RESOLUTION NO. 12236
A RESOLUTION OF THE COUNCIL OF THE CITY OF SCOTTSDALE.
MARICOPA COUNTY, ARIZONA APPROVING CONSTRUCTION SERVICES
JOB ORDER CONTRACT (JOC) NO. 2018-136-COS-A2 WITH SHASTA
INDUSTRIES, INC. TO AUTHORIZE AN ADDITIONAL ONE (1) YEAR
EXTENSION TO THE EXISTING CONTRACT
WHEREAS, the City and Shasta Industries, Inc. have previously entered into
Construction Services Job Order Contract {JOC) No. 2018-136-COS for Citywide Pool
Construction Services; and
WHEREAS, the City now desires to continue the Job Order Contracts (JOC) for Citywide
Pool Construction Services; and
WHEREAS, it is necessary to modify the Construction Services Job Order Contract
(JOC) to authorize the one-year year extension of the existing contract as authorized in Article
3.1 of the Construction Services contracts.
BE IT RESOLVED by the Council of the City of Scottsdale as follows:
Section 1. The City Council hereby authorizes and directs the Mayor to
execute Contract Amendment No. 2018-136-COS-A2 with Shasta Industries, Inc. for Citywide
Pool Construction projects throughout the City as needed for a one-year time extension, in an
amount not to exceed Five Million Dollars ($5,000,000) for this extension.
j. PASSED AND ADOPTED by the Council of the City of Scottsdale this day of
2021.
ATTEST:
CITY OF SCOTTSDALE, an
Arizona municipal corporation
By:.
Ben Lane, City Clerk
"as to FORM;
THE CITY ATTORNEY
'Sherry R. Scott, City Attorney
By: Eric C. Anderson, Senior Assistant City Attorney
Page 1 of 1
David D. OrteglTMayor
APPR
E
O
1C
Resolution 12236
Contract No. 2018-136-COS-A2
CITY OF SCOTTSDALE
MODIFICATION TO JOB ORDER CONTRACTING SERVICES
THIS CONTRACT MODIFICATION made and entered into this 26“^ day of August 2021,
between the City of Scottsdale, an Arizona municipal corporation, “the City," and Shasta
Industries, Inc., an Arizona corporation, “The Contractor", amending the Contract dated
September 11, 2018 between the City and the Contractor.
RECITALS:
The Mayor of the City of Scottsdale is authorized and empowered by provisions of the
City Charter to execute Contracts and Contract Modifications: and
Three (3) years of the authorized 5 years under this Contract have been used and the
City desires to extend by one (1) year, the term of the original Job Order Contract No. 2018-
136-COS for citywide pool construction services, in accordance with the terms of the original
contract: and
The City and the Contractor mutually agree to extend and modify the Contract.
IN CONSIDERATION of the mutual promises and obligations of the Contract, the parties
agree as follows;
1.0 EXTENSION:
In accordance with Article 3.1, CONTRACT TIME, this contract is extended for an
additional one (1) year period, commencing on the 26th day of August 2021.
2.0 MODIFICATIONS:
2.1 Article 3.1(A). COA/TRAC7 T/ME-AMEND to:
Contract time for this Job Order Contract will commence on or about the 26“’ of
August 2021 and will be for one (1) year, with the option to extend for one (1)
additional one-year period, upon satisfactory completion of the construction
services.
OTHER CONTRACT PROVISIONS:
All provisions of the original Contract not modified above shall remain in full force and
effect as previously stated.
[END OF CONTRACT-signatures on next page]
1 of 2
Contract No. 2018-136-COS-A2
T^E CITY OF SCOTTSDALE, by its Mayor and City Clerk have subscribed their names this
day of
______ , 2021.
AUTHORIZATION
CONTRACTOR:
SHASTA INDUSTRIES. INC.,
an Arizona corporation
/
By/ M
iME PRINTED: <^a7~
TITLE:
RECOMMENDED:
By:
Melanie Gibson, City Contract Administrator
CITY OF SCOTTSDALE, an Arizona
municipal corporation
David D. Ortega, Mayor
CITY OF SCOTTSDALE REVIEW:
Bv:
Dave Lipinskff^Jity Engineer
Public Works
ATTEST:
By
Ben Lane, City Clerk
eorge Woods, Risk Management
APPROVE^;^ TO FORM:
OFFier&OF^THE CITY ATTORNEY
Sherry R. Scott, City Attorney
By: Eric C. Anderson, Senior Assistant City Attorney
2 of 2
M
CITY OF SCOTTSDALE
JOB ORDER CONTRACT
NO. 2018-136-COS
2018-136-COS
TABLE OF CONTENTS
RECITALS..................................................................................................................................... 1
ARTICLE 1 - CONTRACTOR’S SERVICES AND RESPONSIBILITIES.....................................1
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES.................................................... 18
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME........................................................ 22
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE....................................................24
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME........................................... 25
ARTICLE 6 - PROCEDURE FOR PAYMENT.............................................................................31
ARTICLE 7 - CLAIMS AND DISPUTES..................................................................................... 35
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION......................................37
ARTICLE 9 - INSURANCE AND BONDS...................................................................................41
ARTICLE 10 - INDEMNIFICATION............................................................................................ 47
ARTICLE 11 - GENERAL PROVISIONS....................................................................................50
ARTICLE 12 - DEFINITIONS...................................................................................................... 62
EXHIBIT A - STATUTORY PERFORMANCE BOND
EXHIBIT B - STATUTORY PAYMENT BOND
EXHIBIT C - CITY OF SCOTTSDALE PUBLISHED BENCHMARKS
2018-136-COS
CITY OF SCOTTSDALE
CONTRACT NO. 2018-021-COS
THIS CONTRACT, entered into this 11th day of September, 2018, between the City of Scottsdale,
an Arizona municipal corporation, the “CITY” and Shasta Industries, Inc., an Arizona Corporation,
the "CONTRACTOR".
RECITALS
A.
The Mayor of the City of Scottsdale, Arizona, is authorized and empowered by the
provisions of the City Charter to execute contracts for construction and related services.
B.
The City intends to contract for construction and related services for one or more individual
Job Orders.
C.
The Contractor has represented to the City the ability to provide or procure the required
construction and related services and, based on this representation, the City engages
Shasta Industries, Inc. for these services.
FOR AND IN CONSIDERATION of the mutual covenants and considerations contained in this
Contract, it is agreed by the City and the Contractor as follows;
ARTICLE 1 - CONTRACTOR’S SERVICES AND RESPONSIBILITIES
1.1. GENERAL SERVICES
A.
The Contractor will furnish any and all labor, materials, equipment, transportation,
utilities, services and facilities specified in the individual Job Order for which it is
issued a Job Order Notice to Proceed in accordance with this Contract. The City
may determine it is in its best interest to furnish materials and equipment for an
individual Job Order in accordance with the Job Order.
B.
The Work will be performed in a good, workmanlike and substantial manner and
to the satisfaction of the City Engineer and under the direction and supervision of
the City Engineer, or his properly authorized agents, within the care and skill of a
qualified contractor in Scottsdale, Arizona.
1.
Minor design services may be required for some Job Orders. For those
Job Orders that may require design services, the Contractor will seek the
services of an Arizona registered architect or engineering professional to
prepare plans for permitting. The procurement of design services will be in
accordance with City of Scottsdale procurement procedures. If the
services of a design professional are used, the design professional must
maintain at least $1,000,000 Professional Liability Coverage.
2.
All documents prepared by the Contractor are subject to review by the City.
Review by the City is for the benefit of the City only, is not intended to be
for the benefit of any other person, and does not relieve the Contractor from
the professional liability associated with the documents they have
prepared.
Page 1 of 68
2018-136-COS
3. The Contractor’s Representative will be reasonably available to the City
and will have the necessary expertise and experience required to supervise
the Contract Services. A Contractor’s Representative will be assigned for
each Job Order. The Contractor’s Representative will communicate
regularly with the City and will be vested with the authority to act on behalf
of the Contractor.
C. The City is a member of SAVE cooperative purchasing group. SAVE includes the
State of Arizona, Maricopa County, many Phoenix metropolitan area
municipalities, and many K-12 unified school districts. Under SAVE Cooperate
Purchasing Agreement, and with the concurrence of successful Respondents
under this solicitation, a member of SAVE may access a contract resulting from
this solicitation issued by the City. By signing the JOC Contract, the Contractor
agrees to allow other SAVE members the ability to purchase their needs and “use”
this contract for JOC requirements.
1.2. GOVERNMENT APPROVALS AND PERMITS
A.
Unless otherwise provided, the Contractor will obtain or assist the City in obtaining
all necessary permits, approvals and licenses required for the prosecution of the
Work from any government or quasi-government entity having jurisdiction over the
Project. The Contractor is responsible for obtaining payment for the necessary
environmental permits or file the necessary environmental notices.
B.
Copies of these permits and notices must be provided to the City's Representative
before starting the permitted activity. This provision does not constitute an
assumption by the City of an obligation of any kind for violation of the permit or
notice requirements.
C.
The City is responsible for the City of Scottsdale review and permit(s) fees for
building and demolition permits. The City will pay City review fees for grading and
drainage, water, sewer, storm water management, and landscaping. The City will
also pay for City utility design fees for permanent services.
D.
The Contractor is responsible for all other permits and review fees not specifically
listed in Article 1.2(C) above.
E.
The Contractor is responsible for the cost of construction-related water meter(s),
water and sewer taps, fire lines and taps, and all water bills on the project meters
until Substantial Completion of the Project. Arrangements for construction water
will be the Contractor's responsibility. Construction water does not include “test
water” required to complete new water line pressure tests.
F.
The M.A.G. Standard Specification 107.12 is modified to read as follows: “The
Contractor, at its own expense, is responsible for the acquisition of any necessary
temporary easements for construction purposes, storage, maintenance, and
refuse haul-off as indicated upon the plans, which are required in addition to
existing easements or rights-of-way secured by the City.”
1.3. PRE-CONSTRUCTION CONFERENCE
Page 2 of 68
2018-136-COS
A.
After execution of a Job Order and before the commencement of any Work on any
individual Job Order, a pre-construction conference may be scheduled by the City.
B.
The purpose of this conference is to establish a working relationship between the
Contractor, utility firms, and various City departments. The agenda will include
critical elements of the work schedule, submittal schedule, level of Record
Drawings required, cost breakdown of major lump sum items, payment application
and processing, coordination with the involved utility firms, and emergency
telephone numbers for all representatives involved in the course of construction.
C.
At a minimum, attendees will include the Contractor Representative, who is
authorized to execute and sign documents on behalf of the firm, the job
superintendent, and the Contractor’s safety officer.
D.
The Job Order Notice to Proceed date will be established.
E.
The Contractor will provide a Baseline Project Schedule indicating duration,
manpower and equipment resources required to complete all major work activities.
The City and Design Team will review and comment on the Baseline Project
Schedule. The Contractor will revise the Baseline Project Schedule to the
satisfaction of the City’s Representative. No work will begin until the City accepts
the Baseline Project Schedule.
F.
The Contractor will submit a Schedule of Values based on the work and bids
accepted from selected Subcontractors. These values will reflect the actual labor
time, materials, profit and overhead for the Work or in accordance with the
Contractor’s price book.
1.4. CONTROL OF THE WORK
The Contractor will properly guard and protect all partially finished work, and will be
responsible for the Work until the entire Job Order is completed and accepted by the City.
Any payment for completed portions of the Work will not release the Contractor from this
responsibility; however, he will turn over the entire Work in full compliance with the
specifications or Job Order before final settlement is made. In case of suspension of the
Work for any cause whatever, the Contractor is responsible for the Project and will take
all precautions necessary to prevent damage to the Project and will erect any necessary
temporary structures, signs, or other facilities at no cost to the City.
A.
After all Work under the Job Order is completed, the Contractor will remove all
loose concrete, lumber, wire, reinforcing, debris and other materials not
incorporated in the Work from the site of the Work.
B.
Unless the Job Order states that it is the responsibility of the City or a separate
contractor, the Contractor will provide through itself or Subcontractors the
necessary supervision, labor, inspection, testing, start-up, material, equipment,
machinery, temporary utilities, other temporary facilities, temporary fencing, roll
offs, and dust control to permit the Contractor to complete the Work consistent with
the Job Order.
C.
The Contractor will perform all construction activities efficiently and with the
Page 3 of 68
2018-136-COS
requisite expertise, skill and competence to satisfy the requirements of the Job
Order. The Contractor will at all times exercise complete and exclusive control over
the means, methods, sequences and techniques of construction.
D.
Survey stakes and marks required for the completion of the construction shown on
the plans and described in the specifications will be furnished by the Contractor.
E.
The Contractor, its designee or the Contractor’s Superintendent will be present at
the Work at all times that construction activities are taking place.
1.
All elements of the Work, such as concrete work, pipe work, etc., will be
under the direct supervision of a foreman or his designated representative
on the Site who will have the authority to take actions required to properly
carry out that particular element of the Work.
2.
In the event of noncompliance with Article 5.1, the City may require the
Contractor to stop or suspend the Work in whole or in part.
F.
Where the Job Order requires that a particular product be installed or applied by an
applicator approved by the manufacturer, it is the Contractor’s responsibility to
ensure the Subcontractor employed for the work is approved.
G.
Before ordering materials or doing work, the Contractor and each Subcontractor
will verify measurements at the Site and will be responsible for the correctness of
these measurements. No extra charge or compensation will be allowed because
of differences between actual dimensions and the dimensions indicated on the
drawings; differences, which may be found, will be submitted to the City for
resolution before proceeding with the Work.
H.
The Contractor will take field measurements and verify field conditions and
carefully compare these field measurements, conditions and other information
known to the Contractor with the Job Order before starting activities. Errors,
inconsistencies or omissions discovered will be immediately reported to the City.
I.
The Contractor will establish and maintain all building and construction grades,
lines, levels, and bench marks, and will be responsible for the accuracy and
protection of these items. This work will be performed or supervised by an Arizona
licensed civil engineer or surveyor.
J.
Any persons employed by the Contractor or any Subcontractor who, in the opinion
of the City, does not perform his work in a proper, skillful and safe manner or is
intemperate or disorderly will, at the written request of the City, be removed from the
Work by the Contractor or Subcontractor employing this person, and will not be
employed again in any portion of the Work without the written approval of the City.
The Contractor or Subcontractor will hold the City harmless from damages or claims,
which may occur in the enforcement of this Article.
K.
The Contractor assumes responsibility for the proper performance of the Work of
Subcontractors and any acts and omissions in connection with this performance.
Nothing in the Contract Documents is intended or considered to create any legal
Page 4 of 68
2018-136-COS
or contractual relationship between the City and any Subcontractor or Sub-
Subcontractor, including but not limited to any third-party beneficiary rights.
L.
The Contractor will coordinate the activities of all Subcontractors. If the City
performs other work on the Project or at the Site with separate contractors under
the City’s control, the Contractor agrees to reasonably cooperate and coordinate
its activities with those of the separate contractors so that the Project can be
completed in an orderly and coordinated manner without unreasonable disruption.
M.
On a daily basis, the Contractor will prepare a Contractor’s Daily Report. The
City’s CPM Project Inspector or the Public Works Project Coordinator will provide
a sample report format to the Contactor. The report will detail the activities that
took place during the course of the day, all equipment utilized and the number of
hours operated, and all personnel on the Site including Subcontractors. Unless
othenwise arranged, the Daily Reports will be submitted on a daily basis to the
City’s CPM Inspector or the Public Work’s Project Coordinator. The Daily Reports
will also be made available to the City’s Representative upon request. Failure to
provide Daily Reports as arranged or requested above will result in the retention
of monthly progress payments until the Reports are brought up to date.
N.
In the event of noncompliance with this Article 1.4, the City may require the
Contractor to stop or suspend the construction in whole or in part. Any suspension
due to the Contractor’s noncompliance will not be considered a basis for an
increase in the Contract Price or extension of the Contract Time.
1.5. CONTROL OF THE WORK SITE
A.
Throughout all phases of construction, including suspension of the Work, the
Contractor will keep the Site reasonably free from debris, trash and construction
wastes to permit the Contractor to perform its construction services efficiently,
safely and without interfering with the use of adjacent land areas. Upon Substantial
Completion of the Work, or a portion of the Work, the Contractor will remove all
debris, trash, construction wastes, materials, equipment, machinery and tools
arising from the Work or applicable portions of it to permit the City to occupy the
Project or a portion of the Project for its intended use.
B.
Dust Control. The Contractor will take whatever steps, procedures or means
required to prevent abnormal dust conditions due to his construction operations in
connection with this Contract. The dust control measures will be maintained at all
times during construction of the Project(s) to the satisfaction of the City in
accordance with the requirements of the Maricopa County Health Department Air
Pollution Control Regulations and City of Scottsdale Supplement to M.A.G.
Standard Specifications together with applicable provisions of Federal and State
Law.
C.
Dust Control Coordinator. At any City construction site of 5 acres or more of
disturbed surface area, subject to a permit issued by a Control Officer requiring
control of PM-10 emissions from dust generating operations, the Contractor must
have at all times at the Site, at least 1 Dust Control Coordinator trained in
accordance with the requirements of A.R.S. §49-474.05 during primary dust
generating operations that is related to the purposes for which the Dust Control
Page 5 of 68
2018-136-COS
Permit was issued. The Dust Control Coordinator must have full authority to
ensure that dust control measures are implemented at the Site, including authority
to conduct inspections, deploy dust suppression resources, and modify or
shutdown activities as needed to control dust. The Dust Control Coordinator must
be responsible for managing dust prevention and dust control on the Site, including
the use of leaf blowers and street sweeping equipment. The Dust Control
Coordinator must have a valid Dust Training Certification Identification Card readily
accessible on the Site while acting as the Dust Control Coordinator.
The requirements described in the above Article do not apply if all 3 of the following
circumstances are present:
1.
The area of disturbed surface area is less than 5 acres.
2. The previously disturbed areas are stabilized
requirements of any applicable County rules.
in accordance with the
3. The Contractor with the Dust Control Permit provides notice of the acreage
stabilized to the County Control Officer.
On sites with greater than 1 acre of disturbed surface area, the Contractor holding
a Dust Control permit issued by a County Control Officer, who is required to obtain
a single permit for multiple noncontiguous sites that is required to control PM-10
emissions from dust generating operations must have at least 1 individual who is
designated as a Dust Control Coordinator. The Dust Control Coordinator must
have a valid Dust Training Certification Identification Card readily accessible on
the Site while acting as the Dust Control Coordinator. The Dust Control
Coordinator must be present on Site at all times during primary dust generating
activities that are related to the purposes for which the permit was issued.
A Subcontractor who is engaged in dust generating operations at a Site that is
subject to a Dust Control Permit issued by a County Control Officer and that
requires the control of PM-10 emissions from dust generating operations must
register with the County Control Officer. The Subcontractor must have its
registration number readily accessible on the Site while conducting any dust
generating operations.
Storage on Site. Only materials and equipment, which are to be used directly in
the Work, will be brought to and stored on the Site by the Contractor. When
equipment is no longer required for the Work, it will be removed promptly from the
Site. Protection of construction materials and equipment stored at the Site from
weather, theft, damage and all other adversity is solely the responsibility of the
Contractor.
Waste Products. The Contractor is responsible for the cost to dispose of all waste
products including excess earth material which will not be incorporated into the
Work under this Contract. The waste product referred to will become the property
of the Contractor. The Contractor will provide for the legal disposal at an
appropriate off-site location for all waste products, debris, etc., and will make
necessary arrangements for its disposal. Any disposal/dumping of waste products
Page 6 of 68
2018-136-COS
or unused materials will conform to applicable Federal, State and Local
Regulations.
F.
The Contractor will supervise and direct the Work. He will be solely responsible
for the means, methods, techniques, sequences and procedures of construction.
