A..F and Is no more than 36” from back wall. Towel bar to be 44” A.F-F. and 4" off the edge of tub surround,
022! $0.00] $0.00] 1 $0.00) '

Provide and Install Kohlér Highlirie® Classi¢ Comfort Helght® two-plece elongated 1.28 gpftollet with Class Five® flush technology
and right-hand trip lever K-3658-RA-O of left-hidnd trip lever K-3658-0. Trip lever to’be on accessible side of toilet. Top of toilet *"
seat to be between 15" and 19". centerline is exactly 18" from closest side wall. including 3/8 In. compression'x 7/8 In, Ballcock
Nut x 42 In, braided polymer tollet connector, with 1/2 In. Nomirial Compression Inlet x 3/8 In. .D, Compression Outlet 1/4-Turn
Angle Valve, floor Hardware & Wax Ring. Include relocation of drain & water line Including ail parts and labor. necesssiifor a
complete installation, :

= $0.00]

$0.09]

$0.00}

023) $0.00} $0.00] ‘|
: : Medicine Cabinet
Provide and install KOHLER 30 In: Wx 26 In H ‘Tivo-Door Recessed of Surface Mount Medicine Cabinet in Silver Aiuminim Model
. : ; i K-CB-CLCBO26FS. To bé mounted at 40°AFF Fever vanity.
~ 024] * $0.00] $0.00) _ . : : : :

Provide ard install a'30"x 4 stand edge mivor secured with metal ale. Installed at 40" AFF over bathroom sink.

Provide and Install Whirlpool 45 cu. af “fighs etionsy| Front Toad Washerin White.) ENERGY STAR Model# WEWTSHEFW or"
Equal. includes all applicable hoses, connections, cords, duct and any other parts fora complete installation,
Provided by Housing .

* $0.06) $0.00} “$0.00 $0.00} $0.00] cea! a : : :
= : Provide and install Whirpodl Thou Flectrie Diver in White ‘Model # WED7SHEFW or ua includes all spleale hoses,
oe connections, cords; duct and any other parts fora complete installation.
029) * $0.00] $0.00} Provided’ by Housing .
Provide and install Laundry 123 10. in Taundny Pedestal White Model # XHPLOOOXW o or Faull, Contractor rep for -. *
an verifying product works with selected washer a dryer a Do :
030] 2 $0.00] _§0.00f|Provided by Housing *
~ |. Provide and install Frigidaire Front. Control ishwasher in White with Tiainless Steel Tub in White! Model # FDB2410HIS.' “eles
all all applicable hoses, connections, cords & & any other parts fora coriplete| listallation,
031 $0.00} 7 : _ a wt _
= Provide and install GE 20.9 cu, Bottom Freezer Refrigerator in White Model # GBEZIDGKWW or oftaual Includes all applicable
a hioses, connections, cords & any other parts for a complete installation.
032} $0.09] $0.00] Provided by Housing eee E
Provide and install Rheem EcoSense 6.4 GPM. Natural Gas Mid Efficiency Tidoor Tankless Gas Water Heater Model #.
ECO150DVLN3-1 or Equal; Includes all applicable gas lines, hoses, piping, venting, valves, mounting hardware,.cords, t-stat or any
Jother parts and labor necessary for a:complete installation: Includes running gas lire, water, lines, vents and condensate lines as
pplicabe. T-stat/Remote contro to be mounted at 44" A.F.F with wh aod x48" clear floor space
_ 033} $0.00] ee pe : i
° Provide and instol GE 30 in, 4.8 cu.ft. Fee Standing Gas Range‘ White Mal # JGBSLODEKWW c or El Ingludes al ai r
nn cords of any other parts necessary for acomplete installation, aa
: O34]. $0.00] $0.00||Provided by Housing“. : | ue

$0.00}

Provide and Initall NuTone RL6200 30 in. Non-Vented Rangel ‘Hood in White Model RLG230WH or regu includes all aepesbe:
sring, cords, bulb, dict and any other parts necessary fora compete installation,

