Pothole Specification

City of Glendale — Regular Meeting (2021-08-10)

View PDF Item 5 Meeting page

Extracted text (via ocr_local) 1172 characters
TYPE A OR B PAVEMENT REPAIR
FLUSH WITH EXISTING PAVEMENT

oat Www
a aY
<<) Ow
Z| es a
z 4
n 1S} ") oof
<|<=
e ¢
FINAL BACKFILL MATERIAL OPTIONS: ————; ‘at?
oNATIVE SOIL PER SECTION 601 4
(TYPE B ONLY) oa
© ABC PER SECTION 702 I
(TYPE B ONLY) 6”
0 1/2-SACK CLSM PER
SECTION 728 <)
/
HIGHEST EXISTING UTILITY(S) —J |

| MATERIAL TO CONFORM
TO SECTION 601

SECTION VIEW
TYPE A PAVEMENT REPAIR TYPE B PAVEMENT REPAIR
iM 18”-24” DRILLED /CORED PILOT HOLE
NOTES: fo
1. DIMENSIONS ARE NOMINAL. A NOTES:
A A 2. EDGES SHALL BE CUT TO A NEAT VERTICAL FACE. 1. CUT, REMOVE AND REPLACE PAVEMENT.
\ | "3. PLACE CLSM BACKFILL IN ACCORDANCE WITH 18”-24” PLUG IN ACCORDANCE WITH SECTION 355.
SECTION 604. 2. PLACE BACKFILL IN ACCORDANCE WITH
4. PLACE AGENCY—APPROVED ASPHALT CONCRETE SECTION 355.
IN MAXIMUM 2” LIFTS. — 3. BONDING MATERIAL SHALL BE AS SPECIFIED
/ TACK EDGES BONDING MATERIAL pavement PLUG
vf No MIN. THICKNESS OR MATCH EXISTING, aoe
¢ WHICHEVER IS GREATER. a” ~—1-1/2” TO 2” COMPACTED CRUSHED GRAVEL
ae! po a“ (ASTM C33 48)
SECTION A-A SECTION A—A
REVISED .
DETAIL NO. MARICOPA STANDARD DETAIL DETAIL NO.
212 | AAANSEetower ENGLISH UTILITY POTHOLE REPAIR or-o1-2015 | 212