The Contractor will employ and maintain on the Job Site a qualified supervisor or
superintendent who will have been designated in writing by the Contractor as the
Contractor’s Representative. The Representative will have full authority to act on
behalf of the Contractor and all communications given to the Representative will
be as binding as if given to the Contractor. The Representative will be present on
the Site at all times as required to perform adequate supervision and coordination
of the Work. Where appropriate all Provisions of M.A.G., Section 105.5, will be
applicable.
G.
Abnormal Weather. In the event of abnormal weather conditions, such as
windstorms, rainstorms, etc., the Contractor will immediately inspect the Work Site
and take ail necessary actions to insure public access and safety are maintained.
H.
Damage to Property at the Site. The Contractor will be responsible for any and all
damage or loss to property at the Site, except to the extent caused by the acts or
omissions of the City or its representatives, employees or agents and not covered
by insurance. The costs and expenses incurred by the Contractor under this
Article will be paid as a Cost of the Work to the extent that these costs and
expenses are in excess of or are not covered by required insurance, and to the
extent of any deductibles, but they will not increase the Contract Price.
I.
Damage to Property of Others. The Contractor will avoid damage, as a result of
the Contractor’s operations, to existing sidewalks, curbs, streets, alleys,
pavements, utilities, adjacent property, the work of Separate Contractors and the
property of the City. The Contractor will repair any damage caused by the
operations of the Contractor, and these costs will be paid as a Cost of the Work to
the extent that the costs and expenses are in excess of or are not covered by
required insurance, and to the extent of any deductible, but they will not increase
the Contract Price.
J.
Failure of Contractor to Repair Damage. After receiving and acknowledging 10
days written notice, if the Contractor fails to commence the repair of damage to
property as provided in Articles 1.5(1) and 1.5(J), and diligently pursue the repair,
then the City may elect to repair the damages with its own forces and to deduct
from payments due or to become due to the Contractor, amounts paid or incurred
by the City in correcting the damage (provided the Contractor has not commenced
such repair during this 10 day period).
1.6. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A. Shop Drawings, Product Data, Samples and similar submittals are not Contract
Documents. The purpose of their submittal is to demonstrate for those portions of
the Work for which submittals are required the way the Contractor proposes to
conform to the information given and the design concept expressed in the Contract
Documents. The Contractor will review, approve and verify that all submittals meet
the intent of the Contract Documents.
Page 7 of 68
2018-136-COS
B.
Three (3) copies of each Shop Drawing, Product Data, Sample, and similar
submittals required by the Contract Documents will be delivered to the City in
compliance with the approved schedule so as to cause no delay in the Work or in
the activities of the City or of separate contractors. Submittals made by the
Contractor, which are not required by the Contract Documents, may be returned
without action.
C.
The Contractor will perform no portion of the Work requiring submittal and review
of Shop Drawings, Product Data, Samples, or similar submittals until the
respective submittal has been approved by the City. All Work will be in compliance
with approved submittals. The Contractor will not be relieved of responsibility for
any errors or omissions in Shop Drawings, Product Data, Samples, or similar
submittals by the City's approval. Deviation from the original specifications will be
specifically noted on the submittal to the City and the City will be allowed 7 days
to approve or reject any deviations.
D.
By approving, verifying and submitting Shop Drawings, Product Data, Samples
and similar submittals, the Contractor represents that the Contractor has
determined and verified materials, field measurements and field construction
criteria, or will do so, and has checked and coordinated the information contained
within the submittals with the requirements of the Work and of the Job Order.
E.
The Contractor will not be relieved of responsibility for deviations from
requirements of the Job Order by the City's approval of Shop Drawings, Product
Data, Samples or similar submittals unless the Contractor has specifically informed
the City in writing of the deviation at the time of submittal and the City has given
written approval to the specific deviation. The Contractor will not be relieved of
responsibility for errors or omissions in Shop Drawings, Product Data, Samples,
or similar submittals by the City's approval.
F.
The Contractor will direct specific attention, in writing or on resubmitted Shop
Drawings, Product Data, Samples, or similar submittals, to revisions other than
those requested by the City on previous submittals.
G.
Informational submittals upon which the City is not expected to take responsive
action may be so identified in the Contract Documents.
H.
When professional certification of performance criteria of materials, systems or
equipment is required by the Job Order, the City will be entitled to rely upon the
accuracy and completeness of the calculations and certifications.
1.7. QUALITY CONTROL, TESTING AND INSPECTION
A. Inspection. The City’s CPM Inspectors may be stationed on the Work site to report
to the City’s Representative or his Designee as to the progress of the Work. The
City’s Representative or his Designee may also report as to the manner in which
the Work is being performed and report whenever it appears that material
furnished or Work performed by the Contractor fails to fulfill the requirements of
the specifications, this Contract or the Job Order. The Inspector may direct the
attention of the Contractor to any failure or infringement but this inspection will not
Page 8 of 68
2018-136-COS
relieve the Contractor from any obligation to furnish acceptable materials or to
provide completed construction that complies with the Contract or the Job Order
in every way. The Inspector is for the purpose of assisting the City’s
Representative and should not be confused with an Inspector with a City regulatory
agency or with an inspector from a laboratory under Article 1.8.
B.
In case of any dispute arising between the Inspector and the Contractor as to
material furnished or the manner of performing the Work, the Inspector will have
the authority to reject materials or suspend the Work until the question and issue
can be referred to and decided by the City. Inspectors are not authorized to
revoke, alter, enlarge, relax, or release any requirements of the specifications.
Inspectors will in no case act as foremen or perform other duties for the Contractor
or interfere with the management of the Work by the Contractor.
C.
Inspection or supervision by the City’s Representative or Designee will not be
considered as direct control of the individual workman and his work. The direct
control will be solely the responsibility of the Contractor.
D.
The furnishing of these services for the City will not make the City responsible for
or give the City control over construction means, methods, techniques, sequenced
procedures or for safety precautions or programs or responsibility for the
Contractor’s failure to perform the Work in compliance with the Contract
Documents.
1.8. MATERIALS TESTING
All materials used in the Work will be new and unused, unless otherwise noted, and will
meet all quality requirements of the Job Order.
A.
All construction materials to be used on the Work or incorporated into the Work,
equipment, plant, tools, appliances or methods to be used in the Work may be
subject to the inspection and approval or rejection of the City. Any materials
rejected by the City will be removed immediately and replaced in a manner
acceptable to the City at no further cost to the City.
B.
The procedures and methods used to sample and test material will be determined
by the City. Unless otherwise specified, samples and test will be made in
compliance with the following:
The City of Scottsdale Minimum Sampling
Frequency Guide, the City of Scottsdale Material Testing Manual and the standard
methods of AASHTO or ASTM, DSPM and MAG supplements.
C.
The City will select a pre-qualified City or Independent Testing Laboratory and will
pay for initial City Acceptance Testing.
1.
When the first and subsequent tests indicate noncompliance with the Job
Order, the cost associated with that noncompliance will be paid for by the
Contractor.
2.
When the first and subsequent tests indicate noncompliance with the Job
Order, all retesting will be performed by the same testing agency. The cost
associated with the noncompliance will be paid by the Contractor.
Page 9 of 68
2018-136-COS
3. The Contractor will cooperate with the selected testing laboratory and all
others responsible for the testing and inspecting of the Work and will
provide them access to the Work at all times.
D.
At the option of the City, materials may be approved at the source of supply before
delivery is started.
E.
Code compliance testing and inspections required by codes or ordinances, or by
a plan approval authority, and which are made by a legally constituted authority,
will be the responsibility of and will be paid by the Contractor, unless othenA/ise
provided in the Job Order.
F.
The Contractor’s convenience and quality control testing and inspections will be
the sole responsibility of the Contractor and paid by the Contractor.
G.
All soils and materials testing will be performed and paid for by the City. The City
will order tests and distribute test results for all construction areas. The City will
be responsible for ordering testing and will distribute test results within 24 hours of
receipt.
1.9. PROJECT RECORD DOCUMENT/AS BUILTS
A. During the construction period, the Contractor will maintain at the jobsite a set of
blueline or blackline prints of the Construction Document drawings and Shop
Drawings for Project Record Document purposes.
1.
The Contractor will mark these drawings to indicate the actual installation
where the installation varies appreciably from the original Construction
Documents. The Contractor will give particular attention to information on
concealed elements, which would be difficult to identify or measure and
record later. Items required to be marked include but are not limited to:
Dimensional changes to the drawings.
Revisions to details shown on drawings.
Depths of foundations below first floor.
Locations and depths of underground utilities.
Revisions to routing of piping and conduits.
Revisions to electrical circuitry.
Actual equipment locations.
Duct size and routing.
Locations of concealed internal utilities.
Changes made by Change Order.
Details not on original Contract Drawings.
2.
The Contractor will mark completely and accurately Record Documents,
prints of Construction Documents or Shop Drawings; whichever is the most
capable of indicating the actual physical condition. Where Shop Drawings
are marked, show cross-reference on the Construction Documents
location.
Page 10 of 68
2018-136-COS
3.
The Contractor will mark Project Record Drawings sets with red erasable
colored pencil.
4.
The Contractor will note Request for Information (RFI) Numbers, American
Standards Institute (ASI) Numbers and Adjustment Numbers, etc., as
required to identify the source of the change to the Construction
Documents.
5.
The Contractor will at the time of Substantial Completion, submit Project
Record Drawing prints and Shop Drawings to the City or its representative
for review and comment.
B. Immediately upon receipt of the reviewed Project Record Drawings from the City,
the Contractor will correct any deficiencies or omissions to the drawings and
prepare the following for submission to the City:
1.
A complete set of PDF electronic files of all Project Record Drawings
prepared in Microstation format compatible with City of Scottsdale CADD
requirements. If a Design Professional is contracted with, the Design
Professional will provide files of the original Construction Documents to the
Contractor for use in preparing these final Record Documents, or the
Contractor may contract with the Design Professional to revise and update
the electronic drawing files. Each drawing will be clearly marked with “As-
Built Document.”
2.
A complete set of As-Built reproducible mylars from the final AutoCAD
drawings and an electronic pdf file on CD are required.
3.
The original copy of the Project Record Drawings (redline mark-ups).
1.10. PROJECT SAFETY
A. If applicable governmental regulations and sound work rules for maintaining a safe
place and environment are not followed, the site environment in which the
Contractor operates may, on occasion, present a potential safety and health
hazard to any who may be on the Job Site. The Occupational Safety and Health
Act (OSHA) and the City of Scottsdale loss control procedures are the minimum
standard for safety and environmental protection and must be fully complied with
at all times. All Work will be performed in compliance with all applicable federal,
state and local laws, ordinances, statutes, rules and regulations including ADOSH
policies and procedures. The Contractor will be required to attend a City safety
briefing session at the pre-construction meeting. The session will be attended by
the Contract Administrator, the designated Risk Management staff, and a
Contractor’s Representative.
The Contractor will provide a safe job site and work environment for the safety and
health of employees and members of the general public and comply with all legal
requirements including but not limited to the following:
Occupational Safety and Health Act (OSHA)
Electrical Safe Work Practices Standards
Page 11 of 68
2018-136-COS
B.
D.
OSHA Personal Protective Equipment Standards
National Fire Protection Association (NFPA) 70E Standard for Electrical Safety in
the Workplace
OSHA Fall Protection Standards
OSHA Confined Space Entry
All other applicable requirements of OSHA and local codes and agencies having
jurisdiction.
Contractors that violate the aforementioned rules and regulations may be subject
to job shutdown and or removal from City facilities.
The Risk Management Division makes available a packet which contains the City’s
OSHA compliance guidelines, emergency evacuation, the City’s safety and health
plan, and other safety information.
The Contractor will conduct tailgate safety meetings regularly to ensure that safety
on the job is given priority.
The Contractor will contact the City’s Representative and the Risk Management
Division within 24 hours of the occurrence of an accident or injury arising out of
the Contractor’s Work under this Contract.
E.
The Contractor employees are encouraged to abate or remedy any unsafe act or
condition, which may arise in the course of the Contractor’s Work under this
Contract.
F.
The City reserves the right to conduct safety audits at the Job Site and stop unsafe
acts at any time. In addition, the City will be notified within 4 hours should any
OSHA inspection occur at a City Job Site.
G.
The Contractor recognizes the importance of performing the Work in a safe
manner so as to prevent damage, injury or loss to:
1.
All individuals at the Site, whether working or visiting;
2.
The Work, including materials and equipment incorporated into the Work
or stored on-Site or off-Site; and
3.
All other property at the Site or adjacent to the Site.
H.
The Contractor assumes responsibility for implementing and monitoring all safety
precautions and programs related to the performance of the Work.
I.
The Contractor will, before commencing construction, designate a Safety
Representative with the necessary qualifications and experience to supervise the
implementation and monitoring of all safety precautions and programs related to
the Work. Unless othenA/ise required by the Contract Documents, the Contractor’s
Safety Representative will be an individual stationed at the Site who may have
responsibilities on the Project in addition to safety.
J.
The Contractor must provide OSHA 300A Summary log information including total
Page 12 of 68
2018-136-COS
recordable cases, total case rates, and lost workday incident rates for the past 2
calendar years. This information can be compared to Bureau of Labor Statistics
(BLS) rates to determine whether a contractor has below average or above
average accident/injury rates. Bureau of Labor Statistics information may be
obtained through Risk Management. The Safety Representative will make routine
daily inspections of the Site and will hold weekly safety meetings with the
Contractor’s personnel. Subcontractors and others as applicable.
The Contractor and Subcontractors will comply with all Legal Requirements
relating to safety, as well as any City-specific safety requirements contained in the
Contract Documents, provided that the City-specific requirements do not violate
any applicable Legal Requirement.
The Contractor will immediately report in writing any safety-related injury, loss,
damage or accident arising from the Work to City’s Representative and, to the
extent mandated by Legal Requirements, to all government orquasi-governmental
authorities having jurisdiction over safety-related matters involving the Project or
the Work.
The Contractor’s responsibility for safety under this Article 1.10 is not intended in
any way to relieve Subcontractors and Sub-Subcontractors of their own
contractual and legal obligations and responsibility for:
1.
Complying with all Legal Requirements, including those related to health
and safety matters; and
2.
Taking all necessary measures to implement and monitor all safety
precautions and programs to guard against injury, losses, damages or
accidents resulting from their performance of the Work.
The Contractor and Subcontractors must agree to provide Material Safety Data
Sheets for all substances that are delivered to the City of Scottsdale, that come
under the Occupational Safety and Health Administration Toxic and Hazardous
Substances - Hazard Communication Standard, 29 CFR 1910.1200 Hazard
Communication (reference Occupational Safety and Health Standards, Subpart Z
Toxic and Hazardous Substances - Hazardous Communication Standard).
All Contractors and all Subcontractors using chemicals on City of Scottsdale
property will use only the safest chemicals, with the least harmful ingredients.
These chemicals will be approved for use by a City of Scottsdale representative
before bringing them on the property.
The Contractor and all Subcontractors will make every attempt to apply approved
chemicals with highly volatile organic compounds, outside of working hours.
Adequate ventilation will be used at all times during the application of these
approved chemicals.
In conjunction with the Occupational Safety and Health Standards, Subpart Z Toxic
and Hazardous Substances - Hazard Communication Standard, 29 CFR
1910.1200 Hazard Communication, the Contractor and Subcontractors are
informed of the presence of (or possible presence of) chemicals in the area where
Page 13 of 68
2018-136-COS
the Work requested will be performed. It is the responsibility of the Contractor or
all selected Subcontractors to contact the City of Scottsdale for specific information
relative to the type of chemicals present and location of appropriate Material Safety
Data Sheets.
Unless included in the Work, if the Contractor encounters onsite material which he
reasonably believes to contain asbestos, polychlorinated biphenyl (PCB), or other
hazardous substances or materials regulated by Public Health Laws, he will
immediately stop Work and report the condition to the City.
If the material is found to contain asbestos, PCB or other hazardous substances
or materials regulated by Public Health Laws, the Contractor will not resume Work
in the affected area until the material has been abated or rendered harmless. The
Contractor and the City may agree, in writing, to continue Work in non-affected
areas onsite. An extension of the Contract Time may be granted as provided in
Article 5.
O. Upon discovery of hazardous materials the Contractor will comply with all
applicable laws/ordinances and regulations and take all appropriate health and
safety precautions.
1.11. WARRANTY
The provisions of M.A.G., Section 108.8 will apply with the following additional
requirements:
Should the Contractor fail to begin repairs or corrective work within 14 calendar
days after receipt of written notice from the City, the City may perform the
necessary work and the Contractor agrees to reimburse the City for the actual cost.
The warranty period on any part of the Work repaired or replaced will be extended
for a period of 1 year from the date of the repair or replacement.
This warranty will not apply to damage caused by normal wear and tear or by acts
beyond the Contractor’s control.
A.
The Contractor’s warranty obligation excludes defects caused by abuse,
alterations, or failure to maintain the Work by persons other than the Contractor or
anyone for whose acts the Contractor may be liable.
B.
The Contractor’s warranty obligation will be for 1 year.
C.
Nothing in this warranty is intended to limit any manufacturer’s warranty which
provides the City with greater warranty rights than those found in this Article 1.11
or the Contract Documents. The Contractor will provide the City with all
manufacturers’ warranties upon Substantial Completion of each Job Order.
1.12. CORRECTION OF DEFECTIVE WORK
A. The Contractor agrees to correct any Work that is found to not be in conformance
with the Contract Documents, including that part of the Work subject to Article 1.11
Page 14 of 68
2018-136-COS
above, within a period of 1 year from the date of Substantial Completion of the
Work or any portion of the Work, or within any longer period to the extent required
by the Contract Documents. All removal/replacement work, as directed by the City
to the Contractor, in compliance with this Contract, MAG standards and City codes
will have cost determinations by the City and be issued as a deduct or change
order to the Project. A Progress Payment, or partial or entire use or occupancy of
the Project by the City will not constitute acceptance of Work not in accordance
with the Contract Documents.
During the Work, the Contractor will take meaningful steps to begin correction of
any nonconforming Work as notified by the City. This includes the correction,
removal or replacement of the nonconforming Work and any damage caused to
other parts of the Work affected by the nonconforming Work. If the Contractor fails
to begin the necessary steps during the Work, the City, in addition to any other
remedies provided under the Contract Documents, may provide the Contractor
with written notice that the City will commence correction of any nonconforming
Work with its own forces.
The Contractor will take meaningful steps to begin correction of nonconforming
Work subject to Article 1.11 above. These measures include but are not limited to
timely correction of the Work. If the Contractor fails to initiate necessary measures
for this Work within 7 days of receipt of written notice from the City, the City, in
addition to any other remedies provided under the Contract Documents, may
provide the Contractor with written notice that the City will begin correction of the
nonconforming Work with its own forces.
B.
If the City does perform this corrective Work, the Contractor will be responsible for
all reasonable costs incurred by the City in performing the correction.
C.
The Contractor will immediately respond to any nonconforming Work that creates
an emergency.
D.
The 1 year period referenced in Article 1.11 above applies only to Contractor’s
obligation to correct nonconforming Work and is not intended to constitute a period
of limitations for any other rights or remedies the City may have regarding the
Contractor’s other obligations under the Contract Documents.
1.13. SUBCONTRACTOR AND MAJOR SUPPLIER SELECTIONS
A. Selection by qualifications only - The City may approve the selection of a
Subcontractor(s) or Supplier(s) based only on their qualifications when the
Contractor can demonstrate it is in the best interest of the Project.
1.
The Contractor will apply the Subcontractor selection plan approved by the
City in the evaluation of the qualifications of a Subcontractor(s) or
Supplier(s) and provide the City with its review and recommendation. The
selection plan will be the Contractor’s own selection plan approved by the
City or the City’s selection plan as provided in this Article 1.13(B).
2.
The Contractor will negotiate costs for services/supplies from the
Subcontractor(s)/Supplier(s) under the approved qualifications only
Page 15 of 68
2018-136-COS
method.
City Selection Plan:
3. The Contractor shall comply with the following City procedures in its
selection of Subcontractor(s) or Suppliers(s) based on qualifications only:
a.
