Traffic Impact Executive Summary

City of Glendale — Regular Meeting (2021-12-14)

View PDF Item 30 Meeting page

Extracted text (via pymupdf) 12166 characters
1921 S. Alma School Rd, Ste 204 \ Mesa, AZ 85210 
480.696.1701 
 
 
info@y2keng.com 
 
 
 
 
 
May 4, 2021 
 
Chuck Chisholm 
K. Hovnanian Phoenix Division, Inc. 
20830 N. Tatum Boulevard, Suite 250 
Phoenix, AZ 85050 
 
Phone: (480) 824-4175 
Email: cchisholm@khov.com  
 
 
Subject:        Traffic Impact Statement – Alto  
Southeast Corner of 75th Avenue and Orangewood Avenue – Glendale, AZ 
 
Dear Mr. Chisholm, 
Y2K Engineering, LLC (Y2K) has been retained to prepare a Traffic Impact Statement (TIS) for the proposed 
single family residential development, located on the southeast corner of 75th Avenue and Orangewood 
Avenue in Glendale, Arizona. The development will consist of 88 single-family homes with one access point 
on 75th Avenue and an emergency-only access on Orangewood Avenue. 
 
The proposed development is anticipated to generate less than 100 trips in the weekday AM and PM peak 
hours. Based on the expected trips generated, a Traffic Impact Statement has been prepared for the site. 
A vicinity map is shown in Figure 1 and an aerial of the site is shown in Figure 2. 
 
Figure 1: Project Vicinity Map 
5/4/21 
Approved
By Alan Heathcoat  10/26/2021 1:01:10 PM

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 2 
 
Figure 2: Proposed Site and Access  
 
EXISTING ROADWAY NETWORK 
75th Avenue is a north-south roadway with an arterial classification. 75th Avenue provides a five-lane cross 
section, with two through lanes in each direction separated by a two-way left turn lane. The roadway serves 
various residential, agricultural, commercial, and industrial developments in the vicinity of the project, and 
connects to Grand Avenue (US 60) approximately 1.5 miles north of the site. Curb, gutter, sidewalk, bike 
lanes, and roadway lighting exist on both sides of the roadway, while the west side of the street also has 
overhead utilities. The posted speed limit on 75th Avenue is 40 miles per hour (mph) near the project site.  
Orangewood Avenue is an east-west collector road that serves existing residential and educational 
developments in the project vicinity. Orangewood Avenue has a three-lane cross section (one lane in each 
direction separated by a two-way left turn lane) and a posted speed limit of 25 mph. East of 75th Avenue, 
Orangewood Avenue provides access to the Desert Spirit Elementary School and eventually three-quarter 
access to Grand Avenue nearly 1.5 miles east of the site. While curb and cutter improvements have been 
constructed on Orangewood Avenue near the 75th Avenue intersection, both the north and south sides of 
the street have dirt shoulders along the project frontage. Overhead power lines parallel Orangewood 
Avenue on the north side of the street adjacent to the project frontage. 
The intersection of Orangewood Avenue and 75th Avenue is a four-legged, signalized intersection with 
permitted left turn signal phasing for each approach. Northbound and southbound traffic is provided with 
a left turn lane, one through lane, and a shared through/right turn lane. The eastbound approach is offered 
a left turn lane, one through lane, and a designated right turn lane. Westbound traffic makes use of a left 
turn lane and a share through/right turn lane at the intersection. 
An aerial of the surrounding roadway network and existing traffic control is shown in Figure 3.

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 3 
 
Figure 3: Existing Roadway Network 
PROPOSED DEVELOPMENT 
SITE LOCATION, LAND USE, AND ACCESS 
The proposed site will be located on currently undeveloped agricultural farmland. The proposed 
development will construct 88 single family homes on a nearly 15-acre parcel. The site is surrounded by an 
elementary school to the east, residential developments to the west, a church to the south, and an 
undeveloped lot to the north.  
The planned Alto Glendale site will be accessed by one proposed driveway on 75th Avenue which aligns with 
State Avenue that serves the Orangewood Estates development on the west side of 75th Avenue. The new 
Alto Driveway will form the fourth leg to the unsignalized intersection and will provide full access to/from 
75th Avenue. The driveway will be wide enough for exiting vehicles to utilize designated separate 
westbound left and right turn lanes. 
The new intersection configuration for the intersection of 75th Avenue/State Avenue will provide eastbound 
and westbound traffic with a left turn lane and a shared through/right turn lane. Northbound and 
southbound traffic on 75th Avenue may utilize the two-way left turn lane, one through lane, and one shared 
through/right turn lane. The minor streets will be STOP-controlled while traffic on 75th Avenue remains 
free-flow.  
The Alto Glendale development will provide an emergency-only access point on Orangewood Avenue. This 
full-access driveway is anticipated to only serve emergency vehicles (as a supplement to Alto Driveway) and 
will not handle general trips to/from the home sites. The site plan is provided in Attachment A.

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 4 
TRIP GENERATION 
Trip generation for new developments is typically estimated using the Institute of Transportation Engineers 
(ITE) Trip Generation Manual, 10th Edition. This resource contains data collected by various transportation 
professionals for a wide range of different land uses. ITE land use code 210: Single Family Detached Housing 
was utilized for the proposed development. The fitted curve equation was used to calculate projected trip 
data, as the quantity of data points and the quality of the data relative to the regression curve warranted 
its use. The estimated trips associated with the residential development are summarized in Table 1. 
Table 1: Trip Generation 
 
 
As summarized in Table 1, the single-family housing development is anticipated to generate a total of 924 
daily trips, with 67 trips in the AM peak hour and 90 trips in the PM peak hour.  
TRIP DISTRIBUTION AND ASSIGNMENT 
Trip distribution assignment percentages used in this analysis were distributed and assigned to the 
surrounding street system based on projected traffic patterns, access, connections to the nearby freeway 
network, and input from the City of Glendale’s Transportation Department. The distribution percentages 
are depicted in Figure 4.  
 