Provide and install a Broan Two 15 Amp (20; ‘Amp. Total): 2 Function Single P Pole Rocker Switch wall Control in White for opelation o.
Jof range hood to meet ADA compliance. ‘Includes gang box; wiring, cover ate and any other parts fora a complete Installation. To
be mountéd:no more than 44" AFF: ° : : :

|. 37] 2

+ 6.00).

lemnove the existing sidewalk and landing from the front and rear of each unit out ‘to the shared sidewalk. Replace witha sloped.

sidewalk and zero step landing. Seé units In cor plex ‘that have already been coristructed. Landings tobe the width Of the front

+ $0.00} $0.00} offset and’s feet deep.
$0.00)" - -* $0,00) $0.00}|SUBTOTAL
~_ $0.00 - -.GRAND TOTAL

. Linkto Online Specs
_ Range (Gas Free-Standing)
“Range Hood * .

_ Range Hood ADA Switch ;

“sink (Bathroom Wall Mount) , _htto: A .
: a _ . http://www.homedepot.com/catalo,
" http://www. hiomedepot.com/catalo,

Sink (Under fav protector)
: Bath/shower Assembly

“Water Heater (Tankless Gas)

- Refrigerator. .
Dishwasher
Clothes Washer

- Clothes Dryer*

“Clothes: Washer/Dryer Pedestal: him oredr a pftaundry-123-10-InLaundry-Pedestal-in-White-XHP1O00XW/204100492,

. Medicine Cabinet. .

Bath Hardware Set:
“Ceiling Fan’ *

Vanity Light’
‘Flushmount Light .
Sink.(Kitchen)

Faucet (Kitchen)
Faucet (Bathroom)
Door Lever (Hall/Closet)’
Door Léver.(Bed/Bath)
Door Exterior Entry
-Toilet .

Grab Bars (Toilet)

+ Shower fixturé
‘Garbage Disposal:
1/4-Turn‘Angle Stop Valve
Toilet Supply.”
Faucet Supply *

", Flooring. :
° Grout .

* http://www.homedepot.com/p/Kwikset-Balboa-Sat

* http://www: homedepot.com/p/GE-30-in-4-8-cu-ft-Free-Standing-Gas-Range-in-White- JGBS1ODEKWW/206943222°

http://www.homedepot.com/p/NuToné-RL6200-30-in-Non-Vented- Range-Hood-in-White-RL6230WH/100080229

 ‘http://www.homedepot.com/catalog/pdfimages/f7/f733c529-2b6d-49fd-98e5-eaf401e0ed99.pdf .
. http://www. homedepot.com/catalog/pdfimages/bd/bd89d390- -085f-441f-948c-bcfbe50bc49d. pdf

http://www.broan.t com/common/productDigitalAssethandler.. ashx?id=6ceBGecs 4 869d-~ 4732-adf9-623a3093at2a

\dfimages/de/deb95293-472f-49ad-b8b7-647f6f489c4a.pdF.

dfimay es/e7/ 7268684 6704-454e-a7a9- 8332a41b5c92.pdt

. https: Llwceow sterlingplumbing. com/baths-and- -showers/bathtub-showers/Accord-R- ADA- -Adaptable~ Tile-Bath- shower. with Left: hand Drain- 7140115. deialDproddciber-71 4011S Bresuti 104215640" 0
- https://www. sterlingplumbing. com/online catalog/pdf/71140115 spec.pdf . : :

https://www. sterlingplumbing. com/snlinecatalop/pdf/1156425 2.pdf. .
http://www-homedepot.com/p/Rheem-EcoSense-6-4-GPM-Natural-Gas-Mid-Effi iency-Indoor- “Tankless: “Gas Water Heater ECOISODVLN3- iunossaasat
http://www.homedepot. ‘com/catalog/pdflmages/42/42634201- -88d2-4c2a-9d2d-26c8cccb9964. pdf,
http://www.homedepot.com/catalog/pdflmages/1a/1a7b364a-791e-42c0-92cf-19f94e284f41.pdi ot .

http://www homedepot.com/p/GE-20-9-cu-ft-Bottom-Freezer- Refrigerator- ‘in-Wi ~GBEZ1DGKWW/206867583