The Request for Qualifications (RFQ) will contain the best
description of the services or material desired; and
b.
A statement that only unpriced statements of qualifications will be
considered; and
c.
State the requirements for the project, such as drawings and
descriptive literature; and
d.
State the criteria for evaluating the qualifications; and
e.
A closing date and time for receipt of a statement of qualifications
and the location where the statements should be delivered or
mailed; and
f.
A statement that discussions may be held; and
g.
A statement that only statements of qualifications determined to be
acceptable will be considered for award.
7.
The RFQ may be amended after the submission of the statements of
qualifications. Any amendment will be distributed only to bidders who
submitted statements of qualifications. Those bidders will be permitted to
submit new unpriced statements of qualifications or to amend statements
already submitted.
Statements of Qualifications will not be opened publicly, but will be opened
in the presence of the Contractor. The contents of unpriced statements of
qualifications will not be disclosed to unauthorized persons.
Statements of Qualifications will be evaluated solely in accordance with the
criteria stated in the RFQ and will be determined to be either acceptable
for further consideration or unacceptable. A determination that the
statement is unacceptable will be in writing, state the basis of the
determination and be retained by the Contractor. The Contractor will notify
the bidder of the determination and the bidder will not be given an
opportunity to amend its statement of qualifications further.
The Contractor may conduct discussions with any bidder who submits an
acceptable or potentially acceptable statement of qualifications. During
discussions, the Contractor will not disclose any information derived from
any other bidder’s statement of qualifications.
The Contractor will negotiate costs for services/supplies from the
Page 16 of 68
2018-136-COS
Subcontractor(s)/Supplier(s) selected under this method.
B.
Selection by qualifications and competitive bid - The Contractor will apply the
City’s Subcontractor selection plan stated above in the Contractor’s evaluation of
the qualifications of Subcontractor(s)/Supplier(s) and will provide the City with the
selected process to prequalify prospective Subcontractors/Suppliers. Selection
may not be based on price alone. All Work by major Subcontractors and major
Suppliers will then be competitively bid to the prequalified Subcontractors unless
a Subcontractor or Supplier was selected in accordance with Article 1.13(B) above.
The Contractor may elect to comply with the following procedures in step 2 of its
competitive bid process.
1.
The Contractor will develop Subcontractor and Supplier interest, submit the
names of a minimum of 3 qualified Subcontractors or Suppliers for each
trade in the Project and solicit bids for the various Work categories. If there
are not 3 qualified Subcontractors/Suppliers available for a specific trade
or there are extenuating circumstances, the Contractor may request
approval by the City to submit less than 3 names. Without first giving
written notice to the City, no change in the recommended
Subcontractors/Suppliers will be allowed.
2.
If the City objects to any nominated Subcontractor/Supplier or to any self-
performed Work for good reason, the Contractor will nominate a substitute
Subcontractor/Supplier that is acceptable to the City.
3.
The Contractor will distribute Drawings and Specifications, and when
appropriate, conduct a prebid conference with prospective Subcontractors
and Suppliers. The Contractor will then review the price bids submitted by
Subcontractors and Suppliers and make its selection based on the
responsive and responsible bidder with the lowest price.
4.
If the Contractor desires to self-perform certain portions of the Work, it must
request to be one of the approved Subcontractor bidders for those specific
bid packages. The Contractor’s bid will be evaluated in accordance with
the process identified in the Invitation for Bids. If events warrant and the
City concurs that in order to insure compliance with the Project Schedule
or cost, the Contractor may self-perform Work without bidding or re-bidding
the Work. (For horizontal construction, as defined in A.R.S. § 34-101(15),
the Contractor must self perform not less than 45% (or such greater
percentage as may be specified in the RFQ) of the Work as required by
A.R.S. § 34-603(0(3).)
C.
If after receipt of sub-bids or after award of Subcontractors and Suppliers, the City
objects to any nominated Subcontractor/Supplier or to any self-performed Work
for good reason, the Contractor will nominate a substitute Subcontractor or
Supplier, preferably if this option is still available, from those who submitted
Subcontractor bids for the Work affected. Once the substitute Subcontractors and
Suppliers are consented to by the City, the Contractor’s proposed price for the
Work or portion of the Work will be correspondingly adjusted to reflect any higher
or lower costs from any substitution. Under no circumstances will the City’s
objection or comment on any Subcontractor or Supplier relieve the Contractor of
Page 17 of 68
2018-136-COS
its sole responsibility for control over the methods, means and processes by which
the Work is accomplished. The City must approve in writing the selected
Subcontractor Selection Plan before work commences on any Job Order.
ARTICLE 2 - CITY’S SERVICES AND RESPONSIBILITIES
2.1
DUTY TO COOPERATE
The City will, throughout the performance of the Contract Services, cooperate with the
Contractor and perform its responsibilities, obligations and services in a timely manner to
facilitate the Contractor’s timely and efficient performance of the Contract Services and so
as not to delay or interfere with the Contractor’s performance of its obligations under the
Contract Documents.
2.2
INFORMATION AND SERVICES
A. The City will furnish the Contractor the following information or services for this
Project:
1.
One copy of data pertinent to the Work. However, the Contractor will be
responsible for searching the records and requesting information required
for the Project.
2.
All available data and information relative to policies, standards, criteria,
studies, etc.
3.
Project funding and budget allocations and any changes affecting the
funding or budget allocations.
4.
For purpose of determining the Job Order Price, any Plans and
Specifications.
5.
For purpose of Project Record Drawings, a CADD file of the Construction
Documents in Microstation format compatible with City of Scottsdale CADD
requirements.
2.3
CITY’S REPRESENTATIVE
A.
The City’s Representative will be responsible for providing City-supplied
information and approvals in a timely manner to permit the Contractor to fulfill its
obligations under the Contract Documents.
B.
The City’s Representative will also provide the Contractor with prompt notice if it
observes any failure on the part of the Contractor to fulfill its contractual
obligations, including any default or defect in the Project or non-conformance with
the drawings and specifications.
2.4
DESIGN PROFESSIONAL SERVICES
A. The City may contract separately with one or more Design Professionals to provide
Page 18 of 68
2018-136-COS
architectural or engineering design of the Project in accordance with the provisions
of A.R.S. §34-603.
B. The City may contract with the Design Professional to provide some or all of the
following services during the performance of the Work:
1.
The Design Professional will provide administration of the Work. The City
and the Contractor will endeavor to communicate through the Design
Professional. Communications by and with the Design Professional's
consultants will be through the Design Professional.
2.
The Design Professional will visit the Site at intervals appropriate to the
stage of construction to become generally familiar with the progress and
quality of the completed Work and to determine in general if the Work is
being performed in accordance with the Contract Documents. The Design
Professional will keep the City informed of progress of the Work, and will
endeavor to guard the City against defects and deficiencies in the Work.
3.
Upon the Contractor’s submittals, the Design Professional will review and
approve or take other appropriate action on submittals as Shop Drawings,
Product Data and Samples in accordance with Article 1.6.
4.
All drawings produced for projects considered to be performed under the
Contractor are the property of the City, and are owned in whole by the City
for any and all future use and considerations.
2.5
CITY’S SEPARATE CONTRACTORS
The City is responsible for all Work performed on the Project or at the Site by separate
contractors under the City’s control. The City will contractually require its separate
contractors to cooperate with, and coordinate their activities so as not to interfere with the
Contractor in order to enable the Contractor to timely complete the Work consistent with
the Contract Documents. The Contractor agrees to reasonably cooperate and coordinate
its activities with those of the separate contractors so that the Project can be completed in
an orderly and coordinated manner without unreasonable disruption.
2.6
FURNISHING OF SERVICES AND INFORMATION
A. The City will be responsible for the payment or waiver of the following:
1. City review and permit(s) fees for building, encroachment, and demolition
permits including City, State and County.
2. City review fees for grading and drainage, water, sewer and landscaping.
3. Utility design fees or permanent services fees are paid by the City, but all
submittals are the responsibility of the Contractor.
4. Obtaining Nationwide 404 Permits.
5. City Development Fees.
Page 19 of 68
2018-136-COS
B. Unless expressly stated to the contrary in the Contract Documents, the City will
provide, at its own cost and expense, for the Contractor’s information the following:
1.
To the extent available, surveys describing the property, boundaries,
topography and reference points for use during construction, including
existing service and utility lines;
2.
Temporary and permanent easements, zoning and other requirements and
encumbrances affecting land use, necessary to permit the proper design
and construction of the Project and enable the Contractor to perform the
Work;
3.
A legal description and Street or Physical address of the Site;
4.
To the extent available, as-built record or historical drawings of any existing
structures at the Site;
5.
To the extent available, environmental studies, reports and impact
statements describing the environmental conditions, including hazardous
materials, in existence at the Site; and
6.
To the extent available. Geotechnical studies describing subsurface
conditions and other surveys describing other latent or concealed physical
conditions at the Site.
The City will provide all City standards and guidelines, supplementary conditions
and special provisions that will be included in the plans and specifications for the
Project. These may include but are not limited to: disposal of surplus material,
special security provisions, investigation of underground facilities, traffic controls
and regulations, special quality control testing and termite treatment requirements.
The City is responsible for securing and executing all necessary Contracts with
adjacent land or property owners that are necessary to enable the Contractor to
perform the construction. The City is further responsible for all costs, including
attorneys’ fees, incurred in securing these necessary Contracts.
2.7 PROJECT MANAGEMENT SERVICES
A.
The City may contract separately with one or more Technical Consultants to
provide project management assistance for the Project. The Technical
Consultant’s contract as well as contracts with other firms hired by the City will be
furnished to the Contractor. The Contractor will not have any right, however, to
limit or restrict any Contract Modifications that are mutually acceptable to the City
and Technical Consultant.
B.
The Technical Consultant services will augment the City staffing resources to
effectively manage the objectives of the City and this Project with the goal of
managing the key Project communication, cost and time parameters.
Page 20 of 68
2018-136-COS
C.
The Technical Consultant may provide preprogramming and design standards.
D.
The City may contract with the Technical Consultant to provide some or all of the
following services during the performance of the construction:
1. Oversight of the Construction. The City may hire Technical Consultants to
assist it in oversight of the Construction Project. The Technical Consultants
will;
a.
Conduct Site visits at intervals appropriate to the stage of
construction to become generally familiar with the progress and
quality of the completed construction and to determine in general if
the construction is being performed in accordance with the
Construction Documents. The Technical Consultant will keep the
City informed of progress of the construction, and will endeavor to
guard the City against defects and deficiencies in the construction.
The Technical Consultant may have authority to reject construction
which does not conform to the Construction Documents and to
require additional inspection or testing of the construction in
accordance with Articles 1.7 and 1.8;
b.
Review and recommend approval of the Contractor’s Payment
Requests;
c.
Interpret matters concerning performance under and requirements
of the Contract Documents on written request of the City. The
Technical Consultant's response to any requests will be made with
reasonable promptness and within any time limits agreed upon;
d.
Analyze, recommend and assist in negotiations of Change Orders;
e.
Conduct inspections to determine Substantial Completion and Final
Acceptance.
f.
Receive and forward to the City for the City's review and records
written warranties and related documents required by the Contract
Documents and assembled by the Contractor.
2.8
PERMIT REVIEW AND INSPECTIONS
For clarification, permitting activities are handled by the City of Scottsdale Developmental
Services, Fire and Planning Departments. Obtaining any permits and submittals are the
responsibility of the City.
2.9
UTILITY COMPANY COORDINATION
The Contractor will be responsible for coordinating utility design work for permanent
service to the Project and will ensure that the work takes place in a timely manner and
does not impact the Project Schedule. Any utility design fees for permanent services to a
Job Order will be paid by the City in accordance with Article 2.6.
Page 21 of 68
2018-136-COS
ARTICLE 3 - CONTRACT TIME AND JOB ORDER TIME
3.1
CONTRACT TIME
A.
Contract Time for this Job Order Contract will commence on or about the 11th day
of September, 2018, and will be for two year(s) with the option to extend for three
additional years in one year increments.
1.
The option to extend may be exercised based on the Contractor’s
successful performance and the needs of the City.
2.
A Contract Modification will be processed for each extension and will
commence on or about the anniversary date of the Contract. Each
extension must be authorized by the City Engineer or designee.
B.
The Contract will remain in full force and effect during the performance of any Job
Order.
3.2 JOB ORDER TIME
A.
Job Orders may be issued at any time during the term of this Contract.
B.
Each individual Job Order will include a Job Order Notice to Proceed date.
Duration of the Work as determined in accordance with this Article 3.2 and a
calculated Substantial Completion date.
C.
The Contractor agrees that it will commence performance of the Work and achieve
each individual Job Order Time.
D. Each Job Order Time will be subject to adjustment in accordance with Article 5.
3.3 SUBSTANTIAL COMPLETION
A.
Substantial Completion of each Job Order is when all construction has been
completed with the exception of final inspection punch list work. The purpose of
granting or acknowledging substantial completion is to stop Job Order Time.
B.
Before notifying the City in accordance to Article 3.3(C), the Contractor will inspect
the Work and prepare and submit to the City a comprehensive list of items to be
completed or corrected. The Contractor will proceed promptly to complete and
correct items on the list. Failure to include an item on the list does not alter the
responsibility of the Contractor to complete all Work in accordance with the
Contract Documents.
C.
The Contractor will notify the City when it believes a Job Order, or to the extent
permitted in the Contract Documents, a portion of the Job Order, is substantially
complete.
D.
Within 5 days of the City’s receipt of the Contractor’s notice, the City and the
Contractor will jointly inspect the Work to verify that it is substantially complete in
accordance with the requirements of the Contract Documents.
Page 22 of 68
2018-136-COS
E.
If the Work is substantially complete, the City will prepare and issue a Certificate
of Substantial Completion that will state:
1.
The date of Substantial Completion of the Work or portion of the Work;
2.
The remaining items of Work that have to be completed within 30 calendar
days before Final Acceptance;
3.
Provisions (to the extent not already provided in the Contract Documents)
establishing the City’s and the Contractor’s responsibility for the Project’s
security, maintenance, utilities and insurance pending Final Acceptance.
F.
The City, at its option, may use a portion of the Work which has been determined
to be substantially complete provided, however, that;
1.
Certificate of Substantial Completion has been issued for the portion of
Work addressing the items in Article 3.3(E) (2);
2.
The Contractor and the City have obtained the consent of their sureties and
insurers, and to the extent applicable, the appropriate government
authorities having jurisdiction over the Project, and
3.
The City and the Contractor agree that the City’s use or occupancy will not
interfere with the Contractor’s completion of the remaining Work.
3.4 PUNCH LIST PREPARATION
A minimum of 7 days before Substantial Completion the Contractor, in conjunction with
the City, will prepare a comprehensive list of Punch List items, which the City may edit
and supplement. The Contractor will proceed promptly to complete and correct the Punch
List items. Failure to include an item on the Punch List does not alter the responsibility of
the Contractor to complete all Work in accordance with the Contract Documents.
Warranties required by the Contract Documents will not commence until the date of Final
Acceptance unless otherwise provided in the Contract Documents. Seven (7) days before
the City issues its Final Acceptance Letter, the Contractor will deliver to the City all
Operation and Maintenance Manuals necessary for the City to assume responsibility for
the operation and maintenance of that portion of the Work.
3.5 FINAL ACCEPTANCE
Upon receipt of written notice that the Work or identified portions of the Work is ready for
final inspection and acceptance the City and the Contractor will jointly inspect to verify that
the remaining items of Work have been completed as provided in Article 3.3(E). The City
will issue a Final Acceptance Letter.
3.6 LIQUIDATED DAMAGES
A. The Contractor understands that if Substantial Completion is not attained within
the Job Order Time of the Work as may be adjusted for each Job Order, the City
will suffer damages, based on the anticipated loss caused by the breach and the
Page 23 of 68
2018-136-COS
B.
difficulty in determining and accurately specifying the damages. The Contractor
agrees that if Substantial Completion is not attained within the Job Order Time as
adjusted, the Contractor will pay the City the amount prescribed in Article 3.6(B)
below as liquidated damages for each Day that Substantial Completion extends
beyond the date determined by the Job Order Time as adjusted.
The following will be the liquidated damages for each Job Order unless a specific
amount has been determined for each individual Job Order.
QUIDATED DAMAGES
Original Job Order Amount
Daily Charges
From more than
To and including
Calendar Day or Fixed Date
$00
$25,000
$200
25,001
50,000
250
50,001
100,000
280
100,001
500,000
430
500,001
750,000
500
750,001
1,000,000
570
1,000,001
1,250,000
610
1,250,001
1,500,000
650
ARTICLE 4- CONTRACT PRICE AND JOB ORDER PRICE
4.1 CONTRACT PRICE
This Contract will have a maximum contract amount of $5,000,000.00 for the initial term.
Renewal term years will have a maximum contract amount of $5,000,000.00. The
Contractor agrees at his own cost and expense, to do all the Work as specified in the
Contract Documents and any Work contingent to the Contract and necessary for the
construction of the improvements. The Contractor will completely construct the Work and
install the materials, free and clear of all claims, liens, and charges of any kind, in the
manner and under the conditions specified within the time or times stated in each Job
Order.
A.
In no event will any individual Job Order Price exceed $1,500,000.00. If the City
opts to extend this Contract in accordance with Article 3.1(A), the Contract
Modification may increase the maximum amount, if necessary, at that time.
B.
The Job Order Price is subject to adjustments made in accordance with Article 5.
C.
The Contractor will be responsible for payment of all State of Arizona and City of
Scottsdale transaction privilege (sales) taxes due on construction income, whether
or not these taxes are specifically separated in the bid amount.
D.
Unless otherwise provided in the Contract Documents, the Job Order Price is
considered to include all sales, use, consumer and other taxes throughout the term
of this Contract, whether or not yet effective or merely scheduled to go into effect.
E.
The Contractor must secure and maintain, during the life of the Contract, State of
Arizona and City of Scottsdale Transaction Privilege (sales) Tax Licenses.
Page 24 of 68
2018-136-COS
To obtain a State of Arizona Privilege (Sales) Tax License Application, please go
to the following website:
http://www.revenue.state.az.us/ADOR Forms/70-79/74-4002 fillable.pdf
To obtain a City of Scottsdale Transaction (Sales) Tax License Application, please
go to the following website:
http://www.scottsdaleaz.qov/taxes/salestax.asp
The Contractor must demonstrate compliance with the E-Verify Program as
provided in Article 11.34 and as required by A.R.S. §41-1080 before issuance of
any License by the City.
4.2 RESPONSIBILITY FOR PRIVILEGE (SALES) TAXES
A. The Contractor is responsible for payment of all applicable State of Arizona and
City of Scottsdale transaction privilege (sales) taxes due on construction income
whether or not these taxes are specifically separated in the bid amount. The taxes
are to be reported on either a progressive billing (accrual) basis or cash receipts
basis, depending on the method chosen at the time application was made for the
Privilege (sales) Tax License.
City Privilege (sales) tax exemptions/deductions may be applicable to certain
projects. The Contractor is advised to consider this as it prepares its bid. Please
review, in detail. Sections 415, 465, and 110 of the Scottsdale Revised City Code,
Appendix C to determine if exemptions/ deductions are applicable. For tax
guidance, please reference the City Code and other tax resources at the following
website:
B.
http://www.scottsdaleaz.qov/taxes/
The State of Arizona has similar exemptions; please reference A.R.S. Title 42 at
the following website:
http://www.azleq.state.az.us/ArizonaRevisedStatutes.asp?Title=42
For further questions regarding tax treatment, please contact the Arizona
Department of Revenue at 602-255-2060 and the City of Scottsdale Tax & Audit
Section at 480-312-2768.
Any Contingencies and Allowances as agreed upon between the City and the
Contractor will be stated in Exhibit A, attached and by reference made a part of
this Contract.
ARTICLE 5 - CHANGES TO THE CONTRACT PRICE AND TIME
5.1 DELAYS TO THE WORK
A.
Delays may be compensable, concurrent, excusable or non-excusable as defined
in Article 12.
