Extracted text (via pymupdf)
2955 characters
Traffic Impact Statement Nirvana at Zanjero – Zanjero Boulevard, West of 91st Avenue 2 NIRVANA AT ZANJERO ZANJERO BOULEVARD, WEST OF 91ST AVENUE TRAFFIC IMPACT STATEMENT Executive Summary The purpose of this traffic impact statement is to estimate the traffic generation associated with the proposed project and to identify the possible impacts of the site on the immediate area. Access The existing Palo Verde Cancer Center Drive, located on the north side of Zanjero Boulevard, approximately 965 feet west of 91st Avenue, will serve as the main access point to the proposed site. This driveway will provide full access to the site. Trip Generation The project site is predicted to generate 142 weekday AM peak hour trips and 164 weekday PM peak hour trips to the surrounding roadway network. This number of trips is not expected to have a significant impact on the surrounding roadway network. Furthermore, Zanjero Boulevard has been constructed to its ultimate five-lane width to accommodate growing traffic volumes in the area. Existing and Future Traffic Data The existing weekday PM peak hour traffic volume on Zanjero Boulevard is 215 vehicles per hour. After the project is completed, it is estimated that approximately 298 vehicles per hour will be present on the roadway during the weekday PM peak hour. Turn Lane Analysis A westbound right turn lane is not warranted at Main Access/Zanjero Boulevard. The existing two-way center left turn lane provided along Zanjero Boulevard will be available for eastbound left turning vehicles at Main Access. The provided storage lengths for the left and right turn lanes at Zanjero Boulevard/Glendale Avenue and Zanjero Boulevard/91st Avenue, that serve the project from Glendale Avenue and 91st Avenue, are expected to adequately serve the estimated queues without and with traffic from the project. 1 Lerma, Alex From: Heathcoat, Alan Sent: Wednesday, October 13, 2021 10:58 AM To: Lerma, Alex; Abbo, Tony Subject: RE: The Capristrano /Nirvana at Zanjero TIS Executive Summary Alex, Transportation approves of the Traffic Impact Statement and the included executive summary for The Capristrano /Nirvana at Zanjero. From: Lerma, Alex <alerma@GLENDALEAZ.com> Sent: Wednesday, October 13, 2021 9:00 AM To: Abbo, Tony <TAbbo@GLENDALEAZ.com>; Heathcoat, Alan <AHeathcoat@GLENDALEAZ.com> Subject: The Capristrano /Nirvana at Zanjero TIS Executive Summary Tony/ Alan: I’m sure you guys have been updated about the additional information that staff needs to include as part of the project hearing process. Staff needs to include TIA Executive Summary for all projects (including those that don’t need a TIA), Alan previously provided me and e mail on September 20, 2021 that the TIA was approved by Transportation. As a follow up attached is the TIS Executive Summary. Please review and let me know if you give approve of it.