+ http://www: homedepot. com/p/Frigidai re-Front-Control-Dishwasher-in-White-with-Stainless-Steel-Tub-FDB2410HIS/203986168

http: ffeest homedepot. com/p/Whirlpool-4- 5-cu-ft- Hi igh-Efficiency- Front: -Load- -Washer-in. -White-ENERGY-: STAR” -WEW7SHEFW/206870346

http://www. homedepot.com/p/Hampton-Bay-3:Light-Brushed- Nickel-Vanity-Light- -EGMI393A-4-6N/203789012 _
hittp://www.homedepot.com/p/Hampton-Bay-2-Light- White-Mushroom-Flushmount-J0105H/100554539?keyword=100554539

http://www. homedepot.com/p/Elkay-Elumind-Undermount- Stainless-Steei-24-in-Single-Bow!-Kitchen-Sirik-in-Satin-EGUH2118/100453562 :
http://www. homedepot.com/p/American-Standard-Colony-Soft-Single-Handle-Pull-Out-Spraver-Kitchen-Faucet-in-Polished-Chrome-4175- 100-002/203118757-

” http://www.homedepot.com/p/Glacier-Bay-Constructor-4-in-Centerset-2-Handlé-Mid-Arc-Bathroom-Faucet-in-Chrome- £5120033CP/206185282

http://www.homedepot.com/p/Kwikset-Balboa-Satin-Nickel-Hall-Closet-Lever-200BL-15-6AL-RC/300115874
jickel-Bed-Bath-Lever-300BL-15-6AL-| RC/300116361
-http://www.homedepot.com/p/Kwikset-Balboa-Satin-Nickel-Exterlor-Entry-Lever-and-Single-Cylinder-Deadbolt- Combo-Pack: 69081~ 4154 CP- K6/203154902 -

+ http://www.us.kohler.com/us/Highline-Classic-Comfort-Height-two-piece-élongated-1.28-ppf-toilet-with-Class-Five-flush-technology-and-right-hand-trip- "lever froduetDetal/toilets/428215. tri ?skuld= A09688&brandid= 739584
 http://wwwus.kohler.com/us/Highline-Classic-Comfort-Height-two-piece-elongated-1.28-gpf-toilet-with-Class-Five-flush-technology-and-left-hand-t trip-lever/productDetail/tollets/428043. htm ?skuld= =408799&brandid=739584

http://www.homiedepot.comi/p/KOHLER-Highline-Classic-the-Completé-Solution-2-piecé-1-28-GPF-Single-Flush- Elongated: Toilet in-White: 144994 0/202705234 .”

tps Lpvwow: homedepot.com/p/Speakman: Sentinel Mark: als Regency: /=1:Handle-1- “Sotav: -Shower-| Faucet: with: Hands Shower: -and-I Prossue: Balance: Valves in-Polshed- Chrome: SM: 2480 /203713805
I-FWD-HD/202077547° : .
Compression-Outlet-1-4-Turn~ -Angle- Valve -G2CRI9X: -c4/an087059 |

-Nominal-Compression-iniet-

https ino homedepot.com/p/BrassCraft-1.

_ http://www.homedepot.com/p/3-8-in-Compression-x-7-8-in-Ballcock-Nut-x-1 aided-Polymer-Toilet-Connector-B1-12DL-F/100094502
- http://www.homedepot.com/p/Homewérks-Worldwide-3-8-in-OD-x- IPS-x-30-in-Faucet-Supply-Line-Braidéd-Stainless-~ Steel-; 7223-30-38- 2/203087368

http://www.homedepot. com/p/MS-international-Mojave-Sand-20-in-x-20-in-Glazed-Ceramic-Floor-and-Wall-Tile-19-44-sq-ft-case- -NMOJASAND20X20/2025294287keywords nmnojasand20x20.
http: L Loree homedendt com/p/cistonn: Bullies Products: Polyblend: 180: Sahdstone- 25-Ib ded Grout. PBG18025/100033705 keywor pbg18025. 18025.