B.
If the Contractor is delayed in the performance of the Work due to acts, omissions.
Page 25 of 68
2018-136-COS
conditions, events, or circumstances beyond its control and due to no fault of its
own or those for whom the Contractor is responsible, the Contract Times for
performance may be reasonably extended by Job Order Adjustment.
C.
The Contractor will request an increase in the Job Order Time by written notice
including an estimate of the probable effect of delay on progress of the Work. In
the case of a continuing delay only one request is necessary.
D.
Written notice will be received within 5 days of the commencement of the cause of
the delay.
1. If written notice is received more than 5 days after commencement of the
cause of the delay, the period of delay will be considered to commence 14
days before the giving of any notice.
E.
By way of example and subject to the Force Majeure provisions of Article 11.8,
events that may entitle the JOC to an extension of the Contract Time include acts
or omissions of the City or anyone under the City’s control (including separate
contractors). Acts of God or public enemy changes in the Work, Differing Site
Conditions, Hazardous Conditions, unusual delay in transportation, and excessive
inclement weather conditions not reasonably anticipated, war or other national
emergency making performance temporarily impossible or illegal, or strikes or
labor disputes not brought about by any act or omission of the JOC.
F.
If adverse weather conditions are the basis for a request for additional Job Order
Time, the requests will be documented by data substantiating that weather
conditions were abnormal for the period of time and could not have been
reasonably anticipated, and that weather conditions had an adverse effect on the
scheduled construction.
G.
It is understood, however, that permitting the Contractor to proceed to complete
any Work, or any part of the Work, after the date to which the time of completion
may have been extended, will in no way act as a waiver on the part of the City of
any of its legal rights.
H.
In the event that the Contractor sustains damages as a result of expenses incurred
by a delay for which the City is responsible, the Contractor and the City will
negotiate to determine the amount of any damages. This provision is made in
accordance with Arizona Revised Statutes Section 34-607 (E) and is effective only
if the delay caused by the City is unreasonable under the circumstances and was
not within the contemplation of the parties. This provision will not be construed to
void any provision of this Contract pertaining to notice of delays, arbitration or other
settlement provisions applicable to disputes, or provisions relating to liquidated
damages.
I.
In addition to the Contractor’s right to a time extension for those events stated in
this Article 5.1, the Contractor may also be entitled to an appropriate adjustment
of the Contract Price provided, however, that the Contract Price will not be adjusted
for those events stated in this Article that are beyond the control of both the
Contractor and the City, including the events of war, acts of terrorism, floods, labor
disputes (but not including the Contractor’s own work force and those of its
Page 26 of 68
2018-136-COS
subcontractors), earthquakes, epidemics, excessive inclement weather conditions
not reasonably anticipated.
5.2
DIFFERING SITE CONDITIONS
5.2.1. If the Contractor encounters a Differing Site Condition(s), the Contractor may be
entitled to an adjustment in the Contract Price or Contract Time(s) to the extent
the Contractor’s cost or time of performance are the direct result of a Differing
Site Condition(s).
5.2.2. Upon encountering a Differing Site Condition, the Contractor will provide prompt
written notice to the City of the condition, which notice will not be later than 7
days after the condition has been encountered. Final costs must be submitted
within thirty (30) days after notice is received by the City, unless extended by
written agreement of the parties. The Contractor must give the City’s Contract
Administrator written notice of and an opportunity to observe, such condition
before disturbing or altering the Differing Site conditions. The failure of the
Contractor to give written notice and make the Claim as required by this Article
and Article 7.1.5 shall constitute a waiver by the Contractor of any rights arising
out of or relating to such Differing Site Conditions. (Final costs must be submitted
within thirty (30) days after notice is received by the City, unless extended by
written agreement of the parties.)
5.2.3. In order for the JOC to obtain any additional compensation or time extensions
for Differing Site Conditions, the JOC must demonstrate that it encountered a
material difference at the Site, as defined in Article 13, that required it to expend
additional cost or time. The JOC will also establish that it actually and reasonably
relied upon the representations found in the Contract Documents concerning the
Site conditions.
5.3
APPLICATION FOR EXTENSION OF TIME
5.3.1
If performance by the Contractor is delayed for a reason set forth in Article 5, the
Contractor may be allowed a reasonable extension of time in conformance with
this Article. Before the Contractor’s time extension request may be considered,
the Contractor shall notify the City of the condition which allegedly has caused or
is causing the delay, and shall submit a written application to the City identifying:
1.
Liquidated damage assessment rate, as specified in the Contract;
2.
Original Job Order Price;
3.
The original Contract start date and completion date;
4.
Any previous time extensions granted (number and duration); and
5.
The extension of time requested.
5.3.2
In addition, the application for extension of time shall set forth in detail;
1. The nature of each alleged cause of delay in completing the Work;
Page 27 of 68
2018-136-COS
2.
The date upon which each such cause of delay began and ended and the
number of dates attributable to each such cause;
3.
A statement that the Contractor waives all claims except for those
delineated in the application, and the particulars of any claims which the
Contractor does not agree to waive. For time extensions for Substantial
Completion and final completion payments, the application shall include a
detailed statement of the dollar amounts of each claim item reserved; and
4.
A statement indicating the Contractor’s understanding that the time
extension is granted only for purposes of permitting continuation of
Contract performance and payment for Work performed and that the City
retains its right to conduct an investigation and assess liquidated damages
as appropriate in the future.
5.4
ERRORS, DISCREPANCIES AND OMISSIONS
A.
If the Contractor observes errors, discrepancies or omissions in the Contract
Documents, it will promptly notify the City and request clarification. The Contractor
will provide a copy of this notice to the City’s Representative.
B.
If the Contractor proceeds with the Work affected by the errors, discrepancies or
omissions, without receiving any clarifications, it does so at its own risk. Adjustments
involving these circumstances made by the Contractor before clarification by the
Design Professional will be at the Contractor’s risk.
5.5
CITY REQUESTED CHANGE IN WORK
A.
The City reserves the right to make, at any time during the progress of the Work,
any alterations as may be found necessary or desirable.
B.
These alterations and changes will not invalidate this Contract nor release the
surety and the Contractor agrees to perform the Work as altered, the same as if it
had been a part of the original Contract Documents. The Contractor will notify the
surety of the changes and will assure that the alternations and changes are
adequately covered by the surety bond.
C.
The City will request a proposal for a change in Work from the Contractor, and an
adjustment in the Contract Price or Contract Times will be made based on a mutual
agreed upon cost and time.
5.6
LEGAL REQUIREMENTS
The Job Order Price or Job Order Times will be adjusted to compensate the Contractor
for the effects of any changes in the Legal Requirements enacted after the date of the
Contract affecting the performance of the Work.
5.7
JOB ORDER ADJUSTMENTS
A. In accordance with Scottsdale Revised Code §2-200 and related Rules and
Page 28 of 68
2018-136-COS
Procedures, the City and the Contractor will negotiate in good faith and as
expeditiously as possible the appropriate Adjustments to the Contract. Upon
reaching an agreement, the parties will prepare and execute an appropriate
Adjustment reflecting the terms of their agreement. The change in Work may or
may not include an Adjustment in the Job Order Price or Job Order Time.
B.
All changes in Work authorized by Job Order Adjustments will be performed under
the conditions of the Contract Documents. The decision to make an Adjustment
in the Contract rests solely with the City and any decision to make a Contract
Adjustment must be promptly complied with by the Contractor, subject to the
provisions of Article 5.8.
C.
The execution of a Job Order Adjustment by the Contractor shall constitute
conclusive evidence of the Contractor’s agreement to the ordered changes in work,
this Contract as thus amended, the Contract Price, and the time for performance
by the Contractor. The Contractor, by executing the Job Order Adjustment, waives
and forever releases any claim against the City for any additional time or
compensation for matters relating to, arising out of, or resulting from the work
included within or affected by the executed Job Order Adjustment of which the
Contractor knew or should have known.
5.8 UNILATERAL DETERMINATION OF CHANGE ORDER VALUE
If no mutual agreement occurs between the City and the Contractor, the change in
Contract Price, if any, shall be derived by determining the reasonable actual costs incurred
or savings achieved, resulting from revisions to the Work. Such reasonable actual costs
or savings shall include a component for direct job site overhead and profit, but shall not
include home-office overhead or other indirect costs and components. The calculation of
actual costs shall conform to the markup schedule in Article 5.12 below. Any such costs
or savings shall be documented in the format and with such content and detail as the City
requires. The Contractor shall promptly submit such documentation and other backup as
the City may require in evaluating the actual costs incurred.
5.9 ADDITIONAL CHANGE ORDER COST REQUIREMENTS
Contractor’s or Subcontractor’s submittals shall include the cost of materials, sales tax,
and the cost of all transport. The cost of items listed shall be directly related to the Job
Order Adjustment. Indirect costs not specifically related to the Job Order Adjustment shall
not be considered. Contractor’s or Subcontractor’s Direct Labor Costs shall be limited to
the hourly rate of directly involved workmen, employer contributions toward Contractor
standard benefits, pensions, unemployment or social security (if any), and employer costs
for paid sick and annual leave. Contractor’s or Subcontractor’s Overhead shall include
license fees, bond premiums, supervision, wages of timekeepers and clerks, incidentals,
home and field office expense, and vehicle expense directly related to the Project, and all
other direct Project expenses not included in the Contractor’s material, direct labor, and
equipment costs.
5.9.1 The allowance for overhead and profit shall be limited to the following schedule:
1.
For the Contractor, for any work performed by the Contractor’s own forces,
fifteen (15%) percent of the Subtotal of Costs to the Contractor.
Page 29 of 68
2018-136-COS
2.
For the Contractor, for any work performed by his Subcontractor, six (6%)
percent of the amount due to the Subcontractor.
3.
For each Subcontractor or Sub-subcontractor involved, for any work
performed by their own forces, fifteen (15%) of their materials and direct
labor costs.
4.
For each Subcontractor, for work performed by his Sub-Subcontractor(s),
six (6%) percent of the amount due to the Sub-subcontractor.
5.10 LIMITATION OF COMPENSABLE ITEMS
5.10.1 For Job Order Adjustment, the total cost or credit to the City shall be based on
the following schedule:
1.
Contractor’s Materials Costs.
2.
Contractor’s Direct Labor Costs.
3.
Contractor’s Equipment Costs (includes owned/rented equipment).
4.
Applicable Subcontractor Costs.
5.
Subtotal of Costs to the Contractor.
6.
Contractor’s Overhead and Profit.
7.
Total Cost or Credit to the City.
5.11 FIELD ORDERS
A.
The City has authority to initiate Field Orders that do not materially and adversely
affect the Work, including the design, quality, performance and workmanship
required by the Contract Documents. Field Orders will be made by written order
and will be binding on the City and the Contractor. The Contractor will carry out any
written orders promptly.
B.
Field Orders will not involve an Adjustment in the Job Order Price or Job Order
Times unless or until it becomes a Contract Adjustment.
C.
The Contractor may make minor changes in the Work, provided, however that the
Contractor will promptly inform the City, in writing, of any changes and record the
changes, if appropriate, on the Project Record Documents maintained by the
Contractor.
5.12 JOB ORDER PRICE ADJUSTMENTS
A. The increase or decrease in Job Order Price resulting from a change in the Work
will be determined by one or more of the following methods:
Page 30 of 68
2018-136-COS
1.
Unit prices stated in the Contract or as subsequently agreed to between
the parties;
2.
A mutually agreed upon accepted, lump sum, properly itemized and
supported by sufficient substantiating data to permit evaluation by the City;
and
3.
Costs, fees and any other markups.
B.
If an increase or decrease cannot be agreed to as stated in Article 5.8(A) (1)
through Article 5.8(A) (3) the cost of the change of the Work will be determined by
the reasonable expense and savings in the performance of the Work resulting from
the change, including a reasonable overhead and profit, as may be stated in the
Contract. The Contractor will maintain a documented, itemized accounting
evidencing the expenses and savings associated with these changes.
C.
If unit prices are stated in the Contract Documents or are later agreed to by the
parties, but application of the unit prices will cause substantial inequity to the City
or the Contractor because of differences in the character or quantity of the unit
items as originally contemplated, the unit prices will be equitably adjusted.
D.
If the City and the Contractor disagree upon whether the Contractor is entitled to
be paid for any services required by the City, the amount to be paid, other
disagreements over the Scope of Work, proposed changes to the Work, the time
required to complete the Work, the City and the Contractor will resolve the
disagreements in accordance with Article 7.
1.
As part of the negotiation process, the Contractor will furnish the City with
a good faith estimate of the costs to perform the disputed services, or the
additional time required in accordance with the City's interpretations.
2.
If the parties are unable to agree and the City expects the Contractor to
perform the services in accordance with the City's interpretations, the
Contractor will proceed to perform the disputed services, conditioned upon
the City issuing a written order to the Contractor:
(a)
directing the Contractor to proceed; and
(b)
specifying the City's interpretation of the services that are to be
performed.
E.
Emergencies. In any emergency affecting the safety of persons or property, the
Contractor will act, at its discretion, to prevent threatened damage, injury or loss.
Any change in the Job Order Price or Job Order Time(s) resulting from emergency
work under this Article 5.8(F) will be determined as provided in this Article 5.
ARTICLE 6 - PROCEDURE FOR PAYMENT
6.1 JOB ORDER PAYMENT REQUEST
A. At the pre-construction conference prescribed in Article 1.3, the Contractor will
Page 31 of 68
2018-136-COS
submit for the City’s review and approval a Schedule of Values. The Schedule of
Values will include values for all items comprising the Job Order Price and will
serve as the basis for monthly progress payments made to the Contractor
throughout the Work.
B.
At least 5 working days before the date established for a progress payment, the
Contractor will meet with the City’s Representative to review the progress of the
Work, as it will be reflected on the Job Order Payment Request.
C.
The Job Order Payment Request will constitute the Contractor’s representation
that the Work has been performed consistent with the Contract Documents, has
progressed to the point indicated in the Job Order Payment Request, and that title
to all Work will pass to City free and clear of all claims, liens, encumbrances, and
security interests upon the incorporation of the Work into the Project.
6.2 PARTIAL PAYMENTS
A.
Partial payment will be made for Job Orders with Job Order Time greater than 30
Days and may be made if the Job Order Time is less than 30 Days.
B.
The Job Order Payment Request may request payment for equipment and
materials not yet incorporated into the Project if construction progress is in
reasonable conformance with the approved schedule.
C.
For equipment and materials suitably stored at the Site, the equipment and
materials will be protected by suitable insurance and the City will receive the
equipment and materials free and clear of all liens and encumbrances.
1.
For materials and equipment stored off the Site, the City must approve the
storage. The material and equipment must be stored within Maricopa
County and be accessible for the City’s inspection. Title to the materials
and equipment will include applicable insurance, bonding, storage and
transportation to the Site.
2.
All bonds and insurance required for stored materials will be in the City’s
name.
6.3 PAYMENT OF JOB ORDER PRICE
A.
Payments should be provided on the City format for a Pay Application which is
based on the agreed upon “Schedule of Values.” The City will make payment in
accordance with A.R.S. §34-607. Payment will be made no later than 14 days
after the Job Order Payment Request is certified and approved, but in each case
less the total of payments previously made.
B.
The City will pay the Contractor all amounts properly due. If the City determines
that the Contractor is not entitled to all or part of a Contractor Payment Request, it
will notify the Contractor in writing within 7 days after the date the Contractor
Payment Request is received by the City. The notice will indicate the specific
amounts the City intends to withhold, the reasons and contractual basis for the
withholding, and the specific measures the Contractor must take to rectify the
Page 32 of 68
2018-136-COS
City’s concerns. The Contractor and the City will attempt to resolve the City’s
concerns. If the parties cannot resolve the concerns, the Contractor may pursue
its rights under the Contract Documents, including those under Article 7.
6.4
RETENTION ON JOB ORDER PAYMENTS
Payment and retention will be made as set forth in Arizona Revised Statutes §34-609,.
6.5
FINAL PAYMENT
A.
After receipt of a final Contractor Payment Request, the City will make final
payment as required by this Article, provided that the Contractor has completed all
of the Work in conformance with the Contract Documents and a Final Acceptance
Letter has been issued by the City.
B.
At the time of submission of its final Contractor Payment Request, the Contractor
will provide the following information:
1.
An affidavit that there are no claims, obligations or liens outstanding or
unsatisfied for labor, services, material, equipment, taxes or other items
performed, furnished or incurred for or in connection with the Work which
will in any way affect the City’s interests; and
2.
A general release executed by the Contractor waiving, upon receipt of final
payment by the Contractor, all claims, except those claims previously made
in writing to the City and remaining unsettled at the time of final payment.
6.6 PAYMENTS TO SUBCONTRACTORS OR SUPPLIERS
A.
The Contractor will pay its Subcontractors or suppliers within 7 calendar days of
receipt of each progress payment from the City. The Contractor will pay for the
amount of Work performed or materials supplied by each Subcontractor or supplier
as accepted and approved by the City with each progress payment. No Contract
between the Contractor and its Subcontractors and suppliers may materially alter
the rights of any Subcontractor or supplier to receive prompt payment as provided
in this Contract.
B.
If the Contractor fails to make payments in accordance with these provisions, the
City may take any one or more of the following actions and the Contractor agrees
that the City may take these actions:
1.
To hold the Contractor in default under this Contract;
2.
Withhold future payments until proper payment has been made to
Subcontractors or suppliers in accordance with these provisions;
3.
Reject all future offers to perform work for the City from the Contractor for
a period not to exceed 1-year from the Substantial Completion date of this
Project; or
4.
Terminate this Contract.
Page 33 of 68
2018-136-COS
E.
If the Contractor’s payment to a Subcontractor or supplier is in dispute, the
Contractor and Subcontractor or supplier agree to submit the dispute to any one
of the following dispute resolution processes within 14 calendar days from the date
any party gives notice to the other:
1.
Binding arbitration;
2.
A form of alternative dispute resolution (ADR) agreeable to all parties; or
3.
A City of Scottsdale facilitated mediation.
When a disputed claim is resolved through ADR or otherwise, the Contractor and
Subcontractor or supplier agrees to implement the resolution within 7 calendar
days after the resolution date.
Should the City fail or delay in exercising or enforcing any right, power, privilege,
or remedy under this Section, the failure or delay will not be considered a waiver,
release, or modification of the requirements of this Section or of any of the terms
or provisions of this Contract.
The Contractor will include these prompt payment provisions in every subcontract,
including procurement of materials and leases of equipment for this Contract.
6.7 RECORD KEEPING AND FINANCE CONTROLS
A.
Records of the Contractor's direct personnel payroll, reimbursable expenses
related to each Job Order and records of accounts between the City and the
Contractor will be kept on a generally recognized accounting basis and will be
available for 3 years after completion of the Project.
From the effective date of this Contract and until 3 years after the date of final
payment by the City of Scottsdale to the Contractor, the City, its authorized
representative, or the appropriate federal or state agencies, reserve the right to
audit the Contractor’s records to verify the accuracy and appropriateness of all
pricing data, including data used to negotiate Contract Documents and any change
orders. The City of Scottsdale or its authorized representative will have access,
during normal working hours, to all necessary Contractor and Subcontractor
facilities, and will be provided adequate and appropriate workspace, in order to
conduct audits in compliance with the provisions of this Article. The City of
Scottsdale will give the Contractor or Subcontractor reasonable advance notice of
intended audits.
B.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if, upon audit of the Contractor’s records, the audit discloses the
Contractor has provided false, misleading, or inaccurate cost and pricing data.
C.
The Contractor will include a similar provision in all of its Contracts with
Subconsultants and Subcontractors providing services under the Contract
Documents to ensure the City, its authorized representative, or the appropriate
federal or state agency, has access to the Subconsultants’ and Subcontractors’
Page 34 of 68
2018-136-COS
F.
records to verify the accuracy of cost and pricing data.