Figure 4: Trip Distribution 
Daily
ID
Land Use
ITE LUC
Total
Enter
Exit
Total
Enter
Exit
Total
1
Single-Family Detached Housing
210
88
D.U.
924
17
50
67
57
33
90
924
17
50
67
57
33
90
Total
DESCRIPTION OF LAND USE
VEHICLE GENERATED TRIPS
AM Peak Hour
PM Peak Hour
Size

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 5 
Peak hour turning volumes at the intersection of Orangewood Avenue and 75th Avenue and the intersection 
of 75th Avenue and State Avenue were estimated based on the trip generation and trip distribution 
percentages shown above. Given the trip distribution and anticipated vehicle generated trips, the hourly 
turning movement volumes at the study intersections are not expected to exceed the volumes shown in 
Figure 5. 
 
Figure 5: Estimated Site Traffic for Peak Hour Volumes 
DRIVEWAY ACCESS REVIEW 
DRIVEWAY SPACING ANALYSIS 
The proposed site will be accessed via Alto Driveway. The proposed access point will align with State 
Avenue. The Alto Driveway will be located approximately 590 feet south of Orangewood Avenue and 520 
feet north of an existing driveway serving a church located south of the site.  
The City of Glendale provides specific guidelines for the placement and spacing of driveways in the 
Engineering and Design Standards (2015). Applicable standards state that “driveways should line up with 
driveways directly across the street to avoid left turn conflicts”. The proposed access point will align with 
an existing driveway and is not anticipated to facilitate offset left turn movements. Thus, Alto Driveway 
conforms to Glendale’s driveway spacing requirements.  
The access spacing between Alto Driveway and the nearby Church Driveway and Orangewood Avenue is 
depicted in Figure 6.

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 6 
 
Figure 6: Existing Driveway Access Spacing 
ON-SITE CIRCULATION 
Alto Driveway extends east from 75th Avenue to form an internal roadway network within the Alto 
Residential Development. The roadway will be wide enough to accommodate bi-directional traffic and will 
loop around the site to offer access to all home sites. No cul-de-sacs or sharp angles are proposed on the 
site, which helps to accommodate large vehicles such as a trailer, a fire truck, or a moving truck. 
DECELERATION AND TURN LANES 
The City of Glendale does not provide specific guidelines on left or right turn lane warrants. Due to this, 
Maricopa County Department of Transportation (MCDOT) guidelines were utilized to determine the need 
for left and right turn lanes at the project driveway. MCDOT provides specifications in the Roadway Design 
Manual (updated February 2020).  
A left turn lane warrant was not conducted, as 75th Avenue currently provides a two-way left turn lane in 
the vicinity of the project. A right turn lane warrant was conducted for Alto Driveway using the following 
MCDOT standards: 
“A driveway right turn deceleration lane is required when either of the following is met: 
 
The outside lane has an expected volume of 250 vph or greater and the right turn volume is greater 
than 55 vph.  
 
Any three of the below criteria are met:  
a. At least 5,000 vehicle per day are using or are expected to be using the adjacent street.  
b. The roadway’s posted speed limit is greater than 35 mph.  
c. At least 1,000 vehicles per day are using or are expected to use the driveway.  
d. At least 30 vehicles are expected to make right-turns into the driveway within a one-hour 
period.”

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
Page | 7 
The right turn volume is anticipated to be 8 vehicles in the AM peak hour and 26 vehicles in the PM peak 
hour, and thus, the first warrant is not met. For the second warrant in which three of the four criteria must 
be met, the driveway does not meet criteria c or d, as the total daily number of trips anticipated by the site 
is 924 vehicles and only 26 vehicles are expected to turn right in the PM peak hour. Thus, the second 
warrant is not met, and a northbound right turn lane is not warranted at Alto Driveway. 
PRINCIPAL FINDINGS AND RECOMMENDATIONS 
 The traffic generated from the site is anticipated to be minimal and have a negligible impact to 75th 
Avenue, Orangewood Avenue, and the nearby roadway system. The single family detached housing 
development with 88 homes is proposed on a ± 15-acre site. The site is expected to generate 924 
daily trips, with 67 AM and 90 PM peak hour trips. 
 The site is proposed to be accessed by one driveway, Alto Driveway, that will extend west from 75th 
Avenue and will align with State Avenue. Alto Driveway conforms to City of Glendale driveway 
spacing guidelines.  
 A site emergency access point on Orangewood Avenue will provide access for emergency vehicles 
only if there was ever a crash at 75th Avenue and the Alto Driveway. 
 A northbound right turn lane is not warranted at Alto Driveway per MCDOT standards. 
 
We appreciate the opportunity to prepare this study. Should you have any questions, please feel free to 
contact me by email at cwilliams@y2keng.com or by phone at (602)-380-8686. 
 
Sincerely, 
Y2K Engineering, LLC. 
 
 
 
Christopher Williams, PE, PTOE 
Senior Traffic Engineer 
 
Attachment

Alto Glendale – Glendale, Arizona  
May 2021 
 
 
 
 
ATTACHMENT A: 
SITE PLAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
39
38
37
36
35
34
45
44
43
42
41
40
26
27
28
29
30
31
32
33
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
75th & Orangewood
Net Area:
Net Density:
14.5 ac (approx)
6.07 du/ac
Gross Area:
Gross Density:
15.02 ac (approx)
5.86 du/ac
Lot Size: 40' x 100'
Total Units:  88 
Product: Cadence (30's)
Date:
2/2/2021