The City reserves the right to decrease Job Order Price or payments made on this
Contract if the above provision is not included in Subconsultants’ and
Subcontractors’ contracts, and one or more Subconsultants or Subcontractors do
not allow the City to audit their records to verify the accuracy and appropriateness
of pricing data.
If an audit in accordance with this Article, discloses overcharges of any nature by
the Contractor to the City in excess of 1% of the total contract billings, the actual
cost of the City’s audit will be reimbursed to the City by the Contractor. Any
adjustments or payments which must be made as a result of any audit or inspection
of the Contractor’s invoices or records will be made within a reasonable amount of
time (not to exceed 90 days) from presentation of the City’s findings.
This audit provision includes the right to inspect personnel records as required by
Section 11.34.
ARTICLE 7- CLAIMS AND DISPUTES
7.1 REQUESTS FOR CONTRACT ADJUSTMENTS AND RELIEF
7.1.1
If either the Contractor or the City believes that it is entitled to relief against the
other Contractor for any event arising out of or related to Contract Services, that
party will provide written notice to the other party of the basis for its claim for relief.
The claims shall set forth in detail all known facts and circumstances supporting
the claim; final costs associated with any claim upon which notice has been given
must be submitted in writing to the City within thirty (30) days after notice has been
received.
7.1.2
This notice will, if possible, be made before incurring any cost or expense and in
accordance with any specific notice requirements contained in applicable sections
of the Contract.
7.1.3
In the absence of any specific notice requirement, written notice will be given within
a reasonable time, not to exceed 10 days, after the occurrence giving rise to the
claim for relief or after the claiming party reasonably should have recognized the
event or condition giving rise to the request, whichever is later.
7.1.4
This notice will include sufficient information to advise the other party of the
circumstances giving rise to the claim for relief, the specific contractual adjustment
or relief requested and the basis of the request. ANY NOTICE OF CLAIM NOT
FILED WITH THE CITY WITHIN SUCH TIME AND IN COMPLIANCE WITH THE
PRECEDING PROVISIONS SHALL BE CONSIDERED TO HAVE BEEN WAIVED
AND SHALL BE DISMISSED.
7.1.5
In the event the Contractor seeks to make a claim for an increase in the Contract
Price, as a condition precedent to any liability of the City therefore, unless
emergency conditions exist, the Contractor shall strictly comply with the
requirements of this section and such claim shall be made by the Contractor before
proceeding to execute any work for which a claim is made. Failure to comply with
Page 35 of 68
2018-136-COS
this condition precedent shall constitute a waiver by the Contractor of any claims
for compensation.
7.1.6
The Contractor must continue its performance under this contract regardless of the
existence of any claims by the Contractor.
7.1.7
In a claim by the Contractor against the City for compensation in excess of the
Contract sum, any liability of the City to the Contractor shall be strictly limited and
computed in accordance with the Contract documents and shall in no event include
indirect costs (such as home office overheads or consequential damages of the
Contractor or any estimated costs or damages.
7.2 DISPUTE AVOIDANCE AND RESOLUTION
A.
The parties are fully committed to working with each other throughout the Project
and agree to communicate regularly with each other at all times so as to avoid or
minimize disputes or disagreements. If disputes or disagreements do arise, the
Contractor and the City each commit to resolving the disputes or disagreements in
an amicable, professional and expeditious manner so as to avoid unnecessary
losses, delays and disruptions to the Work.
B.
The Contractor and the City will first attempt to resolve disputes or disagreements
at the field level through discussions between the Contractor’s Representative and
the City’s Representative.
C.
If a dispute or disagreement cannot be resolved through the Contractor’s
Representative and the City’s Representative, the Contractor’s Senior
Representative and the City’s Senior Representative, upon the request of either
party, will meet as soon as conveniently possible, but in no case later than 30 days
after the request is made, to attempt to resolve the dispute or disagreement.
Before any meetings between the Senior Representatives, the parties will
exchange relevant information that will assist the parties in resolving their dispute
or disagreement.
D.
The City and the Contractor agree to negotiate in good faith in accordance with
this Contract’s procedure for the recovery of damages related to expenses incurred
by the Contractor for a delay for which the City is responsible, that is unreasonable
under the circumstances, and that was not within the contemplation of the parties
to the Contract.
7.3 DUTY TO CONTINUE PERFORMANCE
Unless provided to the contrary in the Contract Documents, the Contractor will continue
to perform the Work and the City will continue to satisfy its payment obligations to the
Contractor, until final resolution of any dispute or disagreement between the Contractor
and the City.
7.4 REPRESENTATIVES OF THE PARTIES
A. City’s Representatives
Page 36 of 68
2018-136-COS
1.
The City designates the individual listed below as the City’s Senior
Representative. This individual has the authority and responsibility for
avoiding and resolving disputes under Article 7.2(C):
Dave Lipinksi
City Engineer
One Civic Center - 2'^'^ Floor
7447 East Indian School Road
Scottsdale, AZ 85251
(480) 312-2641
2.
The City will designate an individual for each Job Order as the City’s
Representative. This person will manage the Job Order.
B. Contractor’s Representatives
1.
The Contractor designates the individual listed below as the Contractor’s
Senior Representative. This individual has the authority and responsibility
for avoiding and resolving disputes under Article 7.2(C):
Name: Curt Lonsdale, Division Manager
Address:
Shasta Industries, Inc.
P.O. Box 28248
Scottsdale, AZ 85255
Telephone No: (480)776-0155
2.
The Contractor will designate an individual for each Job Order as the
Contractor’s Representative.
ARTICLE 8 - SUSPENSION, TERMINATION AND CANCELLATION
8.1 CITY’S RIGHT TO STOP JOB ORDER SERVICES
A. The City may, at its discretion and without cause, order the Contractor in writing to
stop and suspend any Job Order. Immediately after receiving this notice, the
Contractor will discontinue advancing the Job Order. The suspension will not
exceed 180 consecutive days. If the City suspends the Job Order for 181
consecutive Days or more, the suspension will be considered a termination for
convenience.
B. The Contractor may seek an adjustment of the Job Order Price or Job Order Time
if its cost or time to perform the Contract Services has been adversely impacted
by any suspension or stoppage of Work by the City.
8.2 TERMINATION FOR CONVENIENCE
A. Upon receipt of written notice to the Contractor, the City has the right to terminate
this Contract or abandon any portion of any Job Order for which services have not
been performed by the Contractor.
Page 37 of 68
2018-136-COS
B.
1.
The Contractor will estimate the value of the Work it has completed and
submit its appraisal to the City for evaluation. The City will have the right
to inspect the Work to appraise the Work completed.
The Contractor will receive compensation for services performed to the
date of the termination as stated in Article 8.2. The fee will be paid in
accordance with Article 6.5(B) of this Contract, and will be an amount
mutually agreed upon by the Contractor and the City. If there is no mutual
agreement, the final determination will be made in accordance with Article
7.
2.
The Contractor will not be entitled to anticipated profit or anticipated
overhead, but is entitled to recover apportioned profit and overhead
proportional to the amount of the Work completed. In no event will the fee
exceed that stated in Article 8.2(D) of this Contract or as amended.
3.
The City will make the final payment within 60 days after the Contractor
has delivered the last of the partially completed items and the final fee has
been agreed upon.
If the City terminates this Contract in compliance with this Article and
proceeds to construct the Job Order through its employees, agents or third
parties, the City’s rights to use the Work product will be as stated in Article
8.3.
Upon termination of construction services during any Job Order, the Contractor will
proceed with the following obligations:
1.
Stop Work as stated in the notice;
2.
Place no further subcontracts or orders;
3.
Terminate all subcontracts to the extent they relate to the Work terminated;
4.
Assign to the City all right, title and interest of the Contractor under the
subcontracts terminated, in which case the City will have the right to settle or
to pay any termination settlement proposal arising out of those terminations;
and
5.
Take any action that may be necessary for the protection and preservation
of the property related to the Contract that is in the possession of the
Contractor and which the City has or may acquire an interest.
6.
Comply with the requirements of Article 6.5(B)(1) and (2).
C.
The Contractor will submit complete termination inventory schedules no later than 60
days from the date of the notice of termination.
D.
The City will pay the Contractor the following:
Page 38 of 68
2018-136-COS
1.
The direct value of its completed Work and materials supplied as of the date
of termination;
2.
The reasonable costs and expenses attributable to the termination;
3.
The Contractor will be entitled to profit and overhead on completed Work
only, but will not be entitled to anticipated profit or anticipated overhead. If it
appears the Contractor would have sustained a loss on the entire Work had
the Job Order been completed, the Contractor will not be allowed profit and
the City will reduce the settlement to reflect the indicated rate of loss;
4.
The Contractor will maintain all records and documents for 3 years after final
settlement. These records will be maintained and subject to auditing as
required in Article 6.7; and
5.
Take any action that may be necessary for the protection and preservation
of the property related to the Job Order or Orders that is in the possession
of the Contractor and in which the City has or may acquire an interest.
8.3 CANCELLATION FOR CAUSE
A. The City may also cancel this Contract or any part of it with 7 days notice for cause
in the event of any default by the Contractor, or if the Contractor fails to comply
with any of the terms and conditions of this Contract. Unsatisfactory performance,
despite a reasonable opportunity to cure as judged by the City’s Representative
and failure to provide the City, upon request, with adequate assurances of future
performance will all be causes allowing the City to cancel this Contract for cause.
In the event of cancellation for cause, the City will not be liable to the Contractor
for any amount, and the Contractor will be liable to the City for any and all damages
sustained as a result of the default that caused the cancellation.
8.4 CITY’S RIGHT TO PERFORM AND CANCEL FOR CAUSE
A. If the Contractor persistently fails to:
1.
Provide a sufficient number of skilled workers;
2.
Supply the materials required by the Contract or Job Order Documents;
3.
Comply with applicable Legal Requirements;
4.
Timely pay, without cause. Subconsultants or Subcontractors;
5.
Prosecute the Contract Services with promptness and diligence to ensure
that a Job Order is completed by the Job Order Time, as the times may be
adjusted; or
6.
Perform material obligations under the Contract Documents;
Then the City, in addition to any other rights and remedies provided in the Contract
Documents or by law, will have the rights stated in Articles 8.2 and 8.3.
Page 39 of 68
2018-136-COS
In the event the City cancels this Contract or any part of the services under any
Job Order, the City will notify the Contractor in writing, and immediately upon
receiving this notice, the Contractor will discontinue advancing the Work under this
Contract or the Job Order and proceed to close all operations of any affected Job
Order or this Contract.
B.
If the City provides the Contractor with a written order to provide adequate
maintenance of traffic, adequate cleanup, adequate dust control or to correct
deficiencies or damage resulting from abnormal weather conditions, and the
Contractor fails to comply in a time frame specified, the City may have the Work
accomplished by other sources at the Contractor’s expense.
C.
Upon the occurrence of an event stated in Article 8.3(B), the City may provide
written notice to the Contractor that it intends to cancel the Contract unless the
problem cited is cured, or commenced to be cured, within 7 days of the
Contractor’s receipt of notice.
1.
If the Contractor fails to cure, or reasonably commence to cure, the
problem, then the City may give a second written notice to the Contractor
of its intent to cancel within an additional 7 day period.
2.
If the Contractor, within this second 7 day period, fails to cure, or
reasonably commence to cure the problem, then the City may declare the
Contract cancelled for default by providing written notice to the Contractor
of this declaration.
D.
Upon declaring the Contract cancelled in accordance with Article 8.3(B), and for
the purpose of completing the Work, the City may for all Job Orders enter upon the
premises and take possession of all materials, equipment, scaffolds, tools,
appliances and other items, which have been purchased or provided for the
performance of the Work, all of which the Contractor now transfers, assigns and
sets over to the City for this purpose, and to employ any person or persons to
complete the Work and provide all of the required labor, services, materials,
equipment and other items.
E.
If through any cause, the Contractor fails to fulfill in a timely and proper manner its
obligations under this Contract, or if the Contractor violates any of the covenants.
Contracts, or stipulations of this Contract, the City may withhold any payments to
the Contractor for the purpose of setoff until the exact amount of damages due the
City from the Contractor is determined by a court of competent jurisdiction.
F.
In the event of a cancellation, the Contractor will not be entitled to receive any
further payments under the Contract Documents until the Work on all Job Orders
is finally completed in accordance with the Contract Documents. At that time, the
Contractor will only be entitled to be paid for Work performed and accepted by the
City before its default.
G.
If the City’s cost and expense of completing the Work exceeds the unpaid balance
of a Job Order Price, then the Contractor will be obligated to pay the difference to
the City. These costs and expense will include not only the cost of completing the
Page 40 of 68
2018-136-COS
H.
Work, but also losses, damages, costs and expense, including attorneys’ fees and
expenses, incurred by the City in connection with the reprocurement and defense
of claims arising from the Contractor’s default.
If the City cancels this Contract for cause and the cancellation is determined to
have been without legal right, the cancellation for cause will be considered to have
been a termination for convenience in accordance with the provisions of Article
8.2.
ARTICLE 9 - INSURANCE AND BONDS
9.1 INSURANCE REQUIREMENTS
A.
At the same time as execution of this Contract, the Contractor will furnish the City
of Scottsdale a Certificate of Insurance on a standard insurance industry ACORD
form. The ACORD form will be issued by an insurance company authorized to
transact business in the State of Arizona.
B.
The Contractor, Subcontractors and Subconsultants must procure and maintain,
until all of their obligations have been discharged, including any warranty periods
under this Contract are satisfied, insurance against claims for injury to persons or
damage to property, which may arise from or in connection with the performance
of the Work by the Contractor, his agents, representatives, employees, or
Subcontractors.
C.
The insurance requirements are minimum requirements for this Contract and in no
way limit the indemnity covenants contained in this Contract.
D.
The City in no way warrants that the minimum limits contained in this Contract are
sufficient to protect the Contractor from liabilities that might arise out of the
performance of the Contract Services under this Contract by the Contractor, his
agents, representatives, employees. Subcontractors or Subconsultants and the
Contractor is free to purchase any additional insurance as may be determined
necessary. The City will not pay for higher limits, but if the Contractor pays for
insurance with higher limits, the Contractor will name the City as an additional
insured on any additional insurance.
E.
Claims Made. In the event any insurance policies required by this Contract are
written on a “claims made” basis, coverage shall continue uninterrupted throughout
the term of this Contract by keeping coverage in force using the effective date of
this Contract as the retroactive date on all “claims made” policies. The retroactive
date for exclusion of claims must be on or before the effective date of this Contract,
and can never be after the effective date of this Contract. Upon completion or
termination of this Contract, the “claims made” coverage shall be extended for an
additional three (3) years using the original retroactive date, either through
purchasing an extended reporting option; or by continued renewal of the original
insurance policies. Submission of annual Certificates of Insurance, citing the
applicable coverages and provisions specified herein, shall continue for three (3)
years past the completion or termination of this Contract.
F.
Self-Insured Retentions. Any self-insured retentions and deductibles must be
Page 41 of 68
2018-136-COS
declared to and approved by the City. If not approved, the City may require that
the insurer reduce or eliminate any self-insured retentions with respect to the City,
its officers, officials, agents, employees, and volunteers.
9.2 MINIMUM SCOPE AND LIMITS OF INSURANCE
The Contractor must provide coverage with limits of liability not less than those stated
below.
B.
Commercial General Liability-Occurrence Form
General Aggregate
Products-Completed Operations Aggregate
Personal & Advertising Injury
Each Occurrence
Fire Damage (Any one fire)
Medical Expenses (Any one person)
$2,000,000
$2,000,000
$1,000,000
$2,000,000
$100,000
OPTIONAL
Automobile Liability-Any Auto or Owned, Hired and Non-Owned Vehicles
Combined Single Limit Per Accident
For Bodily Injury and Property Damage
Workers Compensation and Employers Liability
Workers Compensation
Employers Liability:
Each Accident
Disease - Each Employee
Disease - Policy Limit
Coverage Terms and Required Endorsements
$1,000,000
Statutory
$500,000
$500,000
$1,000,000
1.
The City of Scottsdale, its officers, officials, agents, and employees are
additional insureds with respect to liability arising out of activities performed
by, or on behalf of, the Contractor including the City's general supervision
of the Contractor; products and completed operations of the Contractor;
and automobiles owned, leased, hired, or borrowed by the Contractor.
2.
The City, its officers, officials, agents, and employees must be additional
insureds to the full limits of liability purchased by the Contractor even if
those limits of liability are in excess of those required by this Contract.
3.
The Contractor’s insurance coverage must be primary insurance with
respect to the City, its officers, officials, agents, and employees. Any
insurance or self-insurance maintained by the City, its officers, officials,
agents, and employees will be in excess of the coverage provided by the
Contractor and must not contribute to it.
4.
The Contractor's insurance must apply separately to each insured against
whom a claim is made or suit is brought, except with respect to the limits
Page 42 of 68
2018-136-COS
of the insurer's liability.
5.
Coverage provided by the Contractor must not be limited to the liability
assumed under the indemnification provisions of this Contract.
6.
All policies must contain a waiver of subrogation against the City, its
officers, officials, agents, and employees, for losses arising from Work
performed by the Contractor for the City.
7.
Workers’ Compensation and Employers Liability Coverage: The insurer
must agree to waive all rights of subrogation against the City, its officers,
officials, agents, employees, and volunteers for losses arising from Work
performed by the Contractor for the City.
8.
If the Contractor receives notice that any of the required policies of
insurance are materially reduced or cancelled, it will be Contractor’s
responsibility to provide prompt notice to the contract administrator of same
to the City, unless such coverage is immediately replaced with similar
policies.
E. Builders Risk Insurance (Course of Construction)
To be provided if determined by the City as necessary with each Job Order.
The Contractor bears all responsibility for loss to all Work being performed and to
buildings under construction. Unless waived in writing by the City of Scottsdale,
the Contractor will purchase and maintain in force Builders Risk-Installation
insurance on the entire Work until completed and accepted by the City. This
insurance will be Special Causes of Loss or Open Perils policy form, for the
completed value, at replacement cost equal to each Job Order contract price and
all subsequent modifications. The Contractor’s Builders Risk-Installation
insurance will be primary and not contributory; and waive all rights of subrogation
against the City of Scottsdale, its officers, officials and employees.
This Builders Risk-Installation insurance must name the City of Scottsdale, the
Contractor and all tiers of Subcontractors as respects their insurable interest at the
date of loss. It must contain a provision that subject insurance will not be canceled
or materially altered without at least 30 days advance notice to the City. The
Contractor is also required to give the City thirty (30) days advance written notice
of the coverage termination for each project. The City will also be named as a
Loss Payee under Builders Risk-Installation coverage.
This Builders Risk-Installation insurance must cover the entire Work including
reasonable compensation for architects and Contractor’s’ services and expenses
and other “soft costs” made necessary by an insured loss. Builders Risk-
Installation insurance must provide coverage from the time any covered property
comes under the Contractor’s control and or responsibility, and continue without
interruption during course of construction, renovation and or installation, including
any time during which any project property or equipment is in transit, off site, or
while on site for future use or installation. Insured property must include, but not
be limited to, scaffolding, false work, and temporary buildings at the site. This
Page 43 of 68
2018-136-COS
insurance must also cover the cost of removing debris, including demolition as may
be legally required by operation of any law, ordinance, regulation or code.
The Contractor must also purchase and maintain Boiler and Machinery insurance
with the same requirements as Builders Risk-Installation insurance stated above if
the Work to be performed involves any exposures or insurable property normally
covered under a Boiler and Machinery insurance policy or made necessary as
required by law and or testing requirements in the performance of this Contract.
The Contractor will be responsible for any and all deductibles under these policies
and the Contractor waives all rights of recovery and subrogation against the City
under the Contractor-provided Builders Risk-Installation insurance described in
this Article.
The Builders’ Risk insurance must be endorsed so that the insurance will not be
canceled or lapse because of any partial use or occupancy by the City. Builders’
Risk Insurance must be maintained until whichever of the following first occurs: (i)
final payment has been made; or (ii) until no person or entity, other than the City,
has an insurable interest in the property required to be covered.
By signing this Contract, all rights of subrogation are waived against the City of
Scottsdale, its officers, officials, agents and employees.
9.3 OTHER INSURANCE REQUIREMENTS
The policies are to contain, or be endorsed to contain, the following provisions:
A.
Contractors Professional Liability: The Contractor must carry Contractors
Professional Liability insurance to cover the residual, contingent, and passive
design exposures of the Contractor.
1.
The City of Scottsdale, its officers, officials, agents, and employees, are to
be named as additional insureds with respect to liability arising out of:
activities performed by or on behalf of the Contractor, including the City’s
general supervision of the Contractor; products and completed operations
of the Contractor.
2.
The City, its officers, officials, agents, and employees must be additional
insureds to the full limits of liability purchased by the Contractor, even if
those limits of liability are in excess of those required by this Contract. The
Commercial General Liability policy will be at least as broad as the
Insurance Service Office, Inc.’s CG 0 0 01 07 98.
B.
Contractors Professional Limits of Liability: The Contractor must carry limits of
$1,000,000 each Project and $2,000,000 in the Aggregate under a stand-alone
policy or included by endorsement under the Commercial General Liability policy.
The Contractor, its successors and or assigns, is required to maintain this
Professional Liability insurance as specified in this Contract for a minimum period
of 3 years following completion and acceptance of the Work. Certificates of
Insurance citing that applicable coverage is in force and contains the provisions
required by this Contract must be submitted for the 3-year period.
Page 44 of 68
2018-136-COS
1.
The Contractor’s insurance coverage must be primary insurance with
respect to the City, its officers, officials, agents, and employees. Insurance
or self-insurance maintained by the City, its officers, officials, agents, and
employees must be in excess of the Contractor’s insurance and will not
contribute to it.
2.
The Contractor’s insurance must apply separately to each insured against
whom a claim is made or suit is brought, except with respect to the limits
of the insurer’s liability. The coverage provided by the Contractor and its
Subcontractors must not be limited to the liability assumed under the
indemnification provisions of this Contract.
3.
The policies must contain a waiver of subrogation against the City, its
officers, officials, agents, and employees for losses arising from Work
performed for the City.
C. The Contractor, its successors and assigns, is required to maintain Commercial
General Liability insurance as specified in this Contract for a minimum period of 3
years following completion and acceptance of the Work. The Contractor must
submit a Certificate of Insurance evidencing the Commercial General Liability
insurance during this 3 year period containing all the insurance requirements
including naming the City of Scottsdale, its agents, representatives, officers,
directors, officials and employees as Additional Insured as required.
9.4
SUBCONSULTANT’S AND SUBCONTRACTOR’S INSURANCE
Unless the Contractor’s Subconsultants and Subcontractors can provide the same level of
coverage as detailed in Article 9.2 and name the City and the Contractor as Additional
Insureds, the Contractor’s certificates must include all Subcontractors and Subconsultants
as insureds under its policies or the Contractor must maintain separate certificates and
endorsements for each Subcontractor and Subconsultant. All coverages for
Subcontractors and Subconsultants must be in the amounts shown in Article 9.2.
Certificates must contain a provision that the insurance will not be canceled or materially
altered without at least 30 days advance notice to the City. The City must also be named
as a Loss Payee under the Builders Risk-Installation coverage.
9.5
NOTICE OF CANCELLATION
If the Contractor receives notice that any of the required policies of insurance are
materially reduced or cancelled, it will be Contractor’s responsibility to provide prompt
notice to the contract administrator of same to the City, unless such coverage is
immediately replaced with similar policies. Each insurance policy required by the
insurance provisions of this Contract must provide the required coverage and must not be
suspended, voided, canceled by either party, reduced in coverage or in limits until 30 days
written notice has first been given, by certified mail, return receipt requested to:
Melanie Gibson
Capital Project Management
7447 E. Indian School Road, Suite 205
Page 45 of 68
2018-136-COS
Scottsdale, Arizona 85251
Curt Lonsdale, Division Manager
Shasta Industries, Inc.
P.O. Box 28248
Scottsdale, AZ 85255
9.6
ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers duly licensed or approved to conduct business in
the State of Arizona and with an A. M. Best rating of no less than B++6. The City in no
way warrants that the above required minimum insurer rating is sufficient to protect the
Contractor from potential insurer insolvency. Failure to maintain insurance as required
may result in termination of this Contract at the City’s option.
9.7
VERIFICATION OF COVERAGE
A.
The Contractor must furnish the City Certificates of Insurance (ACORD form or
equivalent approved by the City) and with original endorsements effecting
coverage as required by this Contract. The certificates and endorsements for each
insurance policy are to be signed by a person authorized by that insurer to bind
coverage on its behalf.
B.
All certificates and endorsements are to be received and approved by the City
before Contract Services commence except for Builders Risk Insurance, which will
be received and approved as provided in Article 9.2(E). Each insurance policy
required by this Contract must be in effect at or before the earlier of
commencement of Contract Services under the Contract Documents or the signing
of this Contract except for Builders Risk Insurance which must be in effect before
commencement of the Work and remain in effect for the duration of the Project.
Failure to maintain the insurance policies as required by this Contract or to provide
evidence of renewal is a material breach of contract.
C.
All Certificates of Insurance required by this Contract must be sent directly to the
City of Scottsdale, Capital Project Management Office. The project number and
project description must be included on the Certificates of Insurance. The
City reserves the right to require complete, certified copies of all insurance policies
required by this Contract, at any time. Failure to provide a Certificate of Insurance
with the appropriate verbiage will result in rejection of the Contractor’s Certificate
and delay in contract execution.
Additional Certificates of Insurance submitted without referencing a Contract
number will be subject to rejection and returned or discarded.
9.8
APPROVAL
Any modification or variation from the insurance requirements in this Contract must be
approved by the Risk Management Division, whose decision is final. This action does not
require a formal Contract Modification, but may be made by administrative action.
9.9 BONDS AND OTHER PERFORMANCE SECURITY
Page 46 of 68
2018-136-COS
A.
Before execution of each individual Job Order, the Contractor must provide a
performance bond and a payment bond for all construction services, each in an
amount equal to the full amount of the agreed upon cost for that Job Order.
Contractor may, at its own option, provide Payment and Performance Bonds for
the entire Job Order Contract amount, but there shall be no obligation for the City
to reimburse the Contractor for bond costs incurred, except on an actual cost basis
as each individual Job Order is issued. Bonds must be submitted in accordance
with Title 34, Chapter 6 of the Arizona Revised Statutes and must be in
substantially the same form as Exhibits A and B, attached to this Contract.
B.
Each bond must be executed by a surety company or companies holding a
Certificate of Authority to transact surety business in the State of Arizona, issued
by the Director of the Arizona Department of Insurance. A copy of the Certificate
of Authority must accompany the bonds. The Certificate must have been issued
or updated within 2 years before the execution of this Contract.
C.
The bonds must be made payable and acceptable to the City of Scottsdale.
D.
The bonds must be written or countersigned by an authorized representative of the
surety and the bonds must have attached a certified copy of the Power of Attorney
of the signing official.
1.
If one Power of Attorney is submitted, it must be for twice the total Job
Order Price.
2.
If two Powers of Attorney are submitted, each must be for the total Job
Order Price. Personal or individual bonds are not acceptable.
E.
3. Upon the request of any person or entity appearing to be a potential
beneficiary of bonds covering payment of obligations arising under the
Contract Documents, the Contractor must promptly furnish a copy of the
bonds or must permit a copy to be made.
All bonds submitted for this Project must be provided by a company which has
been rated "A or better" by the A.M. Best Company.
ARTICLE 10 - INDEMNIFICATION
10.1 CONTRACTOR’S GENERAL INDEMNIFICATION
Contractor’s General Indemnification. To the fullest extent permitted by law, the
Contractor, its successors, assigns and guarantors, must defend, indemnify and hold
harmless the City of Scottsdale, its agents, representatives, officers, directors, officials
and employees from and against all allegations, demands, proceedings, suits, actions,
claims, damages, losses, expenses, including but not limited to, reasonable attorney fees,
court costs, and the cost of appellate proceedings, and all claim adjusting and handling
expense, investigation and litigation, for bodily injury or personal injury (including death),
or loss or damage to tangible or intangible property caused, or alleged to be caused, in
whole or in part, related to, arising from or out of, or resulting from any acts, omissions,
negligence, recklessness, or intentional wrongful conduct to the extent caused by the
Page 47 of 68
2018-136-COS
Contractor or any of its owners, officers, directors, agents or employees performing Work
or Services under this Contract, including but not limited to, any Subcontractor or anyone
directly or indirectly employed by any of them or anyone for whose acts any of them may
be liable and any injury or damages by any of the Contractor employees. This indemnity
includes any claim or amount arising out of, or recovered under, the Worker’s
Compensation Law or arising out of the failure of the Contractor to conform to any federal,
state, or local law, statute, ordinance, rule, regulation, or court decree. It is the specific
intention of the parties that the City shall, in all instances, except for Claims arising solely
from the negligent or willful acts or omissions of the City, be indemnified by the Contractor
from and against any and all claims. It is agreed that the Contractor will be responsible
for primary investigation, defense, and judgment costs where this indemnification is
applicable. In consideration of the award of this Contract, the Contractor agrees to waive
all rights of subrogation against the City, its officers, agents, representatives, directors,
officials, and employees for losses arising from the work performed by the Architect for
the City.
Insurance provisions in this Contract are separate and independent from the indemnity
provisions of this Article and will not be construed in any way to limit the scope and
magnitude of the indemnity provisions. The indemnity provisions of this paragraph will not
be construed in any way to limit the scope and magnitude and applicability of the insurance
provisions.
10.2 INTELLECTUAL PROPERTY
A. The Contractor must pay all
performance of services.
royalties and license fees associated with its
B.
The Contractor must defend any action or proceeding brought against the City
based on any claim that the Work, or any part of the Work, or the operation or use
of the Work or any part of it, constitutes infringement of any United States patent
or copyright, now or subsequently issued. The City will give prompt written notice
to the Contractor of any action or proceeding and will reasonably provide authority,
information and assistance in the defense of the action. The Contractor will
indemnify and hold harmless the City from and against all damages, expenses,
losses, royalties, profits and costs, including but not limited to attorneys’ fees and
expenses awarded against the City or the Contractor in any action or proceeding.
The Contractor agrees to keep the City informed of all developments in the defense
of these actions. The City may be represented by; and actively participate through
its own counsel in any suit or proceedings if it so desires.
C.
If the City is enjoined from the operation or use of the Work, or any part of the
Work, as the result of any patent or copyright suit, claim, or proceeding, the
Contractor will at its sole expense take reasonable steps to procure the right to
operate or use the Work. If the Contractor cannot procure this right within a
reasonable time, the Contractor will promptly, at the Contractor’s option and at the
Contractor’s expense, (i) modify the Work so as to avoid infringement of any patent
or copyright or (ii) replace the Work with Work that does not infringe or violate any
patent or copyright.
D.
Articles 10.2(B) and 10.2(C) will not be applicable to any suit, claim or proceeding
based on infringement or violation of a patent or copyright:
Page 48 of 68
2018-136-COS
1.
Relating solely to a particular process or product of a particular
manufacturer specified by the City and not offered or recommended by the
Contractor to the City; or
2.
Arising from modifications to the Work by the City or its agents after
acceptance of the Work.
E. The obligations stated in this Article 10.3 will constitute the sole Contract between
the parties relating to liability for infringement of violation of any patent or copyright.
ARTICLE 11 - GENERAL PROVISIONS
11.0
MARSHALING AREA
The Contractor is advised to contact the City of Scottsdale Development Services to
determine the requirements for obtaining a permit for marshaling areas it proposes to use.
Marshaling areas must be fenced. The Contractor will obtain written approval from the
property owner for marshaling area use. This approval must contain any requirements,
which are a condition of this approval. Marshaling yard requirements according to M.A.G.
Subsection 107.6.1 and the City of Scottsdale Supplemental Specifications will apply.
11.1
CONTRACT DOCUMENTS
A.
Contract Documents are as defined in Article 12.
B.
The Contract Documents form the entire Contract between the City and the
Contractor. No oral representations or other Contracts have been made by the
parties except as specifically stated in the Contract Documents.
C.
In the event of any inconsistency, conflict, or ambiguity between or among the
Contract Documents, the Contract Documents will take precedence in the order in
which they are listed in the definition of Contract Documents in Article 12. As to
drawings and plans, given dimensions will take precedence over scaled
measurements, and large scale plans over small-scale plans. Contract
specifications will take precedence over contract plans.
D.
The Contract Documents are intended to permit the parties to complete the Work
and all obligations required by the Contract Documents within the times and prices
agreed upon for each Job Order. The Contract Documents are intended to be
complementary and interpreted in harmony so as to avoid conflict, with words and
phrases interpreted in a manner consistent with construction and design industry
standards.
E.
This Contract, the Plans, Standard Specifications and Details, Special Provisions,
Performance Bond, Payment Bond, Certificates of Insurance, and Job Order
Adjustments (if any) are by reference made a part of this Contract to the same
extent as if set forth in full.
F.
Work Product
Page 49 of 68
2018-136-COS
1.
All Work products (electronically or manually generated) including but not
limited to; cost estimates, studies, design analyses, original mylar
drawings. Computer Aided Drafting and Design (CADD) file diskettes, and
other related documents which are prepared or procured in the
performance of this Contract (collectively referred to as documents) are to
be and remain the property of the City and are to be delivered to the City
before the final payment is made to the Contractor. In the event these
documents are altered, modified or adapted without the written consent of
the Contractor or the Subconsultants, which consent the Contractor or the
Subconsultants will not unreasonably withhold, the City agrees to hold the
Contractor and the Subconsultants harmless to the extent permitted by law
from the legal liability arising out of the City’s alteration, modification or
adoption of the documents.
2.
The copyrights, patents, trade secrets or other intellectual property rights
associated with the ideas, concepts, techniques, inventions, processes or
works of authorship developed, created by the Contractor, its
Subconsultants or personnel, during the course of performing this Contract
or arising out of the Project will belong to the Contractor.
11.2
MODIFICATIONS
The Contract Documents may not be changed, altered, or amended in any way except in
writing, signed by a duly authorized representative of each party.
11.3
TIME IS OF THE ESSENCE
The City and Contractor mutually agree that time is of the essence with respect to the
dates and times stated in the Contract Documents.
11.4
MUTUAL OBLIGATIONS
The City and Contractor commit at all times to cooperate fully with each other, and proceed
on the basis of trust and good faith, to permit each party to realize the benefits afforded
under the Contract Documents.
11.5
COOPERATION AND FURTHER DOCUMENTATION
The Contractor agrees to provide the City any other duly executed documents as will be
reasonably requested by the City to implement the intent of the Contract Documents.
11.6
ASSIGNMENT
Neither the Contractor nor the City will, without the written consent of the other, assign,
transfer or sublet any portion of this Contract or part of the Work or the obligations required
by the Contract Documents.
11.7
FORCE MAJEURE
Neither party will be responsible for delays or failures in performance resulting from acts
beyond their control. These acts include, but are not limited to, acts of God, riots, acts of
Page 50 of 68
2018-136-COS
war, acts of terrorism, epidemics, governmental regulations imposed after the fact, fire,
communication line failures, or power failures.
11.8 FUNDS APPROPRIATION
If the City Council does not appropriate funds to continue this Contract and pay for
charges, the City may terminate this Contract at the end of the current fiscal period. The
City agrees to give written notice to the Contractor at least 30 days before the end of its
current fiscal period and will pay the Contractor for all approved charges incurred through
the end of the period.
11.9 CONSTRUCTION METHODS
If the City provides the Contractor with a written order to provide adequate maintenance
of traffic, clean-up, dust control or to correct deficiencies or damage resulting from
abnormal weather conditions, and the Contractor fails to comply in the time frame
specified, the City may have Work accomplished by other sources at the Contractor’s
expense.
11.10
UTILITY RELOCATIONS FOR CONSTRUCTION METHODS
If any utility is relocated or rebuilt to accommodate the Contractor’s construction methods
and available equipment, the expense will be borne by the Contractor and will be replaced
to the original location before completion of the Job Order at the request of the City’s
Project Coordinator at the Contractor’s sole expense.
11.11
DAMAGED UTILITIES DURING CONSTRUCTION
Any utilities damaged during construction will be replaced at the Contractor’s expense as
per the requirements of the M.A.G. Standard Specifications.
11.12
SUCCESSORSHIP
The Contractor and City intend that the provisions of the Contract Documents are binding
upon the parties, their employees, agents, heirs, successors and assigns.
11.13
CONFLICT IN LANGUAGE
All services performed will conform to all applicable City of Scottsdale codes, ordinances
and requirements as outlined in the Contract Documents. If there is a conflict in
interpretation between provisions in this Contract and those in exhibits, the provisions in
this Contract will prevail.
11.14 THIRD PARTY BENEFICIARY
Nothing under the Contract Documents will be construed to give any rights or benefits in
the Contract Documents to anyone other than the City and the Contractor, and all duties
and responsibilities undertaken in accordance with the Contract Documents will be for the
sole and exclusive benefit of the City and the Contractor and not for the benefit of any
other party.
Page 51 of 68
2018-136-COS
11.15
GOVERNING LAW
The Contract and all Contract Documents will be considered to be made under, and will
be construed in accordance with and governed by the laws of the State of Arizona without
regard to the conflicts or choice of law provisions. Any action to enforce any provision of
this Contract or to obtain any remedy with respect to this Contract will be brought in the
Superior Court, Maricopa County, Arizona. Such action must be filed, tried and remain in
this Court for any and all proceedings. For this purpose, each party expressly and
irrevocably consents to the jurisdiction and venue of this Court, and Contractor hereby
waives its right to have such action removed to Federal District Court.
11.16
SEVERABILITY
If any provision of the Contract Documents or the application to any person or
circumstance is invalid, illegal or unenforceable to any extent, the remainder of the
Contract Documents and the application of the Contract will not be affected and will be
enforceable to the fullest extent permitted by law. In accordance with the provisions of
ARS § 41-194.01, should the Attorney General give notice to the City that any provisions
of the Contract violates state law or the Arizona Constitution, or that it may violate a state
statute or the Arizona Constitution, and the Attorney General submits the offending
provision to the Arizona Supreme Court, the offending provision(s) shall be immediately
severed and struck from the Contract and the City and the Contractor shall, within 10 days
after such notice, negotiate in good faith to resolve any issues related to the severed
provision(s).
11.17
LEGAL REQUIREMENTS
The Contractor will perform all Contract Services in accordance with all Legal
Requirements and will provide all notices applicable to the Contract Services as required
by the Legal Requirements.
11.18
INDEPENDENT CONTRACTOR
The Contractor is and will be an independent contractor. Any provisions in the Contract
Documents that may appear to give the City the right to direct the Contractor as to the
details of accomplishing the Work or to exercise a measure of control over the Work
means that the Contractor will follow the wishes of the City as to the results of the Work
only. These results will comply with all applicable laws and ordinances.
11.19
CITY'S RIGHT OF CANCELLATION
All parties to this Contract acknowledge that this Contract is subject to cancellation by the
City of Scottsdale in accordance with the provisions of Section 38-511, Arizona Revised
Statutes.
11.20
SURVIVAL
All warranties, representations and indemnifications by the Contractor will survive the
completion or termination of this Contract.
11.21
COVENANT AGAINST CONTINGENT FEES
Page 52 of 68
2018-136-COS
The Contractor warrants that no person has been employed or retained to solicit or secure
this Contract upon any Contract or understanding for a commission, percentage,
brokerage, or contingent fee, and that no member of the City Council, or any employee of
the City of Scottsdale has any interest, financially, or otherwise, in the firm. For breach or
violation of this warrant, the City of Scottsdale will have the right to annul this Contract
without liability, or at its discretion to deduct from the Contract Price or consideration, the
full amount of any commission, percentage, brokerage, or contingent fee.
11.22
NO WAIVER
The failure of either party to enforce any of the provisions of the Contract Documents or
to require performance of the other party of any of its provisions will not be construed to
be a waiver of those provisions, nor will it affect the validity of the Contract Documents or
any part of the Contract Documents, or the right of either party to enforce each and every
provision.
11.23
HEADINGS
The headings used in this Contract, or any other Contract Documents, are for ease of
reference only and will not in any way be construed to limit or alter the meaning of any
provision.
11.24 COOPERATIVE USE OF CONTRACT
In addition to the City of Scottsdale, this Contract may be extended for use by other
municipalities, government agencies, and governing bodies, including the Arizona Board
of Regents, and political subdivisions of this State. Any such usage by other entities must
be in accord with the ordinances, charter, and/or rules and regulations of the respective
entity and the approval of the Contractor.
11.25
NOTICE
Whenever the Contract Documents require that notice be provided to the other party,
notice will be considered to have been validly given (i) if delivered in person to the
individual intended to receive the notice, (ii) 3 days after the date of the postmark of deposit
by first class United States mail, registered or certified mail, postage prepaid to the
address indicated below. Notice by electronic mail or facsimile will not be considered
notice.
To City:
Dave Lipinski
City Engineer
7447 E. Indian School Road, Suite 205
Scottsdale, Arizona 85251
To JOC Contractor:
Curt Lonsdale, Division Manager
Shasta Industries, Inc.
P.O. Box 28248
Scottsdale, AZ 85255
11.26 EQUAL EMPLOYMENT OPPORTUNITY
Page 53 of 68
2018-136-COS
During the performance of this Contract the Contractor will comply with all provisions of
Executive Order 11246 of September 24, 1965, and the rules, regulations and relevant
orders of the Federal government’s Affirmative Action guidelines to ensure that employees
or applicants applying for employment will not be discriminated against because of race,
color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor
will include the terms of this provision in all contracts and subcontracts for Work performed
under this Contract, including supervision and oversight. The JOC will take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without regard to their race, color, religion, sex, sexual orientation, gender
identity, or national origin. Such action shall include, but not be limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for
training, including apprenticeship. The JOC agrees to post in conspicuous places,
available to employees and applicants for employment, notices to be provided setting forth
the provisions of this non-discrimination clause.
The JOC will, in all solicitations or advertisements for employees placed by or on behalf
of the JOC, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, sexual orientation, gender identity, or national
origin.
11.26.1 No Preferential Treatment or Discrimination: In accordance with the
provisions of Article II, Section 36 of the Arizona Constitution, the City will not grant
preferential treatment to or discriminate against any individual or group on the
basis of race, sex, color, ethnicity or national origin.
11.27 ADDITIONAL CITY RIGHTS REGARDING SECURITY INQUIRIES
In addition to the foregoing, the City reserves the right to: (1) have an
employee/prospective employee of the Contractor be required to provide fingerprints and
execute any other documentation as may be necessary to obtain criminal justice
information pursuant to A.R.S. § 41-1750(G)(4); (2) act on newly acquired information
whether or not that information should have been previously discovered; (3) unilaterally
change its standards and criteria relative to the acceptability of the Contractor's employees
or prospective employees; and, (4) object, at any time and for any reason, to an employee
of the Contractor performing Work (including supervision and oversight) under this
Contract.
A.
Provisions Applicable to all Contractor Contracts and Subcontracts. The
Contractor will include the terms of this provision for employee background and
security checks and screening in all contracts and subcontracts for Work
performed under this Contract, including supervision and oversight.
B.
Materiality of Security Inquiry Provisions. The Security Inquiry provisions of this
Contract, as stated above, are material to the City’s entry into this Contract and
any breach by the Contractor may, at the City’s sole option and unfettered
discretion, be considered to be a breach of contract of sufficient magnitude to
terminate this Contract. Termination will subject the Contractor to liability for its
breach of contract.
11.28 HAZARDOUS MATERIALS
Page 54 of 68
2018-136-COS
A.
Hazardous Materials. Upon discovery of hazardous materials the Contractor will
comply with all applicable laws/ordinances and regulations and take all appropriate
health and safety precautions.
B.
Unless included in the Work, if the Contractor encounters onsite, or as material to
be incorporated in the Work, any material which he reasonably believes to contain
asbestos, polychlorinated biphenyl (PCB), or other hazardous substances or
materials regulated by public health laws, he will immediately stop work and report
the condition to the City.
C.
If the material is found to contain asbestos, PCB or other hazardous substances or
materials regulated by public health laws, the Contractor will not resume work in the
affected area until the material has been abated or rendered harmless. The
Contractor and the City may agree, in writing, to continue work in non-affected areas
onsite.
D.
An extension of Contract Time may be granted in accordance with Article 5.
E.
The Contractor will comply with all applicable laws/ordinances and regulations and
take all appropriate health and safety precautions upon discovery.
F.
Despite the provisions of this Article 11.27, the City is not responsible for
Hazardous Conditions introduced to the Site by the Contractor, Subcontractors or
anyone for whose acts they may be liable. The Contractor will indemnify, defend
and hold harmless the City and the City’s officers, directors, employees and agents
from and against all claims, losses, damages, liabilities and expenses, including
attorneys’ fees and expenses, arising out of or resulting from those Hazardous
Conditions introduced to the Site by the Contractor, Subcontractors or anyone for
whose acts they may be liable.
11.29 TRAFFIC CONTROL
B.
Complete street closures will not be permitted unless specified in the Special
Provisions or approved by the City. The timing and sequence of street closures
will be approved by the Traffic Engineering Director (or designee) at least 14 days
before the closure. This approval is necessary to provide coordination with other
roadway projects and special events.
Adequate barricades and lighted warning signs must be installed and maintained
by the Job Order Contactor throughout the duration of the Project. All traffic control
must be in accordance with the City of Scottsdale Traffic Control Manual or as
required by the approved barricade plan unless otherwise specified in the Special
Provisions.
The Contractor will submit a construction schedule and a barricade plan to the City
Traffic Engineering Director (or designee) for approval or modification at least 72
hours before construction is initiated, and must wait to commence construction
until the plan is signed as accepted by the City Traffic Engineering Director (or
designee).
Page 55 of 68
2018-136-COS
D. The Contractor will comply with all provisions of the City of Scottsdale Traffic
Barricade Manual and any other traffic control provisions as may be provided in
the technical specifications or in the approved barricade plan.
11.30 MATERIAL SOURCE
No material source has been designated by the City for use under this Contract. MAG
Specification, Section 106 will apply as will ADOT Standard Specifications 1982, Section
106.1, 106.2, 106.7 & 106.8, which outline controls and Section 1001-1, -2, & -4
concerning approval of Contractor-Furnished Source and supplemental Contracts in
regards to environmental analysis and the liability for materials testing costs.
Contractor and Subcontractor furnished material sources situated in the 100-year flood
plain of any stream or watercourse will not be allowed if located within 1.0 mile upstream
and 2.0 miles downstream of any highway structure or surfaced roadway crossing.
A Contractor and Subcontractor-furnished source will be defined as a material source,
which is neither an A.D.O.T. furnished source nor a commercial source, as defined in this
Contract.
A commercial source will be defined as a material source in which the owner or producer
has been for at least 1-year regularly engaged during regular business hours on a regular
basis in the processing and selling of sand, rock, ready mixed Portland cement concrete,
asphaltic concrete and other similar products normally produced and sold to all parties.
The company must have an Arizona retail sales tax license.
The location of any new material source or existing non-commercial material source
proposed for use under this Contract must be reviewed by the appropriate agency having
flood plain management jurisdiction over the area of proposed source location. The
Contractor and Subcontractor will obtain a letter from the agency addressed to the
Contract Administrator certifying that the proposed source location conforms to the
required conditions and the applicable Standard Specifications. The Contractor will
familiarize himself with the nature and extent of the Contract Documents, work to be
performed, all local conditions, and federal, state and local laws, ordinances, rules and
regulations that in any manner may affect cost, progress or performance of the Work.
11.31 FAMILIARIZATION WITH APPLICABLE LAWS
The Contractor will familiarize itself with the nature and extent of the Contract Documents,
work to be performed, all local conditions, and federal, state and local laws, ordinances,
rules and regulations that in any manner may affect cost, progress or performance of the
Work.
11.32 NATIVE PLANTS
The Contractor will take whatever steps, procedures or means necessary to remove,
move, displace and save all native plants within the contract work area in accordance with
the City of Scottsdale's Ordinance No. 1438, Native Plants, and all applicable state and
county statutes, ordinances, codes and other policy requirements and recognized
methods, procedures, techniques and equipment for protection, salvage, and handling of
all plants to be moved from the construction area. This is not a pay item unless specified
Page 56 of 68
2018-136-COS
upon the Schedule of Bid Items.
11.33 ENDANGERED HARDWOODS
Projects performed pursuant to this Contract shall not use endangered wood species as
set forth in A.R.S. § 34-201 (J) unless an exemption is granted by the Director of the State
of Arizona, Department of Administration.
11.34 HOURS OF WORK
A.
All building construction and associated work will be restricted to the applicable
summer or winter hours. Construction activity will include any work requiring the
use of manually operated or power assisted tools or equipment and vehicles used
to excavate, erect or deliver materials associated with construction. Summer
hours begin April 1 and end on October 31. No work may begin before 6:00 a.m.
or continue after 7:00 p.m., Monday through Friday. No work will begin on
Saturday or Sunday before 7:00 a.m. or continue after 7:00 p.m. Sunday work may
be conducted only if the Contractor demonstrates, in writing to the building official,
justifiable cause for the Sunday work.
B.
Winter hours begin November 1 and end on March 31. No work will begin before
7:00 a.m. or continue after 5:00 p.m., Monday through Friday. No work may begin
on Saturday or Sunday before 8:00 a.m. or continue after 5:00 p.m. Sunday work
may be conducted only if the Contractor demonstrates, in writing to the building
official, justifiable cause for the Sunday work.
C.
The City may establish other times of work as necessary based on the
geographical location of the jobsite in relation to surrounding occupancies,
buildings and structures.
D.
The Contractor must submit a written request to the Building Official for a variance
from the required work hours at least 7 days before the date for which the variance
is desired. Variances will not be granted for more than 30 days at a time. A new
application must be made for each additional variance. The Contractor must notify
adjacent property owners of the intended work and the duration of the requested
variance. Proof of notification must be presented to the building official before the
variance can be granted.
1.
The application for the variance must demonstrate justifiable cause why
the work must be done outside the prescribed time period (e.g. pouring
concrete during “summer hours”). A variance will not be granted based
solely on convenience or for work that can be completed during daytime
construction hours.
2.
The application for a variance must state the construction permit number,
the address of the work, type of work, time period of the work, and the
duration of the variance.
11.35 COMPLIANCE WITH FEDERAL LAWS
The Contractor understands and acknowledges the applicability to it of the American with
Page 57 of 68
2018-136-COS
Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug Free
Workplace Act of 1989. The Contractor agrees to comply with these laws in performing
this Contract and to permit the City to verify compliance. The Contractor will also comply
with A.R.S. §34-301, “Employment of Aliens on Public Works Prohibited," and A.R.S. §34-
302, “Residence Requirements for Employees,” as amended. The Contractor will include
the terms of this provision in all contracts and subcontracts for Work performed under this
Contract, including supervision and oversight.
Under the provisions of A.R.S. §41 -4401, the Contractor warrants to the City that the
Contractor and all its Subcontractors will comply with all Federal Immigration laws
and regulations that relate to their employees and that the Contractor and all its
Subcontractors now comply with the E-Verify Program under A.R.S. §23-214(A).
A breach of this warranty by the Contractor or any of its Subcontractors will be considered
a material breach of this Contract and may subject the Contractor or Subcontractor to
penalties up to and including termination of this Contract or any subcontract.
The City retains the legal right to inspect the papers of any employee of the Contractor or
any Subcontractor who works on this Contract to ensure that the Contractor or any
Subcontractor is complying with the warranty given above.
The City may conduct random verification of the employment records of the Contractor
and any of its Subcontractors to ensure compliance with this warranty. The Contractor
agrees to indemnify, defend and hold the City harmless for, from and against all losses
and liabilities arising from any and all violations of these statutes.
The City will not consider the Contractor or any of its Subcontractors in material breach of
this Contract if the Contractor and its Subcontractors establish that they have complied
with the employment verification provisions prescribed by 8 USCA §1324(a) and (b) of the
Federal Immigration and Nationality Act and the E-Verify requirements prescribed by
A.R.S. §23-214(A). The “E-Verify Program” means the employment verification pilot
program as jointly administered by the United States Department of Homeland Security
and the Social Security Administration or any of its successor programs.
The provisions of this Article must be included in any contract the Contractor enters into
with any and all of its Subcontractors who provide services under this Contract or any
Subcontract. “Services” are defined as furnishing labor, time or effort in the State of
Arizona by a Contractor or Subcontractor. Services include construction or maintenance
of any structure, building or transportation facility or improvement to real property. The
Contractor will take appropriate steps to assure that all Subcontractors comply with the
requirements of the E-Verify Program. The Contractor’s failure to assure compliance by
all its Subcontractors with the E-Verify Program may be considered a material breach of
this Contract by the City.
A. Compliance with Americans with Disabilities Act
Contractor acknowledges that, in accordance with the Americans with Disabilities
Act (ADA), programs, services and other activities provided by a public entity to
the public, whether directly or through a contractor, must be accessible to the
disabled public. Contractor will provide the services specified in this Contract in a
manner that complies with the ADA and any and all other applicable federal, state
and local disability rights legislation. Contractor agrees not to discriminate against
Page 58 of 68
2018-136-COS
disabled persons in the provision of services, benefits or activities provided under
this Agreement and further agrees that any violation of this prohibition on the part
of Contractor, its employees, agents or assigns will constitute a material breach of
this Contract.
11.36 DATA CONFIDENTIALITY
A.
As used in this Contract, data means all information, whether written or verbal,
including plans, photographs, studies, investigations, audits, analyses, samples,
reports, calculations, internal memos, meeting minutes, data field notes, work
product, proposals, correspondence and any other similar documents or
information prepared by or obtained by the Contractor in the performance of this
Contract.
B.
The parties agree that all data, including originals, images, and reproductions,
prepared by, obtained by, or transmitted to the Contractor in connection with the
Contractor’s performance of this Contract is confidential and proprietary
information belonging to the City.
C.
The Contractor will not divulge data to any third party without first obtaining the
written consent of the City. The Contractor will not use the data for any purposes
except to perform the services required under this Contract. These prohibitions
will not apply to the following data provided the Contractor has first given the
required notice to the City;
1.
Data, which was known to the Contractor before its performance under this
Contract unless the data was acquired in connection with the Work
performed for the City;
2.
Data which was acquired by the Contractor in its performance under this
Contract and which was disclosed to the Contractor by a third party, who
to the best of the Contractor’s knowledge and belief, had the legal right to
make disclosures and the Contractor is not otherwise required to hold the
data in confidence; or
3.
Data, which is required to be disclosed by virtue of law, regulation, or court
order to which the Contractor is subject.
D.
In the event the Contractor is required or requested to disclose data to a third party,
or any other information to which the Contractor became privy as a result of any
other contract with the City, the Contractor will first notify the City as required in
this Article of the request or demand for the data. The Contractor will give the City
sufficient facts so that the City can be given an opportunity to first give its consent
or take any action the City may consider appropriate to protect the data or other
information from disclosure.
E.
Unless prohibited by law, within 10 days after completion of services for a third
party on real or personal property owned or leased by the City, the Contractor will
promptly deliver, as stated in this Article, a copy of all data to the City. All data will
continue to be subject to the confidentiality requirements of this Contract.
Page 59 of 68
2018-136-COS
F. The Contractor assumes all liability for maintaining the confidentiality of the data
in its possession and agrees to compensate the City if any of the provisions of this
Article are violated by the Contractor, its employees, agents or Subconsultants.
Solely for the purposes of seeking injunctive relief, it is agreed that a breach of this
Article will be considered to cause irreparable harm that justifies injunctive relief in
court.
11.37 CONFLICT OF INTEREST
A.
To evaluate and avoid potential conflicts of interest, the Contractor will provide
written notice to the City, as stated in this Article, of any work or services performed
by the Contractor for third parties that may involve or be associated with any real
property or personal property owned or leased by the City. The notice will be given
7 business days before commencement of the Project by the Contractor for a third
party, or 7 business days before an adverse action as defined below. Written
notice and disclosure will be sent to the City Senior Representative identified in
Article 7.4.
B.
Actions that are considered to be adverse to the City under this Contract include
but are not limited to:
1.
Using data as defined in this Contract acquired in connection with this
Contract to assist a third party in pursuing administrative or judicial action
against the City;
2.
Testifying or providing evidence on behalf of any person in connection with
an administrative or judicial action against the City; and
3.
Using data to produce income for the Contractor or its employees
independently of performing the services under this Contract, without first
obtaining the written consent of the City.
C.
The Contractor represents that except for those persons, entities and projects
identified to the City, the services to be performed by the Contractor under this
Contract are not expected to create an interest with any person, entity, or third
party project that is or may be adverse to the interests of the City.
D.
The Contractor’s failure to provide a written notice and disclosure of the information
stated in this Article on Conflicts of Interest will constitute a material breach of this
Contract.
11.38 COMMENCEMENT OF STATUTORY LIMITATION PERIOD AND STATUTE OF
REPOSE
B.
Before Final Completion. As to acts or failures to act occurring before the relevant
date of Final Completion, any applicable statute of limitations will commence to run
and any alleged cause of action will be considered to have accrued in any and all
events not later than the date of Final Completion.
Between Punch List Preparation and Final Completion. As to acts or failures to
act occurring between the relevant date of Punch List Preparation and before Final
Page 60 of 68
2018-136-COS
Completion, any applicable statute of limitation will begin to run and any alleged
cause of action will be considered to have accrued in any events not later than the
date of Final Completion.
C.
After Completion. As to acts or failures to act occurring after the date of Final
Completion, any applicable statute of limitations will commence to run and any
alleged cause of action will be considered to have accrued in any and ail events
not later than the date of any correction of the Work or failure to correct the Work
by the Contractor, or the date of actual commission of any other act or failure to
perform any duty or obligation by the Contractor or the City, whichever occurs last.
D.
Statute of Repose. The time period for the applicable Statute of Repose will
commence to run at the time specified in Arizona Revised Statute §12-552 as it is
amended or renumbered from time to time.
11.39 LOSS AND DAMAGES
All loss or damage arising out of the nature of the Work to be done or from the action of
the elements, or from any unforeseen circumstances, in the prosecution of the same, or
from any unusual obstructions or difficulties which may be encountered in or during the
prosecution of the Work, or from any casualty whatsoever of every description, will be
sustained and borne by the Contractor at its own cost and expense.
11.40 RIGHTS-OF-WAY
The M.A.G. Standard Specification 107.12 is modified to read as follows: “The Contractor,
at its own expense, is responsible for the acquisition of any necessary temporary
easements for construction purposes, storage and maintenance purposes, which are
required in addition to existing easements or rights of way secured by the City as indicated
upon the plans.”
11.41 EXISTING TRAFFIC AND STREET SIGNS AND TRAFFIC SIGNAL EQUIPMENT
The Contractor will use due care when excavating at or near intersections where traffic
signal underground conduit is located. The Contractor will notify the Transportation
Maintenance Traffic Signal Division (480.312.5620) 48 hours in advance of any work at
the intersections. The Contractor will be responsible for the installation and maintenance
of temporary overhead traffic signal cable as specified by the Traffic Engineering Director
when underground conduit is to be severed by excavations at the intersection. The
Transportation Maintenance Manager will have all underground traffic conduit located and
will provide the necessary City Technicians to assist the Contractor in identifying wiring
phases and direction of conduit runs upon 24 hours notice from the Contractor and at least
1 day before the Contractor’s scheduled wiring and installation of temporary cables. The
Contractor will be responsible for the wiring and connection of all temporary cable within
the pull boxes and terminal compartments. The Transportation Maintenance Manager will
provide a City technician to assist the Contractor with connecting field wiring within the
traffic signal control cabinet. The Contractor will provide, at his expense an off-duty
uniformed Police Officer to direct traffic while the traffic signal is turned off and the wiring
is transferred. The Contractor will be responsible as specified by the Traffic Engineering
Manager for the repair and restoration of all traffic signal overhead and underground items
that have been damaged or modified. The City does not permit the splicing of Magnetic
Page 61 of 68
2018-136-COS
Detector Loops.
11.42 CERTIFICATION OF USE OF BENCHMARKS
In compliance with the City’s Design Standards & Policies Manual (DS&PM), Sections 9-
1.1 and 9-1.301, it is the City’s intent that the Contractor must use both horizontal and
vertical benchmarks with City of Scottsdale published values for any survey on all public
works projects. These published values are available for public use at the following
website: http://eservices.scottsdaleaz.gov/landsurvey/. AT LEAST 1 HORIZONTAL AND
1 VERTICAL BENCHMARK MUST MATCH THE NORTHING, EASTING OR ELEVATION
VALUES PUBLISHED ON THE CITY’S WEBSITE. The Contractor must sign and submit
with this Contract, the Certificate of Use attached and by reference made a part of this
Contract.
11.43 TAXES AND INDEMNIFICATION
The fee listed in this Contract includes any and all taxes applicable to the activities under
this Contract. The City will have no obligation to pay additional amounts for taxes of any
type. JOC and all subcontractors shall pay all Federal, state and local taxes applicable to
its operation and any persons employed by the JOC, except as may be otherwise provided
in this Contract. The JOC shall, and require all subcontractors to hold the City harmless
from any responsibility for taxes, damages and interest, if applicable, contributions
required under Federal, and/or state and local laws and regulations and any other costs
including transaction privilege taxes, unemployment compensation insurance. Social
Security and Worker’s Compensation.
11.44 NO BOYCOTT OF ISRAEL
By submitting a quote/proposal/bid and/or entering into a contract with the City, the
vendor/company certifies that they are not currently engaged in and agrees for the
duration of the Contract to not engage in a boycott of Israel as defined in A.R.S. § 35-393.
ARTICLE 12 - DEFINITIONS
“Adjustment” means a written order signed by an authorized representative of the City and the
Contractor and which approves changes in the scope of the Work in the Job Order; in the total
compensation or time allowed for completion of the Job Order, or modifications to other contract
terms.
“Allowance” means an agreed amount by the City and the Contractor for items which may be
required to complete the scope of work.
“As-built Document” - “As-built in construction is equivalent to “as-is.” Drawings deemed “as-
built” are final drawings that include all changes made during the actual construction process.
These drawings represent the actual existing constructed conditions as opposed to designs or a
proposed condition. The As-built Documents should be per Arizona Revised Statute 32-152.
“Blueline or Blackline Prints” - Prints that allows comparison of document versions to show what
has been revised.
“Change Order” means a written order signed by an authorized representative of the City and
Page 62 of 68
2018-136-COS
which approves changes in the total compensation or time allowed for completion of services
consistent with S.R.C. Sec. 2-200.
“City” means the City of Scottsdale, Arizona, an Arizona municipal corporation. Regulatory
activities handled by the City of Scottsdale Development Services, Planning and Fire
Departments or any other City department are not subject to the responsibilities of the City under
this Contract.
“City’s Representative” means the person designated in Subdivision 7.4(A) (2).
"City’s Senior Representative" means the person designated in Subdivision 7.4(A) (1).
“Construction Coordinator” means a City employee who coordinates the daily construction
activities with the contractor, and with their inspection staff that performs quality control
inspections, enforces project plans and specifications and adopted City codes and ordinances.
“Construction Documents” means the plans, specifications and drawings prepared by the Design
Professional after correcting for permit review requirements and incorporating addenda and
approved Job Order Adjustments.
“Construction Fee” means the Contractor’s home office overhead and profit, whether at the
Contractor’s principal or branch offices. This includes the home office costs and any limitations
or exclusions that may be included in the General Conditions for the construction phase.
“Contract” or “Job Order Contract” means this fully executed Contract between the City and the
Contractor.
“Contract Administrator" means the person designated in Article 7.4.
“Contract Documents” means the following items and documents in descending order of
precedence executed by the City and the Contractor:
(1) Change Orders; (2) Job Order
Adjustments; (3) Contract Modifications; (4) this Contract including all exhibits and attachments;
(5) Contractor’s Proposal (if any); (6) Contractor Statement of Qualifications.
“Contract Modification” means a specific written concurrence between the City and the Contractor
for changes to this Contract.
“Contract Price” means the amount or amounts stated in Article 4 subject to any Contract
Adjustments.
“Contract Services” means the services required by the Contract Documents.
“Contract Time(s)” means the time stated in Article 3, subject to Job Order Adjustments or
extensions as permitted by this Contract.
“Contractor” is the contractor selected by the City to provide or procure construction services as
detailed in this Job Order Contract.
“Contractor Payment Request” means the City form used by the Contractor to request progress
payments for Job Orders in accordance with Article 6.
Page 63 of 68
2018-136-COS
“Contractor’s Representative” means the person described in Article 7.4(B) (2).
"Contractor’s Senior Representative" means the person described in Article 7.4(B) (1).
“Day(s)” means calendar days unless otherwise specifically noted in the Contract Documents.
“Delay” means an unanticipated event or interference with the progress of a critical path work
activity being performed at the time that causes the completion date of the project to be extended.
Delays may be caused by the City, the Contractor, third parties or Force Majeure events. Delays
may be excusable, compensable, non-compensable or concurrent.
“Delay, Compensable” means delay that results from the City’s actions or inactions that entitle
the Contractor to both a time extension and delay damages.
“Delay, Concurrent” means 2 or more delays, within the same timeframe, both of which would
independently impact the project’s critical path. If one delay is caused by the City and the other
by the Contractor, the Contractor will generally be entitled to an excusable, non-compensable
time extension, to the degree the delays may “overlap.”
“Delay, Excusable” means an unforeseeable delay caused by an event beyond the control and
without the fault or negligence of the Contractor (including its Suppliers and Subcontractors).
Excusable delays may be compensable or non-compensable, depending upon whether the terms
of the contract or the law allows recovery of delay costs. Unless otherwise shown, it will generally
be presumed that these delays are non-compensable.
“Delay, Non-Excusable” means a delay within the control of the Contractor, its suppliers and
subcontractors, or a delay resulting from a risk taken by the Contractor under the terms of the
Contract. The Contractor will not be due any time extension or delay damages, and may be
responsible for paying to the City, actual or liquidated damages for the delay.
“Deliverables” means the work products prepared by the Contractor in performing the scope of
work described in this Contract. Some of the major deliverables to be prepared and provided by
the Contractor may include, but are not limited to: Construction Management Plan, Project
Schedule, Schedule of Values, alternative system evaluations, procurement strategies and plans,
cost estimates, construction market surveys, cash flow projections. Subcontractor procurement
plan. Subcontractor Contracts, Subcontractor bid packages. Supplier Contracts, and others as
indicated in this Contract or required by the Project Team.
“Design Professional” means a qualified, licensed design professional who furnishes design or
construction administration services.
“Differing Site Conditions” comply with M.A.G. Standard Specifications, Subsection 102.4.
“Duration of the Work” means the number of Days from a Job Order Notice to Proceed to
Substantial Completion.
“Field Order” means a written field directive prepared and signed by the City, directing a change
in work that may or may not include an adjustment in contract price or contract time.
“Final Acceptance” means the completion of a Job Order as prescribed in Article 3.4.
Page 64 of 68
2018-136-COS
“Informational Submittals” - Submittals are required (common with construction projects) for the
architect and engineer to verify that the correct products and quantities will be installed on a
project.
“Job Order” or “Project” means a specific scope of Contract Services done pursuant to an
individual Job Order and includes a specific written Contract between the City and the Contractor
for a Job Order including a Scope of Work, a Job Order Price, a Duration of the Work and any
special conditions that may apply to be performed under this Contract. The Job Order includes
the plans, technical specifications, special provisions and the Contractor’s proposal either by
reference or inclusion.
“Job Order Price” means the amount negotiated between the Contractor and the City that includes
costs, overhead, bonding, insurance, profit and other costs as agreed to and calculated on the
Unit Prices, Cost-coefficient and Special Items as prescribed in Article 4.
“Job Order Time” means the time from the Job Order Notice-to-Proceed to Substantial
Completion. The approved Job Order Time will be made part of this Contract by executing an
individual Job Order for that specific Project.
“Legal Requirements” means all applicable federal, state and local laws, codes, ordinances,
rules, regulations, orders and decrees of any government or quasi-government entity having
jurisdiction over a Project or Site, the practices involved in a Project or Site, or any Work.
“Liquidated Damages” means an amount the Contractor will pay in compliance with Article 3.5.
“Must” and “will” as used in this Contract are mandatory.
“Notice to Proceed,” (NTP) means a written notice given by the City to the Contractor fixing the
date on which the Contractor will start to perform the Contractor’s obligations under that individual
Job Order.
“Owner Agent,” “City’s Agent” or “Owner Representative” see “City’s Senior Representative.”
“Payment Request” means a monthly progress payment request that is based on a monthly
estimate of the dollar value of the Work completed.
“Product Data” means illustrations, standard schedules, performance charts, instructions,
brochures, diagrams and other information furnished by the Contractor to illustrate materials or
equipment for some portion of the Work.
“Professional Certification” - Professional certification is a designation which indicates that a
person is qualified to perform a job or task. Professional certification can be trade certification or
professional designation.
“Project Record Documents” means the documents created pursuant to Article 1.9.
“Project Record Drawing Prints” - Set of current design drawings used by construction contractor
for reference during construction. These drawings are typically marked up during the construction
process, and are used to develop the subsequent “as-built” drawings.
“Punch List” means those minor items of Work to be completed before Final Acceptance which
Page 65 of 68
2018-136-COS
do not prevent the Project from being used for the purpose for which it is intended and which will
not prevent the issuance of a Certificate of Occupancy.
“Samples" means physical examples, which illustrate materials, equipment or workmanship and
establish standards by which the Work will be judged.
“Schedule of Values (SOV)” means the Document specified in the construction phase, which
divides the Contract Price into pay items, such that the sum of all pay items equals the Contract
Price for the construction phase Work, or for any portion of the Work having a separate specified
Contract Price. The SOV may or may not be output from the Progress Schedule depending on
whether the Progress Schedule is cost-loaded or not.
“Shop Drawings” means drawings, diagrams, schedules and other data specially prepared for the
Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or
distributor to illustrate some portion of the Work.
“Site” means the land or premises on which a Job Order is located generally described as (insert
address). The Contractor will require all subcontractors to include the street address of the Job
Order in their contracts.
“Specifications” means those sections of the Contract Documents for the construction phase
consisting of written technical descriptions of materials, equipment, construction systems,
standards and workmanship as applied to the Work and certain applicable administrative details.
“Subcontractor” or “Sub consultant” means any person or entity retained by the Contractor as an
independent contractor to perform a portion of the Contract Services and must include material
men and suppliers. All Subcontractors must be selected in accordance with the selection plan
stated in Article 1.13.
“Substantial Completion” means when the Work, or when an agreed upon portion of the Work is
sufficiently complete so that the City can occupy and use the Project or a portion of it for its
intended purposes. This may include, but is not limited to; (1) approval by the City Fire Marshall
and local authorities (Certificate of Occupancy); (2) issuance of elevator permit; (3) demonstration
to the City that all systems are in place, functional, and displayed to the City or its representative;
(4) installation of all materials and equipment; (5) City review and acceptance of all systems; (6)
City review and acceptance of draft O&M manuals and record documents; (7) City operation and
maintenance training completed; (8) HVAC test and balance completed [provide minimum 30
days before projected substantial completion]; (9) completed landscaping and site work; and (10)
final cleaning.
“Supplier” means a manufacturer, fabricator, supplier, distributor, material man or vendor having
a direct contract with the Contractor or any Subcontractor to furnish materials or equipment to be
incorporated in the construction phase work by the Contractor or any Subcontractor.
“Work” means the entire completed construction or the various separately identifiable parts of the
construction, required to be furnished during the construction phase. Work includes and is the
result of performing or furnishing labor and furnishing and incorporating materials, resources and
equipment into the construction, and performing or furnishing services and documents as required
by the Contract Documents for the construction phase.
Page 66 of 68
2018-136-COS
END OF CONTRACT - SIGNATURES ON NEXT PAGE
Page 67 of 68
2018-136-COS
CITY OF SCOTTSDALE, ARIZONA
CONTRACT NO. 2018-021-COS
CONTRACT
This Contact has been properly executed by the parties above named, on the date and year
written above, to be retained by the City Clerk.
The Contractor agrees that this Contract, as awarded, is for the stated Work and understands
that payment for the Work will be made on the basis of the indicated amount, per the terms and
conditions of this Contract.
CITY OF SCOTTSDALE, an
Arizona municipal corporation
ATTEST:
Carolyn dagger, Cit;
RECOMMENDED;
■ r
Dave Lipinsku^eify Engineer
<atherine Callawav
Katherine Callaway /
Risk Management Director
APPRO
O FORM:
^Bpd6e Washburn, City Attorney
By; Eric C. Anderson
Senior Assistant City Attorney
CONTRACTOR:
SHASTA INDUSTRIES, INC.
An Arizona CojporSlion
(Corporate Seal)
ATTEST: (Signatufe^and title)
Page 68 of 68
2018-136-COS
EXHIBIT A
STATUTORY PERFORMANCE BOND
PURSUANT TO TITLE 34, CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That, (hereinafter called the Principal) as Principal, and
, a corporation organized and existing under the laws of the State of
with its principal office in the City of, (hereinafter called
the Surety), as Surety, are held and firmly bound unto the City of Scottsdale, County of Maricopa, State of
Arizona in the amount of _Dollars ($), for the payment
whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale, dated the
day of, 2018, for Bid No. (bid number). Project No. (project number), (project
name), which contract is hereby referred to and made a part hereof as fully and to the same extent as if
copied at length herein.
NOWTHEREFORE, the condition of this obligation is such, that if the Principal faithfully performs and fulfills
all of the undertakings, covenants, terms, conditions and Contracts of the contract during the original term
of the contract and any extension of the contract, with or without notice to the surety, and during the life of
any guaranty required under the contract, and also performs and fulfills all of the undertakings, covenants,
terms, conditions and Contracts of all duly authorized modifications of the contract that may hereafter be
made, notice of which modifications to the surety being hereby waived, the above obligation is void.
Otherwise it remains in full force and effect.
PROVIDED HOWEVER, that this Bond is executed pursuant to the provisions of Title 34, Chapter 6,
Arizona Revised Statutes, and all liabilities on this Bond will be determined in accordance with the
provisions of Title 34, Chapter 6, Arizona Revised Statutes, to the extent as if it were copied at length in
this Contract. The prevailing party in a suit on this bond will recover as part of the judgment reasonable
attorney fees that may be fixed by a Judge of the Court. The performance under this bond is limited to the
construction to be performed under the contract and does not include any design services, preconstruction
services, financial services, maintenance services, operations services or any other related services
included in the contract.
WITNESS our hands the
. day of _
, 2018.
PRINCIPAL
BY;
SURETY (SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
9769896V5 (Rev Dec. 2016)
Page 1 of 1
2018-136-COS
EXHIBIT B
STATUTORY PAYMENT BOND
PURSUANT TO TITLE 34, CHAPTER 6,
OF THE ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Contract Amount)
KNOW ALL MEN BY THESE PRESENTS:
That,
State of
_______ (hereinafter called the Principal), as Principal, and
______a corporation organized and existing under the laws of the
with its principal office in the City of
(hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Scottsdale,
County of Maricopa, State of Arizona, in the amount ofDollars
($), for the payment whereof, the said Principal and Surety bind themselves,
and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has entered into a certain written contract with the City of Scottsdale
dated theday of, 2018, for Bid No. (bid number), Project No.
(project number), (project name), which contract is hereby referred to and made a part hereof as
fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of this obligation is such that if the Principal promptly pays all
monies due to all persons supplying labor or materials to the Principal or the Principal's
subcontractors in the prosecution of the work provided for in the contract, this obligation is void.
Otherwise it remains in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Title 34, Chapter
6, of the Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance
with the provisions, conditions and limitations of Title 34, Chapters, Arizona Revised Statutes, to
the same extent as if they were copied at length in this Contract.
The prevailing party in a suit on this bond will recover as a part of the judgment reasonable
attorney fees that may be fixed by a Judge of.the Court.
WITNESS our hands the
. day of.
2018.
PRINCIPAL
BY:
SURETY (SEAL)
AGENCY OF RECORD
AGENCY ADDRESS
9769896v5 (Rev Dec, 2016)
Page 1 of 1
2018-136-COS
Contract Name:
CONTRACT NO,:
To the City of Scottsdale:
EXHIBIT C
City of Scottsdale Published Benchmarks
CERTIFICATE OF USE
PROJECT NO.
In compliance with the City of Scottsdale’s Design Standards & Policies Manual (DS&PM),
Sections 9-1.1 and 9-1.301, it is the City's intent that the^must use
both horizontal and vertical benchmarks with City of Scottsdale published values for any survey
on all public works projects. Those published values are available for public use at the following
City website: http://eservices.scottsdaleaz.g0v/landsurvey/.ATLEAST 1 HORIZONTAL AND
1 VERTICAL BENCHMARK MUST MATCH THE NORTHING, EASTING OR ELEVATION
VALUES PUBLISHED ON THE CITY OF SCOTTSDALE’S WEBSITE.
Having read and understood Sections 9-1.1 and 9-1.301 of the DS&PM, and as a Land Surveyor
registered in the State of Arizona, I certify that we will be using the following City of Scottsdale
horizontal and vertical datum to perform the topographic survey for the above named contract
and project. These benchmarks will be shown on the cover sheet of the design and construction
plans.
Benchmark No. 1:
Horizontal datum:
GPS Point:_____
N:
_______
Vertical datum;
GPS Point:__
Elevation:
E:
Benchmark No, 2:
Horizontal datum:
GPS Point:_____
N:_____________
E:
_______
Vertical datum:
GPS Point:___
Elevation:
Certified By;
Print Name:
Title;
(Seal in Area Below)
9769896V5 (Rev Dec. 2016)
Page 1 of 1
flCOPY
RESOLUTION NO. 11234
A RESOLUTION OF THE COUNCIL OF THE CITY OF SCOTTSDALE,
MARICOPA COUNTY, ARIZONA, AUTHORIZING THE CITY OF SCOTTSDALE
TO ENTER INTO CONSTRUCTION SERVICES JOB ORDER CONTRACT
(JOC) NO. 2018-136-COS WITH SHASTA INDUSTRIES, INC. FOR CITYWIDE
POOL CONSTRUCTION SERVICES
WHEREAS, The City desires services for Citywide Pool Construction work involving
design, construction, repairs and/or maintenance as needed; and
WHEREAS, Shasta Industries, Inc. is qualified to render the services desired by the City.
BE IT RESOLVED by the Council of the City of Scottsdale as follows:
Section 1. The City Council hereby authorizes and directs the Mayor to execute
Contract No. 2018-136-COS with Shasta Industries, Inc. for pool construction projects
throughout the City as needed with contract to have a maximum contract price of five million
dollars ($5,000,000) for the initial two year term.
PASSED AND ADOPTED by the Council of the City of Scottsdale this 11th day of
September, 2018.
ATTEST:
CITY OF SCOTTSDALE, an
Arizona Municipal Corporation
Bv:V jcv
Carolyn J^ger, Cre
, Mayor
APPROVED^ TO FORM:
OFFIC^'^T^^ITY ATTORNEY
BpGceTA/ashburn, City Attorney
By>^ Eric C. Anderson, Senior Assistant City Attorney
Page 1 of 1
Resolution 11234